{"slug":"architectural-joinery-wooden-doors-and-windows-qto-and-inspection-sheet","sheets":[{"name":"إعدادات_النجارة_والملخص","maxRow":24,"maxCol":7,"colWidths":[14.0,62.0,16.0,18.0,13.0,13.0,20.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"شيت حصر واستلام أعمال النجارة المعمارية والأبواب والشبابيك الخشبية والحلوق والخردوات","bg":"#78350F","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"نموذج عملي للمكتب الفني ومهندسي التشطيبات لحصر الأبواب (الزان/السويدي/WPC)، الحلوق، البرور، الخردوات، وفحص الشاقول والمقاسات","bg":"#FEF3C7","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":40.0,"cells":[{"c":"A3","v":"أولاً: البيانات الأساسية للمشروع ومعاملات التسعير والهالك (خلايا صفراء قابلة للتعديل)","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":1,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B4","v":"اسم المشروع والمنطقة","bg":"#F8FAFC","b":true},{"c":"C4","v":"مشروع مجمع الياسمين السكني (عمارة سكنية 12 شقة) — الرياض","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"نسبة ضريبة القيمة المضافة (VAT %)","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"G4","v":0.15,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":2,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B5","v":"المقاول / ورشة النجارة","bg":"#F8FAFC","b":true},{"c":"C5","v":"مصنع الديار للأخشاب والنجارة المعمارية المتقدمة","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","cs":2},{"skip":true},{"c":"E5","v":"نسبة استقطاع ضمان حسن التنفيذ (%)","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"G5","v":0.1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":3,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B6","v":"الاستشاري المشرف","bg":"#F8FAFC","b":true},{"c":"C6","v":"مكتب الإتقان للاستشارات الهندسية وإدارة المشاريع","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","cs":2},{"skip":true},{"c":"E6","v":"نسبة هالك تفصيل الحلوق والبرور (%)","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"G6","v":0.05,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":4,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B7","v":"تاريخ الحصر والمراجعة","bg":"#F8FAFC","b":true},{"c":"C7","v":"2026-11-01 | الكود المرجعي: BOQ-FIN-070","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","cs":2},{"skip":true},{"c":"E7","v":"أقصى تفاوت مسموح للشاقول والميزان (مم)","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"G7","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":8,"h":40.0,"cells":[{"c":"A8","v":"ثانياً: جدول فئات الأسعار المرجعية لبنود الأبواب الخشبية والحلوق والخردوات (ريال سعودي)","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":42.0,"cells":[{"c":"A9","v":"كود الفئة","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"توصيف بند النجارة المعمارية أو الخردوات والمواصفة الفنية","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"الوحدة","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"سعر التوريد","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"سعر التركيب والدهان","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"إجمالي سعر الوحدة","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"المرجع الفني","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":"JN-DR-01","b":true,"al":"center"},{"c":"B10","v":"باب مدخل شقة رئيسي خشب زان أو قرو طبيعي كبس أرو (1.10×2.20 م) شامل الحلق والبرور"},{"c":"C10","v":"عدد","b":true,"al":"center"},{"c":"D10","v":2400,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E10","v":450,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F10","v":2850,"f":"=D10+E10","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G10","v":"SBC 201 / AWI","al":"center"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"JN-DR-02","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":"باب غرف نوم ومجالس خشب سويدي محمل قشرة جوز طبيعي (0.90×2.20 م) شامل الحلق والبرور","bg":"#F8FAFC"},{"c":"C11","v":"عدد","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D11","v":1350,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E11","v":300,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F11","v":1650,"f":"=D11+E11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G11","v":"SBC 201 / AWI","bg":"#F8FAFC","al":"center"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":"JN-DR-03","b":true,"al":"center"},{"c":"B12","v":"باب حمامات ومطابخ مقاوم للمياه والرطوبة WPC / PVC (0.80×2.20 م) شامل الحلق والبرور"},{"c":"C12","v":"عدد","b":true,"al":"center"},{"c":"D12","v":980,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E12","v":220,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F12","v":1200,"f":"=D12+E12","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G12","v":"مقاوم للرطوبة 100%","al":"center"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":"JN-DR-04","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":"باب صالة / مجلس ضلفتين خشب زان وقشرة أرو مع زجاج سيكوريت (1.60×2.20 م) كامل","bg":"#F8FAFC"},{"c":"C13","v":"عدد","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D13","v":3200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E13","v":600,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F13","v":3800,"f":"=D13+E13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G13","v":"SBC 201 / AWI","bg":"#F8FAFC","al":"center"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"JN-DR-05","b":true,"al":"center"},{"c":"B14","v":"باب طوارئ / خدمات خشب مضغوط مقاوم للحريق لمدة 60 دقيقة (FD60 - 1.00×2.20 م)"},{"c":"C14","v":"عدد","b":true,"al":"center"},{"c":"D14","v":2100,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E14","v":400,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F14","v":2500,"f":"=D14+E14","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G14","v":"SBC 801 / NFPA 80","al":"center"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"JN-WN-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B15","v":"شباك خشبي معماري بشيش حصيرة زان وزجاج مزدوج (1.20×1.40 م) شامل الحلق والبرور","bg":"#F8FAFC"},{"c":"C15","v":"عدد","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D15","v":1450,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E15","v":280,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F15","v":1730,"f":"=D15+E15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G15","v":"عزل حراري وصوتي","bg":"#F8FAFC","al":"center"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":"JN-HW-01","b":true,"al":"center"},{"c":"B16","v":"طقم مفصلات ستانلس ستيل 304 برمان بلي (مقاس 4×3 بوصة سماكة 3 مم - للضلفة)"},{"c":"C16","v":"حبة","b":true,"al":"center"},{"c":"D16","v":28,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E16","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F16","v":40,"f":"=D16+E16","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G16","v":"EN 1935 Grade 13","al":"center"}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":"JN-HW-02","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B17","v":"كالون داخل الاسطامة (Mortise Lock) مع سلندر نحاس ومقبض أوكرة ستانلس ستيل","bg":"#F8FAFC"},{"c":"C17","v":"طقم","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D17","v":165,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E17","v":45,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F17","v":210,"f":"=D17+E17","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G17","v":"EN 12209 / EN 1906","bg":"#F8FAFC","al":"center"}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":"JN-HW-03","b":true,"al":"center"},{"c":"B18","v":"دفاش باب هيدروليكي علوي (Door Closer) ومصد أرضي مغناطيسي وكاوتش مانع للصوت"},{"c":"C18","v":"طقم","b":true,"al":"center"},{"c":"D18","v":190,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E18","v":50,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F18","v":240,"f":"=D18+E18","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G18","v":"EN 1154","al":"center"}]},{"r":19,"h":40.0,"cells":[{"c":"A19","v":"ثالثاً: الملخص التنفيذي لمقايسة أعمال النجارة المعمارية والخردوات ومؤشرات الفحص","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":"م","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B20","v":"بيان قسم الأعمال (مرتبط تلقائياً بأوراق الحصر والفحص)","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C20","v":"إجمالي العدد / الكمية","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D20","v":"الوحدة","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E20","v":"التكلفة قبل الضريبة","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F20","v":"ضريبة القيمة المضافة 15%","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G20","v":"الإجمالي شامل الضريبة","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":21,"h":40.0,"cells":[{"c":"A21","v":1,"b":true,"al":"center"},{"c":"B21","v":"إجمالي أعمال الأبواب والشبابيك الخشبية والحلوق والبرور (من شيت الحصر)","b":true},{"c":"C21","v":184,"f":"=حصر_الأبواب_والحلوق_والبرور!D19","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D21","v":"وحدة / فتحة","al":"center"},{"c":"E21","v":318740,"f":"=حصر_الأبواب_والحلوق_والبرور!M19","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F21","v":0,"f":"=ROUND(E21*$G$4,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G21","v":318740,"f":"=E21+F21","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":22,"h":40.0,"cells":[{"c":"A22","v":2,"b":true,"al":"center"},{"c":"B22","v":"إجمالي أطقم الخردوات والمفصلات والكوالين والإكسسوارات (من شيت الخردوات)","b":true},{"c":"C22","v":1132,"f":"=حصر_الخردوات_والإكسسوارات!G16","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D22","v":"قطعة / طقم","al":"center"},{"c":"E22","v":68950,"f":"=حصر_الخردوات_والإكسسوارات!I16","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F22","v":0,"f":"=ROUND(E22*$G$4,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G22","v":68950,"f":"=E22+F22","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":23,"h":44.0,"cells":[{"c":"A23","v":"الإجمالي الكلي لمقايسة النجارة المعمارية والخردوات (شاملاً الضريبة)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true},{"c":"C23","v":1316,"f":"=SUM(C21:C22)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D23","v":"إجمالي","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E23","v":387690,"f":"=SUM(E21:E22)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F23","v":0,"f":"=SUM(F21:F22)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G23","v":387690,"f":"=SUM(G21:G22)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":24,"h":40.0,"cells":[{"c":"A24","v":"صافي المستحق للصرف بعد خصم استقطاع ضمان حسن التنفيذ (10% من القيمة قبل الضريبة)","bg":"#FDE68A","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"E24","v":0,"f":"=ROUND(E23*$G$5,2)","bg":"#FDE68A","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F24","v":"صافي الصرف:","bg":"#FDE68A","b":true,"al":"center"},{"c":"G24","v":387690,"f":"=G23-E24","bg":"#FDE68A","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]}]},{"name":"حصر_الأبواب_والحلوق_والبرور","maxRow":19,"maxCol":13,"colWidths":[13.0,60.0,14.0,13.0,14.0,13.0,13.0,13.0,13.0,15.0,16.0,13.0,18.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول حصر كميات الأبواب والشبابيك الخشبية وأطوال الحلوق والبرور ومطابقة الفتحات المعمارية","bg":"#78350F","fg":"#FFFFFF","b":true,"al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"يحسب الشيت تلقائياً صافي مقاس الضلفة، إجمالي المسطح المعماري (م²)، أطوال خشب الحلوق والبرور شاملة الهالك، والتكلفة الإجمالية","bg":"#FEF3C7","b":true,"al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":40.0,"cells":[{"c":"A3","v":"جدول تفريد وحصر الأبواب والشبابيك الخشبية (الخلايا الصفراء لمدخلات العدد وأبعاد الفتحة الإنشائية)","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"رمز النموذج","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"توصيف موقع الباب / الشباك ونوع الخشب والتشطيب","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"نوع الفتحة","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"العدد (وحدة)","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"عرض الفتحة المعمارية (م)","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"ارتفاع الفتحة المعمارية (م)","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"عرض الحائط / الحلق (سم)","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"صافي عرض الضلفة (م)","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"صافي ارتفاع الضلفة (م)","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J4","v":"إجمالي مسطح الفتحات (م²)","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K4","v":"طول الحلوق بالهالك (م.ط)","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L4","v":"طول البرور للوجهين (م.ط)","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M4","v":"إجمالي تكلفة البند (ر.س)","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":50.0,"cells":[{"c":"A5","v":"D-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B5","v":"باب مدخل شقة رئيسي خشب زان طبيعي كبس أرو — الشقق السكنية (12 شقة)","bg":"#F8FAFC"},{"c":"C5","v":"باب ضلفة","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D5","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E5","v":1.1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F5","v":2.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G5","v":20,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H5","v":1,"f":"=ROUND(E5-0.1,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I5","v":2.15,"f":"=ROUND(F5-0.05,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J5","v":29.04,"f":"=ROUND(D5*E5*F5,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K5","v":71.19,"f":"=ROUND(D5*(2*F5+E5+0.15)*(1+إعدادات_النجارة_والملخص!$G$6),2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L5","v":143.64,"f":"=ROUND(D5*2*(2*F5+E5+0.2)*(1+إعدادات_النجارة_والملخص!$G$6),2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M5","v":34200,"f":"=ROUND(D5*إعدادات_النجارة_والملخص!$F$10,2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":6,"h":50.0,"cells":[{"c":"A6","v":"D-02","b":true,"al":"center"},{"c":"B6","v":"باب مجلس الضيوف وصالة الطعام خشب زان ضلفتين مع زجاج سيكوريت"},{"c":"C6","v":"باب ضلفتين","b":true,"al":"center"},{"c":"D6","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E6","v":1.6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F6","v":2.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G6","v":20,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H6","v":1.5,"f":"=ROUND(E6-0.1,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I6","v":2.15,"f":"=ROUND(F6-0.05,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J6","v":42.24,"f":"=ROUND(D6*E6*F6,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K6","v":77.49,"f":"=ROUND(D6*(2*F6+E6+0.15)*(1+إعدادات_النجارة_والملخص!$G$6),2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L6","v":156.24,"f":"=ROUND(D6*2*(2*F6+E6+0.2)*(1+إعدادات_النجارة_والملخص!$G$6),2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M6","v":45600,"f":"=ROUND(D6*إعدادات_النجارة_والملخص!$F$13,2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":7,"h":50.0,"cells":[{"c":"A7","v":"D-03","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B7","v":"باب غرفة النوم الرئيسية (Master Bedroom) خشب سويدي وقشرة جوز طبيعي","bg":"#F8FAFC"},{"c":"C7","v":"باب ضلفة","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D7","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E7","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F7","v":2.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G7","v":15,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H7","v":0.9,"f":"=ROUND(E7-0.1,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I7","v":2.15,"f":"=ROUND(F7-0.05,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J7","v":26.4,"f":"=ROUND(D7*E7*F7,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K7","v":69.93,"f":"=ROUND(D7*(2*F7+E7+0.15)*(1+إعدادات_النجارة_والملخص!$G$6),2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L7","v":141.12,"f":"=ROUND(D7*2*(2*F7+E7+0.2)*(1+إعدادات_النجارة_والملخص!$G$6),2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M7","v":19800,"f":"=ROUND(D7*إعدادات_النجارة_والملخص!$F$11,2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":8,"h":50.0,"cells":[{"c":"A8","v":"D-04","b":true,"al":"center"},{"c":"B8","v":"أبواب غرف النوم الفرعية للأبناء خشب سويدي وقشرة جوز دهان بولي يوريثان"},{"c":"C8","v":"باب ضلفة","b":true,"al":"center"},{"c":"D8","v":24,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E8","v":0.9,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F8","v":2.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G8","v":15,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H8","v":0.8,"f":"=ROUND(E8-0.1,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I8","v":2.15,"f":"=ROUND(F8-0.05,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J8","v":47.52,"f":"=ROUND(D8*E8*F8,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K8","v":137.34,"f":"=ROUND(D8*(2*F8+E8+0.15)*(1+إعدادات_النجارة_والملخص!$G$6),2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L8","v":277.2,"f":"=ROUND(D8*2*(2*F8+E8+0.2)*(1+إعدادات_النجارة_والملخص!$G$6),2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M8","v":39600,"f":"=ROUND(D8*إعدادات_النجارة_والملخص!$F$11,2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":9,"h":50.0,"cells":[{"c":"A9","v":"D-05","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B9","v":"أبواب غرف المعيشة والمكتب الداخلي خشب سويدي محمل قشرة جوز","bg":"#F8FAFC"},{"c":"C9","v":"باب ضلفة","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D9","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E9","v":0.9,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F9","v":2.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G9","v":15,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H9","v":0.8,"f":"=ROUND(E9-0.1,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I9","v":2.15,"f":"=ROUND(F9-0.05,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J9","v":23.76,"f":"=ROUND(D9*E9*F9,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K9","v":68.67,"f":"=ROUND(D9*(2*F9+E9+0.15)*(1+إعدادات_النجارة_والملخص!$G$6),2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L9","v":138.6,"f":"=ROUND(D9*2*(2*F9+E9+0.2)*(1+إعدادات_النجارة_والملخص!$G$6),2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M9","v":19800,"f":"=ROUND(D9*إعدادات_النجارة_والملخص!$F$11,2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":10,"h":50.0,"cells":[{"c":"A10","v":"D-06","b":true,"al":"center"},{"c":"B10","v":"أبواب المطابخ الرئيسية مقاومة للرطوبة والحرارة WPC سماكة ضلفة 45 مم"},{"c":"C10","v":"باب WPC","b":true,"al":"center"},{"c":"D10","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E10","v":0.9,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F10","v":2.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G10","v":15,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H10","v":0.8,"f":"=ROUND(E10-0.1,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I10","v":2.15,"f":"=ROUND(F10-0.05,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J10","v":23.76,"f":"=ROUND(D10*E10*F10,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K10","v":68.67,"f":"=ROUND(D10*(2*F10+E10+0.15)*(1+إعدادات_النجارة_والملخص!$G$6),2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L10","v":138.6,"f":"=ROUND(D10*2*(2*F10+E10+0.2)*(1+إعدادات_النجارة_والملخص!$G$6),2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M10","v":14400,"f":"=ROUND(D10*إعدادات_النجارة_والملخص!$F$12,2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":11,"h":50.0,"cells":[{"c":"A11","v":"D-07","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":"أبواب الحمامات الرئيسية وحمامات الضيوف WPC مقاومة للمياه 100% مع هواية","bg":"#F8FAFC"},{"c":"C11","v":"باب WPC","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D11","v":24,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E11","v":0.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F11","v":2.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G11","v":15,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H11","v":0.7,"f":"=ROUND(E11-0.1,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I11","v":2.15,"f":"=ROUND(F11-0.05,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J11","v":42.24,"f":"=ROUND(D11*E11*F11,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K11","v":134.82,"f":"=ROUND(D11*(2*F11+E11+0.15)*(1+إعدادات_النجارة_والملخص!$G$6),2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L11","v":272.16,"f":"=ROUND(D11*2*(2*F11+E11+0.2)*(1+إعدادات_النجارة_والملخص!$G$6),2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M11","v":28800,"f":"=ROUND(D11*إعدادات_النجارة_والملخص!$F$12,2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":12,"h":50.0,"cells":[{"c":"A12","v":"D-08","b":true,"al":"center"},{"c":"B12","v":"أبواب دورات مياه وغرف الخادمات والغسيل WPC مقاومة للمياه والرطوبة"},{"c":"C12","v":"باب WPC","b":true,"al":"center"},{"c":"D12","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E12","v":0.75,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F12","v":2.15,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G12","v":15,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H12","v":0.65,"f":"=ROUND(E12-0.1,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I12","v":2.1,"f":"=ROUND(F12-0.05,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J12","v":19.35,"f":"=ROUND(D12*E12*F12,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K12","v":65.52,"f":"=ROUND(D12*(2*F12+E12+0.15)*(1+إعدادات_النجارة_والملخص!$G$6),2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L12","v":132.3,"f":"=ROUND(D12*2*(2*F12+E12+0.2)*(1+إعدادات_النجارة_والملخص!$G$6),2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M12","v":14400,"f":"=ROUND(D12*إعدادات_النجارة_والملخص!$F$12,2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":13,"h":50.0,"cells":[{"c":"A13","v":"D-09","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":"أبواب مخارج الطوارئ وبيت الدرج خشب مقاوم للحريق لمدة 60 دقيقة (FD60)","bg":"#F8FAFC"},{"c":"C13","v":"مقاوم للحريق","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D13","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E13","v":1.05,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F13","v":2.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G13","v":20,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H13","v":0.95,"f":"=ROUND(E13-0.1,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I13","v":2.15,"f":"=ROUND(F13-0.05,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J13","v":13.86,"f":"=ROUND(D13*E13*F13,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K13","v":35.28,"f":"=ROUND(D13*(2*F13+E13+0.15)*(1+إعدادات_النجارة_والملخص!$G$6),2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L13","v":71.19,"f":"=ROUND(D13*2*(2*F13+E13+0.2)*(1+إعدادات_النجارة_والملخص!$G$6),2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M13","v":15000,"f":"=ROUND(D13*إعدادات_النجارة_والملخص!$F$14,2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":14,"h":50.0,"cells":[{"c":"A14","v":"D-10","b":true,"al":"center"},{"c":"B14","v":"أبواب غرف الخدمات والعدادات والمستودعات بالقبو والدور الأرضي"},{"c":"C14","v":"باب خدمات","b":true,"al":"center"},{"c":"D14","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E14","v":0.9,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F14","v":2.15,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G14","v":20,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H14","v":0.8,"f":"=ROUND(E14-0.1,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I14","v":2.1,"f":"=ROUND(F14-0.05,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J14","v":11.61,"f":"=ROUND(D14*E14*F14,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K14","v":33.7,"f":"=ROUND(D14*(2*F14+E14+0.15)*(1+إعدادات_النجارة_والملخص!$G$6),2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L14","v":68.04,"f":"=ROUND(D14*2*(2*F14+E14+0.2)*(1+إعدادات_النجارة_والملخص!$G$6),2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M14","v":9900,"f":"=ROUND(D14*إعدادات_النجارة_والملخص!$F$11,2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":15,"h":50.0,"cells":[{"c":"A15","v":"W-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B15","v":"شبابيك خشبية معمارية للواجهات التراثية بشيش حصيرة زان وزجاج دبل","bg":"#F8FAFC"},{"c":"C15","v":"شباك ضلفتين","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D15","v":16,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E15","v":1.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F15","v":1.4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G15","v":20,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H15","v":1.1,"f":"=ROUND(E15-0.1,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I15","v":1.35,"f":"=ROUND(F15-0.05,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J15","v":26.88,"f":"=ROUND(D15*E15*F15,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K15","v":69.72,"f":"=ROUND(D15*(2*F15+E15+0.15)*(1+إعدادات_النجارة_والملخص!$G$6),2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L15","v":141.12,"f":"=ROUND(D15*2*(2*F15+E15+0.2)*(1+إعدادات_النجارة_والملخص!$G$6),2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M15","v":27680,"f":"=ROUND(D15*إعدادات_النجارة_والملخص!$F$15,2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":16,"h":50.0,"cells":[{"c":"A16","v":"W-02","b":true,"al":"center"},{"c":"B16","v":"شبابيك مناور ومطابخ خشبية مفصلية بسلك مانع للحشرات وزجاج مصنفر"},{"c":"C16","v":"شباك مفصلي","b":true,"al":"center"},{"c":"D16","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E16","v":0.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F16","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G16","v":15,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H16","v":0.7,"f":"=ROUND(E16-0.1,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I16","v":0.95,"f":"=ROUND(F16-0.05,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J16","v":9.6,"f":"=ROUND(D16*E16*F16,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K16","v":37.17,"f":"=ROUND(D16*(2*F16+E16+0.15)*(1+إعدادات_النجارة_والملخص!$G$6),2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L16","v":75.6,"f":"=ROUND(D16*2*(2*F16+E16+0.2)*(1+إعدادات_النجارة_والملخص!$G$6),2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M16","v":20760,"f":"=ROUND(D16*إعدادات_النجارة_والملخص!$F$15,2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":"SD-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B17","v":"أبواب خزائن وفتحات صواعد الخدمات الكهروميكانيكية (Shaft Doors) خشب MDF مقاوم للرطوبة","bg":"#F8FAFC"},{"c":"C17","v":"باب صاعد","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D17","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E17","v":0.7,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F17","v":1.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G17","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H17","v":0.6,"f":"=ROUND(E17-0.1,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I17","v":1.75,"f":"=ROUND(F17-0.05,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J17","v":15.12,"f":"=ROUND(D17*E17*F17,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K17","v":56.07,"f":"=ROUND(D17*(2*F17+E17+0.15)*(1+إعدادات_النجارة_والملخص!$G$6),2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L17","v":113.4,"f":"=ROUND(D17*2*(2*F17+E17+0.2)*(1+إعدادات_النجارة_والملخص!$G$6),2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M17","v":14400,"f":"=ROUND(D17*إعدادات_النجارة_والملخص!$F$12,2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":18,"h":50.0,"cells":[{"c":"A18","v":"SD-02","b":true,"al":"center"},{"c":"B18","v":"تجاليد ومعابر خشبية مفتوحة (مداخل الصالات بدون ضلفة - حلق وتجليد وبرور)"},{"c":"C18","v":"معبر خشبي","b":true,"al":"center"},{"c":"D18","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E18","v":1.4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F18","v":2.3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G18","v":20,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H18","v":1.3,"f":"=ROUND(E18-0.1,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I18","v":2.25,"f":"=ROUND(F18-0.05,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J18","v":38.64,"f":"=ROUND(D18*E18*F18,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K18","v":77.49,"f":"=ROUND(D18*(2*F18+E18+0.15)*(1+إعدادات_النجارة_والملخص!$G$6),2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L18","v":156.24,"f":"=ROUND(D18*2*(2*F18+E18+0.2)*(1+إعدادات_النجارة_والملخص!$G$6),2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M18","v":14400,"f":"=ROUND(D18*إعدادات_النجارة_والملخص!$F$12,2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":19,"h":44.0,"cells":[{"c":"A19","v":"إجمالي حصر الأبواب والشبابيك والحلوق والبرور","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D19","v":184,"f":"=SUM(D5:D18)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E19","v":1,"f":"=ROUND(AVERAGE(E5:E18),2)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F19","v":2.03,"f":"=ROUND(AVERAGE(F5:F18),2)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G19","v":16.93,"f":"=ROUND(AVERAGE(G5:G18),2)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H19","v":0.9,"f":"=ROUND(AVERAGE(H5:H18),2)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I19","v":1.98,"f":"=ROUND(AVERAGE(I5:I18),2)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J19","v":370.02,"f":"=SUM(J5:J18)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K19","v":1003.06,"f":"=SUM(K5:K18)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L19","v":2025.45,"f":"=SUM(L5:L18)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M19","v":318740,"f":"=SUM(M5:M18)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]}]},{"name":"حصر_الخردوات_والإكسسوارات","maxRow":16,"maxCol":9,"colWidths":[14.0,60.0,22.0,16.0,15.0,13.0,18.0,16.0,18.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول حصر الخردوات والإكسسوارات المعدنية للأبواب والشبابيك (Ironmongery & Hardware Schedule)","bg":"#78350F","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"يحسب الكميات المطلوبة من المفصلات والكوالين والأكر والدفاشات والمصدات والكاوتش تلقائياً بناءً على أعداد الأبواب في شيت الحصر","bg":"#FEF3C7","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":40.0,"cells":[{"c":"A3","v":"جدول حصر وتفريد الخردوات والكوالين والمفصلات (مرتبط تلقائياً بأعداد الأبواب في شيت الحصر)","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"كود الخردوات","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"توصيف بند الخردوات والإكسسوارات المعدنية والمواصفة (EN / ANSI)","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"مرتبط بنماذج الأبواب","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"إجمالي عدد الأبواب","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"معدل القطع للباب","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"الكمية الصافية","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"الكمية شاملة 3% احتياطي","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"سعر الوحدة (ر.س)","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"الإجمالي الكلي (ر.س)","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"HW-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B5","v":"مفصلات ستانلس ستيل 304 برمان بلي (4×3 بوصة سماكة 3 مم) للأبواب الثقيلة والمداخل","bg":"#F8FAFC"},{"c":"C5","v":"D-01 + D-02 (ضلفتين) + D-09","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D5","v":42,"f":"=حصر_الأبواب_والحلوق_والبرور!D5+(حصر_الأبواب_والحلوق_والبرور!D6*2)+حصر_الأبواب_والحلوق_والبرور!D13","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E5","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F5","v":168,"f":"=D5*E5","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G5","v":174,"f":"=ROUNDUP(F5*1.03,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H5","v":40,"f":"=إعدادات_النجارة_والملخص!$F$16","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I5","v":6960,"f":"=ROUND(G5*H5,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":6,"h":50.0,"cells":[{"c":"A6","v":"HW-02","b":true,"al":"center"},{"c":"B6","v":"مفصلات ستانلس ستيل 304 برمان بلي (4×3 بوصة) لأبواب الغرف والمطابخ والحمامات"},{"c":"C6","v":"D-03 إلى D-08 + D-10","b":true,"al":"center"},{"c":"D6","v":102,"f":"=SUM(حصر_الأبواب_والحلوق_والبرور!D7:D12)+حصر_الأبواب_والحلوق_والبرور!D14","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E6","v":3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F6","v":306,"f":"=D6*E6","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G6","v":316,"f":"=ROUNDUP(F6*1.03,0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H6","v":40,"f":"=إعدادات_النجارة_والملخص!$F$16","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I6","v":12640,"f":"=ROUND(G6*H6,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":7,"h":50.0,"cells":[{"c":"A7","v":"HW-03","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B7","v":"مفصلات شبابيك وصواعد خدمات ستانلس ستيل (3.5×2.5 بوصة) مقاومة للصدأ","bg":"#F8FAFC"},{"c":"C7","v":"W-01 + W-02 + SD-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D7","v":40,"f":"=SUM(حصر_الأبواب_والحلوق_والبرور!D15:D17)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E7","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F7","v":160,"f":"=D7*E7","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G7","v":165,"f":"=ROUNDUP(F7*1.03,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H7","v":40,"f":"=إعدادات_النجارة_والملخص!$F$16","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I7","v":6600,"f":"=ROUND(G7*H7,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"HW-04","b":true,"al":"center"},{"c":"B8","v":"كالون أمان رئيسي داخل الاسطامة (Mortise Deadbolt & Latch) مع سلندر نحاس 5 مفاتيح وعين سحرية"},{"c":"C8","v":"D-01 (أبواب مداخل الشقق)","b":true,"al":"center"},{"c":"D8","v":12,"f":"=حصر_الأبواب_والحلوق_والبرور!D5","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E8","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F8","v":12,"f":"=D8*E8","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G8","v":13,"f":"=ROUNDUP(F8*1.03,0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H8","v":210,"f":"=إعدادات_النجارة_والملخص!$F$17","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I8","v":2730,"f":"=ROUND(G8*H8,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"HW-05","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B9","v":"كالون غرف ومجالس داخل الاسطامة مع سلندر نحاس وطقم مقبض أوكرة ستانلس ستيل على روزتة","bg":"#F8FAFC"},{"c":"C9","v":"D-02 + D-03 + D-04 + D-05 + D-10","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D9","v":66,"f":"=حصر_الأبواب_والحلوق_والبرور!D6+SUM(حصر_الأبواب_والحلوق_والبرور!D7:D9)+حصر_الأبواب_والحلوق_والبرور!D14","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E9","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F9","v":66,"f":"=D9*E9","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G9","v":68,"f":"=ROUNDUP(F9*1.03,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H9","v":210,"f":"=إعدادات_النجارة_والملخص!$F$17","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I9","v":14280,"f":"=ROUND(G9*H9,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":"HW-06","b":true,"al":"center"},{"c":"B10","v":"كالون حمام ومطبخ بمفتاح أمان داخلي (Privacy Thumbturn Lock) وأوكرة مقاومة للرطوبة"},{"c":"C10","v":"D-06 + D-07 + D-08","b":true,"al":"center"},{"c":"D10","v":48,"f":"=SUM(حصر_الأبواب_والحلوق_والبرور!D10:D12)","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E10","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F10","v":48,"f":"=D10*E10","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G10","v":50,"f":"=ROUNDUP(F10*1.03,0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H10","v":210,"f":"=إعدادات_النجارة_والملخص!$F$17","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I10","v":10500,"f":"=ROUND(G10*H10,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"HW-07","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":"طقم سقاطة غاطسة علوية وسفلية (Flush Bolts - إسبانيوليت) للضلفة الثابتة في الأبواب الضلفتين","bg":"#F8FAFC"},{"c":"C11","v":"D-02 (أبواب المجالس الضلفتين)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D11","v":12,"f":"=حصر_الأبواب_والحلوق_والبرور!D6","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E11","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F11","v":24,"f":"=D11*E11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G11","v":25,"f":"=ROUNDUP(F11*1.03,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H11","v":40,"f":"=إعدادات_النجارة_والملخص!$F$16","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I11","v":1000,"f":"=ROUND(G11*H11,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":"HW-08","b":true,"al":"center"},{"c":"B12","v":"دفاش هيدروليكي علوي (Overhead Door Closer EN 1154) وذراع طوارئ لأبواب مخارج الحريق"},{"c":"C12","v":"D-09 (أبواب مخارج الطوارئ FD60)","b":true,"al":"center"},{"c":"D12","v":6,"f":"=حصر_الأبواب_والحلوق_والبرور!D13","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E12","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F12","v":6,"f":"=D12*E12","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G12","v":7,"f":"=ROUNDUP(F12*1.03,0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H12","v":240,"f":"=إعدادات_النجارة_والملخص!$F$18","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I12","v":1680,"f":"=ROUND(G12*H12,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":"HW-09","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":"مصدات أبواب أرضية مغناطيسية / كاوتش ستانلس ستيل (Floor Door Stopper) لحماية الدهانات","bg":"#F8FAFC"},{"c":"C13","v":"كافة أبواب الشقق والغرف","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D13","v":132,"f":"=SUM(حصر_الأبواب_والحلوق_والبرور!D5:D14)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E13","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F13","v":132,"f":"=D13*E13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G13","v":136,"f":"=ROUNDUP(F13*1.03,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H13","v":40,"f":"=إعدادات_النجارة_والملخص!$F$16","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I13","v":5440,"f":"=ROUND(G13*H13,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":14,"h":50.0,"cells":[{"c":"A14","v":"HW-10","b":true,"al":"center"},{"c":"B14","v":"مقابض وسقاطات شبابيك وأقفال أبواب صواعد خدمات (Espagnolette & Budget Locks)"},{"c":"C14","v":"W-01 + W-02 + SD-01","b":true,"al":"center"},{"c":"D14","v":40,"f":"=SUM(حصر_الأبواب_والحلوق_والبرور!D15:D17)","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E14","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F14","v":40,"f":"=D14*E14","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G14","v":42,"f":"=ROUNDUP(F14*1.03,0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H14","v":40,"f":"=إعدادات_النجارة_والملخص!$F$16","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I14","v":1680,"f":"=ROUND(G14*H14,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"HW-11","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B15","v":"شريط كاوتش مطاطي عازل للصوت والأتربة والدخان يركب في مجرى الحلق (لكل باب طقم 6 م.ط)","bg":"#F8FAFC"},{"c":"C15","v":"كافة الأبواب الداخلية والخارجية","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D15","v":132,"f":"=SUM(حصر_الأبواب_والحلوق_والبرور!D5:D14)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E15","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F15","v":132,"f":"=D15*E15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G15","v":136,"f":"=ROUNDUP(F15*1.03,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H15","v":40,"f":"=إعدادات_النجارة_والملخص!$F$16","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I15","v":5440,"f":"=ROUND(G15*H15,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":16,"h":44.0,"cells":[{"c":"A16","v":"إجمالي حصر وتكلفة أطقم الخردوات والمفصلات والكوالين والإكسسوارات","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F16","v":1094,"f":"=SUM(F5:F15)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G16","v":1132,"f":"=SUM(G5:G15)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H16","v":104.55,"f":"=ROUND(AVERAGE(H5:H15),2)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I16","v":68950,"f":"=SUM(I5:I15)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]}]},{"name":"فحص_المقاسات_والشاقول_RFI","maxRow":17,"maxCol":9,"colWidths":[8.0,58.0,16.0,13.0,13.0,13.0,15.0,20.0,26.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"سجل الفحص الميداني واستلام أعمال النجارة المعمارية ومطابقة المقاسات والشاقول والميزان (RFI)","bg":"#78350F","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"يفحص تلقائياً انحراف الشاقول الرأسي وأفقية رأس الحلق ورطوبة الخشب وخلوصات الضلفة ويصدر حكم القبول الهندسي لكل بند","bg":"#FEF3C7","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":40.0,"cells":[{"c":"A3","v":"قائمة الفحص والقياسات الميدانية لاستلام الحلوق والضلف الخشبية والخردوات (12 نقطة فحص قياسية)","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"م","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"بند الفحص الهندسي ومعيار الاستلام الميداني لأعمال النجارة والأبواب","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"المرجع الكودي","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"القيمة التصميمية / المعيار","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"الحد الأقصى للتفاوت","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"القراءة الفعلية بالموقع","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"الانحراف المرصود","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"حكم المطابقة التلقائي","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"ملاحظات مهندس الجودة QA/QC","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":1,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B5","v":"نسبة الرطوبة في أخشاب الحلوق والضلف الموردة للموقع قبل التركيب (Moisture Content %)","bg":"#F8FAFC"},{"c":"C5","v":"AWI / ASTM D4442","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D5","v":10,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E5","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F5","v":9.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G5","v":0.5,"f":"=ABS(F5-D5)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H5","v":"مطابق للمواصفات","f":"=IF(G5<=E5,\"مطابق للمواصفات\",\"مرفوض - يلزم تعديل\")","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"I5","v":"بجهاز قياس رطوبة الخشب","bg":"#F8FAFC"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":2,"b":true,"al":"center"},{"c":"B6","v":"مطابقة عرض الفتحة المعمارية المنفذة مع المخطط التنفيذي (بالمليمتر لنموذج D-01)"},{"c":"C6","v":"Shop Drawing","b":true,"al":"center"},{"c":"D6","v":1100,"in":true,"b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E6","v":5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F6","v":1102,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G6","v":2,"f":"=ABS(F6-D6)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H6","v":"مطابق للمواصفات","f":"=IF(G6<=E6,\"مطابق للمواصفات\",\"مرفوض - يلزم تعديل\")","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"I6","v":"القياس في أعلى ووسط وأسفل الفتحة"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":3,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B7","v":"مطابقة ارتفاع الفتحة المعمارية من شرب التشطيب النهائي للأرضية (بالمليمتر)","bg":"#F8FAFC"},{"c":"C7","v":"Shop Drawing","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D7","v":2200,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E7","v":5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F7","v":2201,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G7","v":1,"f":"=ABS(F7-D7)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H7","v":"مطابق للمواصفات","f":"=IF(G7<=E7,\"مطابق للمواصفات\",\"مرفوض - يلزم تعديل\")","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"I7","v":"مقاس من شرب الـ +1.00 م","bg":"#F8FAFC"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":4,"b":true,"al":"center"},{"c":"B8","v":"ضبط رأسية قوائم الحلق الخشبي في الاتجاهين بميزان الخيط والليزر (انحراف الشاقول مم/2م)"},{"c":"C8","v":"SBC 201 / ECP","b":true,"al":"center"},{"c":"D8","v":0,"in":true,"b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E8","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F8","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G8","v":1,"f":"=ABS(F8-D8)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H8","v":"مطابق للمواصفات","f":"=IF(G8<=E8,\"مطابق للمواصفات\",\"مرفوض - يلزم تعديل\")","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"I8","v":"رأسية ممتازة دون فتل"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":5,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B9","v":"ضبط أفقية الرأس العلوي للحلق الخشبي بميزان المياه وتساوي القطرين (انحراف الميزان مم)","bg":"#F8FAFC"},{"c":"C9","v":"SBC 201 / ECP","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D9","v":0,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E9","v":1.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F9","v":0.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G9","v":0.8,"f":"=ABS(F9-D9)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H9","v":"مطابق للمواصفات","f":"=IF(G9<=E9,\"مطابق للمواصفات\",\"مرفوض - يلزم تعديل\")","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"I9","v":"القطران متساويان تماماً","bg":"#F8FAFC"}]},{"r":10,"h":48.0,"cells":[{"c":"A10","v":6,"b":true,"al":"center"},{"c":"B10","v":"استواء الحلق الخشبي مع بؤج اللياسة الأسمنتية وبروزه بنفس سمك البياض"},{"c":"C10","v":"أصول الصنعة","b":true,"al":"center"},{"c":"D10","v":15,"in":true,"b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E10","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F10","v":15.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G10","v":0.5,"f":"=ABS(F10-D10)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H10","v":"مطابق للمواصفات","f":"=IF(G10<=E10,\"مطابق للمواصفات\",\"مرفوض - يلزم تعديل\")","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"I10","v":"متساطح مع البؤج واللياسة"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":7,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":"دهان ظهر الحلوق الخشبية الملامسة للمباني بالبيتومين المؤكسد العازل للرطوبة (ميكرون)","bg":"#F8FAFC"},{"c":"C11","v":"المواصفات الفنية","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D11","v":200,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E11","v":250,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F11","v":210,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G11","v":10,"f":"=ABS(F11-D11)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H11","v":"مطابق للمواصفات","f":"=IF(G11<=E11,\"مطابق للمواصفات\",\"مرفوض - يلزم تعديل\")","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"I11","v":"تغطية كاملة لظهر الحلق","bg":"#F8FAFC"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":8,"b":true,"al":"center"},{"c":"B12","v":"عدد كانات التثبيت الحديدية المجلفنة (أو المسامير الفيشر) لكل قائم رأسي للحلق"},{"c":"C12","v":"المواصفات الفنية","b":true,"al":"center"},{"c":"D12","v":3,"in":true,"b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E12","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F12","v":3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G12","v":0,"f":"=ABS(F12-D12)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H12","v":"مطابق للمواصفات","f":"=IF(G12<=E12,\"مطابق للمواصفات\",\"مرفوض - يلزم تعديل\")","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"I12","v":"3 كانات يمين + 3 يسار"}]},{"r":13,"h":48.0,"cells":[{"c":"A13","v":9,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":"سماكة ضلفة الباب الخشبي بعد الكبس والقشرة والدهان النهائي (بالمليمتر)","bg":"#F8FAFC"},{"c":"C13","v":"AWI / MIR","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D13","v":45,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E13","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F13","v":45,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G13","v":0,"f":"=ABS(F13-D13)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H13","v":"مطابق للمواصفات","f":"=IF(G13<=E13,\"مطابق للمواصفات\",\"مرفوض - يلزم تعديل\")","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"I13","v":"مطابق للعينة المعتمدة MIR","bg":"#F8FAFC"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":10,"b":true,"al":"center"},{"c":"B14","v":"انتظام خلوص الضلفة مع قوائم ورأس الحلق الخشبي من الجهات الثلاث (بالمليمتر)"},{"c":"C14","v":"BS 8214 / AWI","b":true,"al":"center"},{"c":"D14","v":3,"in":true,"b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E14","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F14","v":3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G14","v":0,"f":"=ABS(F14-D14)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H14","v":"مطابق للمواصفات","f":"=IF(G14<=E14,\"مطابق للمواصفات\",\"مرفوض - يلزم تعديل\")","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"I14","v":"خلوص منتظم 3 مم دون احتكاك"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":11,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B15","v":"خلوص أسفل ضلفة الباب مع تشطيب الأرضيات النهائي (السيراميك / الرخام بالمليمتر)","bg":"#F8FAFC"},{"c":"C15","v":"SBC 201 / AWI","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D15","v":8,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E15","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F15","v":8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G15","v":0,"f":"=ABS(F15-D15)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H15","v":"مطابق للمواصفات","f":"=IF(G15<=E15,\"مطابق للمواصفات\",\"مرفوض - يلزم تعديل\")","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"I15","v":"يسمح بالحركة والتهوية","bg":"#F8FAFC"}]},{"r":16,"h":48.0,"cells":[{"c":"A16","v":12,"b":true,"al":"center"},{"c":"B16","v":"ارتفاع مقبض الكالون (الأوكرة) من منسوب تشطيب الأرضية النهائي (بالمليمتر)"},{"c":"C16","v":"SBC 201","b":true,"al":"center"},{"c":"D16","v":1000,"in":true,"b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E16","v":10,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F16","v":1000,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G16","v":0,"f":"=ABS(F16-D16)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H16","v":"مطابق للمواصفات","f":"=IF(G16<=E16,\"مطابق للمواصفات\",\"مرفوض - يلزم تعديل\")","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"I16","v":"ارتفاع قياسي موحد لكافة الأبواب"}]},{"r":17,"h":44.0,"cells":[{"c":"A17","v":"نتيجة الفحص الميداني الشامل لأعمال النجارة المعمارية (عدد البنود المطابقة ونسبة القبول)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G17","v":12,"f":"=COUNTIF(H5:H16,\"مطابق للمواصفات\")","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H17","v":1,"f":"=G17/12","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"0.0%"},{"c":"I17","v":"مقبول بالكامل للاستلام (Code A)","f":"=IF(G17=12,\"مقبول بالكامل للاستلام (Code A)\",\"يوجد ملاحظات يلزم استيفاؤها\")","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"}]}]}]}