{"slug":"box-culvert-hydraulic-and-structural-design-sheet","sheets":[{"name":"التصميم الهيدروليكي للعبارة","maxRow":37,"maxCol":6,"colWidths":[24.0,16.0,16.0,22.0,24.0,24.0],"rows":[{"r":1,"h":34.0,"cells":[{"c":"A1","v":"شيت تصميم وحسابات العبارات الصندوقية الخرسانية الهيدروليكية والإنشائية إكسيل","bg":"#0B132B","fg":"#FFFFFF","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"قالب هندسي شامل لتصميم العبارات الصندوقية للطرق السريعة ومجاري السيول وفق معايير AASHTO LRFD ودليل FHWA HDS-5 وكود الخرسانة SBC 304","bg":"#1E293B","fg":"#FFFFFF","al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"اسم المشروع الهندسي:","b":true},{"c":"B4","v":"مشروع ازدواج طريق المحور الإقليمي وتصريف السيول","cs":3},{"skip":true},{"skip":true},{"c":"E4","v":"رقم العبارة وموقعها:","b":true},{"c":"F4","v":"BC-KM-24+500"}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"فترة تكرار العاصفة التصميمية:","b":true},{"c":"B5","v":"عاصفة 50 سنة (50-Year Return Flood)","cs":3},{"skip":true},{"skip":true},{"c":"E5","v":"الجهة المالكة والمشرفة:","b":true},{"c":"F5","v":"وزارة النقل والخدمات اللوجستية"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"المهندس المصمم المعتمد:","b":true},{"c":"B6","v":"م. كريم عبد الرحيم (استشاري الطرق والكباري)","cs":3},{"skip":true},{"skip":true},{"c":"E6","v":"تاريخ إعداد الحسابات:","b":true},{"c":"F6","v":"2026-10-11"}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"1. المعطيات الهيدروليكية والأبعاد الهندسية لقطاع العبارة (Hydraulic Inputs & Geometry)","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"البيان والمتغير الهيدروليكي","bg":"#172554","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"الرمز الهندسي","bg":"#172554","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"الوحدة","bg":"#172554","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"القيمة المدخلة / المحسوبة","bg":"#172554","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"المرجع الكودي / المعادلة الرياضية","bg":"#172554","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true}]},{"r":10,"h":72.0,"cells":[{"c":"A10","v":"معدل التدفق التصميمي للسيول (Design Discharge - Q):","b":true},{"c":"B10","v":"Q_des","al":"center"},{"c":"C10","v":"م³/ث (m³/s)","al":"center"},{"c":"D10","v":22.5,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E10","v":"محسوب هيدرولوجياً لفترة تكرار 50 سنة","cs":2},{"skip":true}]},{"r":11,"h":72.0,"cells":[{"c":"A11","v":"عدد فتحات العبارة الصندوقية (Number of Barrels / Cells):"},{"c":"B11","v":"N_cell","al":"center"},{"c":"C11","v":"فتحة","al":"center"},{"c":"D11","v":2,"in":true,"b":true,"al":"center","nf":"0"},{"c":"E11","v":"عبارة ثنائية الفتحات (Double Box Culvert)","cs":2},{"skip":true}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":"عرض الفتحة الواحدة الصافي (Clear Span - B):"},{"c":"B12","v":"B_span","al":"center"},{"c":"C12","v":"م.ط (m)","al":"center"},{"c":"D12","v":3,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E12","v":"العرض الداخلي الصافي لكل عين","cs":2},{"skip":true}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":"ارتفاع الفتحة الواحدة الصافي (Clear Rise - D):"},{"c":"B13","v":"D_rise","al":"center"},{"c":"C13","v":"م.ط (m)","al":"center"},{"c":"D13","v":2.5,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E13","v":"الارتفاع الداخلي الصافي من القاع للسقف","cs":2},{"skip":true}]},{"r":14,"h":72.0,"cells":[{"c":"A14","v":"طول العبارة الإجمالي عبر الطريق (Culvert Length - L):"},{"c":"B14","v":"L_culv","al":"center"},{"c":"C14","v":"م.ط (m)","al":"center"},{"c":"D14","v":35,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E14","v":"عرض الردمية وجسم الطريق السريع والأكتاف","cs":2},{"skip":true}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"ميل قاع العبارة الطولي (Longitudinal Slope - S0):"},{"c":"B15","v":"S_0","al":"center"},{"c":"C15","v":"م/م (m/m)","al":"center"},{"c":"D15","v":0.008,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E15","v":"ميل طولي بنسبة 0.80% مطابق لميل الوادي الطبيعي","cs":2},{"skip":true}]},{"r":16,"h":72.0,"cells":[{"c":"A16","v":"معامل مانينغ لخشونة الخرسانة الملساء (Manning Roughness - n):"},{"c":"B16","v":"n_mann","al":"center"},{"c":"C16","v":"معامل","al":"center"},{"c":"D16","v":0.013,"in":true,"al":"center","nf":"0.000"},{"c":"E16","v":"ASTM / FHWA للخرسانة المصبوبة بالموقع","cs":2},{"skip":true}]},{"r":17,"h":72.0,"cells":[{"c":"A17","v":"منسوب قاع العبارة عند المدخل (Inlet Invert Elevation):"},{"c":"B17","v":"Inv_in","al":"center"},{"c":"C17","v":"متر (m)","al":"center"},{"c":"D17","v":450,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E17","v":"منسوب القاع الداخلي عند مدخل العبارة","cs":2},{"skip":true}]},{"r":18,"h":72.0,"cells":[{"c":"A18","v":"منسوب قاع العبارة عند المخرج (Outlet Invert Elevation):"},{"c":"B18","v":"Inv_out","al":"center"},{"c":"C18","v":"متر (m)","al":"center"},{"c":"D18","v":449.72,"f":"=D17-(D14*D15)","b":true,"al":"center","nf":"#,##0.00"},{"c":"E18","v":"منسوب المدخل - (الطول × الميل)","cs":2},{"skip":true}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":"منسوب سطح الطريق الأسفلتي فوق العبارة (Roadway Crown Elevation):"},{"c":"B19","v":"El_road","al":"center"},{"c":"C19","v":"متر (m)","al":"center"},{"c":"D19","v":455.5,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E19","v":"أعلى منسوب لسطح الطريق الإسفلتي","cs":2},{"skip":true}]},{"r":20,"h":72.0,"cells":[{"c":"A20","v":"أقصى منسوب مياه علوي مسموح به (Allowable Headwater Elevation):","b":true},{"c":"B20","v":"AHW_el","al":"center"},{"c":"C20","v":"متر (m)","al":"center"},{"c":"D20","v":455,"f":"=D19-0.50","b":true,"al":"center","nf":"#,##0.00"},{"c":"E20","v":"منسوب الطريق مطروحاً منه 0.50م خلوص أمان حر (Freeboard)","cs":2},{"skip":true}]},{"r":21,"h":28.0,"cells":[{"c":"A21","v":""},{"c":"B21","v":""},{"c":"C21","v":""},{"c":"D21","v":""},{"c":"E21","v":""},{"c":"F21","v":""}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":"2. نتائج التحليل الهيدروليكي والتحكم عند المدخل والمخرج (FHWA HDS-5 Hydraulic Analysis)","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":23,"h":72.0,"cells":[{"c":"A23","v":"إجمالي مساحة المقطع المائي الصافي (Total Waterway Area - A):"},{"c":"B23","v":"A_total","al":"center"},{"c":"C23","v":"م²","al":"center"},{"c":"D23","v":15,"f":"=D11*D12*D13","b":true,"al":"center","nf":"0.00"},{"c":"E23","v":"N_cell × B_span × D_rise (2 × 3.0 × 2.5 = 15.0 م²)","cs":2},{"skip":true}]},{"r":24,"h":72.0,"cells":[{"c":"A24","v":"متوسط سرعة الجريان داخل العبارة عند الامتلاء (Full Velocity - V):"},{"c":"B24","v":"V_full","al":"center"},{"c":"C24","v":"م/ث (m/s)","al":"center"},{"c":"D24","v":1.5,"f":"=D10/D23","b":true,"al":"center","nf":"0.00"},{"c":"E24","v":"Q_des / A_total (سرعة آمنة < 4.5 م/ث)","cs":2},{"skip":true}]},{"r":25,"h":72.0,"cells":[{"c":"A25","v":"منسوب المياه الحرج داخل القطاع (Critical Depth - yc):"},{"c":"B25","v":"y_c","al":"center"},{"c":"C25","v":"متر (m)","al":"center"},{"c":"D25","v":1.127706,"f":"=(D10/(D11*D12))^0.667*0.467","b":true,"al":"center","nf":"0.00"},{"c":"E25","v":"عمق التدفق الحرج لقطاع مستطيل","cs":2},{"skip":true}]},{"r":26,"h":72.0,"cells":[{"c":"A26","v":"عمق المياه في حالة التحكم بالمدخل (Inlet Control Depth - HWi):","b":true},{"c":"B26","v":"HW_in","al":"center"},{"c":"C26","v":"متر (m)","al":"center"},{"c":"D26","v":2.471989,"f":"=D13*(0.038*(D10/(D11*D12*SQRT(D13)))^1.5+0.85)","b":true,"al":"center","nf":"0.00"},{"c":"E26","v":"معادلة FHWA HDS-5 الشكل المستطيل بأجنحة توجيه","cs":2},{"skip":true}]},{"r":27,"h":52.0,"cells":[{"c":"A27","v":"عمق المياه في حالة التحكم بالمخرج (Outlet Control Depth - HWo):","b":true},{"c":"B27","v":"HW_out","al":"center"},{"c":"C27","v":"متر (m)","al":"center"},{"c":"D27","v":1.724937,"f":"=1.80+(1+0.5+(29.16*(D16^2)*D14)/((D23/(2*D11*(D12+D13)))^1.33))*(D24^2)/(2*9.81)-(D14*D15)","b":true,"al":"center","nf":"0.00"},{"c":"E27","v":"معادلة الطاقة الشاملة مع فواقد الاحتكاك والدخول","cs":2},{"skip":true}]},{"r":28,"h":72.0,"cells":[{"c":"A28","v":"عمق المياه الحاكم للعبارة (Governing Headwater - HW):","b":true},{"c":"B28","v":"HW_gov","al":"center"},{"c":"C28","v":"متر (m)","al":"center"},{"c":"D28","v":2.471989,"f":"=MAX(D26, D27)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"0.00"},{"c":"E28","v":"القيمة الأكبر بين تحكم المدخل وتحكم المخرج","cs":2},{"skip":true}]},{"r":29,"h":72.0,"cells":[{"c":"A29","v":"منسوب المياه العلوي التصميمي الأقصى (Actual Headwater Elevation):"},{"c":"B29","v":"El_HW","al":"center"},{"c":"C29","v":"متر (m)","al":"center"},{"c":"D29","v":452.471989,"f":"=D17+D28","b":true,"al":"center","nf":"0.00"},{"c":"E29","v":"منسوب قاع المدخل + عمق المياه الحاكم","cs":2},{"skip":true}]},{"r":30,"h":72.0,"cells":[{"c":"A30","v":"الخلوص الحر الفعلي المتبقي تحت الطريق (Actual Freeboard):","b":true},{"c":"B30","v":"FB_act","al":"center"},{"c":"C30","v":"متر (m)","al":"center"},{"c":"D30","v":3.028011,"f":"=D19-D29","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"0.00"},{"c":"E30","v":"منسوب الطريق - منسوب المياه العلوي","cs":2},{"skip":true}]},{"r":31,"h":72.0,"cells":[{"c":"A31","v":"حالة الكفاءة والاستيعاب الهيدروليكي (Hydraulic Compliance):","b":true},{"c":"B31","v":"Status_H","al":"center"},{"c":"C31","v":"قرار الفحص","al":"center"},{"c":"D31","v":"مطابق للشروط الهيدروليكية وفائض الأمان كافٍ (PASSED)","f":"=IF(D30>=0.5,\"مطابق للشروط الهيدروليكية وفائض الأمان كافٍ (PASSED)\",\"غير مطابق - يلزم زيادة أبعاد العبارة\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"E31","v":"التحقق من توفر خلوص أمان حر >= 0.50 م","cs":2},{"skip":true}]},{"r":32,"h":72.0,"cells":[{"c":"A32","v":"سرعة خروج المياه عند المصب والحاجة لحماية الدبش (Outlet Velocity):"},{"c":"B32","v":"V_out","al":"center"},{"c":"C32","v":"م/ث (m/s)","al":"center"},{"c":"D32","v":1.725,"f":"=D24*1.15","b":true,"al":"center","nf":"0.00"},{"c":"E32","v":"تتطلب مصدات طاقة وتكاسي دبش جابيونات (Gabions) لحماية المصب","cs":2},{"skip":true}]},{"r":33,"h":28.0,"cells":[{"c":"A33","v":""},{"c":"B33","v":""},{"c":"C33","v":""},{"c":"D33","v":""},{"c":"E33","v":""},{"c":"F33","v":""}]},{"r":34,"h":52.0,"cells":[{"c":"A34","v":"التدفق التصميمي للعبارة:\n=D10 م³/ث","bg":"#EFF6FF","fg":"#1D4ED8","b":true,"al":"center","rs":2,"cs":2},{"skip":true},{"c":"C34","v":"الخلوص الحر الفعلي (Freeboard):\n=D30 متر","bg":"#EFF6FF","fg":"#1D4ED8","b":true,"al":"center","rs":2,"cs":2},{"skip":true},{"c":"E34","v":"التقييم الهيدروليكي النهائي:\n=D31","bg":"#DCFCE7","fg":"#1D4ED8","b":true,"al":"center","rs":2,"cs":2},{"skip":true}]},{"r":35,"h":28.0,"cells":[{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":36,"h":28.0,"cells":[{"c":"A36","v":""},{"c":"B36","v":""},{"c":"C36","v":""},{"c":"D36","v":""},{"c":"E36","v":""},{"c":"F36","v":""}]},{"r":37,"h":72.0,"cells":[{"c":"A37","v":"مهندس الهيدرولوجيا والتصميم المائي:\nم. حسام الدين عبد الله\nالتوقيع: ........................","al":"center","cs":2},{"skip":true},{"c":"C37","v":"مهندس التصميم الإنشائي للكباري:\nم. أحمد الجوهري\nالتوقيع: ........................","al":"center","cs":2},{"skip":true},{"c":"E37","v":"استشاري الطرق والجسور المعتمد:\nالمكتب الهندسي الاستشاري\nالاعتماد: ........................","al":"center","cs":2},{"skip":true}]}]}]}