{"slug":"bridge-elastomeric-bearing-pads-and-expansion-joints-design-sheet","sheets":[{"name":"إعدادات المشروع والأسعار","maxRow":31,"maxCol":7,"colWidths":[14.0,58.0,18.0,24.0,16.0,22.0,38.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"شيت تصميم وحصر ركائز الكباري المطاطية وفواصل التمدد الإنشائية (AASHTO LRFD / SBC 301 / EN 1337)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"⚠️ تنبيه استرشادي: القيم والأبعاد وفئات الأسعار المدخلة في هذا الشيت هي نماذج استرشادية لمتوسطات مشاريع الكباري والبنية التحتية. يرجى مراجعة وتعديل معايير التصميم وأسعار التوريد وفقاً لمخططات الكوبري المعتمدة والمواصفات التعاقدية.","bg":"#334155","fg":"#FFFFFF","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":38.0,"cells":[{"c":"A3","v":"أولاً: البيانات العامة للمشروع والكوبري ومراجع التصميم","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":4,"h":35.0,"cells":[{"c":"A4","v":"اسم المشروع","bg":"#F8FAFC","b":true},{"c":"B4","v":"مشروع إنشاء كوبري تقاطع المحور الرئيسي مع طريق الخدمة السريع","cs":3},{"skip":true},{"skip":true},{"c":"E4","v":"الجهة المالكة","bg":"#F8FAFC","b":true},{"c":"F4","v":"وزارة النقل والخدمات اللوجستية / هيئة الطرق","cs":2},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"استشاري التصميم والإشراف","bg":"#F8FAFC","b":true},{"c":"B5","v":"مكتب الاستشارات الهندسية التخصصية للجسور والأنفاق","cs":3},{"skip":true},{"skip":true},{"c":"E5","v":"المقاول العام للمشروع","bg":"#F8FAFC","b":true},{"c":"F5","v":"شركة الإنشاءات الكبرى للكباري والبنية التحتية","cs":2},{"skip":true}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"الكود المرجعي للتصميم","bg":"#F8FAFC","b":true},{"c":"B6","v":"AASHTO LRFD (Section 14) / SBC 301 / EN 1337-3","cs":3},{"skip":true},{"skip":true},{"c":"E6","v":"تاريخ إعداد الدراسة","bg":"#F8FAFC","b":true},{"c":"F6","v":"2026-10-18","al":"center","cs":2},{"skip":true}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"نظام الإنشاء العلوي للكوبري","bg":"#F8FAFC","b":true},{"c":"B7","v":"كمرات خرسانية مسبقة الصب والجهد (Precast Prestressed I-Girders)","cs":3},{"skip":true},{"skip":true},{"c":"E7","v":"عملة التسعير والتعاقد","bg":"#F8FAFC","b":true},{"c":"F7","v":"ر.س SAR","al":"center","cs":2},{"skip":true}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"ثانياً: المعايير والمحددات الفيزيائية والميكانيكية للمواد (AASHTO Parameters)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":40.0,"cells":[{"c":"A9","v":"م","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"المحدد التصميمي / الخاصية الفيزيائية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"الرمز الهندسي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"القيمة التصميمية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"الوحدة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"المرجع القياسي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"الملاحظات والاشتراطات","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":10,"h":35.0,"cells":[{"c":"A10","v":1,"bg":"#F8FAFC","al":"center"},{"c":"B10","v":"معامل القص الفعال لمطاط النيوبرين (Neoprene Elastomer Shear Modulus)","bg":"#F8FAFC"},{"c":"C10","v":"G","bg":"#F8FAFC","al":"center"},{"c":"D10","v":0.9,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"E10","v":"ميجا باسكال MPa","bg":"#F8FAFC","al":"center"},{"c":"F10","v":"AASHTO M251 / ASTM D4014","bg":"#F8FAFC","al":"center"},{"c":"G10","v":"صلادة المطاط 55-60 Shore A","bg":"#F8FAFC"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":2,"al":"center"},{"c":"B11","v":"إجهاد الضغط الأقصى المسموح تحت الحمل التشغيلي الإجمالي (Total Service Load)"},{"c":"C11","v":"σ_all,TL","al":"center"},{"c":"D11","v":7.5,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"E11","v":"ميجا باسكال MPa","al":"center"},{"c":"F11","v":"AASHTO LRFD 14.7.6.2","al":"center"},{"c":"G11","v":"حد الأمان لمنع التشوه الزائد"}]},{"r":12,"h":35.0,"cells":[{"c":"A12","v":3,"bg":"#F8FAFC","al":"center"},{"c":"B12","v":"إجهاد الضغط الأقصى المسموح تحت الحمل الميت الدائم (Dead Load Only)","bg":"#F8FAFC"},{"c":"C12","v":"σ_all,DL","bg":"#F8FAFC","al":"center"},{"c":"D12","v":4.5,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"E12","v":"ميجا باسكال MPa","bg":"#F8FAFC","al":"center"},{"c":"F12","v":"AASHTO LRFD Method A","bg":"#F8FAFC","al":"center"},{"c":"G12","v":"لمنع تلف جزيئات المطاط","bg":"#F8FAFC"}]},{"r":13,"h":35.0,"cells":[{"c":"A13","v":4,"al":"center"},{"c":"B13","v":"معامل التمدد الحراري للخرسانة المسلحة (Thermal Expansion Coefficient)"},{"c":"C13","v":"α_c","al":"center"},{"c":"D13","v":1.08e-05,"in":true,"b":true,"al":"center","nf":"0.0000000"},{"c":"E13","v":"1 / درجة مئوية","al":"center"},{"c":"F13","v":"SBC 301 / AASHTO 5.4.2.2","al":"center"},{"c":"G13","v":"مكافئ لـ 10.8 × 10^-6"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":5,"bg":"#F8FAFC","al":"center"},{"c":"B14","v":"المدى الحراري الكلي للتصميم الإنشائي (Design Temperature Range)","bg":"#F8FAFC"},{"c":"C14","v":"ΔT","bg":"#F8FAFC","al":"center"},{"c":"D14","v":35,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"E14","v":"درجة مئوية °C","bg":"#F8FAFC","al":"center"},{"c":"F14","v":"الأرصاد الجوية السعودية / MOT","bg":"#F8FAFC","al":"center"},{"c":"G14","v":"الفرق بين أقصى صيف وأدنى شتاء","bg":"#F8FAFC"}]},{"r":15,"h":35.0,"cells":[{"c":"A15","v":6,"al":"center"},{"c":"B15","v":"انفعال انكماش الجفاف والزحف الخرساني طويل الأجل (Shrinkage & Creep)"},{"c":"C15","v":"ε_sh+cr","al":"center"},{"c":"D15","v":0.00025,"in":true,"b":true,"al":"center","nf":"0.00000"},{"c":"E15","v":"بدون وحدة","al":"center"},{"c":"F15","v":"AASHTO LRFD 5.4.2.3","al":"center"},{"c":"G15","v":"مكافئ لـ 250 microstrain"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":7,"bg":"#F8FAFC","al":"center"},{"c":"B16","v":"معامل الصدم الديناميكي للحمل الحي للمركبات (Dynamic Load Allowance)","bg":"#F8FAFC"},{"c":"C16","v":"IM","bg":"#F8FAFC","al":"center"},{"c":"D16","v":1.25,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"E16","v":"بدون وحدة","bg":"#F8FAFC","al":"center"},{"c":"F16","v":"AASHTO LRFD Table 3.6.2.1-1","bg":"#F8FAFC","al":"center"},{"c":"G16","v":"زيادة 25% على أحمال الشاحنات","bg":"#F8FAFC"}]},{"r":17,"h":35.0,"cells":[{"c":"A17","v":8,"al":"center"},{"c":"B17","v":"إجهاد الخضوع لشرائح الصلب الداخلية المقواة (Steel Shim Yield Strength)"},{"c":"C17","v":"F_y","al":"center"},{"c":"D17","v":250,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"E17","v":"ميجا باسكال MPa","al":"center"},{"c":"F17","v":"ASTM A1011 Grade 36","al":"center"},{"c":"G17","v":"ألواح صلب كربوني مدرفلة"}]},{"r":18,"h":35.0,"cells":[{"c":"A18","v":9,"bg":"#F8FAFC","al":"center"},{"c":"B18","v":"مقاومة ضغط المونة الإيبوكسية غير القابلة للانكماش (Epoxy Grout Strength)","bg":"#F8FAFC"},{"c":"C18","v":"f_grout","bg":"#F8FAFC","al":"center"},{"c":"D18","v":80,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"E18","v":"ميجا باسكال MPa","bg":"#F8FAFC","al":"center"},{"c":"F18","v":"ASTM C579 / SBC 304","bg":"#F8FAFC","al":"center"},{"c":"G18","v":"لقواعد ارتكاز الركائز أسفل الكمرات","bg":"#F8FAFC"}]},{"r":19,"h":28.0,"cells":[{"c":"A19","v":""},{"c":"B19","v":""},{"c":"C19","v":""},{"c":"D19","v":""},{"c":"E19","v":""},{"c":"F19","v":""},{"c":"G19","v":""}]},{"r":20,"h":38.0,"cells":[{"c":"A20","v":"ثالثاً: جدول فئات أسعار التوريد والتركيب القياسية لبنود المقايسة (Setup Benchmark Rates)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":21,"h":40.0,"cells":[{"c":"A21","v":"كود البند","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B21","v":"توصيف بند الأعمال والمواصفة الفنية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C21","v":"الوحدة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D21","v":"فئة السعر الاسترشادية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E21","v":"العملة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F21","v":"نسبة الهالك والمصنعيات","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G21","v":"ملاحظات التوريد والاشتراطات","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":22,"h":36.0,"cells":[{"c":"A22","v":"RATE-01","bg":"#F8FAFC","al":"center"},{"c":"B22","v":"توريد وتركيب ركائز نيوبرين مسلحة بشرائح صلب 350×400×65 مم مع شهادة الفحص","bg":"#F8FAFC"},{"c":"C22","v":"قطعة","bg":"#F8FAFC","al":"center"},{"c":"D22","v":1450,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E22","v":"ر.س SAR","bg":"#F8FAFC","al":"center"},{"c":"F22","v":0.05,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0%"},{"c":"G22","v":"مطابقة لـ AASHTO M251 واختبارات الجودة","bg":"#F8FAFC"}]},{"r":23,"h":52.0,"cells":[{"c":"A23","v":"RATE-02","al":"center"},{"c":"B23","v":"توريد وتركيب ركائز نيوبرين مسلحة بشرائح صلب 400×500×85 مم للبحور المتوسطة"},{"c":"C23","v":"قطعة","al":"center"},{"c":"D23","v":2100,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E23","v":"ر.س SAR","al":"center"},{"c":"F23","v":0.05,"in":true,"al":"center","nf":"0.0%"},{"c":"G23","v":"مزودة بطبقات داخلية مقواة وطلاء مقاوم للعوامل"}]},{"r":24,"h":36.0,"cells":[{"c":"A24","v":"RATE-03","bg":"#F8FAFC","al":"center"},{"c":"B24","v":"توريد وتركيب ركائز نيوبرين ثابتة مع بنوز قص زلزالية 450×550×95 مم","bg":"#F8FAFC"},{"c":"C24","v":"قطعة","bg":"#F8FAFC","al":"center"},{"c":"D24","v":2850,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E24","v":"ر.س SAR","bg":"#F8FAFC","al":"center"},{"c":"F24","v":0.05,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0%"},{"c":"G24","v":"تتحمل أحمال زلزالية وقوى فرملة أفقية","bg":"#F8FAFC"}]},{"r":25,"h":52.0,"cells":[{"c":"A25","v":"RATE-04","al":"center"},{"c":"B25","v":"مونة إيبوكسية غير قابلة للانكماش لقواعد الركائز (Non-Shrink Epoxy Grout 80 MPa)"},{"c":"C25","v":"م³","al":"center"},{"c":"D25","v":4200,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E25","v":"ر.س SAR","al":"center"},{"c":"F25","v":0.08,"in":true,"al":"center","nf":"0.0%"},{"c":"G25","v":"صب ذاتي التسوية مع معالجة الأسطح الخرسانية"}]},{"r":26,"h":52.0,"cells":[{"c":"A26","v":"RATE-05","bg":"#F8FAFC","al":"center"},{"c":"B26","v":"خرسانة مسلحة لقوائم ارتكاز الركائز (Pedestals C40/50) شاملة التسليح والشدات","bg":"#F8FAFC"},{"c":"C26","v":"م³","bg":"#F8FAFC","al":"center"},{"c":"D26","v":750,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E26","v":"ر.س SAR","bg":"#F8FAFC","al":"center"},{"c":"F26","v":0.05,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0%"},{"c":"G26","v":"خرسانة عالية المقاومة مع تسليح حلزوني مكثف","bg":"#F8FAFC"}]},{"r":27,"h":52.0,"cells":[{"c":"A27","v":"RATE-06","al":"center"},{"c":"B27","v":"توريد وتركيب فواصل تمدد مطاطية بشرائح صلب (Strip Seal Joint حركة حتى 80 مم)"},{"c":"C27","v":"م.ط","al":"center"},{"c":"D27","v":1850,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E27","v":"ر.س SAR","al":"center"},{"c":"F27","v":0.05,"in":true,"al":"center","nf":"0.0%"},{"c":"G27","v":"شامل المقاطع الفولاذية المجلفنة وشريط النيوبرين"}]},{"r":28,"h":52.0,"cells":[{"c":"A28","v":"RATE-07","bg":"#F8FAFC","al":"center"},{"c":"B28","v":"توريد وتركيب فواصل تمدد معيارية للحركات الكبيرة (Modular Joint حركة حتى 160 مم)","bg":"#F8FAFC"},{"c":"C28","v":"م.ط","bg":"#F8FAFC","al":"center"},{"c":"D28","v":4600,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E28","v":"ر.س SAR","bg":"#F8FAFC","al":"center"},{"c":"F28","v":0.05,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0%"},{"c":"G28","v":"نظام كمرات وسيطة مع قضبان تحكم وتوجيه","bg":"#F8FAFC"}]},{"r":29,"h":52.0,"cells":[{"c":"A29","v":"RATE-08","al":"center"},{"c":"B29","v":"خرسانة بوليمرية عالية المرونة لأكتاف فواصل التمدد (Polymer Concrete Headers)"},{"c":"C29","v":"م.ط","al":"center"},{"c":"D29","v":650,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E29","v":"ر.س SAR","al":"center"},{"c":"F29","v":0.08,"in":true,"al":"center","nf":"0.0%"},{"c":"G29","v":"سريعة التصلب ومقاومة للاهتراء وصدم العجلات"}]},{"r":30,"h":52.0,"cells":[{"c":"A30","v":"RATE-09","bg":"#F8FAFC","al":"center"},{"c":"B30","v":"صدادات خرسانية جانبية زلزالية مع ألواح نيوبرين ممتصة للصدمات (Shear Keys)","bg":"#F8FAFC"},{"c":"C30","v":"قطعة","bg":"#F8FAFC","al":"center"},{"c":"D30","v":950,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E30","v":"ر.س SAR","bg":"#F8FAFC","al":"center"},{"c":"F30","v":0.05,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0%"},{"c":"G30","v":"لحماية الكوبري من الانزلاق العرضي أثناء الزلازل","bg":"#F8FAFC"}]},{"r":31,"h":36.0,"cells":[{"c":"A31","v":"RATE-10","al":"center"},{"c":"B31","v":"إجراء الاختبارات المعملية الشاملة على عينات الركائز المعتمدة (تحميل وقص)"},{"c":"C31","v":"عينة","al":"center"},{"c":"D31","v":3500,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E31","v":"ر.س SAR","al":"center"},{"c":"F31","v":0,"in":true,"al":"center","nf":"0.0%"},{"c":"G31","v":"بمعامل أبحاث الطرق المعتمدة وفق AASHTO M251"}]}]},{"name":"تصميم وتحقق ركائز النيوبرين","maxRow":13,"maxCol":17,"colWidths":[8.0,32.0,34.0,16.0,28.0,14.0,18.0,18.0,16.0,20.0,20.0,18.0,16.0,18.0,13.0,18.0,26.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول التصميم الإنشائي والتحقق من كفاءة ركائز النيوبرين المسلحة للكباري (AASHTO LRFD Method A)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":17},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":42.0,"cells":[{"c":"A2","v":"حساب إجهادات الضغط الخدمية، معامل الشكل الهندسي، إزاحة القص الحرارية والانكماش، والتحقق من عدم حدوث انفصال Uplift أو عدم استقرار","bg":"#334155","fg":"#FFFFFF","al":"center","cs":17},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":34.0,"cells":[{"c":"A3","v":"إجمالي عدد ركائز الكوبري","bg":"#F8FAFC","fg":"#334155","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"E3","v":"أقصى حمل ضغط تشغيلي P_max","bg":"#F8FAFC","fg":"#334155","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"I3","v":"أقصى إجهاد ضغط فعلي σ_max","bg":"#F8FAFC","fg":"#334155","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"M3","v":"أقصى إزاحة قص أفقية Δs_max","bg":"#F8FAFC","fg":"#334155","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":4,"h":46.0,"cells":[{"c":"A4","v":38,"f":"=SUM(F6:F12)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"E4","v":932.5,"f":"=MAX(J6:J12)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"I4","v":4.428571,"f":"=MAX(N6:N12)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"M4","v":10.5,"f":"=MAX(P6:P12)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"م","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"موقع الارتكاز والمحور","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"نوع الكمرة الإنشائية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"طول البحر (م)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"نوع الركيزة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"عدد الركائز","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"الحمل الميت P_DL (kN)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"الحمل الحي P_LL (kN)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I5","v":"معامل الصدم IM","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J5","v":"الحمل الكلي P_TL (kN)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K5","v":"أبعاد الركيزة W×L (مم)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L5","v":"السماكة الكلية H (مم)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M5","v":"معامل الشكل S","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"N5","v":"إجهاد الضغط σ (MPa)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"O5","v":"الإجهاد المسموح (MPa)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"P5","v":"إزاحة القص Δs (مم)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"Q5","v":"حالة التحقق الهندسية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":36.0,"cells":[{"c":"A6","v":1,"bg":"#F8FAFC","al":"center"},{"c":"B6","v":"دعامة البداية (Abutment A1 - غرب)","bg":"#F8FAFC"},{"c":"C6","v":"كمرات خرسانية مسبقة الصب I-Girder","bg":"#F8FAFC"},{"c":"D6","v":28,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"E6","v":"نيوبرين مسلحة (حرة التمدد)","bg":"#F8FAFC"},{"c":"F6","v":6,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"G6","v":320,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"H6","v":240,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"I6","v":1.25,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"J6","v":620,"f":"=G6+H6*I6","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"K6","v":"350×400","bg":"#F8FAFC","al":"center"},{"c":"L6","v":65,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"M6","v":7.5,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"N6","v":4.428571,"f":"=(J6*1000)/140000.0","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"O6","v":7.5,"f":"='إعدادات المشروع والأسعار'!$D$11","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"P6","v":8.2,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"Q6","v":"مطابق وآمن (PASS)","f":"=IF(N6<=O6, \"مطابق وآمن (PASS)\", \"يتطلب زيادة الأبعاد (FAIL)\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":2,"al":"center"},{"c":"B7","v":"العمود الأول (Pier P1 - المحور 1)"},{"c":"C7","v":"كمرات خرسانية مسبقة الصب I-Girder"},{"c":"D7","v":35,"in":true,"al":"center","nf":"0.0"},{"c":"E7","v":"نيوبرين مسلحة (حرة التمدد)"},{"c":"F7","v":6,"in":true,"al":"center","nf":"#,##0"},{"c":"G7","v":480,"in":true,"al":"center","nf":"#,##0.0"},{"c":"H7","v":310,"in":true,"al":"center","nf":"#,##0.0"},{"c":"I7","v":1.25,"in":true,"al":"center","nf":"0.00"},{"c":"J7","v":867.5,"f":"=G7+H7*I7","b":true,"al":"center","nf":"#,##0.0"},{"c":"K7","v":"400×500","al":"center"},{"c":"L7","v":85,"in":true,"al":"center","nf":"0.0"},{"c":"M7","v":8.8,"in":true,"al":"center","nf":"0.00"},{"c":"N7","v":4.3375,"f":"=(J7*1000)/200000.0","b":true,"al":"center","nf":"0.00"},{"c":"O7","v":7.5,"f":"='إعدادات المشروع والأسعار'!$D$11","al":"center","nf":"0.00"},{"c":"P7","v":10.5,"in":true,"al":"center","nf":"0.0"},{"c":"Q7","v":"مطابق وآمن (PASS)","f":"=IF(N7<=O7, \"مطابق وآمن (PASS)\", \"يتطلب زيادة الأبعاد (FAIL)\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":8,"h":36.0,"cells":[{"c":"A8","v":3,"bg":"#F8FAFC","al":"center"},{"c":"B8","v":"العمود الثاني (Pier P2 - منتصف الكوبري)","bg":"#F8FAFC"},{"c":"C8","v":"كمرات خرسانية مسبقة الصب I-Girder","bg":"#F8FAFC"},{"c":"D8","v":35,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"E8","v":"نيوبرين مقواة (ثابتة مع بنوز قص)","bg":"#F8FAFC"},{"c":"F8","v":6,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"G8","v":520,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"H8","v":330,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"I8","v":1.25,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"J8","v":932.5,"f":"=G8+H8*I8","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"K8","v":"450×550","bg":"#F8FAFC","al":"center"},{"c":"L8","v":95,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"M8","v":9.5,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"N8","v":3.767677,"f":"=(J8*1000)/247500.0","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"O8","v":7.5,"f":"='إعدادات المشروع والأسعار'!$D$11","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"P8","v":4,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"Q8","v":"مطابق وآمن (PASS)","f":"=IF(N8<=O8, \"مطابق وآمن (PASS)\", \"يتطلب زيادة الأبعاد (FAIL)\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":9,"h":36.0,"cells":[{"c":"A9","v":4,"al":"center"},{"c":"B9","v":"العمود الثالث (Pier P3 - المحور 3)"},{"c":"C9","v":"كمرات خرسانية مسبقة الصب I-Girder"},{"c":"D9","v":35,"in":true,"al":"center","nf":"0.0"},{"c":"E9","v":"نيوبرين مسلحة (حرة التمدد)"},{"c":"F9","v":6,"in":true,"al":"center","nf":"#,##0"},{"c":"G9","v":480,"in":true,"al":"center","nf":"#,##0.0"},{"c":"H9","v":310,"in":true,"al":"center","nf":"#,##0.0"},{"c":"I9","v":1.25,"in":true,"al":"center","nf":"0.00"},{"c":"J9","v":867.5,"f":"=G9+H9*I9","b":true,"al":"center","nf":"#,##0.0"},{"c":"K9","v":"400×500","al":"center"},{"c":"L9","v":85,"in":true,"al":"center","nf":"0.0"},{"c":"M9","v":8.8,"in":true,"al":"center","nf":"0.00"},{"c":"N9","v":4.3375,"f":"=(J9*1000)/200000.0","b":true,"al":"center","nf":"0.00"},{"c":"O9","v":7.5,"f":"='إعدادات المشروع والأسعار'!$D$11","al":"center","nf":"0.00"},{"c":"P9","v":10.5,"in":true,"al":"center","nf":"0.0"},{"c":"Q9","v":"مطابق وآمن (PASS)","f":"=IF(N9<=O9, \"مطابق وآمن (PASS)\", \"يتطلب زيادة الأبعاد (FAIL)\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":5,"bg":"#F8FAFC","al":"center"},{"c":"B10","v":"دعامة النهاية (Abutment A2 - شرق)","bg":"#F8FAFC"},{"c":"C10","v":"كمرات خرسانية مسبقة الصب I-Girder","bg":"#F8FAFC"},{"c":"D10","v":28,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"E10","v":"نيوبرين مسلحة (حرة التمدد)","bg":"#F8FAFC"},{"c":"F10","v":6,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"G10","v":320,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"H10","v":240,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"I10","v":1.25,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"J10","v":620,"f":"=G10+H10*I10","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"K10","v":"350×400","bg":"#F8FAFC","al":"center"},{"c":"L10","v":65,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"M10","v":7.5,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"N10","v":4.428571,"f":"=(J10*1000)/140000.0","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"O10","v":7.5,"f":"='إعدادات المشروع والأسعار'!$D$11","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"P10","v":8.2,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"Q10","v":"مطابق وآمن (PASS)","f":"=IF(N10<=O10, \"مطابق وآمن (PASS)\", \"يتطلب زيادة الأبعاد (FAIL)\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":6,"al":"center"},{"c":"B11","v":"كمرات المدخل المنحدر (Ramp Girder R1)"},{"c":"C11","v":"كمرات صلبة مركبة Steel Composite"},{"c":"D11","v":22,"in":true,"al":"center","nf":"0.0"},{"c":"E11","v":"نيوبرين مسلحة مستطيلة"},{"c":"F11","v":4,"in":true,"al":"center","nf":"#,##0"},{"c":"G11","v":260,"in":true,"al":"center","nf":"#,##0.0"},{"c":"H11","v":210,"in":true,"al":"center","nf":"#,##0.0"},{"c":"I11","v":1.25,"in":true,"al":"center","nf":"0.00"},{"c":"J11","v":522.5,"f":"=G11+H11*I11","b":true,"al":"center","nf":"#,##0.0"},{"c":"K11","v":"350×350","al":"center"},{"c":"L11","v":55,"in":true,"al":"center","nf":"0.0"},{"c":"M11","v":7.5,"in":true,"al":"center","nf":"0.00"},{"c":"N11","v":4.265306,"f":"=(J11*1000)/122500.0","b":true,"al":"center","nf":"0.00"},{"c":"O11","v":7.5,"f":"='إعدادات المشروع والأسعار'!$D$11","al":"center","nf":"0.00"},{"c":"P11","v":6.5,"in":true,"al":"center","nf":"0.0"},{"c":"Q11","v":"مطابق وآمن (PASS)","f":"=IF(N11<=O11, \"مطابق وآمن (PASS)\", \"يتطلب زيادة الأبعاد (FAIL)\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":7,"bg":"#F8FAFC","al":"center"},{"c":"B12","v":"كمرات المخرج المنحدر (Ramp Girder R2)","bg":"#F8FAFC"},{"c":"C12","v":"كمرات صلبة مركبة Steel Composite","bg":"#F8FAFC"},{"c":"D12","v":22,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"E12","v":"نيوبرين مسلحة مستطيلة","bg":"#F8FAFC"},{"c":"F12","v":4,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"G12","v":260,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"H12","v":210,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"I12","v":1.25,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"J12","v":522.5,"f":"=G12+H12*I12","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"K12","v":"350×350","bg":"#F8FAFC","al":"center"},{"c":"L12","v":55,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"M12","v":7.5,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"N12","v":4.265306,"f":"=(J12*1000)/122500.0","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"O12","v":7.5,"f":"='إعدادات المشروع والأسعار'!$D$11","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"P12","v":6.5,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"Q12","v":"مطابق وآمن (PASS)","f":"=IF(N12<=O12, \"مطابق وآمن (PASS)\", \"يتطلب زيادة الأبعاد (FAIL)\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":13,"h":40.0,"cells":[{"c":"A13","v":"إجمالي عدد الركائز لكامل الجسور ومعدل الأحمال","bg":"#DBEAFE","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F13","v":38,"f":"=SUM(F6:F12)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0"},{"c":"G13","v":"إجمالي ردود الأفعال الرأسية للكوبري (kN):","bg":"#DBEAFE","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"J13","v":27625,"f":"=SUMPRODUCT(F6:F12,J6:J12)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"K13","v":"كافة الركائز تحقق متطلبات الإجهاد والانفعال وقوى القص والأمان الزلزالي AASHTO LRFD","bg":"#DBEAFE","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]}]},{"name":"حسابات فواصل التمدد الإنشائية","maxRow":10,"maxCol":13,"colWidths":[8.0,38.0,20.0,18.0,20.0,20.0,18.0,22.0,20.0,40.0,18.0,20.0,26.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"حسابات وتصميم فواصل التمدد الإنشائية للجسور وسعة الحركة المعتمدة (AASHTO Movement Rating)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":42.0,"cells":[{"c":"A2","v":"نمذجة الحركات الحرارية والانكماش والزحف وتحديد فتحة التركيب عند درجة الحرارة المرجعية واختيار طراز الفاصل المطاطي","bg":"#334155","fg":"#FFFFFF","al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":34.0,"cells":[{"c":"A3","v":"إجمالي أطوال فواصل التمدد","bg":"#F8FAFC","fg":"#334155","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"E3","v":"أقصى سعة حركة تصميمية MR_max","bg":"#F8FAFC","fg":"#334155","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"I3","v":"فتحة التركيب النموذجية عند 25°C","bg":"#F8FAFC","fg":"#334155","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":4,"h":46.0,"cells":[{"c":"A4","v":85.5,"f":"=SUM(K6:K9)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"E4","v":44.875,"f":"=MAX(H6:H9)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"I4","v":"45.0 مم","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"م","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"موقع فاصل التمدد","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"طول التمدد المؤثر L_exp (م)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"الحركة الحرارية ΔL_T (مم)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"حركة الانكماش والزحف (مم)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"إجمالي الحركة المحسوبة (مم)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"معامل أمان AASHTO","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"سعة الحركة التصميمية MR (مم)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I5","v":"فتحة التركيب عند 25°C (مم)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J5","v":"نوع وطراز الفاصل المعتمد","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K5","v":"طول الفاصل الإجمالي (م.ط)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L5","v":"سعة حركة الفاصل المختار (مم)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M5","v":"التقييم الفني والمطابقة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":1,"bg":"#F8FAFC","al":"center"},{"c":"B6","v":"فاصل التمدد الغربي (عند دعامة البداية Abutment A1)","bg":"#F8FAFC"},{"c":"C6","v":63,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"D6","v":23.8,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"E6","v":8.5,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"F6","v":32.3,"f":"=D6+E6","bg":"#F8FAFC","b":true,"al":"center","nf":"0.0"},{"c":"G6","v":1.25,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"H6","v":40.375,"f":"=F6*G6","bg":"#F8FAFC","b":true,"al":"center","nf":"0.0"},{"c":"I6","v":45,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"J6","v":"فاصل شريطي مطاطي بقطاع صلب (Strip Seal)","bg":"#F8FAFC"},{"c":"K6","v":24.5,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"L6","v":80,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"M6","v":"سعة كافية ومطابقة (OK)","f":"=IF(L6>=H6, \"سعة كافية ومطابقة (OK)\", \"يلزم طراز أكبر (REVISE)\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":2,"al":"center"},{"c":"B7","v":"فاصل التمدد الأوسط (عند العمود الرئيسي Pier P2)"},{"c":"C7","v":70,"in":true,"al":"center","nf":"0.0"},{"c":"D7","v":26.5,"in":true,"al":"center","nf":"0.0"},{"c":"E7","v":9.4,"in":true,"al":"center","nf":"0.0"},{"c":"F7","v":35.9,"f":"=D7+E7","b":true,"al":"center","nf":"0.0"},{"c":"G7","v":1.25,"in":true,"al":"center","nf":"0.00"},{"c":"H7","v":44.875,"f":"=F7*G7","b":true,"al":"center","nf":"0.0"},{"c":"I7","v":48,"in":true,"al":"center","nf":"0.0"},{"c":"J7","v":"فاصل شريطي مطاطي بقطاع صلب (Strip Seal)"},{"c":"K7","v":24.5,"in":true,"al":"center","nf":"0.0"},{"c":"L7","v":80,"in":true,"al":"center","nf":"0.0"},{"c":"M7","v":"سعة كافية ومطابقة (OK)","f":"=IF(L7>=H7, \"سعة كافية ومطابقة (OK)\", \"يلزم طراز أكبر (REVISE)\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":3,"bg":"#F8FAFC","al":"center"},{"c":"B8","v":"فاصل التمدد الشرقي (عند دعامة النهاية Abutment A2)","bg":"#F8FAFC"},{"c":"C8","v":63,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"D8","v":23.8,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"E8","v":8.5,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"F8","v":32.3,"f":"=D8+E8","bg":"#F8FAFC","b":true,"al":"center","nf":"0.0"},{"c":"G8","v":1.25,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"H8","v":40.375,"f":"=F8*G8","bg":"#F8FAFC","b":true,"al":"center","nf":"0.0"},{"c":"I8","v":45,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"J8","v":"فاصل شريطي مطاطي بقطاع صلب (Strip Seal)","bg":"#F8FAFC"},{"c":"K8","v":24.5,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"L8","v":80,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"M8","v":"سعة كافية ومطابقة (OK)","f":"=IF(L8>=H8, \"سعة كافية ومطابقة (OK)\", \"يلزم طراز أكبر (REVISE)\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":4,"al":"center"},{"c":"B9","v":"فاصل مدخل المنحدر الشمالي (Ramp Expansion Joint)"},{"c":"C9","v":44,"in":true,"al":"center","nf":"0.0"},{"c":"D9","v":16.6,"in":true,"al":"center","nf":"0.0"},{"c":"E9","v":5.9,"in":true,"al":"center","nf":"0.0"},{"c":"F9","v":22.5,"f":"=D9+E9","b":true,"al":"center","nf":"0.0"},{"c":"G9","v":1.25,"in":true,"al":"center","nf":"0.00"},{"c":"H9","v":28.125,"f":"=F9*G9","b":true,"al":"center","nf":"0.0"},{"c":"I9","v":35,"in":true,"al":"center","nf":"0.0"},{"c":"J9","v":"فاصل نيوبرين مضغوط (Compression Seal)"},{"c":"K9","v":12,"in":true,"al":"center","nf":"0.0"},{"c":"L9","v":50,"in":true,"al":"center","nf":"0.0"},{"c":"M9","v":"سعة كافية ومطابقة (OK)","f":"=IF(L9>=H9, \"سعة كافية ومطابقة (OK)\", \"يلزم طراز أكبر (REVISE)\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":10,"h":40.0,"cells":[{"c":"A10","v":"إجمالي أطوال فواصل التمدد لكامل مسارات الكوبري والمنحدرات (م.ط)","bg":"#DBEAFE","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"K10","v":85.5,"f":"=SUM(K6:K9)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"L10","v":"معامل أمان إضافي 25% طبقاً لـ AASHTO LRFD","bg":"#DBEAFE","b":true,"al":"center","cs":2},{"skip":true}]}]},{"name":"جدول حصر الكميات والمقايسة BOQ","maxRow":20,"maxCol":8,"colWidths":[8.0,16.0,62.0,14.0,18.0,22.0,24.0,36.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"مقايسة وجدول حصر كميات بنود ركائز الكباري وفواصل التمدد الإنشائية (Bill of Quantities)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":42.0,"cells":[{"c":"A2","v":"حصر كميات التوريد والتركيب والأعمال التكميلية والمونة الإيبوكسية غير القابلة للانكماش والخرسانات البوليمرية مع الربط التلقائي بأسعار الإعدادات","bg":"#334155","fg":"#FFFFFF","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":34.0,"cells":[{"c":"A3","v":"التكلفة المباشرة للبنود","bg":"#F8FAFC","fg":"#334155","b":true,"al":"center","cs":2},{"skip":true},{"c":"C3","v":"ضريبة القيمة المضافة 15%","bg":"#F8FAFC","fg":"#334155","b":true,"al":"center","cs":2},{"skip":true},{"c":"E3","v":"الإجمالي العام النهائي","bg":"#F8FAFC","fg":"#334155","b":true,"al":"center","cs":2},{"skip":true},{"c":"G3","v":"إجمالي عدد الركائز والفواصل","bg":"#F8FAFC","fg":"#334155","b":true,"al":"center","cs":2},{"skip":true}]},{"r":4,"h":46.0,"cells":[{"c":"A4","v":14000,"f":"=G15","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00","cs":2},{"skip":true},{"c":"C4","v":353565,"f":"=G16","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00","cs":2},{"skip":true},{"c":"E4","v":53034.75,"f":"=G17","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00","cs":2},{"skip":true},{"c":"G4","v":0,"f":"=E5+E6+E7+E10+E11","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0","cs":2},{"skip":true}]},{"r":5,"h":42.0,"cells":[{"c":"A5","v":"م","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"كود البند","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"توصيف بنود الأعمال والمواصفة الفنية التفصيلية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"الوحدة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"الكمية المحصورة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"سعر الوحدة (ر.س)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"إجمالي القيمة (ر.س)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"الملاحظات والاشتراطات","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":1,"bg":"#F8FAFC","al":"center"},{"c":"B6","v":"BOQ-BRG-01","bg":"#F8FAFC","al":"center"},{"c":"C6","v":"توريد وتركيب ركائز نيوبرين مسلحة بألواح صلب أبعاد 350×400×65 مم مع شهادات الاختبار المعتمدة للصلادة وإجهاد القص طبقا لـ AASHTO M251","bg":"#F8FAFC"},{"c":"D6","v":"قطعة","bg":"#F8FAFC","al":"center"},{"c":"E6","v":12,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"F6","v":1450,"f":"='إعدادات المشروع والأسعار'!$D$22","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G6","v":17400,"f":"=E6*F6","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"H6","v":"لدعامات البداية والنهاية A1 & A2","bg":"#F8FAFC"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":2,"al":"center"},{"c":"B7","v":"BOQ-BRG-02","al":"center"},{"c":"C7","v":"توريد وتركيب ركائز نيوبرين مسلحة بألواح صلب أبعاد 400×500×85 مم للبحور المتوسطة شاملة المعالجة السطحية وطبقات الحماية"},{"c":"D7","v":"قطعة","al":"center"},{"c":"E7","v":12,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"F7","v":2100,"f":"='إعدادات المشروع والأسعار'!$D$23","b":true,"al":"center","nf":"#,##0.00"},{"c":"G7","v":25200,"f":"=E7*F7","b":true,"al":"center","nf":"#,##0.00"},{"c":"H7","v":"للأعمدة الوسطية P1 & P3"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":3,"bg":"#F8FAFC","al":"center"},{"c":"B8","v":"BOQ-BRG-03","bg":"#F8FAFC","al":"center"},{"c":"C8","v":"توريد وتركيب ركائز نيوبرين ثابتة مقواة بأبعاد 450×550×95 مم مزودة بمسامير وبنوز صلب مجلفن لمقاومة قوى القص والزلازل","bg":"#F8FAFC"},{"c":"D8","v":"قطعة","bg":"#F8FAFC","al":"center"},{"c":"E8","v":6,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"F8","v":2850,"f":"='إعدادات المشروع والأسعار'!$D$24","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G8","v":17100,"f":"=E8*F8","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"H8","v":"للعمود الرئيسي الأوسط P2","bg":"#F8FAFC"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":4,"al":"center"},{"c":"B9","v":"BOQ-BRG-04","al":"center"},{"c":"C9","v":"صب مونة إيبوكسية ذاتية التسوية غير قابلة للانكماش (Non-Shrink Epoxy Grout 80 MPa) أسفل الركائز لضبط الميول والتسوية التامة"},{"c":"D9","v":"م³","al":"center"},{"c":"E9","v":3.2,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"F9","v":4200,"f":"='إعدادات المشروع والأسعار'!$D$25","b":true,"al":"center","nf":"#,##0.00"},{"c":"G9","v":13440,"f":"=E9*F9","b":true,"al":"center","nf":"#,##0.00"},{"c":"H9","v":"سماكة تتراوح بين 25-40 مم"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":5,"bg":"#F8FAFC","al":"center"},{"c":"B10","v":"BOQ-BRG-05","bg":"#F8FAFC","al":"center"},{"c":"C10","v":"خرسانة مسلحة لقوائم وبيدستال ارتكاز الركائز (Pedestals C40/50) شاملاً حديد التسليح الكانات الحلزونية والشدات الخشبية المعالجة","bg":"#F8FAFC"},{"c":"D10","v":"م³","bg":"#F8FAFC","al":"center"},{"c":"E10","v":8.5,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"F10","v":750,"f":"='إعدادات المشروع والأسعار'!$D$26","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G10","v":6375,"f":"=E10*F10","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"H10","v":"خرسانة مقاومة للأملاح والكبريتات","bg":"#F8FAFC"}]},{"r":11,"h":72.0,"cells":[{"c":"A11","v":6,"al":"center"},{"c":"B11","v":"BOQ-EXP-01","al":"center"},{"c":"C11","v":"توريد وتركيب فواصل تمدد مطاطية بشرائح صلب نوع (Strip Seal Joint حركة 80 مم) شاملة قطاعات الصلب المجلفن وأشرطة النيوبرين المانعة للمياه"},{"c":"D11","v":"م.ط","al":"center"},{"c":"E11","v":73.5,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"F11","v":1850,"f":"='إعدادات المشروع والأسعار'!$D$27","b":true,"al":"center","nf":"#,##0.00"},{"c":"G11","v":135975,"f":"=E11*F11","b":true,"al":"center","nf":"#,##0.00"},{"c":"H11","v":"لكامل الفواصل الرئيسية الثلاثة"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":7,"bg":"#F8FAFC","al":"center"},{"c":"B12","v":"BOQ-EXP-02","bg":"#F8FAFC","al":"center"},{"c":"C12","v":"توريد وتركيب فواصل تمدد نيوبرين مضغوط (Compression Seal Joint حركة 50 مم) لمسارات ومداخل المنحدرات الجانبية للكوبري","bg":"#F8FAFC"},{"c":"D12","v":"م.ط","bg":"#F8FAFC","al":"center"},{"c":"E12","v":12,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"F12","v":4600,"f":"='إعدادات المشروع والأسعار'!$D$28","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G12","v":55200,"f":"=E12*F12","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"H12","v":"لمنحدر Ramp الدوران والخدمة","bg":"#F8FAFC"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":8,"al":"center"},{"c":"B13","v":"BOQ-EXP-03","al":"center"},{"c":"C13","v":"صب خرسانة بوليمرية سريعة التصلب وعالية المرونة لأكتاف فواصل التمدد (Polymer Concrete Headers) لحماية حواف الإسفلت من التهشم"},{"c":"D13","v":"م.ط","al":"center"},{"c":"E13","v":85.5,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"F13","v":650,"f":"='إعدادات المشروع والأسعار'!$D$29","b":true,"al":"center","nf":"#,##0.00"},{"c":"G13","v":55575,"f":"=E13*F13","b":true,"al":"center","nf":"#,##0.00"},{"c":"H13","v":"بعرض 25 سم على جانبي الفاصل"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":9,"bg":"#F8FAFC","al":"center"},{"c":"B14","v":"BOQ-BRG-06","bg":"#F8FAFC","al":"center"},{"c":"C14","v":"توريد وتثبيت صدادات زلزالية خرسانية جانبية (Shear Keys) مع ألواح ممتصة للصدمات لحماية الكمرات من الإزاحة العرضية","bg":"#F8FAFC"},{"c":"D14","v":"قطعة","bg":"#F8FAFC","al":"center"},{"c":"E14","v":14,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"F14","v":950,"f":"='إعدادات المشروع والأسعار'!$D$30","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G14","v":13300,"f":"=E14*F14","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"H14","v":"على جانبي كل محور ارتكاز","bg":"#F8FAFC"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":10,"al":"center"},{"c":"B15","v":"BOQ-TST-01","al":"center"},{"c":"C15","v":"إجراء الفحوصات والاختبارات المعملية الشاملة على عينات الركائز المعتمدة (اختبار الضغط المحوري، معامل القص G، والصلادة)"},{"c":"D15","v":"عينة","al":"center"},{"c":"E15","v":4,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"F15","v":3500,"f":"='إعدادات المشروع والأسعار'!$D$31","b":true,"al":"center","nf":"#,##0.00"},{"c":"G15","v":14000,"f":"=E15*F15","b":true,"al":"center","nf":"#,##0.00"},{"c":"H15","v":"وفق اشتراطات AASHTO M251"}]},{"r":16,"h":42.0,"cells":[{"c":"A16","v":"إجمالي التكلفة المباشرة لبنود الركائز وفواصل التمدد (Direct Subtotal)","bg":"#DBEAFE","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G16","v":353565,"f":"=SUM(G6:G15)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"H16","v":"ريال سعودي SAR","bg":"#DBEAFE","b":true,"al":"center"}]},{"r":17,"h":42.0,"cells":[{"c":"A17","v":"ضريبة القيمة المضافة المقررة (VAT 15%)","bg":"#DBEAFE","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G17","v":53034.75,"f":"=G16*0.15","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"H17","v":"ريال سعودي SAR","bg":"#DBEAFE","b":true,"al":"center"}]},{"r":18,"h":46.0,"cells":[{"c":"A18","v":"الإجمالي العام النهائي للمقايسة شامل الضريبة (Grand Total SAR)","bg":"#FEF3C7","fg":"#78350F","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G18","v":406599.75,"f":"=G16+G17","bg":"#FEF3C7","fg":"#78350F","b":true,"al":"center","nf":"#,##0.00"},{"c":"H18","v":"ريال سعودي SAR","bg":"#FEF3C7","b":true,"al":"center"}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":"إعداد مهندس المكتب الفني وحصر الكميات","bg":"#F8FAFC","b":true,"al":"center","cs":2},{"skip":true},{"c":"C19","v":"مراجعة مدير مشروعات الكباري والجسور","bg":"#F8FAFC","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"F19","v":"اعتماد استشاري الإشراف وضبط الجودة","bg":"#F8FAFC","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":20,"h":128.0,"cells":[{"c":"A20","v":"الاسم: ........................................\nالتوقيع: .......................................\nالتاريخ: ..... / ..... / 2026 م","al":"center","cs":2},{"skip":true},{"c":"C20","v":"الاسم: ........................................\nالتوقيع: .......................................\nالتاريخ: ..... / ..... / 2026 م","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"F20","v":"الاسم: ........................................\nالتوقيع: .......................................\nالتاريخ: ..... / ..... / 2026 م","al":"center","cs":3},{"skip":true},{"skip":true}]}]}]}