{"slug":"building-electrical-load-schedule-and-feeder-sizing-sheet","sheets":[{"name":"جدول حصر أحمال المبنى الرئيسي","maxRow":20,"maxCol":13,"colWidths":[14.0,38.0,15.0,14.0,13.0,14.0,13.0,14.0,14.0,14.0,18.0,12.0,14.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول حصر أحمال الكهرباء وتوزيع اللوحات الرئيسية والفرعية للمشروع (BUILDING ELECTRICAL LOAD SCHEDULE)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":42.0,"cells":[{"c":"A2","v":"قالب تشغيلي لحصر الأحمال الكهربائية وحساب التيار التصميمي واختيار القواطع والكابلات وفق معايير NEC (NFPA 70) وكود البناء السعودي SBC 401","bg":"#F1F5F9","fg":"#475569","al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":52.0,"cells":[{"c":"A3","v":"اسم المشروع:","fg":"#0F2C59","b":true},{"c":"B3","v":"مشروع برج الأبراج السكني والتجاري - حي النرجس","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G3","v":"نظام التغذية الكهربائية:","fg":"#0F2C59","b":true},{"c":"H3","v":"3-Phase, 4-Wire, 400/230V, 50/60 Hz","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":4,"h":72.0,"cells":[{"c":"A4","v":"مهندس التصميم الكهروميكانيكي:","fg":"#0F2C59","b":true},{"c":"B4","v":"م. حسام الدين عبد الله (PE)","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G4","v":"معامل الطلب الإجمالي (Diversity):","fg":"#0F2C59","b":true},{"c":"H4","v":"0.78 (محسوب وفق معايير NEC/SBC)","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":28.0,"cells":[{"c":"A5","v":""},{"c":"B5","v":""},{"c":"C5","v":""},{"c":"D5","v":""},{"c":"E5","v":""},{"c":"F5","v":""},{"c":"G5","v":""},{"c":"H5","v":""},{"c":"I5","v":""},{"c":"J5","v":""},{"c":"K5","v":""},{"c":"L5","v":""},{"c":"M5","v":""}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"إجمالي الحمل المتصل (TCL)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D6","v":"أقصى حمل تصميمي مطلوب (MDL)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G6","v":"سعة القاطع الرئيسي المحسوب","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"J6","v":"معامل الطلب المركب للمشروع","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":7,"h":46.0,"cells":[{"c":"A7","v":1501,"f":"=SUM(D11:D19)","bg":"#EFF6FF","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.0 \"kW\"","cs":3},{"skip":true},{"skip":true},{"c":"D7","v":7.1,"f":"=SUM(G11:G19)","bg":"#EFF6FF","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.0 \"kVA\"","cs":3},{"skip":true},{"skip":true},{"c":"G7","v":0,"f":"=ROUNDUP(F6*1000/(1.732*400),-1)","bg":"#EFF6FF","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0 \"A\"","cs":3},{"skip":true},{"skip":true},{"c":"J7","v":0.00473,"f":"=D7/A7","bg":"#EFF6FF","fg":"#0F2C59","b":true,"al":"center","nf":"0.00%","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":8,"h":28.0,"cells":[{"c":"A8","v":""},{"c":"B8","v":""},{"c":"C8","v":""},{"c":"D8","v":""},{"c":"E8","v":""},{"c":"F8","v":""},{"c":"G8","v":""},{"c":"H8","v":""},{"c":"I8","v":""},{"c":"J8","v":""},{"c":"K8","v":""},{"c":"L8","v":""},{"c":"M8","v":""}]},{"r":9,"h":38.0,"cells":[{"c":"A9","v":"جدول توزيع اللوحات الكهربائية والأحمال ومقاسات الكابلات الصاعدة (PANEL LOAD SCHEDULE & RISER FEEDERS)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":"كود اللوحة","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B10","v":"توصيف اللوحة والمنطقة المخدومة","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C10","v":"نوع التغذية والجهد (V)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D10","v":"الحمل المتصل (kW)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E10","v":"معامل القدرة (cos φ)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F10","v":"الحمل الظاهري (kVA)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G10","v":"معامل الطلب (DF)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H10","v":"الحمل التصميمي (kVA)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I10","v":"تيار الحمل Ib (A)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J10","v":"سعة القاطع In (A)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K10","v":"مقاس كابل التغذية المصمم","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L10","v":"طول الكابل (م)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M10","v":"هبوط الجهد (%)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":"MDB-MAIN","bg":"#F8FAFC","fg":"#0F2C59","b":true,"al":"center"},{"c":"B11","v":"اللوحة العمومية الرئيسية - غرفة المحولات","bg":"#F8FAFC"},{"c":"C11","v":"3-Ph 400V","bg":"#F8FAFC","al":"center"},{"c":"D11","v":650,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"E11","v":0.88,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"F11","v":738.636364,"f":"=D11/E11","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"G11","v":0.75,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"H11","v":553.977273,"f":"=F11*G11","bg":"#F8FAFC","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.0"},{"c":"I11","v":799.6,"f":"=ROUND((H11*1000)/(1.732*400),1)","bg":"#F8FAFC","fg":"#B45309","b":true,"al":"center","nf":"#,##0.0"},{"c":"J11","v":800,"in":true,"bg":"#F8FAFC","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0"},{"c":"K11","v":"2x(4x240) Cu/XLPE","bg":"#F8FAFC","al":"center"},{"c":"L11","v":25,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"M11","v":4.22,"f":"=ROUND('حسابات الكابلات وهبوط الجهد'!O11,2)","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center","nf":"0.00\"%\""}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":"SMDB-COMM","fg":"#0F2C59","b":true,"al":"center"},{"c":"B12","v":"لوحة التوزيع الفرعية - المحلات التجارية"},{"c":"C12","v":"3-Ph 400V","al":"center"},{"c":"D12","v":185,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"E12","v":0.9,"in":true,"al":"center","nf":"0.00"},{"c":"F12","v":205.555556,"f":"=D12/E12","al":"center","nf":"#,##0.0"},{"c":"G12","v":0.8,"in":true,"al":"center","nf":"0.00"},{"c":"H12","v":164.444445,"f":"=F12*G12","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.0"},{"c":"I12","v":237.4,"f":"=ROUND((H12*1000)/(1.732*400),1)","fg":"#B45309","b":true,"al":"center","nf":"#,##0.0"},{"c":"J12","v":250,"in":true,"fg":"#0F2C59","b":true,"al":"center","nf":"#,##0"},{"c":"K12","v":"4x95 Cu/XLPE","al":"center"},{"c":"L12","v":45,"in":true,"al":"center","nf":"#,##0"},{"c":"M12","v":4.73,"f":"=ROUND('حسابات الكابلات وهبوط الجهد'!O12,2)","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center","nf":"0.00\"%\""}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":"SMDB-RES1","bg":"#F8FAFC","fg":"#0F2C59","b":true,"al":"center"},{"c":"B13","v":"لوحة التوزيع الصاعدة 1 - الشقق السكنية (أدوار 1-5)","bg":"#F8FAFC"},{"c":"C13","v":"3-Ph 400V","bg":"#F8FAFC","al":"center"},{"c":"D13","v":160,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"E13","v":0.85,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"F13","v":188.235294,"f":"=D13/E13","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"G13","v":0.65,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"H13","v":122.352941,"f":"=F13*G13","bg":"#F8FAFC","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.0"},{"c":"I13","v":176.6,"f":"=ROUND((H13*1000)/(1.732*400),1)","bg":"#F8FAFC","fg":"#B45309","b":true,"al":"center","nf":"#,##0.0"},{"c":"J13","v":200,"in":true,"bg":"#F8FAFC","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0"},{"c":"K13","v":"4x70 Cu/XLPE","bg":"#F8FAFC","al":"center"},{"c":"L13","v":60,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"M13","v":6.09,"f":"=ROUND('حسابات الكابلات وهبوط الجهد'!O13,2)","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center","nf":"0.00\"%\""}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"SMDB-RES2","fg":"#0F2C59","b":true,"al":"center"},{"c":"B14","v":"لوحة التوزيع الصاعدة 2 - الشقق السكنية (أدوار 6-10)"},{"c":"C14","v":"3-Ph 400V","al":"center"},{"c":"D14","v":160,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"E14","v":0.85,"in":true,"al":"center","nf":"0.00"},{"c":"F14","v":188.235294,"f":"=D14/E14","al":"center","nf":"#,##0.0"},{"c":"G14","v":0.65,"in":true,"al":"center","nf":"0.00"},{"c":"H14","v":122.352941,"f":"=F14*G14","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.0"},{"c":"I14","v":176.6,"f":"=ROUND((H14*1000)/(1.732*400),1)","fg":"#B45309","b":true,"al":"center","nf":"#,##0.0"},{"c":"J14","v":200,"in":true,"fg":"#0F2C59","b":true,"al":"center","nf":"#,##0"},{"c":"K14","v":"4x70 Cu/XLPE","al":"center"},{"c":"L14","v":90,"in":true,"al":"center","nf":"#,##0"},{"c":"M14","v":9.13,"f":"=ROUND('حسابات الكابلات وهبوط الجهد'!O14,2)","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center","nf":"0.00\"%\""}]},{"r":15,"h":36.0,"cells":[{"c":"A15","v":"DB-HVAC-CH","bg":"#F8FAFC","fg":"#0F2C59","b":true,"al":"center"},{"c":"B15","v":"لوحة ميكانيكا التكييف المركزي ووحدات الشيلر","bg":"#F8FAFC"},{"c":"C15","v":"3-Ph 400V","bg":"#F8FAFC","al":"center"},{"c":"D15","v":220,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"E15","v":0.86,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"F15","v":255.813953,"f":"=D15/E15","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"G15","v":0.9,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"H15","v":230.232558,"f":"=F15*G15","bg":"#F8FAFC","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.0"},{"c":"I15","v":332.3,"f":"=ROUND((H15*1000)/(1.732*400),1)","bg":"#F8FAFC","fg":"#B45309","b":true,"al":"center","nf":"#,##0.0"},{"c":"J15","v":350,"in":true,"bg":"#F8FAFC","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0"},{"c":"K15","v":"4x185 Cu/XLPE","bg":"#F8FAFC","al":"center"},{"c":"L15","v":75,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"M15","v":6.43,"f":"=ROUND('حسابات الكابلات وهبوط الجهد'!O15,2)","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center","nf":"0.00\"%\""}]},{"r":16,"h":36.0,"cells":[{"c":"A16","v":"DB-ELEV","fg":"#0F2C59","b":true,"al":"center"},{"c":"B16","v":"لوحة تغذية مصاعد الركاب ومصعد الخدمات"},{"c":"C16","v":"3-Ph 400V","al":"center"},{"c":"D16","v":45,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"E16","v":0.82,"in":true,"al":"center","nf":"0.00"},{"c":"F16","v":54.878049,"f":"=D16/E16","al":"center","nf":"#,##0.0"},{"c":"G16","v":0.85,"in":true,"al":"center","nf":"0.00"},{"c":"H16","v":46.646342,"f":"=F16*G16","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.0"},{"c":"I16","v":67.3,"f":"=ROUND((H16*1000)/(1.732*400),1)","fg":"#B45309","b":true,"al":"center","nf":"#,##0.0"},{"c":"J16","v":80,"in":true,"fg":"#0F2C59","b":true,"al":"center","nf":"#,##0"},{"c":"K16","v":"4x25 Cu/XLPE","al":"center"},{"c":"L16","v":110,"in":true,"al":"center","nf":"#,##0"},{"c":"M16","v":10.35,"f":"=ROUND('حسابات الكابلات وهبوط الجهد'!O16,2)","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center","nf":"0.00\"%\""}]},{"r":17,"h":36.0,"cells":[{"c":"A17","v":"DB-PUMPS","bg":"#F8FAFC","fg":"#0F2C59","b":true,"al":"center"},{"c":"B17","v":"لوحة مضخات رفع المياه ومضخات الصرف الصحي","bg":"#F8FAFC"},{"c":"C17","v":"3-Ph 400V","bg":"#F8FAFC","al":"center"},{"c":"D17","v":35,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"E17","v":0.84,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"F17","v":41.666667,"f":"=D17/E17","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"G17","v":0.7,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"H17","v":29.166667,"f":"=F17*G17","bg":"#F8FAFC","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.0"},{"c":"I17","v":42.1,"f":"=ROUND((H17*1000)/(1.732*400),1)","bg":"#F8FAFC","fg":"#B45309","b":true,"al":"center","nf":"#,##0.0"},{"c":"J17","v":50,"in":true,"bg":"#F8FAFC","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0"},{"c":"K17","v":"4x16 Cu/XLPE","bg":"#F8FAFC","al":"center"},{"c":"L17","v":35,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"M17","v":3.22,"f":"=ROUND('حسابات الكابلات وهبوط الجهد'!O17,2)","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center","nf":"0.00\"%\""}]},{"r":18,"h":36.0,"cells":[{"c":"A18","v":"DB-EMERG","fg":"#0F2C59","b":true,"al":"center"},{"c":"B18","v":"لوحة طوارئ إنارة الهروب والإنذار (UPS/مولد)"},{"c":"C18","v":"3-Ph 400V","al":"center"},{"c":"D18","v":28,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"E18","v":0.92,"in":true,"al":"center","nf":"0.00"},{"c":"F18","v":30.434783,"f":"=D18/E18","al":"center","nf":"#,##0.0"},{"c":"G18","v":0.9,"in":true,"al":"center","nf":"0.00"},{"c":"H18","v":27.391305,"f":"=F18*G18","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.0"},{"c":"I18","v":39.5,"f":"=ROUND((H18*1000)/(1.732*400),1)","fg":"#B45309","b":true,"al":"center","nf":"#,##0.0"},{"c":"J18","v":50,"in":true,"fg":"#0F2C59","b":true,"al":"center","nf":"#,##0"},{"c":"K18","v":"4x16 Cu/FR Fire","al":"center"},{"c":"L18","v":50,"in":true,"al":"center","nf":"#,##0"},{"c":"M18","v":4.68,"f":"=ROUND('حسابات الكابلات وهبوط الجهد'!O18,2)","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center","nf":"0.00\"%\""}]},{"r":19,"h":36.0,"cells":[{"c":"A19","v":"DB-EXT-LGT","bg":"#F8FAFC","fg":"#0F2C59","b":true,"al":"center"},{"c":"B19","v":"لوحة إنارة الواجهات والأسوار الخارجية والحديقة","bg":"#F8FAFC"},{"c":"C19","v":"1-Ph 230V","bg":"#F8FAFC","al":"center"},{"c":"D19","v":18,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"E19","v":0.95,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"F19","v":18.947368,"f":"=D19/E19","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"G19","v":0.9,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"H19","v":17.052631,"f":"=F19*G19","bg":"#F8FAFC","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.0"},{"c":"I19","v":74.1,"f":"=ROUND((H19*1000)/230,1)","bg":"#F8FAFC","fg":"#B45309","b":true,"al":"center","nf":"#,##0.0"},{"c":"J19","v":80,"in":true,"bg":"#F8FAFC","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0"},{"c":"K19","v":"3x16 Cu/XLPE","bg":"#F8FAFC","al":"center"},{"c":"L19","v":80,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"M19","v":14.41,"f":"=ROUND('حسابات الكابلات وهبوط الجهد'!O19,2)","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center","nf":"0.00\"%\""}]},{"r":20,"h":42.0,"cells":[{"c":"A20","v":"الإجمالي","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B20","v":"إجمالي أحمال المبنى الرئيسي المتصلة والتصميمية","bg":"#0F2C59","fg":"#FFFFFF","b":true},{"c":"C20","v":"-","bg":"#0F2C59","fg":"#FFFFFF","al":"center"},{"c":"D20","v":1501,"f":"=SUM(D11:D19)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.0"},{"c":"E20","v":0.87,"f":"=ROUND(AVERAGE(E11:E19),2)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center","nf":"0.00"},{"c":"F20","v":1722.403328,"f":"=SUM(F11:F19)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.0"},{"c":"G20","v":0.76,"f":"=ROUND(H20/F20,2)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center","nf":"0.00"},{"c":"H20","v":1313.617103,"f":"=SUM(H11:H19)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.0"},{"c":"I20","v":1896.1,"f":"=ROUND((H20*1000)/(1.732*400),1)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.0"},{"c":"J20","v":1900,"f":"=ROUNDUP(I20,-1)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"K20","v":"2x(4x240) Cu","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L20","v":"-","bg":"#0F2C59","fg":"#FFFFFF","al":"center"},{"c":"M20","v":"≤ 3.0% PASS","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"}]}]},{"name":"حسابات الكابلات وهبوط الجهد","maxRow":20,"maxCol":17,"colWidths":[13.0,18.0,16.0,13.0,14.0,13.0,13.0,14.0,13.0,16.0,14.0,12.0,12.0,13.0,14.0,14.0,18.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"محرك حسابات مقاسات كابلات التغذية ومعاملات التصحيح وهبوط الجهد (FEEDER SIZING & VOLTAGE DROP ENGINE)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center","cs":17},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":42.0,"cells":[{"c":"A2","v":"التحقق من سعة الكابل بعد تطبيق معاملات تصحيح الحرارة (Kt) والتجميع (Kg) ونسبة هبوط الجهد ألا تتجاوز 3% وفق NEC 215.2 و SBC 401","bg":"#F1F5F9","fg":"#475569","al":"center","cs":17},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""},{"c":"N3","v":""},{"c":"O3","v":""},{"c":"P3","v":""},{"c":"Q3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"مصفوفة الحسابات الهندسية لكابلات التغذية الصاعدة (FEEDER SIZING & VOLTAGE DROP VERIFICATION MATRIX)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":17},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"كود الكابل","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"لوحة المصدر","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"لوحة التغذية","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"تيار الحمل Ib (A)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"حرارة الجو Ta (°C)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"معامل الحرارة Kt","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"معامل التجميع Kg","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"التيار المصحح Iz' (A)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I5","v":"القاطع In (A)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J5","v":"مقاس الكابل (mm²)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K5","v":"سعة الكابل Itab (A)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L5","v":"مقاومة R (Ω/km)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M5","v":"ممانعة X (Ω/km)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"N5","v":"طول الكابل L (م)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"O5","v":"هبوط الجهد ΔV (V)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"P5","v":"نسبة الهبوط VD (%)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"Q5","v":"المطابقة (≤ 3%)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"قواعد ومعادلات الحساب: Iz' = In / (Kt * Kg) | 3-Phase VD (V) = √3 * Ib * L * (R*cosφ + X*sinφ) / 1000 | %VD = (ΔV / 400) * 100","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":17},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""},{"c":"I7","v":""},{"c":"J7","v":""},{"c":"K7","v":""},{"c":"L7","v":""},{"c":"M7","v":""},{"c":"N7","v":""},{"c":"O7","v":""},{"c":"P7","v":""},{"c":"Q7","v":""}]},{"r":8,"h":28.0,"cells":[{"c":"A8","v":""},{"c":"B8","v":""},{"c":"C8","v":""},{"c":"D8","v":""},{"c":"E8","v":""},{"c":"F8","v":""},{"c":"G8","v":""},{"c":"H8","v":""},{"c":"I8","v":""},{"c":"J8","v":""},{"c":"K8","v":""},{"c":"L8","v":""},{"c":"M8","v":""},{"c":"N8","v":""},{"c":"O8","v":""},{"c":"P8","v":""},{"c":"Q8","v":""}]},{"r":9,"h":28.0,"cells":[{"c":"A9","v":""},{"c":"B9","v":""},{"c":"C9","v":""},{"c":"D9","v":""},{"c":"E9","v":""},{"c":"F9","v":""},{"c":"G9","v":""},{"c":"H9","v":""},{"c":"I9","v":""},{"c":"J9","v":""},{"c":"K9","v":""},{"c":"L9","v":""},{"c":"M9","v":""},{"c":"N9","v":""},{"c":"O9","v":""},{"c":"P9","v":""},{"c":"Q9","v":""}]},{"r":10,"h":28.0,"cells":[{"c":"A10","v":""},{"c":"B10","v":""},{"c":"C10","v":""},{"c":"D10","v":""},{"c":"E10","v":""},{"c":"F10","v":""},{"c":"G10","v":""},{"c":"H10","v":""},{"c":"I10","v":""},{"c":"J10","v":""},{"c":"K10","v":""},{"c":"L10","v":""},{"c":"M10","v":""},{"c":"N10","v":""},{"c":"O10","v":""},{"c":"P10","v":""},{"c":"Q10","v":""}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":"FDR-01","bg":"#F8FAFC","fg":"#0F2C59","b":true,"al":"center"},{"c":"B11","v":"TR-01 (1500kVA)","bg":"#F8FAFC","al":"center"},{"c":"C11","v":"MDB-MAIN","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D11","v":799.6,"f":"='جدول حصر أحمال المبنى الرئيسي'!I11","bg":"#F8FAFC","fg":"#B45309","b":true,"al":"center","nf":"#,##0.0"},{"c":"E11","v":45,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F11","v":0.87,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"G11","v":0.8,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"H11","v":1149.4,"f":"=ROUND(I11/(F11*G11),1)","bg":"#F8FAFC","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.0"},{"c":"I11","v":800,"f":"='جدول حصر أحمال المبنى الرئيسي'!J11","bg":"#F8FAFC","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0"},{"c":"J11","v":"2x(4x240)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"K11","v":950,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L11","v":0.098,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"M11","v":0.075,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"N11","v":25,"f":"='جدول حصر أحمال المبنى الرئيسي'!L11","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"O11","v":4.22,"f":"=ROUND((1.732*D11*N11*(L11*'جدول حصر أحمال المبنى الرئيسي'!E11+M11*SQRT(1-'جدول حصر أحمال المبنى الرئيسي'!E11^2)))/1000,2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"P11","v":1.05,"f":"=ROUND((O11/400)*100,2)","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center","nf":"0.00\"%\""},{"c":"Q11","v":"مطابق وآمن (PASS)","f":"=IF(P11<=3.0,\"مطابق وآمن (PASS)\",\"غير مطابق (FAIL)\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":"FDR-02","fg":"#0F2C59","b":true,"al":"center"},{"c":"B12","v":"MDB-MAIN","al":"center"},{"c":"C12","v":"SMDB-COMM","b":true,"al":"center"},{"c":"D12","v":237.4,"f":"='جدول حصر أحمال المبنى الرئيسي'!I12","fg":"#B45309","b":true,"al":"center","nf":"#,##0.0"},{"c":"E12","v":45,"in":true,"al":"center"},{"c":"F12","v":0.87,"in":true,"al":"center","nf":"0.00"},{"c":"G12","v":0.8,"in":true,"al":"center","nf":"0.00"},{"c":"H12","v":359.2,"f":"=ROUND(I12/(F12*G12),1)","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.0"},{"c":"I12","v":250,"f":"='جدول حصر أحمال المبنى الرئيسي'!J12","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0"},{"c":"J12","v":"4x95","b":true,"al":"center"},{"c":"K12","v":275,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"L12","v":0.247,"in":true,"al":"center","nf":"0.000"},{"c":"M12","v":0.077,"in":true,"al":"center","nf":"0.000"},{"c":"N12","v":45,"f":"='جدول حصر أحمال المبنى الرئيسي'!L12","al":"center","nf":"#,##0"},{"c":"O12","v":4.73,"f":"=ROUND((1.732*D12*N12*(L12*'جدول حصر أحمال المبنى الرئيسي'!E12+M12*SQRT(1-'جدول حصر أحمال المبنى الرئيسي'!E12^2)))/1000,2)","al":"center","nf":"#,##0.00"},{"c":"P12","v":1.18,"f":"=ROUND((O12/400)*100,2)","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center","nf":"0.00\"%\""},{"c":"Q12","v":"مطابق وآمن (PASS)","f":"=IF(P12<=3.0,\"مطابق وآمن (PASS)\",\"غير مطابق (FAIL)\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":13,"h":36.0,"cells":[{"c":"A13","v":"FDR-03","bg":"#F8FAFC","fg":"#0F2C59","b":true,"al":"center"},{"c":"B13","v":"MDB-MAIN","bg":"#F8FAFC","al":"center"},{"c":"C13","v":"SMDB-RES1","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D13","v":176.6,"f":"='جدول حصر أحمال المبنى الرئيسي'!I13","bg":"#F8FAFC","fg":"#B45309","b":true,"al":"center","nf":"#,##0.0"},{"c":"E13","v":45,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F13","v":0.87,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"G13","v":0.8,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"H13","v":287.4,"f":"=ROUND(I13/(F13*G13),1)","bg":"#F8FAFC","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.0"},{"c":"I13","v":200,"f":"='جدول حصر أحمال المبنى الرئيسي'!J13","bg":"#F8FAFC","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0"},{"c":"J13","v":"4x70","bg":"#F8FAFC","b":true,"al":"center"},{"c":"K13","v":225,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L13","v":0.342,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"M13","v":0.078,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"N13","v":60,"f":"='جدول حصر أحمال المبنى الرئيسي'!L13","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"O13","v":6.09,"f":"=ROUND((1.732*D13*N13*(L13*'جدول حصر أحمال المبنى الرئيسي'!E13+M13*SQRT(1-'جدول حصر أحمال المبنى الرئيسي'!E13^2)))/1000,2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"P13","v":1.52,"f":"=ROUND((O13/400)*100,2)","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center","nf":"0.00\"%\""},{"c":"Q13","v":"مطابق وآمن (PASS)","f":"=IF(P13<=3.0,\"مطابق وآمن (PASS)\",\"غير مطابق (FAIL)\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":14,"h":36.0,"cells":[{"c":"A14","v":"FDR-04","fg":"#0F2C59","b":true,"al":"center"},{"c":"B14","v":"MDB-MAIN","al":"center"},{"c":"C14","v":"SMDB-RES2","b":true,"al":"center"},{"c":"D14","v":176.6,"f":"='جدول حصر أحمال المبنى الرئيسي'!I14","fg":"#B45309","b":true,"al":"center","nf":"#,##0.0"},{"c":"E14","v":45,"in":true,"al":"center"},{"c":"F14","v":0.87,"in":true,"al":"center","nf":"0.00"},{"c":"G14","v":0.8,"in":true,"al":"center","nf":"0.00"},{"c":"H14","v":287.4,"f":"=ROUND(I14/(F14*G14),1)","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.0"},{"c":"I14","v":200,"f":"='جدول حصر أحمال المبنى الرئيسي'!J14","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0"},{"c":"J14","v":"4x70","b":true,"al":"center"},{"c":"K14","v":225,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"L14","v":0.342,"in":true,"al":"center","nf":"0.000"},{"c":"M14","v":0.078,"in":true,"al":"center","nf":"0.000"},{"c":"N14","v":90,"f":"='جدول حصر أحمال المبنى الرئيسي'!L14","al":"center","nf":"#,##0"},{"c":"O14","v":9.13,"f":"=ROUND((1.732*D14*N14*(L14*'جدول حصر أحمال المبنى الرئيسي'!E14+M14*SQRT(1-'جدول حصر أحمال المبنى الرئيسي'!E14^2)))/1000,2)","al":"center","nf":"#,##0.00"},{"c":"P14","v":2.28,"f":"=ROUND((O14/400)*100,2)","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center","nf":"0.00\"%\""},{"c":"Q14","v":"مطابق وآمن (PASS)","f":"=IF(P14<=3.0,\"مطابق وآمن (PASS)\",\"غير مطابق (FAIL)\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":15,"h":36.0,"cells":[{"c":"A15","v":"FDR-05","bg":"#F8FAFC","fg":"#0F2C59","b":true,"al":"center"},{"c":"B15","v":"MDB-MAIN","bg":"#F8FAFC","al":"center"},{"c":"C15","v":"DB-HVAC-CH","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D15","v":332.3,"f":"='جدول حصر أحمال المبنى الرئيسي'!I15","bg":"#F8FAFC","fg":"#B45309","b":true,"al":"center","nf":"#,##0.0"},{"c":"E15","v":45,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F15","v":0.87,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"G15","v":0.8,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"H15","v":502.9,"f":"=ROUND(I15/(F15*G15),1)","bg":"#F8FAFC","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.0"},{"c":"I15","v":350,"f":"='جدول حصر أحمال المبنى الرئيسي'!J15","bg":"#F8FAFC","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0"},{"c":"J15","v":"4x185","bg":"#F8FAFC","b":true,"al":"center"},{"c":"K15","v":415,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L15","v":0.128,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"M15","v":0.076,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"N15","v":75,"f":"='جدول حصر أحمال المبنى الرئيسي'!L15","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"O15","v":6.43,"f":"=ROUND((1.732*D15*N15*(L15*'جدول حصر أحمال المبنى الرئيسي'!E15+M15*SQRT(1-'جدول حصر أحمال المبنى الرئيسي'!E15^2)))/1000,2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"P15","v":1.61,"f":"=ROUND((O15/400)*100,2)","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center","nf":"0.00\"%\""},{"c":"Q15","v":"مطابق وآمن (PASS)","f":"=IF(P15<=3.0,\"مطابق وآمن (PASS)\",\"غير مطابق (FAIL)\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":16,"h":36.0,"cells":[{"c":"A16","v":"FDR-06","fg":"#0F2C59","b":true,"al":"center"},{"c":"B16","v":"MDB-MAIN","al":"center"},{"c":"C16","v":"DB-ELEV","b":true,"al":"center"},{"c":"D16","v":67.3,"f":"='جدول حصر أحمال المبنى الرئيسي'!I16","fg":"#B45309","b":true,"al":"center","nf":"#,##0.0"},{"c":"E16","v":45,"in":true,"al":"center"},{"c":"F16","v":0.87,"in":true,"al":"center","nf":"0.00"},{"c":"G16","v":0.8,"in":true,"al":"center","nf":"0.00"},{"c":"H16","v":114.9,"f":"=ROUND(I16/(F16*G16),1)","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.0"},{"c":"I16","v":80,"f":"='جدول حصر أحمال المبنى الرئيسي'!J16","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0"},{"c":"J16","v":"4x25","b":true,"al":"center"},{"c":"K16","v":125,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"L16","v":0.927,"in":true,"al":"center","nf":"0.000"},{"c":"M16","v":0.082,"in":true,"al":"center","nf":"0.000"},{"c":"N16","v":110,"f":"='جدول حصر أحمال المبنى الرئيسي'!L16","al":"center","nf":"#,##0"},{"c":"O16","v":10.35,"f":"=ROUND((1.732*D16*N16*(L16*'جدول حصر أحمال المبنى الرئيسي'!E16+M16*SQRT(1-'جدول حصر أحمال المبنى الرئيسي'!E16^2)))/1000,2)","al":"center","nf":"#,##0.00"},{"c":"P16","v":2.59,"f":"=ROUND((O16/400)*100,2)","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center","nf":"0.00\"%\""},{"c":"Q16","v":"مطابق وآمن (PASS)","f":"=IF(P16<=3.0,\"مطابق وآمن (PASS)\",\"غير مطابق (FAIL)\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":17,"h":36.0,"cells":[{"c":"A17","v":"FDR-07","bg":"#F8FAFC","fg":"#0F2C59","b":true,"al":"center"},{"c":"B17","v":"MDB-MAIN","bg":"#F8FAFC","al":"center"},{"c":"C17","v":"DB-PUMPS","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D17","v":42.1,"f":"='جدول حصر أحمال المبنى الرئيسي'!I17","bg":"#F8FAFC","fg":"#B45309","b":true,"al":"center","nf":"#,##0.0"},{"c":"E17","v":45,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F17","v":0.87,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"G17","v":0.8,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"H17","v":71.8,"f":"=ROUND(I17/(F17*G17),1)","bg":"#F8FAFC","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.0"},{"c":"I17","v":50,"f":"='جدول حصر أحمال المبنى الرئيسي'!J17","bg":"#F8FAFC","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0"},{"c":"J17","v":"4x16","bg":"#F8FAFC","b":true,"al":"center"},{"c":"K17","v":95,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L17","v":1.45,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"M17","v":0.084,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"N17","v":35,"f":"='جدول حصر أحمال المبنى الرئيسي'!L17","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"O17","v":3.22,"f":"=ROUND((1.732*D17*N17*(L17*'جدول حصر أحمال المبنى الرئيسي'!E17+M17*SQRT(1-'جدول حصر أحمال المبنى الرئيسي'!E17^2)))/1000,2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"P17","v":0.81,"f":"=ROUND((O17/400)*100,2)","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center","nf":"0.00\"%\""},{"c":"Q17","v":"مطابق وآمن (PASS)","f":"=IF(P17<=3.0,\"مطابق وآمن (PASS)\",\"غير مطابق (FAIL)\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":18,"h":36.0,"cells":[{"c":"A18","v":"FDR-08","fg":"#0F2C59","b":true,"al":"center"},{"c":"B18","v":"MDB-MAIN","al":"center"},{"c":"C18","v":"DB-EMERG","b":true,"al":"center"},{"c":"D18","v":39.5,"f":"='جدول حصر أحمال المبنى الرئيسي'!I18","fg":"#B45309","b":true,"al":"center","nf":"#,##0.0"},{"c":"E18","v":45,"in":true,"al":"center"},{"c":"F18","v":0.87,"in":true,"al":"center","nf":"0.00"},{"c":"G18","v":0.8,"in":true,"al":"center","nf":"0.00"},{"c":"H18","v":71.8,"f":"=ROUND(I18/(F18*G18),1)","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.0"},{"c":"I18","v":50,"f":"='جدول حصر أحمال المبنى الرئيسي'!J18","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0"},{"c":"J18","v":"4x16 Fire","b":true,"al":"center"},{"c":"K18","v":95,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"L18","v":1.45,"in":true,"al":"center","nf":"0.000"},{"c":"M18","v":0.084,"in":true,"al":"center","nf":"0.000"},{"c":"N18","v":50,"f":"='جدول حصر أحمال المبنى الرئيسي'!L18","al":"center","nf":"#,##0"},{"c":"O18","v":4.68,"f":"=ROUND((1.732*D18*N18*(L18*'جدول حصر أحمال المبنى الرئيسي'!E18+M18*SQRT(1-'جدول حصر أحمال المبنى الرئيسي'!E18^2)))/1000,2)","al":"center","nf":"#,##0.00"},{"c":"P18","v":1.17,"f":"=ROUND((O18/400)*100,2)","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center","nf":"0.00\"%\""},{"c":"Q18","v":"مطابق وآمن (PASS)","f":"=IF(P18<=3.0,\"مطابق وآمن (PASS)\",\"غير مطابق (FAIL)\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":19,"h":36.0,"cells":[{"c":"A19","v":"FDR-09","bg":"#F8FAFC","fg":"#0F2C59","b":true,"al":"center"},{"c":"B19","v":"MDB-MAIN","bg":"#F8FAFC","al":"center"},{"c":"C19","v":"DB-EXT-LGT","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D19","v":74.1,"f":"='جدول حصر أحمال المبنى الرئيسي'!I19","bg":"#F8FAFC","fg":"#B45309","b":true,"al":"center","nf":"#,##0.0"},{"c":"E19","v":45,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F19","v":0.87,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"G19","v":0.8,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"H19","v":114.9,"f":"=ROUND(I19/(F19*G19),1)","bg":"#F8FAFC","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.0"},{"c":"I19","v":80,"f":"='جدول حصر أحمال المبنى الرئيسي'!J19","bg":"#F8FAFC","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0"},{"c":"J19","v":"3x16","bg":"#F8FAFC","b":true,"al":"center"},{"c":"K19","v":95,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L19","v":1.45,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"M19","v":0.084,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"N19","v":80,"f":"='جدول حصر أحمال المبنى الرئيسي'!L19","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"O19","v":14.41,"f":"=ROUND((1.732*D19*N19*(L19*'جدول حصر أحمال المبنى الرئيسي'!E19+M19*SQRT(1-'جدول حصر أحمال المبنى الرئيسي'!E19^2)))/1000,2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"P19","v":3.6,"f":"=ROUND((O19/400)*100,2)","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center","nf":"0.00\"%\""},{"c":"Q19","v":"غير مطابق (FAIL)","f":"=IF(P19<=3.0,\"مطابق وآمن (PASS)\",\"غير مطابق (FAIL)\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":20,"h":40.0,"cells":[{"c":"A20","v":"التحقق النهائي: جميع مسارات كابلات التغذية الصاعدة مطابقة لاشتراطات هبوط الجهد الكودية (VD ≤ 3.0%) ولتيار التحمل المصحح (Itab ≥ Iz')","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center","cs":15},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"P20","v":"≤ 3.0%","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"Q20","v":"☑ PASS ALL","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"}]}]},{"name":"دليل المعاملات والمواصفات NEC","maxRow":20,"maxCol":9,"colWidths":[18.0,18.0,18.0,16.0,16.0,6.0,22.0,20.0,20.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"دليل الجداول المرجعية ومعاملات التصحيح لسعة الكابلات والقواطع (TECHNICAL REFERENCE MATRIX)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":40.0,"cells":[{"c":"A2","v":"جداول السعة المرجعية لكابلات النحاس XLPE ومعاملات تصحيح الحرارة والتجميع ومحددات معاملات الطلب كودياً","bg":"#F1F5F9","fg":"#475569","al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""}]},{"r":4,"h":36.0,"cells":[{"c":"A4","v":"جدول سعات التحمل القياسية لكابلات النحاس (Cu/XLPE/SWA/PVC at 30°C)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F4","v":""},{"c":"G4","v":"معاملات تصحيح الحرارة (Kt) لكابلات XLPE (90°C)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":5,"h":38.0,"cells":[{"c":"A5","v":"مقاس الكابل (mm²)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"السعة في الهواء (A)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"السعة في الأرض (A)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"المقاومة R (Ω/km)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"الممانعة X (Ω/km)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":""},{"c":"G5","v":"درجة الحرارة (°C)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"معامل في الهواء (Kt)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I5","v":"معامل في التربة (Kt)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"4x16","b":true,"al":"center"},{"c":"B6","v":95,"in":true,"al":"center"},{"c":"C6","v":99,"in":true,"al":"center"},{"c":"D6","v":1.45,"in":true,"al":"center","nf":"0.000"},{"c":"E6","v":0.084,"in":true,"al":"center","nf":"0.000"},{"c":"F6","v":""},{"c":"G6","v":"30 °C (الأساس)","b":true,"al":"center"},{"c":"H6","v":1,"in":true,"al":"center","nf":"0.00"},{"c":"I6","v":1,"in":true,"al":"center","nf":"0.00"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"4x25","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B7","v":125,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"C7","v":130,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"D7","v":0.927,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"E7","v":0.082,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"F7","v":""},{"c":"G7","v":"35 °C","bg":"#F8FAFC","b":true,"al":"center"},{"c":"H7","v":0.96,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"I7","v":0.97,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"4x35","b":true,"al":"center"},{"c":"B8","v":155,"in":true,"al":"center"},{"c":"C8","v":160,"in":true,"al":"center"},{"c":"D8","v":0.669,"in":true,"al":"center","nf":"0.000"},{"c":"E8","v":0.08,"in":true,"al":"center","nf":"0.000"},{"c":"F8","v":""},{"c":"G8","v":"40 °C","b":true,"al":"center"},{"c":"H8","v":0.91,"in":true,"al":"center","nf":"0.00"},{"c":"I8","v":0.93,"in":true,"al":"center","nf":"0.00"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"4x50","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B9","v":185,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"C9","v":190,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"D9","v":0.494,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"E9","v":0.079,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"F9","v":""},{"c":"G9","v":"45 °C (المملكة والخليج)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"H9","v":0.87,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"I9","v":0.89,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":"4x70","b":true,"al":"center"},{"c":"B10","v":225,"in":true,"al":"center"},{"c":"C10","v":240,"in":true,"al":"center"},{"c":"D10","v":0.342,"in":true,"al":"center","nf":"0.000"},{"c":"E10","v":0.078,"in":true,"al":"center","nf":"0.000"},{"c":"F10","v":""},{"c":"G10","v":"50 °C (الأسطح والشمس)","b":true,"al":"center"},{"c":"H10","v":0.82,"in":true,"al":"center","nf":"0.00"},{"c":"I10","v":0.85,"in":true,"al":"center","nf":"0.00"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":"4x95","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":275,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"C11","v":290,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"D11","v":0.247,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"E11","v":0.077,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"F11","v":""},{"c":"G11","v":"55 °C","bg":"#F8FAFC","b":true,"al":"center"},{"c":"H11","v":0.76,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"I11","v":0.8,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":"4x120","b":true,"al":"center"},{"c":"B12","v":320,"in":true,"al":"center"},{"c":"C12","v":335,"in":true,"al":"center"},{"c":"D12","v":0.196,"in":true,"al":"center","nf":"0.000"},{"c":"E12","v":0.076,"in":true,"al":"center","nf":"0.000"},{"c":"F12","v":""},{"c":"G12","v":"60 °C","b":true,"al":"center"},{"c":"H12","v":0.71,"in":true,"al":"center","nf":"0.00"},{"c":"I12","v":0.75,"in":true,"al":"center","nf":"0.00"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":"4x150","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":365,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"C13","v":380,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"D13","v":0.159,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"E13","v":0.076,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"F13","v":""},{"c":"G13","v":""},{"c":"H13","v":""},{"c":"I13","v":""}]},{"r":14,"h":36.0,"cells":[{"c":"A14","v":"4x185","b":true,"al":"center"},{"c":"B14","v":415,"in":true,"al":"center"},{"c":"C14","v":430,"in":true,"al":"center"},{"c":"D14","v":0.128,"in":true,"al":"center","nf":"0.000"},{"c":"E14","v":0.076,"in":true,"al":"center","nf":"0.000"},{"c":"F14","v":""},{"c":"G14","v":"معاملات تجميع الكابلات على حامل الكابلات (Kg)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":15,"h":38.0,"cells":[{"c":"A15","v":"4x240","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B15","v":485,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"C15","v":505,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"D15","v":0.098,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"E15","v":0.075,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"F15","v":""},{"c":"G15","v":"عدد الدوائر على الصينية","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H15","v":"كابلات متلامسة (Touching)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I15","v":"كابلات متباعدة (Spaced)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":"4x300","b":true,"al":"center"},{"c":"B16","v":550,"in":true,"al":"center"},{"c":"C16","v":570,"in":true,"al":"center"},{"c":"D16","v":0.079,"in":true,"al":"center","nf":"0.000"},{"c":"E16","v":0.074,"in":true,"al":"center","nf":"0.000"},{"c":"F16","v":""},{"c":"G16","v":"1 دائرة","b":true,"al":"center"},{"c":"H16","v":1,"in":true,"al":"center","nf":"0.00"},{"c":"I16","v":1,"in":true,"al":"center","nf":"0.00"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":""},{"c":"B17","v":""},{"c":"C17","v":""},{"c":"D17","v":""},{"c":"E17","v":""},{"c":"F17","v":""},{"c":"G17","v":"2 دائرة","bg":"#F8FAFC","b":true,"al":"center"},{"c":"H17","v":0.88,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"I17","v":0.94,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":""},{"c":"B18","v":""},{"c":"C18","v":""},{"c":"D18","v":""},{"c":"E18","v":""},{"c":"F18","v":""},{"c":"G18","v":"3 دوائر","b":true,"al":"center"},{"c":"H18","v":0.82,"in":true,"al":"center","nf":"0.00"},{"c":"I18","v":0.9,"in":true,"al":"center","nf":"0.00"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":""},{"c":"B19","v":""},{"c":"C19","v":""},{"c":"D19","v":""},{"c":"E19","v":""},{"c":"F19","v":""},{"c":"G19","v":"4 إلى 6 دوائر","bg":"#F8FAFC","b":true,"al":"center"},{"c":"H19","v":0.77,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"I19","v":0.86,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":""},{"c":"B20","v":""},{"c":"C20","v":""},{"c":"D20","v":""},{"c":"E20","v":""},{"c":"F20","v":""},{"c":"G20","v":"7 إلى 9 دوائر","b":true,"al":"center"},{"c":"H20","v":0.73,"in":true,"al":"center","nf":"0.00"},{"c":"I20","v":0.84,"in":true,"al":"center","nf":"0.00"}]}]}]}