{"slug":"building-management-system-bms-ddc-controllers-sensors-and-field-devices-boq-sheet","sheets":[{"name":"مقايسة نظام BMS والحساسات","maxRow":25,"maxCol":9,"colWidths":[12.0,22.0,54.0,10.0,16.0,14.0,20.0,15.0,22.0],"rows":[{"r":1,"h":34.0,"cells":[{"c":"A1","v":"مقايسة نظام إدارة المباني الذكية (BMS) ولوحات التحكم الرقمية (DDC) والحساسات والأجهزة الحقلية","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"جدول الكميات والأسعار التفصيلي (BOQ) لمحطة العمل المركزية ومتحكمات BACnet/Modbus والحساسات وعدادات الطاقة وفق ISO 16484 و ASHRAE 135","bg":"#1B6B93","fg":"#E2E8F0","al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"اسم المشروع:","bg":"#E2E8F0","b":true},{"c":"B4","v":"توريد وتركيب وبرمجة منظومة إدارة المباني الذكية والأتمتة (BMS)","bg":"#FFFBEB","cs":2},{"skip":true},{"c":"D4","v":"الجهة المالكة:","bg":"#E2E8F0","b":true},{"c":"E4","v":"إدارة المشروعات الكهروميكانيكية والمباني الذكية","bg":"#FFFBEB","cs":2},{"skip":true},{"c":"G4","v":"تاريخ المقايسة:","bg":"#E2E8F0","b":true},{"c":"H4","v":"2026-11-07","bg":"#FFFBEB","b":true,"al":"center","cs":2},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"الاستشاري الهندسي:","bg":"#E2E8F0","b":true},{"c":"B5","v":"مكتب الاستشارات الهندسية للأنظمة الذكية والتيار الخفيف ELV/BMS","bg":"#FFFBEB","cs":2},{"skip":true},{"c":"D5","v":"الكود المرجعي:","bg":"#E2E8F0","b":true},{"c":"E5","v":"ISO 16484-1..6 / ASHRAE 135 (BACnet) / EN 15232 Class A","bg":"#FFFBEB","cs":2},{"skip":true},{"c":"G5","v":"نسبة ضريبة القيمة المضافة:","bg":"#E2E8F0","b":true},{"c":"H5","v":0.15,"in":true,"bg":"#FFFBEB","b":true,"al":"center","nf":"0.0%","cs":2},{"skip":true}]},{"r":6,"h":28.0,"cells":[{"c":"A6","v":""},{"c":"B6","v":""},{"c":"C6","v":""},{"c":"D6","v":""},{"c":"E6","v":""},{"c":"F6","v":""},{"c":"G6","v":""},{"c":"H6","v":""},{"c":"I6","v":""}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"كود البند","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B7","v":"قسم النظام","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C7","v":"بيان ومواصفات البند الفنية (شامل التوريد والتركيب والبرمجة والربط)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D7","v":"الوحدة","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E7","v":"الكمية الهندسية","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F7","v":"معامل الاحتياط %","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G7","v":"الكمية النهائية [Auto]","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H7","v":"سعر الوحدة","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I7","v":"الإجمالي الكلي [Auto]","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":8,"h":151.9,"cells":[{"c":"A8","v":"BMS-01","b":true,"al":"center"},{"c":"B8","v":"الخادم والبرمجيات المركزية","al":"center"},{"c":"C8","v":"توريد وتركيب وبرمجة حزمة برمجيات إدارة المباني الذكية المركزية (Enterprise Web-Based BMS Supervisory Software Package — Unlimited Points License) تدعم بروتوكولات BACnet IP/MSTP و Modbus TCP/RTU و KNX وLON، شاملة شاشات الجرافيك التفاعلية ثلاثية الأبعاد (3D HVAC/MEP Dynamic Graphics) وتقارير الطاقة والأعطال"},{"c":"D8","v":"مجموعة","al":"center"},{"c":"E8","v":1,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F8","v":0,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G8","v":1,"f":"=ROUND(E8*(1+F8),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H8","v":68000,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I8","v":68000,"f":"=ROUND(G8*H8,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":9,"h":104.0,"cells":[{"c":"A9","v":"BMS-02","bg":"#F4F7FA","b":true,"al":"center"},{"c":"B9","v":"الخادم والبرمجيات المركزية","bg":"#F4F7FA","al":"center"},{"c":"C9","v":"توريد وتركيب محطة عمل وخادم مركزي لمشغل النظام (BMS Operator Workstation & Application Server — Intel Xeon/Core i9, 64GB RAM, RAID-1 NVMe SSD, مع شاشتين 32 بوصة 4K وطابعة تقارير التقاطعية وUPS 3000VA)","bg":"#F4F7FA"},{"c":"D9","v":"مجموعة","bg":"#F4F7FA","al":"center"},{"c":"E9","v":1,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F9","v":0,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G9","v":1,"f":"=ROUND(E9*(1+F9),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H9","v":34000,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I9","v":34000,"f":"=ROUND(G9*H9,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":10,"h":128.0,"cells":[{"c":"A10","v":"BMS-03","b":true,"al":"center"},{"c":"B10","v":"الخادم والبرمجيات المركزية","al":"center"},{"c":"C10","v":"توريد وتركيب بوابات ربط وتكامل الشبكات المتعددة (Network Automation Engines / Multi-Protocol Gateways BACnet IP <-> Modbus RTU/TCP) للربط مع الشيلرات، المولدات، لوحات ATS، مضخات الحريق، المصاعد، الإنذار، والعدادات الذكية"},{"c":"D10","v":"عدد","al":"center"},{"c":"E10","v":4,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F10","v":0,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G10","v":4,"f":"=ROUND(E10*(1+F10),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H10","v":14500,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I10","v":58000,"f":"=ROUND(G10*H10,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":11,"h":128.0,"cells":[{"c":"A11","v":"BMS-04","bg":"#F4F7FA","b":true,"al":"center"},{"c":"B11","v":"لوحات ومتحكمات DDC","bg":"#F4F7FA","al":"center"},{"c":"C11","v":"توريد وتركيب لوحة تحكم رقمي مباشر رئيسية لغرف الميكانيكا ووحدات مناولة الهواء (Standalone Modular DDC Control Panel IP54 with BACnet B-BC Controller, I/O Expansion Modules + 20% Spare Capacity, 24VAC Power Supply, Relays & Terminal Blocks)","bg":"#F4F7FA"},{"c":"D11","v":"عدد","bg":"#F4F7FA","al":"center"},{"c":"E11","v":12,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F11","v":0,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G11","v":12,"f":"=ROUND(E11*(1+F11),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H11","v":19500,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I11","v":234000,"f":"=ROUND(G11*H11,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":12,"h":104.0,"cells":[{"c":"A12","v":"BMS-05","b":true,"al":"center"},{"c":"B12","v":"لوحات ومتحكمات DDC","al":"center"},{"c":"C12","v":"توريد وتركيب متحكمات رقمية طرفية لصناديق الهواء المتغير ووحدات الملف والمروحة (BACnet MS/TP VAV & FCU Unitary Controllers with Integrated Damper Actuator / Smart Room Thermostat with LCD Display)"},{"c":"D12","v":"عدد","al":"center"},{"c":"E12","v":85,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F12","v":0.02,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G12","v":86.7,"f":"=ROUND(E12*(1+F12),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H12","v":1150,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I12","v":99705,"f":"=ROUND(G12*H12,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":13,"h":104.0,"cells":[{"c":"A13","v":"BMS-06","bg":"#F4F7FA","b":true,"al":"center"},{"c":"B13","v":"الحساسات والأجهزة الحقلية","bg":"#F4F7FA","al":"center"},{"c":"C13","v":"توريد وتركيب حساسات درجة حرارة ورطوبة نسبية لمجاري الهواء والفراغات والوسط الخارجي (Duct, Room & Outdoor Immersion Temperature & Humidity Transmitters — Pt1000 / 4-20mA / 0-10V, Accuracy ±0.3°C & ±2% RH)","bg":"#F4F7FA"},{"c":"D13","v":"عدد","bg":"#F4F7FA","al":"center"},{"c":"E13","v":140,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F13","v":0.03,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G13","v":144.2,"f":"=ROUND(E13*(1+F13),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H13","v":680,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I13","v":98056,"f":"=ROUND(G13*H13,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":14,"h":72.0,"cells":[{"c":"A14","v":"BMS-07","b":true,"al":"center"},{"c":"B14","v":"الحساسات والأجهزة الحقلية","al":"center"},{"c":"C14","v":"توريد وتركيب حساسات درجة حرارة غاطسة بمواضع الحماية لمواسير المياه المثلجة (Chilled Water Immersion Temperature Sensors with Stainless Steel Thermowell PN16)"},{"c":"D14","v":"عدد","al":"center"},{"c":"E14","v":48,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F14","v":0.02,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G14","v":48.96,"f":"=ROUND(E14*(1+F14),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H14","v":590,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I14","v":28886.4,"f":"=ROUND(G14*H14,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":15,"h":104.0,"cells":[{"c":"A15","v":"BMS-08","bg":"#F4F7FA","b":true,"al":"center"},{"c":"B15","v":"الحساسات والأجهزة الحقلية","bg":"#F4F7FA","al":"center"},{"c":"C15","v":"توريد وتركيب حساسات ومفاتيح فرق الضغط للهواء والمياه (Air Differential Pressure Switches for AHU Filters & Fans + Water Differential Pressure Transmitters across Chillers & Pumps)","bg":"#F4F7FA"},{"c":"D15","v":"عدد","bg":"#F4F7FA","al":"center"},{"c":"E15","v":110,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F15","v":0.03,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G15","v":113.3,"f":"=ROUND(E15*(1+F15),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H15","v":760,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I15","v":86108,"f":"=ROUND(G15*H15,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":16,"h":72.0,"cells":[{"c":"A16","v":"BMS-09","b":true,"al":"center"},{"c":"B16","v":"الحساسات والأجهزة الحقلية","al":"center"},{"c":"C16","v":"توريد وتركيب حساسات جودة الهواء الداخلي وغاز ثاني أكسيد الكربون وأول أكسيد الكربون للجراجات (Indoor Air Quality IAQ / CO2 Transmitters 0-2000 ppm & Car Park CO Gas Detectors with Audible Alarm)"},{"c":"D16","v":"عدد","al":"center"},{"c":"E16","v":55,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F16","v":0.02,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G16","v":56.1,"f":"=ROUND(E16*(1+F16),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H16","v":1420,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I16","v":79662,"f":"=ROUND(G16*H16,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":17,"h":72.0,"cells":[{"c":"A17","v":"BMS-10","bg":"#F4F7FA","b":true,"al":"center"},{"c":"B17","v":"الحساسات والأجهزة الحقلية","bg":"#F4F7FA","al":"center"},{"c":"C17","v":"توريد وتركيب حساسات سريان المياه المثلجة بالموجات فوق الصوتية أو الكهرومغناطيسية وحساسات مستوى الخزانات (Ultrasonic / Electromagnetic Water Flow Meters & Ultrasonic Level Transmitters for Tanks)","bg":"#F4F7FA"},{"c":"D17","v":"عدد","bg":"#F4F7FA","al":"center"},{"c":"E17","v":18,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F17","v":0,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G17","v":18,"f":"=ROUND(E17*(1+F17),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H17","v":6400,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I17","v":115200,"f":"=ROUND(G17*H17,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":18,"h":72.0,"cells":[{"c":"A18","v":"BMS-11","b":true,"al":"center"},{"c":"B18","v":"المشغلات وعدادات الطاقة","al":"center"},{"c":"C18","v":"توريد وتركيب مشغلات خوانق الهواء الكهربائية المتدرجة وذات الإرجاع الزنبركي (Modulating 0-10V & Spring-Return Open/Close Motorized Damper Actuators 10-20 Nm)"},{"c":"D18","v":"عدد","al":"center"},{"c":"E18","v":95,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F18","v":0.02,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G18","v":96.9,"f":"=ROUND(E18*(1+F18),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H18","v":920,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I18","v":89148,"f":"=ROUND(G18*H18,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":19,"h":104.0,"cells":[{"c":"A19","v":"BMS-12","bg":"#F4F7FA","b":true,"al":"center"},{"c":"B19","v":"المشغلات وعدادات الطاقة","bg":"#F4F7FA","al":"center"},{"c":"C19","v":"توريد وتركيب محابس تحكم متدرجة ومستقلة عن الضغط للمياه المثلجة بالمشغلات (Pressure Independent Balancing & Control Valves PIBCV DN25-DN100 with Modulating 0-10V Actuator)","bg":"#F4F7FA"},{"c":"D19","v":"عدد","bg":"#F4F7FA","al":"center"},{"c":"E19","v":64,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F19","v":0.02,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G19","v":65.28,"f":"=ROUND(E19*(1+F19),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H19","v":2650,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I19","v":172992,"f":"=ROUND(G19*H19,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":20,"h":104.0,"cells":[{"c":"A20","v":"BMS-13","b":true,"al":"center"},{"c":"B20","v":"المشغلات وعدادات الطاقة","al":"center"},{"c":"C20","v":"توريد وتركيب عدادات قياس الطاقة الحرارية للتبريد وعدادات الكهرباء الرقمية الذكية (Ultrasonic Thermal Energy BTU Meters + Digital Multi-Function Power Meters kWh with Modbus RTU/BACnet)"},{"c":"D20","v":"عدد","al":"center"},{"c":"E20","v":32,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F20","v":0,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G20","v":32,"f":"=ROUND(E20*(1+F20),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H20","v":4100,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I20","v":131200,"f":"=ROUND(G20*H20,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":21,"h":104.0,"cells":[{"c":"A21","v":"BMS-14","bg":"#F4F7FA","b":true,"al":"center"},{"c":"B21","v":"الكابلات والاختبار والتشغيل","bg":"#F4F7FA","al":"center"},{"c":"C21","v":"توريد وتمديد كابلات اتصالات الشبكة والتحكم المدرعة والمقاومة للحريق (Belden Equivalent Shielded Twisted Pair BACnet/Modbus Cable 1/2 Pair 18/22 AWG LSZH + Cat6A FTP Cable inside EMT Conduit)","bg":"#F4F7FA"},{"c":"D21","v":"م.ط","bg":"#F4F7FA","al":"center"},{"c":"E21","v":6500,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F21","v":0.05,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G21","v":6825,"f":"=ROUND(E21*(1+F21),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H21","v":22,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I21","v":150150,"f":"=ROUND(G21*H21,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":22,"h":104.0,"cells":[{"c":"A22","v":"BMS-15","b":true,"al":"center"},{"c":"B22","v":"الكابلات والاختبار والتشغيل","al":"center"},{"c":"C22","v":"أعمال الفحص نقطة بنقطة (100% Point-to-Point Verification) ومعايرة الحساسات وبرمجة تسلسل التشغيل (Sequence of Operations SOO) والاختبار الوظيفي المتكامل (IST) وتدريب فريق التشغيل"},{"c":"D22","v":"مقطوعية","al":"center"},{"c":"E22","v":1,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F22","v":0,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G22","v":1,"f":"=ROUND(E22*(1+F22),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H22","v":42000,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I22","v":42000,"f":"=ROUND(G22*H22,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":"إجمالي قيمة أعمال نظام إدارة المباني الذكية BMS ولوحات DDC والحساسات (غير شامل الضريبة)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"I23","v":1487107.4,"f":"=SUM(I8:I22)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.00"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":"ضريبة القيمة المضافة المقررة (VAT 15%)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"I24","v":223066.11,"f":"=ROUND(I23*H5,2)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.00"}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":"الإجمالي الكلي للمقايسة شامل ضريبة القيمة المضافة (Grand Total)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"I25","v":1710173.51,"f":"=I23+I24","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.00"}]}]},{"name":"جدول نقاط التحكم I-O","maxRow":10,"maxCol":10,"colWidths":[14.0,38.0,14.0,13.0,13.0,13.0,13.0,18.0,13.0,22.0],"rows":[{"r":1,"h":34.0,"cells":[{"c":"A1","v":"جدول حصر نقاط الإدخال والإخراج الرقمية والتماثلية (BMS I/O Points Schedule & Spare Capacity)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"حساب تلقائي لنقاط المراقبة والتحكم الصلبة (DI, DO, AI, AO) لكل معدة وإضافة 20% سعة احتياطية بلوحات الـ DDC","bg":"#1B6B93","fg":"#E2E8F0","al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"كود اللوحة","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"النظام / المعدات المربوطة بلوحة DDC","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"عدد المعدات","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"مدخل رقمي DI","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"مخرج رقمي DO","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"مدخل تماثلي AI","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"مخرج تماثلي AO","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"إجمالي النقاط للوحدة [Auto]","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"إجمالي النقاط الكلي [Auto]","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J4","v":"السعة التصميمية شاملة 20% احتياطي [Auto]","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"DDC-CHW","b":true,"al":"center"},{"c":"B5","v":"محطة الشيلرات ومضخات المياه المثلجة الأولية والثانوية"},{"c":"C5","v":3,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0"},{"c":"D5","v":8,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0"},{"c":"E5","v":4,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0"},{"c":"F5","v":10,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0"},{"c":"G5","v":4,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0"},{"c":"H5","v":26,"f":"=SUM(D5:G5)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0"},{"c":"I5","v":78,"f":"=C5*H5","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0"},{"c":"J5","v":94,"f":"=ROUND(I5*1.2,0)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"DDC-AHU","b":true,"al":"center"},{"c":"B6","v":"وحدات مناولة الهواء الرئيسية والنقية (AHUs & FAHUs)"},{"c":"C6","v":12,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0"},{"c":"D6","v":6,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0"},{"c":"E6","v":3,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0"},{"c":"F6","v":7,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0"},{"c":"G6","v":3,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0"},{"c":"H6","v":19,"f":"=SUM(D6:G6)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0"},{"c":"I6","v":228,"f":"=C6*H6","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0"},{"c":"J6","v":274,"f":"=ROUND(I6*1.2,0)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"DDC-EXF","b":true,"al":"center"},{"c":"B7","v":"مراوح سحب الدخان والتهوية ومراوح الجراجات (Jet & Exhaust Fans)"},{"c":"C7","v":28,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0"},{"c":"D7","v":3,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0"},{"c":"E7","v":2,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0"},{"c":"F7","v":2,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0"},{"c":"G7","v":1,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0"},{"c":"H7","v":8,"f":"=SUM(D7:G7)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0"},{"c":"I7","v":224,"f":"=C7*H7","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0"},{"c":"J7","v":269,"f":"=ROUND(I7*1.2,0)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"DDC-PMP","b":true,"al":"center"},{"c":"B8","v":"مضخات المياه المنزلية ومضخات الصرف الغاطسة والخزانات"},{"c":"C8","v":10,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0"},{"c":"D8","v":5,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0"},{"c":"E8","v":2,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0"},{"c":"F8","v":3,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0"},{"c":"G8","v":0,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0"},{"c":"H8","v":10,"f":"=SUM(D8:G8)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0"},{"c":"I8","v":100,"f":"=C8*H8","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0"},{"c":"J8","v":120,"f":"=ROUND(I8*1.2,0)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"DDC-ELC","b":true,"al":"center"},{"c":"B9","v":"لوحات الكهرباء الرئيسية والـ ATS والمولدات والـ UPS"},{"c":"C9","v":8,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0"},{"c":"D9","v":6,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0"},{"c":"E9","v":1,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0"},{"c":"F9","v":4,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0"},{"c":"G9","v":0,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0"},{"c":"H9","v":11,"f":"=SUM(D9:G9)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0"},{"c":"I9","v":88,"f":"=C9*H9","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0"},{"c":"J9","v":106,"f":"=ROUND(I9*1.2,0)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":"إجمالي نقاط المراقبة والتحكم الصلبة بالمشروع (Hardwired I/O Points)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"cs":2},{"skip":true},{"c":"C10","v":61,"f":"=SUM(C5:C9)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0"},{"c":"D10","v":28,"f":"=SUM(D5:D9)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0"},{"c":"E10","v":12,"f":"=SUM(E5:E9)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0"},{"c":"F10","v":26,"f":"=SUM(F5:F9)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0"},{"c":"G10","v":8,"f":"=SUM(G5:G9)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0"},{"c":"H10","v":74,"f":"=SUM(H5:H9)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0"},{"c":"I10","v":718,"f":"=SUM(I5:I9)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0"},{"c":"J10","v":863,"f":"=SUM(J5:J9)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0"}]}]},{"name":"الملخص وضوابط الفحص","maxRow":18,"maxCol":7,"colWidths":[14.0,26.0,36.0,24.0,34.0,28.0,24.0],"rows":[{"r":1,"h":34.0,"cells":[{"c":"A1","v":"الملخص التنفيذي لتكاليف منظومة الـ BMS وقائمة اختبارات التحقق والتشغيل (Point-to-Point & SOO)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"تحليل التكلفة حسب المستوى المعماري للنظام وجدول اختبارات الاستلام والتكامل مع الأنظمة (ISO 16484 / ASHRAE)","bg":"#1B6B93","fg":"#E2E8F0","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"رقم القسم","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"قسم منظومة إدارة المباني الذكية BMS","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"عدد البنود","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"إجمالي التكلفة قبل الضريبة [Auto]","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"نسبة القسم من الإجمالي % [Auto]","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"قيمة ضريبة القيمة المضافة 15% [Auto]","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"الإجمالي شامل الضريبة [Auto]","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"01","b":true,"al":"center"},{"c":"B5","v":"الخادم والبرمجيات المركزية"},{"c":"C5","v":3,"in":true,"al":"center"},{"c":"D5","v":160000,"f":"=SUMIF('مقايسة نظام BMS والحساسات'!$B$8:$B$22, B5, 'مقايسة نظام BMS والحساسات'!$I$8:$I$22)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E5","v":0,"f":"=IF($D$10>0, D5/$D$10, 0)","bg":"#EFF6FF","al":"center","nf":"0.0%"},{"c":"F5","v":24000,"f":"=ROUND(D5*0.15, 2)","bg":"#EFF6FF","al":"center","nf":"#,##0.00"},{"c":"G5","v":184000,"f":"=D5+F5","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"02","b":true,"al":"center"},{"c":"B6","v":"لوحات ومتحكمات DDC"},{"c":"C6","v":2,"in":true,"al":"center"},{"c":"D6","v":333705,"f":"=SUMIF('مقايسة نظام BMS والحساسات'!$B$8:$B$22, B6, 'مقايسة نظام BMS والحساسات'!$I$8:$I$22)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E6","v":0,"f":"=IF($D$10>0, D6/$D$10, 0)","bg":"#EFF6FF","al":"center","nf":"0.0%"},{"c":"F6","v":50055.75,"f":"=ROUND(D6*0.15, 2)","bg":"#EFF6FF","al":"center","nf":"#,##0.00"},{"c":"G6","v":383760.75,"f":"=D6+F6","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"03","b":true,"al":"center"},{"c":"B7","v":"الحساسات والأجهزة الحقلية"},{"c":"C7","v":5,"in":true,"al":"center"},{"c":"D7","v":407912.4,"f":"=SUMIF('مقايسة نظام BMS والحساسات'!$B$8:$B$22, B7, 'مقايسة نظام BMS والحساسات'!$I$8:$I$22)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E7","v":0,"f":"=IF($D$10>0, D7/$D$10, 0)","bg":"#EFF6FF","al":"center","nf":"0.0%"},{"c":"F7","v":61186.86,"f":"=ROUND(D7*0.15, 2)","bg":"#EFF6FF","al":"center","nf":"#,##0.00"},{"c":"G7","v":469099.26,"f":"=D7+F7","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"04","b":true,"al":"center"},{"c":"B8","v":"المشغلات وعدادات الطاقة"},{"c":"C8","v":3,"in":true,"al":"center"},{"c":"D8","v":393340,"f":"=SUMIF('مقايسة نظام BMS والحساسات'!$B$8:$B$22, B8, 'مقايسة نظام BMS والحساسات'!$I$8:$I$22)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E8","v":0,"f":"=IF($D$10>0, D8/$D$10, 0)","bg":"#EFF6FF","al":"center","nf":"0.0%"},{"c":"F8","v":59001,"f":"=ROUND(D8*0.15, 2)","bg":"#EFF6FF","al":"center","nf":"#,##0.00"},{"c":"G8","v":452341,"f":"=D8+F8","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"05","b":true,"al":"center"},{"c":"B9","v":"الكابلات والاختبار والتشغيل"},{"c":"C9","v":2,"in":true,"al":"center"},{"c":"D9","v":192150,"f":"=SUMIF('مقايسة نظام BMS والحساسات'!$B$8:$B$22, B9, 'مقايسة نظام BMS والحساسات'!$I$8:$I$22)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E9","v":0,"f":"=IF($D$10>0, D9/$D$10, 0)","bg":"#EFF6FF","al":"center","nf":"0.0%"},{"c":"F9","v":28822.5,"f":"=ROUND(D9*0.15, 2)","bg":"#EFF6FF","al":"center","nf":"#,##0.00"},{"c":"G9","v":220972.5,"f":"=D9+F9","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":"الإجمالي الكلي لمقايسة نظام إدارة المباني BMS","bg":"#E2E8F0","fg":"#0F2C59","b":true,"cs":2},{"skip":true},{"c":"C10","v":15,"f":"=SUM(C5:C9)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center"},{"c":"D10","v":1487107.4,"f":"=SUM(D5:D9)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.00"},{"c":"E10","v":0,"f":"=SUM(E5:E9)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"0.0%"},{"c":"F10","v":223066.11,"f":"=SUM(F5:F9)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.00"},{"c":"G10","v":1710173.51,"f":"=SUM(G5:G9)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.00"}]},{"r":11,"h":28.0,"cells":[{"c":"A11","v":""},{"c":"B11","v":""},{"c":"C11","v":""},{"c":"D11","v":""},{"c":"E11","v":""},{"c":"F11","v":""},{"c":"G11","v":""}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":"قائمة اختبارات الفحص نقطة بنقطة والتشغيل الوظيفي لنظام إدارة المباني (BMS T&C Checklist)","bg":"#1B6B93","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":"كود الفحص","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B13","v":"مرحلة الاختبار","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C13","v":"بيان الفحص والتحقق الهندسي","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D13","v":"المواصفة المرجعية","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E13","v":"معيار القبول القياسي","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F13","v":"نسبة الفحص","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G13","v":"الجهة المسؤولة","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":14,"h":72.0,"cells":[{"c":"A14","v":"BMS-TC1","b":true,"al":"center"},{"c":"B14","v":"اختبار نقطة بنقطة","al":"center"},{"c":"C14","v":"التحقق الميداني من كل نقطة إدخال وإخراج (DI, DO, AI, AO) ومطابقتها على شاشة الجرافيك المركزية"},{"c":"D14","v":"ISO 16484-3","al":"center"},{"c":"E14","v":"تطابق 100% للأسماء والقراءات وزمن استجابة <= ثانيتين"},{"c":"F14","v":"100% من النقاط الصلبة","al":"center"},{"c":"G14","v":"مهندس BMS والاستشاري","al":"center"}]},{"r":15,"h":72.0,"cells":[{"c":"A15","v":"BMS-TC2","bg":"#F4F7FA","b":true,"al":"center"},{"c":"B15","v":"معايرة الحساسات","bg":"#F4F7FA","al":"center"},{"c":"C15","v":"مقارنة قراءات حساسات الحرارة والرطوبة والضغط والـ CO2 مع أجهزة قياس مرجعية معايرة","bg":"#F4F7FA"},{"c":"D15","v":"ASHRAE Guideline 11","bg":"#F4F7FA","al":"center"},{"c":"E15","v":"تفاوت الحرارة <= ±0.5°C والرطوبة <= ±3% والضغط <= ±2%","bg":"#F4F7FA"},{"c":"F15","v":"100% من الحساسات الحرجة","bg":"#F4F7FA","al":"center"},{"c":"G15","v":"مهندس T&C والاستشاري","bg":"#F4F7FA","al":"center"}]},{"r":16,"h":72.0,"cells":[{"c":"A16","v":"BMS-TC3","b":true,"al":"center"},{"c":"B16","v":"تسلسل التشغيل SOO","al":"center"},{"c":"C16","v":"اختبار منطق التحكم التلقائي (PID Loops, Setpoints, Lead/Lag Rotation & Night Setback)"},{"c":"D16","v":"ASHRAE Guideline 36","al":"center"},{"c":"E16","v":"استقرار حلقات التحكم دون تذبذب وعمل التبادل التلقائي للمضخات"},{"c":"F16","v":"جميع أنظمة التكييف والمضخات","al":"center"},{"c":"G16","v":"مهندس التحكم والاستشاري","al":"center"}]},{"r":17,"h":72.0,"cells":[{"c":"A17","v":"BMS-TC4","bg":"#F4F7FA","b":true,"al":"center"},{"c":"B17","v":"بروتوكولات التكامل HLI","bg":"#F4F7FA","al":"center"},{"c":"C17","v":"فحص تبادل البيانات الحية عبر BACnet IP / Modbus مع الشيلرات والعدادات والمولدات والـ UPS","bg":"#F4F7FA"},{"c":"D17","v":"ASHRAE 135 (BACnet)","bg":"#F4F7FA","al":"center"},{"c":"E17","v":"قراءة كافة السجلات والإنذارات دون فقد حزم بيانات","bg":"#F4F7FA"},{"c":"F17","v":"100% من الأنظمة المربوطة","bg":"#F4F7FA","al":"center"},{"c":"G17","v":"مهندس التكامل والاستشاري","bg":"#F4F7FA","al":"center"}]},{"r":18,"h":72.0,"cells":[{"c":"A18","v":"BMS-TC5","b":true,"al":"center"},{"c":"B18","v":"سيناريو الطوارئ والحريق","al":"center"},{"c":"C18","v":"اختبار التكامل مع لوحة إنذار الحريق لإيقاف وحدات التكييف وتشغيل مراوح سحب الدخان والضغط"},{"c":"D18","v":"NFPA 92 / SBC 801","al":"center"},{"c":"E18","v":"استجابة فورية وأولوية قصوى لإشارة الحريق فوق أوامر الـ BMS"},{"c":"F18","v":"اختبار متكامل IST بحضور الدفاع المدني","al":"center"},{"c":"G18","v":"لجنة الاستلام والاستشاري","al":"center"}]}]}]}