{"slug":"chilled-water-piping-and-pump-head-calculation-sheet","sheets":[{"name":"إعدادات ومعايير النظام Setup","maxRow":20,"maxCol":6,"colWidths":[36.0,18.0,26.0,22.0,22.0,22.0],"rows":[{"r":1,"h":52.0,"cells":[{"c":"A1","v":"شيت حساب وتصميم أقطار مواسير المياه المثلجة وفواقد ضغط المضخات (HVAC Chilled Water System)","bg":"#0369A1","fg":"#FFFFFF","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":48.0,"cells":[{"c":"A2","v":"⚠️ تنبيه استرشادي: المعادلات والبارامترات الهيدروليكية في هذا الشيت معدة استرشادياً وفق معايير ASHRAE Fundamentals وكود SBC 501. يرجى مراجعة وتعديل فرق درجات الحرارة ومعاملات الاحتكاك بما يطابق مواصفات مشروعك.","bg":"#FFFBEB","fg":"#92400E","al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"أولاً: بيانات المشروع وتوصيف المبنى وموقع محطة التبريد (Project & Plant Setup)","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"اسم المشروع:","bg":"#F1F5F9","b":true},{"c":"B5","v":"مشروع المجمع الطبي التخصصي - مبنى العيادات التخصصية والعمليات","bg":"#F8FAFC","cs":3},{"skip":true},{"skip":true},{"c":"E5","v":"رقم مستند الحسابات:","bg":"#F1F5F9","b":true},{"c":"F5","v":"CHW-CALC-2026-082","bg":"#F8FAFC","al":"center"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"المالك والموقع:","bg":"#F1F5F9","b":true},{"c":"B6","v":"الشركة الوطنية للرعاية الصحية - الرياض، المملكة العربية السعودية","bg":"#F8FAFC","cs":3},{"skip":true},{"skip":true},{"c":"E6","v":"تاريخ إعداد التصميم:","bg":"#F1F5F9","b":true},{"c":"F6","v":"2026-10-11م","bg":"#F8FAFC","al":"center"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"استشاري الأعمال الكهروميكانيكية:","bg":"#F1F5F9","b":true},{"c":"B7","v":"دار الاستشارات الهندسية العالمية للميكانيكا والكهرباء","bg":"#F8FAFC","cs":3},{"skip":true},{"skip":true},{"c":"E7","v":"كود التصميم الحاكم:","bg":"#F1F5F9","b":true},{"c":"F7","v":"ASHRAE 90.1 / SBC 501 / SMACNA","bg":"#F8FAFC","al":"center"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"نوع محطة التبريد المركزي:","bg":"#F1F5F9","b":true},{"c":"B8","v":"محطة شيلرات مبردة بالهواء (Air-Cooled Water Chillers) بسائل صديق للبيئة R-134a","bg":"#F8FAFC","cs":3},{"skip":true},{"skip":true},{"c":"E8","v":"العملة المستخدمة في التكلفة:","bg":"#F1F5F9","b":true},{"c":"F8","v":"SAR (ريال سعودي)","bg":"#F8FAFC","b":true,"al":"center"}]},{"r":9,"h":28.0,"cells":[{"c":"A9","v":""},{"c":"B9","v":""},{"c":"C9","v":""},{"c":"D9","v":""},{"c":"E9","v":""},{"c":"F9","v":""}]},{"r":10,"h":38.0,"cells":[{"c":"A10","v":"ثانياً: المعايير والمتغيرات التصميمية الهيدروليكية (ASHRAE & SBC 501 Design Criteria)","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":"المتغير والبارامتر التصميمي","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B11","v":"القيمة المدخلة","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C11","v":"الوحدة الهندسية","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D11","v":"التوصيف والأساس الكودي والملاحظات","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":"فرق درجات حرارة المياه المثلجة (ΔT):","bg":"#F1F5F9","b":true},{"c":"B12","v":10,"in":true,"bg":"#E0F2FE","fg":"#075985","b":true,"al":"center","nf":"0.0"},{"c":"C12","v":"درجة فهرنهايت (°F) = 5.56 °C","al":"center"},{"c":"D12","v":"الحمل التبريدي: GPM = (24 × TR) / ΔT","bg":"#F1F5F9","cs":3},{"skip":true},{"skip":true}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":"درجة حرارة مياه التوريد (CHWS Temp):","b":true},{"c":"B13","v":44,"in":true,"bg":"#E0F2FE","fg":"#075985","b":true,"al":"center","nf":"0.0"},{"c":"C13","v":"درجة فهرنهايت (°F) = 6.67 °C","al":"center"},{"c":"D13","v":"درجة حرارة الخروج من مبخر الشيلر","cs":3},{"skip":true},{"skip":true}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":"درجة حرارة مياه الراجع (CHWR Temp):","bg":"#F1F5F9","b":true},{"c":"B14","v":54,"in":true,"bg":"#E0F2FE","fg":"#075985","b":true,"al":"center","nf":"0.0"},{"c":"C14","v":"درجة فهرنهايت (°F) = 12.22 °C","al":"center"},{"c":"D14","v":"درجة حرارة العودة من ملفات التبريد","bg":"#F1F5F9","cs":3},{"skip":true},{"skip":true}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":"كثافة سائل التبريد (Fluid Density):","b":true},{"c":"B15","v":62.4,"in":true,"bg":"#E0F2FE","fg":"#075985","b":true,"al":"center","nf":"0.0"},{"c":"C15","v":"باوند / قدم مكعب (lb/ft³)","al":"center"},{"c":"D15","v":"مياه نقية معالجة بمثبطات الصدأ","cs":3},{"skip":true},{"skip":true}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":"معامل خشونة مواسير الصلب (Hazen-Williams C):","bg":"#F1F5F9","b":true},{"c":"B16","v":120,"in":true,"bg":"#E0F2FE","fg":"#075985","b":true,"al":"center","nf":"0"},{"c":"C16","v":"معامل C للأنابيب الصلب القياسية Sch 40","al":"center"},{"c":"D16","v":"مواسير Black Steel Seamless Sch 40","bg":"#F1F5F9","cs":3},{"skip":true},{"skip":true}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":"أقصى هبوط احتكاك مسموح (Max Head Loss):","b":true},{"c":"B17","v":4,"in":true,"bg":"#E0F2FE","fg":"#075985","b":true,"al":"center","nf":"0.0"},{"c":"C17","v":"قدم ماء / 100 قدم طولي (ft/100ft)","al":"center"},{"c":"D17","v":"معيار ASHRAE 90.1 لتوفير طاقة الضخ","cs":3},{"skip":true},{"skip":true}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":"السرعة القصوى للمواسير الكبيرة (Max Velocity):","bg":"#F1F5F9","b":true},{"c":"B18","v":8.5,"in":true,"bg":"#E0F2FE","fg":"#075985","b":true,"al":"center","nf":"0.0"},{"c":"C18","v":"قدم / ثانية (ft/sec)","al":"center"},{"c":"D18","v":"لتفادي الضوضاء والتآكل الإروزي بالمواسير","bg":"#F1F5F9","cs":3},{"skip":true},{"skip":true}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":"السرعة القصوى للمواسير داخل الأدوار المأهولة:","b":true},{"c":"B19","v":5,"in":true,"bg":"#E0F2FE","fg":"#075985","b":true,"al":"center","nf":"0.0"},{"c":"C19","v":"قدم / ثانية (ft/sec)","al":"center"},{"c":"D19","v":"معيار الهدوء الصوتي ومنع النخر الصوتي","cs":3},{"skip":true},{"skip":true}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":"معامل الأمان الإضافي لفواقد الضغط (Safety Factor):","bg":"#F1F5F9","b":true},{"c":"B20","v":1.15,"in":true,"bg":"#E0F2FE","fg":"#075985","b":true,"al":"center","nf":"0.0"},{"c":"C20","v":"نسبة أمان 15% على ضغط المضخة الإجمالي","al":"center"},{"c":"D20","v":"لتغطية زيادة الاحتكاك مع تقادم الشبكة","bg":"#F1F5F9","cs":3},{"skip":true},{"skip":true}]}]},{"name":"أقطار المواسير Pipe Sizing","maxRow":19,"maxCol":11,"colWidths":[8.0,18.0,48.0,18.0,18.0,16.0,18.0,18.0,20.0,18.0,20.0],"rows":[{"r":1,"h":50.0,"cells":[{"c":"A1","v":"جدول حساب وتصميم أقطار شبكة مواسير المياه المثلجة (Chilled Water Pipe Sizing Schedule)","bg":"#0369A1","fg":"#FFFFFF","b":true,"al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"وفق معادلات التدفق والهبوط الاحتكاكي بدليل ASHRAE Fundamentals ومعادلة Hazen-Williams القياسية لأنابيب الصلب الأسود Sch 40","bg":"#E0F2FE","b":true,"al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""}]},{"r":4,"h":40.0,"cells":[{"c":"A4","v":"م","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"كود المسار والقطاع","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"بيان قطاع الشبكة والوحدات المخدومة","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"الحمل التبريدي (TR)","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"معدل التدفق (GPM)","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"القطر الاسمي (بوصة)","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"القطر الداخلي d (mm)","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"سرعة المياه (ft/s)","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"معدل الاحتكاك (ft/100ft)","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J4","v":"طول القطاع المكافئ (m)","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K4","v":"فاقد الاحتكاك (ft wg)","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":1,"b":true,"al":"center"},{"c":"B5","v":"CHW-HDR-01","fg":"#075985","b":true,"al":"center"},{"c":"C5","v":"مجمع الإمداد الرئيسي للشيلرات (Main Chiller Header)"},{"c":"D5","v":500,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"E5","v":1200,"f":"=D5*24/'إعدادات ومعايير النظام Setup'!$B$12","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0.0"},{"c":"F5","v":10,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"G5","v":254.5,"in":true,"al":"center","nf":"0.0"},{"c":"H5","v":4.882758,"f":"=(0.4085*E5)/((G5/25.4)^2)","b":true,"al":"center","nf":"0.00"},{"c":"I5","v":1.011658,"f":"=0.2083*((100/'إعدادات ومعايير النظام Setup'!$B$16)^1.852)*((E5^1.852)/((G5/25.4)^4.8655))","al":"center","nf":"0.00"},{"c":"J5","v":45,"in":true,"al":"center","nf":"#,##0.0"},{"c":"K5","v":1.49359,"f":"=(I5*(J5*3.28084))/100","bg":"#DCFCE7","b":true,"al":"center","nf":"0.00"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":2,"bg":"#F1F5F9","b":true,"al":"center"},{"c":"B6","v":"CHW-CH-01","bg":"#F1F5F9","fg":"#075985","b":true,"al":"center"},{"c":"C6","v":"تغذية ومخرج مبخر الشيلر الأول (Chiller No. 01 Run)","bg":"#F1F5F9"},{"c":"D6","v":250,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"E6","v":600,"f":"=D6*24/'إعدادات ومعايير النظام Setup'!$B$12","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0.0"},{"c":"F6","v":8,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"0.0"},{"c":"G6","v":202.7,"in":true,"bg":"#F1F5F9","al":"center","nf":"0.0"},{"c":"H6","v":3.848604,"f":"=(0.4085*E6)/((G6/25.4)^2)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.00"},{"c":"I6","v":0.848014,"f":"=0.2083*((100/'إعدادات ومعايير النظام Setup'!$B$16)^1.852)*((E6^1.852)/((G6/25.4)^4.8655))","bg":"#F1F5F9","al":"center","nf":"0.00"},{"c":"J6","v":28,"in":true,"bg":"#F1F5F9","al":"center","nf":"#,##0.0"},{"c":"K6","v":0.779016,"f":"=(I6*(J6*3.28084))/100","bg":"#DCFCE7","b":true,"al":"center","nf":"0.00"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":3,"b":true,"al":"center"},{"c":"B7","v":"CHW-CH-02","fg":"#075985","b":true,"al":"center"},{"c":"C7","v":"تغذية ومخرج مبخر الشيلر الثاني (Chiller No. 02 Run)"},{"c":"D7","v":250,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"E7","v":600,"f":"=D7*24/'إعدادات ومعايير النظام Setup'!$B$12","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0.0"},{"c":"F7","v":8,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"G7","v":202.7,"in":true,"al":"center","nf":"0.0"},{"c":"H7","v":3.848604,"f":"=(0.4085*E7)/((G7/25.4)^2)","b":true,"al":"center","nf":"0.00"},{"c":"I7","v":0.848014,"f":"=0.2083*((100/'إعدادات ومعايير النظام Setup'!$B$16)^1.852)*((E7^1.852)/((G7/25.4)^4.8655))","al":"center","nf":"0.00"},{"c":"J7","v":28,"in":true,"al":"center","nf":"#,##0.0"},{"c":"K7","v":0.779016,"f":"=(I7*(J7*3.28084))/100","bg":"#DCFCE7","b":true,"al":"center","nf":"0.00"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":4,"bg":"#F1F5F9","b":true,"al":"center"},{"c":"B8","v":"CHW-RSR-01","bg":"#F1F5F9","fg":"#075985","b":true,"al":"center"},{"c":"C8","v":"الصاعد الرئيسي المغذي للمبنى (Building Main Riser)","bg":"#F1F5F9"},{"c":"D8","v":400,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"E8","v":960,"f":"=D8*24/'إعدادات ومعايير النظام Setup'!$B$12","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0.0"},{"c":"F8","v":8,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"0.0"},{"c":"G8","v":202.7,"in":true,"bg":"#F1F5F9","al":"center","nf":"0.0"},{"c":"H8","v":6.157767,"f":"=(0.4085*E8)/((G8/25.4)^2)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.00"},{"c":"I8","v":2.025039,"f":"=0.2083*((100/'إعدادات ومعايير النظام Setup'!$B$16)^1.852)*((E8^1.852)/((G8/25.4)^4.8655))","bg":"#F1F5F9","al":"center","nf":"0.00"},{"c":"J8","v":65,"in":true,"bg":"#F1F5F9","al":"center","nf":"#,##0.0"},{"c":"K8","v":4.318489,"f":"=(I8*(J8*3.28084))/100","bg":"#DCFCE7","b":true,"al":"center","nf":"0.00"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":5,"b":true,"al":"center"},{"c":"B9","v":"CHW-FL1-AHU","fg":"#075985","b":true,"al":"center"},{"c":"C9","v":"مجمع الدور الأرضي لوحدات مناولة الهواء (Ground Floor AHUs)"},{"c":"D9","v":180,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"E9","v":432,"f":"=D9*24/'إعدادات ومعايير النظام Setup'!$B$12","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0.0"},{"c":"F9","v":6,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"G9","v":154.1,"in":true,"al":"center","nf":"0.0"},{"c":"H9","v":4.794441,"f":"=(0.4085*E9)/((G9/25.4)^2)","b":true,"al":"center","nf":"0.00"},{"c":"I9","v":1.751565,"f":"=0.2083*((100/'إعدادات ومعايير النظام Setup'!$B$16)^1.852)*((E9^1.852)/((G9/25.4)^4.8655))","al":"center","nf":"0.00"},{"c":"J9","v":48,"in":true,"al":"center","nf":"#,##0.0"},{"c":"K9","v":2.75837,"f":"=(I9*(J9*3.28084))/100","bg":"#DCFCE7","b":true,"al":"center","nf":"0.00"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":6,"bg":"#F1F5F9","b":true,"al":"center"},{"c":"B10","v":"CHW-AHU-01","bg":"#F1F5F9","fg":"#075985","b":true,"al":"center"},{"c":"C10","v":"تفريعة وحدة مناولة قسم العمليات (AHU-01 OT Unit)","bg":"#F1F5F9"},{"c":"D10","v":60,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"E10","v":144,"f":"=D10*24/'إعدادات ومعايير النظام Setup'!$B$12","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0.0"},{"c":"F10","v":4,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"0.0"},{"c":"G10","v":102.3,"in":true,"bg":"#F1F5F9","al":"center","nf":"0.0"},{"c":"H10","v":3.626358,"f":"=(0.4085*E10)/((G10/25.4)^2)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.00"},{"c":"I10","v":1.680744,"f":"=0.2083*((100/'إعدادات ومعايير النظام Setup'!$B$16)^1.852)*((E10^1.852)/((G10/25.4)^4.8655))","bg":"#F1F5F9","al":"center","nf":"0.00"},{"c":"J10","v":35,"in":true,"bg":"#F1F5F9","al":"center","nf":"#,##0.0"},{"c":"K10","v":1.929988,"f":"=(I10*(J10*3.28084))/100","bg":"#DCFCE7","b":true,"al":"center","nf":"0.00"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":7,"b":true,"al":"center"},{"c":"B11","v":"CHW-AHU-02","fg":"#075985","b":true,"al":"center"},{"c":"C11","v":"تفريعة وحدة مناولة قسم العناية المركزة (AHU-02 ICU Unit)"},{"c":"D11","v":50,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"E11","v":120,"f":"=D11*24/'إعدادات ومعايير النظام Setup'!$B$12","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0.0"},{"c":"F11","v":3,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"G11","v":77.9,"in":true,"al":"center","nf":"0.0"},{"c":"H11","v":5.211537,"f":"=(0.4085*E11)/((G11/25.4)^2)","b":true,"al":"center","nf":"0.00"},{"c":"I11","v":4.514735,"f":"=0.2083*((100/'إعدادات ومعايير النظام Setup'!$B$16)^1.852)*((E11^1.852)/((G11/25.4)^4.8655))","al":"center","nf":"0.00"},{"c":"J11","v":32,"in":true,"al":"center","nf":"#,##0.0"},{"c":"K11","v":4.739879,"f":"=(I11*(J11*3.28084))/100","bg":"#DCFCE7","b":true,"al":"center","nf":"0.00"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":8,"bg":"#F1F5F9","b":true,"al":"center"},{"c":"B12","v":"CHW-AHU-03","bg":"#F1F5F9","fg":"#075985","b":true,"al":"center"},{"c":"C12","v":"تفريعة وحدة مناولة قسم الطوارئ (AHU-03 ER Unit)","bg":"#F1F5F9"},{"c":"D12","v":40,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"E12","v":96,"f":"=D12*24/'إعدادات ومعايير النظام Setup'!$B$12","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0.0"},{"c":"F12","v":3,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"0.0"},{"c":"G12","v":77.9,"in":true,"bg":"#F1F5F9","al":"center","nf":"0.0"},{"c":"H12","v":4.16923,"f":"=(0.4085*E12)/((G12/25.4)^2)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.00"},{"c":"I12","v":2.986447,"f":"=0.2083*((100/'إعدادات ومعايير النظام Setup'!$B$16)^1.852)*((E12^1.852)/((G12/25.4)^4.8655))","bg":"#F1F5F9","al":"center","nf":"0.00"},{"c":"J12","v":30,"in":true,"bg":"#F1F5F9","al":"center","nf":"#,##0.0"},{"c":"K12","v":2.939416,"f":"=(I12*(J12*3.28084))/100","bg":"#DCFCE7","b":true,"al":"center","nf":"0.00"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":9,"b":true,"al":"center"},{"c":"B13","v":"CHW-AHU-04","fg":"#075985","b":true,"al":"center"},{"c":"C13","v":"تفريعة وحدة مناولة بهو المدخل الرئيسي (AHU-04 Lobby)"},{"c":"D13","v":30,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"E13","v":72,"f":"=D13*24/'إعدادات ومعايير النظام Setup'!$B$12","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0.0"},{"c":"F13","v":2.5,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"G13","v":62.7,"in":true,"al":"center","nf":"0.0"},{"c":"H13","v":4.826773,"f":"=(0.4085*E13)/((G13/25.4)^2)","b":true,"al":"center","nf":"0.00"},{"c":"I13","v":5.040094,"f":"=0.2083*((100/'إعدادات ومعايير النظام Setup'!$B$16)^1.852)*((E13^1.852)/((G13/25.4)^4.8655))","al":"center","nf":"0.00"},{"c":"J13","v":25,"in":true,"al":"center","nf":"#,##0.0"},{"c":"K13","v":4.133935,"f":"=(I13*(J13*3.28084))/100","bg":"#DCFCE7","b":true,"al":"center","nf":"0.00"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":10,"bg":"#F1F5F9","b":true,"al":"center"},{"c":"B14","v":"CHW-FL2-FCU","bg":"#F1F5F9","fg":"#075985","b":true,"al":"center"},{"c":"C14","v":"مجمع الدور الأول لوحدات الفان كويل (1st Floor FCUs Header)","bg":"#F1F5F9"},{"c":"D14","v":120,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"E14","v":288,"f":"=D14*24/'إعدادات ومعايير النظام Setup'!$B$12","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0.0"},{"c":"F14","v":5,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"0.0"},{"c":"G14","v":128.2,"in":true,"bg":"#F1F5F9","al":"center","nf":"0.0"},{"c":"H14","v":4.618234,"f":"=(0.4085*E14)/((G14/25.4)^2)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.00"},{"c":"I14","v":2.023624,"f":"=0.2083*((100/'إعدادات ومعايير النظام Setup'!$B$16)^1.852)*((E14^1.852)/((G14/25.4)^4.8655))","bg":"#F1F5F9","al":"center","nf":"0.00"},{"c":"J14","v":55,"in":true,"bg":"#F1F5F9","al":"center","nf":"#,##0.0"},{"c":"K14","v":3.651553,"f":"=(I14*(J14*3.28084))/100","bg":"#DCFCE7","b":true,"al":"center","nf":"0.00"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":11,"b":true,"al":"center"},{"c":"B15","v":"CHW-FCU-BR1","fg":"#075985","b":true,"al":"center"},{"c":"C15","v":"فرع مكاتب العيادات الاستشارية A (Clinic Wing A)"},{"c":"D15","v":35,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"E15","v":84,"f":"=D15*24/'إعدادات ومعايير النظام Setup'!$B$12","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0.0"},{"c":"F15","v":2.5,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"G15","v":62.7,"in":true,"al":"center","nf":"0.0"},{"c":"H15","v":5.631236,"f":"=(0.4085*E15)/((G15/25.4)^2)","b":true,"al":"center","nf":"0.00"},{"c":"I15","v":6.70539,"f":"=0.2083*((100/'إعدادات ومعايير النظام Setup'!$B$16)^1.852)*((E15^1.852)/((G15/25.4)^4.8655))","al":"center","nf":"0.00"},{"c":"J15","v":38,"in":true,"al":"center","nf":"#,##0.0"},{"c":"K15","v":8.359738,"f":"=(I15*(J15*3.28084))/100","bg":"#DCFCE7","b":true,"al":"center","nf":"0.00"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":12,"bg":"#F1F5F9","b":true,"al":"center"},{"c":"B16","v":"CHW-FCU-BR2","bg":"#F1F5F9","fg":"#075985","b":true,"al":"center"},{"c":"C16","v":"فرع مكاتب العيادات الاستشارية B (Clinic Wing B)","bg":"#F1F5F9"},{"c":"D16","v":35,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"E16","v":84,"f":"=D16*24/'إعدادات ومعايير النظام Setup'!$B$12","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0.0"},{"c":"F16","v":2.5,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"0.0"},{"c":"G16","v":62.7,"in":true,"bg":"#F1F5F9","al":"center","nf":"0.0"},{"c":"H16","v":5.631236,"f":"=(0.4085*E16)/((G16/25.4)^2)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.00"},{"c":"I16","v":6.70539,"f":"=0.2083*((100/'إعدادات ومعايير النظام Setup'!$B$16)^1.852)*((E16^1.852)/((G16/25.4)^4.8655))","bg":"#F1F5F9","al":"center","nf":"0.00"},{"c":"J16","v":38,"in":true,"bg":"#F1F5F9","al":"center","nf":"#,##0.0"},{"c":"K16","v":8.359738,"f":"=(I16*(J16*3.28084))/100","bg":"#DCFCE7","b":true,"al":"center","nf":"0.00"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":13,"b":true,"al":"center"},{"c":"B17","v":"CHW-FCU-IND","fg":"#075985","b":true,"al":"center"},{"c":"C17","v":"تفريعات وحدات FCU الفردية (Typical FCU 3-5 TR Runs)"},{"c":"D17","v":5,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"E17","v":12,"f":"=D17*24/'إعدادات ومعايير النظام Setup'!$B$12","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0.0"},{"c":"F17","v":1.25,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"G17","v":35.1,"in":true,"al":"center","nf":"0.0"},{"c":"H17","v":2.567004,"f":"=(0.4085*E17)/((G17/25.4)^2)","b":true,"al":"center","nf":"0.00"},{"c":"I17","v":3.070548,"f":"=0.2083*((100/'إعدادات ومعايير النظام Setup'!$B$16)^1.852)*((E17^1.852)/((G17/25.4)^4.8655))","al":"center","nf":"0.00"},{"c":"J17","v":18,"in":true,"al":"center","nf":"#,##0.0"},{"c":"K17","v":1.813316,"f":"=(I17*(J17*3.28084))/100","bg":"#DCFCE7","b":true,"al":"center","nf":"0.00"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":14,"bg":"#F1F5F9","b":true,"al":"center"},{"c":"B18","v":"CHW-RET-HDR","bg":"#F1F5F9","fg":"#075985","b":true,"al":"center"},{"c":"C18","v":"مجمع الراجع الرئيسي ومحبس الخلط (Common Return Header)","bg":"#F1F5F9"},{"c":"D18","v":500,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"E18","v":1200,"f":"=D18*24/'إعدادات ومعايير النظام Setup'!$B$12","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0.0"},{"c":"F18","v":10,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"0.0"},{"c":"G18","v":254.5,"in":true,"bg":"#F1F5F9","al":"center","nf":"0.0"},{"c":"H18","v":4.882758,"f":"=(0.4085*E18)/((G18/25.4)^2)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.00"},{"c":"I18","v":1.011658,"f":"=0.2083*((100/'إعدادات ومعايير النظام Setup'!$B$16)^1.852)*((E18^1.852)/((G18/25.4)^4.8655))","bg":"#F1F5F9","al":"center","nf":"0.00"},{"c":"J18","v":52,"in":true,"bg":"#F1F5F9","al":"center","nf":"#,##0.0"},{"c":"K18","v":1.725926,"f":"=(I18*(J18*3.28084))/100","bg":"#DCFCE7","b":true,"al":"center","nf":"0.00"}]},{"r":19,"h":38.0,"cells":[{"c":"A19","v":"إجمالي أطوال المسارات الهيدروليكية وفواقد احتكاك خطوط التغذية والراجع:","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"J19","v":537,"f":"=SUM(J5:J18)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.0"},{"c":"K19","v":47.78197,"f":"=SUM(K5:K18)","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center","nf":"0.00"}]}]},{"name":"فواقد المضخات Pump Head","maxRow":32,"maxCol":7,"colWidths":[8.0,44.0,36.0,18.0,18.0,20.0,20.0],"rows":[{"r":1,"h":50.0,"cells":[{"c":"A1","v":"حساب ضغط مضخات المياه المثلجة والقدرة الحصانية (Total Dynamic Head & Pump Power)","bg":"#0369A1","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"تحليل المسار الهيدروليكي الحرج (Critical Circuit) لحساب الفواقد الكلية TDH وتحديد قدرة المحرك الكهربائي بموجب ASHRAE 90.1","bg":"#E0F2FE","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"تدفق المضخة الكلي Design Flow","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"ضغط المضخة الكلي Total Head","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"قدرة محرك المضخة Motor Power","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center"},{"c":"F4","v":"القدرة الكهربائية للمحرك kW","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true}]},{"r":5,"h":42.0,"cells":[{"c":"A5","v":2400,"f":"=SUM('أقطار المواسير Pipe Sizing'!E5:E7)","bg":"#E0F2FE","fg":"#0369A1","b":true,"al":"center","nf":"#,##0.0","cs":2},{"skip":true},{"c":"C5","v":"مجموع الفواقد الهيدروليكية للمسار الحرج","f":"=F24","bg":"#E0F2FE","fg":"#0369A1","b":true,"al":"center","nf":"#,##0.0","cs":2},{"skip":true},{"c":"E5","v":"BHP = WHP / Pump_Efficiency","f":"=F28","bg":"#E0F2FE","fg":"#0369A1","b":true,"al":"center","nf":"#,##0.0"},{"c":"F5","v":"kW = (BHP × 0.746) / Motor_Efficiency","f":"=F30","bg":"#E0F2FE","fg":"#0369A1","b":true,"al":"center","nf":"#,##0.0","cs":2},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"GPM (معدل الضخ الأقصى)","bg":"#F1F5F9","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"C6","v":"ft wg (فواقد المسار الحرج)","bg":"#F1F5F9","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"E6","v":"HP (القدرة المقننة)","bg":"#F1F5F9","fg":"#475569","al":"center"},{"c":"F6","v":"kW (الاستهلاك الكهربائي)","bg":"#F1F5F9","fg":"#475569","al":"center","cs":2},{"skip":true}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"جدول تحليل فواقد الضغط للمسار الهيدروليكي الأبعد (Critical Index Circuit Breakdown)","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":38.0,"cells":[{"c":"A9","v":"م","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"مكون هبوط الضغط والعنصر الهيدروليكي","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"معيار الحساب والمصدر الكودي","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"القيمة بالـ psi","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"القيمة بالـ kPa","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"الفاقد (ft wg)","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"النسبة من الإجمالي","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":1,"bg":"#F1F5F9","b":true,"al":"center"},{"c":"B10","v":"فواقد مبخر الشيلر (Chiller Evaporator Pressure Drop)","bg":"#F1F5F9","b":true},{"c":"C10","v":"بيانات كتالوج المصنع وفق معيار AHRI 550/590","bg":"#F1F5F9"},{"c":"D10","v":6.5025,"f":"=F10*0.4335","bg":"#F1F5F9","al":"center","nf":"0.00"},{"c":"E10","v":44.833177,"f":"=D10*6.89476","bg":"#F1F5F9","al":"center","nf":"#,##0.0"},{"c":"F10","v":15,"in":true,"bg":"#E0F2FE","b":true,"al":"center","nf":"0.0"},{"c":"G10","v":0,"f":"=F10/$F$20","bg":"#F1F5F9","al":"center","nf":"0.0%"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":2,"b":true,"al":"center"},{"c":"B11","v":"فواقد احتكاك مواسير المسار الحرج (Piping Friction)","b":true},{"c":"C11","v":"محسوبة من أطول مسار بشيت أقطار المواسير"},{"c":"D11","v":10.8375,"f":"=F11*0.4335","al":"center","nf":"0.00"},{"c":"E11","v":74.721962,"f":"=D11*6.89476","al":"center","nf":"#,##0.0"},{"c":"F11","v":25,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"G11","v":0,"f":"=F11/$F$20","al":"center","nf":"0.0%"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":3,"bg":"#F1F5F9","b":true,"al":"center"},{"c":"B12","v":"فواقد الوصلات والأكواع والمحابس (Fittings Allowance)","bg":"#F1F5F9","b":true},{"c":"C12","v":"نسبة 30% مكافئة من احتكاك المواسير المسار الحرج","bg":"#F1F5F9"},{"c":"D12","v":3.25125,"f":"=F12*0.4335","bg":"#F1F5F9","al":"center","nf":"0.00"},{"c":"E12","v":22.416588,"f":"=D12*6.89476","bg":"#F1F5F9","al":"center","nf":"#,##0.0"},{"c":"F12","v":7.5,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"0.0"},{"c":"G12","v":0,"f":"=F12/$F$20","bg":"#F1F5F9","al":"center","nf":"0.0%"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":4,"b":true,"al":"center"},{"c":"B13","v":"فواقد ملف تبريد الوحدة الحرجة (AHU Cooling Coil)","b":true},{"c":"C13","v":"مواصفات المصنع لملف 6 صفوف 12 زعنفة/بوصة"},{"c":"D13","v":7.803,"f":"=F13*0.4335","al":"center","nf":"0.00"},{"c":"E13","v":53.799812,"f":"=D13*6.89476","al":"center","nf":"#,##0.0"},{"c":"F13","v":18,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"G13","v":0,"f":"=F13/$F$20","al":"center","nf":"0.0%"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":5,"bg":"#F1F5F9","b":true,"al":"center"},{"c":"B14","v":"فواقد محبس التحكم التناسبي (2-Way Control Valve)","bg":"#F1F5F9","b":true},{"c":"C14","v":"مقاومة صمام التحكم بنسبة 50% من ملف التبريد","bg":"#F1F5F9"},{"c":"D14","v":4.335,"f":"=F14*0.4335","bg":"#F1F5F9","al":"center","nf":"0.00"},{"c":"E14","v":29.888785,"f":"=D14*6.89476","bg":"#F1F5F9","al":"center","nf":"#,##0.0"},{"c":"F14","v":10,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"0.0"},{"c":"G14","v":0,"f":"=F14/$F$20","bg":"#F1F5F9","al":"center","nf":"0.0%"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":6,"b":true,"al":"center"},{"c":"B15","v":"فواقد مصافي السحب وموزع السحب (Suction Diffuser)","b":true},{"c":"C15","v":"مصفاة سحب بمش مقاس 20 مع موزع سحب مدمج"},{"c":"D15","v":2.601,"f":"=F15*0.4335","al":"center","nf":"0.00"},{"c":"E15","v":17.933271,"f":"=D15*6.89476","al":"center","nf":"#,##0.0"},{"c":"F15","v":6,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"G15","v":0,"f":"=F15/$F$20","al":"center","nf":"0.0%"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":7,"bg":"#F1F5F9","b":true,"al":"center"},{"c":"B16","v":"فواقد محبس عدم الرجوع والصمام متعدد الأغراض","bg":"#F1F5F9","b":true},{"c":"C16","v":"Triple Duty Valve / Silent Check Valve","bg":"#F1F5F9"},{"c":"D16","v":2.1675,"f":"=F16*0.4335","bg":"#F1F5F9","al":"center","nf":"0.00"},{"c":"E16","v":14.944392,"f":"=D16*6.89476","bg":"#F1F5F9","al":"center","nf":"#,##0.0"},{"c":"F16","v":5,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"0.0"},{"c":"G16","v":0,"f":"=F16/$F$20","bg":"#F1F5F9","al":"center","nf":"0.0%"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":8,"b":true,"al":"center"},{"c":"B17","v":"فواقد صمام الاتزان الهيدروليكي (Balancing Valve)","b":true},{"c":"C17","v":"صمام اتزان يدوي/ديناميكي عند أبعد نقطة تفريغ"},{"c":"D17","v":1.734,"f":"=F17*0.4335","al":"center","nf":"0.00"},{"c":"E17","v":11.955514,"f":"=D17*6.89476","al":"center","nf":"#,##0.0"},{"c":"F17","v":4,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"G17","v":0,"f":"=F17/$F$20","al":"center","nf":"0.0%"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":9,"bg":"#F1F5F9","b":true,"al":"center"},{"c":"B18","v":"فواقد عداد قياس التدفق والحرارة (BTU Flow Meter)","bg":"#F1F5F9","b":true},{"c":"C18","v":"جهاز قياس كهرومغناطيسي لتدفق المياه المثلجة","bg":"#F1F5F9"},{"c":"D18","v":1.3005,"f":"=F18*0.4335","bg":"#F1F5F9","al":"center","nf":"0.00"},{"c":"E18","v":8.966635,"f":"=D18*6.89476","bg":"#F1F5F9","al":"center","nf":"#,##0.0"},{"c":"F18","v":3,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"0.0"},{"c":"G18","v":0,"f":"=F18/$F$20","bg":"#F1F5F9","al":"center","nf":"0.0%"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":10,"b":true,"al":"center"},{"c":"B19","v":"معامل الأمان التشغيلي لتقادم الشبكة (Safety Margin)","b":true},{"c":"C19","v":"نسبة أمان 15% وفق معايير ASHRAE الميكانيكية"},{"c":"D19","v":6.069,"f":"=F19*0.4335","al":"center","nf":"0.00"},{"c":"E19","v":41.844298,"f":"=D19*6.89476","al":"center","nf":"#,##0.0"},{"c":"F19","v":14,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"G19","v":0,"f":"=F19/$F$20","al":"center","nf":"0.0%"}]},{"r":20,"h":42.0,"cells":[{"c":"A20","v":"إجمالي فواقد الضغط الديناميكية الكلية (Total Dynamic Head - TDH):","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"D20","v":46.60125,"f":"=SUM(D10:D19)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"0.00"},{"c":"E20","v":321.304434,"f":"=SUM(E10:E19)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.0"},{"c":"F20","v":107.5,"f":"=SUM(F10:F19)","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center","nf":"0.00"},{"c":"G20","v":0,"f":"=SUM(G10:G19)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"0.0%"}]},{"r":21,"h":28.0,"cells":[{"c":"A21","v":""},{"c":"B21","v":""},{"c":"C21","v":""},{"c":"D21","v":""},{"c":"E21","v":""},{"c":"F21","v":""},{"c":"G21","v":""}]},{"r":22,"h":38.0,"cells":[{"c":"A22","v":"ثانياً: حساب القدرة الهيدروليكية والحصانية واختيار محرك المضخة (Pump Sizing & Motor Selection)","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":"معدل التدفق التصميمي الإجمالي لمضخة التشغيل (Design Flow Rate):","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"D23","v":2400,"f":"=A5","fg":"#075985","b":true,"al":"center","nf":"#,##0.0"},{"c":"E23","v":"GPM (جالون / دقيقة)","al":"center"},{"c":"F23","v":"مأخوذ آلياً من كارت المؤشر أعلى الشيت","cs":2},{"skip":true}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":"ضغط المضخة الكلي المحسوب (Total Dynamic Head - TDH):","bg":"#F1F5F9","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"D24","v":107.5,"f":"=F20","bg":"#F1F5F9","fg":"#075985","b":true,"al":"center","nf":"#,##0.0"},{"c":"E24","v":"ft wg (قدم ماء عمودي)","bg":"#F1F5F9","al":"center"},{"c":"F24","v":"مجموع الفواقد الهيدروليكية للمسار الحرج","bg":"#F1F5F9","cs":2},{"skip":true}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":"الضغط الكلي بالمتر المكافئ لمياه التبريد (Head in Meters):","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"D25","v":0,"f":"=F24*0.3048","fg":"#075985","b":true,"al":"center","nf":"#,##0.0"},{"c":"E25","v":"m w.g (متر ماء عمودي)","al":"center"},{"c":"F25","v":"التحويل القياسي إلى المتر العمودي","cs":2},{"skip":true}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":"كفاءة المضخة الهيدروليكية الافتراضية (Pump Efficiency ηp):","bg":"#F1F5F9","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"D26","v":0.75,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"E26","v":"نسبة مئوية (75%)","bg":"#F1F5F9","al":"center"},{"c":"F26","v":"كفاءة مضخات الطرد المركزي عند نقطة BEP","bg":"#F1F5F9","cs":2},{"skip":true}]},{"r":27,"h":52.0,"cells":[{"c":"A27","v":"القدرة الهيدروليكية الصافية للمياه (Water Horsepower - WHP):","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"D27","v":0,"f":"=(F23*F24*1.0)/3960","fg":"#075985","b":true,"al":"center","nf":"#,##0.0"},{"c":"E27","v":"WHP (قدرة حصانية صافية)","al":"center"},{"c":"F27","v":"WHP = (GPM × Head_ft × SG) / 3960","cs":2},{"skip":true}]},{"r":28,"h":52.0,"cells":[{"c":"A28","v":"القدرة الحصانية على عمود المضخة (Brake Horsepower - BHP):","bg":"#F1F5F9","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"D28","v":"WHP = (GPM × Head_ft × SG) / 3960\"/\"كفاءة مضخات الطرد المركزي عند نقطة BEP","f":"=F27/F26","bg":"#E0F2FE","fg":"#075985","b":true,"al":"center","nf":"#,##0.0"},{"c":"E28","v":"BHP (قدرة عمود الدوران)","bg":"#F1F5F9","al":"center"},{"c":"F28","v":"BHP = WHP / Pump_Efficiency","bg":"#F1F5F9","cs":2},{"skip":true}]},{"r":29,"h":34.0,"cells":[{"c":"A29","v":"كفاءة المحرك الكهربائي القياسية (Motor Efficiency ηm):","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"D29","v":0.93,"in":true,"b":true,"al":"center","nf":"0.0%"},{"c":"E29","v":"نسبة مئوية (93%)","al":"center"},{"c":"F29","v":"محرك كفاءة فائقة IE3 Premium Efficiency","cs":2},{"skip":true}]},{"r":30,"h":34.0,"cells":[{"c":"A30","v":"القدرة الكهربائية للمحرك بالكيلوواط (Motor Input Power kW):","bg":"#F1F5F9","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"D30","v":0,"f":"=(F28*0.746)/F29","bg":"#E0F2FE","fg":"#075985","b":true,"al":"center","nf":"#,##0.0"},{"c":"E30","v":"kW (كيلوواط كهربائي)","bg":"#F1F5F9","al":"center"},{"c":"F30","v":"kW = (BHP × 0.746) / Motor_Efficiency","bg":"#F1F5F9","cs":2},{"skip":true}]},{"r":31,"h":34.0,"cells":[{"c":"A31","v":"القدرة المقننة للمحرك القياسي المختار بالسوق (Selected Motor HP):","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"D31","v":40,"in":true,"bg":"#E0F2FE","b":true,"al":"center","nf":"0.0"},{"c":"E31","v":"HP (حصان ميكانيكي)","al":"center"},{"c":"F31","v":"اختيار الحجم التجاري القياسي الأعلى لحماية المحرك","cs":2},{"skip":true}]},{"r":32,"h":52.0,"cells":[{"c":"A32","v":"القدرة الاسمية للمحرك بالكيلوواط (Standard Commercial Rating):","bg":"#F1F5F9","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"D32","v":30,"in":true,"bg":"#E0F2FE","b":true,"al":"center","nf":"0.0"},{"c":"E32","v":"kW (قدرة المحرك التجاري)","bg":"#F1F5F9","al":"center"},{"c":"F32","v":"محرك الطلمبة القياسي وفق مواصفات NEMA/IEC","bg":"#F1F5F9","cs":2},{"skip":true}]}]}]}