{"slug":"cold-formed-steel-stud-and-drywall-partition-framing-sheet","sheets":[{"name":"تصميم قطاعات الصاج والترخيم","maxRow":32,"maxCol":8,"colWidths":[22.0,42.0,20.0,18.0,22.0,36.0,20.0,18.0],"rows":[{"r":1,"h":34.0,"cells":[{"c":"A1","v":"تصميم وتحقق قطاعات الصاج لقواطع الجبس بورد (Drywall Steel Stud Design)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"التحقق الإنشائي من الترخيم الأفقي ومقاومة ضغط الرياح والصلابة وفق معايير AISI S100 و ASTM C754 و SBC 501","bg":"#1E293B","fg":"#FFFFFF","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"أقصى ارتفاع مسموح به للقاطع (Hmax)","bg":"#E0F2FE","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"نسبة الترخيم الأفقي المحققة (Deflection)","bg":"#DCFCE7","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"معامل العزل الصوتي المحقق (STC Rating)","bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"G4","v":"تصنيف مقاومة الحريق (Fire Rating)","bg":"#DCFCE7","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"4.20 متر","bg":"#E0F2FE","fg":"#0369A1","b":true,"al":"center","cs":2},{"skip":true},{"c":"C5","v":"L / 0","f":"=\"L / \" & TEXT(ROUND((C10*1000)/C23,0),\"0\")","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center","cs":2},{"skip":true},{"c":"E5","v":"STC 52 dB","bg":"#F1F5F9","b":true,"al":"center","cs":2},{"skip":true},{"c":"G5","v":"120 دقيقة (2 Hours)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center","cs":2},{"skip":true}]},{"r":6,"h":28.0,"cells":[{"c":"A6","v":"لقطاع C70x35x0.6mm بتباعد 400مم","f":"=\"لقطاع C70x35x0.6mm بتباعد 400مم\"","bg":"#E0F2FE","fg":"#0369A1","al":"center","cs":2},{"skip":true},{"c":"C6","v":"آمن ومحقق لحد L/240 كودياً OK","f":"=IF(C23<=G24,\"آمن ومحقق لحد L/240 كودياً OK\",\"تجاوز للترخيم المسموح به\")","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center","cs":2},{"skip":true},{"c":"E6","v":"طبقتان جبس 12.5مم + صوف صخري 50مم","f":"=\"طبقتان جبس 12.5مم + صوف صخري 50مم\"","bg":"#F1F5F9","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"G6","v":"طبقاً لاختبارات ASTM E119 و BS 476","f":"=\"طبقاً لاختبارات ASTM E119 و BS 476\"","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center","cs":2},{"skip":true}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"أولاً: أبعاد القاطع وضغط الحمل الجانبي وخصائص قطاع الصاج (Geometry, Pressure & Profile Properties)","bg":"#475569","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":28.0,"cells":[{"c":"A9","v":""},{"c":"B9","v":""},{"c":"C9","v":""},{"c":"D9","v":""},{"c":"E9","v":""},{"c":"F9","v":""},{"c":"G9","v":""},{"c":"H9","v":""}]},{"r":10,"h":72.0,"cells":[{"c":"A10","v":"الارتفاع الصافي للقاطع الجداري (Clear Partition Height H)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C10","v":3.6,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"D10","v":"متر","fg":"#1E293B","al":"center"},{"c":"E10","v":"نوع الجدار وطبيعة الاستخدام الإنشائي","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"G10","v":"قاطع غير حامل للأحمال الرأسية (Non-Load Bearing)","fg":"#1E293B","b":true,"al":"center"},{"c":"H10","v":"تصنيف","fg":"#1E293B","al":"center"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"ضغط الحمل الجانبي / ضغط الهواء الداخلي (Lateral Pressure Pw)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C11","v":0.25,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"0.000"},{"c":"D11","v":"ك.ن/م²","fg":"#1E293B","al":"center"},{"c":"E11","v":"كود التصميم الإنشائي الحاكم (Design Code)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"G11","v":"AISI S100 / ASTM C754 / SBC 501","fg":"#1E293B","b":true,"al":"center"},{"c":"H11","v":"مرجعية","fg":"#1E293B","al":"center"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":"المسافة التباعدية بين القوائم الرأسية (Stud Spacing S)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C12","v":400,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"D12","v":"مم","fg":"#1E293B","al":"center"},{"c":"E12","v":"قطاع القائم الصاج المختار (Selected C-Stud Profile)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"G12","v":"C 70 x 35 x 0.60 mm","fg":"#1E293B","b":true,"al":"center"},{"c":"H12","v":"مواصفة","fg":"#1E293B","al":"center"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":"عمق شفة القائم الصاج الفولاذي (Stud Web Depth D)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C13","v":70,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"D13","v":"مم","fg":"#1E293B","al":"center"},{"c":"E13","v":"عرض جناح القائم الصاج (Stud Flange Width B)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"G13","v":35,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"H13","v":"مم","fg":"#1E293B","al":"center"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":"سمك الصاج المغلفن الاسمي للقطاع (Galvanized Steel Thickness t)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C14","v":0.6,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"D14","v":"مم (G24)","fg":"#1E293B","al":"center"},{"c":"E14","v":"عرض الشفة الراجعة للصلابة (Stiffening Lip Width L)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"G14","v":7,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"H14","v":"مم","fg":"#1E293B","al":"center"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":"إجهاد الخضوع الاسمي للصلب المغلفن (Yield Strength Fy)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C15","v":230,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"D15","v":"ميجاباسكال","fg":"#1E293B","al":"center"},{"c":"E15","v":"معاير مرونة الصلب المشكل على البارد (Elastic Modulus E)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"G15","v":203000,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"H15","v":"ميجاباسكال","fg":"#1E293B","al":"center"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":"عزم القصور الذاتي الفعال للقطاع (Effective Moment of Inertia Ieff)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C16","v":3.85,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.000"},{"c":"D16","v":"سم⁴","fg":"#1E293B","al":"center"},{"c":"E16","v":"معاير المقطع المرن الفعال (Effective Section Modulus Seff)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"G16","v":1.1,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.000"},{"c":"H16","v":"سم³","fg":"#1E293B","al":"center"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":"مساحة المقطع العرضي للقائم الصاج (Gross Cross Section Area A)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C17","v":0.88,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"D17","v":"سم²","fg":"#1E293B","al":"center"},{"c":"E17","v":"وزن المتر الطولي للقطاع الصاج (Linear Weight per meter)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"G17","v":0.69,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"H17","v":"كجم/م.ط","fg":"#1E293B","al":"center"}]},{"r":18,"h":28.0,"cells":[{"c":"A18","v":""},{"c":"B18","v":""},{"c":"C18","v":""},{"c":"D18","v":""},{"c":"E18","v":""},{"c":"F18","v":""},{"c":"G18","v":""},{"c":"H18","v":""}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":"ثانياً: الحسابات الإنشائية والتحقق من إجهاد الانحناء والترخيم الأفقي (Structural Checks & Deflection Limits)","bg":"#0369A1","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":20,"h":28.0,"cells":[{"c":"A20","v":""},{"c":"B20","v":""},{"c":"C20","v":""},{"c":"D20","v":""},{"c":"E20","v":""},{"c":"F20","v":""},{"c":"G20","v":""},{"c":"H20","v":""}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":"الحمل الخطي الموزع بانتظام على القائم (Uniform Load w = Pw * S)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C21","v":0.1,"f":"=ROUND(C11*(C12/1000),4)","fg":"#1E293B","b":true,"al":"center","nf":"0.0000"},{"c":"D21","v":"ك.ن/م.ط","fg":"#1E293B","al":"center"},{"c":"E21","v":"أقصى عزم انحناء تصميمي مطبق (Max Design Moment Mmax)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"G21","v":0.162,"f":"=ROUND(C21*C10^2/8,4)","fg":"#1E293B","b":true,"al":"center","nf":"0.0000"},{"c":"H21","v":"ك.ن.م","fg":"#1E293B","al":"center"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":"عزم الانحناء الاسمي المسموح به للمقطع (Allowable Moment Mall)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C22","v":133.7126,"f":"=ROUND((G15*G16*1000)/(1.67*10^6),4)","fg":"#1E293B","b":true,"al":"center","nf":"0.0000"},{"c":"D22","v":"ك.ن.م","fg":"#1E293B","al":"center"},{"c":"E22","v":"نسبة التحقق من كفاءة عزم الانحناء (Moment Ratio Mmax/Mall)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"G22","v":0.12,"f":"=ROUND((G21/C22)*100,2)","fg":"#1E293B","b":true,"al":"center","nf":"0.00%"},{"c":"H22","v":"نسبة مئوية (محقق OK)","fg":"#1E293B","al":"center"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":"أقصى ترخيم أفقي فعلي محسوب (Actual Mid-Height Deflection Delta)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C23","v":27982.85,"f":"=ROUND((5*C21*1000*(C10*1000)^4)/(384*G15*C16*10000),2)","fg":"#1E293B","b":true,"al":"center","nf":"0.00"},{"c":"D23","v":"مم","fg":"#1E293B","al":"center"},{"c":"E23","v":"معيار الترخيم الكودي المسموح به (Deflection Limit Target)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"G23","v":240,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"H23","v":"نسبة L/240","fg":"#1E293B","al":"center"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":"قيمة الترخيم الأفقي المسموح به كودياً (Allowable Deflection = H/240)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C24","v":15,"f":"=ROUND((C10*1000)/G23,2)","fg":"#1E293B","b":true,"al":"center","nf":"0.00"},{"c":"D24","v":"مم","fg":"#1E293B","al":"center"},{"c":"E24","v":"نسبة كفاءة الترخيم الفعلي للمسموح (Deflection Ratio Delta/Delta_all)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"G24","v":186552.33,"f":"=ROUND((C23/C24)*100,2)","fg":"#1E293B","b":true,"al":"center","nf":"0.00%"},{"c":"H24","v":"نسبة مئوية","fg":"#1E293B","al":"center"}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":"قرار التحقق الإنشائي من الترخيم والصلابة (Structural Status)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C25","v":"غير محقق - يلزم زيادة سمك الصاج أو تقليل التباعد","f":"=IF(C23<=C24,\"محقق وآمن إنشائياً طبقاً للكود OK\",\"غير محقق - يلزم زيادة سمك الصاج أو تقليل التباعد\")","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"D25","v":"قرار هندسي","fg":"#1E293B","al":"center"},{"c":"E25","v":"أقصى ارتفاع مسموح به للقطاع قبل تجاوز الترخيم","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"G25","v":4.2,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"H25","v":"متر","fg":"#1E293B","al":"center"}]},{"r":26,"h":28.0,"cells":[{"c":"A26","v":""},{"c":"B26","v":""},{"c":"C26","v":""},{"c":"D26","v":""},{"c":"E26","v":""},{"c":"F26","v":""},{"c":"G26","v":""},{"c":"H26","v":""}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":"ثالثاً: مواصفات طبقات الألواح والعزل ومقاومة الحريق والصوت (Board Layers, Acoustic & Fire Resistance)","bg":"#475569","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":28,"h":52.0,"cells":[{"c":"A28","v":"عدد طبقات ألواح الجبس بورد لكل جهة (Board Layers per side)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C28","v":"طبقتان (Double Layer 12.5mm + 12.5mm)","fg":"#1E293B","b":true,"al":"center"},{"c":"D28","v":"توصيف","fg":"#1E293B","al":"center"},{"c":"E28","v":"سمك لوح الجبس بورد الفردي (Board Thickness)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"G28","v":12.5,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"H28","v":"مم","fg":"#1E293B","al":"center"}]},{"r":29,"h":52.0,"cells":[{"c":"A29","v":"نوع ألواح الجبس بورد المستخدمة (Gypsum Board Type)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C29","v":"ألواح مقاومة للحريق والرطوبة (Type X MR)","fg":"#1E293B","b":true,"al":"center"},{"c":"D29","v":"مواصفة","fg":"#1E293B","al":"center"},{"c":"E29","v":"الوزن السطحي للألواح (Total Board Surface Density)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"G29","v":38.5,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"H29","v":"كجم/م²","fg":"#1E293B","al":"center"}]},{"r":30,"h":72.0,"cells":[{"c":"A30","v":"مادة العزل الصوتي والحراري داخل تجويف الصاج (Insulation Core)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C30","v":"صوف صخري بكثافة 50 كجم/م³ وسمك 50 مم (Rockwool)","fg":"#1E293B","b":true,"al":"center"},{"c":"D30","v":"عازل","fg":"#1E293B","al":"center"},{"c":"E30","v":"معامل امتصاص الصوت للمادة العازلة (NRC)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"G30","v":0.9,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"H30","v":"معامل ممتاز","fg":"#1E293B","al":"center"}]},{"r":31,"h":52.0,"cells":[{"c":"A31","v":"معامل تخفيض الصوت الكلي المحقق للجدار (Overall STC Rating)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C31","v":52,"in":true,"fg":"#0369A1","b":true,"al":"center","nf":"0.0"},{"c":"D31","v":"ديسيبل (dB)","fg":"#1E293B","al":"center"},{"c":"E31","v":"مستوى الخصوصية الصوتية (Speech Privacy Level)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"G31","v":"خصوصية صوتية فائقة (مكاتب تنفيذية وفنادق)","fg":"#1E293B","b":true,"al":"center"},{"c":"H31","v":"تقييم أداء","fg":"#1E293B","al":"center"}]},{"r":32,"h":52.0,"cells":[{"c":"A32","v":"تصنيف مقاومة الحريق للجدار بالكامل (Fire Resistance Rating)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C32","v":120,"in":true,"fg":"#15803D","b":true,"al":"center","nf":"0"},{"c":"D32","v":"دقيقة (2 Hours)","fg":"#1E293B","al":"center"},{"c":"E32","v":"الكود المعياري لاختبار الحريق (Fire Testing Standard)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"G32","v":"ASTM E119 / BS 476 Part 22","fg":"#1E293B","b":true,"al":"center"},{"c":"H32","v":"شهادة","fg":"#1E293B","al":"center"}]}]},{"name":"حصر كميات القواطع ومقايسة BOQ","maxRow":24,"maxCol":12,"colWidths":[12.0,36.0,14.0,14.0,18.0,16.0,18.0,16.0,20.0,18.0,18.0,22.0],"rows":[{"r":1,"h":34.0,"cells":[{"c":"A1","v":"حصر كميات قواطع الجبس بورد وتفصيل مكونات هيكل الصاج (Drywall Partition BOQ & QTO)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":12},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"حساب دقيق لمسطحات الجدران، أطوال القوائم C-Studs والتراكات U-Tracks، وألواح الجبس، والبراغي والمعجون","bg":"#1E293B","fg":"#FFFFFF","al":"center","cs":12},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"إجمالي مسطح القواطع الجدارية","bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D4","v":"إجمالي أطوال القوائم C-Studs","bg":"#E0F2FE","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G4","v":"إجمالي عدد ألواح الجبس بورد","bg":"#DCFCE7","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"J4","v":"إجمالي التكلفة التقديرية للمقايسة","bg":"#DCFCE7","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":5,"h":28.0,"cells":[{"c":"A5","v":"1,261.6 م² صافي","f":"=TEXT(G24,\"#,##0.0\") & \" م² صافي\"","bg":"#F1F5F9","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D5","v":"3,350.2 م.ط","f":"=TEXT(K24,\"#,##0.0\") & \" م.ط\"","bg":"#E0F2FE","fg":"#0369A1","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G5","v":"1,556 لوح قياسي","f":"=TEXT(ROUNDUP(I24/2.88,0),\"#,##0\") & \" لوح قياسي\"","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"J5","v":"141,502 ريال / درهم","f":"=TEXT(L24,\"#,##0\") & \" ريال / درهم\"","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":6,"h":28.0,"cells":[{"c":"A6","v":"بعد خصم فتحات الأبواب والشبابيك","f":"=\"بعد خصم فتحات الأبواب والشبابيك\"","bg":"#F1F5F9","fg":"#475569","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D6","v":"شامل هالك التركيب 8% والتدعيمات","f":"=\"شامل هالك التركيب 8% والتدعيمات\"","bg":"#E0F2FE","fg":"#0369A1","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G6","v":"مقاس اللوح 1.20م × 2.40م (2.88 م²)","f":"=\"مقاس اللوح 1.20م × 2.40م (2.88 م²)\"","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"J6","v":"شاملة توريد وتركيب ومعالجة الفواصل","f":"=\"شاملة توريد وتركيب ومعالجة الفواصل\"","bg":"#DCFCE7","fg":"#475569","al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""},{"c":"I7","v":""},{"c":"J7","v":""},{"c":"K7","v":""},{"c":"L7","v":""}]},{"r":8,"h":28.0,"cells":[{"c":"A8","v":""},{"c":"B8","v":""},{"c":"C8","v":""},{"c":"D8","v":""},{"c":"E8","v":""},{"c":"F8","v":""},{"c":"G8","v":""},{"c":"H8","v":""},{"c":"I8","v":""},{"c":"J8","v":""},{"c":"K8","v":""},{"c":"L8","v":""}]},{"r":9,"h":28.0,"cells":[{"c":"A9","v":""},{"c":"B9","v":""},{"c":"C9","v":""},{"c":"D9","v":""},{"c":"E9","v":""},{"c":"F9","v":""},{"c":"G9","v":""},{"c":"H9","v":""},{"c":"I9","v":""},{"c":"J9","v":""},{"c":"K9","v":""},{"c":"L9","v":""}]},{"r":10,"h":28.0,"cells":[{"c":"A10","v":""},{"c":"B10","v":""},{"c":"C10","v":""},{"c":"D10","v":""},{"c":"E10","v":""},{"c":"F10","v":""},{"c":"G10","v":""},{"c":"H10","v":""},{"c":"I10","v":""},{"c":"J10","v":""},{"c":"K10","v":""},{"c":"L10","v":""}]},{"r":11,"h":28.0,"cells":[{"c":"A11","v":""},{"c":"B11","v":""},{"c":"C11","v":""},{"c":"D11","v":""},{"c":"E11","v":""},{"c":"F11","v":""},{"c":"G11","v":""},{"c":"H11","v":""},{"c":"I11","v":""},{"c":"J11","v":""},{"c":"K11","v":""},{"c":"L11","v":""}]},{"r":12,"h":28.0,"cells":[{"c":"A12","v":""},{"c":"B12","v":""},{"c":"C12","v":""},{"c":"D12","v":""},{"c":"E12","v":""},{"c":"F12","v":""},{"c":"G12","v":""},{"c":"H12","v":""},{"c":"I12","v":""},{"c":"J12","v":""},{"c":"K12","v":""},{"c":"L12","v":""}]},{"r":13,"h":40.0,"cells":[{"c":"A13","v":"كود القاطع","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B13","v":"توصيف واستخدام القاطع الجداري","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C13","v":"الطول (م)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D13","v":"الارتفاع (م)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E13","v":"المسطح الإجمالي (م²)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F13","v":"خصم الفتحات (م²)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G13","v":"المسطح الصافي (م²)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H13","v":"عدد طبقات الجبس","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I13","v":"مسطح الألواح الكلي (م²)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J13","v":"مسار U-Track (م.ط)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K13","v":"قوائم C-Stud (م.ط)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L13","v":"التكلفة التقديرية (ريال)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":"W-01","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center"},{"c":"B14","v":"قواطع مكاتب الإدارة العامة والمدراء","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C14","v":45,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D14","v":3.6,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E14","v":162,"f":"=ROUND(C14*D14,2)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F14","v":4.2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G14","v":157.8,"f":"=ROUND(E14-F14,2)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"H14","v":4,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"I14","v":631.2,"f":"=ROUND(G14*H14,2)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"J14","v":94.5,"f":"=ROUND(C14*2*1.05,2)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K14","v":441.29,"f":"=ROUND(((C14/(400/1000))+1)*D14*1.08,2)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"L14","v":17358,"f":"=ROUND(G14*110.0,2)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":"W-02","fg":"#1E293B","b":true,"al":"center"},{"c":"B15","v":"قواطع قاعات الاجتماعات والتدريب","fg":"#1E293B"},{"c":"C15","v":32,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D15","v":3.6,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E15","v":115.2,"f":"=ROUND(C15*D15,2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F15","v":6.8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G15","v":108.4,"f":"=ROUND(E15-F15,2)","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"H15","v":4,"in":true,"fg":"#1E293B","al":"center"},{"c":"I15","v":433.6,"f":"=ROUND(G15*H15,2)","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"J15","v":67.2,"f":"=ROUND(C15*2*1.05,2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K15","v":314.93,"f":"=ROUND(((C15/(400/1000))+1)*D15*1.08,2)","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"L15","v":13550,"f":"=ROUND(G15*125.0,2)","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":"W-03","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center"},{"c":"B16","v":"ممرات الحركة الرئيسية والبهو","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C16","v":65,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D16","v":3.6,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E16","v":234,"f":"=ROUND(C16*D16,2)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F16","v":12.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G16","v":221.5,"f":"=ROUND(E16-F16,2)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"H16","v":4,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"I16","v":886,"f":"=ROUND(G16*H16,2)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"J16","v":136.5,"f":"=ROUND(C16*2*1.05,2)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K16","v":635.69,"f":"=ROUND(((C16/(400/1000))+1)*D16*1.08,2)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"L16","v":25472.5,"f":"=ROUND(G16*115.0,2)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":"W-04","fg":"#1E293B","b":true,"al":"center"},{"c":"B17","v":"قواطع مكاتب الموظفين المفتوحة","fg":"#1E293B"},{"c":"C17","v":55,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D17","v":3.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E17","v":176,"f":"=ROUND(C17*D17,2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F17","v":8.4,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G17","v":167.6,"f":"=ROUND(E17-F17,2)","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"H17","v":2,"in":true,"fg":"#1E293B","al":"center"},{"c":"I17","v":335.2,"f":"=ROUND(G17*H17,2)","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"J17","v":115.5,"f":"=ROUND(C17*2*1.05,2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K17","v":320.26,"f":"=ROUND(((C17/(600/1000))+1)*D17*1.08,2)","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"L17","v":14246,"f":"=ROUND(G17*85.0,2)","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":"W-05","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center"},{"c":"B18","v":"قواطع دورات المياه والمطابخ (مقاوم رطوبة)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C18","v":28,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D18","v":3.2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E18","v":89.6,"f":"=ROUND(C18*D18,2)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F18","v":5.2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G18","v":84.4,"f":"=ROUND(E18-F18,2)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"H18","v":4,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"I18","v":337.6,"f":"=ROUND(G18*H18,2)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"J18","v":58.8,"f":"=ROUND(C18*2*1.05,2)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K18","v":245.38,"f":"=ROUND(((C18/(400/1000))+1)*D18*1.08,2)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"L18","v":10972,"f":"=ROUND(G18*130.0,2)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":"W-06","fg":"#1E293B","b":true,"al":"center"},{"c":"B19","v":"قواطع غرف السيرفرات والشبكات IT (حريق 2 ساعة)","fg":"#1E293B"},{"c":"C19","v":22,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D19","v":3.6,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E19","v":79.2,"f":"=ROUND(C19*D19,2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F19","v":4.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G19","v":75,"f":"=ROUND(E19-F19,2)","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"H19","v":4,"in":true,"fg":"#1E293B","al":"center"},{"c":"I19","v":300,"f":"=ROUND(G19*H19,2)","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"J19","v":46.2,"f":"=ROUND(C19*2*1.05,2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K19","v":217.73,"f":"=ROUND(((C19/(400/1000))+1)*D19*1.08,2)","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"L19","v":10500,"f":"=ROUND(G19*140.0,2)","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":"W-07","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center"},{"c":"B20","v":"جدران غرف الأرشيف والمستندات","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C20","v":25,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D20","v":3.2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E20","v":80,"f":"=ROUND(C20*D20,2)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F20","v":4,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G20","v":76,"f":"=ROUND(E20-F20,2)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"H20","v":4,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"I20","v":304,"f":"=ROUND(G20*H20,2)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"J20","v":52.5,"f":"=ROUND(C20*2*1.05,2)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K20","v":219.46,"f":"=ROUND(((C20/(400/1000))+1)*D20*1.08,2)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"L20","v":9120,"f":"=ROUND(G20*120.0,2)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":"W-08","fg":"#1E293B","b":true,"al":"center"},{"c":"B21","v":"قواطع مكاتب خدمة العملاء والمبيعات","fg":"#1E293B"},{"c":"C21","v":38,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D21","v":3.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E21","v":121.6,"f":"=ROUND(C21*D21,2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F21","v":6.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G21","v":115.1,"f":"=ROUND(E21-F21,2)","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"H21","v":2,"in":true,"fg":"#1E293B","al":"center"},{"c":"I21","v":230.2,"f":"=ROUND(G21*H21,2)","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"J21","v":79.8,"f":"=ROUND(C21*2*1.05,2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K21","v":222.34,"f":"=ROUND(((C21/(600/1000))+1)*D21*1.08,2)","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"L21","v":10128.8,"f":"=ROUND(G21*88.0,2)","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":"W-09","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center"},{"c":"B22","v":"جدران فاصلة بين الوحدات الإدارية","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C22","v":48,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D22","v":3.6,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E22","v":172.8,"f":"=ROUND(C22*D22,2)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F22","v":8,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G22","v":164.8,"f":"=ROUND(E22-F22,2)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"H22","v":4,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"I22","v":659.2,"f":"=ROUND(G22*H22,2)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"J22","v":100.8,"f":"=ROUND(C22*2*1.05,2)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K22","v":470.45,"f":"=ROUND(((C22/(400/1000))+1)*D22*1.08,2)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"L22","v":20600,"f":"=ROUND(G22*125.0,2)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":"W-10","fg":"#1E293B","b":true,"al":"center"},{"c":"B23","v":"غرف العيادة والاستراحة والاستقبال","fg":"#1E293B"},{"c":"C23","v":30,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D23","v":3.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E23","v":96,"f":"=ROUND(C23*D23,2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F23","v":5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G23","v":91,"f":"=ROUND(E23-F23,2)","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"H23","v":4,"in":true,"fg":"#1E293B","al":"center"},{"c":"I23","v":364,"f":"=ROUND(G23*H23,2)","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"J23","v":63,"f":"=ROUND(C23*2*1.05,2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K23","v":262.66,"f":"=ROUND(((C23/(400/1000))+1)*D23*1.08,2)","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"L23","v":9555,"f":"=ROUND(G23*105.0,2)","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":"الإجمالي العام لمقايسة القواطع","bg":"#F1F5F9","b":true,"cs":2},{"skip":true},{"c":"C24","v":388,"f":"=SUM(C14:C23)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.00"},{"c":"D24","v":"متوسط","bg":"#F1F5F9","b":true,"al":"center"},{"c":"E24","v":1326.4,"f":"=SUM(E14:E23)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.00"},{"c":"F24","v":64.8,"f":"=SUM(F14:F23)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.00"},{"c":"G24","v":1261.6,"f":"=SUM(G14:G23)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.00"},{"c":"H24","v":"مساحة الألواح","bg":"#F1F5F9","b":true,"al":"center"},{"c":"I24","v":4481,"f":"=SUM(I14:I23)","bg":"#F1F5F9","fg":"#15803D","b":true,"al":"center","nf":"#,##0.00"},{"c":"J24","v":814.8,"f":"=SUM(J14:J23)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.00"},{"c":"K24","v":3350.19,"f":"=SUM(K14:K23)","bg":"#F1F5F9","fg":"#0369A1","b":true,"al":"center","nf":"#,##0.00"},{"c":"L24","v":141502.3,"f":"=SUM(L14:L23)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center","nf":"#,##0.00"}]}]},{"name":"دليل التركيب وضبط الجودة الموقع","maxRow":27,"maxCol":11,"colWidths":[8.0,18.0,18.0,22.0,22.0,22.0,20.0,20.0,18.0,20.0,32.0],"rows":[{"r":1,"h":34.0,"cells":[{"c":"A1","v":"دليل اشتراطات التركيب والمطابقة الفنية وضبط الجودة الموقعي (Drywall Quality Checklist)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"معايير استلام قواطع الجدران الجافة والمسافات البينية وتثبيت الألواح ومعالجة الفواصل وفق كود البناء SBC 801","bg":"#1E293B","fg":"#FFFFFF","al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"نسبة المطابقة الفنية للاستلام","bg":"#DCFCE7","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D4","v":"تباعد براغي تثبيت الألواح","bg":"#E0F2FE","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G4","v":"إزاحة الفواصل بين الطبقات","bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"J4","v":"درجة إنهاء المعجون (Finish Level)","bg":"#DCFCE7","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"100% مستوفاة بالكامل","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D5","v":"25 سم رأسياً كحد أقصى","bg":"#E0F2FE","fg":"#0369A1","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G5","v":"لا تقل عن 30 سم (Staggered)","bg":"#F1F5F9","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"J5","v":"Level 4 (دهان متميز)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center","cs":2},{"skip":true}]},{"r":6,"h":28.0,"cells":[{"c":"A6","v":"مطابقة لكود البناء السعودي SBC 801","f":"=\"مطابقة لكود البناء السعودي SBC 801\"","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D6","v":"مسامير دريوال سوداء ذاتية التثقيب","f":"=\"مسامير دريوال سوداء ذاتية التثقيب\"","bg":"#E0F2FE","fg":"#0369A1","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G6","v":"لمنع الشروخ وضمان كفاءة العزل","f":"=\"لمنع الشروخ وضمان كفاءة العزل\"","bg":"#F1F5F9","fg":"#475569","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"J6","v":"جاهز لأعمال الأساس والدهان","f":"=\"جاهز لأعمال الأساس والدهان\"","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center","cs":2},{"skip":true}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""},{"c":"I7","v":""},{"c":"J7","v":""},{"c":"K7","v":""}]},{"r":8,"h":28.0,"cells":[{"c":"A8","v":""},{"c":"B8","v":""},{"c":"C8","v":""},{"c":"D8","v":""},{"c":"E8","v":""},{"c":"F8","v":""},{"c":"G8","v":""},{"c":"H8","v":""},{"c":"I8","v":""},{"c":"J8","v":""},{"c":"K8","v":""}]},{"r":9,"h":28.0,"cells":[{"c":"A9","v":""},{"c":"B9","v":""},{"c":"C9","v":""},{"c":"D9","v":""},{"c":"E9","v":""},{"c":"F9","v":""},{"c":"G9","v":""},{"c":"H9","v":""},{"c":"I9","v":""},{"c":"J9","v":""},{"c":"K9","v":""}]},{"r":10,"h":28.0,"cells":[{"c":"A10","v":""},{"c":"B10","v":""},{"c":"C10","v":""},{"c":"D10","v":""},{"c":"E10","v":""},{"c":"F10","v":""},{"c":"G10","v":""},{"c":"H10","v":""},{"c":"I10","v":""},{"c":"J10","v":""},{"c":"K10","v":""}]},{"r":11,"h":28.0,"cells":[{"c":"A11","v":""},{"c":"B11","v":""},{"c":"C11","v":""},{"c":"D11","v":""},{"c":"E11","v":""},{"c":"F11","v":""},{"c":"G11","v":""},{"c":"H11","v":""},{"c":"I11","v":""},{"c":"J11","v":""},{"c":"K11","v":""}]},{"r":12,"h":28.0,"cells":[{"c":"A12","v":""},{"c":"B12","v":""},{"c":"C12","v":""},{"c":"D12","v":""},{"c":"E12","v":""},{"c":"F12","v":""},{"c":"G12","v":""},{"c":"H12","v":""},{"c":"I12","v":""},{"c":"J12","v":""},{"c":"K12","v":""}]},{"r":13,"h":40.0,"cells":[{"c":"A13","v":"بند","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B13","v":"مرحلة التنفيذ الإنشائي","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true},{"c":"D13","v":"المعيار الفني واشتراطات الكود (SBC / ASTM)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G13","v":"طريقة التحقق وأداة القياس الموقعي","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true},{"c":"I13","v":"التفاوت المسموح","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J13","v":"حالة المطابقة","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K13","v":"ملاحظات وتوجيهات الاستلام","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":1,"bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center"},{"c":"B14","v":"تثبيت المسار السفلي والعلوي U-Track","bg":"#F8FAFC","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"D14","v":"تثبيت التراك بمسامير رمي صلب كل 60 سم بحد أقصى مع وضع شريط عازل للصوت Acoustic Tape أسفل التراك.","bg":"#F8FAFC","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"G14","v":"شريط قياس وفحص بصري للشريط العازل","bg":"#F8FAFC","fg":"#1E293B","cs":2},{"skip":true},{"c":"I14","v":"± 5 مم استقامة","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"J14","v":"مطابق ومستوفٍ OK","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"K14","v":"تم التأكد من استمرارية شريط العزل الصوتي","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":2,"fg":"#1E293B","b":true,"al":"center"},{"c":"B15","v":"رأسية واستقامة القوائم C-Studs","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"D15","v":"ضبط رأسية القوائم تماماً بميزان الليزر ودخول القائم داخل التراك السفلي والعلوي بما لا يقل عن 25 مم.","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"G15","v":"ميزان ليزر بصري ومسطرة ميكانيكية","fg":"#1E293B","cs":2},{"skip":true},{"c":"I15","v":"2 مم لكل 3 أمتار","fg":"#1E293B","al":"center"},{"c":"J15","v":"مطابق ومستوفٍ OK","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"K15","v":"تم مراجعة الشواخص الليزرية لجميع القوائم","fg":"#1E293B"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":3,"bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center"},{"c":"B16","v":"المسافات البينية بين القوائم (Stud Spacing)","bg":"#F8FAFC","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"D16","v":"الالتزام التام بالتباعد التصميمي (400 مم للقواطع ذات الارتفاعات العالية والتشطيب الثقيل، 600 مم للعادية).","bg":"#F8FAFC","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"G16","v":"شريط قياس وتحديد المحاور على التراك","bg":"#F8FAFC","fg":"#1E293B","cs":2},{"skip":true},{"c":"I16","v":"± 3 مم في التباعد","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"J16","v":"مطابق ومستوفٍ OK","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"K16","v":"المحاور موزعة بانتظام 40 سم","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":4,"fg":"#1E293B","b":true,"al":"center"},{"c":"B17","v":"التدعيمات حول فتحات الأبواب والشبابيك","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"D17","v":"تدعيم جوانب فتحات الأبواب بقوائم C-Stud مزدوجة (Boxed Studs) أو حشوة خشبية صلبة لتثبيت الحلق.","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"G17","v":"فحص التدعيمات والجسور الأفقية العلوية","fg":"#1E293B","cs":2},{"skip":true},{"c":"I17","v":"صفر تفاوت في أبعاد الفتحة","fg":"#1E293B","al":"center"},{"c":"J17","v":"مطابق ومستوفٍ OK","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"K17","v":"تم تركيب قطاعات صاج مزدوجة مقواه","fg":"#1E293B"}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":5,"bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center"},{"c":"B18","v":"تدعيمات الأوزان المعلقة (Backing Plates)","bg":"#F8FAFC","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"D18","v":"تركيب شرائح صاج مجلفن بعرض 15 سم خلف مناطق تثبيت الشاشات الجدارية، الخزائن المعلقة، والمغاسل.","bg":"#F8FAFC","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"G18","v":"مراجعة المخططات ومطابقة أماكن الصاج","bg":"#F8FAFC","fg":"#1E293B","cs":2},{"skip":true},{"c":"I18","v":"تطابق 100% مع المخطط","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"J18","v":"مطابق ومستوفٍ OK","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"K18","v":"تم اعتماد منسوب تدعيم الشاشات","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":6,"fg":"#1E293B","b":true,"al":"center"},{"c":"B19","v":"تركيب الصوف الصخري العازل (Insulation Core)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"D19","v":"ملء كامل التجويف بين القوائم بألواح الصوف الصخري دون فراغات أو انضغاط زائد لضمان العزل الصوتي والحراري.","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"G19","v":"فحص بصري قبل إغلاق الوجه الثاني","fg":"#1E293B","cs":2},{"skip":true},{"c":"I19","v":"خالٍ من أي فجوات هوائية","fg":"#1E293B","al":"center"},{"c":"J19","v":"مطابق ومستوفٍ OK","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"K19","v":"كثافة 50 كجم/م³ بسماكة 50 مم كاملة","fg":"#1E293B"}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":7,"bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center"},{"c":"B20","v":"تثبيت ألواح الجبس والمسافة بين البراغي","bg":"#F8FAFC","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"D20","v":"تثبيت الألواح ببراغي دريوال سوداء كل 25 سم على القوائم مع غاطس خفيف لرأس المسمار دون تمزيق الورق.","bg":"#F8FAFC","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"G20","v":"مفتاح قياس عمق البراغي باللمس","bg":"#F8FAFC","fg":"#1E293B","cs":2},{"skip":true},{"c":"I20","v":"غاطس 0.5 إلى 1 مم","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"J20","v":"مطابق ومستوفٍ OK","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"K20","v":"رؤوس البراغي غاطسة دون تلف الورق","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":21,"h":52.0,"cells":[{"c":"A21","v":8,"fg":"#1E293B","b":true,"al":"center"},{"c":"B21","v":"إزاحة الفواصل بين الطبقات (Staggering)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"D21","v":"إزاحة فواصل الألواح بين الطبقة الأولى والطبقة الثانية بما لا يقل عن 30 سم أفقياً ورأسياً لمنع الشروخ.","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"G21","v":"قياس مسافة إزاحة الفواصل بين الطبقتين","fg":"#1E293B","cs":2},{"skip":true},{"c":"I21","v":"لا تقل عن 300 مم","fg":"#1E293B","al":"center"},{"c":"J21","v":"مطابق ومستوفٍ OK","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"K21","v":"تحقق تام لشرط الإزاحة المتراكبة","fg":"#1E293B"}]},{"r":22,"h":52.0,"cells":[{"c":"A22","v":9,"bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center"},{"c":"B22","v":"خلوص أسفل اللوح عن الأرضية الخرسانية","bg":"#F8FAFC","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"D22","v":"ترك خلوص يتراوح بين 8 مم إلى 12 مم بين أسفل لوح الجبس والأرضية لمنع امتصاص الرطوبة أو التلف.","bg":"#F8FAFC","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"G22","v":"إسفين خشبي أو فاصل بلاستيكي أثناء التركيب","bg":"#F8FAFC","fg":"#1E293B","cs":2},{"skip":true},{"c":"I22","v":"8 - 12 مم خلوص","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"J22","v":"مطابق ومستوفٍ OK","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"K22","v":"تم الحفاظ على خلوص 10 مم لتركيب النعلات","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":23,"h":52.0,"cells":[{"c":"A23","v":10,"fg":"#1E293B","b":true,"al":"center"},{"c":"B23","v":"معالجة الفواصل والزوايا المعدنية (Finishing)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"D23","v":"وضع شريط فايبر/ورقي على الفواصل ومعالجتها بثلاثة أوجه معجون مع تركيب زوايا صاج حامية للأركان الخارجية.","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"G23","v":"مسطرة فحص استواء 2 متر وصنفرة ليزرية","fg":"#1E293B","cs":2},{"skip":true},{"c":"I23","v":"استواء تام بدرجة Level 4","fg":"#1E293B","al":"center"},{"c":"J23","v":"مطابق ومستوفٍ OK","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"K23","v":"سطح ناعم مهيأ تماماً لدهانات الأساس","fg":"#1E293B"}]},{"r":24,"h":28.0,"cells":[{"c":"A24","v":""},{"c":"B24","v":""},{"c":"C24","v":""},{"c":"D24","v":""},{"c":"E24","v":""},{"c":"F24","v":""},{"c":"G24","v":""},{"c":"H24","v":""},{"c":"I24","v":""},{"c":"J24","v":""},{"c":"K24","v":""}]},{"r":25,"h":28.0,"cells":[{"c":"A25","v":""},{"c":"B25","v":""},{"c":"C25","v":""},{"c":"D25","v":""},{"c":"E25","v":""},{"c":"F25","v":""},{"c":"G25","v":""},{"c":"H25","v":""},{"c":"I25","v":""},{"c":"J25","v":""},{"c":"K25","v":""}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":"مهندس التشطيبات والمكتب الفني","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D26","v":"مهندس ضبط وتوكيد الجودة QA/QC","fg":"#1E293B","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"H26","v":"الاستشاري المشرف ومدير المشروع","fg":"#1E293B","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":"التوقيع والاعتماد: ______________","fg":"#1E293B","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D27","v":"التوقيع والاعتماد: ______________","fg":"#1E293B","al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"H27","v":"التوقيع والاعتماد: ______________","fg":"#1E293B","al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true}]}]}]}