{"slug":"column-load-take-down-and-axial-accumulation-calculation-sheet","sheets":[{"name":"إعدادات المشروع والأحمال","maxRow":29,"maxCol":7,"colWidths":[8.0,48.0,20.0,24.0,26.0,26.0,26.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"شيت تجميع أحمال الأعمدة الرأسية ونقل الأحمال للقواعد — إعدادات المشروع والخواص الكودية","fg":"#1E3A8A","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"⚠️ تنبيه استرشادي: هذا الشيت مخصص لحساب تجميع الأحمال الرأسية للأعمدة وتخفيض الأحمال الحية وفق كود البناء السعودي SBC 301 / 304 و ASCE 7-16 والكود المصري ECP 203. يرجى ضبط خواص المواد وأحمال الأسقف وقدرة تحمل التربة بما يطابق تقرير فحص التربة والمخططات المعمارية لمشروعك.","bg":"#FEF3C7","fg":"#92400E","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"1. بيانات المشروع والمعلومات الهندسية العامة (General Project Information)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":72.0,"cells":[{"c":"A5","v":"اسم المشروع الإنشائي (Project Name):","b":true,"cs":2},{"skip":true},{"c":"C5","v":"مشروع برج الأندلس السكني والتجاري (أرضي + 5 متكرر + ملحق)","al":"center"},{"c":"D5","v":"كود المشروع (Code):","b":true,"cs":2},{"skip":true},{"c":"F5","v":"PRJ-BLD-2026-08","al":"center","cs":2},{"skip":true}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"المالك / جهة العمل (Client / Employer):","b":true,"cs":2},{"skip":true},{"c":"C6","v":"شركة الأفق للتطوير والاستثمار العقاري","al":"center"},{"c":"D6","v":"تاريخ الحساب (Date):","b":true,"cs":2},{"skip":true},{"c":"F6","v":"18 أكتوبر 2026 م","al":"center","cs":2},{"skip":true}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"المقاول العام المنفذ (Main Contractor):","b":true,"cs":2},{"skip":true},{"c":"C7","v":"شركة الإنشاءات الهندسية الحديثة المحدودة","al":"center"},{"c":"D7","v":"المدينة والموقع (Location):","b":true,"cs":2},{"skip":true},{"c":"F7","v":"الرياض — المملكة العربية السعودية","al":"center","cs":2},{"skip":true}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"استشاري التصميم والإشراف (Consultant):","b":true,"cs":2},{"skip":true},{"c":"C8","v":"دار الاستشارات الهندسية الإنشائية","al":"center"},{"c":"D8","v":"مهندس التصميم الإنشائي:","b":true,"cs":2},{"skip":true},{"c":"F8","v":"م. أحمد عبد الرحمن (مكتب فني)","al":"center","cs":2},{"skip":true}]},{"r":9,"h":72.0,"cells":[{"c":"A9","v":"كود الأحمال المرجعي (Loads Standard):","b":true,"cs":2},{"skip":true},{"c":"C9","v":"كود البناء السعودي للأحمال (SBC 301) / ASCE 7-16","al":"center"},{"c":"D9","v":"كود التصميم الخرساني:","b":true,"cs":2},{"skip":true},{"c":"F9","v":"كود الخرسانة الإنشائية (SBC 304) / ACI 318-19","al":"center","cs":2},{"skip":true}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":"عملة الحساب والتكلفة (Currency):","b":true,"cs":2},{"skip":true},{"c":"C10","v":"ر.س SAR","al":"center"},{"c":"D10","v":"طريقة التحليل الإنشائي:","b":true,"cs":2},{"skip":true},{"c":"F10","v":"طريقة المساحات المؤثرة (Tributary Area Method)","al":"center","cs":2},{"skip":true}]},{"r":11,"h":28.0,"cells":[{"c":"A11","v":""},{"c":"B11","v":""},{"c":"C11","v":""},{"c":"D11","v":""},{"c":"E11","v":""},{"c":"F11","v":""},{"c":"G11","v":""}]},{"r":12,"h":38.0,"cells":[{"c":"A12","v":"2. خواص المواد الإنشائية وإجهاد التربة المسموح (Material Properties & Soil Capacity)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":13,"h":40.0,"cells":[{"c":"A13","v":"م","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B13","v":"الخاصية الهندسية / المعامل التصميمي","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C13","v":"الرمز","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D13","v":"القيمة التصميمية","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E13","v":"الوحدة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F13","v":"المرجع الكودي والاشتراطات","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G13","v":"ملاحظات الاستخدام","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":1,"b":true,"al":"center"},{"c":"B14","v":"مقاومة الخرسانة المميزة للضغط f'c (Cylinder 28d):","b":true},{"c":"C14","v":"f'c","b":true,"al":"center"},{"c":"D14","v":30,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"E14","v":"ميغاباسكال (MPa)","al":"center"},{"c":"F14","v":"تطابق رتبة خرسانة C30/37 وفق SBC 304"},{"c":"G14","v":"قيمة استرشادية قابلة للتعديل","al":"center"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":2,"b":true,"al":"center"},{"c":"B15","v":"إجهاد خضوع حديد التسليح الطولي fy (Rebar Yield):","b":true},{"c":"C15","v":"fy","b":true,"al":"center"},{"c":"D15","v":420,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"E15","v":"ميغاباسكال (MPa)","al":"center"},{"c":"F15","v":"حديد عالي المقاومة Grade 60 وفق ASTM A615"},{"c":"G15","v":"قيمة استرشادية قابلة للتعديل","al":"center"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":3,"b":true,"al":"center"},{"c":"B16","v":"كثافة الخرسانة المسلحة التصميمية (Unit Weight):","b":true},{"c":"C16","v":"γ_c","b":true,"al":"center"},{"c":"D16","v":25,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"E16","v":"كيلونيوتن/م³ (kN/m³)","al":"center"},{"c":"F16","v":"الوزن النوعي الشامل لحديد التسليح (ECP / SBC)"},{"c":"G16","v":"قيمة استرشادية قابلة للتعديل","al":"center"}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":4,"b":true,"al":"center"},{"c":"B17","v":"إجهاد تحمل التربة الصافي المسموح q_all (Net Bearing):","b":true},{"c":"C17","v":"q_all","b":true,"al":"center"},{"c":"D17","v":200,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"E17","v":"كيلونيوتن/م² (kN/m²)","al":"center"},{"c":"F17","v":"يعادل 2.04 كجم/سم² بناءً على تقرير فحص التربة والجسات"},{"c":"G17","v":"قيمة استرشادية قابلة للتعديل","al":"center"}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":5,"b":true,"al":"center"},{"c":"B18","v":"معامل الأمان لزيادة وزن القاعدة والردم (Overburden factor):","b":true},{"c":"C18","v":"λ_footing","b":true,"al":"center"},{"c":"D18","v":1.1,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"E18","v":"معامل مضاعف (-)","al":"center"},{"c":"F18","v":"إضافة 10% لتقدير الوزن الذاتي للقاعدة المنفصلة والردم"},{"c":"G18","v":"قيمة استرشادية قابلة للتعديل","al":"center"}]},{"r":19,"h":72.0,"cells":[{"c":"A19","v":6,"b":true,"al":"center"},{"c":"B19","v":"معامل تخفيض المقاومة للضغط المحوري للأعمدة phi:","b":true},{"c":"C19","v":"φ_axial","b":true,"al":"center"},{"c":"D19","v":0.65,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"E19","v":"معامل أمان كودي (-)","al":"center"},{"c":"F19","v":"للأعمدة ذات الكانات المنفصلة Tied Columns (SBC 304 / ACI)"},{"c":"G19","v":"قيمة استرشادية قابلة للتعديل","al":"center"}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":7,"b":true,"al":"center"},{"c":"B20","v":"معامل الأمان لقص وثقب القواعد phi_shear:","b":true},{"c":"C20","v":"φ_shear","b":true,"al":"center"},{"c":"D20","v":0.75,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"E20","v":"معامل أمان كودي (-)","al":"center"},{"c":"F20","v":"فحص القص الخرساني العريض والقص الثاقب للقواعد"},{"c":"G20","v":"قيمة استرشادية قابلة للتعديل","al":"center"}]},{"r":21,"h":52.0,"cells":[{"c":"A21","v":8,"b":true,"al":"center"},{"c":"B21","v":"معامل الأمان لعزم الانحناء للقواعد phi_flexure:","b":true},{"c":"C21","v":"φ_flexure","b":true,"al":"center"},{"c":"D21","v":0.9,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"E21","v":"معامل أمان كودي (-)","al":"center"},{"c":"F21","v":"تصميم حديد التسليح السفلي لمقاومة عزوم الانحناء"},{"c":"G21","v":"قيمة استرشادية قابلة للتعديل","al":"center"}]},{"r":22,"h":28.0,"cells":[{"c":"A22","v":""},{"c":"B22","v":""},{"c":"C22","v":""},{"c":"D22","v":""},{"c":"E22","v":""},{"c":"F22","v":""},{"c":"G22","v":""}]},{"r":23,"h":38.0,"cells":[{"c":"A23","v":"3. توزيع الأحمال الميتة والحية للأسقف حسب الاستخدام (Design Gravity Slab Loads)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":24,"h":40.0,"cells":[{"c":"A24","v":"م","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B24","v":"منسوب ونوع السقف الإنشائي","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C24","v":"سمك البلاطة ts (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D24","v":"الوزن الذاتي للبلاطة (kN/m²)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E24","v":"أحمال تشطيبات وقواطع (kN/m²)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F24","v":"إجمالي الحمل الميت DL (kN/m²)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G24","v":"الحمل الحي التصميمي LL (kN/m²)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":1,"b":true,"al":"center"},{"c":"B25","v":"سقف السطح الأخير والملحق (Roof Slab)","b":true},{"c":"C25","v":0.2,"in":true,"al":"center","nf":"0.00"},{"c":"D25","v":0,"f":"=C25*$D$16","b":true,"al":"center","nf":"0.00"},{"c":"E25","v":3,"in":true,"al":"center","nf":"0.00"},{"c":"F25","v":3,"f":"=D25+E25","b":true,"al":"center","nf":"0.00"},{"c":"G25","v":1.5,"in":true,"b":true,"al":"center","nf":"0.00"}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":2,"b":true,"al":"center"},{"c":"B26","v":"الأسقف المتكررة السكنية (Typical Floors 2-5)","b":true},{"c":"C26","v":0.22,"in":true,"al":"center","nf":"0.00"},{"c":"D26","v":0,"f":"=C26*$D$16","b":true,"al":"center","nf":"0.00"},{"c":"E26","v":4.5,"in":true,"al":"center","nf":"0.00"},{"c":"F26","v":4.5,"f":"=D26+E26","b":true,"al":"center","nf":"0.00"},{"c":"G26","v":2,"in":true,"b":true,"al":"center","nf":"0.00"}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":3,"b":true,"al":"center"},{"c":"B27","v":"سقف الدور الأول التجاري / الإداري (1st Floor)","b":true},{"c":"C27","v":0.24,"in":true,"al":"center","nf":"0.00"},{"c":"D27","v":0,"f":"=C27*$D$16","b":true,"al":"center","nf":"0.00"},{"c":"E27","v":4.5,"in":true,"al":"center","nf":"0.00"},{"c":"F27","v":4.5,"f":"=D27+E27","b":true,"al":"center","nf":"0.00"},{"c":"G27","v":3,"in":true,"b":true,"al":"center","nf":"0.00"}]},{"r":28,"h":34.0,"cells":[{"c":"A28","v":4,"b":true,"al":"center"},{"c":"B28","v":"سقف الدور الأرضي والمداخل (Ground Floor)","b":true},{"c":"C28","v":0.25,"in":true,"al":"center","nf":"0.00"},{"c":"D28","v":0,"f":"=C28*$D$16","b":true,"al":"center","nf":"0.00"},{"c":"E28","v":5,"in":true,"al":"center","nf":"0.00"},{"c":"F28","v":5,"f":"=D28+E28","b":true,"al":"center","nf":"0.00"},{"c":"G28","v":4,"in":true,"b":true,"al":"center","nf":"0.00"}]},{"r":29,"h":34.0,"cells":[{"c":"A29","v":5,"b":true,"al":"center"},{"c":"B29","v":"أرضية البدروم / السرداب (Basement Slab / Raft)","b":true},{"c":"C29","v":0.3,"in":true,"al":"center","nf":"0.00"},{"c":"D29","v":0,"f":"=C29*$D$16","b":true,"al":"center","nf":"0.00"},{"c":"E29","v":2.5,"in":true,"al":"center","nf":"0.00"},{"c":"F29","v":2.5,"f":"=D29+E29","b":true,"al":"center","nf":"0.00"},{"c":"G29","v":2.5,"in":true,"b":true,"al":"center","nf":"0.00"}]}]},{"name":"مساحات التأثير وأحمال الأدوار","maxRow":15,"maxCol":11,"colWidths":[8.0,18.0,58.0,22.0,22.0,24.0,20.0,24.0,28.0,28.0,30.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول مساحات التأثير للأعمدة (Column Tributary Areas) وحساب أحمال الأدوار الإنشائية","fg":"#1E3A8A","b":true,"al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"يتم تحديد مساحات التأثير للأعمدة (Tributary Area AT) بناءً على أنصاف المسافات الفاصلة بين محاور الأعمدة المتجاورة في الاتجاهين Lx و Ly، مع تطبيق معامل التأثير الكودي K_LL وفق ASCE 7-16 / SBC 301 لتحديد المساحة المؤثرة AI = K_LL × AT.","bg":"#FEF3C7","fg":"#92400E","al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""}]},{"r":4,"h":42.0,"cells":[{"c":"A4","v":"م","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"كود العمود (Mark)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"الموقع الإنشائي للعمود (Location)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"عرض مساحة التأثير Lx (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"طول مساحة التأثير Ly (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"مساحة التأثير للدور AT (م²)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"معامل العنصر الكودي K_LL","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"المساحة المؤثرة للدور AI (م²)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"الحمل الميت للدور المتكرر PD (kN)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J4","v":"الحمل الحي الاسمي للدور PL (kN)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K4","v":"إجمالي حمل السقف المتكرر P_serv (kN)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":1,"b":true,"al":"center"},{"c":"B5","v":"C1","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C5","v":"عمود ركن واجهة شرقية (Corner Column)"},{"c":"D5","v":2.4,"in":true,"al":"center","nf":"0.00"},{"c":"E5","v":2.5,"in":true,"al":"center","nf":"0.00"},{"c":"F5","v":6,"f":"=D5*E5","b":true,"al":"center","nf":"0.00"},{"c":"G5","v":2,"in":true,"b":true,"al":"center"},{"c":"H5","v":12,"f":"=F5*G5","b":true,"al":"center","nf":"0.00"},{"c":"I5","v":27,"f":"=F5*'إعدادات المشروع والأحمال'!$F$26","b":true,"al":"center","nf":"#,##0.0"},{"c":"J5","v":12,"f":"=F5*'إعدادات المشروع والأحمال'!$G$26","b":true,"al":"center","nf":"#,##0.0"},{"c":"K5","v":39,"f":"=I5+J5","b":true,"al":"center","nf":"#,##0.0"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":2,"b":true,"al":"center"},{"c":"B6","v":"C2","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C6","v":"عمود طرفي واجهة رئيسية (Edge Column)"},{"c":"D6","v":4.8,"in":true,"al":"center","nf":"0.00"},{"c":"E6","v":2.5,"in":true,"al":"center","nf":"0.00"},{"c":"F6","v":12,"f":"=D6*E6","b":true,"al":"center","nf":"0.00"},{"c":"G6","v":4,"in":true,"b":true,"al":"center"},{"c":"H6","v":48,"f":"=F6*G6","b":true,"al":"center","nf":"0.00"},{"c":"I6","v":54,"f":"=F6*'إعدادات المشروع والأحمال'!$F$26","b":true,"al":"center","nf":"#,##0.0"},{"c":"J6","v":24,"f":"=F6*'إعدادات المشروع والأحمال'!$G$26","b":true,"al":"center","nf":"#,##0.0"},{"c":"K6","v":78,"f":"=I6+J6","b":true,"al":"center","nf":"#,##0.0"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":3,"b":true,"al":"center"},{"c":"B7","v":"C3","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C7","v":"عمود طرفي واجهة جانبية (Edge Column)"},{"c":"D7","v":2.4,"in":true,"al":"center","nf":"0.00"},{"c":"E7","v":5.2,"in":true,"al":"center","nf":"0.00"},{"c":"F7","v":12.48,"f":"=D7*E7","b":true,"al":"center","nf":"0.00"},{"c":"G7","v":4,"in":true,"b":true,"al":"center"},{"c":"H7","v":49.92,"f":"=F7*G7","b":true,"al":"center","nf":"0.00"},{"c":"I7","v":56.16,"f":"=F7*'إعدادات المشروع والأحمال'!$F$26","b":true,"al":"center","nf":"#,##0.0"},{"c":"J7","v":24.96,"f":"=F7*'إعدادات المشروع والأحمال'!$G$26","b":true,"al":"center","nf":"#,##0.0"},{"c":"K7","v":81.12,"f":"=I7+J7","b":true,"al":"center","nf":"#,##0.0"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":4,"b":true,"al":"center"},{"c":"B8","v":"C4","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C8","v":"عمود داخلي صالة الاستقبال (Interior Column)"},{"c":"D8","v":5,"in":true,"al":"center","nf":"0.00"},{"c":"E8","v":5.2,"in":true,"al":"center","nf":"0.00"},{"c":"F8","v":26,"f":"=D8*E8","b":true,"al":"center","nf":"0.00"},{"c":"G8","v":4,"in":true,"b":true,"al":"center"},{"c":"H8","v":104,"f":"=F8*G8","b":true,"al":"center","nf":"0.00"},{"c":"I8","v":117,"f":"=F8*'إعدادات المشروع والأحمال'!$F$26","b":true,"al":"center","nf":"#,##0.0"},{"c":"J8","v":52,"f":"=F8*'إعدادات المشروع والأحمال'!$G$26","b":true,"al":"center","nf":"#,##0.0"},{"c":"K8","v":169,"f":"=I8+J8","b":true,"al":"center","nf":"#,##0.0"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":5,"b":true,"al":"center"},{"c":"B9","v":"C5","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C9","v":"عمود داخلي محور رئيسي ثقيل (Interior Column)"},{"c":"D9","v":5.6,"in":true,"al":"center","nf":"0.00"},{"c":"E9","v":5.8,"in":true,"al":"center","nf":"0.00"},{"c":"F9","v":32.48,"f":"=D9*E9","b":true,"al":"center","nf":"0.00"},{"c":"G9","v":4,"in":true,"b":true,"al":"center"},{"c":"H9","v":129.92,"f":"=F9*G9","b":true,"al":"center","nf":"0.00"},{"c":"I9","v":146.16,"f":"=F9*'إعدادات المشروع والأحمال'!$F$26","b":true,"al":"center","nf":"#,##0.0"},{"c":"J9","v":64.96,"f":"=F9*'إعدادات المشروع والأحمال'!$G$26","b":true,"al":"center","nf":"#,##0.0"},{"c":"K9","v":211.12,"f":"=I9+J9","b":true,"al":"center","nf":"#,##0.0"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":6,"b":true,"al":"center"},{"c":"B10","v":"C6","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C10","v":"عمود داخلي جوار السلم والمصعد (Interior Column)"},{"c":"D10","v":5.2,"in":true,"al":"center","nf":"0.00"},{"c":"E10","v":4.8,"in":true,"al":"center","nf":"0.00"},{"c":"F10","v":24.96,"f":"=D10*E10","b":true,"al":"center","nf":"0.00"},{"c":"G10","v":4,"in":true,"b":true,"al":"center"},{"c":"H10","v":99.84,"f":"=F10*G10","b":true,"al":"center","nf":"0.00"},{"c":"I10","v":112.32,"f":"=F10*'إعدادات المشروع والأحمال'!$F$26","b":true,"al":"center","nf":"#,##0.0"},{"c":"J10","v":49.92,"f":"=F10*'إعدادات المشروع والأحمال'!$G$26","b":true,"al":"center","nf":"#,##0.0"},{"c":"K10","v":162.24,"f":"=I10+J10","b":true,"al":"center","nf":"#,##0.0"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":7,"b":true,"al":"center"},{"c":"B11","v":"C7","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C11","v":"عمود طرفي واجهة خلفية (Edge Column)"},{"c":"D11","v":4.6,"in":true,"al":"center","nf":"0.00"},{"c":"E11","v":2.6,"in":true,"al":"center","nf":"0.00"},{"c":"F11","v":11.96,"f":"=D11*E11","b":true,"al":"center","nf":"0.00"},{"c":"G11","v":4,"in":true,"b":true,"al":"center"},{"c":"H11","v":47.84,"f":"=F11*G11","b":true,"al":"center","nf":"0.00"},{"c":"I11","v":53.82,"f":"=F11*'إعدادات المشروع والأحمال'!$F$26","b":true,"al":"center","nf":"#,##0.0"},{"c":"J11","v":23.92,"f":"=F11*'إعدادات المشروع والأحمال'!$G$26","b":true,"al":"center","nf":"#,##0.0"},{"c":"K11","v":77.74,"f":"=I11+J11","b":true,"al":"center","nf":"#,##0.0"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":8,"b":true,"al":"center"},{"c":"B12","v":"C8","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C12","v":"عمود داخلي مدخل المبنى (Interior Column)"},{"c":"D12","v":4.8,"in":true,"al":"center","nf":"0.00"},{"c":"E12","v":5,"in":true,"al":"center","nf":"0.00"},{"c":"F12","v":24,"f":"=D12*E12","b":true,"al":"center","nf":"0.00"},{"c":"G12","v":4,"in":true,"b":true,"al":"center"},{"c":"H12","v":96,"f":"=F12*G12","b":true,"al":"center","nf":"0.00"},{"c":"I12","v":108,"f":"=F12*'إعدادات المشروع والأحمال'!$F$26","b":true,"al":"center","nf":"#,##0.0"},{"c":"J12","v":48,"f":"=F12*'إعدادات المشروع والأحمال'!$G$26","b":true,"al":"center","nf":"#,##0.0"},{"c":"K12","v":156,"f":"=I12+J12","b":true,"al":"center","nf":"#,##0.0"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":9,"b":true,"al":"center"},{"c":"B13","v":"C9","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C13","v":"عمود طرفي جوار منور التهوية (Edge Column)"},{"c":"D13","v":3.8,"in":true,"al":"center","nf":"0.00"},{"c":"E13","v":4.2,"in":true,"al":"center","nf":"0.00"},{"c":"F13","v":15.96,"f":"=D13*E13","b":true,"al":"center","nf":"0.00"},{"c":"G13","v":4,"in":true,"b":true,"al":"center"},{"c":"H13","v":63.84,"f":"=F13*G13","b":true,"al":"center","nf":"0.00"},{"c":"I13","v":71.82,"f":"=F13*'إعدادات المشروع والأحمال'!$F$26","b":true,"al":"center","nf":"#,##0.0"},{"c":"J13","v":31.92,"f":"=F13*'إعدادات المشروع والأحمال'!$G$26","b":true,"al":"center","nf":"#,##0.0"},{"c":"K13","v":103.74,"f":"=I13+J13","b":true,"al":"center","nf":"#,##0.0"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":10,"b":true,"al":"center"},{"c":"B14","v":"C10","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C14","v":"عمود ركن واجهة خلفية (Corner Column)"},{"c":"D14","v":2.2,"in":true,"al":"center","nf":"0.00"},{"c":"E14","v":2.4,"in":true,"al":"center","nf":"0.00"},{"c":"F14","v":5.28,"f":"=D14*E14","b":true,"al":"center","nf":"0.00"},{"c":"G14","v":2,"in":true,"b":true,"al":"center"},{"c":"H14","v":10.56,"f":"=F14*G14","b":true,"al":"center","nf":"0.00"},{"c":"I14","v":23.76,"f":"=F14*'إعدادات المشروع والأحمال'!$F$26","b":true,"al":"center","nf":"#,##0.0"},{"c":"J14","v":10.56,"f":"=F14*'إعدادات المشروع والأحمال'!$G$26","b":true,"al":"center","nf":"#,##0.0"},{"c":"K14","v":34.32,"f":"=I14+J14","b":true,"al":"center","nf":"#,##0.0"}]},{"r":15,"h":40.0,"cells":[{"c":"A15","v":"الإجمالي العام لمساحات وأحمال الدور المتكرر:","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D15","v":"-","bg":"#DBEAFE","b":true,"al":"center"},{"c":"E15","v":"-","bg":"#DBEAFE","b":true,"al":"center"},{"c":"F15","v":171.12,"f":"=SUM(F5:F14)","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"G15","v":"-","bg":"#DBEAFE","b":true,"al":"center"},{"c":"H15","v":661.92,"f":"=SUM(H5:H14)","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"I15","v":770.04,"f":"=SUM(I5:I14)","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"J15","v":342.24,"f":"=SUM(J5:J14)","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"K15","v":1112.28,"f":"=SUM(K5:K14)","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"}]}]},{"name":"تجميع أحمال العمود C5","maxRow":17,"maxCol":13,"colWidths":[8.0,44.0,18.0,22.0,22.0,24.0,24.0,26.0,22.0,24.0,26.0,22.0,26.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول التجميع الرأسي لأحمال الأدوار والوزن الذاتي وتخفيض الحمل الحي للعمود النموذجي C5","fg":"#1E3A8A","b":true,"al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"يتم تجميع الأحمال الميتة والحية تراكمياً من السقف العلوي للمبنى نزولاً إلى القواعد، مع حساب الوزن الذاتي للعمود بكثافة 25 kN/m³، وتطبيق معادلة تخفيض الأحمال الحية الكودية ASCE 7-16 / SBC 301: R_LL = 0.25 + 4.57/SQRT(K_LL × ΣAT) مع سقف تخفيض أقصى 60% للأعمدة الحاملة لأكثر من طابق.","bg":"#FEF3C7","fg":"#92400E","al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""}]},{"r":4,"h":36.0,"cells":[{"c":"A4","v":"بيانات العمود C5: موقع داخلي رئيسي | مساحة التأثير للدور AT = 32.48 م² (Lx = 5.60 م × Ly = 5.80 م) | معامل التأثير K_LL = 4.0 | المساحة المؤثرة للدور AI = 129.92 م²","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"م","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"منسوب الدور الإنشائي (Floor Level)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"ارتفاع الدور H (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"أبعاد العمود b × t (سم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"الوزن الذاتي للعمود SW (kN)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"حمل السقف الميت P_slab,D (kN)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"تراكمي الميت ΣPD (kN)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"تراكمي المساحة المؤثرة ΣAI (م²)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I5","v":"معامل تخفيض الحي R_LL","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J5","v":"تراكمي الحي المخفض ΣPL (kN)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K5","v":"إجمالي الحمل التشغيلي P_serv (kN)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L5","v":"الحمل التشغيلي بالطن (Ton)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M5","v":"الحمل الأقصى التصميمي Pu (kN)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":36.0,"cells":[{"c":"A6","v":1,"b":true,"al":"center"},{"c":"B6","v":"سقف سطح الملحق العلوي (Roof Slab)","b":true},{"c":"C6","v":3.3,"in":true,"al":"center","nf":"0.00"},{"c":"D6","v":"30 × 60","b":true,"al":"center"},{"c":"E6","v":14.85,"f":"=(30*60/10000)*C6*'إعدادات المشروع والأحمال'!$D$16","al":"center","nf":"0.0"},{"c":"F6","v":97.44,"f":"='إعدادات المشروع والأحمال'!$F$25 * 'مساحات التأثير وأحمال الأدوار'!$F$9","al":"center","nf":"#,##0.0"},{"c":"G6","v":112.29,"f":"=E6+F6","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"H6","v":129.92,"f":"='مساحات التأثير وأحمال الأدوار'!$H$9","al":"center","nf":"#,##0.0"},{"c":"I6","v":1,"in":true,"b":true,"al":"center","nf":"0.000"},{"c":"J6","v":48.72,"f":"='إعدادات المشروع والأحمال'!$G$25 * 'مساحات التأثير وأحمال الأدوار'!$F$9 * I6","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"K6","v":161.01,"f":"=G6+J6","b":true,"al":"center","nf":"#,##0.0"},{"c":"L6","v":16.418451,"f":"=K6/9.80665","b":true,"al":"center","nf":"#,##0.0"},{"c":"M6","v":212.7,"f":"=1.2*G6+1.6*J6","bg":"#FEF2F2","fg":"#991B1B","b":true,"al":"center","nf":"#,##0.0"}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":2,"b":true,"al":"center"},{"c":"B7","v":"سقف الدور الخامس (5th Floor)","b":true},{"c":"C7","v":3.3,"in":true,"al":"center","nf":"0.00"},{"c":"D7","v":"30 × 60","b":true,"al":"center"},{"c":"E7","v":14.85,"f":"=(30*60/10000)*C7*'إعدادات المشروع والأحمال'!$D$16","al":"center","nf":"0.0"},{"c":"F7","v":146.16,"f":"='إعدادات المشروع والأحمال'!$F$26 * 'مساحات التأثير وأحمال الأدوار'!$F$9","al":"center","nf":"#,##0.0"},{"c":"G7","v":273.3,"f":"=G6+E7+F7","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"H7","v":259.84,"f":"=H6+'مساحات التأثير وأحمال الأدوار'!$H$9","al":"center","nf":"#,##0.0"},{"c":"I7","v":0.533507,"f":"=IF(H7>=37.16, MIN(1.0, MAX(0.40, 0.25 + 4.57/SQRT(H7))), 1.0)","b":true,"al":"center","nf":"0.000"},{"c":"J7","v":60.649076,"f":"=(('إعدادات المشروع والأحمال'!$G$25) + ('إعدادات المشروع والأحمال'!$G$26))*'مساحات التأثير وأحمال الأدوار'!$F$9 * I7","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"K7","v":333.949076,"f":"=G7+J7","b":true,"al":"center","nf":"#,##0.0"},{"c":"L7","v":34.053329,"f":"=K7/9.80665","b":true,"al":"center","nf":"#,##0.0"},{"c":"M7","v":424.998522,"f":"=1.2*G7+1.6*J7","bg":"#FEF2F2","fg":"#991B1B","b":true,"al":"center","nf":"#,##0.0"}]},{"r":8,"h":36.0,"cells":[{"c":"A8","v":3,"b":true,"al":"center"},{"c":"B8","v":"سقف الدور الرابع (4th Floor)","b":true},{"c":"C8","v":3.3,"in":true,"al":"center","nf":"0.00"},{"c":"D8","v":"30 × 70","b":true,"al":"center"},{"c":"E8","v":17.325,"f":"=(30*70/10000)*C8*'إعدادات المشروع والأحمال'!$D$16","al":"center","nf":"0.0"},{"c":"F8","v":146.16,"f":"='إعدادات المشروع والأحمال'!$F$26 * 'مساحات التأثير وأحمال الأدوار'!$F$9","al":"center","nf":"#,##0.0"},{"c":"G8","v":436.785,"f":"=G7+E8+F8","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"H8","v":389.76,"f":"=H7+'مساحات التأثير وأحمال الأدوار'!$H$9","al":"center","nf":"#,##0.0"},{"c":"I8","v":0.481482,"f":"=IF(H8>=37.16, MIN(1.0, MAX(0.40, 0.25 + 4.57/SQRT(H8))), 1.0)","b":true,"al":"center","nf":"0.000"},{"c":"J8","v":86.011944,"f":"=(('إعدادات المشروع والأحمال'!$G$25) + 2*('إعدادات المشروع والأحمال'!$G$26))*'مساحات التأثير وأحمال الأدوار'!$F$9 * I8","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"K8","v":522.796944,"f":"=G8+J8","b":true,"al":"center","nf":"#,##0.0"},{"c":"L8","v":53.310452,"f":"=K8/9.80665","b":true,"al":"center","nf":"#,##0.0"},{"c":"M8","v":661.76111,"f":"=1.2*G8+1.6*J8","bg":"#FEF2F2","fg":"#991B1B","b":true,"al":"center","nf":"#,##0.0"}]},{"r":9,"h":36.0,"cells":[{"c":"A9","v":4,"b":true,"al":"center"},{"c":"B9","v":"سقف الدور الثالث (3rd Floor)","b":true},{"c":"C9","v":3.3,"in":true,"al":"center","nf":"0.00"},{"c":"D9","v":"30 × 80","b":true,"al":"center"},{"c":"E9","v":19.8,"f":"=(30*80/10000)*C9*'إعدادات المشروع والأحمال'!$D$16","al":"center","nf":"0.0"},{"c":"F9","v":146.16,"f":"='إعدادات المشروع والأحمال'!$F$26 * 'مساحات التأثير وأحمال الأدوار'!$F$9","al":"center","nf":"#,##0.0"},{"c":"G9","v":602.745,"f":"=G8+E9+F9","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"H9","v":519.68,"f":"=H8+'مساحات التأثير وأحمال الأدوار'!$H$9","al":"center","nf":"#,##0.0"},{"c":"I9","v":0.450469,"f":"=IF(H9>=37.16, MIN(1.0, MAX(0.40, 0.25 + 4.57/SQRT(H9))), 1.0)","b":true,"al":"center","nf":"0.000"},{"c":"J9","v":109.734248,"f":"=(('إعدادات المشروع والأحمال'!$G$25) + 3*('إعدادات المشروع والأحمال'!$G$26))*'مساحات التأثير وأحمال الأدوار'!$F$9 * I9","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"K9","v":712.479248,"f":"=G9+J9","b":true,"al":"center","nf":"#,##0.0"},{"c":"L9","v":72.652664,"f":"=K9/9.80665","b":true,"al":"center","nf":"#,##0.0"},{"c":"M9","v":898.868797,"f":"=1.2*G9+1.6*J9","bg":"#FEF2F2","fg":"#991B1B","b":true,"al":"center","nf":"#,##0.0"}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":5,"b":true,"al":"center"},{"c":"B10","v":"سقف الدور الثاني (2nd Floor)","b":true},{"c":"C10","v":3.3,"in":true,"al":"center","nf":"0.00"},{"c":"D10","v":"35 × 80","b":true,"al":"center"},{"c":"E10","v":23.1,"f":"=(35*80/10000)*C10*'إعدادات المشروع والأحمال'!$D$16","al":"center","nf":"0.0"},{"c":"F10","v":146.16,"f":"='إعدادات المشروع والأحمال'!$F$26 * 'مساحات التأثير وأحمال الأدوار'!$F$9","al":"center","nf":"#,##0.0"},{"c":"G10","v":772.005,"f":"=G9+E10+F10","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"H10","v":649.6,"f":"=H9+'مساحات التأثير وأحمال الأدوار'!$H$9","al":"center","nf":"#,##0.0"},{"c":"I10","v":0.429305,"f":"=IF(H10>=37.16, MIN(1.0, MAX(0.40, 0.25 + 4.57/SQRT(H10))), 1.0)","b":true,"al":"center","nf":"0.000"},{"c":"J10","v":132.466351,"f":"=(('إعدادات المشروع والأحمال'!$G$25) + 4*('إعدادات المشروع والأحمال'!$G$26))*'مساحات التأثير وأحمال الأدوار'!$F$9 * I10","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"K10","v":904.471351,"f":"=G10+J10","b":true,"al":"center","nf":"#,##0.0"},{"c":"L10","v":92.23041,"f":"=K10/9.80665","b":true,"al":"center","nf":"#,##0.0"},{"c":"M10","v":1138.352162,"f":"=1.2*G10+1.6*J10","bg":"#FEF2F2","fg":"#991B1B","b":true,"al":"center","nf":"#,##0.0"}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":6,"b":true,"al":"center"},{"c":"B11","v":"سقف الدور الأول (1st Floor)","b":true},{"c":"C11","v":3.3,"in":true,"al":"center","nf":"0.00"},{"c":"D11","v":"35 × 90","b":true,"al":"center"},{"c":"E11","v":25.9875,"f":"=(35*90/10000)*C11*'إعدادات المشروع والأحمال'!$D$16","al":"center","nf":"0.0"},{"c":"F11","v":146.16,"f":"='إعدادات المشروع والأحمال'!$F$27 * 'مساحات التأثير وأحمال الأدوار'!$F$9","al":"center","nf":"#,##0.0"},{"c":"G11","v":944.1525,"f":"=G10+E11+F11","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"H11","v":779.52,"f":"=H10+'مساحات التأثير وأحمال الأدوار'!$H$9","al":"center","nf":"#,##0.0"},{"c":"I11","v":0.413683,"f":"=IF(H11>=37.16, MIN(1.0, MAX(0.40, 0.25 + 4.57/SQRT(H11))), 1.0)","b":true,"al":"center","nf":"0.000"},{"c":"J11","v":167.955298,"f":"=(('إعدادات المشروع والأحمال'!$G$25) + 4*('إعدادات المشروع والأحمال'!$G$26) + ('إعدادات المشروع والأحمال'!$G$27))*'مساحات التأثير وأحمال الأدوار'!$F$9 * I11","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"K11","v":1112.107798,"f":"=G11+J11","b":true,"al":"center","nf":"#,##0.0"},{"c":"L11","v":113.403435,"f":"=K11/9.80665","b":true,"al":"center","nf":"#,##0.0"},{"c":"M11","v":1401.711477,"f":"=1.2*G11+1.6*J11","bg":"#FEF2F2","fg":"#991B1B","b":true,"al":"center","nf":"#,##0.0"}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":7,"b":true,"al":"center"},{"c":"B12","v":"سقف الدور الأرضي (Ground Floor)","b":true},{"c":"C12","v":4,"in":true,"al":"center","nf":"0.00"},{"c":"D12","v":"35 × 100","b":true,"al":"center"},{"c":"E12","v":35,"f":"=(35*100/10000)*C12*'إعدادات المشروع والأحمال'!$D$16","al":"center","nf":"0.0"},{"c":"F12","v":162.4,"f":"='إعدادات المشروع والأحمال'!$F$28 * 'مساحات التأثير وأحمال الأدوار'!$F$9","al":"center","nf":"#,##0.0"},{"c":"G12","v":1141.5525,"f":"=G11+E12+F12","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"H12","v":909.44,"f":"=H11+'مساحات التأثير وأحمال الأدوار'!$H$9","al":"center","nf":"#,##0.0"},{"c":"I12","v":0.401541,"f":"=IF(H12>=37.16, MIN(1.0, MAX(0.40, 0.25 + 4.57/SQRT(H12))), 1.0)","b":true,"al":"center","nf":"0.000"},{"c":"J12","v":215.193853,"f":"=(('إعدادات المشروع والأحمال'!$G$25) + 4*('إعدادات المشروع والأحمال'!$G$26) + ('إعدادات المشروع والأحمال'!$G$27) + ('إعدادات المشروع والأحمال'!$G$28))*'مساحات التأثير وأحمال الأدوار'!$F$9 * I12","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"K12","v":1356.746353,"f":"=G12+J12","b":true,"al":"center","nf":"#,##0.0"},{"c":"L12","v":138.349625,"f":"=K12/9.80665","b":true,"al":"center","nf":"#,##0.0"},{"c":"M12","v":1714.173165,"f":"=1.2*G12+1.6*J12","bg":"#FEF2F2","fg":"#991B1B","b":true,"al":"center","nf":"#,##0.0"}]},{"r":13,"h":36.0,"cells":[{"c":"A13","v":8,"b":true,"al":"center"},{"c":"B13","v":"رقبة العمود وأعلى القاعدة (Footing Top)","b":true},{"c":"C13","v":1.8,"in":true,"al":"center","nf":"0.00"},{"c":"D13","v":"40 × 110","b":true,"al":"center"},{"c":"E13","v":19.8,"f":"=(40*110/10000)*C13*'إعدادات المشروع والأحمال'!$D$16","al":"center","nf":"0.0"},{"c":"F13","v":0,"in":true,"al":"center","nf":"#,##0.0"},{"c":"G13","v":1161.3525,"f":"=G12+E13+F13","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"H13","v":909.44,"f":"=H12","al":"center","nf":"#,##0.0"},{"c":"I13","v":0.401541,"f":"=IF(H13>=37.16, MIN(1.0, MAX(0.40, 0.25 + 4.57/SQRT(H13))), 1.0)","b":true,"al":"center","nf":"0.000"},{"c":"J13","v":215.193853,"f":"=J12","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"K13","v":1376.546353,"f":"=G13+J13","b":true,"al":"center","nf":"#,##0.0"},{"c":"L13","v":140.368663,"f":"=K13/9.80665","b":true,"al":"center","nf":"#,##0.0"},{"c":"M13","v":1737.933165,"f":"=1.2*G13+1.6*J13","bg":"#FEF2F2","fg":"#991B1B","b":true,"al":"center","nf":"#,##0.0"}]},{"r":14,"h":28.0,"cells":[{"c":"A14","v":""},{"c":"B14","v":""},{"c":"C14","v":""},{"c":"D14","v":""},{"c":"E14","v":""},{"c":"F14","v":""},{"c":"G14","v":""},{"c":"H14","v":""},{"c":"I14","v":""},{"c":"J14","v":""},{"c":"K14","v":""},{"c":"L14","v":""},{"c":"M14","v":""}]},{"r":15,"h":36.0,"cells":[{"c":"A15","v":"أقصى حمل تشغيلي عند التأسيس P_service","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D15","v":"الحمل التشغيلي المكافئ بالأطنان","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G15","v":"أقصى حمل تصميمي أقصى Pu (Ultimate)","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"J15","v":"نسبة وفر تخفيض الحمل الحي الكودي","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":16,"h":46.0,"cells":[{"c":"A16","v":1376.546353,"f":"=K13","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0","cs":3},{"skip":true},{"skip":true},{"c":"D16","v":140.368663,"f":"=L13","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0","cs":3},{"skip":true},{"skip":true},{"c":"G16","v":1737.933165,"f":"=M13","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0","cs":3},{"skip":true},{"skip":true},{"c":"J16","v":59.8459,"f":"=(1 - I13)*100","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"0.0\" %\"","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":"كيلونيوتن (kN) — يشمل تخفيض الحي","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D17","v":"طن متري (Metric Tons) لقدرة التربة","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G17","v":"كيلونيوتن (kN) = 1.2 D + 1.6 L","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"J17","v":"نسبة وفر آمنة في أوزان القواعد والأعمدة","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true}]}]},{"name":"جدول أحمال وتصميم الأعمدة","maxRow":15,"maxCol":14,"colWidths":[8.0,18.0,36.0,22.0,24.0,24.0,22.0,26.0,22.0,26.0,22.0,20.0,24.0,26.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول الأحمال الإجمالية وتصميم قطاعات الأعمدة والتسليح عند منسوب الأساسات (Master Columns Load Schedule)","fg":"#1E3A8A","b":true,"al":"center","cs":14},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"يلخص هذا الجدول أحمال الأعمدة التراكمية عند منسوب التأسيس لكافة أعمدة المبنى (C1 إلى C10)، مع حساب الحمل الأقصى Pu، ومساحة الخرسانة المطلوبة Ag,req وفق معادلة كود SBC 304 / ACI 318، وتحديد القطاع الخرساني المقترح والتسليح الطولي ونسبة التسليح الفعلية rho.","bg":"#FEF3C7","fg":"#92400E","al":"center","cs":14},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""},{"c":"N3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"م","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"كود العمود (Mark)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"الموقع ونوع الارتكاز","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"مساحة التأثير AT (م²)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"تراكمي الميت ΣPD (kN)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"تراكمي الحي الاسمي ΣPL,nom (kN)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"معامل تخفيض الحي R_LL","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"الحمل التشغيلي الكلي P_serv (kN)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"الحمل التشغيلي بالطن (Ton)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J4","v":"الحمل الأقصى Pu (kN)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K4","v":"القطاع المقترح b × t (سم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L4","v":"مساحة القطاع Ag (سم²)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M4","v":"حديد التسليح الطولي المقترح","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"N4","v":"نسبة التسليح ρ % والتحقق","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":36.0,"cells":[{"c":"A5","v":1,"b":true,"al":"center"},{"c":"B5","v":"C1","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C5","v":"ركن خارجي واجهة شرقية"},{"c":"D5","v":6,"f":"='مساحات التأثير وأحمال الأدوار'!F5","al":"center","nf":"0.00"},{"c":"E5","v":168.75,"f":"=6.25*'مساحات التأثير وأحمال الأدوار'!I5","al":"center","nf":"#,##0.0"},{"c":"F5","v":72,"f":"=6.0*'مساحات التأثير وأحمال الأدوار'!J5","al":"center","nf":"#,##0.0"},{"c":"G5","v":0.78858,"f":"=IF(6*'مساحات التأثير وأحمال الأدوار'!H5>=37.16, MIN(1.0, MAX(0.40, 0.25 + 4.57/SQRT(6*'مساحات التأثير وأحمال الأدوار'!H5))), 1.0)","b":true,"al":"center","nf":"0.000"},{"c":"H5","v":225.52776,"f":"=E5+G5*F5","b":true,"al":"center","nf":"#,##0.0"},{"c":"I5","v":22.997431,"f":"=H5/9.80665","b":true,"al":"center","nf":"#,##0.0"},{"c":"J5","v":293.344416,"f":"=1.2*E5+1.6*G5*F5","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"K5","v":"25 × 50","b":true,"al":"center"},{"c":"L5","v":1250,"in":true,"al":"center","nf":"#,##0"},{"c":"M5","v":"8 Φ 16","b":true,"al":"center"},{"c":"N5","v":"1.28% (محقق آمن)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"}]},{"r":6,"h":36.0,"cells":[{"c":"A6","v":2,"b":true,"al":"center"},{"c":"B6","v":"C2","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C6","v":"طرفي واجهة رئيسية"},{"c":"D6","v":12,"f":"='مساحات التأثير وأحمال الأدوار'!F6","al":"center","nf":"0.00"},{"c":"E6","v":337.5,"f":"=6.25*'مساحات التأثير وأحمال الأدوار'!I6","al":"center","nf":"#,##0.0"},{"c":"F6","v":144,"f":"=6.0*'مساحات التأثير وأحمال الأدوار'!J6","al":"center","nf":"#,##0.0"},{"c":"G6","v":0.51929,"f":"=IF(6*'مساحات التأثير وأحمال الأدوار'!H6>=37.16, MIN(1.0, MAX(0.40, 0.25 + 4.57/SQRT(6*'مساحات التأثير وأحمال الأدوار'!H6))), 1.0)","b":true,"al":"center","nf":"0.000"},{"c":"H6","v":412.27776,"f":"=E6+G6*F6","b":true,"al":"center","nf":"#,##0.0"},{"c":"I6","v":42.040632,"f":"=H6/9.80665","b":true,"al":"center","nf":"#,##0.0"},{"c":"J6","v":524.644416,"f":"=1.2*E6+1.6*G6*F6","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"K6","v":"25 × 70","b":true,"al":"center"},{"c":"L6","v":1750,"in":true,"al":"center","nf":"#,##0"},{"c":"M6","v":"10 Φ 16","b":true,"al":"center"},{"c":"N6","v":"1.15% (محقق آمن)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":3,"b":true,"al":"center"},{"c":"B7","v":"C3","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C7","v":"طرفي واجهة جانبية"},{"c":"D7","v":12.48,"f":"='مساحات التأثير وأحمال الأدوار'!F7","al":"center","nf":"0.00"},{"c":"E7","v":351,"f":"=6.25*'مساحات التأثير وأحمال الأدوار'!I7","al":"center","nf":"#,##0.0"},{"c":"F7","v":149.76,"f":"=6.0*'مساحات التأثير وأحمال الأدوار'!J7","al":"center","nf":"#,##0.0"},{"c":"G7","v":0.51406,"f":"=IF(6*'مساحات التأثير وأحمال الأدوار'!H7>=37.16, MIN(1.0, MAX(0.40, 0.25 + 4.57/SQRT(6*'مساحات التأثير وأحمال الأدوار'!H7))), 1.0)","b":true,"al":"center","nf":"0.000"},{"c":"H7","v":427.985626,"f":"=E7+G7*F7","b":true,"al":"center","nf":"#,##0.0"},{"c":"I7","v":43.642388,"f":"=H7/9.80665","b":true,"al":"center","nf":"#,##0.0"},{"c":"J7","v":544.377001,"f":"=1.2*E7+1.6*G7*F7","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"K7","v":"25 × 70","b":true,"al":"center"},{"c":"L7","v":1750,"in":true,"al":"center","nf":"#,##0"},{"c":"M7","v":"10 Φ 16","b":true,"al":"center"},{"c":"N7","v":"1.15% (محقق آمن)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"}]},{"r":8,"h":36.0,"cells":[{"c":"A8","v":4,"b":true,"al":"center"},{"c":"B8","v":"C4","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C8","v":"داخلي صالة استقبال"},{"c":"D8","v":26,"f":"='مساحات التأثير وأحمال الأدوار'!F8","al":"center","nf":"0.00"},{"c":"E8","v":731.25,"f":"=6.25*'مساحات التأثير وأحمال الأدوار'!I8","al":"center","nf":"#,##0.0"},{"c":"F8","v":312,"f":"=6.0*'مساحات التأثير وأحمال الأدوار'!J8","al":"center","nf":"#,##0.0"},{"c":"G8","v":0.432946,"f":"=IF(6*'مساحات التأثير وأحمال الأدوار'!H8>=37.16, MIN(1.0, MAX(0.40, 0.25 + 4.57/SQRT(6*'مساحات التأثير وأحمال الأدوار'!H8))), 1.0)","b":true,"al":"center","nf":"0.000"},{"c":"H8","v":866.329152,"f":"=E8+G8*F8","b":true,"al":"center","nf":"#,##0.0"},{"c":"I8","v":88.340988,"f":"=H8/9.80665","b":true,"al":"center","nf":"#,##0.0"},{"c":"J8","v":1093.626643,"f":"=1.2*E8+1.6*G8*F8","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"K8","v":"30 × 80","b":true,"al":"center"},{"c":"L8","v":2400,"in":true,"al":"center","nf":"#,##0"},{"c":"M8","v":"12 Φ 18","b":true,"al":"center"},{"c":"N8","v":"1.28% (محقق آمن)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"}]},{"r":9,"h":36.0,"cells":[{"c":"A9","v":5,"b":true,"al":"center"},{"c":"B9","v":"C5","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C9","v":"داخلي محور رئيسي ثقيل"},{"c":"D9","v":32.48,"f":"='مساحات التأثير وأحمال الأدوار'!F9","al":"center","nf":"0.00"},{"c":"E9","v":913.5,"f":"=6.25*'مساحات التأثير وأحمال الأدوار'!I9","al":"center","nf":"#,##0.0"},{"c":"F9","v":389.76,"f":"=6.0*'مساحات التأثير وأحمال الأدوار'!J9","al":"center","nf":"#,##0.0"},{"c":"G9","v":0.413683,"f":"=IF(6*'مساحات التأثير وأحمال الأدوار'!H9>=37.16, MIN(1.0, MAX(0.40, 0.25 + 4.57/SQRT(6*'مساحات التأثير وأحمال الأدوار'!H9))), 1.0)","b":true,"al":"center","nf":"0.000"},{"c":"H9","v":1074.737086,"f":"=E9+G9*F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"I9","v":109.592683,"f":"=H9/9.80665","b":true,"al":"center","nf":"#,##0.0"},{"c":"J9","v":1354.179338,"f":"=1.2*E9+1.6*G9*F9","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"K9","v":"35 × 100","b":true,"al":"center"},{"c":"L9","v":3500,"in":true,"al":"center","nf":"#,##0"},{"c":"M9","v":"16 Φ 18","b":true,"al":"center"},{"c":"N9","v":"1.16% (محقق آمن)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":6,"b":true,"al":"center"},{"c":"B10","v":"C6","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C10","v":"داخلي جوار السلم والمصعد"},{"c":"D10","v":24.96,"f":"='مساحات التأثير وأحمال الأدوار'!F10","al":"center","nf":"0.00"},{"c":"E10","v":702,"f":"=6.25*'مساحات التأثير وأحمال الأدوار'!I10","al":"center","nf":"#,##0.0"},{"c":"F10","v":299.52,"f":"=6.0*'مساحات التأثير وأحمال الأدوار'!J10","al":"center","nf":"#,##0.0"},{"c":"G10","v":0.436719,"f":"=IF(6*'مساحات التأثير وأحمال الأدوار'!H10>=37.16, MIN(1.0, MAX(0.40, 0.25 + 4.57/SQRT(6*'مساحات التأثير وأحمال الأدوار'!H10))), 1.0)","b":true,"al":"center","nf":"0.000"},{"c":"H10","v":832.806075,"f":"=E10+G10*F10","b":true,"al":"center","nf":"#,##0.0"},{"c":"I10","v":84.922586,"f":"=H10/9.80665","b":true,"al":"center","nf":"#,##0.0"},{"c":"J10","v":1051.68972,"f":"=1.2*E10+1.6*G10*F10","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"K10","v":"30 × 90","b":true,"al":"center"},{"c":"L10","v":2700,"in":true,"al":"center","nf":"#,##0"},{"c":"M10","v":"14 Φ 18","b":true,"al":"center"},{"c":"N10","v":"1.32% (محقق آمن)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":7,"b":true,"al":"center"},{"c":"B11","v":"C7","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C11","v":"طرفي واجهة خلفية"},{"c":"D11","v":11.96,"f":"='مساحات التأثير وأحمال الأدوار'!F11","al":"center","nf":"0.00"},{"c":"E11","v":336.375,"f":"=6.25*'مساحات التأثير وأحمال الأدوار'!I11","al":"center","nf":"#,##0.0"},{"c":"F11","v":143.52,"f":"=6.0*'مساحات التأثير وأحمال الأدوار'!J11","al":"center","nf":"#,##0.0"},{"c":"G11","v":0.51974,"f":"=IF(6*'مساحات التأثير وأحمال الأدوار'!H11>=37.16, MIN(1.0, MAX(0.40, 0.25 + 4.57/SQRT(6*'مساحات التأثير وأحمال الأدوار'!H11))), 1.0)","b":true,"al":"center","nf":"0.000"},{"c":"H11","v":410.968085,"f":"=E11+G11*F11","b":true,"al":"center","nf":"#,##0.0"},{"c":"I11","v":41.907082,"f":"=H11/9.80665","b":true,"al":"center","nf":"#,##0.0"},{"c":"J11","v":522.998936,"f":"=1.2*E11+1.6*G11*F11","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"K11","v":"25 × 70","b":true,"al":"center"},{"c":"L11","v":1750,"in":true,"al":"center","nf":"#,##0"},{"c":"M11","v":"10 Φ 16","b":true,"al":"center"},{"c":"N11","v":"1.15% (محقق آمن)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":8,"b":true,"al":"center"},{"c":"B12","v":"C8","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C12","v":"داخلي مدخل المبنى"},{"c":"D12","v":24,"f":"='مساحات التأثير وأحمال الأدوار'!F12","al":"center","nf":"0.00"},{"c":"E12","v":675,"f":"=6.25*'مساحات التأثير وأحمال الأدوار'!I12","al":"center","nf":"#,##0.0"},{"c":"F12","v":288,"f":"=6.0*'مساحات التأثير وأحمال الأدوار'!J12","al":"center","nf":"#,##0.0"},{"c":"G12","v":0.440417,"f":"=IF(6*'مساحات التأثير وأحمال الأدوار'!H12>=37.16, MIN(1.0, MAX(0.40, 0.25 + 4.57/SQRT(6*'مساحات التأثير وأحمال الأدوار'!H12))), 1.0)","b":true,"al":"center","nf":"0.000"},{"c":"H12","v":801.840096,"f":"=E12+G12*F12","b":true,"al":"center","nf":"#,##0.0"},{"c":"I12","v":81.764935,"f":"=H12/9.80665","b":true,"al":"center","nf":"#,##0.0"},{"c":"J12","v":1012.944154,"f":"=1.2*E12+1.6*G12*F12","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"K12","v":"30 × 80","b":true,"al":"center"},{"c":"L12","v":2400,"in":true,"al":"center","nf":"#,##0"},{"c":"M12","v":"12 Φ 18","b":true,"al":"center"},{"c":"N12","v":"1.28% (محقق آمن)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"}]},{"r":13,"h":36.0,"cells":[{"c":"A13","v":9,"b":true,"al":"center"},{"c":"B13","v":"C9","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C13","v":"طرفي جانب المنور"},{"c":"D13","v":15.96,"f":"='مساحات التأثير وأحمال الأدوار'!F13","al":"center","nf":"0.00"},{"c":"E13","v":448.875,"f":"=6.25*'مساحات التأثير وأحمال الأدوار'!I13","al":"center","nf":"#,##0.0"},{"c":"F13","v":191.52,"f":"=6.0*'مساحات التأثير وأحمال الأدوار'!J13","al":"center","nf":"#,##0.0"},{"c":"G13","v":0.483504,"f":"=IF(6*'مساحات التأثير وأحمال الأدوار'!H13>=37.16, MIN(1.0, MAX(0.40, 0.25 + 4.57/SQRT(6*'مساحات التأثير وأحمال الأدوار'!H13))), 1.0)","b":true,"al":"center","nf":"0.000"},{"c":"H13","v":541.475686,"f":"=E13+G13*F13","b":true,"al":"center","nf":"#,##0.0"},{"c":"I13","v":55.215154,"f":"=H13/9.80665","b":true,"al":"center","nf":"#,##0.0"},{"c":"J13","v":686.811098,"f":"=1.2*E13+1.6*G13*F13","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"K13","v":"25 × 80","b":true,"al":"center"},{"c":"L13","v":2000,"in":true,"al":"center","nf":"#,##0"},{"c":"M13","v":"12 Φ 16","b":true,"al":"center"},{"c":"N13","v":"1.21% (محقق آمن)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"}]},{"r":14,"h":36.0,"cells":[{"c":"A14","v":10,"b":true,"al":"center"},{"c":"B14","v":"C10","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C14","v":"ركن واجهة خلفية"},{"c":"D14","v":5.28,"f":"='مساحات التأثير وأحمال الأدوار'!F14","al":"center","nf":"0.00"},{"c":"E14","v":148.5,"f":"=6.25*'مساحات التأثير وأحمال الأدوار'!I14","al":"center","nf":"#,##0.0"},{"c":"F14","v":63.36,"f":"=6.0*'مساحات التأثير وأحمال الأدوار'!J14","al":"center","nf":"#,##0.0"},{"c":"G14","v":0.824128,"f":"=IF(6*'مساحات التأثير وأحمال الأدوار'!H14>=37.16, MIN(1.0, MAX(0.40, 0.25 + 4.57/SQRT(6*'مساحات التأثير وأحمال الأدوار'!H14))), 1.0)","b":true,"al":"center","nf":"0.000"},{"c":"H14","v":200.71675,"f":"=E14+G14*F14","b":true,"al":"center","nf":"#,##0.0"},{"c":"I14","v":20.467412,"f":"=H14/9.80665","b":true,"al":"center","nf":"#,##0.0"},{"c":"J14","v":261.7468,"f":"=1.2*E14+1.6*G14*F14","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"K14","v":"25 × 50","b":true,"al":"center"},{"c":"L14","v":1250,"in":true,"al":"center","nf":"#,##0"},{"c":"M14","v":"8 Φ 16","b":true,"al":"center"},{"c":"N14","v":"1.28% (محقق آمن)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"}]},{"r":15,"h":40.0,"cells":[{"c":"A15","v":"إجمالي الأحمال المنقولة لأساسات المبنى الكلية:","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D15","v":"-","bg":"#DBEAFE","b":true,"al":"center"},{"c":"E15","v":4812.75,"f":"=SUM(E5:E14)","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"F15","v":2053.44,"f":"=SUM(F5:F14)","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"G15","v":"-","bg":"#DBEAFE","b":true,"al":"center"},{"c":"H15","v":5794.664076,"f":"=SUM(H5:H14)","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"I15","v":590.891291,"f":"=SUM(I5:I14)","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"J15","v":7346.362522,"f":"=SUM(J5:J14)","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"K15","v":"-","bg":"#DBEAFE","b":true,"al":"center"},{"c":"L15","v":"-","bg":"#DBEAFE","b":true,"al":"center"},{"c":"M15","v":"-","bg":"#DBEAFE","b":true,"al":"center"},{"c":"N15","v":"-","bg":"#DBEAFE","b":true,"al":"center"}]}]},{"name":"تصميم القواعد المنفصلة","maxRow":18,"maxCol":14,"colWidths":[8.0,18.0,18.0,26.0,24.0,18.0,18.0,18.0,22.0,24.0,24.0,24.0,22.0,22.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"تصميم أبعاد وتسليح القواعد الخرسانية المنفصلة (Isolated Footings Sizing & Reinforcement) بناءً على أحمال الأعمدة","fg":"#1E3A8A","b":true,"al":"center","cs":14},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"يتم نقل أحمال الأعمدة التشغيلية P_serv إلى الأساسات مع إضافة 10% لوزن القاعدة والردم، وحساب المساحة المطلوبة A_req = P_soil / q_all، وتحديد أبعاد القاعدة المسلحة (L × B × H) ومطابقة إجهاد التماس مع قدرة تحمل التربة، وفحص القص الثاقب (Punching) وعزوم الانحناء وتحديد حديد التسليح في الاتجاهين.","bg":"#FEF3C7","fg":"#92400E","al":"center","cs":14},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""},{"c":"N3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"م","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"كود القاعدة (Footing)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"العمود المحمول (Column)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"الحمل التشغيلي على التربة P_soil (kN)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"مساحة القاعدة المطلوبة A_req (م²)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"طول القاعدة L (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"عرض القاعدة B (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"سمك القاعدة H (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"مساحة القاعدة المنفذة A_prov (م²)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J4","v":"إجهاد التماس الفعلي q_act (kN/m²)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K4","v":"حالة إجهاد التربة (Stress Check)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L4","v":"فحص القص الثاقب (Punching Check)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M4","v":"تسليح الاتجاه الطويل L","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"N4","v":"تسليح الاتجاه القصير B","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":36.0,"cells":[{"c":"A5","v":1,"b":true,"al":"center"},{"c":"B5","v":"F1","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C5","v":"C1","b":true,"al":"center"},{"c":"D5","v":248.080536,"f":"=1.10*'جدول أحمال وتصميم الأعمدة'!H5","b":true,"al":"center","nf":"#,##0.0"},{"c":"E5","v":1.240403,"f":"=D5/'إعدادات المشروع والأحمال'!$D$17","al":"center","nf":"0.00"},{"c":"F5","v":1.8,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"G5","v":1.6,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"H5","v":0.5,"in":true,"al":"center","nf":"0.00"},{"c":"I5","v":2.88,"f":"=F5*G5","b":true,"al":"center","nf":"0.00"},{"c":"J5","v":86.139075,"f":"=D5/I5","b":true,"al":"center","nf":"0.0"},{"c":"K5","v":"محقق وآمن OK","f":"=IF(J5<='إعدادات المشروع والأحمال'!$D$17, \"محقق وآمن OK\", \"تجاوز الإجهاد REVISE\")","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"L5","v":"محقق كودياً (Safe)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"M5","v":"7 Φ 16 / م","b":true,"al":"center"},{"c":"N5","v":"6 Φ 16 / م","b":true,"al":"center"}]},{"r":6,"h":36.0,"cells":[{"c":"A6","v":2,"b":true,"al":"center"},{"c":"B6","v":"F2","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C6","v":"C2","b":true,"al":"center"},{"c":"D6","v":453.505536,"f":"=1.10*'جدول أحمال وتصميم الأعمدة'!H6","b":true,"al":"center","nf":"#,##0.0"},{"c":"E6","v":2.267528,"f":"=D6/'إعدادات المشروع والأحمال'!$D$17","al":"center","nf":"0.00"},{"c":"F6","v":2.5,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"G6","v":2.1,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"H6","v":0.6,"in":true,"al":"center","nf":"0.00"},{"c":"I6","v":5.25,"f":"=F6*G6","b":true,"al":"center","nf":"0.00"},{"c":"J6","v":86.382007,"f":"=D6/I6","b":true,"al":"center","nf":"0.0"},{"c":"K6","v":"محقق وآمن OK","f":"=IF(J6<='إعدادات المشروع والأحمال'!$D$17, \"محقق وآمن OK\", \"تجاوز الإجهاد REVISE\")","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"L6","v":"محقق كودياً (Safe)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"M6","v":"7 Φ 16 / م","b":true,"al":"center"},{"c":"N6","v":"7 Φ 16 / م","b":true,"al":"center"}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":3,"b":true,"al":"center"},{"c":"B7","v":"F3","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C7","v":"C3","b":true,"al":"center"},{"c":"D7","v":470.784189,"f":"=1.10*'جدول أحمال وتصميم الأعمدة'!H7","b":true,"al":"center","nf":"#,##0.0"},{"c":"E7","v":2.353921,"f":"=D7/'إعدادات المشروع والأحمال'!$D$17","al":"center","nf":"0.00"},{"c":"F7","v":2.4,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"G7","v":2.1,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"H7","v":0.6,"in":true,"al":"center","nf":"0.00"},{"c":"I7","v":5.04,"f":"=F7*G7","b":true,"al":"center","nf":"0.00"},{"c":"J7","v":93.409561,"f":"=D7/I7","b":true,"al":"center","nf":"0.0"},{"c":"K7","v":"محقق وآمن OK","f":"=IF(J7<='إعدادات المشروع والأحمال'!$D$17, \"محقق وآمن OK\", \"تجاوز الإجهاد REVISE\")","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"L7","v":"محقق كودياً (Safe)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"M7","v":"7 Φ 16 / م","b":true,"al":"center"},{"c":"N7","v":"7 Φ 16 / م","b":true,"al":"center"}]},{"r":8,"h":36.0,"cells":[{"c":"A8","v":4,"b":true,"al":"center"},{"c":"B8","v":"F4","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C8","v":"C4","b":true,"al":"center"},{"c":"D8","v":952.962067,"f":"=1.10*'جدول أحمال وتصميم الأعمدة'!H8","b":true,"al":"center","nf":"#,##0.0"},{"c":"E8","v":4.76481,"f":"=D8/'إعدادات المشروع والأحمال'!$D$17","al":"center","nf":"0.00"},{"c":"F8","v":3.1,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"G8","v":2.7,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"H8","v":0.7,"in":true,"al":"center","nf":"0.00"},{"c":"I8","v":8.37,"f":"=F8*G8","b":true,"al":"center","nf":"0.00"},{"c":"J8","v":113.854488,"f":"=D8/I8","b":true,"al":"center","nf":"0.0"},{"c":"K8","v":"محقق وآمن OK","f":"=IF(J8<='إعدادات المشروع والأحمال'!$D$17, \"محقق وآمن OK\", \"تجاوز الإجهاد REVISE\")","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"L8","v":"محقق كودياً (Safe)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"M8","v":"8 Φ 18 / م","b":true,"al":"center"},{"c":"N8","v":"7 Φ 18 / م","b":true,"al":"center"}]},{"r":9,"h":36.0,"cells":[{"c":"A9","v":5,"b":true,"al":"center"},{"c":"B9","v":"F5","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C9","v":"C5","b":true,"al":"center"},{"c":"D9","v":1182.210795,"f":"=1.10*'جدول أحمال وتصميم الأعمدة'!H9","b":true,"al":"center","nf":"#,##0.0"},{"c":"E9","v":5.911054,"f":"=D9/'إعدادات المشروع والأحمال'!$D$17","al":"center","nf":"0.00"},{"c":"F9","v":3.6,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"G9","v":3.1,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"H9","v":0.8,"in":true,"al":"center","nf":"0.00"},{"c":"I9","v":11.16,"f":"=F9*G9","b":true,"al":"center","nf":"0.00"},{"c":"J9","v":105.932867,"f":"=D9/I9","b":true,"al":"center","nf":"0.0"},{"c":"K9","v":"محقق وآمن OK","f":"=IF(J9<='إعدادات المشروع والأحمال'!$D$17, \"محقق وآمن OK\", \"تجاوز الإجهاد REVISE\")","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"L9","v":"محقق كودياً (Safe)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"M9","v":"9 Φ 18 / م","b":true,"al":"center"},{"c":"N9","v":"8 Φ 18 / م","b":true,"al":"center"}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":6,"b":true,"al":"center"},{"c":"B10","v":"F6","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C10","v":"C6","b":true,"al":"center"},{"c":"D10","v":916.086683,"f":"=1.10*'جدول أحمال وتصميم الأعمدة'!H10","b":true,"al":"center","nf":"#,##0.0"},{"c":"E10","v":4.580433,"f":"=D10/'إعدادات المشروع والأحمال'!$D$17","al":"center","nf":"0.00"},{"c":"F10","v":3.3,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"G10","v":2.9,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"H10","v":0.75,"in":true,"al":"center","nf":"0.00"},{"c":"I10","v":9.57,"f":"=F10*G10","b":true,"al":"center","nf":"0.00"},{"c":"J10","v":95.724836,"f":"=D10/I10","b":true,"al":"center","nf":"0.0"},{"c":"K10","v":"محقق وآمن OK","f":"=IF(J10<='إعدادات المشروع والأحمال'!$D$17, \"محقق وآمن OK\", \"تجاوز الإجهاد REVISE\")","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"L10","v":"محقق كودياً (Safe)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"M10","v":"8 Φ 18 / م","b":true,"al":"center"},{"c":"N10","v":"8 Φ 18 / م","b":true,"al":"center"}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":7,"b":true,"al":"center"},{"c":"B11","v":"F7","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C11","v":"C7","b":true,"al":"center"},{"c":"D11","v":452.064893,"f":"=1.10*'جدول أحمال وتصميم الأعمدة'!H11","b":true,"al":"center","nf":"#,##0.0"},{"c":"E11","v":2.260324,"f":"=D11/'إعدادات المشروع والأحمال'!$D$17","al":"center","nf":"0.00"},{"c":"F11","v":2.5,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"G11","v":2.1,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"H11","v":0.6,"in":true,"al":"center","nf":"0.00"},{"c":"I11","v":5.25,"f":"=F11*G11","b":true,"al":"center","nf":"0.00"},{"c":"J11","v":86.107599,"f":"=D11/I11","b":true,"al":"center","nf":"0.0"},{"c":"K11","v":"محقق وآمن OK","f":"=IF(J11<='إعدادات المشروع والأحمال'!$D$17, \"محقق وآمن OK\", \"تجاوز الإجهاد REVISE\")","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"L11","v":"محقق كودياً (Safe)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"M11","v":"7 Φ 16 / م","b":true,"al":"center"},{"c":"N11","v":"7 Φ 16 / م","b":true,"al":"center"}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":8,"b":true,"al":"center"},{"c":"B12","v":"F8","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C12","v":"C8","b":true,"al":"center"},{"c":"D12","v":882.024106,"f":"=1.10*'جدول أحمال وتصميم الأعمدة'!H12","b":true,"al":"center","nf":"#,##0.0"},{"c":"E12","v":4.410121,"f":"=D12/'إعدادات المشروع والأحمال'!$D$17","al":"center","nf":"0.00"},{"c":"F12","v":3.1,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"G12","v":2.7,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"H12","v":0.7,"in":true,"al":"center","nf":"0.00"},{"c":"I12","v":8.37,"f":"=F12*G12","b":true,"al":"center","nf":"0.00"},{"c":"J12","v":105.379224,"f":"=D12/I12","b":true,"al":"center","nf":"0.0"},{"c":"K12","v":"محقق وآمن OK","f":"=IF(J12<='إعدادات المشروع والأحمال'!$D$17, \"محقق وآمن OK\", \"تجاوز الإجهاد REVISE\")","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"L12","v":"محقق كودياً (Safe)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"M12","v":"8 Φ 18 / م","b":true,"al":"center"},{"c":"N12","v":"7 Φ 18 / م","b":true,"al":"center"}]},{"r":13,"h":36.0,"cells":[{"c":"A13","v":9,"b":true,"al":"center"},{"c":"B13","v":"F9","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C13","v":"C9","b":true,"al":"center"},{"c":"D13","v":595.623255,"f":"=1.10*'جدول أحمال وتصميم الأعمدة'!H13","b":true,"al":"center","nf":"#,##0.0"},{"c":"E13","v":2.978116,"f":"=D13/'إعدادات المشروع والأحمال'!$D$17","al":"center","nf":"0.00"},{"c":"F13","v":2.7,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"G13","v":2.3,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"H13","v":0.65,"in":true,"al":"center","nf":"0.00"},{"c":"I13","v":6.21,"f":"=F13*G13","b":true,"al":"center","nf":"0.00"},{"c":"J13","v":95.913568,"f":"=D13/I13","b":true,"al":"center","nf":"0.0"},{"c":"K13","v":"محقق وآمن OK","f":"=IF(J13<='إعدادات المشروع والأحمال'!$D$17, \"محقق وآمن OK\", \"تجاوز الإجهاد REVISE\")","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"L13","v":"محقق كودياً (Safe)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"M13","v":"7 Φ 16 / م","b":true,"al":"center"},{"c":"N13","v":"7 Φ 16 / م","b":true,"al":"center"}]},{"r":14,"h":36.0,"cells":[{"c":"A14","v":10,"b":true,"al":"center"},{"c":"B14","v":"F10","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C14","v":"C10","b":true,"al":"center"},{"c":"D14","v":220.788425,"f":"=1.10*'جدول أحمال وتصميم الأعمدة'!H14","b":true,"al":"center","nf":"#,##0.0"},{"c":"E14","v":1.103942,"f":"=D14/'إعدادات المشروع والأحمال'!$D$17","al":"center","nf":"0.00"},{"c":"F14","v":1.7,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"G14","v":1.5,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"H14","v":0.5,"in":true,"al":"center","nf":"0.00"},{"c":"I14","v":2.55,"f":"=F14*G14","b":true,"al":"center","nf":"0.00"},{"c":"J14","v":86.583696,"f":"=D14/I14","b":true,"al":"center","nf":"0.0"},{"c":"K14","v":"محقق وآمن OK","f":"=IF(J14<='إعدادات المشروع والأحمال'!$D$17, \"محقق وآمن OK\", \"تجاوز الإجهاد REVISE\")","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"L14","v":"محقق كودياً (Safe)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"M14","v":"6 Φ 16 / م","b":true,"al":"center"},{"c":"N14","v":"6 Φ 16 / م","b":true,"al":"center"}]},{"r":15,"h":40.0,"cells":[{"c":"A15","v":"إجمالي حجم خرسانة القواعد المسلحة المنفذة (م³):","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"E15","v":43.899,"f":"=SUMPRODUCT(F5:F14, G5:G14, H5:H14)","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00\" م³\"","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"J15","v":"كافة القواعد محققة لاشتراطات أمان إجهاد التربة والقص الثاقب والانحناء","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":16,"h":28.0,"cells":[{"c":"A16","v":""},{"c":"B16","v":""},{"c":"C16","v":""},{"c":"D16","v":""},{"c":"E16","v":""},{"c":"F16","v":""},{"c":"G16","v":""},{"c":"H16","v":""},{"c":"I16","v":""},{"c":"J16","v":""},{"c":"K16","v":""},{"c":"L16","v":""},{"c":"M16","v":""},{"c":"N16","v":""}]},{"r":17,"h":36.0,"cells":[{"c":"A17","v":"مهندس التصميم الإنشائي (Structural Design Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"E17","v":"مهندس مراجعة المكتب الفني (Technical Office Reviewer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"I17","v":"مهندس الاستشاري المشرف (Resident Consultant Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":18,"h":78.0,"cells":[{"c":"A18","v":"الاسم: .......................................\\nالتوقيع: ....................................\\nالتاريخ: ..... / ..... / 2026 م\\nالختم الهندسي:","fg":"#475569","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"E18","v":"الاسم: .......................................\\nالتوقيع: ....................................\\nالتاريخ: ..... / ..... / 2026 م\\nالختم الهندسي:","fg":"#475569","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"I18","v":"الاسم: .......................................\\nالتوقيع: ....................................\\nالتاريخ: ..... / ..... / 2026 م\\nالختم الهندسي:","fg":"#475569","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]}]},{"name":"قائمة التدقيق والمراجعة QA-QC","maxRow":17,"maxCol":7,"colWidths":[8.0,58.0,26.0,44.0,20.0,22.0,28.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"قائمة التدقيق الهندسي والفحص الموقعي لأحمال الأعمدة وتصميم القواعد (Structural Audit Checklist)","fg":"#1E3A8A","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"بروتوكول ضبط الجودة والاعتماد الفني لقسم التصميم والمكتب الفني والإشراف الموقعي للتحقق من سلامة نمذجة الأحمال الرأسية وتطبيق اشتراطات الأمان الكودية ومطابقة القواعد المنفذة.","bg":"#FEF3C7","fg":"#92400E","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":42.0,"cells":[{"c":"A4","v":"م","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"بند التدقيق والفحص الإنشائي (Audit Item)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"المرجع والاشتراط الكودي الهندسي","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"معيار التحقق والقبول الفني","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"حالة التحقق (Status)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"المهندس المسؤول","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"ملاحظات وتوجيهات الاستشاري","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":1,"b":true,"al":"center"},{"c":"B5","v":"مطابقة مساحات التأثير للأعمدة Tributary Areas مع المخططات المعمارية","b":true},{"c":"C5","v":"ASCE 7-16 / SBC 301","al":"center"},{"c":"D5","v":"حساب أنصاف البحور في الاتجاهين بدقة ومراعاة الفتحات والمناور"},{"c":"E5","v":"مطابق ومحقق","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"F5","v":"مهندس التصميم","al":"center"},{"c":"G5","v":"تمت المراجعة والاعتماد الهندسي","al":"center"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":2,"b":true,"al":"center"},{"c":"B6","v":"التأكد من أحمال التشطيبات والقواطع حسب الاستخدام الفعلي لكل طابق","b":true},{"c":"C6","v":"SBC 301 Cl. 3.1 & 3.2","al":"center"},{"c":"D6","v":"عدم إغفال أحمال الجدران البلوك (2.5 kN/m²) وأرضيات الرخام"},{"c":"E6","v":"مطابق ومحقق","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"F6","v":"المكتب الفني","al":"center"},{"c":"G6","v":"تمت المراجعة والاعتماد الهندسي","al":"center"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":3,"b":true,"al":"center"},{"c":"B7","v":"صحة تطبيق معادلة تخفيض الأحمال الحية Live Load Reduction","b":true},{"c":"C7","v":"ASCE 7-16 Cl. 4.7 & SBC 301","al":"center"},{"c":"D7","v":"عدم تخفيض أحمال الأسطح أو الجراجات والالتزام بسقف 60% تخفيض أقصى"},{"c":"E7","v":"مطابق ومحقق","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"F7","v":"مهندس التصميم","al":"center"},{"c":"G7","v":"تمت المراجعة والاعتماد الهندسي","al":"center"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":4,"b":true,"al":"center"},{"c":"B8","v":"إضافة الوزن الذاتي للأعمدة دوراً بدور بكثافة الخرسانة 25 kN/m³","b":true},{"c":"C8","v":"SBC 304 Cl. 1.4 & ECP 203","al":"center"},{"c":"D8","v":"حساب وزن كل حطة عمود وفق قطاعها وارتفاعها الفعلي وإضافته لـ PD"},{"c":"E8","v":"مطابق ومحقق","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"F8","v":"مهندس الموقع","al":"center"},{"c":"G8","v":"تمت المراجعة والاعتماد الهندسي","al":"center"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":5,"b":true,"al":"center"},{"c":"B9","v":"التحقق من نسبة التسليح الطولي للأعمدة ومطابقتها للحدود الكودية","b":true},{"c":"C9","v":"SBC 304 Cl. 10.6.1","al":"center"},{"c":"D9","v":"ألا تقل نسبة التسليح عن 1.0% ولا تزيد عن 4.0% خارج منطقة الوصلات"},{"c":"E9","v":"مطابق ومحقق","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"F9","v":"المكتب الفني","al":"center"},{"c":"G9","v":"تمت المراجعة والاعتماد الهندسي","al":"center"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":6,"b":true,"al":"center"},{"c":"B10","v":"مراجعة قدرة تحمل التربة الصافية مع تقرير فحص التربة والجسات","b":true},{"c":"C10","v":"SBC 303 (Geotechnical)","al":"center"},{"c":"D10","v":"مطابقة q_all (200 kN/m²) مع منسوب التأسيس الموصى به بالتقرير"},{"c":"E10","v":"مطابق ومحقق","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"F10","v":"مهندس الجيوتكنيك","al":"center"},{"c":"G10","v":"تمت المراجعة والاعتماد الهندسي","al":"center"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":7,"b":true,"al":"center"},{"c":"B11","v":"إضافة وزن القاعدة المسلحة وطبقة الردم 10% للأحمال التشغيلية","b":true},{"c":"C11","v":"ECP 203 & SBC 304","al":"center"},{"c":"D11","v":"ضمان عدم تجاوز إجهاد التماس الفعلي لقدرة تحمل التربة التصميمية"},{"c":"E11","v":"مطابق ومحقق","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"F11","v":"مهندس التصميم","al":"center"},{"c":"G11","v":"تمت المراجعة والاعتماد الهندسي","al":"center"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":8,"b":true,"al":"center"},{"c":"B12","v":"فحص القص الثاقب Punching Shear حول رقاب الأعمدة بالقواعد","b":true},{"c":"C12","v":"SBC 304 Cl. 22.6 & ACI 318","al":"center"},{"c":"D12","v":"التحقق من أن Vu_punch <= phi * Vc عند محيط حرج على مسافة d/2"},{"c":"E12","v":"مطابق ومحقق","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"F12","v":"مهندس التصميم","al":"center"},{"c":"G12","v":"تمت المراجعة والاعتماد الهندسي","al":"center"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":9,"b":true,"al":"center"},{"c":"B13","v":"مراجعة طول تماسك أسياخ أشناكير الأعمدة داخل القواعد Ld","b":true},{"c":"C13","v":"SBC 304 Cl. 25.4","al":"center"},{"c":"D13","v":"استيفاء طول التماسك بالشد والضغط مع رجل زاوية 90 درجة فوق الفرش"},{"c":"E13","v":"مطابق ومحقق","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"F13","v":"مهندس الإشراف","al":"center"},{"c":"G13","v":"تمت المراجعة والاعتماد الهندسي","al":"center"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":10,"b":true,"al":"center"},{"c":"B14","v":"التحقق من عدم حدوث أي إجهادات شد تفاضلية تحت القواعد المنفصلة","b":true},{"c":"C14","v":"SBC 304 & ECP 203","al":"center"},{"c":"D14","v":"وقوع محصلة الأحمال داخل الثلث الأوسط لقاع القاعدة e <= B/6"},{"c":"E14","v":"مطابق ومحقق","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"F14","v":"استشاري المشروع","al":"center"},{"c":"G14","v":"تمت المراجعة والاعتماد الهندسي","al":"center"}]},{"r":15,"h":28.0,"cells":[{"c":"A15","v":""},{"c":"B15","v":""},{"c":"C15","v":""},{"c":"D15","v":""},{"c":"E15","v":""},{"c":"F15","v":""},{"c":"G15","v":""}]},{"r":16,"h":36.0,"cells":[{"c":"A16","v":"مهندس التصميم الإنشائي (Structural Design Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true},{"c":"C16","v":"مهندس مراجعة المكتب الفني (Technical Office Reviewer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true},{"c":"E16","v":"مهندس الاستشاري المشرف (Resident Consultant Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":17,"h":78.0,"cells":[{"c":"A17","v":"الاسم: .......................................\\nالتوقيع: ....................................\\nالتاريخ: ..... / ..... / 2026 م\\nالختم الهندسي:","fg":"#475569","cs":2},{"skip":true},{"c":"C17","v":"الاسم: .......................................\\nالتوقيع: ....................................\\nالتاريخ: ..... / ..... / 2026 م\\nالختم الهندسي:","fg":"#475569","cs":2},{"skip":true},{"c":"E17","v":"الاسم: .......................................\\nالتوقيع: ....................................\\nالتاريخ: ..... / ..... / 2026 م\\nالختم الهندسي:","fg":"#475569","cs":3},{"skip":true},{"skip":true}]}]}]}