{"slug":"columns-concrete-qto","sheets":[{"name":"Setup_Parameters","maxRow":18,"maxCol":7,"colWidths":[14.0,46.0,22.0,24.0,20.0,22.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"ثوابت ومعايير حصر خرسانة الأعمدة الإنشائية وحوائط القص","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"معايير رتب الخرسانة C35/C40 ونسب الهالك وتحديد مناسيب الصب طبقاً للكود السعودي SBC 304 والكود المصري ECP 203","bg":"#1E3A8A","fg":"#E2E8F0","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"1. رتب الخرسانة المسلحة المعتمدة للأعمدة والعناصر الرأسية","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"كود الرتبة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"توصيف العنصر الإنشائي","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"مقاومة الكسر f'c (ميجاباسكال)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"نوع الأسمنت","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"نسبة هالك الصب %","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"سعر المتر المكعب (ر.س)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"ملاحظات الفحص والصب","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"GR-01","b":true,"al":"center"},{"c":"B6","v":"رقاب الأعمدة أسفل الميد (Pedestals)","b":true},{"c":"C6","v":"35.0 N/mm²","fg":"#1E293B","al":"center"},{"c":"D6","v":"أسمنت مقاوم للكبريتات SRC","fg":"#1E293B","al":"center"},{"c":"E6","v":0.03,"in":true,"fg":"#1E293B","al":"center"},{"c":"F6","v":245,"in":true,"b":true,"al":"center"},{"c":"G6","v":"عزل مائي إيبوكسي/بيتوميني للرقاب تحت الردم","fg":"#1E293B"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"GR-02","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B7","v":"أعمدة الدور الأرضي والأول (C35/40)","bg":"#F8FAFC","b":true},{"c":"C7","v":"40.0 N/mm²","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D7","v":"أسمنت بورتلاندي عادي OPC","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E7","v":0.025,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F7","v":260,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"G7","v":"خرسانة عالية المقاومة مع إضافات ملدنة فائقة","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"GR-03","b":true,"al":"center"},{"c":"B8","v":"أعمدة الأدوار المتكررة والملحق","b":true},{"c":"C8","v":"35.0 N/mm²","fg":"#1E293B","al":"center"},{"c":"D8","v":"أسمنت بورتلاندي عادي OPC","fg":"#1E293B","al":"center"},{"c":"E8","v":0.025,"in":true,"fg":"#1E293B","al":"center"},{"c":"F8","v":245,"in":true,"b":true,"al":"center"},{"c":"G8","v":"دمك ميكانيكي بهزازات إبرية 35-50 مم","fg":"#1E293B"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"GR-04","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B9","v":"حوائط القص وكور المصعد (Shear Walls)","bg":"#F8FAFC","b":true},{"c":"C9","v":"40.0 N/mm²","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D9","v":"أسمنت بورتلاندي عادي OPC","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E9","v":0.03,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F9","v":265,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"G9","v":"صب على طبقات بارتفاع لا يتجاوز 50 سم لمنع التعشيش","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":10,"h":28.0,"cells":[{"c":"A10","v":""},{"c":"B10","v":""},{"c":"C10","v":""},{"c":"D10","v":""},{"c":"E10","v":""},{"c":"F10","v":""},{"c":"G10","v":""}]},{"r":11,"h":28.0,"cells":[{"c":"A11","v":""},{"c":"B11","v":""},{"c":"C11","v":""},{"c":"D11","v":""},{"c":"E11","v":""},{"c":"F11","v":""},{"c":"G11","v":""}]},{"r":12,"h":38.0,"cells":[{"c":"A12","v":"2. مناسيب الصب والارتفاعات الطابقية الصافية للأعمدة (Story Heights)","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":13,"h":40.0,"cells":[{"c":"A13","v":"كود الطابق","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B13","v":"اسم المنسوب / الدور","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C13","v":"منسوب البداية (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D13","v":"منسوب الصب لنهاية العمود (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E13","v":"الارتفاع الكلي (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F13","v":"سماكة السقف/الكمرة (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G13","v":"الارتفاع الحر الصافي (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":"FL-00","b":true,"al":"center"},{"c":"B14","v":"رقاب الأعمدة (من أعلى القاعدة لبطن الميدة)","b":true},{"c":"C14","v":-2.2,"in":true,"fg":"#1E293B","al":"center"},{"c":"D14","v":-0.6,"in":true,"fg":"#1E293B","al":"center"},{"c":"E14","v":1.6,"in":true,"fg":"#1E293B","al":"center"},{"c":"F14","v":0.4,"in":true,"fg":"#1E293B","al":"center"},{"c":"G14","v":1.2,"f":"=E14-F14","b":true,"al":"center"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":"FL-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B15","v":"أعمدة الدور الأرضي (من ظهر الميدة لبطن كمرة السقف)","bg":"#F8FAFC","b":true},{"c":"C15","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D15","v":3.8,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E15","v":3.8,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F15","v":0.6,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"G15","v":3.2,"f":"=E15-F15","bg":"#F8FAFC","b":true,"al":"center"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":"FL-02","b":true,"al":"center"},{"c":"B16","v":"أعمدة الدور الأول المتكرر (من بلاطة الأرضي لبلاطة الأول)","b":true},{"c":"C16","v":3.8,"in":true,"fg":"#1E293B","al":"center"},{"c":"D16","v":7,"in":true,"fg":"#1E293B","al":"center"},{"c":"E16","v":3.2,"in":true,"fg":"#1E293B","al":"center"},{"c":"F16","v":0.5,"in":true,"fg":"#1E293B","al":"center"},{"c":"G16","v":2.7,"f":"=E16-F16","b":true,"al":"center"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":"FL-03","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B17","v":"أعمدة الدور الثاني المتكرر (من بلاطة الأول لبلاطة الثاني)","bg":"#F8FAFC","b":true},{"c":"C17","v":7,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D17","v":10.2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E17","v":3.2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F17","v":0.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"G17","v":2.7,"f":"=E17-F17","bg":"#F8FAFC","b":true,"al":"center"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":"FL-04","b":true,"al":"center"},{"c":"B18","v":"أعمدة الملحق العلوي (من بلاطة الثاني لسقف الملحق)","b":true},{"c":"C18","v":10.2,"in":true,"fg":"#1E293B","al":"center"},{"c":"D18","v":13.2,"in":true,"fg":"#1E293B","al":"center"},{"c":"E18","v":3,"in":true,"fg":"#1E293B","al":"center"},{"c":"F18","v":0.4,"in":true,"fg":"#1E293B","al":"center"},{"c":"G18","v":2.6,"f":"=E18-F18","b":true,"al":"center"}]}]},{"name":"Columns_Schedule","maxRow":12,"maxCol":8,"colWidths":[14.0,46.0,20.0,16.0,16.0,24.0,18.0,38.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول نماذج وقطاعات الأعمدة الخرسانية وحوائط القص المعتمدة","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"بيانات الأبعاد الخرسانية (العرض، الطول)، مساحة المقطع العرضي (م²)، ونموذج التسليح لجميع قطاعات المشروع","bg":"#1E3A8A","fg":"#E2E8F0","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":42.0,"cells":[{"c":"A4","v":"رمز النموذج","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"توصيف قطاع العمود / الحائط","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"الشكل الهندسي","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"العرض b (م)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"الطول t (م)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"مساحة المقطع العرضي (م²)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"العدد الكلي بالمبنى","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"ملاحظات إنشائية والتسليح","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":35.0,"cells":[{"c":"A5","v":"C1","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B5","v":"عمود مستطيل ركني (20×50 سم)","bg":"#F8FAFC","b":true},{"c":"C5","v":"مستطيل","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D5","v":0.2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E5","v":0.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F5","v":0.1,"f":"=D5*E5","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"G5","v":8,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"H5","v":"تسليح 8T16 - كانات 8T8/m","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":6,"h":35.0,"cells":[{"c":"A6","v":"C2","b":true,"al":"center"},{"c":"B6","v":"عمود مستطيل وسطي (25×60 سم)","b":true},{"c":"C6","v":"مستطيل","fg":"#1E293B","al":"center"},{"c":"D6","v":0.25,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E6","v":0.6,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F6","v":0.15,"f":"=D6*E6","b":true,"al":"center","nf":"#,##0.000"},{"c":"G6","v":12,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"H6","v":"تسليح 12T16 - كانات أوتوماتيك","fg":"#1E293B"}]},{"r":7,"h":35.0,"cells":[{"c":"A7","v":"C3","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B7","v":"عمود وسطي رئيسي (30×80 سم)","bg":"#F8FAFC","b":true},{"c":"C7","v":"مستطيل","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D7","v":0.3,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E7","v":0.8,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F7","v":0.24,"f":"=D7*E7","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"G7","v":6,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"H7","v":"تسليح 14T18 - حمل محوري عالي","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":8,"h":35.0,"cells":[{"c":"A8","v":"C4","b":true,"al":"center"},{"c":"B8","v":"عمود دائري معماري بهو المدخل (قطر 50 سم)","b":true},{"c":"C8","v":"دائري","fg":"#1E293B","al":"center"},{"c":"D8","v":0.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E8","v":0.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F8","v":0.196349,"f":"=3.14159*(D8/2)^2","b":true,"al":"center","nf":"#,##0.000"},{"c":"G8","v":4,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"H8","v":"تسليح 10T16 - كانات حلزونية Spiral","fg":"#1E293B"}]},{"r":9,"h":35.0,"cells":[{"c":"A9","v":"C5","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B9","v":"عمود مربع طرفي (40×40 سم)","bg":"#F8FAFC","b":true},{"c":"C9","v":"مربع","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D9","v":0.4,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E9","v":0.4,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F9","v":0.16,"f":"=D9*E9","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"G9","v":4,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"H9","v":"تسليح 8T16 - كانات مغلقة","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":10,"h":35.0,"cells":[{"c":"A10","v":"SW1","b":true,"al":"center"},{"c":"B10","v":"حائط قص خرساني لمقاومة الزلازل (25×200 سم)","b":true},{"c":"C10","v":"حائط قص مستطيل","fg":"#1E293B","al":"center"},{"c":"D10","v":0.25,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E10","v":2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F10","v":0.5,"f":"=D10*E10","b":true,"al":"center","nf":"#,##0.000"},{"c":"G10","v":2,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"H10","v":"تسليح رقتين 10T16/m مع شبك كانات","fg":"#1E293B"}]},{"r":11,"h":35.0,"cells":[{"c":"A11","v":"SW2","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":"حائط قص خرساني جانبي (25×250 سم)","bg":"#F8FAFC","b":true},{"c":"C11","v":"حائط قص مستطيل","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D11","v":0.25,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E11","v":2.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F11","v":0.625,"f":"=D11*E11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"G11","v":2,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"H11","v":"تسليح رقتين 12T16/m ورؤوس أعمدة مخفية","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":12,"h":35.0,"cells":[{"c":"A12","v":"CORE","b":true,"al":"center"},{"c":"B12","v":"كور المصعد الخرساني شكل U (جدار 25 سم)","b":true},{"c":"C12","v":"قطاع U مجوف","fg":"#1E293B","al":"center"},{"c":"D12","v":0.25,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E12","v":5.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F12","v":1.375,"f":"=D12*E12","b":true,"al":"center","nf":"#,##0.000"},{"c":"G12","v":1,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"H12","v":"مجموع أطوال حوائط بئر المصعد 5.5 م طولي","fg":"#1E293B"}]}]},{"name":"Columns_QTO","maxRow":32,"maxCol":13,"colWidths":[6.0,20.0,14.0,40.0,12.0,14.0,14.0,18.0,16.0,20.0,20.0,22.0,36.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول حصر كميات خرسانة رقاب وأعمدة المبنى وحوائط القص بالأدوار","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"مشروع: مبنى سكني تجاري نموذج (أبراج الرياض) | حساب الحجوم الصافية للأعمدة بعد خصم تقاطعات الأسقف والكمرات","bg":"#1E3A8A","fg":"#E2E8F0","al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""}]},{"r":4,"h":42.0,"cells":[{"c":"A4","v":"م","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"الدور / المنسوب","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"رمز النموذج","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"توصيف قطاع العمود","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"العدد بالدور","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"العرض b (م)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"الطول t (م)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"مساحة القطاع (م²)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"الارتفاع الكلي (م)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J4","v":"سماكة السقف المخصوم (م)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K4","v":"الارتفاع الحر الصافي (م)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L4","v":"الحجم الصافي للخرسانة (م³)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M4","v":"ملاحظات الصب والتقاطع","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":35.0,"cells":[{"c":"A5","v":1,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B5","v":"رقاب الأعمدة","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C5","v":"C1","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D5","v":"رقاب أعمدة ركنية (20×50 سم)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"E5","v":8,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"F5","v":0.2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G5","v":0.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H5","v":0.1,"f":"=F5*G5","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"I5","v":1.6,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J5","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K5","v":1.6,"f":"=I5-J5","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"L5","v":1.28,"f":"=E5*H5*K5","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M5","v":"صب الرقاب حتى منسوب أسفل الميدة المسلحة","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":6,"h":35.0,"cells":[{"c":"A6","v":2,"b":true,"al":"center"},{"c":"B6","v":"رقاب الأعمدة","fg":"#1E293B"},{"c":"C6","v":"C2","b":true,"al":"center"},{"c":"D6","v":"رقاب أعمدة وسطية (25×60 سم)","fg":"#1E293B"},{"c":"E6","v":12,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"F6","v":0.25,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G6","v":0.6,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H6","v":0.15,"f":"=F6*G6","b":true,"al":"center","nf":"#,##0.000"},{"c":"I6","v":1.6,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J6","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K6","v":1.6,"f":"=I6-J6","b":true,"al":"center","nf":"#,##0.00"},{"c":"L6","v":2.88,"f":"=E6*H6*K6","b":true,"al":"center","nf":"#,##0.00"},{"c":"M6","v":"صب الرقاب مع معالجة فواصل الصب مع القاعدة","fg":"#1E293B"}]},{"r":7,"h":35.0,"cells":[{"c":"A7","v":3,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B7","v":"رقاب الأعمدة","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C7","v":"C3","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D7","v":"رقاب أعمدة رئيسية (30×80 سم)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"E7","v":6,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"F7","v":0.3,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G7","v":0.8,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H7","v":0.24,"f":"=F7*G7","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"I7","v":1.6,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J7","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K7","v":1.6,"f":"=I7-J7","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"L7","v":2.304,"f":"=E7*H7*K7","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M7","v":"أحمال محورية عالية - دمك مكثف","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":8,"h":35.0,"cells":[{"c":"A8","v":4,"b":true,"al":"center"},{"c":"B8","v":"رقاب الأعمدة","fg":"#1E293B"},{"c":"C8","v":"C4","b":true,"al":"center"},{"c":"D8","v":"رقاب أعمدة دائرية (قطر 50 سم)","fg":"#1E293B"},{"c":"E8","v":4,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"F8","v":0.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G8","v":0.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H8","v":0.196349,"f":"=3.14159*(F8/2)^2","b":true,"al":"center","nf":"#,##0.000"},{"c":"I8","v":1.6,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J8","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K8","v":1.6,"f":"=I8-J8","b":true,"al":"center","nf":"#,##0.00"},{"c":"L8","v":1.256634,"f":"=E8*H8*K8","b":true,"al":"center","nf":"#,##0.00"},{"c":"M8","v":"قوالب كرتونية أسطوانية ملساء Sonotube","fg":"#1E293B"}]},{"r":9,"h":35.0,"cells":[{"c":"A9","v":5,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B9","v":"رقاب الأعمدة","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C9","v":"SW1","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D9","v":"أكتاف حوائط القص بالبدروم","bg":"#F8FAFC","fg":"#1E293B"},{"c":"E9","v":2,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"F9","v":0.25,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G9","v":2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H9","v":0.5,"f":"=F9*G9","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"I9","v":1.6,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J9","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K9","v":1.6,"f":"=I9-J9","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"L9","v":1.6,"f":"=E9*H9*K9","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M9","v":"متصلة باللبشة المسلحة مع كانات مكثفة","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":10,"h":35.0,"cells":[{"c":"A10","v":6,"b":true,"al":"center"},{"c":"B10","v":"رقاب الأعمدة","fg":"#1E293B"},{"c":"C10","v":"CORE","b":true,"al":"center"},{"c":"D10","v":"رقاب كور المصعد الخرساني","fg":"#1E293B"},{"c":"E10","v":1,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"F10","v":0.25,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G10","v":5.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H10","v":1.375,"f":"=F10*G10","b":true,"al":"center","nf":"#,##0.000"},{"c":"I10","v":1.6,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J10","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K10","v":1.6,"f":"=I10-J10","b":true,"al":"center","nf":"#,##0.00"},{"c":"L10","v":2.2,"f":"=E10*H10*K10","b":true,"al":"center","nf":"#,##0.00"},{"c":"M10","v":"جدران خرسانية محيطة بحفرة المصعد Pit","fg":"#1E293B"}]},{"r":11,"h":35.0,"cells":[{"c":"A11","v":7,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":"الدور الأرضي","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C11","v":"C1","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D11","v":"أعمدة ركنية (20×50 سم)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"E11","v":8,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"F11","v":0.2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G11","v":0.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H11","v":0.1,"f":"=F11*G11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"I11","v":3.8,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J11","v":0.6,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K11","v":3.2,"f":"=I11-J11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"L11","v":2.56,"f":"=E11*H11*K11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M11","v":"ارتفاع حر 3.20 م بعد خصم سقوط الكمرة","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":12,"h":35.0,"cells":[{"c":"A12","v":8,"b":true,"al":"center"},{"c":"B12","v":"الدور الأرضي","fg":"#1E293B"},{"c":"C12","v":"C2","b":true,"al":"center"},{"c":"D12","v":"أعمدة وسطية (25×60 سم)","fg":"#1E293B"},{"c":"E12","v":12,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"F12","v":0.25,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G12","v":0.6,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H12","v":0.15,"f":"=F12*G12","b":true,"al":"center","nf":"#,##0.000"},{"c":"I12","v":3.8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J12","v":0.6,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K12","v":3.2,"f":"=I12-J12","b":true,"al":"center","nf":"#,##0.00"},{"c":"L12","v":5.76,"f":"=E12*H12*K12","b":true,"al":"center","nf":"#,##0.00"},{"c":"M12","v":"ارتفاع حر 3.20 م بعد خصم سقوط الكمرة","fg":"#1E293B"}]},{"r":13,"h":35.0,"cells":[{"c":"A13","v":9,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":"الدور الأرضي","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C13","v":"C3","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D13","v":"أعمدة وسطي رئيسي (30×80 سم)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"E13","v":6,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"F13","v":0.3,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G13","v":0.8,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H13","v":0.24,"f":"=F13*G13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"I13","v":3.8,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J13","v":0.6,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K13","v":3.2,"f":"=I13-J13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"L13","v":4.608,"f":"=E13*H13*K13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M13","v":"أعمدة حاملة لأسقف صالة الاستقبال","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":14,"h":35.0,"cells":[{"c":"A14","v":10,"b":true,"al":"center"},{"c":"B14","v":"الدور الأرضي","fg":"#1E293B"},{"c":"C14","v":"C4","b":true,"al":"center"},{"c":"D14","v":"أعمدة دائرية بهو المدخل","fg":"#1E293B"},{"c":"E14","v":4,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"F14","v":0.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G14","v":0.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H14","v":0.196349,"f":"=3.14159*(F14/2)^2","b":true,"al":"center","nf":"#,##0.000"},{"c":"I14","v":3.8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J14","v":0.6,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K14","v":3.2,"f":"=I14-J14","b":true,"al":"center","nf":"#,##0.00"},{"c":"L14","v":2.513267,"f":"=E14*H14*K14","b":true,"al":"center","nf":"#,##0.00"},{"c":"M14","v":"ارتفاع حر 3.20 م وتشطيب ناعم Fair-faced","fg":"#1E293B"}]},{"r":15,"h":35.0,"cells":[{"c":"A15","v":11,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B15","v":"الدور الأرضي","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C15","v":"SW1","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D15","v":"حائط قص زلزالي 1 (25×200 سم)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"E15","v":2,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"F15","v":0.25,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G15","v":2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H15","v":0.5,"f":"=F15*G15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"I15","v":3.8,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J15","v":0.3,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K15","v":3.5,"f":"=I15-J15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"L15","v":3.5,"f":"=E15*H15*K15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M15","v":"خصم سماكة البلاطة الفلات 30 سم","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":16,"h":35.0,"cells":[{"c":"A16","v":12,"b":true,"al":"center"},{"c":"B16","v":"الدور الأرضي","fg":"#1E293B"},{"c":"C16","v":"SW2","b":true,"al":"center"},{"c":"D16","v":"حائط قص زلزالي 2 (25×250 سم)","fg":"#1E293B"},{"c":"E16","v":2,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"F16","v":0.25,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G16","v":2.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H16","v":0.625,"f":"=F16*G16","b":true,"al":"center","nf":"#,##0.000"},{"c":"I16","v":3.8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J16","v":0.3,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K16","v":3.5,"f":"=I16-J16","b":true,"al":"center","nf":"#,##0.00"},{"c":"L16","v":4.375,"f":"=E16*H16*K16","b":true,"al":"center","nf":"#,##0.00"},{"c":"M16","v":"خصم سماكة البلاطة الفلات 30 سم","fg":"#1E293B"}]},{"r":17,"h":35.0,"cells":[{"c":"A17","v":13,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B17","v":"الدور الأرضي","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C17","v":"CORE","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D17","v":"كور المصعد بالدور الأرضي","bg":"#F8FAFC","fg":"#1E293B"},{"c":"E17","v":1,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"F17","v":0.25,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G17","v":5.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H17","v":1.375,"f":"=F17*G17","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"I17","v":3.8,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J17","v":0.3,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K17","v":3.5,"f":"=I17-J17","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"L17","v":4.8125,"f":"=E17*H17*K17","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M17","v":"صب متواصل لجدران بئر المصعد","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":18,"h":35.0,"cells":[{"c":"A18","v":14,"b":true,"al":"center"},{"c":"B18","v":"الدور الأول المتكرر","fg":"#1E293B"},{"c":"C18","v":"C1","b":true,"al":"center"},{"c":"D18","v":"أعمدة ركنية (20×50 سم)","fg":"#1E293B"},{"c":"E18","v":8,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"F18","v":0.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G18","v":0.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H18","v":0.1,"f":"=F18*G18","b":true,"al":"center","nf":"#,##0.000"},{"c":"I18","v":3.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J18","v":0.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K18","v":2.7,"f":"=I18-J18","b":true,"al":"center","nf":"#,##0.00"},{"c":"L18","v":2.16,"f":"=E18*H18*K18","b":true,"al":"center","nf":"#,##0.00"},{"c":"M18","v":"ارتفاع حر 2.70 م أسفل كمرات السقف","fg":"#1E293B"}]},{"r":19,"h":35.0,"cells":[{"c":"A19","v":15,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B19","v":"الدور الأول المتكرر","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C19","v":"C2","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D19","v":"أعمدة وسطية (25×60 سم)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"E19","v":12,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"F19","v":0.25,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G19","v":0.6,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H19","v":0.15,"f":"=F19*G19","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"I19","v":3.2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J19","v":0.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K19","v":2.7,"f":"=I19-J19","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"L19","v":4.86,"f":"=E19*H19*K19","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M19","v":"ارتفاع حر 2.70 م","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":20,"h":35.0,"cells":[{"c":"A20","v":16,"b":true,"al":"center"},{"c":"B20","v":"الدور الأول المتكرر","fg":"#1E293B"},{"c":"C20","v":"C3","b":true,"al":"center"},{"c":"D20","v":"أعمدة رئيسية (30×80 سم)","fg":"#1E293B"},{"c":"E20","v":6,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"F20","v":0.3,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G20","v":0.8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H20","v":0.24,"f":"=F20*G20","b":true,"al":"center","nf":"#,##0.000"},{"c":"I20","v":3.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J20","v":0.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K20","v":2.7,"f":"=I20-J20","b":true,"al":"center","nf":"#,##0.00"},{"c":"L20","v":3.888,"f":"=E20*H20*K20","b":true,"al":"center","nf":"#,##0.00"},{"c":"M20","v":"ارتفاع حر 2.70 م","fg":"#1E293B"}]},{"r":21,"h":35.0,"cells":[{"c":"A21","v":17,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B21","v":"الدور الأول المتكرر","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C21","v":"SW1","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D21","v":"حائط قص زلزالي 1","bg":"#F8FAFC","fg":"#1E293B"},{"c":"E21","v":2,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"F21","v":0.25,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G21","v":2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H21","v":0.5,"f":"=F21*G21","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"I21","v":3.2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J21","v":0.25,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K21","v":2.95,"f":"=I21-J21","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"L21","v":2.95,"f":"=E21*H21*K21","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M21","v":"خصم سماكة البلاطة 25 سم","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":22,"h":35.0,"cells":[{"c":"A22","v":18,"b":true,"al":"center"},{"c":"B22","v":"الدور الأول المتكرر","fg":"#1E293B"},{"c":"C22","v":"SW2","b":true,"al":"center"},{"c":"D22","v":"حائط قص زلزالي 2","fg":"#1E293B"},{"c":"E22","v":2,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"F22","v":0.25,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G22","v":2.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H22","v":0.625,"f":"=F22*G22","b":true,"al":"center","nf":"#,##0.000"},{"c":"I22","v":3.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J22","v":0.25,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K22","v":2.95,"f":"=I22-J22","b":true,"al":"center","nf":"#,##0.00"},{"c":"L22","v":3.6875,"f":"=E22*H22*K22","b":true,"al":"center","nf":"#,##0.00"},{"c":"M22","v":"خصم سماكة البلاطة 25 سم","fg":"#1E293B"}]},{"r":23,"h":35.0,"cells":[{"c":"A23","v":19,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B23","v":"الدور الأول المتكرر","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C23","v":"CORE","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D23","v":"كور المصعد بالدور الأول","bg":"#F8FAFC","fg":"#1E293B"},{"c":"E23","v":1,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"F23","v":0.25,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G23","v":5.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H23","v":1.375,"f":"=F23*G23","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"I23","v":3.2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J23","v":0.25,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K23","v":2.95,"f":"=I23-J23","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"L23","v":4.05625,"f":"=E23*H23*K23","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M23","v":"جدران بئر المصعد","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":24,"h":35.0,"cells":[{"c":"A24","v":20,"b":true,"al":"center"},{"c":"B24","v":"الدور الثاني المتكرر","fg":"#1E293B"},{"c":"C24","v":"C1","b":true,"al":"center"},{"c":"D24","v":"أعمدة ركنية (20×50 سم)","fg":"#1E293B"},{"c":"E24","v":8,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"F24","v":0.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G24","v":0.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H24","v":0.1,"f":"=F24*G24","b":true,"al":"center","nf":"#,##0.000"},{"c":"I24","v":3.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J24","v":0.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K24","v":2.7,"f":"=I24-J24","b":true,"al":"center","nf":"#,##0.00"},{"c":"L24","v":2.16,"f":"=E24*H24*K24","b":true,"al":"center","nf":"#,##0.00"},{"c":"M24","v":"ارتفاع حر 2.70 م","fg":"#1E293B"}]},{"r":25,"h":35.0,"cells":[{"c":"A25","v":21,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B25","v":"الدور الثاني المتكرر","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C25","v":"C2","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D25","v":"أعمدة وسطية (25×60 سم)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"E25","v":12,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"F25","v":0.25,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G25","v":0.6,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H25","v":0.15,"f":"=F25*G25","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"I25","v":3.2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J25","v":0.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K25","v":2.7,"f":"=I25-J25","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"L25","v":4.86,"f":"=E25*H25*K25","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M25","v":"ارتفاع حر 2.70 م","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":26,"h":35.0,"cells":[{"c":"A26","v":22,"b":true,"al":"center"},{"c":"B26","v":"الدور الثاني المتكرر","fg":"#1E293B"},{"c":"C26","v":"C3","b":true,"al":"center"},{"c":"D26","v":"أعمدة رئيسية (30×80 سم)","fg":"#1E293B"},{"c":"E26","v":6,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"F26","v":0.3,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G26","v":0.8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H26","v":0.24,"f":"=F26*G26","b":true,"al":"center","nf":"#,##0.000"},{"c":"I26","v":3.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J26","v":0.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K26","v":2.7,"f":"=I26-J26","b":true,"al":"center","nf":"#,##0.00"},{"c":"L26","v":3.888,"f":"=E26*H26*K26","b":true,"al":"center","nf":"#,##0.00"},{"c":"M26","v":"ارتفاع حر 2.70 م","fg":"#1E293B"}]},{"r":27,"h":35.0,"cells":[{"c":"A27","v":23,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B27","v":"الدور الثاني المتكرر","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C27","v":"SW1","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D27","v":"حائط قص زلزالي 1","bg":"#F8FAFC","fg":"#1E293B"},{"c":"E27","v":2,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"F27","v":0.25,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G27","v":2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H27","v":0.5,"f":"=F27*G27","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"I27","v":3.2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J27","v":0.25,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K27","v":2.95,"f":"=I27-J27","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"L27","v":2.95,"f":"=E27*H27*K27","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M27","v":"خصم سماكة البلاطة 25 سم","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":28,"h":35.0,"cells":[{"c":"A28","v":24,"b":true,"al":"center"},{"c":"B28","v":"الدور الثاني المتكرر","fg":"#1E293B"},{"c":"C28","v":"CORE","b":true,"al":"center"},{"c":"D28","v":"كور المصعد بالدور الثاني","fg":"#1E293B"},{"c":"E28","v":1,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"F28","v":0.25,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G28","v":5.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H28","v":1.375,"f":"=F28*G28","b":true,"al":"center","nf":"#,##0.000"},{"c":"I28","v":3.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J28","v":0.25,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K28","v":2.95,"f":"=I28-J28","b":true,"al":"center","nf":"#,##0.00"},{"c":"L28","v":4.05625,"f":"=E28*H28*K28","b":true,"al":"center","nf":"#,##0.00"},{"c":"M28","v":"جدران بئر المصعد","fg":"#1E293B"}]},{"r":29,"h":35.0,"cells":[{"c":"A29","v":25,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B29","v":"الملحق والسطح","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C29","v":"C1","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D29","v":"أعمدة الملحق العلوي (20×50 سم)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"E29","v":6,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"F29","v":0.2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G29","v":0.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H29","v":0.1,"f":"=F29*G29","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"I29","v":3,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J29","v":0.4,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K29","v":2.6,"f":"=I29-J29","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"L29","v":1.56,"f":"=E29*H29*K29","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M29","v":"ارتفاع حر 2.60 م لسقف الملحق","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":30,"h":35.0,"cells":[{"c":"A30","v":26,"b":true,"al":"center"},{"c":"B30","v":"الملحق والسطح","fg":"#1E293B"},{"c":"C30","v":"C2","b":true,"al":"center"},{"c":"D30","v":"أعمدة الملحق الوسطية (25×60 سم)","fg":"#1E293B"},{"c":"E30","v":6,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"F30","v":0.25,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G30","v":0.6,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H30","v":0.15,"f":"=F30*G30","b":true,"al":"center","nf":"#,##0.000"},{"c":"I30","v":3,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J30","v":0.4,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K30","v":2.6,"f":"=I30-J30","b":true,"al":"center","nf":"#,##0.00"},{"c":"L30","v":2.34,"f":"=E30*H30*K30","b":true,"al":"center","nf":"#,##0.00"},{"c":"M30","v":"ارتفاع حر 2.60 م","fg":"#1E293B"}]},{"r":31,"h":35.0,"cells":[{"c":"A31","v":27,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B31","v":"الملحق والسطح","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C31","v":"CORE","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D31","v":"أعمدة وجدران غرفة ماكينة المصعد","bg":"#F8FAFC","fg":"#1E293B"},{"c":"E31","v":1,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"F31","v":0.25,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G31","v":5.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H31","v":1.375,"f":"=F31*G31","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"I31","v":3.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J31","v":0.3,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K31","v":3.2,"f":"=I31-J31","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"L31","v":4.4,"f":"=E31*H31*K31","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M31","v":"ارتفاع حر 3.20 م لغرفة الماكينة العلوية","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":32,"h":42.0,"cells":[{"c":"A32","v":"الإجمالي العام لحصر كميات خرسانة الأعمدة وحوائط القص","bg":"#065F46","fg":"#FFFFFF","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"E32","v":141,"f":"=SUM(E5:E31)","bg":"#065F46","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"F32","v":"—","bg":"#065F46","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G32","v":"—","bg":"#065F46","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H32","v":"—","bg":"#065F46","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I32","v":"—","bg":"#065F46","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J32","v":"—","bg":"#065F46","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K32","v":"—","bg":"#065F46","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L32","v":87.465401,"f":"=SUM(L5:L31)","bg":"#065F46","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"M32","v":"متر مكعب خرسانة صافية دون هالك","bg":"#065F46","fg":"#FFFFFF","b":true,"al":"center"}]}]},{"name":"Summary_Dashboard","maxRow":22,"maxCol":7,"colWidths":[6.0,42.0,22.0,24.0,24.0,26.0,28.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"لوحة المتابعة والمؤشرات التنفيذية والتكلفة التقديرية لخرسانة الأعمدة","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"ملخص الحجوم الخرسانية الصافية، نسبة الهالك، تكلفة التوريد والمصنعية، وتوزيع الكميات حسب الطوابق الإنشائية","bg":"#1E3A8A","fg":"#E2E8F0","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":""},{"c":"B4","v":"إجمالي حجم الخرسانة الصافي","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true},{"c":"D4","v":"إجمالي أمر التوريد شاملاً الهالك (3%)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true},{"c":"F4","v":"إجمالي عدد الأعمدة والحوائط","bg":"#065F46","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true}]},{"r":5,"h":46.0,"cells":[{"c":"A5","v":""},{"c":"B5","v":87.465401,"f":"=Columns_QTO!L32","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.00","cs":2},{"skip":true},{"c":"D5","v":91,"f":"=ROUNDUP(B5*1.03, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0","cs":2},{"skip":true},{"c":"F5","v":141,"f":"=Columns_QTO!E32","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0","cs":2},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":""},{"c":"B6","v":"متر مكعب (م³) بعد خصم الأسقف","bg":"#F0F9FF","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"D6","v":"م³ خرسانة جاهزة مطلوبة للمضخة","bg":"#F8FAFC","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"F6","v":"عنصر رأسي لكافة أدوار المبنى","bg":"#ECFDF5","fg":"#475569","al":"center","cs":2},{"skip":true}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"توزيع كميات الخرسانة والتكلفة التقديرية حسب الأدوار الإنشائية","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":40.0,"cells":[{"c":"A9","v":"م","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"الدور / المنسوب الإنشائي","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"عدد الأعمدة والحوائط","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"حجم الخرسانة الصافي (م³)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"حجم الصب مع الهالك 3% (م³)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"متوسط سعر المتر شامل الصب (ر.س)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"التكلفة الإجمالية التقديرية (ر.س)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":10,"h":35.0,"cells":[{"c":"A10","v":1,"b":true,"al":"center"},{"c":"B10","v":"رقاب الأعمدة (Pedestals أسفل الميدة)","b":true},{"c":"C10","v":33,"f":"=SUM(Columns_QTO!E5:E10)","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D10","v":11.520634,"f":"=SUM(Columns_QTO!L5:L10)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E10","v":11.9,"f":"=ROUNDUP(D10*1.03, 1)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F10","v":380,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G10","v":4522,"f":"=E10*F10","b":true,"al":"center","nf":"#,##0.00"}]},{"r":11,"h":35.0,"cells":[{"c":"A11","v":2,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":"أعمدة وحوائط الدور الأرضي","bg":"#F8FAFC","b":true},{"c":"C11","v":35,"f":"=SUM(Columns_QTO!E11:E17)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D11","v":28.128767,"f":"=SUM(Columns_QTO!L11:L17)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E11","v":29,"f":"=ROUNDUP(D11*1.03, 1)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F11","v":435,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G11","v":12615,"f":"=E11*F11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"}]},{"r":12,"h":35.0,"cells":[{"c":"A12","v":3,"b":true,"al":"center"},{"c":"B12","v":"أعمدة وحوائط الدور الأول المتكرر","b":true},{"c":"C12","v":31,"f":"=SUM(Columns_QTO!E18:E23)","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D12","v":21.60175,"f":"=SUM(Columns_QTO!L18:L23)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E12","v":22.3,"f":"=ROUNDUP(D12*1.03, 1)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F12","v":420,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G12","v":9366,"f":"=E12*F12","b":true,"al":"center","nf":"#,##0.00"}]},{"r":13,"h":35.0,"cells":[{"c":"A13","v":4,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":"أعمدة وحوائط الدور الثاني المتكرر","bg":"#F8FAFC","b":true},{"c":"C13","v":29,"f":"=SUM(Columns_QTO!E24:E28)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D13","v":17.91425,"f":"=SUM(Columns_QTO!L24:L28)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E13","v":18.5,"f":"=ROUNDUP(D13*1.03, 1)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F13","v":420,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G13","v":7770,"f":"=E13*F13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"}]},{"r":14,"h":35.0,"cells":[{"c":"A14","v":5,"b":true,"al":"center"},{"c":"B14","v":"أعمدة وغرفة ماكينة الملحق والسطح","b":true},{"c":"C14","v":13,"f":"=SUM(Columns_QTO!E29:E31)","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D14","v":8.3,"f":"=SUM(Columns_QTO!L29:L31)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E14","v":8.6,"f":"=ROUNDUP(D14*1.03, 1)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F14","v":420,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G14","v":3612,"f":"=E14*F14","b":true,"al":"center","nf":"#,##0.00"}]},{"r":15,"h":42.0,"cells":[{"c":"A15","v":"الإجمالي الكلي لخرسانة الأعمدة وحوائط القص للمشروع","bg":"#065F46","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true},{"c":"C15","v":141,"f":"=SUM(C10:C14)","bg":"#065F46","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"D15","v":87.465401,"f":"=SUM(D10:D14)","bg":"#065F46","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E15","v":90.3,"f":"=SUM(E10:E14)","bg":"#065F46","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F15","v":"—","bg":"#065F46","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G15","v":37885,"f":"=SUM(G10:G14)","bg":"#065F46","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":16,"h":28.0,"cells":[{"c":"A16","v":""},{"c":"B16","v":""},{"c":"C16","v":""},{"c":"D16","v":""},{"c":"E16","v":""},{"c":"F16","v":""},{"c":"G16","v":""}]},{"r":17,"h":38.0,"cells":[{"c":"A17","v":"الاشتراطات الهندسية وضوابط صب خرسانة الأعمدة طبقاً للكود السعودي SBC 304","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":"1. تحديد منسوب صب العمود بدقة عند منسوب قاع أعمق كمرة متصلة بالعمود، مع خصم سماكة البلاطة والكمرات من الحصر.","bg":"#F8FAFC","fg":"#1E293B","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":"2. استخدام هزاز ميكانيكي (Poker Vibrator) بإبرة 35-50 مم والدمك على طبقات لا تتجاوز 50 سم لمنع التعشيش والانفصال الحبيبي.","bg":"#F8FAFC","fg":"#1E293B","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":"3. الالتزام بتركيب بسكويت خرساني أو بلاستيكي لا يقل عن 25 مم لضمان الغطاء الخرساني (Cover) وحماية كانات الأعمدة.","bg":"#F8FAFC","fg":"#1E293B","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":"4. التحقق من شاقولية نجارة العمود بميزان الخيط من جانبين متعامدين وتدعيم الحطات المعدنية لضمان عدم الميلان.","bg":"#F8FAFC","fg":"#1E293B","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":"5. رش قوالب الأعمدة الخرسانية بالماء المستمر مرتين يومياً لمدة 7 أيام متتالية بعد فك الشدات الخشبية (بعد 24-48 ساعة).","bg":"#F8FAFC","fg":"#1E293B","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]}]}]}