{"slug":"columns-ties-bbs","sheets":[{"name":"لوحة المؤشرات وملخص التوريد","maxRow":28,"maxCol":10,"colWidths":[6.0,16.0,18.0,20.0,20.0,20.0,20.0,16.0,22.0,24.0],"rows":[{"r":1,"h":38.0,"cells":[{"c":"A1","v":"شيت تفريد وحصر حديد الأعمدة وحساب طول الكانات الإنشائية والزلزالية","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"حساب دقيق لأشاير الأعمدة والتجنيب والوصلات المتراكبة وتكثيف الكانات ومحيط الكانات المركبة","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"اسم المشروع:","b":true},{"c":"B4","v":"مشروع إنشاء برج الفخامة السكني (أرضي + 8 أدوار متكررة)","al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"F4","v":"تاريخ الحصر:","b":true},{"c":"G4","v":"2026-10-01","al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"استشاري المشروع:","b":true},{"c":"B5","v":"مكتب دار الهندسة والإنشاءات الاستشارية","al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"F5","v":"رقم الإصدار:","b":true},{"c":"G5","v":"Rev 01 - معتمد للتشغيل","al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":6,"h":72.0,"cells":[{"c":"A6","v":"المقاول العام:","b":true},{"c":"B6","v":"شركة الأفق للمقاولات والتطوير العقاري","al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"F6","v":"الكود المعتمد:","b":true},{"c":"G6","v":"ECP 203 (المصري) / SBC 304 (السعودي) / ACI 318","al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""},{"c":"I7","v":""},{"c":"J7","v":""}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"إجمالي حديد الأعمدة الصافي","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C8","v":"الوزن الإجمالي شامل الهالك","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"E8","v":"إجمالي عدد الأسياخ القياسية (12م)","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H8","v":"التكلفة التقديرية للحديد","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":9,"h":28.0,"cells":[{"c":"A9","v":4.862884,"f":"=G23","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"0.000","cs":2},{"skip":true},{"c":"C9","v":5.104648,"f":"=I23","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"0.000","cs":2},{"skip":true},{"c":"E9","v":975,"f":"=J23","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0","cs":3},{"skip":true},{"skip":true},{"c":"H9","v":178662.68,"f":"=I23*35000","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0","cs":3},{"skip":true},{"skip":true}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":"طن متري صافي","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C10","v":"طن شامل هالك 4.5%","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"E10","v":"سيخ 12م للطلبية","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H10","v":"جنيه/ريال (فئة 35,000)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":11,"h":28.0,"cells":[{"c":"A11","v":""},{"c":"B11","v":""},{"c":"C11","v":""},{"c":"D11","v":""},{"c":"E11","v":""},{"c":"F11","v":""},{"c":"G11","v":""},{"c":"H11","v":""},{"c":"I11","v":""},{"c":"J11","v":""}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":"📌 ملخص طلبيات وتوريد حديد الأعمدة والكانات بالأقطار والهالك","fg":"#1E293B","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":"م","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B13","v":"قطر السيخ (Φ ملم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C13","v":"وزن المتر الطولي (كجم/م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D13","v":"طول الحديد الطولي (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E13","v":"إجمالي طول الكانات (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F13","v":"إجمالي الطول الكلي (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G13","v":"إجمالي الوزن الصافي (طن)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H13","v":"نسبة الهالك المقدرة (%)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I13","v":"إجمالي وزن الطلبية شامل الهالك (طن)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J13","v":"عدد الأسياخ القياسية (12 م) المطلوبة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":1,"al":"center"},{"c":"B14","v":"Φ 8","al":"center"},{"c":"C14","v":0.395,"f":"=ROUND((8^2)/162, 3)","al":"center","nf":"0.000"},{"c":"D14","v":0,"f":"=SUMIF('تفريد حديد الأعمدة الطولي'!$I$6:$I$30, 8, 'تفريد حديد الأعمدة الطولي'!$P$6:$P$30)","al":"center","nf":"#,##0.00"},{"c":"E14","v":9400.44,"f":"=SUMIF('حساب وتفصيل كانات الأعمدة'!$I$6:$I$30, 8, 'حساب وتفصيل كانات الأعمدة'!$T$6:$T$30)","al":"center","nf":"#,##0.00"},{"c":"F14","v":9400.44,"f":"=D14+E14","b":true,"al":"center","nf":"#,##0.00"},{"c":"G14","v":3.713174,"f":"=(F14*C14)/1000","b":true,"al":"center","nf":"0.000"},{"c":"H14","v":0.05,"in":true,"al":"center","nf":"0.0%"},{"c":"I14","v":3.898833,"f":"=G14*(1+H14)","fg":"#065F46","b":true,"al":"center","nf":"0.000"},{"c":"J14","v":823,"f":"=ROUNDUP((F14*(1+H14))/12, 0)","b":true,"al":"center","nf":"#,##0"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":2,"bg":"#F8FAFC","al":"center"},{"c":"B15","v":"Φ 10","bg":"#F8FAFC","al":"center"},{"c":"C15","v":0.617,"f":"=ROUND((10^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"D15","v":0,"f":"=SUMIF('تفريد حديد الأعمدة الطولي'!$I$6:$I$30, 10, 'تفريد حديد الأعمدة الطولي'!$P$6:$P$30)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E15","v":1639.68,"f":"=SUMIF('حساب وتفصيل كانات الأعمدة'!$I$6:$I$30, 10, 'حساب وتفصيل كانات الأعمدة'!$T$6:$T$30)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"F15","v":1639.68,"f":"=D15+E15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G15","v":1.011683,"f":"=(F15*C15)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"H15","v":0.05,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0%"},{"c":"I15","v":1.062267,"f":"=G15*(1+H15)","bg":"#F8FAFC","fg":"#065F46","b":true,"al":"center","nf":"0.000"},{"c":"J15","v":144,"f":"=ROUNDUP((F15*(1+H15))/12, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":3,"al":"center"},{"c":"B16","v":"Φ 12","al":"center"},{"c":"C16","v":0.889,"f":"=ROUND((12^2)/162, 3)","al":"center","nf":"0.000"},{"c":"D16","v":0,"f":"=SUMIF('تفريد حديد الأعمدة الطولي'!$I$6:$I$30, 12, 'تفريد حديد الأعمدة الطولي'!$P$6:$P$30)","al":"center","nf":"#,##0.00"},{"c":"E16","v":0,"f":"=SUMIF('حساب وتفصيل كانات الأعمدة'!$I$6:$I$30, 12, 'حساب وتفصيل كانات الأعمدة'!$T$6:$T$30)","al":"center","nf":"#,##0.00"},{"c":"F16","v":0,"f":"=D16+E16","b":true,"al":"center","nf":"#,##0.00"},{"c":"G16","v":0,"f":"=(F16*C16)/1000","b":true,"al":"center","nf":"0.000"},{"c":"H16","v":0.04,"in":true,"al":"center","nf":"0.0%"},{"c":"I16","v":0,"f":"=G16*(1+H16)","fg":"#065F46","b":true,"al":"center","nf":"0.000"},{"c":"J16","v":0,"f":"=ROUNDUP((F16*(1+H16))/12, 0)","b":true,"al":"center","nf":"#,##0"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":4,"bg":"#F8FAFC","al":"center"},{"c":"B17","v":"Φ 14","bg":"#F8FAFC","al":"center"},{"c":"C17","v":1.21,"f":"=ROUND((14^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"D17","v":0,"f":"=SUMIF('تفريد حديد الأعمدة الطولي'!$I$6:$I$30, 14, 'تفريد حديد الأعمدة الطولي'!$P$6:$P$30)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E17","v":0,"f":"=SUMIF('حساب وتفصيل كانات الأعمدة'!$I$6:$I$30, 14, 'حساب وتفصيل كانات الأعمدة'!$T$6:$T$30)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"F17","v":0,"f":"=D17+E17","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G17","v":0,"f":"=(F17*C17)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"H17","v":0.04,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0%"},{"c":"I17","v":0,"f":"=G17*(1+H17)","bg":"#F8FAFC","fg":"#065F46","b":true,"al":"center","nf":"0.000"},{"c":"J17","v":0,"f":"=ROUNDUP((F17*(1+H17))/12, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":5,"al":"center"},{"c":"B18","v":"Φ 16","al":"center"},{"c":"C18","v":1.58,"f":"=ROUND((16^2)/162, 3)","al":"center","nf":"0.000"},{"c":"D18","v":25.74,"f":"=SUMIF('تفريد حديد الأعمدة الطولي'!$I$6:$I$30, 16, 'تفريد حديد الأعمدة الطولي'!$P$6:$P$30)","al":"center","nf":"#,##0.00"},{"c":"E18","v":0,"f":"=SUMIF('حساب وتفصيل كانات الأعمدة'!$I$6:$I$30, 16, 'حساب وتفصيل كانات الأعمدة'!$T$6:$T$30)","al":"center","nf":"#,##0.00"},{"c":"F18","v":25.74,"f":"=D18+E18","b":true,"al":"center","nf":"#,##0.00"},{"c":"G18","v":0.040669,"f":"=(F18*C18)/1000","b":true,"al":"center","nf":"0.000"},{"c":"H18","v":0.04,"in":true,"al":"center","nf":"0.0%"},{"c":"I18","v":0.042296,"f":"=G18*(1+H18)","fg":"#065F46","b":true,"al":"center","nf":"0.000"},{"c":"J18","v":3,"f":"=ROUNDUP((F18*(1+H18))/12, 0)","b":true,"al":"center","nf":"#,##0"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":6,"bg":"#F8FAFC","al":"center"},{"c":"B19","v":"Φ 18","bg":"#F8FAFC","al":"center"},{"c":"C19","v":2,"f":"=ROUND((18^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"D19","v":28.68,"f":"=SUMIF('تفريد حديد الأعمدة الطولي'!$I$6:$I$30, 18, 'تفريد حديد الأعمدة الطولي'!$P$6:$P$30)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E19","v":0,"f":"=SUMIF('حساب وتفصيل كانات الأعمدة'!$I$6:$I$30, 18, 'حساب وتفصيل كانات الأعمدة'!$T$6:$T$30)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"F19","v":28.68,"f":"=D19+E19","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G19","v":0.05736,"f":"=(F19*C19)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"H19","v":0.04,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0%"},{"c":"I19","v":0.059654,"f":"=G19*(1+H19)","bg":"#F8FAFC","fg":"#065F46","b":true,"al":"center","nf":"0.000"},{"c":"J19","v":3,"f":"=ROUNDUP((F19*(1+H19))/12, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":7,"al":"center"},{"c":"B20","v":"Φ 20","al":"center"},{"c":"C20","v":2.469,"f":"=ROUND((20^2)/162, 3)","al":"center","nf":"0.000"},{"c":"D20","v":16.2,"f":"=SUMIF('تفريد حديد الأعمدة الطولي'!$I$6:$I$30, 20, 'تفريد حديد الأعمدة الطولي'!$P$6:$P$30)","al":"center","nf":"#,##0.00"},{"c":"E20","v":0,"f":"=SUMIF('حساب وتفصيل كانات الأعمدة'!$I$6:$I$30, 20, 'حساب وتفصيل كانات الأعمدة'!$T$6:$T$30)","al":"center","nf":"#,##0.00"},{"c":"F20","v":16.2,"f":"=D20+E20","b":true,"al":"center","nf":"#,##0.00"},{"c":"G20","v":0.039998,"f":"=(F20*C20)/1000","b":true,"al":"center","nf":"0.000"},{"c":"H20","v":0.04,"in":true,"al":"center","nf":"0.0%"},{"c":"I20","v":0.041598,"f":"=G20*(1+H20)","fg":"#065F46","b":true,"al":"center","nf":"0.000"},{"c":"J20","v":2,"f":"=ROUNDUP((F20*(1+H20))/12, 0)","b":true,"al":"center","nf":"#,##0"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":8,"bg":"#F8FAFC","al":"center"},{"c":"B21","v":"Φ 22","bg":"#F8FAFC","al":"center"},{"c":"C21","v":2.988,"f":"=ROUND((22^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"D21","v":0,"f":"=SUMIF('تفريد حديد الأعمدة الطولي'!$I$6:$I$30, 22, 'تفريد حديد الأعمدة الطولي'!$P$6:$P$30)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E21","v":0,"f":"=SUMIF('حساب وتفصيل كانات الأعمدة'!$I$6:$I$30, 22, 'حساب وتفصيل كانات الأعمدة'!$T$6:$T$30)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"F21","v":0,"f":"=D21+E21","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G21","v":0,"f":"=(F21*C21)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"H21","v":0.04,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0%"},{"c":"I21","v":0,"f":"=G21*(1+H21)","bg":"#F8FAFC","fg":"#065F46","b":true,"al":"center","nf":"0.000"},{"c":"J21","v":0,"f":"=ROUNDUP((F21*(1+H21))/12, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":9,"al":"center"},{"c":"B22","v":"Φ 25","al":"center"},{"c":"C22","v":3.858,"f":"=ROUND((25^2)/162, 3)","al":"center","nf":"0.000"},{"c":"D22","v":0,"f":"=SUMIF('تفريد حديد الأعمدة الطولي'!$I$6:$I$30, 25, 'تفريد حديد الأعمدة الطولي'!$P$6:$P$30)","al":"center","nf":"#,##0.00"},{"c":"E22","v":0,"f":"=SUMIF('حساب وتفصيل كانات الأعمدة'!$I$6:$I$30, 25, 'حساب وتفصيل كانات الأعمدة'!$T$6:$T$30)","al":"center","nf":"#,##0.00"},{"c":"F22","v":0,"f":"=D22+E22","b":true,"al":"center","nf":"#,##0.00"},{"c":"G22","v":0,"f":"=(F22*C22)/1000","b":true,"al":"center","nf":"0.000"},{"c":"H22","v":0.04,"in":true,"al":"center","nf":"0.0%"},{"c":"I22","v":0,"f":"=G22*(1+H22)","fg":"#065F46","b":true,"al":"center","nf":"0.000"},{"c":"J22","v":0,"f":"=ROUNDUP((F22*(1+H22))/12, 0)","b":true,"al":"center","nf":"#,##0"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":"الإجمالي الكلي","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D23","v":70.62,"f":"=SUM(D14:D22)","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0.00"},{"c":"E23","v":11040.12,"f":"=SUM(E14:E22)","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0.00"},{"c":"F23","v":11110.74,"f":"=SUM(F14:F22)","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0.00"},{"c":"G23","v":4.862884,"f":"=SUM(G14:G22)","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"0.000"},{"c":"H23","v":"-","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center"},{"c":"I23","v":5.104648,"f":"=SUM(I14:I22)","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"0.000"},{"c":"J23","v":975,"f":"=SUM(J14:J22)","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"}]},{"r":24,"h":28.0,"cells":[{"c":"A24","v":""},{"c":"B24","v":""},{"c":"C24","v":""},{"c":"D24","v":""},{"c":"E24","v":""},{"c":"F24","v":""},{"c":"G24","v":""},{"c":"H24","v":""},{"c":"I24","v":""},{"c":"J24","v":""}]},{"r":25,"h":28.0,"cells":[{"c":"A25","v":""},{"c":"B25","v":""},{"c":"C25","v":""},{"c":"D25","v":""},{"c":"E25","v":""},{"c":"F25","v":""},{"c":"G25","v":""},{"c":"H25","v":""},{"c":"I25","v":""},{"c":"J25","v":""}]},{"r":26,"h":128.0,"cells":[{"c":"A26","v":"مهندس المكتب الفني (إعداد وحصر):","b":true,"al":"center"},{"c":"B26","v":""},{"c":"C26","v":""},{"c":"D26","v":"مدير المشروع (مراجعة وتدقيق):","b":true,"al":"center"},{"c":"E26","v":""},{"c":"F26","v":""},{"c":"G26","v":""},{"c":"H26","v":"استشاري المشروع (اعتماد التنفيذ):","b":true,"al":"center"},{"c":"I26","v":""},{"c":"J26","v":""}]},{"r":27,"h":28.0,"cells":[{"c":"A27","v":""},{"c":"B27","v":""},{"c":"C27","v":""},{"c":"D27","v":""},{"c":"E27","v":""},{"c":"F27","v":""},{"c":"G27","v":""},{"c":"H27","v":""},{"c":"I27","v":""},{"c":"J27","v":""}]},{"r":28,"h":248.0,"cells":[{"c":"A28","v":"الاسم والتوقيع: .......................................","al":"center"},{"c":"B28","v":""},{"c":"C28","v":""},{"c":"D28","v":"الاسم والتوقيع: .......................................","al":"center"},{"c":"E28","v":""},{"c":"F28","v":""},{"c":"G28","v":""},{"c":"H28","v":"الختم والاعتماد: .......................................","al":"center"},{"c":"I28","v":""},{"c":"J28","v":""}]}]},{"name":"تفريد حديد الأعمدة الطولي","maxRow":21,"maxCol":20,"colWidths":[5.0,12.0,14.0,10.0,9.0,9.0,10.0,16.0,10.0,12.0,12.0,13.0,11.0,12.0,11.0,13.0,15.0,13.0,14.0,22.0],"rows":[{"r":1,"h":36.0,"cells":[{"c":"A1","v":"جدول تفريد وتفصيل حديد التسليح الطولي للأعمدة (Columns Longitudinal Rebar BBS)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":20},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"حساب أشاير الأساسات + ارتفاع الطابق الخالص + سمك البلاطة + طول وصلة التراكب (Lap Splice = 60Φ) + تجنيب الأسياخ (Cranking 1:6)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center","cs":20},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""},{"c":"N3","v":""},{"c":"O3","v":""},{"c":"P3","v":""},{"c":"Q3","v":""},{"c":"R3","v":""},{"c":"S3","v":""},{"c":"T3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"م","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"B4","v":"نموذج العمود","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"C4","v":"الدور / المنسوب","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"D4","v":"العدد المتكرر","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"E4","v":"أبعاد العمود والارتفاع (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H4","v":"موضع وطبقة السيخ","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"I4","v":"القطر Φ (ملم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"J4","v":"الأسياخ بالمقطع","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"K4","v":"إجمالي الأسياخ","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"L4","v":"طول الوصلة Lap (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"M4","v":"تفاصيل وتشكيل أضلاع السيخ (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"P4","v":"طول القطعية (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"Q4","v":"إجمالي الأطوال (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"R4","v":"وزن المتر (كجم/م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"S4","v":"الوزن الكلي (طن)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"T4","v":"ملاحظات الوصلات والتجنيب","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2}]},{"r":5,"h":52.0,"cells":[{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"E5","v":"عرض b","bg":"#E2E8F0","fg":"#334155","b":true,"al":"center"},{"c":"F5","v":"عمق t","bg":"#E2E8F0","fg":"#334155","b":true,"al":"center"},{"c":"G5","v":"ارتفاع H","bg":"#E2E8F0","fg":"#334155","b":true,"al":"center"},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"M5","v":"رجل/إشارة (Ld)","bg":"#E2E8F0","fg":"#334155","b":true,"al":"center"},{"c":"N5","v":"طول السيخ بالدور","bg":"#E2E8F0","fg":"#334155","b":true,"al":"center"},{"c":"O5","v":"وصلة/تكسيح","bg":"#E2E8F0","fg":"#334155","b":true,"al":"center"},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":1,"al":"center"},{"c":"B6","v":"ع1","b":true,"al":"center"},{"c":"C6","v":"أشاير أساسات ➔ أرضي"},{"c":"D6","v":6,"in":true,"al":"center"},{"c":"E6","v":0.3,"in":true,"al":"center"},{"c":"F6","v":0.6,"in":true,"al":"center"},{"c":"G6","v":4,"in":true,"al":"center"},{"c":"H6","v":"أشاير قواعد (Starter)"},{"c":"I6","v":16,"in":true,"b":true,"al":"center"},{"c":"J6","v":10,"in":true,"al":"center"},{"c":"K6","v":60,"f":"=D6*J6","b":true,"al":"center"},{"c":"L6","v":0.96,"f":"=60*(I6/1000)","al":"center","nf":"0.00"},{"c":"M6","v":0.5,"f":"=0.50","al":"center","nf":"0.00"},{"c":"N6","v":4,"f":"=G6","al":"center","nf":"0.00"},{"c":"O6","v":0.96,"f":"=L6","al":"center","nf":"0.00"},{"c":"P6","v":5.46,"f":"=ROUND(M6+N6+O6, 2)","b":true,"al":"center","nf":"0.00"},{"c":"Q6","v":327.6,"f":"=K6*P6","b":true,"al":"center","nf":"#,##0.00"},{"c":"R6","v":1.58,"f":"=ROUND((I6^2)/162, 3)","al":"center","nf":"0.000"},{"c":"S6","v":0.517608,"f":"=(Q6*R6)/1000","b":true,"al":"center","nf":"0.000"},{"c":"T6","v":"رجل قائمة 50 سم بقاع القاعدة + تراكب 60Φ"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":2,"bg":"#F8FAFC","al":"center"},{"c":"B7","v":"ع1","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C7","v":"الدور الأرضي","bg":"#F8FAFC"},{"c":"D7","v":6,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E7","v":0.3,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F7","v":0.6,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G7","v":3.8,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H7","v":"حديد طولي كامل","bg":"#F8FAFC"},{"c":"I7","v":16,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"J7","v":10,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"K7","v":60,"f":"=D7*J7","bg":"#F8FAFC","b":true,"al":"center"},{"c":"L7","v":0.96,"f":"=60*(I7/1000)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"M7","v":0,"f":"=0.00","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"N7","v":3.8,"f":"=G7","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"O7","v":0.96,"f":"=L7","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"P7","v":4.76,"f":"=ROUND(M7+N7+O7, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"Q7","v":285.6,"f":"=K7*P7","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"R7","v":1.58,"f":"=ROUND((I7^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"S7","v":0.451248,"f":"=(Q7*R7)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"T7","v":"وصلة تراكب فوق بلاطة الأرضي بمسافة 60Φ","bg":"#F8FAFC"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":3,"al":"center"},{"c":"B8","v":"ع1","b":true,"al":"center"},{"c":"C8","v":"متكرر (أول - رابع)"},{"c":"D8","v":24,"in":true,"al":"center"},{"c":"E8","v":0.3,"in":true,"al":"center"},{"c":"F8","v":0.6,"in":true,"al":"center"},{"c":"G8","v":3.2,"in":true,"al":"center"},{"c":"H8","v":"حديد طولي متكرر"},{"c":"I8","v":16,"in":true,"b":true,"al":"center"},{"c":"J8","v":10,"in":true,"al":"center"},{"c":"K8","v":240,"f":"=D8*J8","b":true,"al":"center"},{"c":"L8","v":0.96,"f":"=60*(I8/1000)","al":"center","nf":"0.00"},{"c":"M8","v":0,"f":"=0.00","al":"center","nf":"0.00"},{"c":"N8","v":3.2,"f":"=G8","al":"center","nf":"0.00"},{"c":"O8","v":0.96,"f":"=L8","al":"center","nf":"0.00"},{"c":"P8","v":4.16,"f":"=ROUND(M8+N8+O8, 2)","b":true,"al":"center","nf":"0.00"},{"c":"Q8","v":998.4,"f":"=K8*P8","b":true,"al":"center","nf":"#,##0.00"},{"c":"R8","v":1.58,"f":"=ROUND((I8^2)/162, 3)","al":"center","nf":"0.000"},{"c":"S8","v":1.577472,"f":"=(Q8*R8)/1000","b":true,"al":"center","nf":"0.000"},{"c":"T8","v":"تجنيب 1:6 عند استمرار القطاع للعلوي"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":4,"bg":"#F8FAFC","al":"center"},{"c":"B9","v":"ع1","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C9","v":"الدور الأخير (سطح)","bg":"#F8FAFC"},{"c":"D9","v":6,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E9","v":0.3,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F9","v":0.6,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G9","v":3.2,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H9","v":"نهاية عمود (قفل زاوية)","bg":"#F8FAFC"},{"c":"I9","v":16,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"J9","v":10,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"K9","v":60,"f":"=D9*J9","bg":"#F8FAFC","b":true,"al":"center"},{"c":"L9","v":0.4,"f":"=0.40","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"M9","v":0,"f":"=0.00","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"N9","v":3.2,"f":"=G9","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"O9","v":0.4,"f":"=L9","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"P9","v":3.6,"f":"=ROUND(M9+N9+O9, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"Q9","v":216,"f":"=K9*P9","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"R9","v":1.58,"f":"=ROUND((I9^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"S9","v":0.34128,"f":"=(Q9*R9)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"T9","v":"ثني الأسياخ برجل أفقية 40 سم داخل كمرة السطح","bg":"#F8FAFC"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":5,"al":"center"},{"c":"B10","v":"ع2","b":true,"al":"center"},{"c":"C10","v":"أشاير أساسات ➔ أرضي"},{"c":"D10","v":8,"in":true,"al":"center"},{"c":"E10","v":0.3,"in":true,"al":"center"},{"c":"F10","v":0.8,"in":true,"al":"center"},{"c":"G10","v":4.2,"in":true,"al":"center"},{"c":"H10","v":"أشاير قواعد (Starter)"},{"c":"I10","v":18,"in":true,"b":true,"al":"center"},{"c":"J10","v":14,"in":true,"al":"center"},{"c":"K10","v":112,"f":"=D10*J10","b":true,"al":"center"},{"c":"L10","v":1.08,"f":"=60*(I10/1000)","al":"center","nf":"0.00"},{"c":"M10","v":0.6,"f":"=0.60","al":"center","nf":"0.00"},{"c":"N10","v":4.2,"f":"=G10","al":"center","nf":"0.00"},{"c":"O10","v":1.08,"f":"=L10","al":"center","nf":"0.00"},{"c":"P10","v":5.88,"f":"=ROUND(M10+N10+O10, 2)","b":true,"al":"center","nf":"0.00"},{"c":"Q10","v":658.56,"f":"=K10*P10","b":true,"al":"center","nf":"#,##0.00"},{"c":"R10","v":2,"f":"=ROUND((I10^2)/162, 3)","al":"center","nf":"0.000"},{"c":"S10","v":1.31712,"f":"=(Q10*R10)/1000","b":true,"al":"center","nf":"0.000"},{"c":"T10","v":"رجل بقاع القاعدة 60 سم + تراكب"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":6,"bg":"#F8FAFC","al":"center"},{"c":"B11","v":"ع2","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C11","v":"الدور الأرضي","bg":"#F8FAFC"},{"c":"D11","v":8,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E11","v":0.3,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F11","v":0.8,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G11","v":4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H11","v":"حديد طولي كامل","bg":"#F8FAFC"},{"c":"I11","v":18,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"J11","v":14,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"K11","v":112,"f":"=D11*J11","bg":"#F8FAFC","b":true,"al":"center"},{"c":"L11","v":1.08,"f":"=60*(I11/1000)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"M11","v":0,"f":"=0.00","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"N11","v":4,"f":"=G11","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"O11","v":1.08,"f":"=L11","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"P11","v":5.08,"f":"=ROUND(M11+N11+O11, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"Q11","v":568.96,"f":"=K11*P11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"R11","v":2,"f":"=ROUND((I11^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"S11","v":1.13792,"f":"=(Q11*R11)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"T11","v":"توزيع منتظم بالمقطع مع الحفاظ على المسافات","bg":"#F8FAFC"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":7,"al":"center"},{"c":"B12","v":"ع2","b":true,"al":"center"},{"c":"C12","v":"متكرر (أول - رابع)"},{"c":"D12","v":32,"in":true,"al":"center"},{"c":"E12","v":0.3,"in":true,"al":"center"},{"c":"F12","v":0.8,"in":true,"al":"center"},{"c":"G12","v":3.2,"in":true,"al":"center"},{"c":"H12","v":"حديد طولي متكرر"},{"c":"I12","v":18,"in":true,"b":true,"al":"center"},{"c":"J12","v":14,"in":true,"al":"center"},{"c":"K12","v":448,"f":"=D12*J12","b":true,"al":"center"},{"c":"L12","v":1.08,"f":"=60*(I12/1000)","al":"center","nf":"0.00"},{"c":"M12","v":0,"f":"=0.00","al":"center","nf":"0.00"},{"c":"N12","v":3.2,"f":"=G12","al":"center","nf":"0.00"},{"c":"O12","v":1.08,"f":"=L12","al":"center","nf":"0.00"},{"c":"P12","v":4.28,"f":"=ROUND(M12+N12+O12, 2)","b":true,"al":"center","nf":"0.00"},{"c":"Q12","v":1917.44,"f":"=K12*P12","b":true,"al":"center","nf":"#,##0.00"},{"c":"R12","v":2,"f":"=ROUND((I12^2)/162, 3)","al":"center","nf":"0.000"},{"c":"S12","v":3.83488,"f":"=(Q12*R12)/1000","b":true,"al":"center","nf":"0.000"},{"c":"T12","v":"وصلة تبادلية (Staggered Splice) كل سيخين"}]},{"r":13,"h":72.0,"cells":[{"c":"A13","v":8,"bg":"#F8FAFC","al":"center"},{"c":"B13","v":"ع2","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C13","v":"متكرر (خامس - ثامن)","bg":"#F8FAFC"},{"c":"D13","v":32,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E13","v":0.3,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F13","v":0.7,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G13","v":3.2,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H13","v":"تخفيض قطاع (قص عمود)","bg":"#F8FAFC"},{"c":"I13","v":16,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"J13","v":12,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"K13","v":384,"f":"=D13*J13","bg":"#F8FAFC","b":true,"al":"center"},{"c":"L13","v":0.96,"f":"=60*(I13/1000)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"M13","v":0,"f":"=0.00","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"N13","v":3.2,"f":"=G13","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"O13","v":0.96,"f":"=L13","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"P13","v":4.16,"f":"=ROUND(M13+N13+O13, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"Q13","v":1597.44,"f":"=K13*P13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"R13","v":1.58,"f":"=ROUND((I13^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"S13","v":2.523955,"f":"=(Q13*R13)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"T13","v":"قص العمود بمقدار 10 سم وتجنيب الأسياخ بنسبة 1:6","bg":"#F8FAFC"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":9,"al":"center"},{"c":"B14","v":"ع2","b":true,"al":"center"},{"c":"C14","v":"الدور الأخير (سطح)"},{"c":"D14","v":8,"in":true,"al":"center"},{"c":"E14","v":0.3,"in":true,"al":"center"},{"c":"F14","v":0.7,"in":true,"al":"center"},{"c":"G14","v":3.2,"in":true,"al":"center"},{"c":"H14","v":"نهاية عمود (سطح)"},{"c":"I14","v":16,"in":true,"b":true,"al":"center"},{"c":"J14","v":12,"in":true,"al":"center"},{"c":"K14","v":96,"f":"=D14*J14","b":true,"al":"center"},{"c":"L14","v":0.4,"f":"=0.40","al":"center","nf":"0.00"},{"c":"M14","v":0,"f":"=0.00","al":"center","nf":"0.00"},{"c":"N14","v":3.2,"f":"=G14","al":"center","nf":"0.00"},{"c":"O14","v":0.4,"f":"=L14","al":"center","nf":"0.00"},{"c":"P14","v":3.6,"f":"=ROUND(M14+N14+O14, 2)","b":true,"al":"center","nf":"0.00"},{"c":"Q14","v":345.6,"f":"=K14*P14","b":true,"al":"center","nf":"#,##0.00"},{"c":"R14","v":1.58,"f":"=ROUND((I14^2)/162, 3)","al":"center","nf":"0.000"},{"c":"S14","v":0.546048,"f":"=(Q14*R14)/1000","b":true,"al":"center","nf":"0.000"},{"c":"T14","v":"رجل قفل زاوية داخل بلاطة السطح"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":10,"bg":"#F8FAFC","al":"center"},{"c":"B15","v":"ع3","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C15","v":"أشاير أساسات","bg":"#F8FAFC"},{"c":"D15","v":4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E15","v":0.4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F15","v":1,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G15","v":4.5,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H15","v":"أشاير قواعد لبشة","bg":"#F8FAFC"},{"c":"I15","v":20,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"J15","v":18,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"K15","v":72,"f":"=D15*J15","bg":"#F8FAFC","b":true,"al":"center"},{"c":"L15","v":1.2,"f":"=60*(I15/1000)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"M15","v":0.7,"f":"=0.70","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"N15","v":4.5,"f":"=G15","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"O15","v":1.2,"f":"=L15","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"P15","v":6.4,"f":"=ROUND(M15+N15+O15, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"Q15","v":460.8,"f":"=K15*P15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"R15","v":2.469,"f":"=ROUND((I15^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"S15","v":1.137715,"f":"=(Q15*R15)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"T15","v":"أشاير في لبشة مسلحة سمك 1.20 م برجل 70 سم","bg":"#F8FAFC"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":11,"al":"center"},{"c":"B16","v":"ع3","b":true,"al":"center"},{"c":"C16","v":"الدور الأرضي"},{"c":"D16","v":4,"in":true,"al":"center"},{"c":"E16","v":0.4,"in":true,"al":"center"},{"c":"F16","v":1,"in":true,"al":"center"},{"c":"G16","v":4.2,"in":true,"al":"center"},{"c":"H16","v":"حديد طولي رئيسي"},{"c":"I16","v":20,"in":true,"b":true,"al":"center"},{"c":"J16","v":18,"in":true,"al":"center"},{"c":"K16","v":72,"f":"=D16*J16","b":true,"al":"center"},{"c":"L16","v":1.2,"f":"=60*(I16/1000)","al":"center","nf":"0.00"},{"c":"M16","v":0,"f":"=0.00","al":"center","nf":"0.00"},{"c":"N16","v":4.2,"f":"=G16","al":"center","nf":"0.00"},{"c":"O16","v":1.2,"f":"=L16","al":"center","nf":"0.00"},{"c":"P16","v":5.4,"f":"=ROUND(M16+N16+O16, 2)","b":true,"al":"center","nf":"0.00"},{"c":"Q16","v":388.8,"f":"=K16*P16","b":true,"al":"center","nf":"#,##0.00"},{"c":"R16","v":2.469,"f":"=ROUND((I16^2)/162, 3)","al":"center","nf":"0.000"},{"c":"S16","v":0.959947,"f":"=(Q16*R16)/1000","b":true,"al":"center","nf":"0.000"},{"c":"T16","v":"تسليح كثيف لمقاومة أحمال الرياح والزلازل"}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":12,"bg":"#F8FAFC","al":"center"},{"c":"B17","v":"ع3","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C17","v":"متكرر (أول - رابع)","bg":"#F8FAFC"},{"c":"D17","v":16,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E17","v":0.4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F17","v":1,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G17","v":3.2,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H17","v":"حديد طولي متكرر","bg":"#F8FAFC"},{"c":"I17","v":20,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"J17","v":18,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"K17","v":288,"f":"=D17*J17","bg":"#F8FAFC","b":true,"al":"center"},{"c":"L17","v":1.2,"f":"=60*(I17/1000)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"M17","v":0,"f":"=0.00","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"N17","v":3.2,"f":"=G17","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"O17","v":1.2,"f":"=L17","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"P17","v":4.4,"f":"=ROUND(M17+N17+O17, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"Q17","v":1267.2,"f":"=K17*P17","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"R17","v":2.469,"f":"=ROUND((I17^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"S17","v":3.128717,"f":"=(Q17*R17)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"T17","v":"وصلات متراكبة متوافقة مع الكود","bg":"#F8FAFC"}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":13,"al":"center"},{"c":"B18","v":"ع3","b":true,"al":"center"},{"c":"C18","v":"متكرر (خامس - ثامن)"},{"c":"D18","v":16,"in":true,"al":"center"},{"c":"E18","v":0.4,"in":true,"al":"center"},{"c":"F18","v":0.9,"in":true,"al":"center"},{"c":"G18","v":3.2,"in":true,"al":"center"},{"c":"H18","v":"قص عمود وتخفيض"},{"c":"I18","v":18,"in":true,"b":true,"al":"center"},{"c":"J18","v":16,"in":true,"al":"center"},{"c":"K18","v":256,"f":"=D18*J18","b":true,"al":"center"},{"c":"L18","v":1.08,"f":"=60*(I18/1000)","al":"center","nf":"0.00"},{"c":"M18","v":0,"f":"=0.00","al":"center","nf":"0.00"},{"c":"N18","v":3.2,"f":"=G18","al":"center","nf":"0.00"},{"c":"O18","v":1.08,"f":"=L18","al":"center","nf":"0.00"},{"c":"P18","v":4.28,"f":"=ROUND(M18+N18+O18, 2)","b":true,"al":"center","nf":"0.00"},{"c":"Q18","v":1095.68,"f":"=K18*P18","b":true,"al":"center","nf":"#,##0.00"},{"c":"R18","v":2,"f":"=ROUND((I18^2)/162, 3)","al":"center","nf":"0.000"},{"c":"S18","v":2.19136,"f":"=(Q18*R18)/1000","b":true,"al":"center","nf":"0.000"},{"c":"T18","v":"تخفيض سيخين وتجنيب الباقي"}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":14,"bg":"#F8FAFC","al":"center"},{"c":"B19","v":"ع.د 1","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C19","v":"الدور الأرضي","bg":"#F8FAFC"},{"c":"D19","v":4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E19","v":0.6,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F19","v":0.6,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G19","v":3.8,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H19","v":"عمود دائري (Circular)","bg":"#F8FAFC"},{"c":"I19","v":18,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"J19","v":12,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"K19","v":48,"f":"=D19*J19","bg":"#F8FAFC","b":true,"al":"center"},{"c":"L19","v":1.08,"f":"=60*(I19/1000)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"M19","v":0,"f":"=0.00","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"N19","v":3.8,"f":"=G19","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"O19","v":1.08,"f":"=L19","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"P19","v":4.88,"f":"=ROUND(M19+N19+O19, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"Q19","v":234.24,"f":"=K19*P19","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"R19","v":2,"f":"=ROUND((I19^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"S19","v":0.46848,"f":"=(Q19*R19)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"T19","v":"كانة حلزونية مستمرة (Spiral) محيطية","bg":"#F8FAFC"}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":15,"al":"center"},{"c":"B20","v":"ع.د 1","b":true,"al":"center"},{"c":"C20","v":"متكرر (أول - رابع)"},{"c":"D20","v":16,"in":true,"al":"center"},{"c":"E20","v":0.6,"in":true,"al":"center"},{"c":"F20","v":0.6,"in":true,"al":"center"},{"c":"G20","v":3.2,"in":true,"al":"center"},{"c":"H20","v":"عمود دائري متكرر"},{"c":"I20","v":18,"in":true,"b":true,"al":"center"},{"c":"J20","v":12,"in":true,"al":"center"},{"c":"K20","v":192,"f":"=D20*J20","b":true,"al":"center"},{"c":"L20","v":1.08,"f":"=60*(I20/1000)","al":"center","nf":"0.00"},{"c":"M20","v":0,"f":"=0.00","al":"center","nf":"0.00"},{"c":"N20","v":3.2,"f":"=G20","al":"center","nf":"0.00"},{"c":"O20","v":1.08,"f":"=L20","al":"center","nf":"0.00"},{"c":"P20","v":4.28,"f":"=ROUND(M20+N20+O20, 2)","b":true,"al":"center","nf":"0.00"},{"c":"Q20","v":821.76,"f":"=K20*P20","b":true,"al":"center","nf":"#,##0.00"},{"c":"R20","v":2,"f":"=ROUND((I20^2)/162, 3)","al":"center","nf":"0.000"},{"c":"S20","v":1.64352,"f":"=(Q20*R20)/1000","b":true,"al":"center","nf":"0.000"},{"c":"T20","v":"توزيع دائري منتظم بزاوية 30 درجة"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":"الإجمالي الكلي لحديد الأعمدة الطولي","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"K21","v":2500,"f":"=SUM(K6:K20)","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"L21","v":"","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center"},{"c":"M21","v":"","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center"},{"c":"N21","v":"","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center"},{"c":"O21","v":"","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center"},{"c":"P21","v":"","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center"},{"c":"Q21","v":11184.08,"f":"=SUM(Q6:Q20)","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0.00"},{"c":"R21","v":"","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center"},{"c":"S21","v":21.77727,"f":"=SUM(S6:S20)","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"0.000"},{"c":"T21","v":"","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center"}]}]},{"name":"حساب وتفصيل كانات الأعمدة","maxRow":24,"maxCol":21,"colWidths":[5.0,12.0,14.0,10.0,9.0,9.0,9.0,16.0,9.0,13.0,13.0,12.0,12.0,12.0,11.0,11.0,11.0,10.0,14.0,15.0,14.0],"rows":[{"r":1,"h":36.0,"cells":[{"c":"A1","v":"حاسبة أطوال وأوزان كانات الأعمدة وتكثيف المناطق الزلزالية (Column Ties & Confinement Calculator)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":21},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"حساب الكانة الخارجية + الكانة الأوتوماتيك + المعين + الحباية + طول قفل الكانة الزلزالية (10Φ بقفل 135°) ومناطق التكثيف Lo","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center","cs":21},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""},{"c":"N3","v":""},{"c":"O3","v":""},{"c":"P3","v":""},{"c":"Q3","v":""},{"c":"R3","v":""},{"c":"S3","v":""},{"c":"T3","v":""},{"c":"U3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"م","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"B4","v":"نموذج العمود","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"C4","v":"الدور / المنسوب","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"D4","v":"العدد المتكرر","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"E4","v":"قطاع العمود (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true},{"c":"G4","v":"الغطاء (سم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"H4","v":"نوع الكانة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"I4","v":"القطر Φ (ملم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"J4","v":"توزيع وتكثيف الكانات بالعمود","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"M4","v":"الكانات بالعمود","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"N4","v":"إجمالي الكانات","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"O4","v":"أبعاد وتفصيلة أضلاع الكانة (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"S4","v":"طول الكانة القطعية (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"T4","v":"إجمالي الأطوال (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"U4","v":"الوزن الكلي (طن)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2}]},{"r":5,"h":52.0,"cells":[{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"E5","v":"عرض b","bg":"#E2E8F0","fg":"#334155","b":true,"al":"center"},{"c":"F5","v":"عمق t","bg":"#E2E8F0","fg":"#334155","b":true,"al":"center"},{"skip":true},{"skip":true},{"skip":true},{"c":"J5","v":"كانات التكثيف (أعلى+أسفل)","bg":"#E2E8F0","fg":"#334155","b":true,"al":"center"},{"c":"K5","v":"كانات المنتصف العادية","bg":"#E2E8F0","fg":"#334155","b":true,"al":"center"},{"c":"L5","v":"كانات الاتصال بالكمرة","bg":"#E2E8F0","fg":"#334155","b":true,"al":"center"},{"skip":true},{"skip":true},{"c":"O5","v":"ضلع أ (b-2cov)","bg":"#E2E8F0","fg":"#334155","b":true,"al":"center"},{"c":"P5","v":"ضلع ب (t-2cov)","bg":"#E2E8F0","fg":"#334155","b":true,"al":"center"},{"c":"Q5","v":"قفل كانة (2*10d)","bg":"#E2E8F0","fg":"#334155","b":true,"al":"center"},{"c":"R5","v":"خصم ثنيات","bg":"#E2E8F0","fg":"#334155","b":true,"al":"center"},{"skip":true},{"skip":true},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":1,"al":"center"},{"c":"B6","v":"ع1","b":true,"al":"center"},{"c":"C6","v":"الدور الأرضي"},{"c":"D6","v":6,"in":true,"al":"center"},{"c":"E6","v":0.3,"in":true,"al":"center"},{"c":"F6","v":0.6,"in":true,"al":"center"},{"c":"G6","v":2.5,"in":true,"al":"center"},{"c":"H6","v":"كانة خارجية صندوقية"},{"c":"I6","v":8,"in":true,"b":true,"al":"center"},{"c":"J6","v":12,"in":true,"al":"center"},{"c":"K6","v":10,"in":true,"al":"center"},{"c":"L6","v":4,"in":true,"al":"center"},{"c":"M6","v":26,"f":"=J6+K6+L6","b":true,"al":"center"},{"c":"N6","v":156,"f":"=D6*M6","b":true,"al":"center"},{"c":"O6","v":0.25,"f":"=E6-(2*G6/100)","al":"center","nf":"0.00"},{"c":"P6","v":0.55,"f":"=F6-(2*G6/100)","al":"center","nf":"0.00"},{"c":"Q6","v":0.16,"f":"=2*10*(I6/1000)","al":"center","nf":"0.00"},{"c":"R6","v":0.048,"f":"=3*2*(I6/1000)","al":"center","nf":"0.00"},{"c":"S6","v":1.71,"f":"=ROUND(2*O6+2*P6+Q6-R6, 2)","b":true,"al":"center","nf":"0.00"},{"c":"T6","v":266.76,"f":"=N6*S6","b":true,"al":"center","nf":"#,##0.00"},{"c":"U6","v":0.10537,"f":"=(T6*ROUND((I6^2)/162, 3))/1000","b":true,"al":"center","nf":"0.000"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":2,"bg":"#F8FAFC","al":"center"},{"c":"B7","v":"ع1","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C7","v":"الدور الأرضي","bg":"#F8FAFC"},{"c":"D7","v":6,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E7","v":0.3,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F7","v":0.6,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G7","v":2.5,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H7","v":"كانة داخلية (حباية)","bg":"#F8FAFC"},{"c":"I7","v":8,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"J7","v":12,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"K7","v":10,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"L7","v":4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"M7","v":26,"f":"=J7+K7+L7","bg":"#F8FAFC","b":true,"al":"center"},{"c":"N7","v":156,"f":"=D7*M7","bg":"#F8FAFC","b":true,"al":"center"},{"c":"O7","v":0.25,"f":"=E7-(2*G7/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"P7","v":0.55,"f":"=F7-(2*G7/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"Q7","v":0.16,"f":"=2*10*(I7/1000)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"R7","v":0.048,"f":"=3*2*(I7/1000)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"S7","v":0.41,"f":"=ROUND(O7+Q7, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"T7","v":63.96,"f":"=N7*S7","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"U7","v":0.025264,"f":"=(T7*ROUND((I7^2)/162, 3))/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":3,"al":"center"},{"c":"B8","v":"ع1","b":true,"al":"center"},{"c":"C8","v":"متكرر (أول - رابع)"},{"c":"D8","v":24,"in":true,"al":"center"},{"c":"E8","v":0.3,"in":true,"al":"center"},{"c":"F8","v":0.6,"in":true,"al":"center"},{"c":"G8","v":2.5,"in":true,"al":"center"},{"c":"H8","v":"كانة خارجية صندوقية"},{"c":"I8","v":8,"in":true,"b":true,"al":"center"},{"c":"J8","v":10,"in":true,"al":"center"},{"c":"K8","v":9,"in":true,"al":"center"},{"c":"L8","v":3,"in":true,"al":"center"},{"c":"M8","v":22,"f":"=J8+K8+L8","b":true,"al":"center"},{"c":"N8","v":528,"f":"=D8*M8","b":true,"al":"center"},{"c":"O8","v":0.25,"f":"=E8-(2*G8/100)","al":"center","nf":"0.00"},{"c":"P8","v":0.55,"f":"=F8-(2*G8/100)","al":"center","nf":"0.00"},{"c":"Q8","v":0.16,"f":"=2*10*(I8/1000)","al":"center","nf":"0.00"},{"c":"R8","v":0.048,"f":"=3*2*(I8/1000)","al":"center","nf":"0.00"},{"c":"S8","v":1.71,"f":"=ROUND(2*O8+2*P8+Q8-R8, 2)","b":true,"al":"center","nf":"0.00"},{"c":"T8","v":902.88,"f":"=N8*S8","b":true,"al":"center","nf":"#,##0.00"},{"c":"U8","v":0.356638,"f":"=(T8*ROUND((I8^2)/162, 3))/1000","b":true,"al":"center","nf":"0.000"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":4,"bg":"#F8FAFC","al":"center"},{"c":"B9","v":"ع1","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C9","v":"متكرر (أول - رابع)","bg":"#F8FAFC"},{"c":"D9","v":24,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E9","v":0.3,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F9","v":0.6,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G9","v":2.5,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H9","v":"كانة داخلية (حباية)","bg":"#F8FAFC"},{"c":"I9","v":8,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"J9","v":10,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"K9","v":9,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"L9","v":3,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"M9","v":22,"f":"=J9+K9+L9","bg":"#F8FAFC","b":true,"al":"center"},{"c":"N9","v":528,"f":"=D9*M9","bg":"#F8FAFC","b":true,"al":"center"},{"c":"O9","v":0.25,"f":"=E9-(2*G9/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"P9","v":0.55,"f":"=F9-(2*G9/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"Q9","v":0.16,"f":"=2*10*(I9/1000)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"R9","v":0.048,"f":"=3*2*(I9/1000)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"S9","v":0.41,"f":"=ROUND(O9+Q9, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"T9","v":216.48,"f":"=N9*S9","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"U9","v":0.08551,"f":"=(T9*ROUND((I9^2)/162, 3))/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":5,"al":"center"},{"c":"B10","v":"ع2","b":true,"al":"center"},{"c":"C10","v":"الدور الأرضي"},{"c":"D10","v":8,"in":true,"al":"center"},{"c":"E10","v":0.3,"in":true,"al":"center"},{"c":"F10","v":0.8,"in":true,"al":"center"},{"c":"G10","v":2.5,"in":true,"al":"center"},{"c":"H10","v":"كانة خارجية صندوقية"},{"c":"I10","v":10,"in":true,"b":true,"al":"center"},{"c":"J10","v":14,"in":true,"al":"center"},{"c":"K10","v":11,"in":true,"al":"center"},{"c":"L10","v":4,"in":true,"al":"center"},{"c":"M10","v":29,"f":"=J10+K10+L10","b":true,"al":"center"},{"c":"N10","v":232,"f":"=D10*M10","b":true,"al":"center"},{"c":"O10","v":0.25,"f":"=E10-(2*G10/100)","al":"center","nf":"0.00"},{"c":"P10","v":0.75,"f":"=F10-(2*G10/100)","al":"center","nf":"0.00"},{"c":"Q10","v":0.2,"f":"=2*10*(I10/1000)","al":"center","nf":"0.00"},{"c":"R10","v":0.06,"f":"=3*2*(I10/1000)","al":"center","nf":"0.00"},{"c":"S10","v":2.14,"f":"=ROUND(2*O10+2*P10+Q10-R10, 2)","b":true,"al":"center","nf":"0.00"},{"c":"T10","v":496.48,"f":"=N10*S10","b":true,"al":"center","nf":"#,##0.00"},{"c":"U10","v":0.306328,"f":"=(T10*ROUND((I10^2)/162, 3))/1000","b":true,"al":"center","nf":"0.000"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":6,"bg":"#F8FAFC","al":"center"},{"c":"B11","v":"ع2","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C11","v":"الدور الأرضي","bg":"#F8FAFC"},{"c":"D11","v":8,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E11","v":0.3,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F11","v":0.8,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G11","v":2.5,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H11","v":"كانة داخلية مزدوجة","bg":"#F8FAFC"},{"c":"I11","v":10,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"J11","v":14,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"K11","v":11,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"L11","v":4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"M11","v":29,"f":"=J11+K11+L11","bg":"#F8FAFC","b":true,"al":"center"},{"c":"N11","v":232,"f":"=D11*M11","bg":"#F8FAFC","b":true,"al":"center"},{"c":"O11","v":0.25,"f":"=E11-(2*G11/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"P11","v":0.75,"f":"=F11-(2*G11/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"Q11","v":0.2,"f":"=2*10*(I11/1000)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"R11","v":0.06,"f":"=3*2*(I11/1000)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"S11","v":1.39,"f":"=ROUND(2*O11+2*(P11/2)+Q11-R11, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"T11","v":322.48,"f":"=N11*S11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"U11","v":0.19897,"f":"=(T11*ROUND((I11^2)/162, 3))/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":7,"al":"center"},{"c":"B12","v":"ع2","b":true,"al":"center"},{"c":"C12","v":"الدور الأرضي"},{"c":"D12","v":8,"in":true,"al":"center"},{"c":"E12","v":0.3,"in":true,"al":"center"},{"c":"F12","v":0.8,"in":true,"al":"center"},{"c":"G12","v":2.5,"in":true,"al":"center"},{"c":"H12","v":"كانة معين (Diamond)"},{"c":"I12","v":8,"in":true,"b":true,"al":"center"},{"c":"J12","v":14,"in":true,"al":"center"},{"c":"K12","v":11,"in":true,"al":"center"},{"c":"L12","v":4,"in":true,"al":"center"},{"c":"M12","v":29,"f":"=J12+K12+L12","b":true,"al":"center"},{"c":"N12","v":232,"f":"=D12*M12","b":true,"al":"center"},{"c":"O12","v":0.25,"f":"=E12-(2*G12/100)","al":"center","nf":"0.00"},{"c":"P12","v":0.75,"f":"=F12-(2*G12/100)","al":"center","nf":"0.00"},{"c":"Q12","v":0.16,"f":"=2*10*(I12/1000)","al":"center","nf":"0.00"},{"c":"R12","v":0.048,"f":"=3*2*(I12/1000)","al":"center","nf":"0.00"},{"c":"S12","v":1.69,"f":"=ROUND(4*SQRT((O12/2)^2 + (P12/2)^2)+Q12-R12, 2)","b":true,"al":"center","nf":"0.00"},{"c":"T12","v":392.08,"f":"=N12*S12","b":true,"al":"center","nf":"#,##0.00"},{"c":"U12","v":0.154872,"f":"=(T12*ROUND((I12^2)/162, 3))/1000","b":true,"al":"center","nf":"0.000"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":8,"bg":"#F8FAFC","al":"center"},{"c":"B13","v":"ع2","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C13","v":"متكرر (أول - رابع)","bg":"#F8FAFC"},{"c":"D13","v":32,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E13","v":0.3,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F13","v":0.8,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G13","v":2.5,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H13","v":"كانة خارجية صندوقية","bg":"#F8FAFC"},{"c":"I13","v":8,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"J13","v":12,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"K13","v":10,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"L13","v":3,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"M13","v":25,"f":"=J13+K13+L13","bg":"#F8FAFC","b":true,"al":"center"},{"c":"N13","v":800,"f":"=D13*M13","bg":"#F8FAFC","b":true,"al":"center"},{"c":"O13","v":0.25,"f":"=E13-(2*G13/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"P13","v":0.75,"f":"=F13-(2*G13/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"Q13","v":0.16,"f":"=2*10*(I13/1000)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"R13","v":0.048,"f":"=3*2*(I13/1000)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"S13","v":2.11,"f":"=ROUND(2*O13+2*P13+Q13-R13, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"T13","v":1688,"f":"=N13*S13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"U13","v":0.66676,"f":"=(T13*ROUND((I13^2)/162, 3))/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":9,"al":"center"},{"c":"B14","v":"ع2","b":true,"al":"center"},{"c":"C14","v":"متكرر (أول - رابع)"},{"c":"D14","v":32,"in":true,"al":"center"},{"c":"E14","v":0.3,"in":true,"al":"center"},{"c":"F14","v":0.8,"in":true,"al":"center"},{"c":"G14","v":2.5,"in":true,"al":"center"},{"c":"H14","v":"كانة داخلية مزدوجة"},{"c":"I14","v":8,"in":true,"b":true,"al":"center"},{"c":"J14","v":12,"in":true,"al":"center"},{"c":"K14","v":10,"in":true,"al":"center"},{"c":"L14","v":3,"in":true,"al":"center"},{"c":"M14","v":25,"f":"=J14+K14+L14","b":true,"al":"center"},{"c":"N14","v":800,"f":"=D14*M14","b":true,"al":"center"},{"c":"O14","v":0.25,"f":"=E14-(2*G14/100)","al":"center","nf":"0.00"},{"c":"P14","v":0.75,"f":"=F14-(2*G14/100)","al":"center","nf":"0.00"},{"c":"Q14","v":0.16,"f":"=2*10*(I14/1000)","al":"center","nf":"0.00"},{"c":"R14","v":0.048,"f":"=3*2*(I14/1000)","al":"center","nf":"0.00"},{"c":"S14","v":1.36,"f":"=ROUND(2*O14+2*(P14/2)+Q14-R14, 2)","b":true,"al":"center","nf":"0.00"},{"c":"T14","v":1088,"f":"=N14*S14","b":true,"al":"center","nf":"#,##0.00"},{"c":"U14","v":0.42976,"f":"=(T14*ROUND((I14^2)/162, 3))/1000","b":true,"al":"center","nf":"0.000"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":10,"bg":"#F8FAFC","al":"center"},{"c":"B15","v":"ع2","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C15","v":"متكرر (أول - رابع)","bg":"#F8FAFC"},{"c":"D15","v":32,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E15","v":0.3,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F15","v":0.8,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G15","v":2.5,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H15","v":"كانة معين (Diamond)","bg":"#F8FAFC"},{"c":"I15","v":8,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"J15","v":12,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"K15","v":10,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"L15","v":3,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"M15","v":25,"f":"=J15+K15+L15","bg":"#F8FAFC","b":true,"al":"center"},{"c":"N15","v":800,"f":"=D15*M15","bg":"#F8FAFC","b":true,"al":"center"},{"c":"O15","v":0.25,"f":"=E15-(2*G15/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"P15","v":0.75,"f":"=F15-(2*G15/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"Q15","v":0.16,"f":"=2*10*(I15/1000)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"R15","v":0.048,"f":"=3*2*(I15/1000)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"S15","v":1.69,"f":"=ROUND(4*SQRT((O15/2)^2 + (P15/2)^2)+Q15-R15, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"T15","v":1352,"f":"=N15*S15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"U15","v":0.53404,"f":"=(T15*ROUND((I15^2)/162, 3))/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":11,"al":"center"},{"c":"B16","v":"ع2","b":true,"al":"center"},{"c":"C16","v":"متكرر مقصوص (5-8)"},{"c":"D16","v":32,"in":true,"al":"center"},{"c":"E16","v":0.3,"in":true,"al":"center"},{"c":"F16","v":0.7,"in":true,"al":"center"},{"c":"G16","v":2.5,"in":true,"al":"center"},{"c":"H16","v":"كانة خارجية صندوقية"},{"c":"I16","v":8,"in":true,"b":true,"al":"center"},{"c":"J16","v":11,"in":true,"al":"center"},{"c":"K16","v":9,"in":true,"al":"center"},{"c":"L16","v":3,"in":true,"al":"center"},{"c":"M16","v":23,"f":"=J16+K16+L16","b":true,"al":"center"},{"c":"N16","v":736,"f":"=D16*M16","b":true,"al":"center"},{"c":"O16","v":0.25,"f":"=E16-(2*G16/100)","al":"center","nf":"0.00"},{"c":"P16","v":0.65,"f":"=F16-(2*G16/100)","al":"center","nf":"0.00"},{"c":"Q16","v":0.16,"f":"=2*10*(I16/1000)","al":"center","nf":"0.00"},{"c":"R16","v":0.048,"f":"=3*2*(I16/1000)","al":"center","nf":"0.00"},{"c":"S16","v":1.91,"f":"=ROUND(2*O16+2*P16+Q16-R16, 2)","b":true,"al":"center","nf":"0.00"},{"c":"T16","v":1405.76,"f":"=N16*S16","b":true,"al":"center","nf":"#,##0.00"},{"c":"U16","v":0.555275,"f":"=(T16*ROUND((I16^2)/162, 3))/1000","b":true,"al":"center","nf":"0.000"}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":12,"bg":"#F8FAFC","al":"center"},{"c":"B17","v":"ع2","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C17","v":"متكرر مقصوص (5-8)","bg":"#F8FAFC"},{"c":"D17","v":32,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E17","v":0.3,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F17","v":0.7,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G17","v":2.5,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H17","v":"كانة داخلية مزدوجة","bg":"#F8FAFC"},{"c":"I17","v":8,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"J17","v":11,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"K17","v":9,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"L17","v":3,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"M17","v":23,"f":"=J17+K17+L17","bg":"#F8FAFC","b":true,"al":"center"},{"c":"N17","v":736,"f":"=D17*M17","bg":"#F8FAFC","b":true,"al":"center"},{"c":"O17","v":0.25,"f":"=E17-(2*G17/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"P17","v":0.65,"f":"=F17-(2*G17/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"Q17","v":0.16,"f":"=2*10*(I17/1000)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"R17","v":0.048,"f":"=3*2*(I17/1000)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"S17","v":1.26,"f":"=ROUND(2*O17+2*(P17/2)+Q17-R17, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"T17","v":927.36,"f":"=N17*S17","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"U17","v":0.366307,"f":"=(T17*ROUND((I17^2)/162, 3))/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":13,"al":"center"},{"c":"B18","v":"ع3","b":true,"al":"center"},{"c":"C18","v":"الدور الأرضي"},{"c":"D18","v":4,"in":true,"al":"center"},{"c":"E18","v":0.4,"in":true,"al":"center"},{"c":"F18","v":1,"in":true,"al":"center"},{"c":"G18","v":3,"in":true,"al":"center"},{"c":"H18","v":"كانة خارجية صندوقية"},{"c":"I18","v":10,"in":true,"b":true,"al":"center"},{"c":"J18","v":16,"in":true,"al":"center"},{"c":"K18","v":12,"in":true,"al":"center"},{"c":"L18","v":5,"in":true,"al":"center"},{"c":"M18","v":33,"f":"=J18+K18+L18","b":true,"al":"center"},{"c":"N18","v":132,"f":"=D18*M18","b":true,"al":"center"},{"c":"O18","v":0.34,"f":"=E18-(2*G18/100)","al":"center","nf":"0.00"},{"c":"P18","v":0.94,"f":"=F18-(2*G18/100)","al":"center","nf":"0.00"},{"c":"Q18","v":0.2,"f":"=2*10*(I18/1000)","al":"center","nf":"0.00"},{"c":"R18","v":0.06,"f":"=3*2*(I18/1000)","al":"center","nf":"0.00"},{"c":"S18","v":2.7,"f":"=ROUND(2*O18+2*P18+Q18-R18, 2)","b":true,"al":"center","nf":"0.00"},{"c":"T18","v":356.4,"f":"=N18*S18","b":true,"al":"center","nf":"#,##0.00"},{"c":"U18","v":0.219899,"f":"=(T18*ROUND((I18^2)/162, 3))/1000","b":true,"al":"center","nf":"0.000"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":14,"bg":"#F8FAFC","al":"center"},{"c":"B19","v":"ع3","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C19","v":"الدور الأرضي","bg":"#F8FAFC"},{"c":"D19","v":4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E19","v":0.4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F19","v":1,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G19","v":3,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H19","v":"كانة داخلية مربعة","bg":"#F8FAFC"},{"c":"I19","v":10,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"J19","v":16,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"K19","v":12,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"L19","v":5,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"M19","v":33,"f":"=J19+K19+L19","bg":"#F8FAFC","b":true,"al":"center"},{"c":"N19","v":132,"f":"=D19*M19","bg":"#F8FAFC","b":true,"al":"center"},{"c":"O19","v":0.34,"f":"=E19-(2*G19/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"P19","v":0.94,"f":"=F19-(2*G19/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"Q19","v":0.2,"f":"=2*10*(I19/1000)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"R19","v":0.06,"f":"=3*2*(I19/1000)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"S19","v":1.76,"f":"=ROUND(2*O19+2*(P19/2)+Q19-R19, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"T19","v":232.32,"f":"=N19*S19","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"U19","v":0.143341,"f":"=(T19*ROUND((I19^2)/162, 3))/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":15,"al":"center"},{"c":"B20","v":"ع3","b":true,"al":"center"},{"c":"C20","v":"الدور الأرضي"},{"c":"D20","v":4,"in":true,"al":"center"},{"c":"E20","v":0.4,"in":true,"al":"center"},{"c":"F20","v":1,"in":true,"al":"center"},{"c":"G20","v":3,"in":true,"al":"center"},{"c":"H20","v":"كانة معين (Diamond)"},{"c":"I20","v":8,"in":true,"b":true,"al":"center"},{"c":"J20","v":16,"in":true,"al":"center"},{"c":"K20","v":12,"in":true,"al":"center"},{"c":"L20","v":5,"in":true,"al":"center"},{"c":"M20","v":33,"f":"=J20+K20+L20","b":true,"al":"center"},{"c":"N20","v":132,"f":"=D20*M20","b":true,"al":"center"},{"c":"O20","v":0.34,"f":"=E20-(2*G20/100)","al":"center","nf":"0.00"},{"c":"P20","v":0.94,"f":"=F20-(2*G20/100)","al":"center","nf":"0.00"},{"c":"Q20","v":0.16,"f":"=2*10*(I20/1000)","al":"center","nf":"0.00"},{"c":"R20","v":0.048,"f":"=3*2*(I20/1000)","al":"center","nf":"0.00"},{"c":"S20","v":2.11,"f":"=ROUND(4*SQRT((O20/2)^2 + (P20/2)^2)+Q20-R20, 2)","b":true,"al":"center","nf":"0.00"},{"c":"T20","v":278.52,"f":"=N20*S20","b":true,"al":"center","nf":"#,##0.00"},{"c":"U20","v":0.110015,"f":"=(T20*ROUND((I20^2)/162, 3))/1000","b":true,"al":"center","nf":"0.000"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":16,"bg":"#F8FAFC","al":"center"},{"c":"B21","v":"ع3","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C21","v":"الدور الأرضي","bg":"#F8FAFC"},{"c":"D21","v":4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E21","v":0.4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F21","v":1,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G21","v":3,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H21","v":"كانة حباية ربط وسطي","bg":"#F8FAFC"},{"c":"I21","v":8,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"J21","v":16,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"K21","v":12,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"L21","v":5,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"M21","v":33,"f":"=J21+K21+L21","bg":"#F8FAFC","b":true,"al":"center"},{"c":"N21","v":132,"f":"=D21*M21","bg":"#F8FAFC","b":true,"al":"center"},{"c":"O21","v":0.34,"f":"=E21-(2*G21/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"P21","v":0.94,"f":"=F21-(2*G21/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"Q21","v":0.16,"f":"=2*10*(I21/1000)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"R21","v":0.048,"f":"=3*2*(I21/1000)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"S21","v":0.5,"f":"=ROUND(O21+Q21, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"T21","v":66,"f":"=N21*S21","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"U21","v":0.02607,"f":"=(T21*ROUND((I21^2)/162, 3))/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":17,"al":"center"},{"c":"B22","v":"ع.د 1","b":true,"al":"center"},{"c":"C22","v":"الدور الأرضي"},{"c":"D22","v":4,"in":true,"al":"center"},{"c":"E22","v":0.6,"in":true,"al":"center"},{"c":"F22","v":0.6,"in":true,"al":"center"},{"c":"G22","v":3,"in":true,"al":"center"},{"c":"H22","v":"كانة دائرية محيطية"},{"c":"I22","v":10,"in":true,"b":true,"al":"center"},{"c":"J22","v":14,"in":true,"al":"center"},{"c":"K22","v":11,"in":true,"al":"center"},{"c":"L22","v":4,"in":true,"al":"center"},{"c":"M22","v":29,"f":"=J22+K22+L22","b":true,"al":"center"},{"c":"N22","v":116,"f":"=D22*M22","b":true,"al":"center"},{"c":"O22","v":0.54,"f":"=E22-(2*G22/100)","al":"center","nf":"0.00"},{"c":"P22","v":0.54,"f":"=F22-(2*G22/100)","al":"center","nf":"0.00"},{"c":"Q22","v":0.2,"f":"=2*10*(I22/1000)","al":"center","nf":"0.00"},{"c":"R22","v":0.06,"f":"=3*2*(I22/1000)","al":"center","nf":"0.00"},{"c":"S22","v":2,"f":"=ROUND(3.1416*(E22-(2*G22/100))+Q22+0.10, 2)","b":true,"al":"center","nf":"0.00"},{"c":"T22","v":232,"f":"=N22*S22","b":true,"al":"center","nf":"#,##0.00"},{"c":"U22","v":0.143144,"f":"=(T22*ROUND((I22^2)/162, 3))/1000","b":true,"al":"center","nf":"0.000"}]},{"r":23,"h":52.0,"cells":[{"c":"A23","v":18,"bg":"#F8FAFC","al":"center"},{"c":"B23","v":"ع.د 1","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C23","v":"متكرر (أول - رابع)","bg":"#F8FAFC"},{"c":"D23","v":16,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E23","v":0.6,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F23","v":0.6,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G23","v":3,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H23","v":"كانة دائرية محيطية","bg":"#F8FAFC"},{"c":"I23","v":8,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"J23","v":12,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"K23","v":9,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"L23","v":3,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"M23","v":24,"f":"=J23+K23+L23","bg":"#F8FAFC","b":true,"al":"center"},{"c":"N23","v":384,"f":"=D23*M23","bg":"#F8FAFC","b":true,"al":"center"},{"c":"O23","v":0.54,"f":"=E23-(2*G23/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"P23","v":0.54,"f":"=F23-(2*G23/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"Q23","v":0.16,"f":"=2*10*(I23/1000)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"R23","v":0.048,"f":"=3*2*(I23/1000)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"S23","v":1.96,"f":"=ROUND(3.1416*(E23-(2*G23/100))+Q23+0.10, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"T23","v":752.64,"f":"=N23*S23","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"U23","v":0.297293,"f":"=(T23*ROUND((I23^2)/162, 3))/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":"الإجمالي الكلي لكانات الأعمدة","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"N24","v":6964,"f":"=SUM(N6:N23)","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"O24","v":"","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center"},{"c":"P24","v":"","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center"},{"c":"Q24","v":"","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center"},{"c":"R24","v":"","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center"},{"c":"S24","v":"","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center"},{"c":"T24","v":11040.12,"f":"=SUM(T6:T23)","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0.00"},{"c":"U24","v":4.724856,"f":"=SUM(U6:U23)","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"0.000"}]}]},{"name":"الأكواد والمحددات الهندسية","maxRow":22,"maxCol":8,"colWidths":[22.0,22.0,22.0,22.0,22.0,22.0,22.0,22.0],"rows":[{"r":1,"h":36.0,"cells":[{"c":"A1","v":"المرجع الفني واشتراطات الكود لتسليح وتكثيف كانات الأعمدة الخرسانية","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":28.0,"cells":[{"c":"A2","v":""},{"c":"B2","v":""},{"c":"C2","v":""},{"c":"D2","v":""},{"c":"E2","v":""},{"c":"F2","v":""},{"c":"G2","v":""},{"c":"H2","v":""}]},{"r":3,"h":104.0,"cells":[{"c":"A3","v":"1. اشتراطات وضوابط كانات الأعمدة ومناطق التكثيف الزلزالية (Seismic Confinement):","fg":"#1E293B","b":true,"al":"center"},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"طول منطقة التكثيف (Lo):","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"C4","v":"Lo = Max [ البعد الأكبر للعمود ، سدس الارتفاع الخالص H/6 ، 50 سم ]","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"F4","v":"يتم تكثيف الكانات في هذه المسافة عند أسفل العمود وأعلى العمود أسفل الكمرات.","bg":"#F8FAFC","cs":3},{"skip":true},{"skip":true}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"المسافة بين الكانات في منطقة التكثيف (So):","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"C5","v":"So = Min [ 8 أقطار أصغر سيخ طولي ، ربع أصغر بعد للعمود ، 15 سم ]","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"F5","v":"تضمن حبس الخرسانة ومنع التحنيب ومقاومة القص الزلزالي.","bg":"#F8FAFC","cs":3},{"skip":true},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"المسافة بين الكانات في منطقة المنتصف (S):","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"C6","v":"S = Min [ 15 قطر أصغر سيخ طولي ، أصغر بعد للعمود ، 20 سم ]","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"F6","v":"المسافة المعيارية خارج مناطق التكثيف.","bg":"#F8FAFC","cs":3},{"skip":true},{"skip":true}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"استمرار كانات الأعمدة داخل الكمرات والقواعد:","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"C7","v":"تستمر كانات الأعمدة بكامل عددها داخل منطقة اتصال العمود بالكمرة والقاعدة","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"F7","v":"لا يجوز إيقاف كانات العمود عند بطنية الكمرة نهائياً.","bg":"#F8FAFC","cs":3},{"skip":true},{"skip":true}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"قفل الكانة واشتراطات الزلازل:","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"C8","v":"طول قفل الكانة لا يقل عن 10 أقطار السيخ (10Φ) أو 7.5 سم أيهما أكبر بزاوية 135°","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"F8","v":"يتم تبادل مواضع قفل الكانات رأسياً بطول العمود (Staggered Hooks).","bg":"#F8FAFC","cs":3},{"skip":true},{"skip":true}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"ربط الأسياخ الطولية بالكانات:","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"C9","v":"إذا زادت المسافة بين سيخين متتاليين عن 15 سم، يجب ربط السيخ التالي بكانة (حباية أو معين)","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"F9","v":"المسافة بين أي سيخ مربوط وسيخ غير مربوط لا تزيد عن 30 سم.","bg":"#F8FAFC","cs":3},{"skip":true},{"skip":true}]},{"r":10,"h":28.0,"cells":[{"c":"A10","v":""},{"c":"B10","v":""},{"c":"C10","v":""},{"c":"D10","v":""},{"c":"E10","v":""},{"c":"F10","v":""},{"c":"G10","v":""},{"c":"H10","v":""}]},{"r":11,"h":28.0,"cells":[{"c":"A11","v":""},{"c":"B11","v":""},{"c":"C11","v":""},{"c":"D11","v":""},{"c":"E11","v":""},{"c":"F11","v":""},{"c":"G11","v":""},{"c":"H11","v":""}]},{"r":12,"h":72.0,"cells":[{"c":"A12","v":"2. جدول الخصائص القياسية لأقطار حديد التسليح والكانات:","fg":"#1E293B","b":true,"al":"center"},{"c":"B12","v":""},{"c":"C12","v":""},{"c":"D12","v":""},{"c":"E12","v":""},{"c":"F12","v":""},{"c":"G12","v":""},{"c":"H12","v":""}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":"القطر الاسمي (Φ ملم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B13","v":"مساحة المقطع (سم²)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C13","v":"وزن المتر الطولي النظري (كجم/م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D13","v":"عدد الأسياخ (12م) في الطن","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E13","v":"طول التراكب بالضغط (Ld = 40Φ)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F13","v":"طول التراكب بالشد (Lap = 60Φ)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G13","v":"أقل طول لقفل الكانة (10Φ)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H13","v":"مجال الاستخدام الشائع بالأعمدة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":"Φ 8","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B14","v":0.503,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"C14","v":0.395,"f":"=ROUND((8^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"D14","v":211,"f":"=ROUND(1000/(C14*12), 1)","bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"E14","v":"0.32 م","bg":"#F8FAFC","al":"center"},{"c":"F14","v":"0.48 م","bg":"#F8FAFC","al":"center"},{"c":"G14","v":"8.0 سم","bg":"#F8FAFC","al":"center"},{"c":"H14","v":"كانات داخلية وخارجية خفيفة","bg":"#F8FAFC"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":"Φ 10","b":true,"al":"center"},{"c":"B15","v":0.785,"in":true,"al":"center","nf":"0.000"},{"c":"C15","v":0.617,"f":"=ROUND((10^2)/162, 3)","al":"center","nf":"0.000"},{"c":"D15","v":135.1,"f":"=ROUND(1000/(C15*12), 1)","al":"center","nf":"0.0"},{"c":"E15","v":"0.40 م","al":"center"},{"c":"F15","v":"0.60 م","al":"center"},{"c":"G15","v":"10.0 سم","al":"center"},{"c":"H15","v":"كانات رئيسية وتكثيف زلزالي"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":"Φ 12","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B16","v":1.131,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"C16","v":0.889,"f":"=ROUND((12^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"D16","v":93.7,"f":"=ROUND(1000/(C16*12), 1)","bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"E16","v":"0.48 م","bg":"#F8FAFC","al":"center"},{"c":"F16","v":"0.72 م","bg":"#F8FAFC","al":"center"},{"c":"G16","v":"12.0 سم","bg":"#F8FAFC","al":"center"},{"c":"H16","v":"كانات أعمدة ضخمة أو تسليح طولي خفيف","bg":"#F8FAFC"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":"Φ 14","b":true,"al":"center"},{"c":"B17","v":1.539,"in":true,"al":"center","nf":"0.000"},{"c":"C17","v":1.21,"f":"=ROUND((14^2)/162, 3)","al":"center","nf":"0.000"},{"c":"D17","v":68.9,"f":"=ROUND(1000/(C17*12), 1)","al":"center","nf":"0.0"},{"c":"E17","v":"0.56 م","al":"center"},{"c":"F17","v":"0.84 م","al":"center"},{"c":"G17","v":"14.0 سم","al":"center"},{"c":"H17","v":"حديد طولي لأعمدة الفلل والمباني الصغيرة"}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":"Φ 16","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B18","v":2.011,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"C18","v":1.58,"f":"=ROUND((16^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"D18","v":52.7,"f":"=ROUND(1000/(C18*12), 1)","bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"E18","v":"0.64 م","bg":"#F8FAFC","al":"center"},{"c":"F18","v":"0.96 م","bg":"#F8FAFC","al":"center"},{"c":"G18","v":"16.0 سم","bg":"#F8FAFC","al":"center"},{"c":"H18","v":"حديد طولي رئيسي للمباني السكنية","bg":"#F8FAFC"}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":"Φ 18","b":true,"al":"center"},{"c":"B19","v":2.545,"in":true,"al":"center","nf":"0.000"},{"c":"C19","v":2,"f":"=ROUND((18^2)/162, 3)","al":"center","nf":"0.000"},{"c":"D19","v":41.7,"f":"=ROUND(1000/(C19*12), 1)","al":"center","nf":"0.0"},{"c":"E19","v":"0.72 م","al":"center"},{"c":"F19","v":"1.08 م","al":"center"},{"c":"G19","v":"18.0 سم","al":"center"},{"c":"H19","v":"حديد طولي للأعمدة المحملة والأبراج"}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":"Φ 20","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B20","v":3.142,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"C20","v":2.469,"f":"=ROUND((20^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"D20","v":33.8,"f":"=ROUND(1000/(C20*12), 1)","bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"E20","v":"0.80 م","bg":"#F8FAFC","al":"center"},{"c":"F20","v":"1.20 م","bg":"#F8FAFC","al":"center"},{"c":"G20","v":"20.0 سم","bg":"#F8FAFC","al":"center"},{"c":"H20","v":"تسليح رئيسي لأعمدة الأبراج والرياح","bg":"#F8FAFC"}]},{"r":21,"h":52.0,"cells":[{"c":"A21","v":"Φ 22","b":true,"al":"center"},{"c":"B21","v":3.801,"in":true,"al":"center","nf":"0.000"},{"c":"C21","v":2.988,"f":"=ROUND((22^2)/162, 3)","al":"center","nf":"0.000"},{"c":"D21","v":27.9,"f":"=ROUND(1000/(C21*12), 1)","al":"center","nf":"0.0"},{"c":"E21","v":"0.88 م","al":"center"},{"c":"F21","v":"1.32 م","al":"center"},{"c":"G21","v":"22.0 سم","al":"center"},{"c":"H21","v":"تسليح ثقيل للمصاعد والأبراج العالية"}]},{"r":22,"h":52.0,"cells":[{"c":"A22","v":"Φ 25","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B22","v":4.909,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"C22","v":3.858,"f":"=ROUND((25^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"D22","v":21.6,"f":"=ROUND(1000/(C22*12), 1)","bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"E22","v":"1.00 م","bg":"#F8FAFC","al":"center"},{"c":"F22","v":"1.50 م","bg":"#F8FAFC","al":"center"},{"c":"G22","v":"25.0 سم","bg":"#F8FAFC","al":"center"},{"c":"H22","v":"تسليح ثقيل جداً لأبراج +20 دور","bg":"#F8FAFC"}]}]}]}