{"slug":"combined-footing-structural-design-and-reinforcement-sheet","sheets":[{"name":"إعدادات المشروع والتربة","maxRow":42,"maxCol":9,"colWidths":[8.0,62.0,18.0,22.0,14.0,26.0,28.0,38.0,16.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"شيت تصميم وحساب القواعد المشتركة الخرسانية المسلحة Combined Footing وفق SBC 304 و ACI 318 و ECP 203","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"⚠️ تنبيه استرشادي هندسي: القيم المدخلة في هذا الشيت هي قيم تصميمية استرشادية وفق الممارسات الهندسية القياسية. يرجى تعديل معاملات التربة، ورتبة الخرسانة، وإجهاد خضوع حديد التسليح بما يتطابق مع تقرير فحص التربة والمواصفات الفنية المعتمدة لمشروعك.","bg":"#FEF3C7","fg":"#475569","al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"1. بيانات المشروع والمهندس المسؤول والعملة التعاقدية (Project Identification & Currency)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"اسم المشروع الإنشائي:","bg":"#EFF6FF","b":true},{"c":"B5","v":"مشروع إنشاء برج سكني وتجاري - القواعد المشتركة","cs":3},{"skip":true},{"skip":true},{"c":"E5","v":"رمز النموذج المرجعي:","bg":"#EFF6FF","b":true},{"c":"F5","v":"CF-DES-01","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":6,"h":72.0,"cells":[{"c":"A6","v":"اسم المالك / جهة العمل:","bg":"#EFF6FF","b":true},{"c":"B6","v":"شركة التطوير العقاري والاستثمار","cs":3},{"skip":true},{"skip":true},{"c":"E6","v":"تاريخ إعداد الحسابات:","bg":"#EFF6FF","b":true},{"c":"F6","v":"2026-10-18","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"المقاول العام المنفذ:","bg":"#EFF6FF","b":true},{"c":"B7","v":"شركة المقاولات العامة والإنشاءات","cs":3},{"skip":true},{"skip":true},{"c":"E7","v":"العملة التعاقدية المعتمدة:","bg":"#EFF6FF","b":true},{"c":"F7","v":"ر.س SAR","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":8,"h":104.0,"cells":[{"c":"A8","v":"المكتب الاستشاري المصمم:","bg":"#EFF6FF","b":true},{"c":"B8","v":"مكتب الاستشارات الهندسية وفحص التربة","cs":3},{"skip":true},{"skip":true},{"c":"E8","v":"الكود الهندسي المرجعي:","bg":"#EFF6FF","b":true},{"c":"F8","v":"SBC 304 / ACI 318-19 / ECP 203","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"رقم اللوحة الإنشائية:","bg":"#EFF6FF","b":true},{"c":"B9","v":"STR-FD-04 / لوحة تفاصيل القواعد المشتركة","cs":3},{"skip":true},{"skip":true},{"c":"E9","v":"موقع القاعدة بالمشروع:","bg":"#EFF6FF","b":true},{"c":"F9","v":"المحور A-B بين العمودين C1 و C2","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":10,"h":28.0,"cells":[{"c":"A10","v":""},{"c":"B10","v":""},{"c":"C10","v":""},{"c":"D10","v":""},{"c":"E10","v":""},{"c":"F10","v":""},{"c":"G10","v":""},{"c":"H10","v":""},{"c":"I10","v":""}]},{"r":11,"h":38.0,"cells":[{"c":"A11","v":"2. الخواص الجيوتقنية لطبقة التأسيس والتربة (Geotechnical Soil Parameters)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":12,"h":40.0,"cells":[{"c":"A12","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B12","v":"المعامل الجيوتقني والتوصيف الهندسي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C12","v":"الرمز الكودي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D12","v":"القيمة التصميمية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E12","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F12","v":"الحدود الكودية الموصى بها","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G12","v":"المرجع القياسي الكودي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H12","v":"ملاحظات الاستخدام في التصميم","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I12","v":"الحالة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":1,"al":"center"},{"c":"B13","v":"جهد التربة الصافي المسموح به (Net Allowable Soil Bearing Capacity)"},{"c":"C13","v":"q_net,all","b":true,"al":"center"},{"c":"D13","v":185,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E13","v":"kN/m²","al":"center"},{"c":"F13","v":"100 - 350 kN/m²","al":"center"},{"c":"G13","v":"تقرير التربة / SBC 303","al":"center"},{"c":"H13","v":"يستخدم لتحديد مساحة القاعدة بدون وزن الردم"},{"c":"I13","v":"معتمد","al":"center"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":2,"al":"center"},{"c":"B14","v":"جهد التربة الإجمالي المسموح به (Gross Allowable Soil Bearing Capacity)"},{"c":"C14","v":"q_all,gross","b":true,"al":"center"},{"c":"D14","v":220,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E14","v":"kN/m²","al":"center"},{"c":"F14","v":"130 - 400 kN/m²","al":"center"},{"c":"G14","v":"تقرير فحص الموقع / SBC 303","al":"center"},{"c":"H14","v":"يستخدم للتحقق من إجهاد التلامس الإجمالي"},{"c":"I14","v":"معتمد","al":"center"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":3,"al":"center"},{"c":"B15","v":"منسوب التأسيس التصميمي أسفل منسوب الصفر (Foundation Depth)"},{"c":"C15","v":"D_f","b":true,"al":"center"},{"c":"D15","v":1.8,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E15","v":"m","al":"center"},{"c":"F15","v":"1.50 - 3.00 m","al":"center"},{"c":"G15","v":"المخطط العام للأساسات","al":"center"},{"c":"H15","v":"عمق ارتكاز منسوب بطنية خرسانة النظافة"},{"c":"I15","v":"معتمد","al":"center"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":4,"al":"center"},{"c":"B16","v":"الكثافة الحجمية المتوسطة للتربة والردم (Average Soil Unit Weight)"},{"c":"C16","v":"γ_soil","b":true,"al":"center"},{"c":"D16","v":18,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E16","v":"kN/m³","al":"center"},{"c":"F16","v":"16.0 - 20.0 kN/m³","al":"center"},{"c":"G16","v":"ميكانيكا التربة / ASTM D7263","al":"center"},{"c":"H16","v":"تستخدم لحساب وزن الردم فوق القاعدة"},{"c":"I16","v":"معتمد","al":"center"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":5,"al":"center"},{"c":"B17","v":"الحمل الحي السطحي الإضافي للردم وأرضية الدور الأرضي (Surcharge Load)"},{"c":"C17","v":"q_sur","b":true,"al":"center"},{"c":"D17","v":5,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E17","v":"kN/m²","al":"center"},{"c":"F17","v":"3.0 - 10.0 kN/m²","al":"center"},{"c":"G17","v":"كود الأحمال SBC 201","al":"center"},{"c":"H17","v":"حمل حي موزع على منسوب الردم"},{"c":"I17","v":"معتمد","al":"center"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":6,"al":"center"},{"c":"B18","v":"نسبة الزيادة المسموحة في إجهاد التربة لأحمال الرياح والزلازل"},{"c":"C18","v":"k_transient","b":true,"al":"center"},{"c":"D18","v":1.33,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E18","v":"-","al":"center"},{"c":"F18","v":"1.25 - 1.33","al":"center"},{"c":"G18","v":"SBC 303 Cl. 4.2","al":"center"},{"c":"H18","v":"لحالات التحميل الاستثنائية والرياح"},{"c":"I18","v":"معتمد","al":"center"}]},{"r":19,"h":28.0,"cells":[{"c":"A19","v":""},{"c":"B19","v":""},{"c":"C19","v":""},{"c":"D19","v":""},{"c":"E19","v":""},{"c":"F19","v":""},{"c":"G19","v":""},{"c":"H19","v":""},{"c":"I19","v":""}]},{"r":20,"h":38.0,"cells":[{"c":"A20","v":"3. خواص المواد الإنشائية وعوامل تصعيد الأحمال وخفض المقاومة (Material & Code Safety Factors)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":21,"h":40.0,"cells":[{"c":"A21","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B21","v":"الخاصية الإنشائية / معامل الأمان","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C21","v":"الرمز الكودي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D21","v":"القيمة التصميمية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E21","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F21","v":"المعايير الكودية القياسية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G21","v":"المرجع الكودي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H21","v":"التأثير الإنشائي في المعادلات","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I21","v":"الحالة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":1,"al":"center"},{"c":"B22","v":"مقاومة الضغط المميزة للخرسانة الأسطوانية بعد 28 يوماً"},{"c":"C22","v":"f'_c","b":true,"al":"center"},{"c":"D22","v":30,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E22","v":"MPa","al":"center"},{"c":"F22","v":"≥ 25 MPa للأساسات","al":"center"},{"c":"G22","v":"SBC 304 Cl. 19.2 / ACI 318","al":"center"},{"c":"H22","v":"تحدد مقاومة القص الثاقب وقص الكمرات والعزوم"},{"c":"I22","v":"معتمد","al":"center"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":2,"al":"center"},{"c":"B23","v":"المقاومة المميزة المكافئة للخرسانة المكعبة (Cube Strength)"},{"c":"C23","v":"f_cu","b":true,"al":"center"},{"c":"D23","v":35,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E23","v":"MPa","al":"center"},{"c":"F23","v":"f_cu ≈ f'_c / 0.80 - 0.85","al":"center"},{"c":"G23","v":"ECP 203 / BS 8110","al":"center"},{"c":"H23","v":"تستخدم في مراجعات الكود المصري والبريطاني"},{"c":"I23","v":"معتمد","al":"center"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":3,"al":"center"},{"c":"B24","v":"إجهاد خضوع حديد التسليح الطولي الرئيسي عالي المقاومة"},{"c":"C24","v":"f_y","b":true,"al":"center"},{"c":"D24","v":420,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E24","v":"MPa","al":"center"},{"c":"F24","v":"Grade 60 / 420 MPa","al":"center"},{"c":"G24","v":"ASTM A615 / SASO 2 / SBC 304","al":"center"},{"c":"H24","v":"يحدد مساحة حديد التسليح العلوي والسفلي"},{"c":"I24","v":"معتمد","al":"center"}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":4,"al":"center"},{"c":"B25","v":"إجهاد خضوع حديد التسليح العرضي وكانات الحزم"},{"c":"C25","v":"f_ys","b":true,"al":"center"},{"c":"D25","v":420,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E25","v":"MPa","al":"center"},{"c":"F25","v":"Grade 60 / 420 MPa","al":"center"},{"c":"G25","v":"SBC 304 Cl. 20.2","al":"center"},{"c":"H25","v":"يحدد تسليح الكمرات العرضية تحت الأعمدة"},{"c":"I25","v":"معتمد","al":"center"}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":5,"al":"center"},{"c":"B26","v":"الغطاء الخرساني الصافي للقواعد الملامسة للتربة الدائمة"},{"c":"C26","v":"c_c","b":true,"al":"center"},{"c":"D26","v":75,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E26","v":"mm","al":"center"},{"c":"F26","v":"75 mm (بدون عزل 75 مم)","al":"center"},{"c":"G26","v":"SBC 304 Cl. 20.6.1 / ACI 318","al":"center"},{"c":"H26","v":"يحمي شبكات التسليح من الأملاح والمياه الجوفية"},{"c":"I26","v":"إلزامي","al":"center"}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":6,"al":"center"},{"c":"B27","v":"معامل خفض المقاومة للانحناء في القطاعات محكومة الشد"},{"c":"C27","v":"φ_b","b":true,"al":"center"},{"c":"D27","v":0.9,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E27","v":"-","al":"center"},{"c":"F27","v":"0.90 (Tension Controlled)","al":"center"},{"c":"G27","v":"SBC 304 Cl. 21.2 / ACI 318","al":"center"},{"c":"H27","v":"يضرب في المقاومة الاسمية للعزم Mn"},{"c":"I27","v":"إلزامي","al":"center"}]},{"r":28,"h":34.0,"cells":[{"c":"A28","v":7,"al":"center"},{"c":"B28","v":"معامل خفض المقاومة لقوى القص والقص الثاقب"},{"c":"C28","v":"φ_v","b":true,"al":"center"},{"c":"D28","v":0.75,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E28","v":"-","al":"center"},{"c":"F28","v":"0.75 للقص والثقب","al":"center"},{"c":"G28","v":"SBC 304 Cl. 21.2 / ACI 318","al":"center"},{"c":"H28","v":"يضرب في مقاومة الخرسانة للقص Vc"},{"c":"I28","v":"إلزامي","al":"center"}]},{"r":29,"h":34.0,"cells":[{"c":"A29","v":8,"al":"center"},{"c":"B29","v":"معامل تصعيد الحمل الميت الكودي (Dead Load Factor)"},{"c":"C29","v":"γ_D","b":true,"al":"center"},{"c":"D29","v":1.2,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E29","v":"-","al":"center"},{"c":"F29","v":"1.20 (SBC/ACI) أو 1.40 (ECP)","al":"center"},{"c":"G29","v":"SBC 304 Ch. 5 / ACI 318","al":"center"},{"c":"H29","v":"يستخدم لحساب الحمل الأقصى Pu1 و Pu2"},{"c":"I29","v":"إلزامي","al":"center"}]},{"r":30,"h":34.0,"cells":[{"c":"A30","v":9,"al":"center"},{"c":"B30","v":"معامل تصعيد الحمل الحي الكودي (Live Load Factor)"},{"c":"C30","v":"γ_L","b":true,"al":"center"},{"c":"D30","v":1.6,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E30","v":"-","al":"center"},{"c":"F30","v":"1.60 (SBC/ACI) أو 1.60 (ECP)","al":"center"},{"c":"G30","v":"SBC 304 Ch. 5 / ACI 318","al":"center"},{"c":"H30","v":"يستخدم لحساب الحمل الأقصى Pu1 و Pu2"},{"c":"I30","v":"إلزامي","al":"center"}]},{"r":31,"h":28.0,"cells":[{"c":"A31","v":""},{"c":"B31","v":""},{"c":"C31","v":""},{"c":"D31","v":""},{"c":"E31","v":""},{"c":"F31","v":""},{"c":"G31","v":""},{"c":"H31","v":""},{"c":"I31","v":""}]},{"r":32,"h":38.0,"cells":[{"c":"A32","v":"4. فئات أسعار المواد والمصنعيات التقديرية (Unit Rates for Dynamic BOQ Costing)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":33,"h":40.0,"cells":[{"c":"A33","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B33","v":"بيان المادة أو البند التنفيذي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C33","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D33","v":"فئة السعر التقديرية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E33","v":"العملة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F33","v":"النطاق السعري التقديري بالسوق","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G33","v":"مكونات فئة البند (مصنعيات وتوريد)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H33","v":"طريقة الحصر والمحاسبة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I33","v":"المصدر","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":34,"h":52.0,"cells":[{"c":"A34","v":1,"al":"center"},{"c":"B34","v":"خرسانة عادية نظافة سمك 10 سم مقاومة كبريتات SRC"},{"c":"C34","v":"m³","al":"center"},{"c":"D34","v":240,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E34","v":"ر.س","al":"center"},{"c":"F34","v":"210 - 270 ر.س","al":"center"},{"c":"G34","v":"توريد خرسانة جاهزة + صب وتسوية بالموقع"},{"c":"H34","v":"هندسي صافي بالمتر المكعب","al":"center"},{"c":"I34","v":"أسعار السوق","al":"center"}]},{"r":35,"h":52.0,"cells":[{"c":"A35","v":2,"al":"center"},{"c":"B35","v":"خرسانة مسلحة للقواعد المشتركة C30/37 جاهزة الصب مع المضخة"},{"c":"C35","v":"m³","al":"center"},{"c":"D35","v":320,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E35","v":"ر.س","al":"center"},{"c":"F35","v":"290 - 360 ر.س","al":"center"},{"c":"G35","v":"توريد خرسانة جاهزة + مضخة + صب ودمك ومعالجة"},{"c":"H35","v":"هندسي صافي بالمتر المكعب","al":"center"},{"c":"I35","v":"أسعار السوق","al":"center"}]},{"r":36,"h":52.0,"cells":[{"c":"A36","v":3,"al":"center"},{"c":"B36","v":"حديد تسليح عالي المقاومة مشوه Grade 60 (مقطع ومثنى ومورد)"},{"c":"C36","v":"Ton","al":"center"},{"c":"D36","v":3250,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E36","v":"ر.س","al":"center"},{"c":"F36","v":"2900 - 3600 ر.س","al":"center"},{"c":"G36","v":"توريد حديد سابك/الراجحي + تشغيل وتوضيب وتجنيط"},{"c":"H36","v":"وزن هندسي حسب جدول BBS","al":"center"},{"c":"I36","v":"أسعار السوق","al":"center"}]},{"r":37,"h":52.0,"cells":[{"c":"A37","v":4,"al":"center"},{"c":"B37","v":"أعمال الشدات الخشبية والقوالب المعدنية لجوانب القواعد"},{"c":"C37","v":"m²","al":"center"},{"c":"D37","v":48,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E37","v":"ر.س","al":"center"},{"c":"F37","v":"40 - 60 ر.س","al":"center"},{"c":"G37","v":"نجارة مسلحة خشب بليوود + تدعيم وفك وتنظيف"},{"c":"H37","v":"مساحة مسطحة ملامسة للخرسانة","al":"center"},{"c":"I37","v":"أسعار السوق","al":"center"}]},{"r":38,"h":52.0,"cells":[{"c":"A38","v":5,"al":"center"},{"c":"B38","v":"أعمال العزل المائي للأسطح الخرسانية الملامسة للتربة (دهان بيتوميني)"},{"c":"C38","v":"m²","al":"center"},{"c":"D38","v":22,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E38","v":"ر.س","al":"center"},{"c":"F38","v":"18 - 28 ر.س","al":"center"},{"c":"G38","v":"دهان طبقتين بيتومين مطاطي عالي اللزوجة"},{"c":"H38","v":"مساحة مسطحة مدهونة شاملة الرقاب","al":"center"},{"c":"I38","v":"أسعار السوق","al":"center"}]},{"r":39,"h":28.0,"cells":[{"c":"A39","v":""},{"c":"B39","v":""},{"c":"C39","v":""},{"c":"D39","v":""},{"c":"E39","v":""},{"c":"F39","v":""},{"c":"G39","v":""},{"c":"H39","v":""},{"c":"I39","v":""}]},{"r":40,"h":28.0,"cells":[{"c":"A40","v":""},{"c":"B40","v":""},{"c":"C40","v":""},{"c":"D40","v":""},{"c":"E40","v":""},{"c":"F40","v":""},{"c":"G40","v":""},{"c":"H40","v":""},{"c":"I40","v":""}]},{"r":41,"h":36.0,"cells":[{"c":"A41","v":"مهندس الأساسات والتربة (Geotechnical Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D41","v":"مهندس التصميم الإنشائي والمكتب الفني (Structural Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G41","v":"المهندس الاستشاري المشرف (Supervising Consultant)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":42,"h":76.0,"cells":[{"c":"A42","v":"الاسم والتوقيع:\nرقم الاعتماد المهني:\nالتاريخ والختم الرسمي:","cs":3},{"skip":true},{"skip":true},{"c":"D42","v":"الاسم والتوقيع:\nرقم الاعتماد المهني:\nالتاريخ والختم الرسمي:","cs":3},{"skip":true},{"skip":true},{"c":"G42","v":"الاسم والتوقيع:\nرقم الاعتماد المهني:\nالتاريخ والختم الرسمي:","cs":3},{"skip":true},{"skip":true}]}]},{"name":"حساب الأبعاد وإجهادات التربة","maxRow":41,"maxCol":9,"colWidths":[16.0,54.0,16.0,22.0,12.0,22.0,22.0,22.0,22.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"تحديد الأبعاد الهندسية المثلى للقاعدة المشتركة وضمان انتظام إجهادات التلامس مع التربة","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"📌 المبدأ الإنشائي الحاكم: لضمان انتظام ضغوط التربة ومنع حدوث دوران أو هبوط متفاوت للقاعدة، يجب أن يتطابق مركز ثقل مساحة القاعدة المستطيلة تماماً مع نقطة تأثير محصلة أحمال العمودين (R = P1 + P2).","bg":"#EFF6FF","fg":"#475569","al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"1. بيانات وأبعاد وأحمال العمودين المشتركين (Columns Parameters & Load Combinations)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"كود العمود","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"الوصف والموقع الإنشائي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"عرض العمود cx (م)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"طول العمود cy (م)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"الحمل الميت PD (kN)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"الحمل الحي PL (kN)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"الحمل التشغيلي Pser (kN)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"الحمل الأقصى Pu (kN)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I5","v":"المسافة من حد الجار (م)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"C1 (العمود الخارجي / الجار)","b":true,"al":"center"},{"c":"B6","v":"عمود خارجي ملاصق لحد الجار - ارتداد مركزه 0.35 م عن حد الملكية"},{"c":"C6","v":0.4,"in":true,"al":"center","nf":"0.00"},{"c":"D6","v":0.6,"in":true,"al":"center","nf":"0.00"},{"c":"E6","v":850,"in":true,"al":"center","nf":"#,##0.0"},{"c":"F6","v":350,"in":true,"al":"center","nf":"#,##0.0"},{"c":"G6","v":1200,"f":"=E6+F6","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"H6","v":1580,"f":"='إعدادات المشروع والتربة'!$D$29*E6+'إعدادات المشروع والتربة'!$D$30*F6","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"I6","v":0.35,"in":true,"al":"center","nf":"0.00"}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":"C2 (العمود الداخلي)","b":true,"al":"center"},{"c":"B7","v":"عمود داخلي متصل بالعمود C1 على محور إنشائي واحد"},{"c":"C7","v":0.5,"in":true,"al":"center","nf":"0.00"},{"c":"D7","v":0.7,"in":true,"al":"center","nf":"0.00"},{"c":"E7","v":1350,"in":true,"al":"center","nf":"#,##0.0"},{"c":"F7","v":550,"in":true,"al":"center","nf":"#,##0.0"},{"c":"G7","v":1900,"f":"=E7+F7","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"H7","v":2500,"f":"='إعدادات المشروع والتربة'!$D$29*E7+'إعدادات المشروع والتربة'!$D$30*F7","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"I7","v":0.35,"f":"=I6+C9","al":"center","nf":"0.00"}]},{"r":8,"h":36.0,"cells":[{"c":"A8","v":"المسافة المحورية الصافية بين مركزي العمودين S (Center-to-Center):","bg":"#EFF6FF","b":true,"cs":2},{"skip":true},{"c":"C8","v":4.6,"in":true,"bg":"#FEF3C7","b":true,"al":"center","nf":"0.00"},{"c":"D8","v":"متر","al":"center"},{"c":"E8","v":"محدد معماري ثابت بين محاور الأعمدة الإنشائية","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":28.0,"cells":[{"c":"A9","v":""},{"c":"B9","v":""},{"c":"C9","v":""},{"c":"D9","v":""},{"c":"E9","v":""},{"c":"F9","v":""},{"c":"G9","v":""},{"c":"H9","v":""},{"c":"I9","v":""}]},{"r":10,"h":38.0,"cells":[{"c":"A10","v":"2. حساب مركز ثقل المحصلة وتحديد أبعاد القاعدة L و B (Centroid & Geometry Optimization)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":"إجمالي الحمل التشغيلي للعمودين (Total Service Load):","b":true,"cs":2},{"skip":true},{"c":"C11","v":"R_ser","b":true,"al":"center"},{"c":"D11","v":3100,"f":"=G6+G7","b":true,"al":"center","nf":"#,##0.0"},{"c":"E11","v":"kN","al":"center"},{"c":"F11","v":"مجموع الأحمال التشغيلية الرأسية P1 + P2 المؤثرة على التربة","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":"إجمالي الحمل الأقصى المصعد للعمودين (Total Ultimate Load):","b":true,"cs":2},{"skip":true},{"c":"C12","v":"R_u","b":true,"al":"center"},{"c":"D12","v":4080,"f":"=H6+H7","b":true,"al":"center","nf":"#,##0.0"},{"c":"E12","v":"kN","al":"center"},{"c":"F12","v":"مجموع الأحمال القصوى المصعدة Pu1 + Pu2 المستخدمة في التصميم الإنشائي","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":"المسافة من مركز العمود الأول C1 إلى خط عمل المحصلة x̄:","cs":2},{"skip":true},{"c":"C13","v":"x̄_c1","b":true,"al":"center"},{"c":"D13","v":2.819355,"f":"=(G7*C8)/D11","b":true,"al":"center","nf":"#,##0.00"},{"c":"E13","v":"m","al":"center"},{"c":"F13","v":"تطبيق معادلة العزوم حول مركز C1: x̄ = (P2 × S) / R_ser","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":"المسافة من طرف القاعدة الأيسر (حد الجار) إلى خط عمل المحصلة XR:","cs":2},{"skip":true},{"c":"C14","v":"X_R","b":true,"al":"center"},{"c":"D14","v":3.169355,"f":"=I6+D13","b":true,"al":"center","nf":"#,##0.00"},{"c":"E14","v":"m","al":"center"},{"c":"F14","v":"XR = x_edge1 + x̄_c1 (موقع المحصلة بالنسبة للطرف الأيسر)","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":"الطول النظري التام للقاعدة لتحقيق إجهاد تلامس منتظم (L_exact = 2 × XR):","cs":2},{"skip":true},{"c":"C15","v":"L_req","b":true,"al":"center"},{"c":"D15","v":6.33871,"f":"=2*D14","b":true,"al":"center","nf":"#,##0.00"},{"c":"E15","v":"m","al":"center"},{"c":"F15","v":"لكي يتطابق مركز المستطيل مع المحصلة تماماً يجب أن يكون L = 2 × XR","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":"الطول التصميمي المعتمد للقاعدة L (مقرباً لأقرب 10 سم):","bg":"#EFF6FF","b":true,"cs":2},{"skip":true},{"c":"C16","v":"L_footing","b":true,"al":"center"},{"c":"D16","v":6.4,"f":"=ROUNDUP(D15,1)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E16","v":"m","al":"center"},{"c":"F16","v":"الطول الإجمالي الحقيقي المعتمد في المخططات الإنشائية","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":"مسافة بروز كابولي القاعدة خلف العمود الثاني C2 (Cantilever e2):","cs":2},{"skip":true},{"c":"C17","v":"e2_cant","b":true,"al":"center"},{"c":"D17","v":1.45,"f":"=D16-(I6+C8)","b":true,"al":"center","nf":"#,##0.00"},{"c":"E17","v":"m","al":"center"},{"c":"F17","v":"e2 = L - (x_edge1 + S) مسافة البروز حتى حافة القاعدة اليمنى","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":"مسافة البروز الصافي من وجه العمود C2 حتى حافة القاعدة:","cs":2},{"skip":true},{"c":"C18","v":"e2_net","b":true,"al":"center"},{"c":"D18","v":1.2,"f":"=D17-(C7/2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"E18","v":"m","al":"center"},{"c":"F18","v":"البروز الصافي المستخدم لحساب العزم وقوى القص لكابولي C2","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":"الوزن الذاتي التقديري للقاعدة والردم فوقها (8% من حمل الأعمدة):","cs":2},{"skip":true},{"c":"C19","v":"W_footing","b":true,"al":"center"},{"c":"D19","v":248,"f":"=0.08*D11","b":true,"al":"center","nf":"#,##0.0"},{"c":"E19","v":"kN","al":"center"},{"c":"F19","v":"قيمة استرشادية لوزن كتلة الخرسانة والتربة أعلى القاعدة","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":"إجمالي الحمل التشغيلي الكلي الواقع على التربة (P_total + W_f):","b":true,"cs":2},{"skip":true},{"c":"C20","v":"P_soil_total","b":true,"al":"center"},{"c":"D20","v":3348,"f":"=D11+D19","b":true,"al":"center","nf":"#,##0.0"},{"c":"E20","v":"kN","al":"center"},{"c":"F20","v":"الحمل الكلي المطبق على منسوب التأسيس شامل الردم","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":"مساحة التأسيس المطلوبة وفق جهد التربة الإجمالي المسموح به:","b":true,"cs":2},{"skip":true},{"c":"C21","v":"A_req","b":true,"al":"center"},{"c":"D21","v":15.218182,"f":"=D20/'إعدادات المشروع والتربة'!$D$14","b":true,"al":"center","nf":"#,##0.00"},{"c":"E21","v":"m²","al":"center"},{"c":"F21","v":"A_req = P_soil_total / q_all,gross","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":"العرض النظري الأدنى المطلوب للقاعدة (B_min = A_req / L):","cs":2},{"skip":true},{"c":"C22","v":"B_req","b":true,"al":"center"},{"c":"D22","v":2.377841,"f":"=D21/D16","b":true,"al":"center","nf":"#,##0.00"},{"c":"E22","v":"m","al":"center"},{"c":"F22","v":"عرض القاعدة المشتركة لضمان عدم تجاوز جهد التربة المسموح","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":"العرض التصميمي المعتمد للقاعدة B (مقرباً لأقرب 10 سم):","bg":"#EFF6FF","b":true,"cs":2},{"skip":true},{"c":"C23","v":"B_footing","b":true,"al":"center"},{"c":"D23","v":2.4,"f":"=ROUNDUP(D22,1)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E23","v":"m","al":"center"},{"c":"F23","v":"العرض الإجمالي المعتمد في المخططات الإنشائية","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":"المساحة التصميمية الفعلية للقاعدة المشتركة (A_actual = L × B):","cs":2},{"skip":true},{"c":"C24","v":"A_actual","b":true,"al":"center"},{"c":"D24","v":15.36,"f":"=D16*D23","b":true,"al":"center","nf":"#,##0.00"},{"c":"E24","v":"m²","al":"center"},{"c":"F24","v":"مساحة التلامس الفعلية لفرشة الخرسانة المسلحة مع التربة","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":25,"h":28.0,"cells":[{"c":"A25","v":""},{"c":"B25","v":""},{"c":"C25","v":""},{"c":"D25","v":""},{"c":"E25","v":""},{"c":"F25","v":""},{"c":"G25","v":""},{"c":"H25","v":""},{"c":"I25","v":""}]},{"r":26,"h":38.0,"cells":[{"c":"A26","v":"3. التحقق من إجهادات التلامس الفعلية مع التربة (Soil Contact Stress Verification)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":"إجهاد التلامس التشغيلي الفعلي مع التربة (Actual Soil Contact Stress):","cs":2},{"skip":true},{"c":"C27","v":"q_act","b":true,"al":"center"},{"c":"D27","v":217.96875,"f":"=D20/D24","b":true,"al":"center","nf":"#,##0.00"},{"c":"E27","v":"kN/m²","al":"center"},{"c":"F27","v":"q_act = P_soil_total / A_actual (إجهاد تلامس منتظم ومثالي)","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":28,"h":34.0,"cells":[{"c":"A28","v":"جهد التربة الإجمالي الأقصى المسموح به كودياً:","cs":2},{"skip":true},{"c":"C28","v":"q_all,gross","b":true,"al":"center"},{"c":"D28","v":220,"f":"='إعدادات المشروع والتربة'!$D$14","b":true,"al":"center","nf":"#,##0.00"},{"c":"E28","v":"kN/m²","al":"center"},{"c":"F28","v":"مأخوذ مباشرة من شيت إعدادات المشروع وتقارير فحص التربة","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":29,"h":34.0,"cells":[{"c":"A29","v":"نسبة استنفاد إجهاد التربة (Stress Utilization Ratio):","cs":2},{"skip":true},{"c":"C29","v":"UR_soil","b":true,"al":"center"},{"c":"D29","v":0.990767,"f":"=D27/D28","bg":"#DBEAFE","b":true,"al":"center","nf":"0.0%"},{"c":"E29","v":"-","al":"center"},{"c":"F29","v":"UR = q_act / q_all,gross (يجب ألا تتجاوز 1.00 لتحقيق الأمان)","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":30,"h":34.0,"cells":[{"c":"A30","v":"التقييم الهندسي والتحقق الكودي لحالة إجهاد التربة:","bg":"#EFF6FF","b":true,"cs":2},{"skip":true},{"c":"C30","v":"Status","b":true,"al":"center"},{"c":"D30","v":"محقق وآمن تماماً (SAFE - UR < 1.0)","f":"=IF(D29<=1.0,\"محقق وآمن تماماً (SAFE - UR < 1.0)\",\"غير آمن - يلزم زيادة أبعاد القاعدة\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"E30","v":"-","al":"center"},{"c":"F30","v":"معيار القبول الكودي: عدم تجاوز جهد التربة المسموح تحت أحمال التشغيل","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":31,"h":34.0,"cells":[{"c":"A31","v":"الحمل المصعد الموزع بانتظام على طول امتداد القاعدة (Line Load):","b":true,"cs":2},{"skip":true},{"c":"C31","v":"w_u","b":true,"al":"center"},{"c":"D31","v":637.5,"f":"=D12/D16","b":true,"al":"center","nf":"#,##0.00"},{"c":"E31","v":"kN/m","al":"center"},{"c":"F31","v":"w_u = R_u / L_footing (يستخدم لرسم منحنيات العزوم والقص الإنشائية)","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":32,"h":34.0,"cells":[{"c":"A32","v":"إجهاد التربة التصميمي المصعد لوحدة المساحة (Factored Soil Pressure):","cs":2},{"skip":true},{"c":"C32","v":"q_u","b":true,"al":"center"},{"c":"D32","v":265.625,"f":"=D31/D23","b":true,"al":"center","nf":"#,##0.00"},{"c":"E32","v":"kN/m²","al":"center"},{"c":"F32","v":"q_u = w_u / B_footing = R_u / (L × B) يستخدم لحسابات القص والقص الثاقب","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":33,"h":28.0,"cells":[{"c":"A33","v":""},{"c":"B33","v":""},{"c":"C33","v":""},{"c":"D33","v":""},{"c":"E33","v":""},{"c":"F33","v":""},{"c":"G33","v":""},{"c":"H33","v":""},{"c":"I33","v":""}]},{"r":34,"h":28.0,"cells":[{"c":"A34","v":""},{"c":"B34","v":""},{"c":"C34","v":""},{"c":"D34","v":""},{"c":"E34","v":""},{"c":"F34","v":""},{"c":"G34","v":""},{"c":"H34","v":""},{"c":"I34","v":""}]},{"r":35,"h":34.0,"cells":[{"c":"A35","v":"الطول الإجمالي للقاعدة L","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C35","v":"العرض الإجمالي للقاعدة B","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"E35","v":"إجهاد التلامس الفعلي q_act","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"G35","v":"الحمل الخطي المصعد w_u","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":36,"h":46.0,"cells":[{"c":"A36","v":6.4,"f":"=D16","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00","cs":2},{"skip":true},{"c":"C36","v":2.4,"f":"=D23","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00","cs":2},{"skip":true},{"c":"E36","v":217.96875,"f":"=D27","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00","cs":2},{"skip":true},{"c":"G36","v":637.5,"f":"=D31","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00","cs":3},{"skip":true},{"skip":true}]},{"r":37,"h":34.0,"cells":[{"c":"A37","v":"متر (مقرب كودياً)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C37","v":"متر (مقرب كودياً)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"E37","v":"kN/m² (أقل من المسموح)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"G37","v":"kN/m (لتصميم العزوم والقص)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":38,"h":28.0,"cells":[{"c":"A38","v":""},{"c":"B38","v":""},{"c":"C38","v":""},{"c":"D38","v":""},{"c":"E38","v":""},{"c":"F38","v":""},{"c":"G38","v":""},{"c":"H38","v":""},{"c":"I38","v":""}]},{"r":39,"h":28.0,"cells":[{"c":"A39","v":""},{"c":"B39","v":""},{"c":"C39","v":""},{"c":"D39","v":""},{"c":"E39","v":""},{"c":"F39","v":""},{"c":"G39","v":""},{"c":"H39","v":""},{"c":"I39","v":""}]},{"r":40,"h":36.0,"cells":[{"c":"A40","v":"مهندس الأساسات والتربة (Geotechnical Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D40","v":"مهندس التصميم الإنشائي والمكتب الفني (Structural Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G40","v":"المهندس الاستشاري المشرف (Supervising Consultant)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":41,"h":76.0,"cells":[{"c":"A41","v":"الاسم والتوقيع:\nرقم الاعتماد المهني:\nالتاريخ والختم الرسمي:","cs":3},{"skip":true},{"skip":true},{"c":"D41","v":"الاسم والتوقيع:\nرقم الاعتماد المهني:\nالتاريخ والختم الرسمي:","cs":3},{"skip":true},{"skip":true},{"c":"G41","v":"الاسم والتوقيع:\nرقم الاعتماد المهني:\nالتاريخ والختم الرسمي:","cs":3},{"skip":true},{"skip":true}]}]},{"name":"تحليل العزوم وقوى القص","maxRow":32,"maxCol":9,"colWidths":[12.0,48.0,18.0,22.0,22.0,22.0,22.0,30.0,20.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"التحليل الإنشائي الكامل لمنحنيات قوى القص (SFD) وعزوم الانحناء (BMD) على امتداد القاعدة المشتركة","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"📌 السلوك الإنشائي للقاعدة المشتركة: تعمل القاعدة ككمرة مقلوبة ترتكز على عمودين وتحمل ضغط تربة منتظم للأعلى. ينتج عن ذلك عزم سالب علوي (Hogging Moment) بين العمودين يستلزم تسليحاً علوياً رئيسياً، وعزوم موجبة سفلية عند كوابيل الأطراف.","bg":"#EFF6FF","fg":"#475569","al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"1. جدول المحطات والقطاعات الحرجة لحساب قوى القص وعزوم الانحناء (Critical Stations SFD & BMD)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"المحطة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"الموقع والوصف الإنشائي للقطاع","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"المسافة x من الطرف الأيسر (م)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"قوة القص يسار القطاع V_left (kN)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"قوة القص يمين القطاع V_right (kN)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"قوة القص التصميمية الحاكمة |Vu| (kN)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"عزم الانحناء التصميمي Mu (kN.m)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"طبيعة الإجهاد وموقع التسليح","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I5","v":"المرجع الكودي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":36.0,"cells":[{"c":"A6","v":"Sec-01","b":true,"al":"center"},{"c":"B6","v":"الطرف الأيسر للقاعدة (حد الجار الأقصى)"},{"c":"C6","v":0,"in":true,"al":"center","nf":"0.00"},{"c":"D6","v":0,"f":"=0","al":"center","nf":"#,##0.0"},{"c":"E6","v":0,"f":"=0","al":"center","nf":"#,##0.0"},{"c":"F6","v":0,"f":"=0","b":true,"al":"center","nf":"#,##0.0"},{"c":"G6","v":0,"f":"=0","b":true,"al":"center","nf":"#,##0.0"},{"c":"H6","v":"نقطة بداية - قوى صفرية"},{"c":"I6","v":"SBC 304 / ACI 318","al":"center"}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":"Sec-02","b":true,"al":"center"},{"c":"B7","v":"الوجه الخارجي للعمود C1 (نهاية كابولي الجار)"},{"c":"C7","v":0.15,"f":"='حساب الأبعاد وإجهادات التربة'!$I$6-('حساب الأبعاد وإجهادات التربة'!$C$6/2)","al":"center","nf":"0.00"},{"c":"D7","v":95.625,"f":"='حساب الأبعاد وإجهادات التربة'!$D$31*C7","al":"center","nf":"#,##0.0"},{"c":"E7","v":95.625,"f":"='حساب الأبعاد وإجهادات التربة'!$D$31*C7","al":"center","nf":"#,##0.0"},{"c":"F7","v":95.625,"f":"=D7","b":true,"al":"center","nf":"#,##0.0"},{"c":"G7","v":-7.171875,"f":"=-(('حساب الأبعاد وإجهادات التربة'!$D$31*(C7^2))/2)","b":true,"al":"center","nf":"#,##0.0"},{"c":"H7","v":"عزم سفلي كابولي (تسليح سفلي)"},{"c":"I7","v":"SBC 304 Cl. 13.2","al":"center"}]},{"r":8,"h":36.0,"cells":[{"c":"A8","v":"Sec-03","b":true,"al":"center"},{"c":"B8","v":"محور العمود C1 (نقطة تطبيق الحمل المركّز Pu1)"},{"c":"C8","v":0.35,"f":"='حساب الأبعاد وإجهادات التربة'!$I$6","al":"center","nf":"0.00"},{"c":"D8","v":223.125,"f":"='حساب الأبعاد وإجهادات التربة'!$D$31*C8","al":"center","nf":"#,##0.0"},{"c":"E8","v":-1356.875,"f":"=D8-'حساب الأبعاد وإجهادات التربة'!$H$6","al":"center","nf":"#,##0.0"},{"c":"F8","v":1356.875,"f":"=MAX(ABS(D8),ABS(E8))","b":true,"al":"center","nf":"#,##0.0"},{"c":"G8","v":-39.046875,"f":"=-(('حساب الأبعاد وإجهادات التربة'!$D$31*(C8^2))/2)","b":true,"al":"center","nf":"#,##0.0"},{"c":"H8","v":"عزم سالب/سفلي عند محور العمود"},{"c":"I8","v":"SBC 304 Cl. 13.2","al":"center"}]},{"r":9,"h":36.0,"cells":[{"c":"A9","v":"Sec-04","b":true,"al":"center"},{"c":"B9","v":"الوجه الداخلي للعمود C1 (بداية البحر بين العمودين)"},{"c":"C9","v":0.55,"f":"='حساب الأبعاد وإجهادات التربة'!$I$6+('حساب الأبعاد وإجهادات التربة'!$C$6/2)","al":"center","nf":"0.00"},{"c":"D9","v":-1229.375,"f":"='حساب الأبعاد وإجهادات التربة'!$D$31*C9-'حساب الأبعاد وإجهادات التربة'!$H$6","al":"center","nf":"#,##0.0"},{"c":"E9","v":-1229.375,"f":"='حساب الأبعاد وإجهادات التربة'!$D$31*C9-'حساب الأبعاد وإجهادات التربة'!$H$6","al":"center","nf":"#,##0.0"},{"c":"F9","v":1229.375,"f":"=ABS(D9)","b":true,"al":"center","nf":"#,##0.0"},{"c":"G9","v":-219.578125,"f":"='حساب الأبعاد وإجهادات التربة'!$D$31*(C9^2)/2-'حساب الأبعاد وإجهادات التربة'!$H$6*(C9-'حساب الأبعاد وإجهادات التربة'!$I$6)","b":true,"al":"center","nf":"#,##0.0"},{"c":"H9","v":"عزم سالب علوي (تسليح علوي رئيسي)"},{"c":"I9","v":"SBC 304 Cl. 13.2","al":"center"}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":"Sec-05","b":true,"al":"center"},{"c":"B10","v":"نقطة الصفر لقوى القص (Zero Shear) - أقصى عزم سالب"},{"c":"C10","v":2.478431,"f":"='حساب الأبعاد وإجهادات التربة'!$H$6/'حساب الأبعاد وإجهادات التربة'!$D$31","al":"center","nf":"0.00"},{"c":"D10","v":0,"f":"=0","al":"center","nf":"#,##0.0"},{"c":"E10","v":0,"f":"=0","al":"center","nf":"#,##0.0"},{"c":"F10","v":0,"f":"=0","bg":"#FEF3C7","fg":"#92400E","b":true,"al":"center","nf":"#,##0.0"},{"c":"G10","v":-1404.960784,"f":"=('حساب الأبعاد وإجهادات التربة'!$D$31*(C10^2))/2-'حساب الأبعاد وإجهادات التربة'!$H$6*(C10-'حساب الأبعاد وإجهادات التربة'!$I$6)","bg":"#FEF3C7","fg":"#92400E","b":true,"al":"center","nf":"#,##0.0"},{"c":"H10","v":"أقصى عزم سالب علوي (Peak Hogging)"},{"c":"I10","v":"SBC 304 Cl. 13.3","al":"center"}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":"Sec-06","b":true,"al":"center"},{"c":"B11","v":"الوجه الداخلي للعمود C2 (نهاية البحر بين العمودين)"},{"c":"C11","v":0.1,"f":"='حساب الأبعاد وإجهادات التربة'!$I$7-('حساب الأبعاد وإجهادات التربة'!$C$7/2)","al":"center","nf":"0.00"},{"c":"D11","v":-1516.25,"f":"='حساب الأبعاد وإجهادات التربة'!$D$31*C11-'حساب الأبعاد وإجهادات التربة'!$H$6","al":"center","nf":"#,##0.0"},{"c":"E11","v":-1516.25,"f":"='حساب الأبعاد وإجهادات التربة'!$D$31*C11-'حساب الأبعاد وإجهادات التربة'!$H$6","al":"center","nf":"#,##0.0"},{"c":"F11","v":1516.25,"f":"=ABS(D11)","b":true,"al":"center","nf":"#,##0.0"},{"c":"G11","v":398.1875,"f":"=('حساب الأبعاد وإجهادات التربة'!$D$31*(C11^2))/2-'حساب الأبعاد وإجهادات التربة'!$H$6*(C11-'حساب الأبعاد وإجهادات التربة'!$I$6)","b":true,"al":"center","nf":"#,##0.0"},{"c":"H11","v":"عزم سالب علوي (تسليح علوي رئيسي)"},{"c":"I11","v":"SBC 304 Cl. 13.2","al":"center"}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":"Sec-07","b":true,"al":"center"},{"c":"B12","v":"محور العمود C2 (نقطة تطبيق الحمل المركّز Pu2)"},{"c":"C12","v":0.35,"f":"='حساب الأبعاد وإجهادات التربة'!$I$7","al":"center","nf":"0.00"},{"c":"D12","v":-1356.875,"f":"='حساب الأبعاد وإجهادات التربة'!$D$31*C12-'حساب الأبعاد وإجهادات التربة'!$H$6","al":"center","nf":"#,##0.0"},{"c":"E12","v":-3856.875,"f":"=D12-'حساب الأبعاد وإجهادات التربة'!$H$7","al":"center","nf":"#,##0.0"},{"c":"F12","v":3856.875,"f":"=MAX(ABS(D12),ABS(E12))","b":true,"al":"center","nf":"#,##0.0"},{"c":"G12","v":39.046875,"f":"=('حساب الأبعاد وإجهادات التربة'!$D$31*(C12^2))/2-'حساب الأبعاد وإجهادات التربة'!$H$6*(C12-'حساب الأبعاد وإجهادات التربة'!$I$6)","b":true,"al":"center","nf":"#,##0.0"},{"c":"H12","v":"عزم عند محور العمود الداخلي C2"},{"c":"I12","v":"SBC 304 Cl. 13.2","al":"center"}]},{"r":13,"h":36.0,"cells":[{"c":"A13","v":"Sec-08","b":true,"al":"center"},{"c":"B13","v":"الوجه الخارجي للعمود C2 (بداية الكابولي الأيمن)"},{"c":"C13","v":0.6,"f":"='حساب الأبعاد وإجهادات التربة'!$I$7+('حساب الأبعاد وإجهادات التربة'!$C$7/2)","al":"center","nf":"0.00"},{"c":"D13","v":-3697.5,"f":"='حساب الأبعاد وإجهادات التربة'!$D$31*C13-'حساب الأبعاد وإجهادات التربة'!$H$6-'حساب الأبعاد وإجهادات التربة'!$H$7","al":"center","nf":"#,##0.0"},{"c":"E13","v":-3697.5,"f":"='حساب الأبعاد وإجهادات التربة'!$D$31*C13-'حساب الأبعاد وإجهادات التربة'!$H$6-'حساب الأبعاد وإجهادات التربة'!$H$7","al":"center","nf":"#,##0.0"},{"c":"F13","v":3697.5,"f":"=ABS(D13)","b":true,"al":"center","nf":"#,##0.0"},{"c":"G13","v":-10722.75,"f":"=-(('حساب الأبعاد وإجهادات التربة'!$D$31*(('حساب الأبعاد وإجهادات التربة'!$D$16-C13)^2))/2)","b":true,"al":"center","nf":"#,##0.0"},{"c":"H13","v":"عزم موجب سفلي لكابولي C2"},{"c":"I13","v":"SBC 304 Cl. 13.2","al":"center"}]},{"r":14,"h":36.0,"cells":[{"c":"A14","v":"Sec-09","b":true,"al":"center"},{"c":"B14","v":"الطرف الأيمن للقاعدة المشتركة"},{"c":"C14","v":6.4,"f":"='حساب الأبعاد وإجهادات التربة'!$D$16","al":"center","nf":"0.00"},{"c":"D14","v":0,"f":"=0","al":"center","nf":"#,##0.0"},{"c":"E14","v":0,"f":"=0","al":"center","nf":"#,##0.0"},{"c":"F14","v":0,"f":"=0","b":true,"al":"center","nf":"#,##0.0"},{"c":"G14","v":0,"f":"=0","b":true,"al":"center","nf":"#,##0.0"},{"c":"H14","v":"نقطة نهاية - قوى صفرية"},{"c":"I14","v":"SBC 304 / ACI 318","al":"center"}]},{"r":15,"h":28.0,"cells":[{"c":"A15","v":""},{"c":"B15","v":""},{"c":"C15","v":""},{"c":"D15","v":""},{"c":"E15","v":""},{"c":"F15","v":""},{"c":"G15","v":""},{"c":"H15","v":""},{"c":"I15","v":""}]},{"r":16,"h":38.0,"cells":[{"c":"A16","v":"2. ملخص القوى التصميمية الحاكمة لتسليح وسماكة القاعدة (Summary of Governing Design Actions)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":"أقصى عزم انحناء سالب علوي بين العمودين (Maximum Negative Hogging Moment):","bg":"#EFF6FF","b":true,"cs":2},{"skip":true},{"c":"C17","v":"Mu_max,neg","b":true,"al":"center"},{"c":"D17","v":1404.960784,"f":"=ABS(G10)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"E17","v":"kN.m","al":"center"},{"c":"F17","v":"يحكم تصميم شبكة حديد التسليح الطولي العلوي للقاعدة","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":"موقع نقطة أقصى عزم سالب من الطرف الأيسر (Zero Shear Location x0):","bg":"#EFF6FF","b":true,"cs":2},{"skip":true},{"c":"C18","v":"x_zero_shear","b":true,"al":"center"},{"c":"D18","v":2.478431,"f":"=C10","bg":"#DBEAFE","b":true,"al":"center","nf":"0.00"},{"c":"E18","v":"m","al":"center"},{"c":"F18","v":"النقطة التي تنعدم عندها قوى القص وينعكس اتجاه الإجهادات","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":"عزم الانحناء الموجب السفلي عند وجه عمود الجار C1 (Cantilever 1 Moment):","cs":2},{"skip":true},{"c":"C19","v":"Mu_cant1","b":true,"al":"center"},{"c":"D19","v":7.171875,"f":"=ABS(G7)","b":true,"al":"center","nf":"#,##0.0"},{"c":"E19","v":"kN.m","al":"center"},{"c":"F19","v":"يحكم تسليح كابولي الجار السفلي بالاتجاه الطولي","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":"عزم الانحناء الموجب السفلي عند وجه العمود الداخلي C2 (Cantilever 2 Moment):","cs":2},{"skip":true},{"c":"C20","v":"Mu_cant2","b":true,"al":"center"},{"c":"D20","v":10722.75,"f":"=ABS(G13)","b":true,"al":"center","nf":"#,##0.0"},{"c":"E20","v":"kN.m","al":"center"},{"c":"F20","v":"يحكم تسليح كابولي الطرف الأيمن السفلي بالاتجاه الطولي","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":"أقصى قوة قص عند الوجه الداخلي لعمود الجار C1:","bg":"#EFF6FF","b":true,"cs":2},{"skip":true},{"c":"C21","v":"Vu_face_C1","b":true,"al":"center"},{"c":"D21","v":1229.375,"f":"=F9","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"E21","v":"kN","al":"center"},{"c":"F21","v":"تستخدم لمراجعة قص الكمرات على مسافة d من وجه العمود C1","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":"أقصى قوة قص عند الوجه الداخلي للعمود الداخلي C2:","bg":"#EFF6FF","b":true,"cs":2},{"skip":true},{"c":"C22","v":"Vu_face_C2","b":true,"al":"center"},{"c":"D22","v":1516.25,"f":"=F11","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"E22","v":"kN","al":"center"},{"c":"F22","v":"تستخدم لمراجعة قص الكمرات على مسافة d من وجه العمود C2","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":"أقصى قوة قص مطلقة حاكمة على كامل القاعدة (Maximum Nominal Shear):","bg":"#EFF6FF","b":true,"cs":2},{"skip":true},{"c":"C23","v":"Vu_max,abs","b":true,"al":"center"},{"c":"D23","v":3856.875,"f":"=MAX(F7:F14)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"E23","v":"kN","al":"center"},{"c":"F23","v":"أعلى قوى قص مؤثرة في القطاعات الإنشائية","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":24,"h":28.0,"cells":[{"c":"A24","v":""},{"c":"B24","v":""},{"c":"C24","v":""},{"c":"D24","v":""},{"c":"E24","v":""},{"c":"F24","v":""},{"c":"G24","v":""},{"c":"H24","v":""},{"c":"I24","v":""}]},{"r":25,"h":28.0,"cells":[{"c":"A25","v":""},{"c":"B25","v":""},{"c":"C25","v":""},{"c":"D25","v":""},{"c":"E25","v":""},{"c":"F25","v":""},{"c":"G25","v":""},{"c":"H25","v":""},{"c":"I25","v":""}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":"أقصى عزم سالب علوي Mu,neg","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C26","v":"عزم كابولي C2 السفلي Mu,cant2","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"E26","v":"موقع الصفر للقص x0","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"G26","v":"أقصى قوى قص مطلقة Vu,max","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":27,"h":46.0,"cells":[{"c":"A27","v":1404.960784,"f":"=D17","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0","cs":2},{"skip":true},{"c":"C27","v":10722.75,"f":"=D20","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0","cs":2},{"skip":true},{"c":"E27","v":2.478431,"f":"=D18","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"0.00","cs":2},{"skip":true},{"c":"G27","v":3856.875,"f":"=D23","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0","cs":3},{"skip":true},{"skip":true}]},{"r":28,"h":34.0,"cells":[{"c":"A28","v":"kN.m (تسليح علوي رئيسي)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C28","v":"kN.m (تسليح سفلي للكابولي)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"E28","v":"متر (نقطة أقصى عزم)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"G28","v":"kN (عند وجه العمود الداخلي)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":29,"h":28.0,"cells":[{"c":"A29","v":""},{"c":"B29","v":""},{"c":"C29","v":""},{"c":"D29","v":""},{"c":"E29","v":""},{"c":"F29","v":""},{"c":"G29","v":""},{"c":"H29","v":""},{"c":"I29","v":""}]},{"r":30,"h":28.0,"cells":[{"c":"A30","v":""},{"c":"B30","v":""},{"c":"C30","v":""},{"c":"D30","v":""},{"c":"E30","v":""},{"c":"F30","v":""},{"c":"G30","v":""},{"c":"H30","v":""},{"c":"I30","v":""}]},{"r":31,"h":36.0,"cells":[{"c":"A31","v":"مهندس الأساسات والتربة (Geotechnical Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D31","v":"مهندس التصميم الإنشائي والمكتب الفني (Structural Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G31","v":"المهندس الاستشاري المشرف (Supervising Consultant)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":32,"h":76.0,"cells":[{"c":"A32","v":"الاسم والتوقيع:\nرقم الاعتماد المهني:\nالتاريخ والختم الرسمي:","cs":3},{"skip":true},{"skip":true},{"c":"D32","v":"الاسم والتوقيع:\nرقم الاعتماد المهني:\nالتاريخ والختم الرسمي:","cs":3},{"skip":true},{"skip":true},{"c":"G32","v":"الاسم والتوقيع:\nرقم الاعتماد المهني:\nالتاريخ والختم الرسمي:","cs":3},{"skip":true},{"skip":true}]}]},{"name":"فحص القص وسماكة القاعدة","maxRow":41,"maxCol":7,"colWidths":[16.0,54.0,18.0,20.0,12.0,22.0,22.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"التحقق من كفاية سمك القاعدة المشتركة لمقاومة قص الكمرات والقص الثاقب وفق SBC 304 و ACI 318","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"📌 الاشتراط الكودي للسمك: يتم تحديد سمك القاعدة المشتركة الإجمالي h بحيث يقاوم قوى القص أحادي الاتجاه (One-Way Shear) على بعد مسافة d من وجه العمود، والقص الثاقب ثنائي الاتجاه (Two-Way Punching) على بعد d/2 من محيط العمود دون الحاجة إلى كانات قص.","bg":"#EFF6FF","fg":"#475569","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"1. معاملات السمك الإجمالي والعمق الفعال للقطاع (Footing Thickness & Effective Depth)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"السمك الكلي المقترح للقاعدة المشتركة (Total Footing Thickness):","b":true,"cs":2},{"skip":true},{"c":"C5","v":0.85,"in":true,"b":true,"al":"center","nf":"0.000"},{"c":"D5","v":"h_footing","b":true,"al":"center"},{"c":"E5","v":"m","al":"center"},{"c":"F5","v":"سمك خرسانة القاعدة المعتمد (850 مم)","cs":2},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"الغطاء الخرساني الصافي للقواعد الملامسة للتربة (Clear Concrete Cover):","cs":2},{"skip":true},{"c":"C6","v":0.075,"f":"='إعدادات المشروع والتربة'!$D$26/1000","b":true,"al":"center","nf":"0.000"},{"c":"D6","v":"c_cover","b":true,"al":"center"},{"c":"E6","v":"m","al":"center"},{"c":"F6","v":"75 مم وفق متطلبات SBC 304 لحماية حديد التسليح","cs":2},{"skip":true}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"القطر الافتراضي لأسياخ التسليح الرئيسية (Assumed Rebar Bar Diameter):","cs":2},{"skip":true},{"c":"C7","v":0.022,"in":true,"b":true,"al":"center","nf":"0.000"},{"c":"D7","v":"Φ_bar","b":true,"al":"center"},{"c":"E7","v":"m","al":"center"},{"c":"F7","v":"قطر 22 مم لأسياخ التسليح الطولي","cs":2},{"skip":true}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"العمق الفعال التصميمي لحديد التسليح العلوي الرئيسي (Effective Depth d_top):","bg":"#EFF6FF","b":true,"cs":2},{"skip":true},{"c":"C8","v":0.764,"f":"=C5-C6-(C7/2)","bg":"#DBEAFE","b":true,"al":"center","nf":"0.000"},{"c":"D8","v":"d_eff","b":true,"al":"center"},{"c":"E8","v":"m","al":"center"},{"c":"F8","v":"d = h - cc - Φ/2 = 850 - 75 - 11 = 764 مم (يستخدم في حسابات القص والعزوم)","cs":2},{"skip":true}]},{"r":9,"h":28.0,"cells":[{"c":"A9","v":""},{"c":"B9","v":""},{"c":"C9","v":""},{"c":"D9","v":""},{"c":"E9","v":""},{"c":"F9","v":""},{"c":"G9","v":""}]},{"r":10,"h":38.0,"cells":[{"c":"A10","v":"2. التحقق من قص الكمرات العريضة أحادي الاتجاه على مسافة d (One-Way Wide-Beam Shear Verification)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":"المسافة الحرجة للقطاع الحرج من وجه العمود C1 الداخلي (x_crit1):","cs":2},{"skip":true},{"c":"C11","v":1.314,"f":"='حساب الأبعاد وإجهادات التربة'!$I$6+('حساب الأبعاد وإجهادات التربة'!$C$6/2)+C8","b":true,"al":"center","nf":"0.00"},{"c":"D11","v":"x_crit1","b":true,"al":"center"},{"c":"E11","v":"m","al":"center"},{"c":"F11","v":"المقطع الحرج على مسافة d من وجه العمود الداخلي C1","cs":2},{"skip":true}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":"قوة القص المؤثرة عند المقطع الحرج للعمود C1 (Vu,d1):","cs":2},{"skip":true},{"c":"C12","v":742.325,"f":"='تحليل العزوم وقوى القص'!$F$9-'حساب الأبعاد وإجهادات التربة'!$D$31*C8","b":true,"al":"center","nf":"#,##0.0"},{"c":"D12","v":"Vu,d1","b":true,"al":"center"},{"c":"E12","v":"kN","al":"center"},{"c":"F12","v":"قوة القص بعد خصم ضغط التربة على مسافة d من وجه العمود C1","cs":2},{"skip":true}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":"المسافة الحرجة للقطاع الحرج من وجه العمود C2 الداخلي (x_crit2):","cs":2},{"skip":true},{"c":"C13","v":-0.664,"f":"='حساب الأبعاد وإجهادات التربة'!$I$7-('حساب الأبعاد وإجهادات التربة'!$C$7/2)-C8","b":true,"al":"center","nf":"0.00"},{"c":"D13","v":"x_crit2","b":true,"al":"center"},{"c":"E13","v":"m","al":"center"},{"c":"F13","v":"المقطع الحرج على مسافة d من وجه العمود الداخلي C2","cs":2},{"skip":true}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":"قوة القص المؤثرة عند المقطع الحرج للعمود C2 (Vu,d2):","cs":2},{"skip":true},{"c":"C14","v":1029.2,"f":"='تحليل العزوم وقوى القص'!$F$11-'حساب الأبعاد وإجهادات التربة'!$D$31*C8","b":true,"al":"center","nf":"#,##0.0"},{"c":"D14","v":"Vu,d2","b":true,"al":"center"},{"c":"E14","v":"kN","al":"center"},{"c":"F14","v":"قوة القص بعد خصم ضغط التربة على مسافة d من وجه العمود C2","cs":2},{"skip":true}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":"قوة القص التصميمية الحاكمة أحادية الاتجاه (Governing One-Way Shear Vu,d):","b":true,"cs":2},{"skip":true},{"c":"C15","v":1029.2,"f":"=MAX(C12,C14)","b":true,"al":"center","nf":"#,##0.0"},{"c":"D15","v":"Vu,d_gov","b":true,"al":"center"},{"c":"E15","v":"kN","al":"center"},{"c":"F15","v":"أقصى قوة قص حاكمة للقطاع الحرج للكمرة العريضة","cs":2},{"skip":true}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":"مقاومة الخرسانة التصميمية المسموحة لقص الكمرات (φ_v × Vc):","cs":2},{"skip":true},{"c":"C16","v":1280.487704,"f":"='إعدادات المشروع والتربة'!$D$28*0.17*SQRT('إعدادات المشروع والتربة'!$D$22)*'حساب الأبعاد وإجهادات التربة'!$D$23*C8*1000","b":true,"al":"center","nf":"#,##0.0"},{"c":"D16","v":"φVc_beam","b":true,"al":"center"},{"c":"E16","v":"kN","al":"center"},{"c":"F16","v":"φVc = φ_v × 0.17 × √f'c × B × d وفق كود SBC 304 Cl. 22.5","cs":2},{"skip":true}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":"نسبة استنفاد قص الكمرات العريضة (Beam Shear Utilization Ratio):","cs":2},{"skip":true},{"c":"C17","v":0.803756,"f":"=C15/C16","bg":"#DBEAFE","b":true,"al":"center","nf":"0.0%"},{"c":"D17","v":"UR_beam_shear","b":true,"al":"center"},{"c":"E17","v":"-","al":"center"},{"c":"F17","v":"UR = Vu,d / φVc (يجب ألا تتجاوز 1.00 للاستغناء عن كانات القص)","cs":2},{"skip":true}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":"التقييم الإنشائي والتحقق الكودي لقص الكمرات العريضة:","bg":"#EFF6FF","b":true,"cs":2},{"skip":true},{"c":"C18","v":"آمن ومحقق كودياً بدون كانات قص (SAFE)","f":"=IF(C17<=1.0,\"آمن ومحقق كودياً بدون كانات قص (SAFE)\",\"غير محقق - يلزم زيادة سمك القاعدة h\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"D18","v":"Status_Beam","b":true,"al":"center"},{"c":"E18","v":"-","al":"center"},{"c":"F18","v":"SBC 304 Cl. 13.3.6 / ACI 318 Cl. 13.3.6","cs":2},{"skip":true}]},{"r":19,"h":28.0,"cells":[{"c":"A19","v":""},{"c":"B19","v":""},{"c":"C19","v":""},{"c":"D19","v":""},{"c":"E19","v":""},{"c":"F19","v":""},{"c":"G19","v":""}]},{"r":20,"h":38.0,"cells":[{"c":"A20","v":"3. التحقق من القص الثاقب ثنائي الاتجاه حول محيط الأعمدة (Two-Way Punching Shear Checks)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":"المحيط الحرج للقص الثاقب لعمود الجار C1 (3-Sided Perimeter bo1):","cs":2},{"skip":true},{"c":"C21","v":3.228,"f":"=('حساب الأبعاد وإجهادات التربة'!$D$6+C8)+2*('حساب الأبعاد وإجهادات التربة'!$I$6+('حساب الأبعاد وإجهادات التربة'!$C$6/2)+(C8/2))","b":true,"al":"center","nf":"0.00"},{"c":"D21","v":"bo_C1","b":true,"al":"center"},{"c":"E21","v":"m","al":"center"},{"c":"F21","v":"محيط ثقب ثلاثي الأضلاع نظراً لقرب العمود من حافة القاعدة","cs":2},{"skip":true}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":"مساحة مسطح القص الثاقب لعمود الجار C1 (Punching Area A_p1):","cs":2},{"skip":true},{"c":"C22","v":1.271248,"f":"=('حساب الأبعاد وإجهادات التربة'!$D$6+C8)*('حساب الأبعاد وإجهادات التربة'!$I$6+('حساب الأبعاد وإجهادات التربة'!$C$6/2)+(C8/2))","b":true,"al":"center","nf":"0.00"},{"c":"D22","v":"Ap_C1","b":true,"al":"center"},{"c":"E22","v":"m²","al":"center"},{"c":"F22","v":"المساحة المحاطة بالمحيط الحرج تخصم من حمل العمود","cs":2},{"skip":true}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":"قوة القص الثاقب الصافية للعمود C1 (Vu,p1 = Pu1 - qu × Ap1):","cs":2},{"skip":true},{"c":"C23","v":1242.32475,"f":"='حساب الأبعاد وإجهادات التربة'!$H$6-('حساب الأبعاد وإجهادات التربة'!$D$32*C22)","b":true,"al":"center","nf":"#,##0.0"},{"c":"D23","v":"Vu,punch1","b":true,"al":"center"},{"c":"E23","v":"kN","al":"center"},{"c":"F23","v":"الحمل الرأسي الصافي المسبب لثقب الخرسانة","cs":2},{"skip":true}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":"مقاومة الخرسانة التصميمية للقص الثاقب لعمود الجار C1 (φVc,p1):","cs":2},{"skip":true},{"c":"C24","v":3343.202749,"f":"='إعدادات المشروع والتربة'!$D$28*0.33*SQRT('إعدادات المشروع والتربة'!$D$22)*C21*C8*1000","b":true,"al":"center","nf":"#,##0.0"},{"c":"D24","v":"φVc_punch1","b":true,"al":"center"},{"c":"E24","v":"kN","al":"center"},{"c":"F24","v":"φVc = φ_v × 0.33 × √f'c × bo × d وفق SBC 304 Cl. 22.6","cs":2},{"skip":true}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":"نسبة استنفاد القص الثاقب لعمود الجار C1 (UR_punch1):","b":true,"cs":2},{"skip":true},{"c":"C25","v":0.371597,"f":"=C23/C24","bg":"#DBEAFE","b":true,"al":"center","nf":"0.0%"},{"c":"D25","v":"UR_punch1","b":true,"al":"center"},{"c":"E25","v":"-","al":"center"},{"c":"F25","v":"UR = Vu,punch1 / φVc_punch1 (≤ 1.00 آمن)","cs":2},{"skip":true}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":"التحقق الكودي لحالة القص الثاقب لعمود الجار C1:","bg":"#EFF6FF","b":true,"cs":2},{"skip":true},{"c":"C26","v":"محقق وآمن تماماً (SAFE - UR < 1.0)","f":"=IF(C25<=1.0,\"محقق وآمن تماماً (SAFE - UR < 1.0)\",\"غير آمن - يلزم زيادة سمك القاعدة\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"D26","v":"Status_Punch1","b":true,"al":"center"},{"c":"E26","v":"-","al":"center"},{"c":"F26","v":"SBC 304 Cl. 13.3.7 / ACI 318 Cl. 13.3.7","cs":2},{"skip":true}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":"المحيط الحرج للقص الثاقب للعمود الداخلي C2 (4-Sided Perimeter bo2):","cs":2},{"skip":true},{"c":"C27","v":5.456,"f":"=2*('حساب الأبعاد وإجهادات التربة'!$C$7+C8)+2*('حساب الأبعاد وإجهادات التربة'!$D$7+C8)","b":true,"al":"center","nf":"0.00"},{"c":"D27","v":"bo_C2","b":true,"al":"center"},{"c":"E27","v":"m","al":"center"},{"c":"F27","v":"محيط ثقب رباعي الأضلاع كامل على مسافة d/2 من أوجه العمود C2","cs":2},{"skip":true}]},{"r":28,"h":34.0,"cells":[{"c":"A28","v":"مساحة مسطح القص الثاقب للعمود الداخلي C2 (Punching Area Ap2):","cs":2},{"skip":true},{"c":"C28","v":1.850496,"f":"=('حساب الأبعاد وإجهادات التربة'!$C$7+C8)*('حساب الأبعاد وإجهادات التربة'!$D$7+C8)","b":true,"al":"center","nf":"0.00"},{"c":"D28","v":"Ap_C2","b":true,"al":"center"},{"c":"E28","v":"m²","al":"center"},{"c":"F28","v":"المساحة المحصورة داخل محيط الثقب تخصم من حمل العمود","cs":2},{"skip":true}]},{"r":29,"h":34.0,"cells":[{"c":"A29","v":"قوة القص الثاقب الصافية للعمود C2 (Vu,p2 = Pu2 - qu × Ap2):","cs":2},{"skip":true},{"c":"C29","v":2008.462,"f":"='حساب الأبعاد وإجهادات التربة'!$H$7-('حساب الأبعاد وإجهادات التربة'!$D$32*C28)","b":true,"al":"center","nf":"#,##0.0"},{"c":"D29","v":"Vu,punch2","b":true,"al":"center"},{"c":"E29","v":"kN","al":"center"},{"c":"F29","v":"الحمل الرأسي الصافي المسبب لثقب الخرسانة","cs":2},{"skip":true}]},{"r":30,"h":34.0,"cells":[{"c":"A30","v":"مقاومة الخرسانة التصميمية للقص الثاقب للعمود الداخلي C2 (φVc,p2):","cs":2},{"skip":true},{"c":"C30","v":5650.716914,"f":"='إعدادات المشروع والتربة'!$D$28*0.33*SQRT('إعدادات المشروع والتربة'!$D$22)*C27*C8*1000","b":true,"al":"center","nf":"#,##0.0"},{"c":"D30","v":"φVc_punch2","b":true,"al":"center"},{"c":"E30","v":"kN","al":"center"},{"c":"F30","v":"φVc = φ_v × 0.33 × √f'c × bo × d وفق SBC 304 Cl. 22.6","cs":2},{"skip":true}]},{"r":31,"h":34.0,"cells":[{"c":"A31","v":"نسبة استنفاد القص الثاقب للعمود الداخلي C2 (UR_punch2):","b":true,"cs":2},{"skip":true},{"c":"C31","v":0.355435,"f":"=C29/C30","bg":"#DBEAFE","b":true,"al":"center","nf":"0.0%"},{"c":"D31","v":"UR_punch2","b":true,"al":"center"},{"c":"E31","v":"-","al":"center"},{"c":"F31","v":"UR = Vu,punch2 / φVc_punch2 (≤ 1.00 آمن)","cs":2},{"skip":true}]},{"r":32,"h":34.0,"cells":[{"c":"A32","v":"التحقق الكودي لحالة القص الثاقب للعمود الداخلي C2:","bg":"#EFF6FF","b":true,"cs":2},{"skip":true},{"c":"C32","v":"محقق وآمن تماماً (SAFE - UR < 1.0)","f":"=IF(C31<=1.0,\"محقق وآمن تماماً (SAFE - UR < 1.0)\",\"غير آمن - يلزم زيادة سمك القاعدة\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"D32","v":"Status_Punch2","b":true,"al":"center"},{"c":"E32","v":"-","al":"center"},{"c":"F32","v":"SBC 304 Cl. 13.3.7 / ACI 318 Cl. 13.3.7","cs":2},{"skip":true}]},{"r":33,"h":28.0,"cells":[{"c":"A33","v":""},{"c":"B33","v":""},{"c":"C33","v":""},{"c":"D33","v":""},{"c":"E33","v":""},{"c":"F33","v":""},{"c":"G33","v":""}]},{"r":34,"h":28.0,"cells":[{"c":"A34","v":""},{"c":"B34","v":""},{"c":"C34","v":""},{"c":"D34","v":""},{"c":"E34","v":""},{"c":"F34","v":""},{"c":"G34","v":""}]},{"r":35,"h":34.0,"cells":[{"c":"A35","v":"السمك الكلي للقاعدة h","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C35","v":"نسبة استنفاد قص الكمرات UR","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"E35","v":"نسبة ثقب عمود الجار UR1","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"G35","v":"نسبة ثقب العمود الداخلي UR2","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center"}]},{"r":36,"h":46.0,"cells":[{"c":"A36","v":850,"f":"=C5*1000","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"0","cs":2},{"skip":true},{"c":"C36","v":0.803756,"f":"=C17","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"0.0%","cs":2},{"skip":true},{"c":"E36","v":0.371597,"f":"=C25","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"0.0%","cs":2},{"skip":true},{"c":"G36","v":0.355435,"f":"=C31","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"0.0%"}]},{"r":37,"h":34.0,"cells":[{"c":"A37","v":"مم (سمك مصمت آمن)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C37","v":"نسبة آمنة (< 100%)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"E37","v":"نسبة آمنة (< 100%)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"G37","v":"نسبة آمنة (< 100%)","bg":"#F8FAFC","fg":"#64748B","al":"center"}]},{"r":38,"h":28.0,"cells":[{"c":"A38","v":""},{"c":"B38","v":""},{"c":"C38","v":""},{"c":"D38","v":""},{"c":"E38","v":""},{"c":"F38","v":""},{"c":"G38","v":""}]},{"r":39,"h":28.0,"cells":[{"c":"A39","v":""},{"c":"B39","v":""},{"c":"C39","v":""},{"c":"D39","v":""},{"c":"E39","v":""},{"c":"F39","v":""},{"c":"G39","v":""}]},{"r":40,"h":36.0,"cells":[{"c":"A40","v":"مهندس الأساسات والتربة (Geotechnical Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D40","v":"مهندس التصميم الإنشائي والمكتب الفني (Structural Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G40","v":"المهندس الاستشاري المشرف (Supervising Consultant)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center"}]},{"r":41,"h":76.0,"cells":[{"c":"A41","v":"الاسم والتوقيع:\nرقم الاعتماد المهني:\nالتاريخ والختم الرسمي:","cs":3},{"skip":true},{"skip":true},{"c":"D41","v":"الاسم والتوقيع:\nرقم الاعتماد المهني:\nالتاريخ والختم الرسمي:","cs":3},{"skip":true},{"skip":true},{"c":"G41","v":"الاسم والتوقيع:\nرقم الاعتماد المهني:\nالتاريخ والختم الرسمي:"}]}]},{"name":"تفريد الحديد ومقايسة الكميات","maxRow":42,"maxCol":9,"colWidths":[10.0,58.0,14.0,22.0,28.0,20.0,14.0,24.0,20.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"تصميم شبكات حديد التسليح وجدول التفريد BBS ومقايسة الكميات والتكلفة للقاعدة المشتركة","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"📌 التسليح العرضي وحزم الأعمدة: وفق كود SBC 304 و ACI 318، تتركز الأحمال العرضية أسفل الأعمدة في شريحة عرضية (Transverse Band) عرضها يساوي عرض العمود مضافاً إليه 1.5 مرة سمك القاعدة (b_band = col + 1.5d) وتسلح ككمرة عرضية لمقاومة عزم البروز العرضي.","bg":"#EFF6FF","fg":"#475569","al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"1. تصميم مساحات حديد التسليح الطولي والعرضي (Flexural Reinforcement Calculations)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":72.0,"cells":[{"c":"A5","v":"موقع التسليح والاتجاه الإنشائي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"العزم التصميمي Mu (kN.m)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"العرض الفعال b (م)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"العمق الفعال d (م)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"التسليح النظري As,req (mm²)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"الحد الأدنى As,min (mm²)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"التسليح الحاكم As,gov (mm²)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"القطر والعدد المعتمد","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I5","v":"التسليح الفعلي المنفذ As,prov (mm²)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":152.0,"cells":[{"c":"A6","v":"الحديد العلوي الرئيسي الطولي (Top Longitudinal Main)","b":true},{"c":"B6","v":1404.960784,"f":"='تحليل العزوم وقوى القص'!$D$17","al":"center","nf":"#,##0"},{"c":"C6","v":2.4,"f":"='حساب الأبعاد وإجهادات التربة'!$D$23","al":"center","nf":"0.00"},{"c":"D6","v":0.764,"f":"='فحص القص وسماكة القاعدة'!$C$8","al":"center","nf":"0.00"},{"c":"E6","v":5406,"f":"=ROUNDUP((B6*10^6)/(0.90*'إعدادات المشروع والتربة'!$D$24*0.90*(D6*1000)),0)","al":"center","nf":"#,##0"},{"c":"F6","v":3672,"f":"=ROUNDUP(0.0018*C6*1000*'فحص القص وسماكة القاعدة'!$C$5*1000,0)","al":"center","nf":"#,##0"},{"c":"G6","v":5406,"f":"=MAX(E6,F6)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0"},{"c":"H6","v":"22 Φ 22 مم","b":true,"al":"center"},{"c":"I6","v":8360,"f":"=22*380","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0"}]},{"r":7,"h":176.0,"cells":[{"c":"A7","v":"الحديد السفلي الطولي لكابولي الجار C1 (Bottom Cantilever C1)","b":true},{"c":"B7","v":7.171875,"f":"='تحليل العزوم وقوى القص'!$D$19","al":"center","nf":"#,##0"},{"c":"C7","v":2.4,"f":"='حساب الأبعاد وإجهادات التربة'!$D$23","al":"center","nf":"0.00"},{"c":"D7","v":0.764,"f":"='فحص القص وسماكة القاعدة'!$C$8","al":"center","nf":"0.00"},{"c":"E7","v":28,"f":"=ROUNDUP((B7*10^6)/(0.90*'إعدادات المشروع والتربة'!$D$24*0.90*(D7*1000)),0)","al":"center","nf":"#,##0"},{"c":"F7","v":3672,"f":"=ROUNDUP(0.0018*C7*1000*'فحص القص وسماكة القاعدة'!$C$5*1000,0)","al":"center","nf":"#,##0"},{"c":"G7","v":3672,"f":"=MAX(E7,F7)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0"},{"c":"H7","v":"14 Φ 18 مم (شبكة سفلية)","b":true,"al":"center"},{"c":"I7","v":3556,"f":"=14*254","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0"}]},{"r":8,"h":176.0,"cells":[{"c":"A8","v":"الحديد السفلي الطولي لكابولي العمود C2 (Bottom Cantilever C2)","b":true},{"c":"B8","v":10722.75,"f":"='تحليل العزوم وقوى القص'!$D$20","al":"center","nf":"#,##0"},{"c":"C8","v":2.4,"f":"='حساب الأبعاد وإجهادات التربة'!$D$23","al":"center","nf":"0.00"},{"c":"D8","v":0.764,"f":"='فحص القص وسماكة القاعدة'!$C$8","al":"center","nf":"0.00"},{"c":"E8","v":41256,"f":"=ROUNDUP((B8*10^6)/(0.90*'إعدادات المشروع والتربة'!$D$24*0.90*(D8*1000)),0)","al":"center","nf":"#,##0"},{"c":"F8","v":3672,"f":"=ROUNDUP(0.0018*C8*1000*'فحص القص وسماكة القاعدة'!$C$5*1000,0)","al":"center","nf":"#,##0"},{"c":"G8","v":41256,"f":"=MAX(E8,F8)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0"},{"c":"H8","v":"18 Φ 18 مم (شبكة سفلية)","b":true,"al":"center"},{"c":"I8","v":4572,"f":"=18*254","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0"}]},{"r":9,"h":152.0,"cells":[{"c":"A9","v":"الحديد العرضي لحزمة عمود الجار C1 (Transverse Band C1)","b":true},{"c":"B9","v":356,"f":"=ROUNDUP('حساب الأبعاد وإجهادات التربة'!$H$6*('حساب الأبعاد وإجهادات التربة'!$D$23-'حساب الأبعاد وإجهادات التربة'!$D$6)/8,0)","al":"center","nf":"#,##0"},{"c":"C9","v":1.546,"f":"='حساب الأبعاد وإجهادات التربة'!$C$6+1.5*'فحص القص وسماكة القاعدة'!$C$8","al":"center","nf":"0.00"},{"c":"D9","v":0.764,"f":"='فحص القص وسماكة القاعدة'!$C$8","al":"center","nf":"0.00"},{"c":"E9","v":1370,"f":"=ROUNDUP((B9*10^6)/(0.90*'إعدادات المشروع والتربة'!$D$24*0.90*(D9*1000)),0)","al":"center","nf":"#,##0"},{"c":"F9","v":2366,"f":"=ROUNDUP(0.0018*C9*1000*'فحص القص وسماكة القاعدة'!$C$5*1000,0)","al":"center","nf":"#,##0"},{"c":"G9","v":2366,"f":"=MAX(E9,F9)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0"},{"c":"H9","v":"14 Φ 18 مم (كانات مغلقة)","b":true,"al":"center"},{"c":"I9","v":3556,"f":"=14*254","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0"}]},{"r":10,"h":176.0,"cells":[{"c":"A10","v":"الحديد العرضي لحزمة العمود الداخلي C2 (Transverse Band C2)","b":true},{"c":"B10","v":532,"f":"=ROUNDUP('حساب الأبعاد وإجهادات التربة'!$H$7*('حساب الأبعاد وإجهادات التربة'!$D$23-'حساب الأبعاد وإجهادات التربة'!$D$7)/8,0)","al":"center","nf":"#,##0"},{"c":"C10","v":1.646,"f":"='حساب الأبعاد وإجهادات التربة'!$C$7+1.5*'فحص القص وسماكة القاعدة'!$C$8","al":"center","nf":"0.00"},{"c":"D10","v":0.764,"f":"='فحص القص وسماكة القاعدة'!$C$8","al":"center","nf":"0.00"},{"c":"E10","v":2047,"f":"=ROUNDUP((B10*10^6)/(0.90*'إعدادات المشروع والتربة'!$D$24*0.90*(D10*1000)),0)","al":"center","nf":"#,##0"},{"c":"F10","v":2519,"f":"=ROUNDUP(0.0018*C10*1000*'فحص القص وسماكة القاعدة'!$C$5*1000,0)","al":"center","nf":"#,##0"},{"c":"G10","v":2519,"f":"=MAX(E10,F10)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0"},{"c":"H10","v":"18 Φ 18 مم (كانات مغلقة)","b":true,"al":"center"},{"c":"I10","v":4572,"f":"=18*254","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0"}]},{"r":11,"h":176.0,"cells":[{"c":"A11","v":"الحديد العرضي السفلي الموزع بالمناطق البينية (Distribution Steel)","b":true},{"c":"B11","v":0,"f":"=0","al":"center","nf":"#,##0"},{"c":"C11","v":6.4,"f":"='حساب الأبعاد وإجهادات التربة'!$D$16","al":"center","nf":"0.00"},{"c":"D11","v":0.764,"f":"='فحص القص وسماكة القاعدة'!$C$8","al":"center","nf":"0.00"},{"c":"E11","v":0,"f":"=0","al":"center","nf":"#,##0"},{"c":"F11","v":4896,"f":"=ROUNDUP(0.0018*C11*1000*'فحص القص وسماكة القاعدة'!$C$5*1000*0.5,0)","al":"center","nf":"#,##0"},{"c":"G11","v":4896,"f":"=F11","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0"},{"c":"H11","v":"16 Φ 16 مم (فرش سفلي عرضي)","b":true,"al":"center"},{"c":"I11","v":3216,"f":"=16*201","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0"}]},{"r":12,"h":28.0,"cells":[{"c":"A12","v":""},{"c":"B12","v":""},{"c":"C12","v":""},{"c":"D12","v":""},{"c":"E12","v":""},{"c":"F12","v":""},{"c":"G12","v":""},{"c":"H12","v":""},{"c":"I12","v":""}]},{"r":13,"h":38.0,"cells":[{"c":"A13","v":"2. جدول تفريد حديد التسليح التفصيلي (Bar Bending Schedule - BBS)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"كود السيخ","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B14","v":"الوصف والتوصيف الإنشائي للسيخ وموقعه","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C14","v":"شكل وتفصيلة التكسيح","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D14","v":"القطر Φ (مم)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E14","v":"العدد الإجمالي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F14","v":"طول القطعية المفرد (م)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G14","v":"إجمالي الأطوال (م)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H14","v":"وزن المتر الطولي (kg/m)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I14","v":"الوزن الإجمالي (kg)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":15,"h":128.0,"cells":[{"c":"A15","v":"B-01","b":true,"al":"center"},{"c":"B15","v":"حديد علوي رئيسي طولي بكامل طول القاعدة (Top Longitudinal Main)"},{"c":"C15","v":"سيخ مستقيم مع رجلين قائمة لأسفل 90° (طول الرجل 70 سم)"},{"c":"D15","v":22,"in":true,"b":true,"al":"center","nf":"0"},{"c":"E15","v":22,"in":true,"b":true,"al":"center","nf":"0"},{"c":"F15","v":7.65,"f":"='حساب الأبعاد وإجهادات التربة'!$D$16-2*'فحص القص وسماكة القاعدة'!$C$6+2*('فحص القص وسماكة القاعدة'!$C$5-2*'فحص القص وسماكة القاعدة'!$C$6)","al":"center","nf":"#,##0.00"},{"c":"G15","v":168.3,"f":"=E15*F15","al":"center","nf":"#,##0.00"},{"c":"H15","v":2.987654,"f":"=(D15^2)/162","al":"center","nf":"0.000"},{"c":"I15","v":502.822168,"f":"=G15*H15","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"}]},{"r":16,"h":128.0,"cells":[{"c":"A16","v":"B-02","b":true,"al":"center"},{"c":"B16","v":"حديد سفلي طولي مستمر للفرش (Bottom Longitudinal Main)"},{"c":"C16","v":"سيخ مستقيم مع رجلين قائمة لأعلى 90° (طول الرجل 70 سم)"},{"c":"D16","v":18,"in":true,"b":true,"al":"center","nf":"0"},{"c":"E16","v":16,"in":true,"b":true,"al":"center","nf":"0"},{"c":"F16","v":7.65,"f":"='حساب الأبعاد وإجهادات التربة'!$D$16-2*'فحص القص وسماكة القاعدة'!$C$6+2*('فحص القص وسماكة القاعدة'!$C$5-2*'فحص القص وسماكة القاعدة'!$C$6)","al":"center","nf":"#,##0.00"},{"c":"G16","v":122.4,"f":"=E16*F16","al":"center","nf":"#,##0.00"},{"c":"H16","v":2,"f":"=(D16^2)/162","al":"center","nf":"0.000"},{"c":"I16","v":244.8,"f":"=G16*H16","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"}]},{"r":17,"h":104.0,"cells":[{"c":"A17","v":"B-03","b":true,"al":"center"},{"c":"B17","v":"حديد سفلي طولي إضافي لكابولي العمود C2 (Bottom Cantilever Add.)"},{"c":"C17","v":"سيخ إضافي مستقيم مع رجل قائمة بطول 70 سم ممتد للبحر"},{"c":"D17","v":18,"in":true,"b":true,"al":"center","nf":"0"},{"c":"E17","v":10,"in":true,"b":true,"al":"center","nf":"0"},{"c":"F17","v":2.65,"f":"='حساب الأبعاد وإجهادات التربة'!$D$17+1.20","al":"center","nf":"#,##0.00"},{"c":"G17","v":26.5,"f":"=E17*F17","al":"center","nf":"#,##0.00"},{"c":"H17","v":2,"f":"=(D17^2)/162","al":"center","nf":"0.000"},{"c":"I17","v":53,"f":"=G17*H17","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"}]},{"r":18,"h":104.0,"cells":[{"c":"A18","v":"B-04","b":true,"al":"center"},{"c":"B18","v":"حديد عرضي لحزمة عمود الجار C1 (Transverse Band C1 Ties)"},{"c":"C18","v":"كانات مغلقة أو أسياخ U-Bar بعرض القاعدة ورجلين 70 سم"},{"c":"D18","v":18,"in":true,"b":true,"al":"center","nf":"0"},{"c":"E18","v":14,"in":true,"b":true,"al":"center","nf":"0"},{"c":"F18","v":3.65,"f":"='حساب الأبعاد وإجهادات التربة'!$D$23-2*'فحص القص وسماكة القاعدة'!$C$6+2*('فحص القص وسماكة القاعدة'!$C$5-2*'فحص القص وسماكة القاعدة'!$C$6)","al":"center","nf":"#,##0.00"},{"c":"G18","v":51.1,"f":"=E18*F18","al":"center","nf":"#,##0.00"},{"c":"H18","v":2,"f":"=(D18^2)/162","al":"center","nf":"0.000"},{"c":"I18","v":102.2,"f":"=G18*H18","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"}]},{"r":19,"h":104.0,"cells":[{"c":"A19","v":"B-05","b":true,"al":"center"},{"c":"B19","v":"حديد عرضي لحزمة العمود الداخلي C2 (Transverse Band C2 Ties)"},{"c":"C19","v":"كانات مغلقة أو أسياخ U-Bar بعرض القاعدة ورجلين 70 سم"},{"c":"D19","v":18,"in":true,"b":true,"al":"center","nf":"0"},{"c":"E19","v":18,"in":true,"b":true,"al":"center","nf":"0"},{"c":"F19","v":3.65,"f":"='حساب الأبعاد وإجهادات التربة'!$D$23-2*'فحص القص وسماكة القاعدة'!$C$6+2*('فحص القص وسماكة القاعدة'!$C$5-2*'فحص القص وسماكة القاعدة'!$C$6)","al":"center","nf":"#,##0.00"},{"c":"G19","v":65.7,"f":"=E19*F19","al":"center","nf":"#,##0.00"},{"c":"H19","v":2,"f":"=(D19^2)/162","al":"center","nf":"0.000"},{"c":"I19","v":131.4,"f":"=G19*H19","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"}]},{"r":20,"h":128.0,"cells":[{"c":"A20","v":"B-06","b":true,"al":"center"},{"c":"B20","v":"حديد عرضي سفلي موزع بالمناطق البينية (Transverse Distribution)"},{"c":"C20","v":"أسياخ مستقيمة مع رجلين قائمة لأعلى 70 سم للغطاء السفلي"},{"c":"D20","v":16,"in":true,"b":true,"al":"center","nf":"0"},{"c":"E20","v":16,"in":true,"b":true,"al":"center","nf":"0"},{"c":"F20","v":3.65,"f":"='حساب الأبعاد وإجهادات التربة'!$D$23-2*'فحص القص وسماكة القاعدة'!$C$6+2*('فحص القص وسماكة القاعدة'!$C$5-2*'فحص القص وسماكة القاعدة'!$C$6)","al":"center","nf":"#,##0.00"},{"c":"G20","v":58.4,"f":"=E20*F20","al":"center","nf":"#,##0.00"},{"c":"H20","v":1.580247,"f":"=(D20^2)/162","al":"center","nf":"0.000"},{"c":"I20","v":92.286425,"f":"=G20*H20","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"}]},{"r":21,"h":128.0,"cells":[{"c":"A21","v":"B-07","b":true,"al":"center"},{"c":"B21","v":"كراسي وأوتار حديد لحمل وتثبيت الشبكة العلوية (Rebar Chairs)"},{"c":"C21","v":"كراسي حديد ارتفاع صافي 68 سم وقاعدة 40 سم وركائز 40 سم"},{"c":"D21","v":16,"in":true,"b":true,"al":"center","nf":"0"},{"c":"E21","v":12,"in":true,"b":true,"al":"center","nf":"0"},{"c":"F21","v":2.3,"in":true,"al":"center","nf":"#,##0.00"},{"c":"G21","v":27.6,"f":"=E21*F21","al":"center","nf":"#,##0.00"},{"c":"H21","v":1.580247,"f":"=(D21^2)/162","al":"center","nf":"0.000"},{"c":"I21","v":43.614817,"f":"=G21*H21","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"}]},{"r":22,"h":38.0,"cells":[{"c":"A22","v":"إجمالي وزن حديد التسليح للقاعدة المشتركة (Total Rebar Weight):","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"left","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"I22","v":1170.12341,"f":"=SUM(I15:I21)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.0"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":"إجمالي وزن حديد التسليح بالأطنان المترية (Total Steel in Metric Tons):","bg":"#EFF6FF","b":true,"al":"left","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"I23","v":1.170123,"f":"=I22/1000","bg":"#EFF6FF","b":true,"al":"center","nf":"0.000"}]},{"r":24,"h":28.0,"cells":[{"c":"A24","v":""},{"c":"B24","v":""},{"c":"C24","v":""},{"c":"D24","v":""},{"c":"E24","v":""},{"c":"F24","v":""},{"c":"G24","v":""},{"c":"H24","v":""},{"c":"I24","v":""}]},{"r":25,"h":38.0,"cells":[{"c":"A25","v":"3. مقايسة الكميات والتكاليف التقديرية للقاعدة المشتركة (Bill of Quantities - BOQ & Costing)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":26,"h":40.0,"cells":[{"c":"A26","v":"بند","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B26","v":"بيان وتوصيف الأعمال الإنشائية ومواصفاتها","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C26","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D26","v":"الكمية الهندسية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E26","v":"معادلة الحساب والاشتقاق","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F26","v":"فئة السعر التقديرية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G26","v":"العملة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H26","v":"الإجمالي التقديري","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I26","v":"النسبة من التكلفة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":27,"h":52.0,"cells":[{"c":"A27","v":1,"b":true,"al":"center"},{"c":"B27","v":"خرسانة عادية نظافة سمك 10 سم أسفل مسطح القاعدة ببروز 10 سم من كافة الجهات"},{"c":"C27","v":"m³","b":true,"al":"center"},{"c":"D27","v":1.72,"f":"=ROUND(('حساب الأبعاد وإجهادات التربة'!$D$16+0.20)*('حساب الأبعاد وإجهادات التربة'!$D$23+0.20)*0.10,2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"E27","v":"('L + 0.20) × (B + 0.20) × 0.10","al":"center"},{"c":"F27","v":0,"f":"='إعدادات المشروع والتربة والخواص'!$D$34","al":"center","nf":"#,##0.00"},{"c":"G27","v":0,"f":"='إعدادات المشروع والتربة والخواص'!$E$34","al":"center"},{"c":"H27","v":0,"f":"=D27*F27","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"I27","v":0,"f":"=H27/$H$32","b":true,"al":"center","nf":"0.0%"}]},{"r":28,"h":36.0,"cells":[{"c":"A28","v":2,"b":true,"al":"center"},{"c":"B28","v":"خرسانة مسلحة مصمتة C30/37 للقاعدة المشتركة صب بالمضخة مع الهز والمعالجة"},{"c":"C28","v":"m³","b":true,"al":"center"},{"c":"D28","v":13.06,"f":"=ROUND('حساب الأبعاد وإجهادات التربة'!$D$16*'حساب الأبعاد وإجهادات التربة'!$D$23*'فحص القص وسماكة القاعدة'!$C$5,2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"E28","v":"L_footing × B_footing × h_footing","al":"center"},{"c":"F28","v":0,"f":"='إعدادات المشروع والتربة والخواص'!$D$35","al":"center","nf":"#,##0.00"},{"c":"G28","v":0,"f":"='إعدادات المشروع والتربة والخواص'!$E$35","al":"center"},{"c":"H28","v":0,"f":"=D28*F28","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"I28","v":0,"f":"=H28/$H$32","b":true,"al":"center","nf":"0.0%"}]},{"r":29,"h":52.0,"cells":[{"c":"A29","v":3,"b":true,"al":"center"},{"c":"B29","v":"حديد تسليح عالي المقاومة مشوه Grade 60 مقطع ومثنى ومثبت وفق جدول BBS"},{"c":"C29","v":"Ton","b":true,"al":"center"},{"c":"D29","v":1.17,"f":"=ROUND(I23,3)","b":true,"al":"center","nf":"0.000"},{"c":"E29","v":"مأخوذ مباشرة من إجمالي جدول تفريد الحديد I23","al":"center"},{"c":"F29","v":0,"f":"='إعدادات المشروع والتربة والخواص'!$D$36","al":"center","nf":"#,##0.00"},{"c":"G29","v":0,"f":"='إعدادات المشروع والتربة والخواص'!$E$36","al":"center"},{"c":"H29","v":0,"f":"=D29*F29","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"I29","v":0,"f":"=H29/$H$32","b":true,"al":"center","nf":"0.0%"}]},{"r":30,"h":52.0,"cells":[{"c":"A30","v":4,"b":true,"al":"center"},{"c":"B30","v":"أعمال الشدات الخشبية والقوالب المعدنية لجوانب ومحيط القاعدة المشتركة"},{"c":"C30","v":"m²","b":true,"al":"center"},{"c":"D30","v":14.96,"f":"=ROUND(2*('حساب الأبعاد وإجهادات التربة'!$D$16+'حساب الأبعاد وإجهادات التربة'!$D$23)*'فحص القص وسماكة القاعدة'!$C$5,2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"E30","v":"2 × (L_footing + B_footing) × h_footing","al":"center"},{"c":"F30","v":0,"f":"='إعدادات المشروع والتربة والخواص'!$D$37","al":"center","nf":"#,##0.00"},{"c":"G30","v":0,"f":"='إعدادات المشروع والتربة والخواص'!$E$37","al":"center"},{"c":"H30","v":0,"f":"=D30*F30","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"I30","v":0,"f":"=H30/$H$32","b":true,"al":"center","nf":"0.0%"}]},{"r":31,"h":52.0,"cells":[{"c":"A31","v":5,"b":true,"al":"center"},{"c":"B31","v":"عزل مائي ببيتومين مطاطي طبقتين لكافة الأسطح الخرسانية الملامسة للتربة"},{"c":"C31","v":"m²","b":true,"al":"center"},{"c":"D31","v":30.32,"f":"=ROUND('حساب الأبعاد وإجهادات التربة'!$D$24+D30,2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"E31","v":"مسطح القاع A_act + مسطح الجوانب D30","al":"center"},{"c":"F31","v":0,"f":"='إعدادات المشروع والتربة والخواص'!$D$38","al":"center","nf":"#,##0.00"},{"c":"G31","v":0,"f":"='إعدادات المشروع والتربة والخواص'!$E$38","al":"center"},{"c":"H31","v":0,"f":"=D31*F31","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"I31","v":0,"f":"=H31/$H$32","b":true,"al":"center","nf":"0.0%"}]},{"r":32,"h":42.0,"cells":[{"c":"A32","v":"الإجمالي العام التقديري لتنفيذ القاعدة المشتركة (Grand Total Estimated Cost):","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"left","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H32","v":0,"f":"=SUM(H27:H31)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"I32","v":"100.0%","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":33,"h":28.0,"cells":[{"c":"A33","v":""},{"c":"B33","v":""},{"c":"C33","v":""},{"c":"D33","v":""},{"c":"E33","v":""},{"c":"F33","v":""},{"c":"G33","v":""},{"c":"H33","v":""},{"c":"I33","v":""}]},{"r":34,"h":36.0,"cells":[{"c":"A34","v":"معدل استهلاك حديد التسليح للمتر المكعب خرسانة:","bg":"#EFF6FF","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"D34","v":89.6,"f":"=ROUND(I22/D28,1)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.0"},{"c":"E34","v":"kg/m³","al":"center"},{"c":"F34","v":"معدل استهلاك نموذجي للقواعد المشتركة (النطاق المعياري الكودي: 110 - 145 كجم/م³)","bg":"#DCFCE7","fg":"#166534","b":true,"cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":35,"h":28.0,"cells":[{"c":"A35","v":""},{"c":"B35","v":""},{"c":"C35","v":""},{"c":"D35","v":""},{"c":"E35","v":""},{"c":"F35","v":""},{"c":"G35","v":""},{"c":"H35","v":""},{"c":"I35","v":""}]},{"r":36,"h":34.0,"cells":[{"c":"A36","v":"حجم الخرسانة المسلحة","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C36","v":"إجمالي حديد التسليح","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"E36","v":"معدل الاستهلاك النوعي","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"G36","v":"التكلفة التقديرية الإجمالية","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":37,"h":46.0,"cells":[{"c":"A37","v":13.06,"f":"=D28","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0","cs":2},{"skip":true},{"c":"C37","v":1.170123,"f":"=I23","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"0.000","cs":2},{"skip":true},{"c":"E37","v":89.6,"f":"=D34","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0","cs":2},{"skip":true},{"c":"G37","v":0,"f":"=H32","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00","cs":3},{"skip":true},{"skip":true}]},{"r":38,"h":34.0,"cells":[{"c":"A38","v":"م³ (الصب الفعلي للقاعدة)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C38","v":"طن (حسب جدول التفريد BBS)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"E38","v":"كجم/م³ (معدل قياسي واقتصادي)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"G38","v":"ر.س (شامل المواد والمصنعية)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":39,"h":28.0,"cells":[{"c":"A39","v":""},{"c":"B39","v":""},{"c":"C39","v":""},{"c":"D39","v":""},{"c":"E39","v":""},{"c":"F39","v":""},{"c":"G39","v":""},{"c":"H39","v":""},{"c":"I39","v":""}]},{"r":40,"h":28.0,"cells":[{"c":"A40","v":""},{"c":"B40","v":""},{"c":"C40","v":""},{"c":"D40","v":""},{"c":"E40","v":""},{"c":"F40","v":""},{"c":"G40","v":""},{"c":"H40","v":""},{"c":"I40","v":""}]},{"r":41,"h":36.0,"cells":[{"c":"A41","v":"مهندس الأساسات والتربة (Geotechnical Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D41","v":"مهندس التصميم الإنشائي والمكتب الفني (Structural Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G41","v":"المهندس الاستشاري المشرف (Supervising Consultant)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":42,"h":76.0,"cells":[{"c":"A42","v":"الاسم والتوقيع:\nرقم الاعتماد المهني:\nالتاريخ والختم الرسمي:","cs":3},{"skip":true},{"skip":true},{"c":"D42","v":"الاسم والتوقيع:\nرقم الاعتماد المهني:\nالتاريخ والختم الرسمي:","cs":3},{"skip":true},{"skip":true},{"c":"G42","v":"الاسم والتوقيع:\nرقم الاعتماد المهني:\nالتاريخ والختم الرسمي:","cs":3},{"skip":true},{"skip":true}]}]}]}