{"slug":"concrete-batching-plant-calibration-and-scale-accuracy-sheet","sheets":[{"name":"لوحة التحكم وملخص المحطة","maxRow":24,"maxCol":8,"colWidths":[14.0,30.0,18.0,20.0,18.0,18.0,18.0,22.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"سجل الفحص والمعايرة الدورية لموازين محطة الخلط الخرساني المركزية (ASTM C94 & SBC 304)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"وثيقة تشغيلية موقعية للتحقق من دقة موازين الأسمنت والركام والماء والمضافات الكيميائية وفق المواصفات القياسية ASTM C94 و AASHTO M157 وكود البناء السعودي SBC 304","bg":"#EFF6FF","fg":"#1E3A8A","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":14.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"ميزان الأسمنت والمواد الرابطة","bg":"#ECFDF5","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"موازين الركام (الخشن والناعم)","bg":"#ECFDF5","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"ميزان ماء الخلط والمضخة","bg":"#ECFDF5","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"G4","v":"القرار الفني الإجمالي للمحطة","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true}]},{"r":5,"h":46.0,"cells":[{"c":"A5","v":"مطابق ومجاز","bg":"#ECFDF5","fg":"#059669","b":true,"al":"center","cs":2},{"skip":true},{"c":"C5","v":"مطابق ومجاز","bg":"#ECFDF5","fg":"#059669","b":true,"al":"center","cs":2},{"skip":true},{"c":"E5","v":"مطابق ومجاز","bg":"#ECFDF5","fg":"#059669","b":true,"al":"center","cs":2},{"skip":true},{"c":"G5","v":"جاهزة ومجازة للإنتاج","bg":"#F1F5F9","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"±1.0% مسموح","bg":"#ECFDF5","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C6","v":"±2.0% مسموح","bg":"#ECFDF5","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"E6","v":"±1.0% مسموح","bg":"#ECFDF5","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"G6","v":"ASTM C94 / SBC 304","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true}]},{"r":7,"h":14.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"1. البيانات الفنية لمحطة الخلط المركزية والجهة المشرفة (Plant Identification)","bg":"#2563EB","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"اسم المشروع الإنشائي:","bg":"#E2E8F0","fg":"#1E293B","b":true},{"c":"B9","v":"مشروع المجمع السكني والتجاري المتكامل - الرياض","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"E9","v":"اسم مورد الخرسانة الجاهزة:","bg":"#E2E8F0","fg":"#1E293B","b":true},{"c":"F9","v":"شركة الخرسانة الجاهزة المتطورة المحدودة","fg":"#1E293B","cs":3},{"skip":true},{"skip":true}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":"الموقع الجغرافي للمحطة:","bg":"#E2E8F0","fg":"#1E293B","b":true},{"c":"B10","v":"الرياض - طريق الخرج الصناعي (المحطة رقم 2)","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"E10","v":"الجهة الاستشارية المشرفة:","bg":"#E2E8F0","fg":"#1E293B","b":true},{"c":"F10","v":"المكتب الاستشاري الهندسي الموحد","fg":"#1E293B","cs":3},{"skip":true},{"skip":true}]},{"r":11,"h":72.0,"cells":[{"c":"A11","v":"طراز وموديل المحطة (Make/Model):","bg":"#E2E8F0","fg":"#1E293B","b":true},{"c":"B11","v":"Liebherr Betomix 2.5 - Twin-Shaft Mixer","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"E11","v":"المقاول الرئيسي للمشروع:","bg":"#E2E8F0","fg":"#1E293B","b":true},{"c":"F11","v":"شركة المقاولات العامة المتقدمة","fg":"#1E293B","cs":3},{"skip":true},{"skip":true}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":"الطاقة الإنتاجية الاسمية:","bg":"#E2E8F0","fg":"#1E293B","b":true},{"c":"B12","v":"120 متر مكعب / ساعة (خلاط 2.5 م³)","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"E12","v":"تاريخ إجراء المعايرة الحالية:","bg":"#E2E8F0","fg":"#1E293B","b":true},{"c":"F12","v":"2026-10-11","fg":"#1E293B","cs":3},{"skip":true},{"skip":true}]},{"r":13,"h":72.0,"cells":[{"c":"A13","v":"الرقم التسلسلي لوحدة الوزن PLC:","bg":"#E2E8F0","fg":"#1E293B","b":true},{"c":"B13","v":"LBR-PLC-2024-88492-SA","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"E13","v":"تاريخ استحقاق المعايرة القادمة:","bg":"#E2E8F0","fg":"#1E293B","b":true},{"c":"F13","v":"2027-04-11 (دورية كل 6 أشهر)","fg":"#1E293B","cs":3},{"skip":true},{"skip":true}]},{"r":14,"h":14.0,"cells":[{"c":"A14","v":""},{"c":"B14","v":""},{"c":"C14","v":""},{"c":"D14","v":""},{"c":"E14","v":""},{"c":"F14","v":""},{"c":"G14","v":""},{"c":"H14","v":""}]},{"r":15,"h":38.0,"cells":[{"c":"A15","v":"2. ملخص نتائج المعايرة ومقارنة الدقة بسماحيات ASTM C94 و SBC 304","bg":"#2563EB","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":16,"h":40.0,"cells":[{"c":"A16","v":"م","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B16","v":"عنصر الوزن والميزان المفحوص","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C16","v":"سعة قادوس الوزن (kg)","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D16","v":"الحمل الأقصى المختبر (kg)","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E16","v":"أقصى خطأ مسجل (kg)","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F16","v":"نسبة الخطأ الأقصى %","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G16","v":"سماحية الكود المسموحة","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H16","v":"الحالة والنتيجة الفنية","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":1,"fg":"#1E3A8A","b":true,"al":"center"},{"c":"B17","v":"ميزان الأسمنت والمواد الرابطة (Cement Hopper)","fg":"#1E293B","b":true},{"c":"C17","v":1500,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D17","v":1200,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E17","v":"السماحية المسموحة","f":"='معايرة الأسمنت والركام'!H15","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"F17","v":"القرار والمطابقة","f":"='معايرة الأسمنت والركام'!I15","fg":"#1E3A8A","b":true,"al":"center","nf":"0.00%"},{"c":"G17","v":"±1.0%","fg":"#1E3A8A","b":true,"al":"center"},{"c":"H17","v":"مطابق ومجاز","bg":"#ECFDF5","fg":"#059669","b":true,"al":"center"}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":2,"bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B18","v":"ميزان الركام الخشن (Coarse Aggregate - Sun 1 & 2)","bg":"#F8FAFC","fg":"#1E293B","b":true},{"c":"C18","v":5000,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D18","v":4000,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E18","v":0.02,"f":"='معايرة الأسمنت والركام'!H29","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"F18","v":"مطابق ومجاز","f":"='معايرة الأسمنت والركام'!I29","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"0.00%"},{"c":"G18","v":"±2.0%","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center"},{"c":"H18","v":"مطابق ومجاز","bg":"#ECFDF5","fg":"#059669","b":true,"al":"center"}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":3,"fg":"#1E3A8A","b":true,"al":"center"},{"c":"B19","v":"ميزان الركام الناعم (Fine Aggregate - Sand)","fg":"#1E293B","b":true},{"c":"C19","v":3000,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D19","v":2500,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E19","v":0,"f":"='معايرة الأسمنت والركام'!H43","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"F19","v":0,"f":"='معايرة الأسمنت والركام'!I43","fg":"#1E3A8A","b":true,"al":"center","nf":"0.00%"},{"c":"G19","v":"±2.0%","fg":"#1E3A8A","b":true,"al":"center"},{"c":"H19","v":"مطابق ومجاز","bg":"#ECFDF5","fg":"#059669","b":true,"al":"center"}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":4,"bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B20","v":"ميزان ومقياس ماء الخلط (Mixing Water Scale)","bg":"#F8FAFC","fg":"#1E293B","b":true},{"c":"C20","v":800,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D20","v":600,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E20","v":"السماحية المسموحة","f":"='معايرة الماء والمضافات'!H15","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"F20","v":"القرار والمطابقة","f":"='معايرة الماء والمضافات'!I15","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"0.00%"},{"c":"G20","v":"±1.0%","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center"},{"c":"H20","v":"مطابق ومجاز","bg":"#ECFDF5","fg":"#059669","b":true,"al":"center"}]},{"r":21,"h":52.0,"cells":[{"c":"A21","v":5,"fg":"#1E3A8A","b":true,"al":"center"},{"c":"B21","v":"موزعات المضافات الكيميائية (Chemical Admixtures)","fg":"#1E293B","b":true},{"c":"C21","v":50,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D21","v":40,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E21","v":"تكرارية ممتازة","f":"='معايرة الماء والمضافات'!H29","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"F21","v":"استقرار فوري للمؤشر","f":"='معايرة الماء والمضافات'!I29","fg":"#1E3A8A","b":true,"al":"center","nf":"0.00%"},{"c":"G21","v":"±3.0%","fg":"#1E3A8A","b":true,"al":"center"},{"c":"H21","v":"مطابق ومجاز","bg":"#ECFDF5","fg":"#059669","b":true,"al":"center"}]},{"r":22,"h":14.0,"cells":[{"c":"A22","v":""},{"c":"B22","v":""},{"c":"C22","v":""},{"c":"D22","v":""},{"c":"E22","v":""},{"c":"F22","v":""},{"c":"G22","v":""},{"c":"H22","v":""}]},{"r":23,"h":36.0,"cells":[{"c":"A23","v":"3. اعتماد وتوقيعات لجنة الفحص والمعايرة الفنية المشتركة","bg":"#2563EB","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":24,"h":104.0,"cells":[{"c":"A24","v":"مهندس الجودة والمختبر (محطة الخلط):\nالاسم: .......................................\nالتوقيع: ....................................\nالتاريخ: 2026/10/11","bg":"#F8FAFC","fg":"#1E293B","cs":2},{"skip":true},{"c":"C24","v":"مهندس ضبط الجودة QA/QC (المقاول الرئيسي):\nالاسم: .......................................\nالتوقيع: ....................................\nالتاريخ: 2026/10/11","bg":"#F8FAFC","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"F24","v":"المهندس الاستشاري المشرف (جهة الإشراف):\nالاسم: .......................................\nالتوقيع: ....................................\nالقرار: مجاز للصب والتشغيل الموقعي","bg":"#F8FAFC","fg":"#1E293B","cs":3},{"skip":true},{"skip":true}]}]},{"name":"معايرة الأسمنت والركام","maxRow":32,"maxCol":9,"colWidths":[14.0,26.0,20.0,20.0,20.0,16.0,18.0,16.0,18.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول المعايرة التفصيلية لموازين الأسمنت والركام (ASTM C94 & SBC 304)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":38.0,"cells":[{"c":"A2","v":"أولاً: معايرة ميزان الأسمنت والمواد الرابطة (سعة 1,500 كجم - السماحية المسموحة ±1.0%)","bg":"#2563EB","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":52.0,"cells":[{"c":"A3","v":"خطوة الاختبار","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B3","v":"الأوزان المعيارية القياسية (kg)","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C3","v":"قراءة الميزان صعوداً (kg)","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D3","v":"قراءة الميزان هبوطاً (kg)","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E3","v":"متوسط القراءة الفعلية (kg)","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F3","v":"الخطأ المطلق (kg)","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G3","v":"نسبة الخطأ المحسوبة %","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H3","v":"السماحية المسموحة","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I3","v":"القرار والمطابقة","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"نقطة 1","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B4","v":0,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"C4","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"D4","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"E4","v":0,"f":"=AVERAGE(C4:D4)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"F4","v":0,"f":"=E4-B4","fg":"#1E293B","al":"center","nf":"+0.0;-0.0;0.0"},{"c":"G4","v":0,"f":"=IF(B4>0, F4/B4, 0)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"H4","v":0.01,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"I4","v":"مطابق ومجاز","f":"=IF(ABS(G4)<=H4, \"مطابق ومجاز\", \"غير مطابق\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"نقطة 2","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B5","v":200,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"C5","v":200.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"D5","v":200,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"E5","v":200.25,"f":"=AVERAGE(C5:D5)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"F5","v":0.25,"f":"=E5-B5","fg":"#1E293B","al":"center","nf":"+0.0;-0.0;0.0"},{"c":"G5","v":0.00125,"f":"=IF(B5>0, F5/B5, 0)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"H5","v":0.01,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"I5","v":"مطابق ومجاز","f":"=IF(ABS(G5)<=H5, \"مطابق ومجاز\", \"غير مطابق\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"نقطة 3","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B6","v":400,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"C6","v":401,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"D6","v":400.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"E6","v":400.75,"f":"=AVERAGE(C6:D6)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"F6","v":0.75,"f":"=E6-B6","fg":"#1E293B","al":"center","nf":"+0.0;-0.0;0.0"},{"c":"G6","v":0.001875,"f":"=IF(B6>0, F6/B6, 0)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"H6","v":0.01,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"I6","v":"مطابق ومجاز","f":"=IF(ABS(G6)<=H6, \"مطابق ومجاز\", \"غير مطابق\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"نقطة 4","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B7","v":600,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"C7","v":601.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"D7","v":601,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"E7","v":601.25,"f":"=AVERAGE(C7:D7)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"F7","v":1.25,"f":"=E7-B7","fg":"#1E293B","al":"center","nf":"+0.0;-0.0;0.0"},{"c":"G7","v":0.002083,"f":"=IF(B7>0, F7/B7, 0)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"H7","v":0.01,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"I7","v":"مطابق ومجاز","f":"=IF(ABS(G7)<=H7, \"مطابق ومجاز\", \"غير مطابق\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"نقطة 5","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B8","v":800,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"C8","v":802,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"D8","v":801.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"E8","v":801.75,"f":"=AVERAGE(C8:D8)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"F8","v":1.75,"f":"=E8-B8","fg":"#1E293B","al":"center","nf":"+0.0;-0.0;0.0"},{"c":"G8","v":0.002188,"f":"=IF(B8>0, F8/B8, 0)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"H8","v":0.01,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"I8","v":"مطابق ومجاز","f":"=IF(ABS(G8)<=H8, \"مطابق ومجاز\", \"غير مطابق\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"نقطة 6","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B9","v":1000,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"C9","v":1002.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"D9","v":1002,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"E9","v":1002.25,"f":"=AVERAGE(C9:D9)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"F9","v":2.25,"f":"=E9-B9","fg":"#1E293B","al":"center","nf":"+0.0;-0.0;0.0"},{"c":"G9","v":0.00225,"f":"=IF(B9>0, F9/B9, 0)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"H9","v":0.01,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"I9","v":"مطابق ومجاز","f":"=IF(ABS(G9)<=H9, \"مطابق ومجاز\", \"غير مطابق\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":"نقطة 7","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B10","v":1200,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"C10","v":1203,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"D10","v":1202.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"E10","v":1202.75,"f":"=AVERAGE(C10:D10)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"F10","v":2.75,"f":"=E10-B10","fg":"#1E293B","al":"center","nf":"+0.0;-0.0;0.0"},{"c":"G10","v":0.002292,"f":"=IF(B10>0, F10/B10, 0)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"H10","v":0.01,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"I10","v":"مطابق ومجاز","f":"=IF(ABS(G10)<=H10, \"مطابق ومجاز\", \"غير مطابق\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":"أقصى خطأ مسجل لميزان الأسمنت والنتيجة الفنية:","bg":"#E2E8F0","fg":"#1E293B","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F11","v":2.75,"f":"=MAX(F4:F10)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.0;-0.0;0.0"},{"c":"G11","v":0.002292,"f":"=MAX(G4:G10)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%"},{"c":"H11","v":"مجاز وفق ASTM C94","f":"=IF(MAX(G4:G10)<=0.01, \"مجاز وفق ASTM C94\", \"مرفوض - يلزم ضبط\")","bg":"#ECFDF5","fg":"#059669","b":true,"al":"center","cs":2},{"skip":true}]},{"r":12,"h":28.0,"cells":[{"c":"A12","v":""},{"c":"B12","v":""},{"c":"C12","v":""},{"c":"D12","v":""},{"c":"E12","v":""},{"c":"F12","v":""},{"c":"G12","v":""},{"c":"H12","v":""},{"c":"I12","v":""}]},{"r":13,"h":14.0,"cells":[{"c":"A13","v":""},{"c":"B13","v":""},{"c":"C13","v":""},{"c":"D13","v":""},{"c":"E13","v":""},{"c":"F13","v":""},{"c":"G13","v":""},{"c":"H13","v":""},{"c":"I13","v":""}]},{"r":14,"h":38.0,"cells":[{"c":"A14","v":"ثانياً: معايرة ميزان الركام الخشن - سن 1 وسن 2 (سعة 5,000 كجم - السماحية المسموحة ±2.0%)","bg":"#2563EB","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"خطوة الاختبار","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B15","v":"الأوزان المعيارية القياسية (kg)","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C15","v":"قراءة الميزان صعوداً (kg)","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D15","v":"قراءة الميزان هبوطاً (kg)","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E15","v":"متوسط القراءة الفعلية (kg)","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F15","v":"الخطأ المطلق (kg)","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G15","v":"نسبة الخطأ المحسوبة %","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H15","v":"السماحية المسموحة","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I15","v":"القرار والمطابقة","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":"نقطة 1","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B16","v":0,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"C16","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"D16","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"E16","v":0,"f":"=AVERAGE(C16:D16)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"F16","v":0,"f":"=E16-B16","fg":"#1E293B","al":"center","nf":"+0.0;-0.0;0.0"},{"c":"G16","v":0,"f":"=IF(B16>0, F16/B16, 0)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"H16","v":0.02,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"I16","v":"مطابق ومجاز","f":"=IF(ABS(G16)<=H16, \"مطابق ومجاز\", \"غير مطابق\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":"نقطة 2","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B17","v":500,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"C17","v":502,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"D17","v":501,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"E17","v":501.5,"f":"=AVERAGE(C17:D17)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"F17","v":1.5,"f":"=E17-B17","fg":"#1E293B","al":"center","nf":"+0.0;-0.0;0.0"},{"c":"G17","v":0.003,"f":"=IF(B17>0, F17/B17, 0)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"H17","v":0.02,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"I17","v":"مطابق ومجاز","f":"=IF(ABS(G17)<=H17, \"مطابق ومجاز\", \"غير مطابق\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":"نقطة 3","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B18","v":1000,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"C18","v":1004,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"D18","v":1003,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"E18","v":1003.5,"f":"=AVERAGE(C18:D18)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"F18","v":3.5,"f":"=E18-B18","fg":"#1E293B","al":"center","nf":"+0.0;-0.0;0.0"},{"c":"G18","v":0.0035,"f":"=IF(B18>0, F18/B18, 0)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"H18","v":0.02,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"I18","v":"مطابق ومجاز","f":"=IF(ABS(G18)<=H18, \"مطابق ومجاز\", \"غير مطابق\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":"نقطة 4","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B19","v":2000,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"C19","v":2007,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"D19","v":2005,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"E19","v":2006,"f":"=AVERAGE(C19:D19)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"F19","v":6,"f":"=E19-B19","fg":"#1E293B","al":"center","nf":"+0.0;-0.0;0.0"},{"c":"G19","v":0.003,"f":"=IF(B19>0, F19/B19, 0)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"H19","v":0.02,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"I19","v":"مطابق ومجاز","f":"=IF(ABS(G19)<=H19, \"مطابق ومجاز\", \"غير مطابق\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":"نقطة 5","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B20","v":3000,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"C20","v":3010,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"D20","v":3008,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"E20","v":3009,"f":"=AVERAGE(C20:D20)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"F20","v":9,"f":"=E20-B20","fg":"#1E293B","al":"center","nf":"+0.0;-0.0;0.0"},{"c":"G20","v":0.003,"f":"=IF(B20>0, F20/B20, 0)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"H20","v":0.02,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"I20","v":"مطابق ومجاز","f":"=IF(ABS(G20)<=H20, \"مطابق ومجاز\", \"غير مطابق\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":"نقطة 6","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B21","v":4000,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"C21","v":4012,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"D21","v":4010,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"E21","v":4011,"f":"=AVERAGE(C21:D21)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"F21","v":11,"f":"=E21-B21","fg":"#1E293B","al":"center","nf":"+0.0;-0.0;0.0"},{"c":"G21","v":0.00275,"f":"=IF(B21>0, F21/B21, 0)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"H21","v":0.02,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"I21","v":"مطابق ومجاز","f":"=IF(ABS(G21)<=H21, \"مطابق ومجاز\", \"غير مطابق\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"}]},{"r":22,"h":36.0,"cells":[{"c":"A22","v":"أقصى خطأ مسجل لميزان الركام الخشن والنتيجة الفنية:","bg":"#E2E8F0","fg":"#1E293B","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F22","v":11,"f":"=MAX(F16:F21)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.0;-0.0;0.0"},{"c":"G22","v":0.0035,"f":"=MAX(G16:G21)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%"},{"c":"H22","v":"مجاز وفق ASTM C94","f":"=IF(MAX(G16:G21)<=0.02, \"مجاز وفق ASTM C94\", \"مرفوض - يلزم ضبط\")","bg":"#ECFDF5","fg":"#059669","b":true,"al":"center","cs":2},{"skip":true}]},{"r":23,"h":14.0,"cells":[{"c":"A23","v":""},{"c":"B23","v":""},{"c":"C23","v":""},{"c":"D23","v":""},{"c":"E23","v":""},{"c":"F23","v":""},{"c":"G23","v":""},{"c":"H23","v":""},{"c":"I23","v":""}]},{"r":24,"h":38.0,"cells":[{"c":"A24","v":"ثالثاً: معايرة ميزان الركام الناعم - الرمل (سعة 3,000 كجم - السماحية المسموحة ±2.0%)","bg":"#2563EB","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":25,"h":52.0,"cells":[{"c":"A25","v":"خطوة الاختبار","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B25","v":"الأوزان المعيارية القياسية (kg)","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C25","v":"قراءة الميزان صعوداً (kg)","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D25","v":"قراءة الميزان هبوطاً (kg)","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E25","v":"متوسط القراءة الفعلية (kg)","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F25","v":"الخطأ المطلق (kg)","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G25","v":"نسبة الخطأ المحسوبة %","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H25","v":"السماحية المسموحة","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I25","v":"القرار والمطابقة","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":"نقطة 1","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B26","v":0,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"C26","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"D26","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"E26","v":0,"f":"=AVERAGE(C26:D26)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"F26","v":0,"f":"=E26-B26","fg":"#1E293B","al":"center","nf":"+0.0;-0.0;0.0"},{"c":"G26","v":0,"f":"=IF(B26>0, F26/B26, 0)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"H26","v":0.02,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"I26","v":"مطابق ومجاز","f":"=IF(ABS(G26)<=H26, \"مطابق ومجاز\", \"غير مطابق\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":"نقطة 2","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B27","v":500,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"C27","v":501.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"D27","v":501,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"E27","v":501.25,"f":"=AVERAGE(C27:D27)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"F27","v":1.25,"f":"=E27-B27","fg":"#1E293B","al":"center","nf":"+0.0;-0.0;0.0"},{"c":"G27","v":0.0025,"f":"=IF(B27>0, F27/B27, 0)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"H27","v":0.02,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"I27","v":"مطابق ومجاز","f":"=IF(ABS(G27)<=H27, \"مطابق ومجاز\", \"غير مطابق\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"}]},{"r":28,"h":34.0,"cells":[{"c":"A28","v":"نقطة 3","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B28","v":1000,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"C28","v":1003,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"D28","v":1002,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"E28","v":1002.5,"f":"=AVERAGE(C28:D28)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"F28","v":2.5,"f":"=E28-B28","fg":"#1E293B","al":"center","nf":"+0.0;-0.0;0.0"},{"c":"G28","v":0.0025,"f":"=IF(B28>0, F28/B28, 0)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"H28","v":0.02,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"I28","v":"مطابق ومجاز","f":"=IF(ABS(G28)<=H28, \"مطابق ومجاز\", \"غير مطابق\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"}]},{"r":29,"h":34.0,"cells":[{"c":"A29","v":"نقطة 4","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B29","v":1500,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"C29","v":1504.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"D29","v":1503.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"E29","v":1504,"f":"=AVERAGE(C29:D29)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"F29","v":4,"f":"=E29-B29","fg":"#1E293B","al":"center","nf":"+0.0;-0.0;0.0"},{"c":"G29","v":0.002667,"f":"=IF(B29>0, F29/B29, 0)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"H29","v":0.02,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"I29","v":"مطابق ومجاز","f":"=IF(ABS(G29)<=H29, \"مطابق ومجاز\", \"غير مطابق\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"}]},{"r":30,"h":34.0,"cells":[{"c":"A30","v":"نقطة 5","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B30","v":2000,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"C30","v":2006,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"D30","v":2005,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"E30","v":2005.5,"f":"=AVERAGE(C30:D30)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"F30","v":5.5,"f":"=E30-B30","fg":"#1E293B","al":"center","nf":"+0.0;-0.0;0.0"},{"c":"G30","v":0.00275,"f":"=IF(B30>0, F30/B30, 0)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"H30","v":0.02,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"I30","v":"مطابق ومجاز","f":"=IF(ABS(G30)<=H30, \"مطابق ومجاز\", \"غير مطابق\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"}]},{"r":31,"h":34.0,"cells":[{"c":"A31","v":"نقطة 6","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B31","v":2500,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"C31","v":2507,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"D31","v":2506,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"E31","v":2506.5,"f":"=AVERAGE(C31:D31)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"F31","v":6.5,"f":"=E31-B31","fg":"#1E293B","al":"center","nf":"+0.0;-0.0;0.0"},{"c":"G31","v":0.0026,"f":"=IF(B31>0, F31/B31, 0)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"H31","v":0.02,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"I31","v":"مطابق ومجاز","f":"=IF(ABS(G31)<=H31, \"مطابق ومجاز\", \"غير مطابق\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"}]},{"r":32,"h":36.0,"cells":[{"c":"A32","v":"أقصى خطأ مسجل لميزان الركام الناعم والنتيجة الفنية:","bg":"#E2E8F0","fg":"#1E293B","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F32","v":6.5,"f":"=MAX(F26:F31)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.0;-0.0;0.0"},{"c":"G32","v":0.00275,"f":"=MAX(G26:G31)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%"},{"c":"H32","v":"مجاز وفق ASTM C94","f":"=IF(MAX(G26:G31)<=0.02, \"مجاز وفق ASTM C94\", \"مرفوض - يلزم ضبط\")","bg":"#ECFDF5","fg":"#059669","b":true,"al":"center","cs":2},{"skip":true}]}]},{"name":"معايرة الماء والمضافات","maxRow":30,"maxCol":9,"colWidths":[14.0,26.0,20.0,20.0,20.0,16.0,18.0,16.0,18.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول معايرة موازين ماء الخلط وموزعات المضافات الكيميائية (ASTM C94 & SBC 304)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":38.0,"cells":[{"c":"A2","v":"أولاً: معايرة ميزان ومقياس ماء الخلط (سعة 800 كجم - السماحية المسموحة ±1.0%)","bg":"#2563EB","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":52.0,"cells":[{"c":"A3","v":"خطوة الاختبار","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B3","v":"الأوزان المعيارية القياسية (kg)","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C3","v":"قراءة الميزان صعوداً (kg)","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D3","v":"قراءة الميزان هبوطاً (kg)","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E3","v":"متوسط القراءة الفعلية (kg)","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F3","v":"الخطأ المطلق (kg)","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G3","v":"نسبة الخطأ المحسوبة %","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H3","v":"السماحية المسموحة","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I3","v":"القرار والمطابقة","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"نقطة 1","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B4","v":0,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"C4","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"D4","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"E4","v":0,"f":"=AVERAGE(C4:D4)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"F4","v":0,"f":"=E4-B4","fg":"#1E293B","al":"center","nf":"+0.0;-0.0;0.0"},{"c":"G4","v":0,"f":"=IF(B4>0, F4/B4, 0)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"H4","v":0.01,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"I4","v":"مطابق ومجاز","f":"=IF(ABS(G4)<=H4, \"مطابق ومجاز\", \"غير مطابق\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"نقطة 2","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B5","v":100,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"C5","v":100.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"D5","v":100,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"E5","v":100.1,"f":"=AVERAGE(C5:D5)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"F5","v":0.1,"f":"=E5-B5","fg":"#1E293B","al":"center","nf":"+0.0;-0.0;0.0"},{"c":"G5","v":0.001,"f":"=IF(B5>0, F5/B5, 0)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"H5","v":0.01,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"I5","v":"مطابق ومجاز","f":"=IF(ABS(G5)<=H5, \"مطابق ومجاز\", \"غير مطابق\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"نقطة 3","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B6","v":200,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"C6","v":200.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"D6","v":200.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"E6","v":200.35,"f":"=AVERAGE(C6:D6)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"F6","v":0.35,"f":"=E6-B6","fg":"#1E293B","al":"center","nf":"+0.0;-0.0;0.0"},{"c":"G6","v":0.00175,"f":"=IF(B6>0, F6/B6, 0)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"H6","v":0.01,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"I6","v":"مطابق ومجاز","f":"=IF(ABS(G6)<=H6, \"مطابق ومجاز\", \"غير مطابق\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"نقطة 4","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B7","v":300,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"C7","v":300.8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"D7","v":300.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"E7","v":300.65,"f":"=AVERAGE(C7:D7)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"F7","v":0.65,"f":"=E7-B7","fg":"#1E293B","al":"center","nf":"+0.0;-0.0;0.0"},{"c":"G7","v":0.002167,"f":"=IF(B7>0, F7/B7, 0)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"H7","v":0.01,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"I7","v":"مطابق ومجاز","f":"=IF(ABS(G7)<=H7, \"مطابق ومجاز\", \"غير مطابق\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"نقطة 5","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B8","v":400,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"C8","v":401,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"D8","v":400.8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"E8","v":400.9,"f":"=AVERAGE(C8:D8)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"F8","v":0.9,"f":"=E8-B8","fg":"#1E293B","al":"center","nf":"+0.0;-0.0;0.0"},{"c":"G8","v":0.00225,"f":"=IF(B8>0, F8/B8, 0)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"H8","v":0.01,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"I8","v":"مطابق ومجاز","f":"=IF(ABS(G8)<=H8, \"مطابق ومجاز\", \"غير مطابق\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"نقطة 6","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B9","v":500,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"C9","v":501.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"D9","v":501,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"E9","v":501.1,"f":"=AVERAGE(C9:D9)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"F9","v":1.1,"f":"=E9-B9","fg":"#1E293B","al":"center","nf":"+0.0;-0.0;0.0"},{"c":"G9","v":0.0022,"f":"=IF(B9>0, F9/B9, 0)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"H9","v":0.01,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"I9","v":"مطابق ومجاز","f":"=IF(ABS(G9)<=H9, \"مطابق ومجاز\", \"غير مطابق\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":"نقطة 7","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B10","v":600,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"C10","v":601.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"D10","v":601.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"E10","v":601.35,"f":"=AVERAGE(C10:D10)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"F10","v":1.35,"f":"=E10-B10","fg":"#1E293B","al":"center","nf":"+0.0;-0.0;0.0"},{"c":"G10","v":0.00225,"f":"=IF(B10>0, F10/B10, 0)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"H10","v":0.01,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"I10","v":"مطابق ومجاز","f":"=IF(ABS(G10)<=H10, \"مطابق ومجاز\", \"غير مطابق\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":"أقصى خطأ مسجل لميزان ماء الخلط والنتيجة الفنية:","bg":"#E2E8F0","fg":"#1E293B","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F11","v":1.35,"f":"=MAX(F4:F10)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.0;-0.0;0.0"},{"c":"G11","v":0.00225,"f":"=MAX(G4:G10)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%"},{"c":"H11","v":"مجاز وفق ASTM C94","f":"=IF(MAX(G4:G10)<=0.01, \"مجاز وفق ASTM C94\", \"مرفوض - يلزم ضبط\")","bg":"#ECFDF5","fg":"#059669","b":true,"al":"center","cs":2},{"skip":true}]},{"r":12,"h":28.0,"cells":[{"c":"A12","v":""},{"c":"B12","v":""},{"c":"C12","v":""},{"c":"D12","v":""},{"c":"E12","v":""},{"c":"F12","v":""},{"c":"G12","v":""},{"c":"H12","v":""},{"c":"I12","v":""}]},{"r":13,"h":14.0,"cells":[{"c":"A13","v":""},{"c":"B13","v":""},{"c":"C13","v":""},{"c":"D13","v":""},{"c":"E13","v":""},{"c":"F13","v":""},{"c":"G13","v":""},{"c":"H13","v":""},{"c":"I13","v":""}]},{"r":14,"h":38.0,"cells":[{"c":"A14","v":"ثانياً: معايرة موزع وميزان المضافات الكيميائية - الملدنات الفائقة (سعة 50 كجم - السماحية المسموحة ±3.0%)","bg":"#2563EB","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"خطوة الاختبار","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B15","v":"الأوزان المعيارية القياسية (kg)","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C15","v":"قراءة الميزان صعوداً (kg)","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D15","v":"قراءة الميزان هبوطاً (kg)","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E15","v":"متوسط القراءة الفعلية (kg)","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F15","v":"الخطأ المطلق (kg)","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G15","v":"نسبة الخطأ المحسوبة %","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H15","v":"السماحية المسموحة","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I15","v":"القرار والمطابقة","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":"نقطة 1","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B16","v":0,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"C16","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D16","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E16","v":0,"f":"=AVERAGE(C16:D16)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"F16","v":0,"f":"=E16-B16","fg":"#1E293B","al":"center","nf":"+0.00;-0.00;0.00"},{"c":"G16","v":0,"f":"=IF(B16>0, F16/B16, 0)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"H16","v":0.03,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"I16","v":"مطابق ومجاز","f":"=IF(ABS(G16)<=H16, \"مطابق ومجاز\", \"غير مطابق\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":"نقطة 2","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B17","v":5,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"C17","v":5.05,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D17","v":5.02,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E17","v":5.035,"f":"=AVERAGE(C17:D17)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"F17","v":0.035,"f":"=E17-B17","fg":"#1E293B","al":"center","nf":"+0.00;-0.00;0.00"},{"c":"G17","v":0.007,"f":"=IF(B17>0, F17/B17, 0)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"H17","v":0.03,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"I17","v":"مطابق ومجاز","f":"=IF(ABS(G17)<=H17, \"مطابق ومجاز\", \"غير مطابق\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":"نقطة 3","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B18","v":10,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"C18","v":10.1,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D18","v":10.05,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E18","v":10.075,"f":"=AVERAGE(C18:D18)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"F18","v":0.075,"f":"=E18-B18","fg":"#1E293B","al":"center","nf":"+0.00;-0.00;0.00"},{"c":"G18","v":0.0075,"f":"=IF(B18>0, F18/B18, 0)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"H18","v":0.03,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"I18","v":"مطابق ومجاز","f":"=IF(ABS(G18)<=H18, \"مطابق ومجاز\", \"غير مطابق\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":"نقطة 4","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B19","v":20,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"C19","v":20.15,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D19","v":20.1,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E19","v":20.125,"f":"=AVERAGE(C19:D19)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"F19","v":0.125,"f":"=E19-B19","fg":"#1E293B","al":"center","nf":"+0.00;-0.00;0.00"},{"c":"G19","v":0.00625,"f":"=IF(B19>0, F19/B19, 0)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"H19","v":0.03,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"I19","v":"مطابق ومجاز","f":"=IF(ABS(G19)<=H19, \"مطابق ومجاز\", \"غير مطابق\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":"نقطة 5","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B20","v":30,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"C20","v":30.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D20","v":30.15,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E20","v":30.175,"f":"=AVERAGE(C20:D20)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"F20","v":0.175,"f":"=E20-B20","fg":"#1E293B","al":"center","nf":"+0.00;-0.00;0.00"},{"c":"G20","v":0.005833,"f":"=IF(B20>0, F20/B20, 0)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"H20","v":0.03,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"I20","v":"مطابق ومجاز","f":"=IF(ABS(G20)<=H20, \"مطابق ومجاز\", \"غير مطابق\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":"نقطة 6","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B21","v":40,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"C21","v":40.25,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D21","v":40.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E21","v":40.225,"f":"=AVERAGE(C21:D21)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"F21","v":0.225,"f":"=E21-B21","fg":"#1E293B","al":"center","nf":"+0.00;-0.00;0.00"},{"c":"G21","v":0.005625,"f":"=IF(B21>0, F21/B21, 0)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"H21","v":0.03,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"I21","v":"مطابق ومجاز","f":"=IF(ABS(G21)<=H21, \"مطابق ومجاز\", \"غير مطابق\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"}]},{"r":22,"h":36.0,"cells":[{"c":"A22","v":"أقصى خطأ مسجل لموزع المضافات والنتيجة الفنية:","bg":"#E2E8F0","fg":"#1E293B","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F22","v":0.225,"f":"=MAX(F16:F21)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00;-0.00;0.00"},{"c":"G22","v":0.0075,"f":"=MAX(G16:G21)","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%"},{"c":"H22","v":"مجاز وفق ASTM C94","f":"=IF(MAX(G16:G21)<=0.03, \"مجاز وفق ASTM C94\", \"مرفوض - يلزم ضبط\")","bg":"#ECFDF5","fg":"#059669","b":true,"al":"center","cs":2},{"skip":true}]},{"r":23,"h":14.0,"cells":[{"c":"A23","v":""},{"c":"B23","v":""},{"c":"C23","v":""},{"c":"D23","v":""},{"c":"E23","v":""},{"c":"F23","v":""},{"c":"G23","v":""},{"c":"H23","v":""},{"c":"I23","v":""}]},{"r":24,"h":38.0,"cells":[{"c":"A24","v":"ثالثاً: اختبار تكرارية القراءات لنفس الحمل المعياري (Repeatability Verification)","bg":"#2563EB","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":25,"h":52.0,"cells":[{"c":"A25","v":"رقم التكرار","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B25","v":"عنصر الوزن المختبر","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C25","v":"الحمل المعياري الثابت (kg)","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D25","v":"القراءة المسجلة (kg)","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E25","v":"الانحراف عن المعياري (kg)","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F25","v":"نسبة الانحراف %","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G25","v":"أقصى انحراف مسموح","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H25","v":"حالة التكرارية","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I25","v":"ملاحظات الفحص","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":"تكرار 1","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B26","v":"ميزان الأسمنت","fg":"#1E293B","b":true},{"c":"C26","v":1000,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D26","v":1002,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"E26","v":2,"f":"=D26-C26","fg":"#1E293B","al":"center","nf":"+0.0;-0.0;0.0"},{"c":"F26","v":0.002,"f":"=E26/C26","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%"},{"c":"G26","v":0.01,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"H26","v":"تكرارية ممتازة","f":"=IF(ABS(F26)<=G26, \"تكرارية ممتازة\", \"تباين غير مقبول\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"},{"c":"I26","v":"استقرار فوري للمؤشر","fg":"#1E293B"}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":"تكرار 2","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B27","v":"ميزان الأسمنت","fg":"#1E293B","b":true},{"c":"C27","v":1000,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D27","v":1002.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"E27","v":2.5,"f":"=D27-C27","fg":"#1E293B","al":"center","nf":"+0.0;-0.0;0.0"},{"c":"F27","v":0.0025,"f":"=E27/C27","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%"},{"c":"G27","v":0.01,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"H27","v":"تكرارية ممتازة","f":"=IF(ABS(F27)<=G27, \"تكرارية ممتازة\", \"تباين غير مقبول\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"},{"c":"I27","v":"استقرار فوري للمؤشر","fg":"#1E293B"}]},{"r":28,"h":34.0,"cells":[{"c":"A28","v":"تكرار 3","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B28","v":"ميزان الأسمنت","fg":"#1E293B","b":true},{"c":"C28","v":1000,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D28","v":1002,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"E28","v":2,"f":"=D28-C28","fg":"#1E293B","al":"center","nf":"+0.0;-0.0;0.0"},{"c":"F28","v":0.002,"f":"=E28/C28","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%"},{"c":"G28","v":0.01,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"H28","v":"تكرارية ممتازة","f":"=IF(ABS(F28)<=G28, \"تكرارية ممتازة\", \"تباين غير مقبول\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"},{"c":"I28","v":"استقرار فوري للمؤشر","fg":"#1E293B"}]},{"r":29,"h":34.0,"cells":[{"c":"A29","v":"تكرار 4","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B29","v":"ميزان الأسمنت","fg":"#1E293B","b":true},{"c":"C29","v":1000,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D29","v":1002.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"E29","v":2.5,"f":"=D29-C29","fg":"#1E293B","al":"center","nf":"+0.0;-0.0;0.0"},{"c":"F29","v":0.0025,"f":"=E29/C29","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%"},{"c":"G29","v":0.01,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"H29","v":"تكرارية ممتازة","f":"=IF(ABS(F29)<=G29, \"تكرارية ممتازة\", \"تباين غير مقبول\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"},{"c":"I29","v":"استقرار فوري للمؤشر","fg":"#1E293B"}]},{"r":30,"h":52.0,"cells":[{"c":"A30","v":"تكرار 5","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B30","v":"ميزان الأسمنت","fg":"#1E293B","b":true},{"c":"C30","v":1000,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D30","v":1002,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"E30","v":2,"f":"=D30-C30","fg":"#1E293B","al":"center","nf":"+0.0;-0.0;0.0"},{"c":"F30","v":0.002,"f":"=E30/C30","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%"},{"c":"G30","v":0.01,"in":true,"fg":"#1E293B","al":"center","nf":"±0.0%"},{"c":"H30","v":"تكرارية ممتازة","f":"=IF(ABS(F30)<=G30, \"تكرارية ممتازة\", \"تباين غير مقبول\")","bg":"#ECFDF5","fg":"#1E293B","b":true,"al":"center"},{"c":"I30","v":"تطابق تام وتكرارية ممتازة","fg":"#1E293B"}]}]},{"name":"سماحيات واشتراطات الكود","maxRow":17,"maxCol":7,"colWidths":[14.0,28.0,20.0,24.0,20.0,22.0,40.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول المقارنة المعيارية لسماحيات وزن الخرسانة الجاهزة (ASTM C94 & SBC 304 & ACI 304R)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"دليل مهندسي ضبط الجودة والمواد للاشتراطات الفنية وحدود التفاوت المقبولة في موازين محطات الخلط المركزية لضمان قوة ومقاومة الخرسانة التصميمية","bg":"#EFF6FF","fg":"#1E3A8A","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":14.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"1. حدود التفاوت المسموح بها لموازين مكونات الخلطة الخرسانية (Batching Tolerances)","bg":"#2563EB","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"م","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"مكون الخلطة الخرسانية","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"سماحية ASTM C94","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"سماحية كود البناء السعودي SBC 304","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"سماحية ACI 304R","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"دورية المعايرة المطلوبة","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"الأثر الهندسي لمخالفة السماحية","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":1,"bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B6","v":"الأسمنت البورتلاندي والمواد الرابطة الإسمنتية","bg":"#F8FAFC","fg":"#1E293B","b":true},{"c":"C6","v":"±1.0% من الوزن المطلوب","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D6","v":"±1.0% (أو ±0.3% من سعة الميزان)","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E6","v":"±1.0%","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F6","v":"كل 6 أشهر (أو كل 50,000 م³)","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"G6","v":"خلل في نسبة الماء للأسمنت w/c وهبوط المقاومة المميزة fc","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":2,"fg":"#1E3A8A","b":true,"al":"center"},{"c":"B7","v":"الركام الإجمالي (الركام الخشن + الناعم مجمعاً)","fg":"#1E293B","b":true},{"c":"C7","v":"±2.0% من إجمالي وزن الركام","fg":"#1E293B","al":"center"},{"c":"D7","v":"±2.0% لخلطات أكثر من 30% من السعة","fg":"#1E293B","al":"center"},{"c":"E7","v":"±2.0%","fg":"#1E293B","al":"center"},{"c":"F7","v":"كل 6 أشهر (أو كل 50,000 م³)","fg":"#1E293B","al":"center"},{"c":"G7","v":"تغير منحنى التدرج الحبيبي وحدوث انفصال حبيبي أو تعشيش","fg":"#1E293B"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":3,"bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B8","v":"الركام المفرد (السن أو الرمل بشكل منفصل)","bg":"#F8FAFC","fg":"#1E293B","b":true},{"c":"C8","v":"±2.0% لوزن كل ركام مفرد","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D8","v":"±2.0% من الوزن التصميمي للمكون","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E8","v":"±2.0%","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F8","v":"كل 6 أشهر (أو عند تبديل المصدر)","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"G8","v":"اختلال نسبة الرمل للسن وتدهور قابلية التشغيل Workability","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":4,"fg":"#1E3A8A","b":true,"al":"center"},{"c":"B9","v":"ماء الخلط (الماء المضاف + ماء الجليد)","fg":"#1E293B","b":true},{"c":"C9","v":"±1.0% من إجمالي ماء الخلط","fg":"#1E293B","al":"center"},{"c":"D9","v":"±1.0% من الحجم أو الوزن المحدد","fg":"#1E293B","al":"center"},{"c":"E9","v":"±1.0%","fg":"#1E293B","al":"center"},{"c":"F9","v":"كل 3 إلى 6 أشهر","fg":"#1E293B","al":"center"},{"c":"G9","v":"زيادة الماء تقلل مقاومة الضغط بنسبة 5% لكل 10 لتر فائضة","fg":"#1E293B"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":5,"bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B10","v":"المضافات الكيميائية السائلة (Admixtures)","bg":"#F8FAFC","fg":"#1E293B","b":true},{"c":"C10","v":"±3.0% من المقدار التصميمي","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D10","v":"±3.0% أو مقدار جرعة واحدة أيهما أكبر","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E10","v":"±3.0%","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F10","v":"كل 3 أشهر (ومعايرة أسبوعية سريعة)","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"G10","v":"زيادة الجرعة تؤخر زمن الشك لأيام ونقصانها يسبب فقدان الهبوط","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":6,"fg":"#1E3A8A","b":true,"al":"center"},{"c":"B11","v":"المضافات البوزولانية (السيليكا فيوم والرماد المتطاير)","fg":"#1E293B","b":true},{"c":"C11","v":"±1.0% عند وزنها منفصلة","fg":"#1E293B","al":"center"},{"c":"D11","v":"±1.0% من الوزن المحدد في الخلطة","fg":"#1E293B","al":"center"},{"c":"E11","v":"±1.0%","fg":"#1E293B","al":"center"},{"c":"F11","v":"كل 6 أشهر","fg":"#1E293B","al":"center"},{"c":"G11","v":"تأثير مباشر على نفاذية الخرسانة ومقاومة الكبريتات والأملاح","fg":"#1E293B"}]},{"r":12,"h":14.0,"cells":[{"c":"A12","v":""},{"c":"B12","v":""},{"c":"C12","v":""},{"c":"D12","v":""},{"c":"E12","v":""},{"c":"F12","v":""},{"c":"G12","v":""}]},{"r":13,"h":38.0,"cells":[{"c":"A13","v":"2. البروتوكول الإلزامي لمهندس الموقع والاستشاري عند استلام شهادة معايرة المحطة","bg":"#2563EB","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"•","bg":"#E2E8F0","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B14","v":"التحقق من الأوزان المعيارية:","bg":"#E2E8F0","fg":"#1E293B","b":true},{"c":"C14","v":"يجب التأكد من أن الأوزان القياسية المستخدمة في المعايرة مرقمة ومحفوظة ومعايرة بواسطة جهة قياس وطنية موثوقة (SASO / مصلحة دمغ المصوغات والموازين) وبشهادة سارية.","fg":"#1E293B","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":15,"h":40.0,"cells":[{"c":"A15","v":"•","bg":"#E2E8F0","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B15","v":"فحص خلايا الحمل (Load Cells):","bg":"#E2E8F0","fg":"#1E293B","b":true},{"c":"C15","v":"التأكد البصري من سلامة خلايا الحمل الإلكترونية أسفل القواديس وعدم تراكم كتل خرسانية أو أتربة صلبة تعيق الحركة الحرة وتؤدي لقراءات خاطئة.","fg":"#1E293B","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":"•","bg":"#E2E8F0","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B16","v":"اختبار التعويض عن الرطوبة (Moisture Probe):","bg":"#E2E8F0","fg":"#1E293B","b":true},{"c":"C16","v":"التحقق من عمل حساسات رطوبة الرمل الإلكترونية (Microwave Moisture Sensors) لتعديل كمية ماء الخلط الحقيقي تلقائياً على شاشة PLC.","fg":"#1E293B","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":17,"h":40.0,"cells":[{"c":"A17","v":"•","bg":"#E2E8F0","fg":"#1E3A8A","b":true,"al":"center"},{"c":"B17","v":"سريان المعايرة والربط الزمني:","bg":"#E2E8F0","fg":"#1E293B","b":true},{"c":"C17","v":"مدة صلاحية شهادة المعايرة القصوى هي 6 أشهر، ويُلغى العمل بها فوراً في حال استبدال أي خلية حمل أو صيانة قادوس الوزن وتلزم إعادة المعايرة رسمياً.","fg":"#1E293B","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]}]}]}