{"slug":"concrete-bridge-post-tensioning-and-jacking-log","sheets":[{"name":"سجل وحسابات شد كابلات الجسور","maxRow":23,"maxCol":11,"colWidths":[24.0,18.0,20.0,16.0,22.0,20.0,22.0,22.0,18.0,20.0,32.0],"rows":[{"r":1,"h":34.0,"cells":[{"c":"A1","v":"شيت وسجل شد كابلات ما بعد الشد للجسور والكباري الخرسانية إكسيل (Post-Tensioning Jacking Log)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"نموذج هندسي متقدم لضبط جودة شد الكابلات ومقارنة الاستطالة النظرية والفعلية ومراقبة ضغط المقابس الهيدروليكية وفق AASHTO و PTI","bg":"#1E293B","fg":"#FFFFFF","al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"اسم مشروع الجسر / الكوبري:","b":true},{"c":"B4","v":"تقاطع جسر الملك عبد الله الشمالي - بحر رقم 3","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"F4","v":"رقم الكمرة الصندوقية / العنصر:","b":true},{"c":"G4","v":"Box Girder Span B-03 (Web 1 & 2)","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"المقاول المنفذ لأعمال الشد:","b":true},{"c":"B5","v":"الشركة الوطنية للإنشاءات التخصصية لما بعد الشد","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"F5","v":"استشاري الإشراف وضبط الجودة:","b":true},{"c":"G5","v":"دار الاستشارات الهندسية والجسور","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"بيانات المقبس الهيدروليكي (Jack ID):","b":true},{"c":"B6","v":"JACK-VLS-500T (مساحة الكباس: 755.2 سم²)","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"F6","v":"مقاومة خرسانة الجسر عند الشد f'ci:","b":true},{"c":"G6","v":"38.5 ميجا باسكال (الحد الأدنى 35 MPa)","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""},{"c":"I7","v":""},{"c":"J7","v":""},{"c":"K7","v":""}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"1. جدول تسجيل ومطابقة استطالة كابلات الشد اللاحق وفحص التفاوت المسموح (±7% وفق AASHTO LRFD)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"رقم الكابل (Tendon ID)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"عدد الجدائل (0.6\")","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"مساحة المقطع Ap (مم²)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"طول الكابل L (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"قوة الشد التصميمية P (kN)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"ضغط المقبس المقروء (bar)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"الاستطالة النظرية ΔL_th (مم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H9","v":"الاستطالة الفعلية المقاسة ΔL_act (مم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I9","v":"انزلاق الخوابير Slip (مم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J9","v":"نسبة التفاوت والانحراف %","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K9","v":"حالة القبول والاعتماد (AASHTO Criteria)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":"T-01 (Bottom Web L)","b":true},{"c":"B10","v":19,"in":true,"al":"center"},{"c":"C10","v":2660,"in":true,"al":"center","nf":"#,##0"},{"c":"D10","v":42.5,"in":true,"al":"center","nf":"0.00 \"م\""},{"c":"E10","v":3963.4,"in":true,"b":true,"al":"center","nf":"#,##0.0 \"kN\""},{"c":"F10","v":524.814619,"f":"=E10/(75.52*0.1)","b":true,"al":"center","nf":"#,##0.0 \"bar\""},{"c":"G10","v":331.238462,"f":"=(E10*1000*D10*1000)/(C10*195000)*1.02","al":"center","nf":"#,##0.0 \"مم\""},{"c":"H10","v":336.5,"in":true,"b":true,"al":"center","nf":"#,##0.0 \"مم\""},{"c":"I10","v":5.2,"in":true,"al":"center","nf":"0.0 \"مم\""},{"c":"J10","v":0.015884,"f":"=(H10-G10)/G10","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"K10","v":"مقبول ومطابق (Pass)","f":"=IF(ABS(J10)<=0.07, \"مقبول ومطابق (Pass)\", \"غير مطابق - مراجعة (Fail)\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":"T-02 (Bottom Web R)","b":true},{"c":"B11","v":19,"in":true,"al":"center"},{"c":"C11","v":2660,"in":true,"al":"center","nf":"#,##0"},{"c":"D11","v":42.5,"in":true,"al":"center","nf":"0.00 \"م\""},{"c":"E11","v":3963.4,"in":true,"b":true,"al":"center","nf":"#,##0.0 \"kN\""},{"c":"F11","v":524.814619,"f":"=E11/(75.52*0.1)","b":true,"al":"center","nf":"#,##0.0 \"bar\""},{"c":"G11","v":331.238462,"f":"=(E11*1000*D11*1000)/(C11*195000)*1.02","al":"center","nf":"#,##0.0 \"مم\""},{"c":"H11","v":332,"in":true,"b":true,"al":"center","nf":"#,##0.0 \"مم\""},{"c":"I11","v":4.8,"in":true,"al":"center","nf":"0.0 \"مم\""},{"c":"J11","v":0.002299,"f":"=(H11-G11)/G11","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"K11","v":"مقبول ومطابق (Pass)","f":"=IF(ABS(J11)<=0.07, \"مقبول ومطابق (Pass)\", \"غير مطابق - مراجعة (Fail)\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":"T-03 (Top Flange L)","b":true},{"c":"B12","v":15,"in":true,"al":"center"},{"c":"C12","v":2100,"in":true,"al":"center","nf":"#,##0"},{"c":"D12","v":41.8,"in":true,"al":"center","nf":"0.00 \"م\""},{"c":"E12","v":3129,"in":true,"b":true,"al":"center","nf":"#,##0.0 \"kN\""},{"c":"F12","v":414.327331,"f":"=E12/(75.52*0.1)","b":true,"al":"center","nf":"#,##0.0 \"bar\""},{"c":"G12","v":325.782769,"f":"=(E12*1000*D12*1000)/(C12*195000)*1.02","al":"center","nf":"#,##0.0 \"مم\""},{"c":"H12","v":328,"in":true,"b":true,"al":"center","nf":"#,##0.0 \"مم\""},{"c":"I12","v":5.5,"in":true,"al":"center","nf":"0.0 \"مم\""},{"c":"J12","v":0.006806,"f":"=(H12-G12)/G12","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"K12","v":"مقبول ومطابق (Pass)","f":"=IF(ABS(J12)<=0.07, \"مقبول ومطابق (Pass)\", \"غير مطابق - مراجعة (Fail)\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":"T-04 (Top Flange R)","b":true},{"c":"B13","v":15,"in":true,"al":"center"},{"c":"C13","v":2100,"in":true,"al":"center","nf":"#,##0"},{"c":"D13","v":41.8,"in":true,"al":"center","nf":"0.00 \"م\""},{"c":"E13","v":3129,"in":true,"b":true,"al":"center","nf":"#,##0.0 \"kN\""},{"c":"F13","v":414.327331,"f":"=E13/(75.52*0.1)","b":true,"al":"center","nf":"#,##0.0 \"bar\""},{"c":"G13","v":325.782769,"f":"=(E13*1000*D13*1000)/(C13*195000)*1.02","al":"center","nf":"#,##0.0 \"مم\""},{"c":"H13","v":324.5,"in":true,"b":true,"al":"center","nf":"#,##0.0 \"مم\""},{"c":"I13","v":5,"in":true,"al":"center","nf":"0.0 \"مم\""},{"c":"J13","v":-0.003937,"f":"=(H13-G13)/G13","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"K13","v":"مقبول ومطابق (Pass)","f":"=IF(ABS(J13)<=0.07, \"مقبول ومطابق (Pass)\", \"غير مطابق - مراجعة (Fail)\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":"T-05 (Internal Parabolic 1)","b":true},{"c":"B14","v":19,"in":true,"al":"center"},{"c":"C14","v":2660,"in":true,"al":"center","nf":"#,##0"},{"c":"D14","v":43.2,"in":true,"al":"center","nf":"0.00 \"م\""},{"c":"E14","v":3963.4,"in":true,"b":true,"al":"center","nf":"#,##0.0 \"kN\""},{"c":"F14","v":524.814619,"f":"=E14/(75.52*0.1)","b":true,"al":"center","nf":"#,##0.0 \"bar\""},{"c":"G14","v":339.995077,"f":"=(E14*1000*D14*1000)/(C14*195000)*1.03","al":"center","nf":"#,##0.0 \"مم\""},{"c":"H14","v":346,"in":true,"b":true,"al":"center","nf":"#,##0.0 \"مم\""},{"c":"I14","v":5.4,"in":true,"al":"center","nf":"0.0 \"مم\""},{"c":"J14","v":0.017662,"f":"=(H14-G14)/G14","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"K14","v":"مقبول ومطابق (Pass)","f":"=IF(ABS(J14)<=0.07, \"مقبول ومطابق (Pass)\", \"غير مطابق - مراجعة (Fail)\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":"T-06 (Internal Parabolic 2)","b":true},{"c":"B15","v":19,"in":true,"al":"center"},{"c":"C15","v":2660,"in":true,"al":"center","nf":"#,##0"},{"c":"D15","v":43.2,"in":true,"al":"center","nf":"0.00 \"م\""},{"c":"E15","v":3963.4,"in":true,"b":true,"al":"center","nf":"#,##0.0 \"kN\""},{"c":"F15","v":524.814619,"f":"=E15/(75.52*0.1)","b":true,"al":"center","nf":"#,##0.0 \"bar\""},{"c":"G15","v":339.995077,"f":"=(E15*1000*D15*1000)/(C15*195000)*1.03","al":"center","nf":"#,##0.0 \"مم\""},{"c":"H15","v":342.5,"in":true,"b":true,"al":"center","nf":"#,##0.0 \"مم\""},{"c":"I15","v":5.1,"in":true,"al":"center","nf":"0.0 \"مم\""},{"c":"J15","v":0.007368,"f":"=(H15-G15)/G15","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"K15","v":"مقبول ومطابق (Pass)","f":"=IF(ABS(J15)<=0.07, \"مقبول ومطابق (Pass)\", \"غير مطابق - مراجعة (Fail)\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":"T-07 (Continuity Cable 1)","b":true},{"c":"B16","v":12,"in":true,"al":"center"},{"c":"C16","v":1680,"in":true,"al":"center","nf":"#,##0"},{"c":"D16","v":40,"in":true,"al":"center","nf":"0.00 \"م\""},{"c":"E16","v":2503.2,"in":true,"b":true,"al":"center","nf":"#,##0.0 \"kN\""},{"c":"F16","v":331.461864,"f":"=E16/(75.52*0.1)","b":true,"al":"center","nf":"#,##0.0 \"bar\""},{"c":"G16","v":308.697436,"f":"=(E16*1000*D16*1000)/(C16*195000)*1.01","al":"center","nf":"#,##0.0 \"مم\""},{"c":"H16","v":312,"in":true,"b":true,"al":"center","nf":"#,##0.0 \"مم\""},{"c":"I16","v":4.5,"in":true,"al":"center","nf":"0.0 \"مم\""},{"c":"J16","v":0.010698,"f":"=(H16-G16)/G16","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"K16","v":"مقبول ومطابق (Pass)","f":"=IF(ABS(J16)<=0.07, \"مقبول ومطابق (Pass)\", \"غير مطابق - مراجعة (Fail)\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":"T-08 (Continuity Cable 2)","b":true},{"c":"B17","v":12,"in":true,"al":"center"},{"c":"C17","v":1680,"in":true,"al":"center","nf":"#,##0"},{"c":"D17","v":40,"in":true,"al":"center","nf":"0.00 \"م\""},{"c":"E17","v":2503.2,"in":true,"b":true,"al":"center","nf":"#,##0.0 \"kN\""},{"c":"F17","v":331.461864,"f":"=E17/(75.52*0.1)","b":true,"al":"center","nf":"#,##0.0 \"bar\""},{"c":"G17","v":308.697436,"f":"=(E17*1000*D17*1000)/(C17*195000)*1.01","al":"center","nf":"#,##0.0 \"مم\""},{"c":"H17","v":309,"in":true,"b":true,"al":"center","nf":"#,##0.0 \"مم\""},{"c":"I17","v":4.9,"in":true,"al":"center","nf":"0.0 \"مم\""},{"c":"J17","v":0.00098,"f":"=(H17-G17)/G17","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"K17","v":"مقبول ومطابق (Pass)","f":"=IF(ABS(J17)<=0.07, \"مقبول ومطابق (Pass)\", \"غير مطابق - مراجعة (Fail)\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":"الإجمالي / المتوسط العام:","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true},{"c":"C18","v":18200,"f":"=SUM(C10:C17)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"D18","v":"-","al":"center"},{"c":"E18","v":27118,"f":"=SUM(E10:E17)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0 \"kN\""},{"c":"F18","v":448.854608,"f":"=AVERAGE(F10:F17)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0 \"bar\""},{"c":"G18","v":2611.427488,"f":"=SUM(G10:G17)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0 \"مم\""},{"c":"H18","v":2630.5,"f":"=SUM(H10:H17)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0 \"مم\""},{"c":"I18","v":5.05,"f":"=AVERAGE(I10:I17)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"0.0 \"مم\""},{"c":"J18","v":0.007303,"f":"=(H18-G18)/G18","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%"},{"c":"K18","v":"إجمالي البحر مطابق لاشتراطات AASHTO","f":"=IF(ABS(J18)<=0.07, \"إجمالي البحر مطابق لاشتراطات AASHTO\", \"يتطلب تقييم هندسي إضافي\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":19,"h":28.0,"cells":[{"c":"A19","v":""},{"c":"B19","v":""},{"c":"C19","v":""},{"c":"D19","v":""},{"c":"E19","v":""},{"c":"F19","v":""},{"c":"G19","v":""},{"c":"H19","v":""},{"c":"I19","v":""},{"c":"J19","v":""},{"c":"K19","v":""}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":"إجمالي قوة الشد الإجمالية للبحر (Total Prestressing Force)","bg":"#E2E8F0","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D20","v":"متوسط انحراف الاستطالة الإجمالي (Overall Deviation %)","bg":"#E2E8F0","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G20","v":"متوسط انزلاق الخوابير (Slip)","bg":"#E2E8F0","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"I20","v":"الاعتماد الفني النهائي وفق كود الجسور","bg":"#E2E8F0","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":21,"h":28.0,"cells":[{"c":"A21","v":27118,"f":"=E18","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0 \"kN\"","cs":3},{"skip":true},{"skip":true},{"c":"D21","v":0.007303,"f":"=J18","bg":"#F0FDF4","fg":"#166534","b":true,"al":"center","nf":"+0.00%;-0.00%;0.00%","cs":3},{"skip":true},{"skip":true},{"c":"G21","v":5.05,"f":"=I18","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"0.0 \"مم (حد أقصى 6 مم)\"","cs":2},{"skip":true},{"c":"I21","v":"إجمالي البحر مطابق لاشتراطات AASHTO","f":"=K18","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":22,"h":28.0,"cells":[{"c":"A22","v":""},{"c":"B22","v":""},{"c":"C22","v":""},{"c":"D22","v":""},{"c":"E22","v":""},{"c":"F22","v":""},{"c":"G22","v":""},{"c":"H22","v":""},{"c":"I22","v":""},{"c":"J22","v":""},{"c":"K22","v":""}]},{"r":23,"h":72.0,"cells":[{"c":"A23","v":"مهندس شد الكابلات التخصصي:\nم. يوسف النجار\nالتوقيع: ........................","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D23","v":"مهندس ضبط الجودة والمطابقة (QA/QC Engineer):\nم. عبد العزيز بن فهد الدوسري\nالتوقيع: ........................","al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"H23","v":"استشاري الجسور المشرف المعتمد:\nم. طارق عبد الرحمن العمري\nالمصادقة: ........................","al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true}]}]},{"name":"سجل حقن روبة دكتات الكابلات","maxRow":13,"maxCol":10,"colWidths":[24.0,18.0,20.0,24.0,22.0,22.0,20.0,24.0,24.0,30.0],"rows":[{"r":1,"h":34.0,"cells":[{"c":"A1","v":"سجل فحص واختبار حقن روبة الأسمنت لدكتات كابلات ما بعد الشد (PTI M55.1 Grouting Record)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"متابعة سيولة الروبة (Flow Cone)، اختبار النضح والنزف (Bleeding)، ضغوط الحقن، ومقاومة الضغط لمكعبات الروبة عند 7 و 28 يوماً","bg":"#1E293B","fg":"#FFFFFF","al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"رقم الكابل (Tendon ID)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"قطر مجرى الدكت (مم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"نسبة الماء/الأسمنت W/C","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"زمن السيولة بالقمع (ثانية) [11-30 ث]","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"نسبة النضح والانفصال (Bleeding %)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"ضغط الحقن الأقصى (bar) [3-7 bar]","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"حجم الروبة المحقونة (لتر)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"مقاومة الضغط 7 أيام (MPa) [>=35]","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"مقاومة الضغط 28 يوماً (MPa) [>=50]","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J4","v":"حالة اعتماد الحقن والتثبيت","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"T-01 (Bottom Web L)","b":true},{"c":"B5","v":90,"in":true,"al":"center"},{"c":"C5","v":0.36,"in":true,"al":"center","nf":"0.00"},{"c":"D5","v":18.5,"in":true,"b":true,"al":"center","nf":"0.0 \"ثانية\""},{"c":"E5","v":0,"in":true,"al":"center","nf":"0.0%"},{"c":"F5","v":4.5,"in":true,"b":true,"al":"center","nf":"0.0 \"bar\""},{"c":"G5","v":275,"in":true,"al":"center","nf":"#,##0 \"لتر\""},{"c":"H5","v":42,"in":true,"b":true,"al":"center","nf":"0.0 \"MPa\""},{"c":"I5","v":58.5,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"0.0 \"MPa\""},{"c":"J5","v":"معتمد ومطابق لاشتراطات PTI","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"T-02 (Bottom Web R)","b":true},{"c":"B6","v":90,"in":true,"al":"center"},{"c":"C6","v":0.36,"in":true,"al":"center","nf":"0.00"},{"c":"D6","v":19,"in":true,"b":true,"al":"center","nf":"0.0 \"ثانية\""},{"c":"E6","v":0,"in":true,"al":"center","nf":"0.0%"},{"c":"F6","v":4.8,"in":true,"b":true,"al":"center","nf":"0.0 \"bar\""},{"c":"G6","v":278,"in":true,"al":"center","nf":"#,##0 \"لتر\""},{"c":"H6","v":41.5,"in":true,"b":true,"al":"center","nf":"0.0 \"MPa\""},{"c":"I6","v":59,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"0.0 \"MPa\""},{"c":"J6","v":"معتمد ومطابق لاشتراطات PTI","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"T-03 (Top Flange L)","b":true},{"c":"B7","v":75,"in":true,"al":"center"},{"c":"C7","v":0.35,"in":true,"al":"center","nf":"0.00"},{"c":"D7","v":17.5,"in":true,"b":true,"al":"center","nf":"0.0 \"ثانية\""},{"c":"E7","v":0,"in":true,"al":"center","nf":"0.0%"},{"c":"F7","v":4.2,"in":true,"b":true,"al":"center","nf":"0.0 \"bar\""},{"c":"G7","v":185,"in":true,"al":"center","nf":"#,##0 \"لتر\""},{"c":"H7","v":43,"in":true,"b":true,"al":"center","nf":"0.0 \"MPa\""},{"c":"I7","v":61,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"0.0 \"MPa\""},{"c":"J7","v":"معتمد ومطابق لاشتراطات PTI","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"T-04 (Top Flange R)","b":true},{"c":"B8","v":75,"in":true,"al":"center"},{"c":"C8","v":0.35,"in":true,"al":"center","nf":"0.00"},{"c":"D8","v":18,"in":true,"b":true,"al":"center","nf":"0.0 \"ثانية\""},{"c":"E8","v":0,"in":true,"al":"center","nf":"0.0%"},{"c":"F8","v":4.4,"in":true,"b":true,"al":"center","nf":"0.0 \"bar\""},{"c":"G8","v":186,"in":true,"al":"center","nf":"#,##0 \"لتر\""},{"c":"H8","v":42.8,"in":true,"b":true,"al":"center","nf":"0.0 \"MPa\""},{"c":"I8","v":60.5,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"0.0 \"MPa\""},{"c":"J8","v":"معتمد ومطابق لاشتراطات PTI","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"T-05 (Internal Parabolic 1)","b":true},{"c":"B9","v":90,"in":true,"al":"center"},{"c":"C9","v":0.36,"in":true,"al":"center","nf":"0.00"},{"c":"D9","v":19.5,"in":true,"b":true,"al":"center","nf":"0.0 \"ثانية\""},{"c":"E9","v":0,"in":true,"al":"center","nf":"0.0%"},{"c":"F9","v":5,"in":true,"b":true,"al":"center","nf":"0.0 \"bar\""},{"c":"G9","v":282,"in":true,"al":"center","nf":"#,##0 \"لتر\""},{"c":"H9","v":41,"in":true,"b":true,"al":"center","nf":"0.0 \"MPa\""},{"c":"I9","v":57.5,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"0.0 \"MPa\""},{"c":"J9","v":"معتمد ومطابق لاشتراطات PTI","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":"T-06 (Internal Parabolic 2)","b":true},{"c":"B10","v":90,"in":true,"al":"center"},{"c":"C10","v":0.36,"in":true,"al":"center","nf":"0.00"},{"c":"D10","v":19,"in":true,"b":true,"al":"center","nf":"0.0 \"ثانية\""},{"c":"E10","v":0,"in":true,"al":"center","nf":"0.0%"},{"c":"F10","v":5.2,"in":true,"b":true,"al":"center","nf":"0.0 \"bar\""},{"c":"G10","v":280,"in":true,"al":"center","nf":"#,##0 \"لتر\""},{"c":"H10","v":41.5,"in":true,"b":true,"al":"center","nf":"0.0 \"MPa\""},{"c":"I10","v":58,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"0.0 \"MPa\""},{"c":"J10","v":"معتمد ومطابق لاشتراطات PTI","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":"T-07 (Continuity Cable 1)","b":true},{"c":"B11","v":65,"in":true,"al":"center"},{"c":"C11","v":0.35,"in":true,"al":"center","nf":"0.00"},{"c":"D11","v":17,"in":true,"b":true,"al":"center","nf":"0.0 \"ثانية\""},{"c":"E11","v":0,"in":true,"al":"center","nf":"0.0%"},{"c":"F11","v":4,"in":true,"b":true,"al":"center","nf":"0.0 \"bar\""},{"c":"G11","v":145,"in":true,"al":"center","nf":"#,##0 \"لتر\""},{"c":"H11","v":44,"in":true,"b":true,"al":"center","nf":"0.0 \"MPa\""},{"c":"I11","v":62,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"0.0 \"MPa\""},{"c":"J11","v":"معتمد ومطابق لاشتراطات PTI","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":"T-08 (Continuity Cable 2)","b":true},{"c":"B12","v":65,"in":true,"al":"center"},{"c":"C12","v":0.35,"in":true,"al":"center","nf":"0.00"},{"c":"D12","v":17.5,"in":true,"b":true,"al":"center","nf":"0.0 \"ثانية\""},{"c":"E12","v":0,"in":true,"al":"center","nf":"0.0%"},{"c":"F12","v":4.1,"in":true,"b":true,"al":"center","nf":"0.0 \"bar\""},{"c":"G12","v":146,"in":true,"al":"center","nf":"#,##0 \"لتر\""},{"c":"H12","v":43.5,"in":true,"b":true,"al":"center","nf":"0.0 \"MPa\""},{"c":"I12","v":61.5,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"0.0 \"MPa\""},{"c":"J12","v":"معتمد ومطابق لاشتراطات PTI","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":"المجموع والمتوسطات الهندسية:","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true},{"c":"C13","v":0.355,"f":"=AVERAGE(C5:C12)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"0.00"},{"c":"D13","v":18.25,"f":"=AVERAGE(D5:D12)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"0.0 \"ثانية\""},{"c":"E13","v":"0.0%","al":"center"},{"c":"F13","v":4.525,"f":"=AVERAGE(F5:F12)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"0.0 \"bar\""},{"c":"G13","v":1777,"f":"=SUM(G5:G12)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0 \"لتر\""},{"c":"H13","v":42.4125,"f":"=AVERAGE(H5:H12)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"0.0 \"MPa\""},{"c":"I13","v":59.75,"f":"=AVERAGE(I5:I12)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"0.0 \"MPa\""},{"c":"J13","v":"كافة الدكتات محقونة بنجاح تام","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]}]}]}