{"slug":"concrete-maturity-method-and-strength-estimation-sheet","sheets":[{"name":"لوحة متابعة نضج الخرسانة","maxRow":19,"maxCol":10,"colWidths":[8.0,38.0,22.0,22.0,24.0,24.0,24.0,26.0,26.0,48.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"تقدير المقاومة الحقلية المبكرة للخرسانة بطريقة النضج الحراري لفك الشدات المبكر وشد الكابلات | ASTM C1074","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"قالب تشغيلي لربط قياسات الحساسات الحرارية اللاسلكية بدالة نورس-شول (Nurse-Saul) ومعادلة أرهينيوس لتقدير قوة الضغط اللحظية | ACI 318 / SBC 304","bg":"#DBEAFE","fg":"#475569","al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"المقاومة الحقلية اللحظية f'c","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"مؤشر النضج التراكمي (TTF)","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"مقاومة فك الشدات المطلوبة","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H4","v":"قرار فك الشدات الإنشائية","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":5,"h":44.0,"cells":[{"c":"A5","v":"26.4 MPa","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true},{"c":"C5","v":"1,940 °C·hr","bg":"#F8FAFC","fg":"#0E7490","b":true,"al":"center","cs":2},{"skip":true},{"c":"E5","v":"24.5 MPa","bg":"#F8FAFC","fg":"#334155","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H5","v":"آمن لفك الشدات القاعية","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"75.4% من المقاومة التصميمية 35 MPa","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C6","v":"دالة نورس-شول عند درجة حرارة أساس 0°م","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"E6","v":"70% من رتبة الخرسانة وفق كود ACI 318","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H6","v":"تم توفير 3 أيام كاملة مقارنة بالمعالجة التقليدية","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""},{"c":"I7","v":""},{"c":"J7","v":""}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"اسم المشروع الإنشائي:","b":true,"al":"center","cs":2},{"skip":true},{"c":"C8","v":"برج المجد التجاري - سقف الدور المتكرر الخامس","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"F8","v":"رتبة الخرسانة f'c:","b":true,"al":"center"},{"c":"G8","v":"C35 (35 MPa عند 28 يوم)","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true},{"c":"I8","v":"نوع الأسمنت:","b":true,"al":"center"},{"c":"J8","v":"بورتلاندي عادي Type I","al":"center"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"العنصر الإنشائي المصبوب:","b":true,"al":"center","cs":2},{"skip":true},{"c":"C9","v":"بلاطة خرسانية لا كمرية سابقة الإجهاد (Post-Tensioned Flat Slab)","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"F9","v":"عمر الخرسانة الحالي:","b":true,"al":"center"},{"c":"G9","v":"68 ساعة (2.83 يوم)","fg":"#0E7490","b":true,"al":"center","cs":2},{"skip":true},{"c":"I9","v":"درجة حرارة الأساس T0:","b":true,"al":"center"},{"c":"J9","v":"0.0 °C (ASTM C1074)","al":"center"}]},{"r":10,"h":28.0,"cells":[{"c":"A10","v":""},{"c":"B10","v":""},{"c":"C10","v":""},{"c":"D10","v":""},{"c":"E10","v":""},{"c":"F10","v":""},{"c":"G10","v":""},{"c":"H10","v":""},{"c":"I10","v":""},{"c":"J10","v":""}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"م","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B11","v":"العملية الإنشائية المستهدفة","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C11","v":"نسبة المقاومة المطلوبة (%)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D11","v":"المقاومة المطلوبة (MPa)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E11","v":"المقاومة الحقلية المقدرة (MPa)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F11","v":"مؤشر النضج المطلوب (°C·hr)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G11","v":"مؤشر النضج الحالي (°C·hr)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H11","v":"حالة الأمان الهندسي","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I11","v":"المرجع القياسي في الكود","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J11","v":"التوجيه التنفيذي للموقع","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":1,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B12","v":"فك الشدات الرأسية (جوانب الأعمدة والجدران)","bg":"#F8FAFC"},{"c":"C12","v":"30%","bg":"#F8FAFC","al":"center"},{"c":"D12","v":10.5,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E12","v":26.4,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"F12","v":520,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G12","v":1940,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H12","v":"آمن ومصرح بالفك فوراً","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"I12","v":"ACI 347R / SBC 304","bg":"#F8FAFC","al":"center"},{"c":"J12","v":"يسمح بفك قوالب الأعمدة بعد 18-24 ساعة مع بدء الرش بالماء","bg":"#F8FAFC"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":2,"b":true,"al":"center"},{"c":"B13","v":"شد كابلات ما بعد الشد المرحلة الأولى (PT Initial)"},{"c":"C13","v":"60%","al":"center"},{"c":"D13","v":21,"in":true,"b":true,"al":"center"},{"c":"E13","v":26.4,"in":true,"b":true,"al":"center"},{"c":"F13","v":1380,"in":true,"al":"center"},{"c":"G13","v":1940,"in":true,"al":"center"},{"c":"H13","v":"مستوفٍ لقوة الشد الأولى","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"I13","v":"PTI Manual / ACI 318","al":"center"},{"c":"J13","v":"تطبيق 50% من قوة الشد التصميمية للحد من شروخ الانكماش المبكر"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":3,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B14","v":"فك الشدات القاعية للبلاطات والكمرات (Soffit Forms)","bg":"#F8FAFC"},{"c":"C14","v":"70%","bg":"#F8FAFC","al":"center"},{"c":"D14","v":24.5,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E14","v":26.4,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"F14","v":1750,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G14","v":1940,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H14","v":"آمن لفك الشدات القاعية","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"I14","v":"ACI 318 Section 26.11","bg":"#F8FAFC","al":"center"},{"c":"J14","v":"فك القوالب مع تركيب دعامات أمان دورية (Reshoring) فوراً","bg":"#F8FAFC"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":4,"b":true,"al":"center"},{"c":"B15","v":"شد كابلات ما بعد الشد المرحلة النهائية (PT Final)"},{"c":"C15","v":"80%","al":"center"},{"c":"D15","v":28,"in":true,"b":true,"al":"center"},{"c":"E15","v":26.4,"in":true,"b":true,"al":"center"},{"c":"F15","v":2180,"in":true,"al":"center"},{"c":"G15","v":1940,"in":true,"al":"center"},{"c":"H15","v":"غير مكتمل (يلزم 1.6 MPa إضافية)","bg":"#FEF3C7","fg":"#92400E","b":true,"al":"center"},{"c":"I15","v":"PTI Manual / ACI 318","al":"center"},{"c":"J15","v":"الوصول المتوقع خلال 14 ساعة القادمة بحسب حرارة الجو"}]},{"r":16,"h":36.0,"cells":[{"c":"A16","v":5,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B16","v":"تحميل السقف بمعدات التشوين وسقالات الدور التالي","bg":"#F8FAFC"},{"c":"C16","v":"85%","bg":"#F8FAFC","al":"center"},{"c":"D16","v":29.75,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E16","v":26.4,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"F16","v":2450,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G16","v":1940,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H16","v":"انتظار اكتمال النضج الحراري","bg":"#FEF3C7","fg":"#92400E","b":true,"al":"center"},{"c":"I16","v":"ACI 347R","bg":"#F8FAFC","al":"center"},{"c":"J16","v":"حظر تشوين حديد التسليح أو البلوك قبل الوصول لـ 30 MPa","bg":"#F8FAFC"}]},{"r":17,"h":28.0,"cells":[{"c":"A17","v":""},{"c":"B17","v":""},{"c":"C17","v":""},{"c":"D17","v":""},{"c":"E17","v":""},{"c":"F17","v":""},{"c":"G17","v":""},{"c":"H17","v":""},{"c":"I17","v":""},{"c":"J17","v":""}]},{"r":18,"h":38.0,"cells":[{"c":"A18","v":"معادلة المعايرة اللوغاريتمية لنضج الخرسانة (Strength-Maturity Calibration Curve: S = a + b · log10(M))","bg":"#0E7490","fg":"#FFFFFF","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":"معامل التقاطع (a):","b":true,"al":"center","cs":2},{"skip":true},{"c":"C19","v":-32.85,"in":true,"b":true,"al":"center"},{"c":"D19","v":"معامل الميل اللوغاريتمي (b):","b":true,"al":"center","cs":2},{"skip":true},{"c":"F19","v":18.02,"in":true,"b":true,"al":"center"},{"c":"G19","v":"معامل الارتباط الإحصائي R²:","b":true,"al":"center","cs":2},{"skip":true},{"c":"I19","v":"0.988 (دقة إحصائية ممتازة)","fg":"#166534","b":true,"al":"center","cs":2},{"skip":true}]}]},{"name":"معايرة منحنى النضج المخبري","maxRow":9,"maxCol":9,"colWidths":[18.0,18.0,26.0,26.0,20.0,26.0,26.0,22.0,46.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"بيانات معايرة منحنى النضج والكسر المخبري لمكعبات وأسطوانات الخرسانة وفق ASTM C1074","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"كسر 15 أسطوانة خرسانية قياسية (150×300 ملم) عند أعمار 1، 3، 7، 14، 28 يوماً مع تسجيل مؤشر النضج المتزامن","bg":"#DBEAFE","fg":"#475569","al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""}]},{"r":4,"h":40.0,"cells":[{"c":"A4","v":"عمر الاختبار (أيام)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"عمر الاختبار (ساعات)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"متوسط حرارة المعالجة (°C)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"مؤشر النضج المكتسب (°C·hr)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"قيمة log10(M)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"مقاومة الكسر المقاسة (MPa)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"المقاومة المحسوبة بالمعادلة","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"نسبة الخطأ النسبي (%)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"ملاحظات الاختبار المخبري","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":36.0,"cells":[{"c":"A5","v":1,"b":true,"al":"center"},{"c":"B5","v":24,"in":true,"al":"center"},{"c":"C5","v":23.5,"in":true,"al":"center"},{"c":"D5","v":564,"in":true,"b":true,"al":"center"},{"c":"E5","v":0,"f":"=ROUND(LOG10(D5), 3)","al":"center"},{"c":"F5","v":16.8,"in":true,"b":true,"al":"center"},{"c":"G5","v":-32.85,"f":"=ROUND(-32.85+18.02*E5, 2)","al":"center"},{"c":"H5","v":-295.5,"f":"=ROUND((G5-F5)/F5*100, 1)","al":"center"},{"c":"I5","v":"متوسط كسر 3 أسطوانات عند 24 ساعة"}]},{"r":6,"h":36.0,"cells":[{"c":"A6","v":3,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B6","v":72,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"C6","v":23,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"D6","v":1656,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E6","v":0,"f":"=ROUND(LOG10(D6), 3)","bg":"#F8FAFC","al":"center"},{"c":"F6","v":25.1,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"G6","v":-32.85,"f":"=ROUND(-32.85+18.02*E6, 2)","bg":"#F8FAFC","al":"center"},{"c":"H6","v":-230.9,"f":"=ROUND((G6-F6)/F6*100, 1)","bg":"#F8FAFC","al":"center"},{"c":"I6","v":"تطور مبكر سريع للقوة بسبب التفاعل المائي","bg":"#F8FAFC"}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":7,"b":true,"al":"center"},{"c":"B7","v":168,"in":true,"al":"center"},{"c":"C7","v":22.8,"in":true,"al":"center"},{"c":"D7","v":3830,"in":true,"b":true,"al":"center"},{"c":"E7","v":0,"f":"=ROUND(LOG10(D7), 3)","al":"center"},{"c":"F7","v":31.4,"in":true,"b":true,"al":"center"},{"c":"G7","v":-32.85,"f":"=ROUND(-32.85+18.02*E7, 2)","al":"center"},{"c":"H7","v":-204.6,"f":"=ROUND((G7-F7)/F7*100, 1)","al":"center"},{"c":"I7","v":"وصول لـ 89.7% من المقاومة التصميمية"}]},{"r":8,"h":36.0,"cells":[{"c":"A8","v":14,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B8","v":336,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"C8","v":22.5,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"D8","v":7560,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E8","v":0,"f":"=ROUND(LOG10(D8), 3)","bg":"#F8FAFC","al":"center"},{"c":"F8","v":35.8,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"G8","v":-32.85,"f":"=ROUND(-32.85+18.02*E8, 2)","bg":"#F8FAFC","al":"center"},{"c":"H8","v":-191.8,"f":"=ROUND((G8-F8)/F8*100, 1)","bg":"#F8FAFC","al":"center"},{"c":"I8","v":"تجاوز المقاومة المميزة C35 بأمان تام","bg":"#F8FAFC"}]},{"r":9,"h":36.0,"cells":[{"c":"A9","v":28,"b":true,"al":"center"},{"c":"B9","v":672,"in":true,"al":"center"},{"c":"C9","v":22.5,"in":true,"al":"center"},{"c":"D9","v":15120,"in":true,"b":true,"al":"center"},{"c":"E9","v":0,"f":"=ROUND(LOG10(D9), 3)","al":"center"},{"c":"F9","v":42.5,"in":true,"b":true,"al":"center"},{"c":"G9","v":-32.85,"f":"=ROUND(-32.85+18.02*E9, 2)","al":"center"},{"c":"H9","v":-177.3,"f":"=ROUND((G9-F9)/F9*100, 1)","al":"center"},{"c":"I9","v":"المقاومة المرجعية القياسية عند 28 يوماً"}]}]},{"name":"سجل الحساسات الحقلية","maxRow":11,"maxCol":10,"colWidths":[14.0,24.0,26.0,24.0,24.0,24.0,18.0,24.0,24.0,26.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"سجل القياسات الحرارية اللحظية للحساسات اللاسلكية المغمورة في الخرسانة (Wireless Concrete Sensors)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"رصد درجة الحرارة كل ساعتين وحساب النضج التراكمي: ΔM = (T_avg - T0) × Δt وتوقع قوة الضغط الآنية","bg":"#DBEAFE","fg":"#475569","al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""}]},{"r":4,"h":40.0,"cells":[{"c":"A4","v":"ساعة الرصد (h)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"وقت القراءة والتاريخ","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"درجة حرارة الجو الخارجي (°C)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"حرارة الحساس 1 (قلب السقف)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"حرارة الحساس 2 (سطح السقف)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"متوسط حرارة الخرسانة (°C)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"فترة الرصد Δt (hr)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"النضج للفترة ΔM (°C·hr)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"إجمالي النضج التراكمي M","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J4","v":"المقاومة المقدرة f'c (MPa)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":36.0,"cells":[{"c":"A5","v":2,"b":true,"al":"center"},{"c":"B5","v":"اليوم 1 - 10:00 ص"},{"c":"C5","v":28,"in":true,"al":"center"},{"c":"D5","v":31.5,"in":true,"al":"center"},{"c":"E5","v":29.5,"in":true,"al":"center"},{"c":"F5","v":30.5,"f":"=ROUND((D5+E5)/2, 1)","al":"center"},{"c":"G5","v":2,"in":true,"al":"center"},{"c":"H5","v":61,"f":"=ROUND(F5*G5, 1)","al":"center"},{"c":"I5","v":61,"f":"=H5","b":true,"al":"center"},{"c":"J5","v":4.2,"in":true,"b":true,"al":"center"}]},{"r":6,"h":36.0,"cells":[{"c":"A6","v":6,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B6","v":"اليوم 1 - 02:00 م","bg":"#F8FAFC"},{"c":"C6","v":34.5,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"D6","v":42,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E6","v":38,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F6","v":40,"f":"=ROUND((D6+E6)/2, 1)","bg":"#F8FAFC","al":"center"},{"c":"G6","v":4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H6","v":160,"f":"=ROUND(F6*G6, 1)","bg":"#F8FAFC","al":"center"},{"c":"I6","v":221,"f":"=I5+H6","bg":"#F8FAFC","b":true,"al":"center"},{"c":"J6","v":8.9,"in":true,"bg":"#F8FAFC","b":true,"al":"center"}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":12,"b":true,"al":"center"},{"c":"B7","v":"اليوم 1 - 08:00 م"},{"c":"C7","v":29,"in":true,"al":"center"},{"c":"D7","v":52.5,"in":true,"al":"center"},{"c":"E7","v":46.5,"in":true,"al":"center"},{"c":"F7","v":49.5,"f":"=ROUND((D7+E7)/2, 1)","al":"center"},{"c":"G7","v":6,"in":true,"al":"center"},{"c":"H7","v":297,"f":"=ROUND(F7*G7, 1)","al":"center"},{"c":"I7","v":518,"f":"=I6+H7","b":true,"al":"center"},{"c":"J7","v":14.5,"in":true,"b":true,"al":"center"}]},{"r":8,"h":36.0,"cells":[{"c":"A8","v":24,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B8","v":"اليوم 2 - 08:00 ص","bg":"#F8FAFC"},{"c":"C8","v":26,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"D8","v":48,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E8","v":42,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F8","v":45,"f":"=ROUND((D8+E8)/2, 1)","bg":"#F8FAFC","al":"center"},{"c":"G8","v":12,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H8","v":540,"f":"=ROUND(F8*G8, 1)","bg":"#F8FAFC","al":"center"},{"c":"I8","v":1058,"f":"=I7+H8","bg":"#F8FAFC","b":true,"al":"center"},{"c":"J8","v":19.8,"in":true,"bg":"#F8FAFC","b":true,"al":"center"}]},{"r":9,"h":36.0,"cells":[{"c":"A9","v":36,"b":true,"al":"center"},{"c":"B9","v":"اليوم 2 - 08:00 م"},{"c":"C9","v":31,"in":true,"al":"center"},{"c":"D9","v":41.5,"in":true,"al":"center"},{"c":"E9","v":36.5,"in":true,"al":"center"},{"c":"F9","v":39,"f":"=ROUND((D9+E9)/2, 1)","al":"center"},{"c":"G9","v":12,"in":true,"al":"center"},{"c":"H9","v":468,"f":"=ROUND(F9*G9, 1)","al":"center"},{"c":"I9","v":1526,"f":"=I8+H9","b":true,"al":"center"},{"c":"J9","v":22.4,"in":true,"b":true,"al":"center"}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":48,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B10","v":"اليوم 3 - 08:00 ص","bg":"#F8FAFC"},{"c":"C10","v":25.5,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"D10","v":36,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E10","v":32,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F10","v":34,"f":"=ROUND((D10+E10)/2, 1)","bg":"#F8FAFC","al":"center"},{"c":"G10","v":12,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H10","v":408,"f":"=ROUND(F10*G10, 1)","bg":"#F8FAFC","al":"center"},{"c":"I10","v":1934,"f":"=I9+H10","bg":"#F8FAFC","b":true,"al":"center"},{"c":"J10","v":24.6,"in":true,"bg":"#F8FAFC","b":true,"al":"center"}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":68,"b":true,"al":"center"},{"c":"B11","v":"اليوم 3 - 04:00 م"},{"c":"C11","v":33,"in":true,"al":"center"},{"c":"D11","v":32.5,"in":true,"al":"center"},{"c":"E11","v":30.5,"in":true,"al":"center"},{"c":"F11","v":31.5,"f":"=ROUND((D11+E11)/2, 1)","al":"center"},{"c":"G11","v":20,"in":true,"al":"center"},{"c":"H11","v":630,"f":"=ROUND(F11*G11, 1)","al":"center"},{"c":"I11","v":2564,"f":"=I10+H11","b":true,"al":"center"},{"c":"J11","v":26.4,"in":true,"b":true,"al":"center"}]}]}]}