{"slug":"concrete-temperature-monitoring-log","sheets":[{"name":"بيانات_الصب_والمجسات_الحرارية","maxRow":18,"maxCol":7,"colWidths":[16.0,34.0,24.0,20.0,22.0,26.0,32.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"سجل مراقبة ورصد درجات حرارة الخرسانة الكتلية (Mass Concrete Thermal Control Log)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":40.0,"cells":[{"c":"A2","v":"معايير التحكم الحراري: كود الخرسانة الكتلية الأمريكي ACI 207 ومواصفات ASTM C1064 وكود البناء السعودي SBC 304","bg":"#2563EB","fg":"#E2E8F0","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":36.0,"cells":[{"c":"A4","v":"1. بيانات عنصر الصب الخرساني الكتلي والمواصفات التعاقدية","bg":"#E2E8F0","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"اسم المشروع:","b":true},{"c":"B5","v":"مشروع إنشاء برج سكني إداري متكامل (لبشة مسلحة كتلية)","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"E5","v":"رقم كود البند:","b":true},{"c":"F5","v":"BOQ-QAC-012","b":true,"al":"center","cs":2},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"المقاول العام:","b":true},{"c":"B6","v":"شركة البنيان للإنشاءات والمقاولات المتقدمة","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"E6","v":"تاريخ وتوقيت بدء الصب:","b":true},{"c":"F6","v":"2026-10-11 - الساعة 20:00 ليلاً","b":true,"al":"center","cs":2},{"skip":true}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"الاستشاري المشرف:","b":true},{"c":"B7","v":"مكتب الاستشارات الهندسية وفحص ضبط الجودة","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"E7","v":"عنصر الصب الإنشائي:","b":true},{"c":"F7","v":"لبشة مسلحة كتلية (Raft Foundation Pour #2)","b":true,"al":"center","cs":2},{"skip":true}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"سمك العنصر الخرساني:","b":true},{"c":"B8","v":"2.60 متر (سماكة كتلية تتجاوز 1.0 متر)","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"E8","v":"الحجم الإجمالي للصب:","b":true},{"c":"F8","v":"2,850 متر مكعب (m³) خرسانة مسلحة","b":true,"al":"center","cs":2},{"skip":true}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"مقاومة الخرسانة التصميمية:","b":true},{"c":"B9","v":"C40/50 (مقاومة مميزة 50 MPa بعد 56 يوماً)","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"E9","v":"رتبة الأسمنت والإضافات:","b":true},{"c":"F9","v":"CEM I 40% + خبث أفران GGBS 60%","b":true,"al":"center","cs":2},{"skip":true}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":"درجة حرارة الصب القصوى:","b":true},{"c":"B10","v":"أقل من 30° مئوية (استخدام ثلج مجروش)","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"E10","v":"حد الفارق الحراري الأقصى (ΔT):","b":true},{"c":"F10","v":"لا يتجاوز 20° مئوية بين القلب والسطح","b":true,"al":"center","cs":2},{"skip":true}]},{"r":11,"h":28.0,"cells":[{"c":"A11","v":""},{"c":"B11","v":""},{"c":"C11","v":""},{"c":"D11","v":""},{"c":"E11","v":""},{"c":"F11","v":""},{"c":"G11","v":""}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":"2. جدول توزيع مجسات قياس درجات الحرارة المغمورة (Thermocouple Sensor Layout)","bg":"#E2E8F0","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":13,"h":40.0,"cells":[{"c":"A13","v":"رمز المجس","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B13","v":"توصيف موقع المجس في المقطع الكتلي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C13","v":"العمق من السطح العلوي (م)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D13","v":"نوع المجس الحراري","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E13","v":"الحد الحراري المستهدف (°م)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F13","v":"طريقة القراءة والتسجيل","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G13","v":"الأهمية والهدف الإنشائي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":"TC-01","b":true,"al":"center"},{"c":"B14","v":"قلب ومركز الكتلة الخرسانية (Core Sensor)","b":true},{"c":"C14","v":1.3,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D14","v":"Type K Thermocouple","fg":"#1E293B","al":"center"},{"c":"E14","v":"أقل من 70°م","b":true,"al":"center"},{"c":"F14","v":"جهاز Data Logger آلي 24/7","fg":"#1E293B","al":"center"},{"c":"G14","v":"مراقبة ذروة إماهة الأسمنت ومنع DEF","fg":"#64748B"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":"TC-02","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B15","v":"السطح العلوي الخرساني (Top Surface)","bg":"#F8FAFC","b":true},{"c":"C15","v":0.05,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D15","v":"Type K Thermocouple","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E15","v":"حسب حرارة الجو والعزل","bg":"#F8FAFC","b":true,"al":"center"},{"c":"F15","v":"جهاز Data Logger آلي 24/7","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"G15","v":"حساب الفارق الحراري مع القلب (ΔT)","bg":"#F8FAFC","fg":"#64748B"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":"TC-03","b":true,"al":"center"},{"c":"B16","v":"السطح السفلي فوق الخرسانة العادية (Bottom)","b":true},{"c":"C16","v":2.55,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D16","v":"Type K Thermocouple","fg":"#1E293B","al":"center"},{"c":"E16","v":"توازن مع حرارة الأرض","b":true,"al":"center"},{"c":"F16","v":"جهاز Data Logger آلي 24/7","fg":"#1E293B","al":"center"},{"c":"G16","v":"فحص تبدد الحرارة باتجاه التربة","fg":"#64748B"}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":"TC-04","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B17","v":"الواجهة الجانبية قرب الشدة الخشبية (Side Surface)","bg":"#F8FAFC","b":true},{"c":"C17","v":1.3,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D17","v":"Type K Thermocouple","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E17","v":"حسب عزل الجوانب","bg":"#F8FAFC","b":true,"al":"center"},{"c":"F17","v":"جهاز Data Logger آلي 24/7","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"G17","v":"منع الشروخ الجانبية عند فك الشدات","bg":"#F8FAFC","fg":"#64748B"}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":"TC-05","b":true,"al":"center"},{"c":"B18","v":"درجة حرارة الهواء المحيط بالموقع (Ambient Air)","b":true},{"c":"C18","v":"—","fg":"#1E293B","al":"center"},{"c":"D18","v":"مجس خارجي مظلل","fg":"#1E293B","al":"center"},{"c":"E18","v":"18°م - 38°م","b":true,"al":"center"},{"c":"F18","v":"تسجيل يدوي ورقمي متزامن","fg":"#1E293B","al":"center"},{"c":"G18","v":"مقارنة تأثير التغير المناخي والرياح","fg":"#64748B"}]}]},{"name":"لوحة_المؤشرات_والتحذير_المبكر","maxRow":14,"maxCol":6,"colWidths":[16.0,36.0,22.0,24.0,22.0,32.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"لوحة المراقبة الحرارية ونظام الإنذار المبكر للشروخ (Thermal Control & Early Warning)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":40.0,"cells":[{"c":"A2","v":"مؤشرات درجة الحرارة القصوى بقلب الخرسانة، الفارق الحراري اللحظي، خطر التصدع، وإجراءات العزل الحراري","bg":"#2563EB","fg":"#E2E8F0","al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"أعلى درجة حرارة مسجلة بالقلب (Peak Core Temp)","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"أقصى فارق حراري مسجل (Max ΔT)","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center"},{"c":"D4","v":"أقصى معدل تبريد يومي","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center"},{"c":"E4","v":"حالة المطابقة الفنية وسلامة العنصر","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true}]},{"r":5,"h":48.0,"cells":[{"c":"A5","v":66.5,"f":"=MAX('سجل_القراءات_الحرارية_الزمنية'!D5:D24)","bg":"#F1F5F9","fg":"#1E3A8A","b":true,"al":"center","nf":"0.0\" °م\"","cs":2},{"skip":true},{"c":"C5","v":17.5,"f":"=MAX('سجل_القراءات_الحرارية_الزمنية'!G5:G24)","bg":"#F1F5F9","fg":"#B45309","b":true,"al":"center","nf":"0.0\" °م\""},{"c":"D5","v":6.5,"in":true,"bg":"#F1F5F9","fg":"#047857","b":true,"al":"center","nf":"0.0\" °م/يوم\""},{"c":"E5","v":"🟢 آمن ومطابق للمواصفات","f":"=IF(AND(A5<=70, C5<=20), \"🟢 آمن ومطابق للمواصفات\", IF(A5>70, \"🔴 تجاوز حد DEF الحرج\", \"🟡 تنبيه: اقتراب حد الشروخ الحرارية\"))","bg":"#F1F5F9","fg":"#047857","b":true,"al":"center","cs":2},{"skip":true}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"الحد الأقصى المسموح 70.0°م (منع تشكل الإترينجايت DEF)","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C6","v":"الحد الأقصى المسموح 20.0°م (منع الشروخ)","bg":"#F1F5F9","fg":"#64748B","al":"center"},{"c":"D6","v":"الحد المسموح لا يتجاوز 11.0°م/24 ساعة","bg":"#F1F5F9","fg":"#64748B","al":"center"},{"c":"E6","v":"العنصر خالي تماماً من الإجهادات الحرارية الضارة","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""}]},{"r":8,"h":36.0,"cells":[{"c":"A8","v":"مصفوفة تقييم الإجهادات الحرارية والحدود الكودية (Thermal Stress Evaluation Matrix)","bg":"#E2E8F0","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":40.0,"cells":[{"c":"A9","v":"م","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"المؤشر الحراري الخرساني","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"القيمة الحالية المقاسة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"الحد الكودي الأقصى","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"حالة المطابقة الفنية","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"المعيار الكودي المرجعي","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":1,"b":true,"al":"center"},{"c":"B10","v":"أقصى درجة حرارة في قلب الخرسانة (Peak Core Temp)","b":true},{"c":"C10","v":66.5,"f":"=A5","b":true,"al":"center","nf":"0.0\" °م\""},{"c":"D10","v":"70.0° مئوية كحد أقصى مطلق","fg":"#1E293B","al":"center"},{"c":"E10","v":"✅ مطابق وآمن","f":"=IF(A5<=70, \"✅ مطابق وآمن\", \"❌ تجاوز خطير\")","bg":"#ECFDF5","b":true,"al":"center"},{"c":"F10","v":"ACI 207.1R & SBC 304 Section 19.3","fg":"#64748B"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":2,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":"الفارق الحراري بين القلب والسطح (Thermal Differential ΔT)","bg":"#F8FAFC","b":true},{"c":"C11","v":17.5,"f":"=C5","bg":"#F8FAFC","b":true,"al":"center","nf":"0.0\" °م\""},{"c":"D11","v":"20.0° مئوية (لتفادي شروخ الشد)","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E11","v":"✅ ضمن النطاق المسموح","f":"=IF(C5<=20, \"✅ ضمن النطاق المسموح\", \"❌ خطر تشقق\")","bg":"#ECFDF5","b":true,"al":"center"},{"c":"F11","v":"ACI 207.2R Thermal Cracking Guide","bg":"#F8FAFC","fg":"#64748B"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":3,"b":true,"al":"center"},{"c":"B12","v":"معدل التبريد في الـ 24 ساعة (Cooling Rate per Day)","b":true},{"c":"C12","v":6.5,"f":"=D5","b":true,"al":"center"},{"c":"D12","v":"11.0° مئوية / 24 ساعة","fg":"#1E293B","al":"center"},{"c":"E12","v":"✅ تبريد تدريجي متزن","bg":"#ECFDF5","b":true,"al":"center"},{"c":"F12","v":"CIRIA C766 Thermal Control Guide","fg":"#64748B"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":4,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":"درجة حرارة الخلطة الخرسانية أثناء الصب (Fresh Concrete)","bg":"#F8FAFC","b":true},{"c":"C13","v":"26.5° مئوية","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D13","v":"30.0° مئوية (32°م كحد أقصى صيفي)","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E13","v":"✅ تم استخدام ثلج مجروش بالخلطة","bg":"#ECFDF5","b":true,"al":"center"},{"c":"F13","v":"ASTM C1064 Fresh Temp Limits","bg":"#F8FAFC","fg":"#64748B"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":5,"b":true,"al":"center"},{"c":"B14","v":"سماكة أغطية العزل الحراري العلوية (Thermal Insulation)","b":true},{"c":"C14","v":"طبقتان خيش رطب + مشمع 500µ + صوف","b":true,"al":"center"},{"c":"D14","v":"R-value >= 1.5 m²·K/W","fg":"#1E293B","al":"center"},{"c":"E14","v":"✅ عزل حراري محكم ومثبت","bg":"#ECFDF5","b":true,"al":"center"},{"c":"F14","v":"خطة معالجة الخرسانة الكتلية PQP","fg":"#64748B"}]}]},{"name":"سجل_القراءات_الحرارية_الزمنية","maxRow":24,"maxCol":8,"colWidths":[16.0,22.0,22.0,22.0,22.0,22.0,22.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"سجل الرصد الحراري الزمني المتواصل لمدة 7 أيام (Continuous 7-Day Thermal History Log)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":40.0,"cells":[{"c":"A2","v":"تسجيل قراءات مجسات القلب، السطح العلوي، السطح السفلي، وحساب الفارق الحراري اللحظي (ΔT) مع التحقق التلقائي","bg":"#2563EB","fg":"#E2E8F0","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":42.0,"cells":[{"c":"A4","v":"الساعة بعد الصب","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"التاريخ والوقت","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"حرارة الجو الخارجي (°م)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"حرارة القلب TC-01 (°م)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"حرارة السطح TC-02 (°م)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"حرارة القاع TC-03 (°م)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"الفارق الحراري ΔT (°م)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"حالة التوافق مع الكود","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"ساعة 0","b":true,"al":"center"},{"c":"B5","v":"2026-10-11 20:00","fg":"#1E293B","al":"center"},{"c":"C5","v":28,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"D5","v":26.5,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"E5","v":26.5,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"F5","v":27,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"G5","v":0,"f":"=ABS(D5-E5)","fg":"#B45309","b":true,"al":"center","nf":"0.0"},{"c":"H5","v":"🟢 آمن ومطابق","f":"=IF(G5<=20, \"🟢 آمن ومطابق\", \"🔴 تجاوز حد 20°م\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"ساعة 6","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B6","v":"2026-10-12 02:00","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"C6","v":22,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"D6","v":31,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.0"},{"c":"E6","v":26,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.0"},{"c":"F6","v":28.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"G6","v":5,"f":"=ABS(D6-E6)","bg":"#F8FAFC","fg":"#B45309","b":true,"al":"center","nf":"0.0"},{"c":"H6","v":"🟢 آمن ومطابق","f":"=IF(G6<=20, \"🟢 آمن ومطابق\", \"🔴 تجاوز حد 20°م\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"ساعة 12","b":true,"al":"center"},{"c":"B7","v":"2026-10-12 08:00","fg":"#1E293B","al":"center"},{"c":"C7","v":25,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"D7","v":38.5,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"E7","v":28,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"F7","v":31,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"G7","v":10.5,"f":"=ABS(D7-E7)","fg":"#B45309","b":true,"al":"center","nf":"0.0"},{"c":"H7","v":"🟢 آمن ومطابق","f":"=IF(G7<=20, \"🟢 آمن ومطابق\", \"🔴 تجاوز حد 20°م\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"ساعة 18","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B8","v":"2026-10-12 14:00","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"C8","v":35,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"D8","v":47,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.0"},{"c":"E8","v":34,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.0"},{"c":"F8","v":35.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"G8","v":13,"f":"=ABS(D8-E8)","bg":"#F8FAFC","fg":"#B45309","b":true,"al":"center","nf":"0.0"},{"c":"H8","v":"🟢 آمن ومطابق","f":"=IF(G8<=20, \"🟢 آمن ومطابق\", \"🔴 تجاوز حد 20°م\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"ساعة 24","b":true,"al":"center"},{"c":"B9","v":"2026-10-12 20:00","fg":"#1E293B","al":"center"},{"c":"C9","v":27,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"D9","v":54.5,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"E9","v":38,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"F9","v":41,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"G9","v":16.5,"f":"=ABS(D9-E9)","fg":"#B45309","b":true,"al":"center","nf":"0.0"},{"c":"H9","v":"🟢 آمن ومطابق","f":"=IF(G9<=20, \"🟢 آمن ومطابق\", \"🔴 تجاوز حد 20°م\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":"ساعة 30","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B10","v":"2026-10-13 02:00","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"C10","v":21,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"D10","v":60,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.0"},{"c":"E10","v":42.5,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.0"},{"c":"F10","v":46,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"G10","v":17.5,"f":"=ABS(D10-E10)","bg":"#F8FAFC","fg":"#B45309","b":true,"al":"center","nf":"0.0"},{"c":"H10","v":"🟢 آمن ومطابق","f":"=IF(G10<=20, \"🟢 آمن ومطابق\", \"🔴 تجاوز حد 20°م\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":"ساعة 36","b":true,"al":"center"},{"c":"B11","v":"2026-10-13 08:00","fg":"#1E293B","al":"center"},{"c":"C11","v":26,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"D11","v":63.5,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"E11","v":46,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"F11","v":49,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"G11","v":17.5,"f":"=ABS(D11-E11)","fg":"#B45309","b":true,"al":"center","nf":"0.0"},{"c":"H11","v":"🟢 آمن ومطابق","f":"=IF(G11<=20, \"🟢 آمن ومطابق\", \"🔴 تجاوز حد 20°م\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":"ساعة 42","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B12","v":"2026-10-13 14:00","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"C12","v":36,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"D12","v":65.8,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.0"},{"c":"E12","v":49.5,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.0"},{"c":"F12","v":52,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"G12","v":16.3,"f":"=ABS(D12-E12)","bg":"#F8FAFC","fg":"#B45309","b":true,"al":"center","nf":"0.0"},{"c":"H12","v":"🟢 آمن ومطابق","f":"=IF(G12<=20, \"🟢 آمن ومطابق\", \"🔴 تجاوز حد 20°م\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":"ساعة 48","b":true,"al":"center"},{"c":"B13","v":"2026-10-13 20:00","fg":"#1E293B","al":"center"},{"c":"C13","v":28,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"D13","v":66.5,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"E13","v":50,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"F13","v":53.5,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"G13","v":16.5,"f":"=ABS(D13-E13)","fg":"#B45309","b":true,"al":"center","nf":"0.0"},{"c":"H13","v":"🟢 آمن ومطابق","f":"=IF(G13<=20, \"🟢 آمن ومطابق\", \"🔴 تجاوز حد 20°م\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":"ساعة 54","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B14","v":"2026-10-14 02:00","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"C14","v":22,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"D14","v":66,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.0"},{"c":"E14","v":48.5,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.0"},{"c":"F14","v":53,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"G14","v":17.5,"f":"=ABS(D14-E14)","bg":"#F8FAFC","fg":"#B45309","b":true,"al":"center","nf":"0.0"},{"c":"H14","v":"🟢 آمن ومطابق","f":"=IF(G14<=20, \"🟢 آمن ومطابق\", \"🔴 تجاوز حد 20°م\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":"ساعة 60","b":true,"al":"center"},{"c":"B15","v":"2026-10-14 08:00","fg":"#1E293B","al":"center"},{"c":"C15","v":26,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"D15","v":64.5,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"E15","v":47,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"F15","v":52,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"G15","v":17.5,"f":"=ABS(D15-E15)","fg":"#B45309","b":true,"al":"center","nf":"0.0"},{"c":"H15","v":"🟢 آمن ومطابق","f":"=IF(G15<=20, \"🟢 آمن ومطابق\", \"🔴 تجاوز حد 20°م\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":"ساعة 72","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B16","v":"2026-10-14 20:00","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"C16","v":27,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"D16","v":62,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.0"},{"c":"E16","v":45,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.0"},{"c":"F16","v":50.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"G16","v":17,"f":"=ABS(D16-E16)","bg":"#F8FAFC","fg":"#B45309","b":true,"al":"center","nf":"0.0"},{"c":"H16","v":"🟢 آمن ومطابق","f":"=IF(G16<=20, \"🟢 آمن ومطابق\", \"🔴 تجاوز حد 20°م\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":"ساعة 84","b":true,"al":"center"},{"c":"B17","v":"2026-10-15 08:00","fg":"#1E293B","al":"center"},{"c":"C17","v":25,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"D17","v":59.5,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"E17","v":43.5,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"F17","v":49,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"G17","v":16,"f":"=ABS(D17-E17)","fg":"#B45309","b":true,"al":"center","nf":"0.0"},{"c":"H17","v":"🟢 آمن ومطابق","f":"=IF(G17<=20, \"🟢 آمن ومطابق\", \"🔴 تجاوز حد 20°م\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":"ساعة 96","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B18","v":"2026-10-15 20:00","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"C18","v":26,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"D18","v":56.5,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.0"},{"c":"E18","v":41,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.0"},{"c":"F18","v":47,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"G18","v":15.5,"f":"=ABS(D18-E18)","bg":"#F8FAFC","fg":"#B45309","b":true,"al":"center","nf":"0.0"},{"c":"H18","v":"🟢 آمن ومطابق","f":"=IF(G18<=20, \"🟢 آمن ومطابق\", \"🔴 تجاوز حد 20°م\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":"ساعة 108","b":true,"al":"center"},{"c":"B19","v":"2026-10-16 08:00","fg":"#1E293B","al":"center"},{"c":"C19","v":24,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"D19","v":53,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"E19","v":39.5,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"F19","v":45,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"G19","v":13.5,"f":"=ABS(D19-E19)","fg":"#B45309","b":true,"al":"center","nf":"0.0"},{"c":"H19","v":"🟢 آمن ومطابق","f":"=IF(G19<=20, \"🟢 آمن ومطابق\", \"🔴 تجاوز حد 20°م\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":"ساعة 120","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B20","v":"2026-10-16 20:00","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"C20","v":25,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"D20","v":49.5,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.0"},{"c":"E20","v":37,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.0"},{"c":"F20","v":43,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"G20","v":12.5,"f":"=ABS(D20-E20)","bg":"#F8FAFC","fg":"#B45309","b":true,"al":"center","nf":"0.0"},{"c":"H20","v":"🟢 آمن ومطابق","f":"=IF(G20<=20, \"🟢 آمن ومطابق\", \"🔴 تجاوز حد 20°م\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":"ساعة 132","b":true,"al":"center"},{"c":"B21","v":"2026-10-17 08:00","fg":"#1E293B","al":"center"},{"c":"C21","v":23,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"D21","v":46,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"E21","v":35,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"F21","v":41,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"G21","v":11,"f":"=ABS(D21-E21)","fg":"#B45309","b":true,"al":"center","nf":"0.0"},{"c":"H21","v":"🟢 آمن ومطابق","f":"=IF(G21<=20, \"🟢 آمن ومطابق\", \"🔴 تجاوز حد 20°م\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":"ساعة 144","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B22","v":"2026-10-17 20:00","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"C22","v":24,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"D22","v":42.5,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.0"},{"c":"E22","v":33,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.0"},{"c":"F22","v":38.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"G22","v":9.5,"f":"=ABS(D22-E22)","bg":"#F8FAFC","fg":"#B45309","b":true,"al":"center","nf":"0.0"},{"c":"H22","v":"🟢 آمن ومطابق","f":"=IF(G22<=20, \"🟢 آمن ومطابق\", \"🔴 تجاوز حد 20°م\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":"ساعة 156","b":true,"al":"center"},{"c":"B23","v":"2026-10-18 08:00","fg":"#1E293B","al":"center"},{"c":"C23","v":22,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"D23","v":39,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"E23","v":31,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"F23","v":36,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"G23","v":8,"f":"=ABS(D23-E23)","fg":"#B45309","b":true,"al":"center","nf":"0.0"},{"c":"H23","v":"🟢 آمن ومطابق","f":"=IF(G23<=20, \"🟢 آمن ومطابق\", \"🔴 تجاوز حد 20°م\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":"ساعة 168","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B24","v":"2026-10-18 20:00","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"C24","v":24,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"D24","v":35.5,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.0"},{"c":"E24","v":29.5,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.0"},{"c":"F24","v":33.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"G24","v":6,"f":"=ABS(D24-E24)","bg":"#F8FAFC","fg":"#B45309","b":true,"al":"center","nf":"0.0"},{"c":"H24","v":"🟢 آمن ومطابق","f":"=IF(G24<=20, \"🟢 آمن ومطابق\", \"🔴 تجاوز حد 20°م\")","bg":"#ECFDF5","b":true,"al":"center"}]}]},{"name":"حسابات_العزل_والإجراءات","maxRow":8,"maxCol":7,"colWidths":[20.0,24.0,32.0,42.0,22.0,20.0,26.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"حسابات كفاءة العزل الحراري وخطة الإجراءات التصحيحية الموقعية (Insulation & Mitigation Plan)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":40.0,"cells":[{"c":"A2","v":"حساب المقاومة الحرارية R-value للأغطية السطحية والشدات وتحديد خطوات التدخل الفوري في حال ارتفاع الفارق الحراري","bg":"#2563EB","fg":"#E2E8F0","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":42.0,"cells":[{"c":"A4","v":"مستوى الخطر الحراري","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"الفارق الحراري المرصود (ΔT)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"الحالة الإنشائية المتوقعة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"الإجراء التصحيحي الفوري المطلوب بالموقع","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"المسؤول الميداني","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"المهلة الزمنية للتنفيذ","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"المرجع الفني","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"المستوى الأخضر (طبيعي)","b":true,"al":"center"},{"c":"B5","v":"ΔT أقل من 15°م","b":true,"al":"center"},{"c":"C5","v":"توازن مثالي وانعدام إجهادات الشد","fg":"#1E293B"},{"c":"D5","v":"استمرار المعالجة الرطبة المعتادة وتغطية المشمع البولي إيثيلين","b":true},{"c":"E5","v":"مراقب الجودة QA","fg":"#1E293B","al":"center"},{"c":"F5","v":"مستمر 24/7","b":true,"al":"center"},{"c":"G5","v":"ACI 207.2R Normal","fg":"#64748B","al":"center"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"المستوى الأصفر (تنبيه أول)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B6","v":"ΔT بين 16°م و 18°م","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C6","v":"بدء تركيز إجهادات شد بالسطح","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D6","v":"إضافة طبقة عزل حراري إضافية (بطانيات حرارية Thermal Blankets)","bg":"#F8FAFC","b":true},{"c":"E6","v":"مهندس الموقع","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F6","v":"خلال ساعتين","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G6","v":"خطة PQP الحرارية","bg":"#F8FAFC","fg":"#64748B","al":"center"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"المستوى البرتقالي (حرج)","b":true,"al":"center"},{"c":"B7","v":"ΔT بين 19°م و 20°م","b":true,"al":"center"},{"c":"C7","v":"اقتراب خطر التصدع والشروخ الشعرية","fg":"#1E293B"},{"c":"D7","v":"مضاعفة العزل الحراري ومنع فك أي شدات خشبية نهائياً","b":true},{"c":"E7","v":"مدير المشروع","fg":"#1E293B","al":"center"},{"c":"F7","v":"خلال 30 دقيقة","b":true,"al":"center"},{"c":"G7","v":"ACI 207 Mitigation","fg":"#64748B","al":"center"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"المستوى الأحمر (طوارئ)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B8","v":"ΔT أكبر من 20°م","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C8","v":"بدء حدوث شروخ حرارية نافذة","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D8","v":"تطبيق تدفئة صناعية سطحية أو تبريد مائي داخلي، وإخطار الاستشاري","bg":"#F8FAFC","b":true},{"c":"E8","v":"لجنة الطوارئ الهندسية","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F8","v":"فوري ولحظي","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G8","v":"إيقاف استلام البند","bg":"#F8FAFC","fg":"#64748B","al":"center"}]}]},{"name":"التقرير_الفني_والاعتمادات","maxRow":12,"maxCol":5,"colWidths":[24.0,24.0,24.0,24.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"محضر الاعتماد الفني النهائي لسلامة الصب الكتلي وإزالة العزل (Mass Concrete Sign-off Certificate)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":40.0,"cells":[{"c":"A2","v":"شهادة إتمام فترة المعالجة الحرارية والتصريح بفك الشدات وإزالة البطانيات العازلة وفق الاشتراطات الهندسية","bg":"#2563EB","fg":"#E2E8F0","al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""}]},{"r":4,"h":36.0,"cells":[{"c":"A4","v":"النتيجة الفنية النهائية لفترة الرصد الحراري (7 أيام متواصلة)","bg":"#E2E8F0","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"الخلاصة الفنية العامة:","b":true},{"c":"B5","v":"تم اجتياز فترة الإماهة الحرارية بنجاح تام ودون تسجيل أي شروخ شعرية أو هبوط حراري.","fg":"#1E293B","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"ذروة حرارة القلب المسجلة:","b":true},{"c":"B6","v":"66.5° مئوية (أقل من الحد الأقصى المسموح 70.0°م)، مما يضمن عدم حدوث تفاعل DEF.","fg":"#1E293B","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"أقصى فارق حراري مسجل (ΔT):","b":true},{"c":"B7","v":"17.5° مئوية (أقل من الحد الأقصى 20.0°م)، مما يضمن سلامة العنصر من إجهادات الشد.","fg":"#1E293B","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"تصريح إزالة العزل والشدات:","b":true},{"c":"B8","v":"يُصرح بإزالة البطانيات الحرارية وفك الشدات الجانبية تدريجياً لتقارب الحرارة مع الجو.","fg":"#1E293B","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":28.0,"cells":[{"c":"A9","v":""},{"c":"B9","v":""},{"c":"C9","v":""},{"c":"D9","v":""},{"c":"E9","v":""}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":"الاعتمادات والتوقيعات الرسمية لمحضر الجودة الحراري (Official Quality Signatures)","bg":"#E2E8F0","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":"مهندس ضبط الجودة بالموقع QA/QC","bg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"C11","v":"مدير المشروع للمقاول العام","bg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"E11","v":"مهندس استشاري الإشراف وضبط الجودة","bg":"#1E293B","b":true,"al":"center"}]},{"r":12,"h":72.0,"cells":[{"c":"A12","v":"الاسم:\nالتوقيع:\nالتاريخ:","fg":"#64748B","cs":2},{"skip":true},{"c":"C12","v":"الاسم:\nالتوقيع:\nالتاريخ:","fg":"#64748B","cs":2},{"skip":true},{"c":"E12","v":"الاسم:\nالتوقيع:\nالتاريخ:","fg":"#64748B"}]}]}]}