{"slug":"construction-safety-manhours-and-ltifr-statistics-sheet","sheets":[{"name":"لوحة مؤشرات السلامة السنوية","maxRow":24,"maxCol":13,"colWidths":[16.0,22.0,16.0,22.0,24.0,16.0,20.0,18.0,16.0,18.0,22.0,18.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"شيت حساب ساعات العمل الآمنة ومعدلات الحوادث الموقعية (HSE Man-Hours & LTIFR Dashboard)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"سجل الإحصائيات الشهرية والتراكمية للسلامة المهنية وفق معايير OSHA 1904 و ISO 45001 وكود البناء السعودي SBC 801","bg":"#1E3A8A","fg":"#FFFFFF","al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":38.0,"cells":[{"c":"A3","v":"البيانات التعاقدية للمشروع وفريق السلامة والصحة المهنية (HSE Project Metadata)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":4,"h":36.0,"cells":[{"c":"A4","v":"اسم المشروع الإنشائي:","bg":"#F1F5F9","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"D4","v":"مشروع إنشاء مجمع الأبراج السكنية والتجارية - العاصمة","al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"H4","v":"المقاول العام المنفذ:","bg":"#F1F5F9","b":true,"cs":2},{"skip":true},{"c":"J4","v":"شركة الإنشاءات الكبرى للمقاولات","al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":36.0,"cells":[{"c":"A5","v":"استشاري السلامة والإشراف:","bg":"#F1F5F9","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"D5","v":"مكتب الاستشارات الهندسية المتكاملة","al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"H5","v":"مدير السلامة بالمشروع (HSE Manager):","bg":"#F1F5F9","b":true,"cs":2},{"skip":true},{"c":"J5","v":"م. أحمد بن سالم الدوسري (CSP / NEBOSH)","al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":6,"h":36.0,"cells":[{"c":"A6","v":"ساعات العمل القياسية بالوردية:","bg":"#F1F5F9","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"D6","v":"8.5 ساعة/يوم عمل (شاملة الراحة)","al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"H6","v":"السنة التقويمية للإحصائيات:","bg":"#F1F5F9","b":true,"cs":2},{"skip":true},{"c":"J6","v":"2026 م","al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"ساعات العمل الآمنة التراكمية (Safe Man-Hours)","bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D7","v":"معدل تكرار الإصابات (LTIFR / 1,000,000 hrs)","bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G7","v":"معدل الحوادث المسجلة (TRIR / 200,000 hrs)","bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"J7","v":"معدل شدة الإصابات المهدرة (LTISR / 1,000,000)","bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":8,"h":46.0,"cells":[{"c":"A8","v":1429190,"f":"=E24","bg":"#F0FDF4","fg":"#15803D","b":true,"al":"center","nf":"#,##0 \"ساعة عمل\"","cs":3},{"skip":true},{"skip":true},{"c":"D8","v":0.699697,"f":"=(G24*1000000)/E24","bg":"#F0FDF4","fg":"#15803D","b":true,"al":"center","nf":"0.00","cs":3},{"skip":true},{"skip":true},{"c":"G8","v":1.679273,"f":"=((F24+G24+I24)*200000)/E24","bg":"#FFFBEB","fg":"#B45309","b":true,"al":"center","nf":"0.00","cs":3},{"skip":true},{"skip":true},{"c":"J8","v":9.795758,"f":"=(H24*1000000)/E24","bg":"#F0F9FF","fg":"#1E293B","b":true,"al":"center","nf":"0.00","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"إجمالي الساعات بدون حوادث وقت ضائع","bg":"#F0FDF4","fg":"#475569","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D9","v":"الهدف السنوي: أقل من 1.0 (أداء متميز)","bg":"#F0FDF4","fg":"#475569","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G9","v":"معيار OSHA القياسي لكافة الإصابات الطبية","bg":"#FFFBEB","fg":"#475569","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"J9","v":"الأيام الضائعة لكل مليون ساعة عمل","bg":"#F0F9FF","fg":"#475569","al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":10,"h":16.0,"cells":[{"c":"A10","v":""},{"c":"B10","v":""},{"c":"C10","v":""},{"c":"D10","v":""},{"c":"E10","v":""},{"c":"F10","v":""},{"c":"G10","v":""},{"c":"H10","v":""},{"c":"I10","v":""},{"c":"J10","v":""},{"c":"K10","v":""},{"c":"L10","v":""},{"c":"M10","v":""}]},{"r":11,"h":42.0,"cells":[{"c":"A11","v":"الشهر","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B11","v":"متوسط العمالة اليومية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C11","v":"أيام العمل","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D11","v":"ساعات العمل الشهرية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E11","v":"الساعات التراكمية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F11","v":"وفيات (Fatality)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G11","v":"إصابات وقت ضائع (LTI)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H11","v":"الأيام الضائعة (LWD)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I11","v":"علاج طبي (MTC)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J11","v":"إسعافات أولية (FAC)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K11","v":"حوادث وشيكة (Near Miss)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L11","v":"LTIFR الشهري","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M11","v":"LTIFR التراكمي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":"يناير 2026","b":true,"al":"center"},{"c":"B12","v":420,"in":true,"al":"center","nf":"#,##0 \"عامل\""},{"c":"C12","v":26,"in":true,"al":"center","nf":"0 \"يوم\""},{"c":"D12","v":92820,"f":"=B12*C12*8.5","b":true,"al":"center","nf":"#,##0 \"ساعة\""},{"c":"E12","v":92820,"f":"=D12","b":true,"al":"center","nf":"#,##0 \"ساعة\""},{"c":"F12","v":0,"in":true,"al":"center","nf":"0"},{"c":"G12","v":0,"in":true,"al":"center","nf":"0"},{"c":"H12","v":0,"in":true,"al":"center","nf":"0 \"يوم\""},{"c":"I12","v":1,"in":true,"al":"center","nf":"0"},{"c":"J12","v":4,"in":true,"al":"center","nf":"0"},{"c":"K12","v":12,"in":true,"b":true,"al":"center","nf":"0"},{"c":"L12","v":0,"f":"=IF(D12>0, (G12*1000000)/D12, 0)","al":"center","nf":"0.00"},{"c":"M12","v":0,"f":"=IF(E12>0, (SUM($G$12:G12)*1000000)/E12, 0)","b":true,"al":"center","nf":"0.00"}]},{"r":13,"h":36.0,"cells":[{"c":"A13","v":"فبراير 2026","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":450,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0 \"عامل\""},{"c":"C13","v":24,"in":true,"bg":"#F8FAFC","al":"center","nf":"0 \"يوم\""},{"c":"D13","v":91800,"f":"=B13*C13*8.5","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0 \"ساعة\""},{"c":"E13","v":184620,"f":"=E12+D13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0 \"ساعة\""},{"c":"F13","v":0,"in":true,"bg":"#F8FAFC","al":"center","nf":"0"},{"c":"G13","v":0,"in":true,"bg":"#F8FAFC","al":"center","nf":"0"},{"c":"H13","v":0,"in":true,"bg":"#F8FAFC","al":"center","nf":"0 \"يوم\""},{"c":"I13","v":0,"in":true,"bg":"#F8FAFC","al":"center","nf":"0"},{"c":"J13","v":3,"in":true,"bg":"#F8FAFC","al":"center","nf":"0"},{"c":"K13","v":15,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0"},{"c":"L13","v":0,"f":"=IF(D13>0, (G13*1000000)/D13, 0)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"M13","v":0,"f":"=IF(E13>0, (SUM($G$12:G13)*1000000)/E13, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"}]},{"r":14,"h":36.0,"cells":[{"c":"A14","v":"مارس 2026","b":true,"al":"center"},{"c":"B14","v":480,"in":true,"al":"center","nf":"#,##0 \"عامل\""},{"c":"C14","v":26,"in":true,"al":"center","nf":"0 \"يوم\""},{"c":"D14","v":106080,"f":"=B14*C14*8.5","b":true,"al":"center","nf":"#,##0 \"ساعة\""},{"c":"E14","v":290700,"f":"=E13+D14","b":true,"al":"center","nf":"#,##0 \"ساعة\""},{"c":"F14","v":0,"in":true,"al":"center","nf":"0"},{"c":"G14","v":0,"in":true,"al":"center","nf":"0"},{"c":"H14","v":0,"in":true,"al":"center","nf":"0 \"يوم\""},{"c":"I14","v":1,"in":true,"al":"center","nf":"0"},{"c":"J14","v":5,"in":true,"al":"center","nf":"0"},{"c":"K14","v":18,"in":true,"b":true,"al":"center","nf":"0"},{"c":"L14","v":0,"f":"=IF(D14>0, (G14*1000000)/D14, 0)","al":"center","nf":"0.00"},{"c":"M14","v":0,"f":"=IF(E14>0, (SUM($G$12:G14)*1000000)/E14, 0)","b":true,"al":"center","nf":"0.00"}]},{"r":15,"h":36.0,"cells":[{"c":"A15","v":"أبريل 2026","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B15","v":510,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0 \"عامل\""},{"c":"C15","v":25,"in":true,"bg":"#F8FAFC","al":"center","nf":"0 \"يوم\""},{"c":"D15","v":108375,"f":"=B15*C15*8.5","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0 \"ساعة\""},{"c":"E15","v":399075,"f":"=E14+D15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0 \"ساعة\""},{"c":"F15","v":0,"in":true,"bg":"#F8FAFC","al":"center","nf":"0"},{"c":"G15","v":1,"in":true,"bg":"#FEE2E2","fg":"#991B1B","b":true,"al":"center","nf":"0"},{"c":"H15","v":14,"in":true,"bg":"#FEE2E2","fg":"#991B1B","b":true,"al":"center","nf":"0 \"يوم\""},{"c":"I15","v":2,"in":true,"bg":"#F8FAFC","al":"center","nf":"0"},{"c":"J15","v":6,"in":true,"bg":"#F8FAFC","al":"center","nf":"0"},{"c":"K15","v":22,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0"},{"c":"L15","v":9.22722,"f":"=IF(D15>0, (G15*1000000)/D15, 0)","bg":"#FEE2E2","fg":"#991B1B","b":true,"al":"center","nf":"0.00"},{"c":"M15","v":2.505795,"f":"=IF(E15>0, (SUM($G$12:G15)*1000000)/E15, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"}]},{"r":16,"h":36.0,"cells":[{"c":"A16","v":"مايو 2026","b":true,"al":"center"},{"c":"B16","v":530,"in":true,"al":"center","nf":"#,##0 \"عامل\""},{"c":"C16","v":26,"in":true,"al":"center","nf":"0 \"يوم\""},{"c":"D16","v":117130,"f":"=B16*C16*8.5","b":true,"al":"center","nf":"#,##0 \"ساعة\""},{"c":"E16","v":516205,"f":"=E15+D16","b":true,"al":"center","nf":"#,##0 \"ساعة\""},{"c":"F16","v":0,"in":true,"al":"center","nf":"0"},{"c":"G16","v":0,"in":true,"al":"center","nf":"0"},{"c":"H16","v":0,"in":true,"al":"center","nf":"0 \"يوم\""},{"c":"I16","v":1,"in":true,"al":"center","nf":"0"},{"c":"J16","v":4,"in":true,"al":"center","nf":"0"},{"c":"K16","v":19,"in":true,"b":true,"al":"center","nf":"0"},{"c":"L16","v":0,"f":"=IF(D16>0, (G16*1000000)/D16, 0)","al":"center","nf":"0.00"},{"c":"M16","v":1.937215,"f":"=IF(E16>0, (SUM($G$12:G16)*1000000)/E16, 0)","b":true,"al":"center","nf":"0.00"}]},{"r":17,"h":36.0,"cells":[{"c":"A17","v":"يونيو 2026","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B17","v":550,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0 \"عامل\""},{"c":"C17","v":25,"in":true,"bg":"#F8FAFC","al":"center","nf":"0 \"يوم\""},{"c":"D17","v":116875,"f":"=B17*C17*8.5","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0 \"ساعة\""},{"c":"E17","v":633080,"f":"=E16+D17","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0 \"ساعة\""},{"c":"F17","v":0,"in":true,"bg":"#F8FAFC","al":"center","nf":"0"},{"c":"G17","v":0,"in":true,"bg":"#F8FAFC","al":"center","nf":"0"},{"c":"H17","v":0,"in":true,"bg":"#F8FAFC","al":"center","nf":"0 \"يوم\""},{"c":"I17","v":0,"in":true,"bg":"#F8FAFC","al":"center","nf":"0"},{"c":"J17","v":5,"in":true,"bg":"#F8FAFC","al":"center","nf":"0"},{"c":"K17","v":25,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0"},{"c":"L17","v":0,"f":"=IF(D17>0, (G17*1000000)/D17, 0)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"M17","v":1.579579,"f":"=IF(E17>0, (SUM($G$12:G17)*1000000)/E17, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"}]},{"r":18,"h":36.0,"cells":[{"c":"A18","v":"يوليو 2026","b":true,"al":"center"},{"c":"B18","v":560,"in":true,"al":"center","nf":"#,##0 \"عامل\""},{"c":"C18","v":26,"in":true,"al":"center","nf":"0 \"يوم\""},{"c":"D18","v":123760,"f":"=B18*C18*8.5","b":true,"al":"center","nf":"#,##0 \"ساعة\""},{"c":"E18","v":756840,"f":"=E17+D18","b":true,"al":"center","nf":"#,##0 \"ساعة\""},{"c":"F18","v":0,"in":true,"al":"center","nf":"0"},{"c":"G18","v":0,"in":true,"al":"center","nf":"0"},{"c":"H18","v":0,"in":true,"al":"center","nf":"0 \"يوم\""},{"c":"I18","v":1,"in":true,"al":"center","nf":"0"},{"c":"J18","v":3,"in":true,"al":"center","nf":"0"},{"c":"K18","v":20,"in":true,"b":true,"al":"center","nf":"0"},{"c":"L18","v":0,"f":"=IF(D18>0, (G18*1000000)/D18, 0)","al":"center","nf":"0.00"},{"c":"M18","v":1.321283,"f":"=IF(E18>0, (SUM($G$12:G18)*1000000)/E18, 0)","b":true,"al":"center","nf":"0.00"}]},{"r":19,"h":36.0,"cells":[{"c":"A19","v":"أغسطس 2026","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B19","v":580,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0 \"عامل\""},{"c":"C19","v":26,"in":true,"bg":"#F8FAFC","al":"center","nf":"0 \"يوم\""},{"c":"D19","v":128180,"f":"=B19*C19*8.5","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0 \"ساعة\""},{"c":"E19","v":885020,"f":"=E18+D19","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0 \"ساعة\""},{"c":"F19","v":0,"in":true,"bg":"#F8FAFC","al":"center","nf":"0"},{"c":"G19","v":0,"in":true,"bg":"#F8FAFC","al":"center","nf":"0"},{"c":"H19","v":0,"in":true,"bg":"#F8FAFC","al":"center","nf":"0 \"يوم\""},{"c":"I19","v":2,"in":true,"bg":"#F8FAFC","al":"center","nf":"0"},{"c":"J19","v":6,"in":true,"bg":"#F8FAFC","al":"center","nf":"0"},{"c":"K19","v":24,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0"},{"c":"L19","v":0,"f":"=IF(D19>0, (G19*1000000)/D19, 0)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"M19","v":1.129918,"f":"=IF(E19>0, (SUM($G$12:G19)*1000000)/E19, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"}]},{"r":20,"h":36.0,"cells":[{"c":"A20","v":"سبتمبر 2026","b":true,"al":"center"},{"c":"B20","v":600,"in":true,"al":"center","nf":"#,##0 \"عامل\""},{"c":"C20","v":25,"in":true,"al":"center","nf":"0 \"يوم\""},{"c":"D20","v":127500,"f":"=B20*C20*8.5","b":true,"al":"center","nf":"#,##0 \"ساعة\""},{"c":"E20","v":1012520,"f":"=E19+D20","b":true,"al":"center","nf":"#,##0 \"ساعة\""},{"c":"F20","v":0,"in":true,"al":"center","nf":"0"},{"c":"G20","v":0,"in":true,"al":"center","nf":"0"},{"c":"H20","v":0,"in":true,"al":"center","nf":"0 \"يوم\""},{"c":"I20","v":1,"in":true,"al":"center","nf":"0"},{"c":"J20","v":4,"in":true,"al":"center","nf":"0"},{"c":"K20","v":28,"in":true,"b":true,"al":"center","nf":"0"},{"c":"L20","v":0,"f":"=IF(D20>0, (G20*1000000)/D20, 0)","al":"center","nf":"0.00"},{"c":"M20","v":0.987635,"f":"=IF(E20>0, (SUM($G$12:G20)*1000000)/E20, 0)","b":true,"al":"center","nf":"0.00"}]},{"r":21,"h":36.0,"cells":[{"c":"A21","v":"أكتوبر 2026","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B21","v":620,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0 \"عامل\""},{"c":"C21","v":26,"in":true,"bg":"#F8FAFC","al":"center","nf":"0 \"يوم\""},{"c":"D21","v":137020,"f":"=B21*C21*8.5","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0 \"ساعة\""},{"c":"E21","v":1149540,"f":"=E20+D21","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0 \"ساعة\""},{"c":"F21","v":0,"in":true,"bg":"#F8FAFC","al":"center","nf":"0"},{"c":"G21","v":0,"in":true,"bg":"#F8FAFC","al":"center","nf":"0"},{"c":"H21","v":0,"in":true,"bg":"#F8FAFC","al":"center","nf":"0 \"يوم\""},{"c":"I21","v":0,"in":true,"bg":"#F8FAFC","al":"center","nf":"0"},{"c":"J21","v":5,"in":true,"bg":"#F8FAFC","al":"center","nf":"0"},{"c":"K21","v":30,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0"},{"c":"L21","v":0,"f":"=IF(D21>0, (G21*1000000)/D21, 0)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"M21","v":0.869913,"f":"=IF(E21>0, (SUM($G$12:G21)*1000000)/E21, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"}]},{"r":22,"h":36.0,"cells":[{"c":"A22","v":"نوفمبر 2026","b":true,"al":"center"},{"c":"B22","v":640,"in":true,"al":"center","nf":"#,##0 \"عامل\""},{"c":"C22","v":25,"in":true,"al":"center","nf":"0 \"يوم\""},{"c":"D22","v":136000,"f":"=B22*C22*8.5","b":true,"al":"center","nf":"#,##0 \"ساعة\""},{"c":"E22","v":1285540,"f":"=E21+D22","b":true,"al":"center","nf":"#,##0 \"ساعة\""},{"c":"F22","v":0,"in":true,"al":"center","nf":"0"},{"c":"G22","v":0,"in":true,"al":"center","nf":"0"},{"c":"H22","v":0,"in":true,"al":"center","nf":"0 \"يوم\""},{"c":"I22","v":1,"in":true,"al":"center","nf":"0"},{"c":"J22","v":4,"in":true,"al":"center","nf":"0"},{"c":"K22","v":26,"in":true,"b":true,"al":"center","nf":"0"},{"c":"L22","v":0,"f":"=IF(D22>0, (G22*1000000)/D22, 0)","al":"center","nf":"0.00"},{"c":"M22","v":0.777883,"f":"=IF(E22>0, (SUM($G$12:G22)*1000000)/E22, 0)","b":true,"al":"center","nf":"0.00"}]},{"r":23,"h":36.0,"cells":[{"c":"A23","v":"ديسمبر 2026","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B23","v":650,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0 \"عامل\""},{"c":"C23","v":26,"in":true,"bg":"#F8FAFC","al":"center","nf":"0 \"يوم\""},{"c":"D23","v":143650,"f":"=B23*C23*8.5","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0 \"ساعة\""},{"c":"E23","v":1429190,"f":"=E22+D23","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0 \"ساعة\""},{"c":"F23","v":0,"in":true,"bg":"#F8FAFC","al":"center","nf":"0"},{"c":"G23","v":0,"in":true,"bg":"#F8FAFC","al":"center","nf":"0"},{"c":"H23","v":0,"in":true,"bg":"#F8FAFC","al":"center","nf":"0 \"يوم\""},{"c":"I23","v":1,"in":true,"bg":"#F8FAFC","al":"center","nf":"0"},{"c":"J23","v":5,"in":true,"bg":"#F8FAFC","al":"center","nf":"0"},{"c":"K23","v":27,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0"},{"c":"L23","v":0,"f":"=IF(D23>0, (G23*1000000)/D23, 0)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"M23","v":0.699697,"f":"=IF(E23>0, (SUM($G$12:G23)*1000000)/E23, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"}]},{"r":24,"h":52.0,"cells":[{"c":"A24","v":"الإجمالي التراكمي لسنة 2026 م","bg":"#E2E8F0","b":true,"al":"center"},{"c":"B24","v":549.166667,"f":"=AVERAGE(B12:B23)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0 \"عامل\""},{"c":"C24","v":306,"f":"=SUM(C12:C23)","bg":"#E2E8F0","b":true,"al":"center","nf":"0 \"يوم\""},{"c":"D24","v":1429190,"f":"=SUM(D12:D23)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0 \"ساعة\""},{"c":"E24","v":1429190,"f":"=E23","bg":"#E2E8F0","fg":"#15803D","b":true,"al":"center","nf":"#,##0 \"ساعة\""},{"c":"F24","v":0,"f":"=SUM(F12:F23)","bg":"#E2E8F0","b":true,"al":"center","nf":"0"},{"c":"G24","v":1,"f":"=SUM(G12:G23)","bg":"#E2E8F0","b":true,"al":"center","nf":"0"},{"c":"H24","v":14,"f":"=SUM(H12:H23)","bg":"#E2E8F0","b":true,"al":"center","nf":"0 \"يوم\""},{"c":"I24","v":11,"f":"=SUM(I12:I23)","bg":"#E2E8F0","b":true,"al":"center","nf":"0"},{"c":"J24","v":54,"f":"=SUM(J12:J23)","bg":"#E2E8F0","b":true,"al":"center","nf":"0"},{"c":"K24","v":266,"f":"=SUM(K12:K23)","bg":"#E2E8F0","b":true,"al":"center","nf":"0"},{"c":"L24","v":0.699697,"f":"=(G24*1000000)/E24","bg":"#E2E8F0","fg":"#15803D","b":true,"al":"center","nf":"0.00"},{"c":"M24","v":"أداء سلامة عالمي مميز","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]}]},{"name":"سجل الحوادث الموقعية","maxRow":22,"maxCol":10,"colWidths":[16.0,20.0,22.0,24.0,28.0,28.0,65.0,18.0,65.0,22.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"سجل توثيق وتحقيق حوادث وإصابات العمل الموقعية (HSE Incident & Accident Log)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"حصر وتصنيف الحوادث المهنية، الإصابات، الحوادث الوشيكة، وتتبع الإجراءات التصحيحية والإغلاق وفق OSHA 1904","bg":"#1E3A8A","fg":"#FFFFFF","al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"إجمالي البلاغات المسجلة","bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"إصابات الوقت الضائع (LTI)","bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"F4","v":"إجمالي الأيام الضائعة (LWD)","bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"H4","v":"نسبة إغلاق الإجراءات التصحيحية","bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":5,"h":46.0,"cells":[{"c":"A5","v":12,"f":"=COUNTA(A10:A21)","bg":"#F0F9FF","fg":"#1E293B","b":true,"al":"center","nf":"0 \"بلاغ موثق\"","cs":2},{"skip":true},{"c":"C5","v":0,"f":"=COUNTIF(C10:C21, \"*LTI*\")","bg":"#FEE2E2","fg":"#B91C1C","b":true,"al":"center","nf":"0 \"إصابة عمل\"","cs":3},{"skip":true},{"skip":true},{"c":"F5","v":14,"f":"=SUM(H10:H21)","bg":"#FEE2E2","fg":"#B91C1C","b":true,"al":"center","nf":"0 \"يوم غياب\"","cs":2},{"skip":true},{"c":"H5","v":0,"f":"=COUNTIF(J10:J21, \"*مغلق*\")/COUNTA(J10:J21)","bg":"#F0FDF4","fg":"#15803D","b":true,"al":"center","nf":"0.00%","cs":3},{"skip":true},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"كافة الحوادث والإصابات والوشيكة","bg":"#F0F9FF","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"C6","v":"إصابات نتج عنها غياب عن الوردية","bg":"#FEE2E2","fg":"#475569","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"F6","v":"أيام التوقف المرضي المقررة بالتقرير الطبي","bg":"#FEE2E2","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"H6","v":"فاعلية معالجة الأسباب الجذرية","bg":"#F0FDF4","fg":"#475569","al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""},{"c":"I7","v":""},{"c":"J7","v":""}]},{"r":8,"h":16.0,"cells":[{"c":"A8","v":""},{"c":"B8","v":""},{"c":"C8","v":""},{"c":"D8","v":""},{"c":"E8","v":""},{"c":"F8","v":""},{"c":"G8","v":""},{"c":"H8","v":""},{"c":"I8","v":""},{"c":"J8","v":""}]},{"r":9,"h":42.0,"cells":[{"c":"A9","v":"رقم البلاغ","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"تاريخ ووقت الواقعة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"تصنيف الحادث (OSHA)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"المصاب / المبلغ","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"المسمى الوظيفي والجهة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"موقع الحادث بالمنشأة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"وصف الواقعة والسبب الجذري المباشر","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H9","v":"أيام الغياب (LWD)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I9","v":"الإجراء التصحيحي المتخذ (CAPA)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J9","v":"حالة البلاغ","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":10,"h":38.0,"cells":[{"c":"A10","v":"INC-2026-001","b":true,"al":"center"},{"c":"B10","v":"2026-01-14 09:30","al":"center"},{"c":"C10","v":"علاج طبي (MTC)","bg":"#FEF3C7","fg":"#92400E","b":true,"al":"center"},{"c":"D10","v":"محمود فوزي حسن"},{"c":"E10","v":"حداد مسلح - مقاول باطن"},{"c":"F10","v":"سقف الدور الأول - محور B4"},{"c":"G10","v":"جرح قطعي بالساعد الأيسر أثناء مناولة أسياخ حديد تسليح بدون قفازات مقواة"},{"c":"H10","v":0,"in":true,"al":"center","nf":"0 \"يوم\""},{"c":"I10","v":"إسعاف بمستوصف الموقع + إلزام طاقم الحدادة بارتداء قفازات Kevlar Class 4"},{"c":"J10","v":"مغلق ومحقق بالكامل","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"INC-2026-002","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":"2026-01-28 14:15","bg":"#F8FAFC","al":"center"},{"c":"C11","v":"حادث وشيك (Near Miss)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D11","v":"سالم محمد الدوسري","bg":"#F8FAFC"},{"c":"E11","v":"مراقب سلامة - المقاول العام","bg":"#F8FAFC"},{"c":"F11","v":"منطقة تفريغ الرمل - البوابة الغربية","bg":"#F8FAFC"},{"c":"G11","v":"تراجع لودر للخلف بدون انطلاق جهاز إنذار الرجوع واقترابه من عمال النظافة","bg":"#F8FAFC"},{"c":"H11","v":0,"in":true,"bg":"#F8FAFC","al":"center","nf":"0 \"يوم\""},{"c":"I11","v":"إيقاف المعدة فوراً وصيانة حساس الإنذار الصوتي وتعيين رجل إشارة متفرغ","bg":"#F8FAFC"},{"c":"J11","v":"مغلق ومحقق بالكامل","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":12,"h":38.0,"cells":[{"c":"A12","v":"INC-2026-003","b":true,"al":"center"},{"c":"B12","v":"2026-02-11 11:00","al":"center"},{"c":"C12","v":"إسعاف أولي (FAC)","b":true,"al":"center"},{"c":"D12","v":"كومار راجو سينغ"},{"c":"E12","v":"عامل صب - شركة الخرسانة"},{"c":"F12","v":"محطة مضخة الخرسانة رقم 2"},{"c":"G12","v":"تناثر رذاذ خرسانة في العين اليمنى لعدم ارتداء نظارة الوقاية الشفافة"},{"c":"H12","v":0,"in":true,"al":"center","nf":"0 \"يوم\""},{"c":"I12","v":"غسيل العين بمحلول ملحي بمحطة غسيل العيون + توعية فورية بطاقم الصب"},{"c":"J12","v":"مغلق ومحقق بالكامل","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":13,"h":38.0,"cells":[{"c":"A13","v":"INC-2026-004","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":"2026-03-05 16:45","bg":"#F8FAFC","al":"center"},{"c":"C13","v":"حادث وشيك (Near Miss)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D13","v":"عبدالله عمر باوزير","bg":"#F8FAFC"},{"c":"E13","v":"نجار مسلح - مقاول باطن","bg":"#F8FAFC"},{"c":"F13","v":"محيط المصعد - الدور الثالث","bg":"#F8FAFC"},{"c":"G13","v":"سقوط لوح بليود خشبي من فتحة مصعد غير مغلقة بحاجز حماية وسقوطه على الشباك","bg":"#F8FAFC"},{"c":"H13","v":0,"in":true,"bg":"#F8FAFC","al":"center","nf":"0 \"يوم\""},{"c":"I13","v":"تركيب سياج حماية صلب حول كافة فتحات المصاعد والمناور بارتفاع 1.10م","bg":"#F8FAFC"},{"c":"J13","v":"مغلق ومحقق بالكامل","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":14,"h":38.0,"cells":[{"c":"A14","v":"INC-2026-005","b":true,"al":"center"},{"c":"B14","v":"2026-04-18 10:20","al":"center"},{"c":"C14","v":"إصابة وقت ضائع (LTI)","bg":"#FEE2E2","fg":"#991B1B","b":true,"al":"center"},{"c":"D14","v":"سردار خان علم"},{"c":"E14","v":"فني سقالات - مقاول تخصصي"},{"c":"F14","v":"واجهة البرج الشمالية - شدة الدور 5"},{"c":"G14","v":"انزلاق أثناء فك السقالة والتواء شديد بمفصل الكاحل وسقوط على منصة العمل"},{"c":"H14","v":14,"in":true,"bg":"#FEE2E2","fg":"#991B1B","b":true,"al":"center","nf":"0 \"يوم\""},{"c":"I14","v":"نقل للمستشفى وعلاج تجبيري + إلزامية ربط حزام الأمان بنقطة تثبيت مزدوجة 100%"},{"c":"J14","v":"مغلق ومحقق بالكامل","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":15,"h":38.0,"cells":[{"c":"A15","v":"INC-2026-006","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B15","v":"2026-05-09 13:40","bg":"#F8FAFC","al":"center"},{"c":"C15","v":"علاج طبي (MTC)","bg":"#FEF3C7","fg":"#92400E","b":true,"al":"center"},{"c":"D15","v":"طارق مصطفى الباز","bg":"#F8FAFC"},{"c":"E15","v":"لحام كهربائي - مقاول الميكانيك","bg":"#F8FAFC"},{"c":"F15","v":"غرفة المضخات المركزية","bg":"#F8FAFC"},{"c":"G15","v":"حروق خفيفة بالدرجة الأولى في الرقبة نتيجة شرر لحام مع نقص واقي العنق","bg":"#F8FAFC"},{"c":"H15","v":0,"in":true,"bg":"#F8FAFC","al":"center","nf":"0 \"يوم\""},{"c":"I15","v":"تضميد طبي بمستشفى التخصصي + توفير واقيات جلدية للرقبة ومتابعة الحالة","bg":"#F8FAFC"},{"c":"J15","v":"مغلق ومحقق بالكامل","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":16,"h":38.0,"cells":[{"c":"A16","v":"INC-2026-007","b":true,"al":"center"},{"c":"B16","v":"2026-06-22 15:10","al":"center"},{"c":"C16","v":"إجهاد حراري (Heat Stress)","b":true,"al":"center"},{"c":"D16","v":"محمد شفيق الرحمن"},{"c":"E16","v":"عامل خرسانة - المقاول العام"},{"c":"F16","v":"الساحة الخارجية - أعمال الدفان"},{"c":"G16","v":"دوار وإعياء ناتج عن ارتفاع درجات الحرارة أثناء فترة ما بعد الظهيرة"},{"c":"H16","v":0,"in":true,"al":"center","nf":"0 \"يوم\""},{"c":"I16","v":"نقل لاستراحة مكيفة وتبريد وسوائل أملاح + تفعيل استراحة حظر العمل وقت الظهيرة"},{"c":"J16","v":"مغلق ومحقق بالكامل","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":17,"h":38.0,"cells":[{"c":"A17","v":"INC-2026-008","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B17","v":"2026-07-15 08:30","bg":"#F8FAFC","al":"center"},{"c":"C17","v":"حادث وشيك (Near Miss)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D17","v":"بشير أحمد عبدالحميد","bg":"#F8FAFC"},{"c":"E17","v":"سائق ونش برج - المقاول العام","bg":"#F8FAFC"},{"c":"F17","v":"الرافعة البرجية TC-01","bg":"#F8FAFC"},{"c":"G17","v":"انفلات حبل تصبين خفيف أثناء رفع حزمة أخشاب واستقرارها على الممر دون إصابات","bg":"#F8FAFC"},{"c":"H17","v":0,"in":true,"bg":"#F8FAFC","al":"center","nf":"0 \"يوم\""},{"c":"I17","v":"إتلاف حبال التصبين غير المفحوصة وإعادة فحص كافة الوايرات وتدريب المصنبين","bg":"#F8FAFC"},{"c":"J17","v":"مغلق ومحقق بالكامل","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":18,"h":38.0,"cells":[{"c":"A18","v":"INC-2026-009","b":true,"al":"center"},{"c":"B18","v":"2026-08-30 11:50","al":"center"},{"c":"C18","v":"إسعاف أولي (FAC)","b":true,"al":"center"},{"c":"D18","v":"إسماعيل خان ولي"},{"c":"E18","v":"مساعد ميكانيكي - مقاول الباطن"},{"c":"F18","v":"ورشة صيانة المعدات الميدانية"},{"c":"G18","v":"كدمة خفيفة بإبهام اليد أثناء استخدام مفتاح عزم يدوي مع انزلاق المفتاح"},{"c":"H18","v":0,"in":true,"al":"center","nf":"0 \"يوم\""},{"c":"I18","v":"كمادات ثلج وتضميد موضعي + استبدال المفاتيح التالفة بورشة الصيانة"},{"c":"J18","v":"مغلق ومحقق بالكامل","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":19,"h":38.0,"cells":[{"c":"A19","v":"INC-2026-010","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B19","v":"2026-09-19 14:00","bg":"#F8FAFC","al":"center"},{"c":"C19","v":"علاج طبي (MTC)","bg":"#FEF3C7","fg":"#92400E","b":true,"al":"center"},{"c":"D19","v":"فهد خالد الشمري","bg":"#F8FAFC"},{"c":"E19","v":"فني تكييف - مقاول MEP","bg":"#F8FAFC"},{"c":"F19","v":"غرفة مناولة الهواء - الدور 8","bg":"#F8FAFC"},{"c":"G19","v":"استنشاق غاز تبريد خفيف أثناء فحص ضغوط شبكة التكييف وتهيج تنفسي مؤقت","bg":"#F8FAFC"},{"c":"H19","v":0,"in":true,"bg":"#F8FAFC","al":"center","nf":"0 \"يوم\""},{"c":"I19","v":"فحص العلامات الحيوية بالمستوصف الميداني + تهوية قسرية للغرف المغلقة قبل العمل","bg":"#F8FAFC"},{"c":"J19","v":"مغلق ومحقق بالكامل","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":20,"h":38.0,"cells":[{"c":"A20","v":"INC-2026-011","b":true,"al":"center"},{"c":"B20","v":"2026-10-12 10:15","al":"center"},{"c":"C20","v":"حادث وشيك (Near Miss)","b":true,"al":"center"},{"c":"D20","v":"عبدالوهاب بن ناصر"},{"c":"E20","v":"مسؤول سلامة ميداني"},{"c":"F20","v":"منطقة الحفريات العميقة - الخزان"},{"c":"G20","v":"انهيار طفيف في ناتج حفر موضوع على مسافة أقل من 60 سم من حافة الحفر"},{"c":"H20","v":0,"in":true,"al":"center","nf":"0 \"يوم\""},{"c":"I20","v":"إبعاد نواتج الحفر لمسافة تتجاوز 1 متر وتثبيت ستائر حماية خشبية للتربة"},{"c":"J20","v":"مغلق ومحقق بالكامل","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":21,"h":38.0,"cells":[{"c":"A21","v":"INC-2026-012","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B21","v":"2026-11-25 16:00","bg":"#F8FAFC","al":"center"},{"c":"C21","v":"إسعاف أولي (FAC)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D21","v":"نور الحق عبدالجليل","bg":"#F8FAFC"},{"c":"E21","v":"عامل نظافة وتشوين","bg":"#F8FAFC"},{"c":"F21","v":"الممر الرئيسي - الدور الأرضي","bg":"#F8FAFC"},{"c":"G21","v":"تعثر في كابل كهرباء ممتد على الأرضية وسقوط سطحي بدون كدمات قوية","bg":"#F8FAFC"},{"c":"H21","v":0,"in":true,"bg":"#F8FAFC","al":"center","nf":"0 \"يوم\""},{"c":"I21","v":"تعليق كافة الكابلات المؤقتة على حوامل رأسية بارتفاع 2 متر فوق الممرات","bg":"#F8FAFC"},{"c":"J21","v":"مغلق ومحقق بالكامل","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":22,"h":44.0,"cells":[{"c":"A22","v":"إجمالي الأيام الضائعة المسجلة بحوادث العمل (Total Lost Work Days):","bg":"#E2E8F0","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H22","v":14,"f":"=SUM(H10:H21)","bg":"#E2E8F0","fg":"#991B1B","b":true,"al":"center","nf":"0 \"يوم\""},{"c":"I22","v":"كافة الإجراءات التصحيحية تم إغلاقها بنجاح","bg":"#E2E8F0","fg":"#166534","b":true,"al":"center","cs":2},{"skip":true}]}]},{"name":"معادلات ومؤشرات OSHA","maxRow":10,"maxCol":7,"colWidths":[8.0,16.0,48.0,58.0,26.0,32.0,28.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"دليل ومعادلات احتساب مؤشرات السلامة والصحة المهنية القياسية (OSHA & ISO 45001)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"الصيغ الرياضية المعيارية والمعايير المرجعية لمعدلات التكرار والشدة المطبقة عالمياً في مشاريع التشييد","bg":"#1E3A8A","fg":"#FFFFFF","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":42.0,"cells":[{"c":"A4","v":"م","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"كود المؤشر","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"اسم مؤشر السلامة المهنية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"المعادلة الرياضية القياسية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"أساس القياس المرجعي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"الحد المستهدف بالمشروع","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"المرجع القياسي الدولي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":1,"bg":"#F8FAFC","al":"center"},{"c":"B5","v":"LTIFR","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C5","v":"معدل تكرار إصابات الوقت الضائع (Lost Time Injury Frequency Rate)","bg":"#F8FAFC","b":true},{"c":"D5","v":"(عدد إصابات LTI × 1,000,000) ÷ إجمالي ساعات العمل","bg":"#F8FAFC","b":true,"al":"center"},{"c":"E5","v":"1,000,000 ساعة عمل","bg":"#F8FAFC","al":"center"},{"c":"F5","v":"أقل من 1.00","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"G5","v":"OSHA 1904 / ISO 45001","bg":"#F8FAFC","al":"center"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":2,"al":"center"},{"c":"B6","v":"LTISR","b":true,"al":"center"},{"c":"C6","v":"معدل شدة إصابات الوقت الضائع (Lost Time Injury Severity Rate)","b":true},{"c":"D6","v":"(عدد الأيام الضائعة LWD × 1,000,000) ÷ إجمالي ساعات العمل","b":true,"al":"center"},{"c":"E6","v":"1,000,000 ساعة عمل","al":"center"},{"c":"F6","v":"أقل من 20.0 يوم","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"G6","v":"ANSI Z16.1 / OSHA","al":"center"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":3,"bg":"#F8FAFC","al":"center"},{"c":"B7","v":"TRIR","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C7","v":"معدل الحوادث الإجمالي القابل للتسجيل (Total Recordable Incident Rate)","bg":"#F8FAFC","b":true},{"c":"D7","v":"((الوفيات + LTI + MTC) × 200,000) ÷ إجمالي ساعات العمل","bg":"#F8FAFC","b":true,"al":"center"},{"c":"E7","v":"200,000 ساعة عمل (100 عامل/سنة)","bg":"#F8FAFC","al":"center"},{"c":"F7","v":"أقل من 2.50","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"G7","v":"OSHA 1904.7","bg":"#F8FAFC","al":"center"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":4,"al":"center"},{"c":"B8","v":"DART","b":true,"al":"center"},{"c":"C8","v":"معدل الأيام الضائعة والعمل المقيد (Days Away, Restricted or Transferred)","b":true},{"c":"D8","v":"((أيام الغياب + أيام العمل المقيد) × 200,000) ÷ إجمالي الساعات","b":true,"al":"center"},{"c":"E8","v":"200,000 ساعة عمل","al":"center"},{"c":"F8","v":"أقل من 1.50","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"G8","v":"US BLS / OSHA","al":"center"}]},{"r":9,"h":40.0,"cells":[{"c":"A9","v":5,"bg":"#F8FAFC","al":"center"},{"c":"B9","v":"NMFR","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C9","v":"معدل الإبلاغ عن الحوادث الوشيكة (Near Miss Frequency Rate)","bg":"#F8FAFC","b":true},{"c":"D9","v":"(عدد الحوادث الوشيكة المسجلة × 1,000,000) ÷ إجمالي ساعات العمل","bg":"#F8FAFC","b":true,"al":"center"},{"c":"E9","v":"1,000,000 ساعة عمل","bg":"#F8FAFC","al":"center"},{"c":"F9","v":"أكثر من 50.0 (تشجيع الإبلاغ)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G9","v":"DuPont Safety Model","bg":"#F8FAFC","al":"center"}]},{"r":10,"h":40.0,"cells":[{"c":"A10","v":6,"al":"center"},{"c":"B10","v":"SR-Safe","b":true,"al":"center"},{"c":"C10","v":"ساعات العمل الآمنة المتراكمة (Cumulative Safe Man-Hours)","b":true},{"c":"D10","v":"مجموع ساعات العمل الشهرية منذ وقوع آخر إصابة وقت ضائع (LTI)","b":true,"al":"center"},{"c":"E10","v":"ساعات عمل تراكمية مستمرة","al":"center"},{"c":"F10","v":"تجاوز 1,000,000 ساعة بدون LTI","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"G10","v":"Saudi Aramco CSM / SBC 801","al":"center"}]}]}]}