{"slug":"contracting-chart-of-accounts","sheets":[{"name":"إعدادات شجرة الحسابات","maxRow":24,"maxCol":4,"colWidths":[4.0,38.0,40.0,55.0],"rows":[{"r":1,"h":42.0,"cells":[{"c":"A1","v":"🏢 دليل الحسابات والسياسات المالية لشركات المقاولات والتشييد — الإعدادات المركزية","bg":"#065F46","fg":"#FFFFFF","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":52.0,"cells":[{"c":"A2","v":"⚠️ تنبيه استرشادي: شجرة الحسابات والترميز المحاسبي المرفق مصمم خصيصاً لشركات المقاولات والتشييد وفق معايير المحاسبة الدولية (IFRS 15) والكود المحاسبي الموحد. يرجى تعديل العملة وأسماء المشاريع ومراكز التكلفة أدناه بما يطابق نظام شركتكم.","bg":"#FEF3C7","fg":"#92400E","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":""},{"c":"B4","v":"بيانات الشركة والهيكل المالي الأساسي","bg":"#047857","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":""},{"c":"B5","v":"المعيار / البيان","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center"},{"c":"C5","v":"القيمة / الخيار المعتمد","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center"},{"c":"D5","v":"التوضيح والتوجيه المحاسبي","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":""},{"c":"B6","v":"اسم شركة المقاولات","fg":"#1F2937","b":true},{"c":"C6","v":"شركة البنيان للمقاولات العامة والإنشاءات ذ.م.م","fg":"#1F2937","al":"center"},{"c":"D6","v":"يظهر في ترويسة التقارير والقوائم المالية","fg":"#4B5563"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":"النشاط التخصصي","bg":"#F8FAFC","fg":"#1F2937","b":true},{"c":"C7","v":"مقاولات عامة، أعمال خرسانية وتشطيبات، وأعمال كهروميكانيك MEP","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"D7","v":"تصنيف نشاط الشركة","bg":"#F8FAFC","fg":"#4B5563"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":""},{"c":"B8","v":"الرقم الضريبي (VAT / Tax ID)","fg":"#1F2937","b":true},{"c":"C8","v":"300123456700003","fg":"#1F2937","al":"center"},{"c":"D8","v":"رقم التسجيل في هيئة الزكاة والضريبة والجمارك","fg":"#4B5563"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":""},{"c":"B9","v":"رقم السجل التجاري (CR)","bg":"#F8FAFC","fg":"#1F2937","b":true},{"c":"C9","v":"1010987654","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"D9","v":"رقم السجل بوزارة التجارة والاستثمار","bg":"#F8FAFC","fg":"#4B5563"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":""},{"c":"B10","v":"السنة المالية للشركة","fg":"#1F2937","b":true},{"c":"C10","v":"2026","fg":"#1F2937","al":"center"},{"c":"D10","v":"فترة إعداد القوائم المالية","fg":"#4B5563"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":""},{"c":"B11","v":"عملة الحسابات الأساسية","bg":"#F8FAFC","fg":"#1F2937","b":true},{"c":"C11","v":"ر.س SAR","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"D11","v":"العملة الرئيسية للقوائم المالية (SAR, EGP, AED, KWD, USD)","bg":"#F8FAFC","fg":"#4B5563"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":""},{"c":"B12","v":"نسبة ضريبة القيمة المضافة الافتراضية","fg":"#1F2937","b":true},{"c":"C12","v":0.15,"in":true,"fg":"#1F2937","b":true,"al":"center","nf":"0.0%"},{"c":"D12","v":"نسبة ضريبة القيمة المضافة المطبقة على عقود المقاولات","fg":"#4B5563"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":""},{"c":"B13","v":"نسبة استقطاع ضمان حسن التنفيذ","bg":"#F8FAFC","fg":"#1F2937","b":true},{"c":"C13","v":0.1,"in":true,"bg":"#F8FAFC","fg":"#1F2937","b":true,"al":"center","nf":"0.0%"},{"c":"D13","v":"نسبة حجز الضمان من مستخلصات مقاولي الباطن (Retention)","bg":"#F8FAFC","fg":"#4B5563"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":""},{"c":"B14","v":"نسبة استرداد الدفعة المقدمة","fg":"#1F2937","b":true},{"c":"C14","v":0.1,"in":true,"fg":"#1F2937","b":true,"al":"center","nf":"0.0%"},{"c":"D14","v":"نسبة خصم الدفعة المقدمة من المستخلصات الجارية للمقاول","fg":"#4B5563"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":""},{"c":"B15","v":"نسبة ضريبة الخصم والإضافة لمقاولي الباطن","bg":"#F8FAFC","fg":"#1F2937","b":true},{"c":"C15","v":0.01,"in":true,"bg":"#F8FAFC","fg":"#1F2937","b":true,"al":"center","nf":"0.0%"},{"c":"D15","v":"ضريبة الخصم تحت حساب الضريبة (WHT)","bg":"#F8FAFC","fg":"#4B5563"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":""},{"c":"B16","v":"نظام الاعتراف بإيراد العقود","fg":"#1F2937","b":true},{"c":"C16","v":"وفق نسبة الإنجاز الفعلي (IFRS 15 - Percentage of Completion)","fg":"#1F2937","al":"center"},{"c":"D16","v":"المعيار المحاسبي المعتمد لعقود التشييد","fg":"#4B5563"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":""},{"c":"B17","v":"نظام تسعير المواد المنصرفة للمواقع","bg":"#F8FAFC","fg":"#1F2937","b":true},{"c":"C17","v":"الوارد أولاً يصرف أولاً (FIFO) أو المتوسط المرجح","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"D17","v":"سياسة تقييم مخزون خامات الموقع","bg":"#F8FAFC","fg":"#4B5563"}]},{"r":18,"h":28.0,"cells":[{"c":"A18","v":""},{"c":"B18","v":""},{"c":"C18","v":""},{"c":"D18","v":""}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":""},{"c":"B19","v":"📌 القواعد الذهبية لمحاسبة شركات المقاولات في هذا النظام","bg":"#065F46","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":""},{"c":"B20","v":"1. الفصل التام بين تكاليف المشاريع المباشرة (حسابات 5) والمصاريف العمومية والإدارية للشركة (حسابات 6).","bg":"#ECFDF5","fg":"#1F2937","cs":3},{"skip":true},{"skip":true}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":""},{"c":"B21","v":"2. ربط كل مصروف موقعي بكود مركز تكلفة المشروع (Cost Center) لضمان حصر تكلفة كل مشروع بدقة وحساب ربحيته.","fg":"#1F2937","cs":3},{"skip":true},{"skip":true}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":""},{"c":"B22","v":"3. إثبات الدفعة المقدمة المستلمة من العميل كالتزام متداول (213) ولا تسجل كإيراد إلا بمقدار ما ينجز فعلياً في المستخلصات.","bg":"#ECFDF5","fg":"#1F2937","cs":3},{"skip":true},{"skip":true}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":""},{"c":"B23","v":"4. إثبات تأمينات ضمان الأعمال المحتجزة لدى العملاء (1223) كأصل متداول، وتأمينات مقاولي الباطن (2122) كالتزام متداول.","fg":"#1F2937","cs":3},{"skip":true},{"skip":true}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":""},{"c":"B24","v":"5. الاعتراف بإيراد العقود دورياً وفق نسبة الإنجاز الفعلي (IFRS 15): إيراد الفترة = (التكاليف الفعلية ÷ إجمالي التكاليف المقدرة) × قيمة العقد.","bg":"#ECFDF5","fg":"#1F2937","cs":3},{"skip":true},{"skip":true}]}]},{"name":"دليل شجرة الحسابات العامة","maxRow":113,"maxCol":8,"colWidths":[14.0,38.0,36.0,10.0,14.0,24.0,14.0,48.0],"rows":[{"r":1,"h":40.0,"cells":[{"c":"A1","v":"📑 دليل شجرة الحسابات العامة لشركات المقاولات والتشييد — الكود المحاسبي الموحد","bg":"#065F46","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":28.0,"cells":[{"c":"A2","v":""},{"c":"B2","v":""},{"c":"C2","v":""},{"c":"D2","v":""},{"c":"E2","v":""},{"c":"F2","v":""},{"c":"G2","v":""},{"c":"H2","v":""}]},{"r":3,"h":34.0,"cells":[{"c":"A3","v":"كود الحساب","bg":"#047857","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B3","v":"اسم الحساب بالعربية","bg":"#047857","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C3","v":"اسم الحساب بالإنجليزية (EN)","bg":"#047857","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D3","v":"المستوى","bg":"#047857","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E3","v":"طبيعة الحساب","bg":"#047857","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F3","v":"القائمة المالية","bg":"#047857","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G3","v":"يقبل حركة؟","bg":"#047857","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H3","v":"التوجيه المحاسبي والتفصيل","bg":"#047857","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"1","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"B4","v":"الأصول","bg":"#D1FAE5","fg":"#065F46","b":true},{"c":"C4","v":"Assets","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"left"},{"c":"D4","v":1,"in":true,"bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"E4","v":"مدين","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"F4","v":"قائمة المركز المالي","bg":"#D1FAE5","fg":"#065F46","b":true},{"c":"G4","v":"لا - رئيسي","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"H4","v":"كافة ممتلكات وموجودات ومستحقات الشركة","bg":"#D1FAE5","fg":"#065F46","b":true}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"11","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"B5","v":"الأصول غير المتداولة (الثابتة)","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"C5","v":"Non-Current Assets","bg":"#ECFDF5","fg":"#047857","b":true,"al":"left"},{"c":"D5","v":2,"in":true,"bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"E5","v":"مدين","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"F5","v":"قائمة المركز المالي","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"G5","v":"لا - تجميعي","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"H5","v":"الممتلكات الإنتاجية والمعدات طويلة الأجل","bg":"#ECFDF5","fg":"#047857","b":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"111","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B6","v":"الأصول الثابتة","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C6","v":"Property, Plant & Equipment","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D6","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E6","v":"مدين","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F6","v":"قائمة المركز المالي","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G6","v":"لا - تجميعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H6","v":"المعدات والسيارات والآلات بالتكلفة التاريخية","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"1111","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B7","v":"آلات ومعدات ثقيلة للمشاريع","bg":"#F8FAFC","fg":"#1F2937"},{"c":"C7","v":"Heavy Construction Equipment","bg":"#F8FAFC","fg":"#1F2937","al":"left"},{"c":"D7","v":4,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"E7","v":"مدين","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"F7","v":"قائمة المركز المالي","bg":"#F8FAFC","fg":"#1F2937"},{"c":"G7","v":"نعم - فرعي","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"H7","v":"حفارات، لوادر، أوناش برجية، دكاكات","bg":"#F8FAFC","fg":"#1F2937"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"1112","fg":"#1F2937","al":"center"},{"c":"B8","v":"سقالات وقوالب وشدات معدنية","fg":"#1F2937"},{"c":"C8","v":"Scaffolding & Metal Formwork","fg":"#1F2937","al":"left"},{"c":"D8","v":4,"in":true,"fg":"#1F2937","al":"center"},{"c":"E8","v":"مدين","fg":"#1F2937","al":"center"},{"c":"F8","v":"قائمة المركز المالي","fg":"#1F2937"},{"c":"G8","v":"نعم - فرعي","fg":"#1F2937","al":"center"},{"c":"H8","v":"الشدات المعدنية والكمرات والقوالب الإنشائية","fg":"#1F2937"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"1113","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B9","v":"سيارات ومركبات نقل موقعية","bg":"#F8FAFC","fg":"#1F2937"},{"c":"C9","v":"Vehicles & Transport","bg":"#F8FAFC","fg":"#1F2937","al":"left"},{"c":"D9","v":4,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"E9","v":"مدين","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"F9","v":"قائمة المركز المالي","bg":"#F8FAFC","fg":"#1F2937"},{"c":"G9","v":"نعم - فرعي","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"H9","v":"سيارات نقل الخامات ومركبات المهندسين","bg":"#F8FAFC","fg":"#1F2937"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":"1114","fg":"#1F2937","al":"center"},{"c":"B10","v":"أجهزة مساحة ومعدات هندسية","fg":"#1F2937"},{"c":"C10","v":"Surveying & Engineering Instruments","fg":"#1F2937","al":"left"},{"c":"D10","v":4,"in":true,"fg":"#1F2937","al":"center"},{"c":"E10","v":"مدين","fg":"#1F2937","al":"center"},{"c":"F10","v":"قائمة المركز المالي","fg":"#1F2937"},{"c":"G10","v":"نعم - فرعي","fg":"#1F2937","al":"center"},{"c":"H10","v":"Total Station, أجهزة ميزان قامة، ليزر","fg":"#1F2937"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":"1115","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B11","v":"أثاث وأجهزة مكتبية للمقر الرئيسي","bg":"#F8FAFC","fg":"#1F2937"},{"c":"C11","v":"Office Furniture & IT Equipment","bg":"#F8FAFC","fg":"#1F2937","al":"left"},{"c":"D11","v":4,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"E11","v":"مدين","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"F11","v":"قائمة المركز المالي","bg":"#F8FAFC","fg":"#1F2937"},{"c":"G11","v":"نعم - فرعي","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"H11","v":"أجهزة حاسوب وسيرفرات وأثاث إداري","bg":"#F8FAFC","fg":"#1F2937"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":"1119","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B12","v":"مجمع إهلاك الأصول الثابتة","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C12","v":"Accumulated Depreciation","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D12","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E12","v":"دائن","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F12","v":"قائمة المركز المالي","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G12","v":"نعم - فرعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H12","v":"حساب مقابل لتخفيض القيمة الدفترية للأصول","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":"112","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B13","v":"خطابات ضمان بنكية غير مسيلة (تأمينات)","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C13","v":"Long-Term Guarantee Deposits","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D13","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E13","v":"مدين","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F13","v":"قائمة المركز المالي","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G13","v":"نعم - فرعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H13","v":"تأمينات نهائية محتجزة لدى جهات الإسناد الحكومية","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":"12","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"B14","v":"الأصول المتداولة","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"C14","v":"Current Assets","bg":"#ECFDF5","fg":"#047857","b":true,"al":"left"},{"c":"D14","v":2,"in":true,"bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"E14","v":"مدين","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"F14","v":"قائمة المركز المالي","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"G14","v":"لا - تجميعي","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"H14","v":"النقدية والعملاء والمخزون ومصاريف المشاريع","bg":"#ECFDF5","fg":"#047857","b":true}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":"121","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B15","v":"النقدية وما في حكمها","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C15","v":"Cash & Cash Equivalents","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D15","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E15","v":"مدين","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F15","v":"قائمة المركز المالي","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G15","v":"لا - تجميعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H15","v":"الصناديق والبنوك والودائع السائلة","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":"1211","fg":"#1F2937","al":"center"},{"c":"B16","v":"الخزينة الرئيسية (صندوق الشركة)","fg":"#1F2937"},{"c":"C16","v":"Main Cash On Hand","fg":"#1F2937","al":"left"},{"c":"D16","v":4,"in":true,"fg":"#1F2937","al":"center"},{"c":"E16","v":"مدين","fg":"#1F2937","al":"center"},{"c":"F16","v":"قائمة المركز المالي","fg":"#1F2937"},{"c":"G16","v":"نعم - فرعي","fg":"#1F2937","al":"center"},{"c":"H16","v":"النقدية السائلة بمقر الشركة الرئيسي","fg":"#1F2937"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":"1212","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B17","v":"عهد نقدية لمشرفي ومديري المواقع","bg":"#F8FAFC","fg":"#1F2937"},{"c":"C17","v":"Site Petty Cash & Custodies","bg":"#F8FAFC","fg":"#1F2937","al":"left"},{"c":"D17","v":4,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"E17","v":"مدين","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"F17","v":"قائمة المركز المالي","bg":"#F8FAFC","fg":"#1F2937"},{"c":"G17","v":"نعم - فرعي","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"H17","v":"عهد مؤقتة ومستديمة للمصاريف النثرية بالمواقع","bg":"#F8FAFC","fg":"#1F2937"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":"1213","fg":"#1F2937","al":"center"},{"c":"B18","v":"البنك الجاري - العملة المحلية","fg":"#1F2937"},{"c":"C18","v":"Bank Current Account - Local","fg":"#1F2937","al":"left"},{"c":"D18","v":4,"in":true,"fg":"#1F2937","al":"center"},{"c":"E18","v":"مدين","fg":"#1F2937","al":"center"},{"c":"F18","v":"قائمة المركز المالي","fg":"#1F2937"},{"c":"G18","v":"نعم - فرعي","fg":"#1F2937","al":"center"},{"c":"H18","v":"الحسابات المصرفية الجارية بالعملة المحلية","fg":"#1F2937"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":"1214","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B19","v":"البنك الجاري - العملات الأجنبية","bg":"#F8FAFC","fg":"#1F2937"},{"c":"C19","v":"Bank Current Account - FX","bg":"#F8FAFC","fg":"#1F2937","al":"left"},{"c":"D19","v":4,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"E19","v":"مدين","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"F19","v":"قائمة المركز المالي","bg":"#F8FAFC","fg":"#1F2937"},{"c":"G19","v":"نعم - فرعي","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"H19","v":"حسابات بنكية بالدولار/اليورو للاستيراد","bg":"#F8FAFC","fg":"#1F2937"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":"1215","fg":"#1F2937","al":"center"},{"c":"B20","v":"ودائع بنكية مجمدة لخطابات الضمان","fg":"#1F2937"},{"c":"C20","v":"Restricted Cash / Margin Deposits","fg":"#1F2937","al":"left"},{"c":"D20","v":4,"in":true,"fg":"#1F2937","al":"center"},{"c":"E20","v":"مدين","fg":"#1F2937","al":"center"},{"c":"F20","v":"قائمة المركز المالي","fg":"#1F2937"},{"c":"G20","v":"نعم - فرعي","fg":"#1F2937","al":"center"},{"c":"H20","v":"الغطاء النقدي المجمد (Cash Margin) لدى البنوك","fg":"#1F2937"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":"122","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B21","v":"العملاء ومستخلصات عقود تحت التحصيل","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C21","v":"Accounts Receivable & Contract Assets","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D21","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E21","v":"مدين","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F21","v":"قائمة المركز المالي","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G21","v":"لا - تجميعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H21","v":"مستحقات الشركة لدى مالكي المشاريع","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":"1221","fg":"#1F2937","al":"center"},{"c":"B22","v":"مستخلصات معتمدة تحت التحصيل (العملاء)","fg":"#1F2937"},{"c":"C22","v":"Approved Progress Billings (Clients)","fg":"#1F2937","al":"left"},{"c":"D22","v":4,"in":true,"fg":"#1F2937","al":"center"},{"c":"E22","v":"مدين","fg":"#1F2937","al":"center"},{"c":"F22","v":"قائمة المركز المالي","fg":"#1F2937"},{"c":"G22","v":"نعم - فرعي","fg":"#1F2937","al":"center"},{"c":"H22","v":"مستخلصات جارية معتمدة من الاستشاري بانتظار الصرف","fg":"#1F2937"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":"1222","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B23","v":"إيرادات عقود غير مفوترة (أصول عقود)","bg":"#F8FAFC","fg":"#1F2937"},{"c":"C23","v":"Unbilled Contract Revenue (WIP)","bg":"#F8FAFC","fg":"#1F2937","al":"left"},{"c":"D23","v":4,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"E23","v":"مدين","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"F23","v":"قائمة المركز المالي","bg":"#F8FAFC","fg":"#1F2937"},{"c":"G23","v":"نعم - فرعي","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"H23","v":"أعمال منفذة معترف بإيرادها ولم يصدر بها مستخلص بعد","bg":"#F8FAFC","fg":"#1F2937"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":"1223","fg":"#1F2937","al":"center"},{"c":"B24","v":"محتجزات ضمان أعمال لدى العملاء","fg":"#1F2937"},{"c":"C24","v":"Retentions Receivable (Clients)","fg":"#1F2937","al":"left"},{"c":"D24","v":4,"in":true,"fg":"#1F2937","al":"center"},{"c":"E24","v":"مدين","fg":"#1F2937","al":"center"},{"c":"F24","v":"قائمة المركز المالي","fg":"#1F2937"},{"c":"G24","v":"نعم - فرعي","fg":"#1F2937","al":"center"},{"c":"H24","v":"نسبة 5% أو 10% محتجزة لحين التسليم النهائي","fg":"#1F2937"}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":"1224","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B25","v":"شيكات تحت التحصيل","bg":"#F8FAFC","fg":"#1F2937"},{"c":"C25","v":"Checks Under Collection","bg":"#F8FAFC","fg":"#1F2937","al":"left"},{"c":"D25","v":4,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"E25","v":"مدين","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"F25","v":"قائمة المركز المالي","bg":"#F8FAFC","fg":"#1F2937"},{"c":"G25","v":"نعم - فرعي","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"H25","v":"شيكات مستلمة من العملاء ومودعة للتحصيل","bg":"#F8FAFC","fg":"#1F2937"}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":"1229","fg":"#1F2937","al":"center"},{"c":"B26","v":"مخصص خسائر ائتمانية متوقعة (ديون مشكوك فيها)","fg":"#1F2937"},{"c":"C26","v":"Expected Credit Loss Allowance","fg":"#1F2937","al":"left"},{"c":"D26","v":4,"in":true,"fg":"#1F2937","al":"center"},{"c":"E26","v":"دائن","fg":"#1F2937","al":"center"},{"c":"F26","v":"قائمة المركز المالي","fg":"#1F2937"},{"c":"G26","v":"نعم - فرعي","fg":"#1F2937","al":"center"},{"c":"H26","v":"مخصص وفق معيار IFRS 9 للديون المتعثرة","fg":"#1F2937"}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":"123","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B27","v":"دفعات وسلف مقدمة","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C27","v":"Prepayments & Advances","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D27","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E27","v":"مدين","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F27","v":"قائمة المركز المالي","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G27","v":"لا - تجميعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H27","v":"أموال مدفوعة مقدماً تسترد لاحقاً","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":28,"h":34.0,"cells":[{"c":"A28","v":"1231","fg":"#1F2937","al":"center"},{"c":"B28","v":"دفعات مقدمة لمقاولي الباطن","fg":"#1F2937"},{"c":"C28","v":"Advances to Subcontractors","fg":"#1F2937","al":"left"},{"c":"D28","v":4,"in":true,"fg":"#1F2937","al":"center"},{"c":"E28","v":"مدين","fg":"#1F2937","al":"center"},{"c":"F28","v":"قائمة المركز المالي","fg":"#1F2937"},{"c":"G28","v":"نعم - فرعي","fg":"#1F2937","al":"center"},{"c":"H28","v":"سلف تسترد بنسبة مئوية من مستخلصاتهم الجارية","fg":"#1F2937"}]},{"r":29,"h":34.0,"cells":[{"c":"A29","v":"1232","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B29","v":"دفعات مقدمة لموردي مواد التشييد","bg":"#F8FAFC","fg":"#1F2937"},{"c":"C29","v":"Advances to Material Suppliers","bg":"#F8FAFC","fg":"#1F2937","al":"left"},{"c":"D29","v":4,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"E29","v":"مدين","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"F29","v":"قائمة المركز المالي","bg":"#F8FAFC","fg":"#1F2937"},{"c":"G29","v":"نعم - فرعي","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"H29","v":"دفعات حجز حديد وأسمنت وخامات للمشاريع","bg":"#F8FAFC","fg":"#1F2937"}]},{"r":30,"h":34.0,"cells":[{"c":"A30","v":"1233","fg":"#1F2937","al":"center"},{"c":"B30","v":"تأمينات ابتدائية لدخول مناقصات","fg":"#1F2937"},{"c":"C30","v":"Bid Bonds & Tender Guarantees","fg":"#1F2937","al":"left"},{"c":"D30","v":4,"in":true,"fg":"#1F2937","al":"center"},{"c":"E30","v":"مدين","fg":"#1F2937","al":"center"},{"c":"F30","v":"قائمة المركز المالي","fg":"#1F2937"},{"c":"G30","v":"نعم - فرعي","fg":"#1F2937","al":"center"},{"c":"H30","v":"تأمينات نقدية مستردة بعد البت في المناقصات","fg":"#1F2937"}]},{"r":31,"h":34.0,"cells":[{"c":"A31","v":"1234","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B31","v":"مصروفات إدارية مدفوعة مقدماً","bg":"#F8FAFC","fg":"#1F2937"},{"c":"C31","v":"Prepaid Administrative Expenses","bg":"#F8FAFC","fg":"#1F2937","al":"left"},{"c":"D31","v":4,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"E31","v":"مدين","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"F31","v":"قائمة المركز المالي","bg":"#F8FAFC","fg":"#1F2937"},{"c":"G31","v":"نعم - فرعي","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"H31","v":"إيجارات مدفوعة مقدماً، وثائق تأمين شامل للمشاريع","bg":"#F8FAFC","fg":"#1F2937"}]},{"r":32,"h":34.0,"cells":[{"c":"A32","v":"124","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B32","v":"مخزون خامات ومواد بالمواقع والمستودعات","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C32","v":"Construction Materials Inventory","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D32","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E32","v":"مدين","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F32","v":"قائمة المركز المالي","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G32","v":"لا - تجميعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H32","v":"الخامات الموردة بالمستودعات قبل الصرف للبنود","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":33,"h":34.0,"cells":[{"c":"A33","v":"1241","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B33","v":"مخزون حديد تسليح ومعدن","bg":"#F8FAFC","fg":"#1F2937"},{"c":"C33","v":"Rebar & Structural Steel Inventory","bg":"#F8FAFC","fg":"#1F2937","al":"left"},{"c":"D33","v":4,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"E33","v":"مدين","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"F33","v":"قائمة المركز المالي","bg":"#F8FAFC","fg":"#1F2937"},{"c":"G33","v":"نعم - فرعي","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"H33","v":"أسياخ حديد تسليح بالأطنان في تشوينات الموقع","bg":"#F8FAFC","fg":"#1F2937"}]},{"r":34,"h":34.0,"cells":[{"c":"A34","v":"1242","fg":"#1F2937","al":"center"},{"c":"B34","v":"مخزون أسمنت ورمل وسن وركام","fg":"#1F2937"},{"c":"C34","v":"Cement, Sand & Aggregates","fg":"#1F2937","al":"left"},{"c":"D34","v":4,"in":true,"fg":"#1F2937","al":"center"},{"c":"E34","v":"مدين","fg":"#1F2937","al":"center"},{"c":"F34","v":"قائمة المركز المالي","fg":"#1F2937"},{"c":"G34","v":"نعم - فرعي","fg":"#1F2937","al":"center"},{"c":"H34","v":"تشوينات الخلط الموقعي وأعمال البياض والمباني","fg":"#1F2937"}]},{"r":35,"h":34.0,"cells":[{"c":"A35","v":"1243","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B35","v":"مخزون مواد عزل وكيماويات بناء","bg":"#F8FAFC","fg":"#1F2937"},{"c":"C35","v":"Waterproofing & Chemical Additives","bg":"#F8FAFC","fg":"#1F2937","al":"left"},{"c":"D35","v":4,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"E35","v":"مدين","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"F35","v":"قائمة المركز المالي","bg":"#F8FAFC","fg":"#1F2937"},{"c":"G35","v":"نعم - فرعي","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"H35","v":"رولات بيتومين، فوم، إيبوكسي، إضافات خرسانة","bg":"#F8FAFC","fg":"#1F2937"}]},{"r":36,"h":34.0,"cells":[{"c":"A36","v":"1244","fg":"#1F2937","al":"center"},{"c":"B36","v":"مخزون تشطيبات معمارية (سيراميك، دهانات)","fg":"#1F2937"},{"c":"C36","v":"Architectural Finishes Inventory","fg":"#1F2937","al":"left"},{"c":"D36","v":4,"in":true,"fg":"#1F2937","al":"center"},{"c":"E36","v":"مدين","fg":"#1F2937","al":"center"},{"c":"F36","v":"قائمة المركز المالي","fg":"#1F2937"},{"c":"G36","v":"نعم - فرعي","fg":"#1F2937","al":"center"},{"c":"H36","v":"سيراميك، براميل دهانات، معجون، جبس","fg":"#1F2937"}]},{"r":37,"h":34.0,"cells":[{"c":"A37","v":"1245","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B37","v":"مخزون مستلزمات كهروميكانيكية (MEP)","bg":"#F8FAFC","fg":"#1F2937"},{"c":"C37","v":"MEP Supplies & Pipes Inventory","bg":"#F8FAFC","fg":"#1F2937","al":"left"},{"c":"D37","v":4,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"E37","v":"مدين","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"F37","v":"قائمة المركز المالي","bg":"#F8FAFC","fg":"#1F2937"},{"c":"G37","v":"نعم - فرعي","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"H37","v":"مواسير PVC/PPR، كابلات، لوحات قواطع","bg":"#F8FAFC","fg":"#1F2937"}]},{"r":38,"h":34.0,"cells":[{"c":"A38","v":"125","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B38","v":"مشاريع تحت التنفيذ - تكاليف العمليات","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C38","v":"Work In Progress (WIP) Job Costs","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D38","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E38","v":"مدين","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F38","v":"قائمة المركز المالي","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G38","v":"لا - تجميعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H38","v":"تكاليف المشاريع المنفذة خلال الدورة التشغيلية","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":39,"h":34.0,"cells":[{"c":"A39","v":"1251","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B39","v":"تكاليف مباشرة للمشاريع جارية","bg":"#F8FAFC","fg":"#1F2937"},{"c":"C39","v":"WIP Direct Construction Costs","bg":"#F8FAFC","fg":"#1F2937","al":"left"},{"c":"D39","v":4,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"E39","v":"مدين","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"F39","v":"قائمة المركز المالي","bg":"#F8FAFC","fg":"#1F2937"},{"c":"G39","v":"نعم - فرعي","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"H39","v":"إجمالي ما تم صرفه على بنود المشاريع الجارية","bg":"#F8FAFC","fg":"#1F2937"}]},{"r":40,"h":34.0,"cells":[{"c":"A40","v":"1252","fg":"#1F2937","al":"center"},{"c":"B40","v":"تكاليف غير مباشرة للمشاريع جارية","fg":"#1F2937"},{"c":"C40","v":"WIP Indirect Construction Costs","fg":"#1F2937","al":"left"},{"c":"D40","v":4,"in":true,"fg":"#1F2937","al":"center"},{"c":"E40","v":"مدين","fg":"#1F2937","al":"center"},{"c":"F40","v":"قائمة المركز المالي","fg":"#1F2937"},{"c":"G40","v":"نعم - فرعي","fg":"#1F2937","al":"center"},{"c":"H40","v":"تكاليف الموقع المشتركة الموزعة على المشاريع","fg":"#1F2937"}]},{"r":41,"h":34.0,"cells":[{"c":"A41","v":"2","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"B41","v":"الالتزامات","bg":"#D1FAE5","fg":"#065F46","b":true},{"c":"C41","v":"Liabilities","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"left"},{"c":"D41","v":1,"in":true,"bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"E41","v":"دائن","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"F41","v":"قائمة المركز المالي","bg":"#D1FAE5","fg":"#065F46","b":true},{"c":"G41","v":"لا - رئيسي","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"H41","v":"ديون والتزامات الشركة للغير ومقاولي الباطن والضرائب","bg":"#D1FAE5","fg":"#065F46","b":true}]},{"r":42,"h":34.0,"cells":[{"c":"A42","v":"21","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"B42","v":"الالتزامات المتداولة","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"C42","v":"Current Liabilities","bg":"#ECFDF5","fg":"#047857","b":true,"al":"left"},{"c":"D42","v":2,"in":true,"bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"E42","v":"دائن","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"F42","v":"قائمة المركز المالي","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"G42","v":"لا - تجميعي","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"H42","v":"مستحقات واجبة السداد خلال أقل من سنة","bg":"#ECFDF5","fg":"#047857","b":true}]},{"r":43,"h":34.0,"cells":[{"c":"A43","v":"211","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B43","v":"موردو مواد ومهمات (ذمم دائنة)","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C43","v":"Accounts Payable - Suppliers","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D43","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E43","v":"دائن","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F43","v":"قائمة المركز المالي","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G43","v":"لا - تجميعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H43","v":"مستحقات موردي المواد والخامات","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":44,"h":34.0,"cells":[{"c":"A44","v":"2111","fg":"#1F2937","al":"center"},{"c":"B44","v":"موردو حديد وخرسانة جاهزة","fg":"#1F2937"},{"c":"C44","v":"Suppliers - Rebar & Ready-Mix","fg":"#1F2937","al":"left"},{"c":"D44","v":4,"in":true,"fg":"#1F2937","al":"center"},{"c":"E44","v":"دائن","fg":"#1F2937","al":"center"},{"c":"F44","v":"قائمة المركز المالي","fg":"#1F2937"},{"c":"G44","v":"نعم - فرعي","fg":"#1F2937","al":"center"},{"c":"H44","v":"فواتير توريد الخرسانة الجاهزة ومصانع الحديد","fg":"#1F2937"}]},{"r":45,"h":34.0,"cells":[{"c":"A45","v":"2112","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B45","v":"موردو مواد تشطيبات ومعدات","bg":"#F8FAFC","fg":"#1F2937"},{"c":"C45","v":"Suppliers - Finishes & Tools","bg":"#F8FAFC","fg":"#1F2937","al":"left"},{"c":"D45","v":4,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"E45","v":"دائن","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"F45","v":"قائمة المركز المالي","bg":"#F8FAFC","fg":"#1F2937"},{"c":"G45","v":"نعم - فرعي","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"H45","v":"شركات السيراميك والدهانات ومحلات المواد","bg":"#F8FAFC","fg":"#1F2937"}]},{"r":46,"h":34.0,"cells":[{"c":"A46","v":"2113","fg":"#1F2937","al":"center"},{"c":"B46","v":"أوراق دفع تجارية للموردين (كمبيالات)","fg":"#1F2937"},{"c":"C46","v":"Notes Payable - Trade","fg":"#1F2937","al":"left"},{"c":"D46","v":4,"in":true,"fg":"#1F2937","al":"center"},{"c":"E46","v":"دائن","fg":"#1F2937","al":"center"},{"c":"F46","v":"قائمة المركز المالي","fg":"#1F2937"},{"c":"G46","v":"نعم - فرعي","fg":"#1F2937","al":"center"},{"c":"H46","v":"كمبيالات وسندات لأمر مستحقة لموردي المواد","fg":"#1F2937"}]},{"r":47,"h":34.0,"cells":[{"c":"A47","v":"212","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B47","v":"مقاولو الباطن (ذمم دائنة ومحتجزات)","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C47","v":"Subcontractors Payable & Retentions","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D47","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E47","v":"دائن","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F47","v":"قائمة المركز المالي","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G47","v":"لا - تجميعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H47","v":"مستحقات مقاولي الباطن التنفيذيين","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":48,"h":34.0,"cells":[{"c":"A48","v":"2121","fg":"#1F2937","al":"center"},{"c":"B48","v":"مستحقات مقاولي باطن - مستخلصات جارية","fg":"#1F2937"},{"c":"C48","v":"Subcontractors Progress Payables","fg":"#1F2937","al":"left"},{"c":"D48","v":4,"in":true,"fg":"#1F2937","al":"center"},{"c":"E48","v":"دائن","fg":"#1F2937","al":"center"},{"c":"F48","v":"قائمة المركز المالي","fg":"#1F2937"},{"c":"G48","v":"نعم - فرعي","fg":"#1F2937","al":"center"},{"c":"H48","v":"صافي مستخلصات مقاولي الباطن المعتمدة للصرف","fg":"#1F2937"}]},{"r":49,"h":34.0,"cells":[{"c":"A49","v":"2122","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B49","v":"تأمينات محتجزة لمقاولي الباطن (ضمان أعمال)","bg":"#F8FAFC","fg":"#1F2937"},{"c":"C49","v":"Retentions Payable - Subcontractors","bg":"#F8FAFC","fg":"#1F2937","al":"left"},{"c":"D49","v":4,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"E49","v":"دائن","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"F49","v":"قائمة المركز المالي","bg":"#F8FAFC","fg":"#1F2937"},{"c":"G49","v":"نعم - فرعي","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"H49","v":"حجز 10% من مستخلصاتهم لحين الاستلام والتسليم","bg":"#F8FAFC","fg":"#1F2937"}]},{"r":50,"h":34.0,"cells":[{"c":"A50","v":"213","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B50","v":"دفعات مقدمة من العملاء (التزامات عقود)","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C50","v":"Contract Liabilities (Client Advances)","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D50","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E50","v":"دائن","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F50","v":"قائمة المركز المالي","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G50","v":"لا - تجميعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H50","v":"أموال مستلمة مقدماً من الملاك عند توقيع العقود","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":51,"h":34.0,"cells":[{"c":"A51","v":"2131","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B51","v":"دفعات مقدمة مستلمة عن مشاريع جارية","bg":"#F8FAFC","fg":"#1F2937"},{"c":"C51","v":"Advance Payments Received from Clients","bg":"#F8FAFC","fg":"#1F2937","al":"left"},{"c":"D51","v":4,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"E51","v":"دائن","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"F51","v":"قائمة المركز المالي","bg":"#F8FAFC","fg":"#1F2937"},{"c":"G51","v":"نعم - فرعي","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"H51","v":"تسترد بخصم 10% من مستخلصات العميل المعتمدة","bg":"#F8FAFC","fg":"#1F2937"}]},{"r":52,"h":34.0,"cells":[{"c":"A52","v":"214","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B52","v":"مصلحة الضرائب والجهات السيادية","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C52","v":"Taxes & Regulatory Payables","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D52","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E52","v":"دائن","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F52","v":"قائمة المركز المالي","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G52","v":"لا - تجميعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H52","v":"الالتزامات الضريبية والتأمينات الاجتماعية","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":53,"h":34.0,"cells":[{"c":"A53","v":"2141","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B53","v":"ضريبة القيمة المضافة المحصلة (مخرجات)","bg":"#F8FAFC","fg":"#1F2937"},{"c":"C53","v":"Output VAT Payable","bg":"#F8FAFC","fg":"#1F2937","al":"left"},{"c":"D53","v":4,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"E53","v":"دائن","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"F53","v":"قائمة المركز المالي","bg":"#F8FAFC","fg":"#1F2937"},{"c":"G53","v":"نعم - فرعي","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"H53","v":"الضريبة المضافة على مستخلصات العملاء الصادرة","bg":"#F8FAFC","fg":"#1F2937"}]},{"r":54,"h":34.0,"cells":[{"c":"A54","v":"2142","fg":"#1F2937","al":"center"},{"c":"B54","v":"ضريبة القيمة المضافة المسددة (مدخلات)","fg":"#1F2937"},{"c":"C54","v":"Input VAT (Recoverable)","fg":"#1F2937","al":"left"},{"c":"D54","v":4,"in":true,"fg":"#1F2937","al":"center"},{"c":"E54","v":"مدين","fg":"#1F2937","al":"center"},{"c":"F54","v":"قائمة المركز المالي","fg":"#1F2937"},{"c":"G54","v":"نعم - فرعي","fg":"#1F2937","al":"center"},{"c":"H54","v":"الضريبة المضافة على فواتير المشتريات (تخصم)","fg":"#1F2937"}]},{"r":55,"h":34.0,"cells":[{"c":"A55","v":"2143","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B55","v":"ضريبة الخصم والإضافة المحتجزة (WHT)","bg":"#F8FAFC","fg":"#1F2937"},{"c":"C55","v":"Withholding Tax Payable (1%)","bg":"#F8FAFC","fg":"#1F2937","al":"left"},{"c":"D55","v":4,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"E55","v":"دائن","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"F55","v":"قائمة المركز المالي","bg":"#F8FAFC","fg":"#1F2937"},{"c":"G55","v":"نعم - فرعي","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"H55","v":"المستقطعة من مقاولي الباطن لتوريدها للضرائب","bg":"#F8FAFC","fg":"#1F2937"}]},{"r":56,"h":34.0,"cells":[{"c":"A56","v":"2144","fg":"#1F2937","al":"center"},{"c":"B56","v":"ضريبة كسب العمل والأجور المستقطعة","fg":"#1F2937"},{"c":"C56","v":"Payroll Taxes Payable","fg":"#1F2937","al":"left"},{"c":"D56","v":4,"in":true,"fg":"#1F2937","al":"center"},{"c":"E56","v":"دائن","fg":"#1F2937","al":"center"},{"c":"F56","v":"قائمة المركز المالي","fg":"#1F2937"},{"c":"G56","v":"نعم - فرعي","fg":"#1F2937","al":"center"},{"c":"H56","v":"الضرائب المستقطعة من رواتب الموظفين","fg":"#1F2937"}]},{"r":57,"h":34.0,"cells":[{"c":"A57","v":"2145","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B57","v":"مستحقات التأمينات الاجتماعية (GOSI)","bg":"#F8FAFC","fg":"#1F2937"},{"c":"C57","v":"Social Insurance Payable","bg":"#F8FAFC","fg":"#1F2937","al":"left"},{"c":"D57","v":4,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"E57","v":"دائن","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"F57","v":"قائمة المركز المالي","bg":"#F8FAFC","fg":"#1F2937"},{"c":"G57","v":"نعم - فرعي","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"H57","v":"حصة الشركة والموظف في التأمينات الاجتماعية","bg":"#F8FAFC","fg":"#1F2937"}]},{"r":58,"h":34.0,"cells":[{"c":"A58","v":"215","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B58","v":"مصروفات ومستحقات أخرى مستحقة","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C58","v":"Accrued Expenses & Other Payables","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D58","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E58","v":"دائن","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F58","v":"قائمة المركز المالي","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G58","v":"لا - تجميعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H58","v":"الرواتب والعمولات غير المسددة نهاية الفترة","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":59,"h":34.0,"cells":[{"c":"A59","v":"2151","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B59","v":"رواتب وأجور موقعية وإدارية مستحقة","bg":"#F8FAFC","fg":"#1F2937"},{"c":"C59","v":"Accrued Salaries & Wages","bg":"#F8FAFC","fg":"#1F2937","al":"left"},{"c":"D59","v":4,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"E59","v":"دائن","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"F59","v":"قائمة المركز المالي","bg":"#F8FAFC","fg":"#1F2937"},{"c":"G59","v":"نعم - فرعي","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"H59","v":"رواتب مستحقة لم تسدد حتى تاريخ الإقفال","bg":"#F8FAFC","fg":"#1F2937"}]},{"r":60,"h":34.0,"cells":[{"c":"A60","v":"2152","fg":"#1F2937","al":"center"},{"c":"B60","v":"إيجارات ومصاريف بنكية مستحقة","fg":"#1F2937"},{"c":"C60","v":"Accrued Rent & Banking Fees","fg":"#1F2937","al":"left"},{"c":"D60","v":4,"in":true,"fg":"#1F2937","al":"center"},{"c":"E60","v":"دائن","fg":"#1F2937","al":"center"},{"c":"F60","v":"قائمة المركز المالي","fg":"#1F2937"},{"c":"G60","v":"نعم - فرعي","fg":"#1F2937","al":"center"},{"c":"H60","v":"مصاريف خطابات الضمان والفوائد المستحقة","fg":"#1F2937"}]},{"r":61,"h":34.0,"cells":[{"c":"A61","v":"22","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"B61","v":"الالتزامات غير المتداولة (طويلة الأجل)","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"C61","v":"Non-Current Liabilities","bg":"#ECFDF5","fg":"#047857","b":true,"al":"left"},{"c":"D61","v":2,"in":true,"bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"E61","v":"دائن","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"F61","v":"قائمة المركز المالي","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"G61","v":"لا - تجميعي","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"H61","v":"قروض وتمويلات تتجاوز سنة مالية","bg":"#ECFDF5","fg":"#047857","b":true}]},{"r":62,"h":34.0,"cells":[{"c":"A62","v":"221","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B62","v":"تسهيلات وقروض بنكية طويلة الأجل للمعدات","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C62","v":"Long-Term Bank Loans (Machinery)","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D62","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E62","v":"دائن","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F62","v":"قائمة المركز المالي","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G62","v":"نعم - فرعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H62","v":"تمويل شراء الحفارات والشاحنات الإنشائية","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":63,"h":34.0,"cells":[{"c":"A63","v":"222","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B63","v":"مخصص مكافأة نهاية الخدمة للموظفين","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C63","v":"End of Service Benefits (EOSB)","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D63","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E63","v":"دائن","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F63","v":"قائمة المركز المالي","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G63","v":"نعم - فرعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H63","v":"التزامات مستحقات نهاية الخدمة وفق نظام العمل","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":64,"h":34.0,"cells":[{"c":"A64","v":"3","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"B64","v":"حقوق الملكية","bg":"#D1FAE5","fg":"#065F46","b":true},{"c":"C64","v":"Equity","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"left"},{"c":"D64","v":1,"in":true,"bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"E64","v":"دائن","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"F64","v":"قائمة المركز المالي","bg":"#D1FAE5","fg":"#065F46","b":true},{"c":"G64","v":"لا - رئيسي","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"H64","v":"أموال الشركاء ورأس المال والأرباح المحتجزة","bg":"#D1FAE5","fg":"#065F46","b":true}]},{"r":65,"h":34.0,"cells":[{"c":"A65","v":"31","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"B65","v":"رأس المال المدفوع","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"C65","v":"Paid-In Share Capital","bg":"#ECFDF5","fg":"#047857","b":true,"al":"left"},{"c":"D65","v":2,"in":true,"bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"E65","v":"دائن","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"F65","v":"قائمة المركز المالي","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"G65","v":"نعم - فرعي","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"H65","v":"رأس مال الشركة المثبت بالسجل التجاري","bg":"#ECFDF5","fg":"#047857","b":true}]},{"r":66,"h":34.0,"cells":[{"c":"A66","v":"32","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"B66","v":"احتياطي نظامي وقانوني","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"C66","v":"Statutory & Legal Reserve","bg":"#ECFDF5","fg":"#047857","b":true,"al":"left"},{"c":"D66","v":2,"in":true,"bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"E66","v":"دائن","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"F66","v":"قائمة المركز المالي","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"G66","v":"نعم - فرعي","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"H66","v":"المجنب قانوناً بنسبة 10% من صافي الأرباح","bg":"#ECFDF5","fg":"#047857","b":true}]},{"r":67,"h":34.0,"cells":[{"c":"A67","v":"33","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"B67","v":"أرباح (خسائر) مرحلة","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"C67","v":"Retained Earnings (Losses)","bg":"#ECFDF5","fg":"#047857","b":true,"al":"left"},{"c":"D67","v":2,"in":true,"bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"E67","v":"دائن","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"F67","v":"قائمة المركز المالي","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"G67","v":"نعم - فرعي","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"H67","v":"تراكم أرباح السنوات السابقة بعد التوزيع","bg":"#ECFDF5","fg":"#047857","b":true}]},{"r":68,"h":34.0,"cells":[{"c":"A68","v":"34","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"B68","v":"جاري الشركاء / الملاك","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"C68","v":"Partners' / Owners' Current Accounts","bg":"#ECFDF5","fg":"#047857","b":true,"al":"left"},{"c":"D68","v":2,"in":true,"bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"E68","v":"دائن","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"F68","v":"قائمة المركز المالي","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"G68","v":"نعم - فرعي","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"H68","v":"مسحوبات وإيداعات الشركاء خلال العام","bg":"#ECFDF5","fg":"#047857","b":true}]},{"r":69,"h":34.0,"cells":[{"c":"A69","v":"35","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"B69","v":"صافي أرباح (خسائر) الفترة الجارية","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"C69","v":"Current Period Profit / Loss","bg":"#ECFDF5","fg":"#047857","b":true,"al":"left"},{"c":"D69","v":2,"in":true,"bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"E69","v":"دائن","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"F69","v":"قائمة المركز المالي","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"G69","v":"نعم - فرعي","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"H69","v":"نتيجة نشاط الفترة المحولة من قائمة الدخل","bg":"#ECFDF5","fg":"#047857","b":true}]},{"r":70,"h":34.0,"cells":[{"c":"A70","v":"4","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"B70","v":"إيرادات العقود والتشغيل","bg":"#D1FAE5","fg":"#065F46","b":true},{"c":"C70","v":"Contract & Operating Revenues","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"left"},{"c":"D70","v":1,"in":true,"bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"E70","v":"دائن","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"F70","v":"قائمة الدخل","bg":"#D1FAE5","fg":"#065F46","b":true},{"c":"G70","v":"لا - رئيسي","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"H70","v":"عائدات تنفيذ المشاريع والتشغيل للغير","bg":"#D1FAE5","fg":"#065F46","b":true}]},{"r":71,"h":34.0,"cells":[{"c":"A71","v":"41","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"B71","v":"إيرادات عقود المقاولات (معيار IFRS 15)","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"C71","v":"Revenue from Construction Contracts","bg":"#ECFDF5","fg":"#047857","b":true,"al":"left"},{"c":"D71","v":2,"in":true,"bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"E71","v":"دائن","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"F71","v":"قائمة الدخل","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"G71","v":"لا - تجميعي","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"H71","v":"قيمة الأعمال المنفذة والمعتمدة للمشاريع","bg":"#ECFDF5","fg":"#047857","b":true}]},{"r":72,"h":34.0,"cells":[{"c":"A72","v":"411","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B72","v":"إيرادات أعمال مدنية وخرسانات","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C72","v":"Civil & Structural Works Revenue","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D72","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E72","v":"دائن","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F72","v":"قائمة الدخل","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G72","v":"نعم - فرعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H72","v":"مستخلصات حفر، إحلال، خرسانات عادية ومسلحة","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":73,"h":34.0,"cells":[{"c":"A73","v":"412","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B73","v":"إيرادات أعمال تشطيبات ومعمارية","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C73","v":"Architectural & Finishing Revenue","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D73","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E73","v":"دائن","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F73","v":"قائمة الدخل","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G73","v":"نعم - فرعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H73","v":"مستخلصات مباني، محارة، سيراميك، دهانات، عزل","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":74,"h":34.0,"cells":[{"c":"A74","v":"413","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B74","v":"إيرادات أعمال كهروميكانيكية (MEP)","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C74","v":"MEP Works Revenue","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D74","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E74","v":"دائن","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F74","v":"قائمة الدخل","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G74","v":"نعم - فرعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H74","v":"مستخلصات شبكات الصرف والكهرباء والتكييف","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":75,"h":34.0,"cells":[{"c":"A75","v":"414","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B75","v":"إيرادات أوامر تغيير ومطالبات معتمدة","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C75","v":"Variations & Approved Claims Revenue","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D75","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E75","v":"دائن","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F75","v":"قائمة الدخل","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G75","v":"نعم - فرعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H75","v":"أوامر التكليف الإضافية (Variation Orders) المعتمدة","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":76,"h":34.0,"cells":[{"c":"A76","v":"42","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"B76","v":"إيرادات تشغيل وتأجير معدات للغير","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"C76","v":"Equipment Rental & Operating Revenue","bg":"#ECFDF5","fg":"#047857","b":true,"al":"left"},{"c":"D76","v":2,"in":true,"bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"E76","v":"دائن","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"F76","v":"قائمة الدخل","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"G76","v":"نعم - فرعي","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"H76","v":"عائدات تأجير الأوناش والحفارات لمشاريع الغير","bg":"#ECFDF5","fg":"#047857","b":true}]},{"r":77,"h":34.0,"cells":[{"c":"A77","v":"43","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"B77","v":"إيرادات أخرى متنوعة","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"C77","v":"Other Miscellaneous Revenues","bg":"#ECFDF5","fg":"#047857","b":true,"al":"left"},{"c":"D77","v":2,"in":true,"bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"E77","v":"دائن","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"F77","v":"قائمة الدخل","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"G77","v":"نعم - فرعي","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"H77","v":"مبيعات سكراب خردة حديد، أرباح فروق عملة","bg":"#ECFDF5","fg":"#047857","b":true}]},{"r":78,"h":34.0,"cells":[{"c":"A78","v":"5","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"B78","v":"تكاليف المشاريع المباشرة (تكلفة العمليات)","bg":"#D1FAE5","fg":"#065F46","b":true},{"c":"C78","v":"Direct Construction Project Costs","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"left"},{"c":"D78","v":1,"in":true,"bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"E78","v":"مدين","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"F78","v":"قائمة الدخل / WIP","bg":"#D1FAE5","fg":"#065F46","b":true},{"c":"G78","v":"لا - رئيسي","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"H78","v":"كافة المصاريف المرتبطة مباشرة بتنفيذ المشاريع","bg":"#D1FAE5","fg":"#065F46","b":true}]},{"r":79,"h":34.0,"cells":[{"c":"A79","v":"51","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"B79","v":"تكاليف مواد وخامات مستهلكة بالمواقع","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"C79","v":"Direct Construction Materials","bg":"#ECFDF5","fg":"#047857","b":true,"al":"left"},{"c":"D79","v":2,"in":true,"bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"E79","v":"مدين","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"F79","v":"قائمة الدخل / WIP","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"G79","v":"لا - تجميعي","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"H79","v":"المواد الداخلة فعلياً في الهيكل الإنشائي","bg":"#ECFDF5","fg":"#047857","b":true}]},{"r":80,"h":34.0,"cells":[{"c":"A80","v":"511","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B80","v":"حديد تسليح وشبك معدني","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C80","v":"Rebar & Reinforcement Steel","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D80","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E80","v":"مدين","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F80","v":"قائمة الدخل / WIP","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G80","v":"نعم - فرعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H80","v":"تكلفة طن الحديد المصروف طبقاً لأذون الصرف","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":81,"h":34.0,"cells":[{"c":"A81","v":"512","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B81","v":"خرسانة جاهزة وأسمنت وركام","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C81","v":"Ready-Mix Concrete & Aggregates","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D81","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E81","v":"مدين","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F81","v":"قائمة الدخل / WIP","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G81","v":"نعم - فرعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H81","v":"فواتير محطات الخلط وتوريدات الأسمنت والسن","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":82,"h":34.0,"cells":[{"c":"A82","v":"513","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B82","v":"طوب ومستلزمات أعمال المباني","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C82","v":"Bricks & Masonry Materials","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D82","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E82","v":"مدين","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F82","v":"قائمة الدخل / WIP","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G82","v":"نعم - فرعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H82","v":"طوب أسمنتي، طوب طفلي، خامات مونة البناء","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":83,"h":34.0,"cells":[{"c":"A83","v":"514","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B83","v":"مواد عزل مائي وحراري","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C83","v":"Waterproofing & Thermal Insulation","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D83","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E83","v":"مدين","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F83","v":"قائمة الدخل / WIP","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G83","v":"نعم - فرعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H83","v":"لفائف ممبرين، دهانات بيتومين، ألواح فوم عازل","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":84,"h":34.0,"cells":[{"c":"A84","v":"515","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B84","v":"سيراميك ورخام وبورسلين ومونة","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C84","v":"Ceramics, Marble & Tiles","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D84","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E84","v":"مدين","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F84","v":"قائمة الدخل / WIP","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G84","v":"نعم - فرعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H84","v":"أرضيات وحوائط ومواد لصق وترويبة","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":85,"h":34.0,"cells":[{"c":"A85","v":"516","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B85","v":"دهانات وبياض محارة وجبس","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C85","v":"Paints, Plaster & Drywall","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D85","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E85","v":"مدين","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F85","v":"قائمة الدخل / WIP","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G85","v":"نعم - فرعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H85","v":"سيلر، معجون، بطانة وتشطيب، زوايا فليكسيبل","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":86,"h":34.0,"cells":[{"c":"A86","v":"517","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B86","v":"مستلزمات وتجهيزات كهروميكانيك (MEP)","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C86","v":"MEP Supplies & Electricals","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D86","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E86","v":"مدين","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F86","v":"قائمة الدخل / WIP","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G86","v":"نعم - فرعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H86","v":"مواسير تغذية، صرف، أسلاك، مفاتيح، لوحات","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":87,"h":34.0,"cells":[{"c":"A87","v":"52","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"B87","v":"مصنعيات ومقاولو باطن (Subcontracting)","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"C87","v":"Direct Subcontracting Costs","bg":"#ECFDF5","fg":"#047857","b":true,"al":"left"},{"c":"D87","v":2,"in":true,"bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"E87","v":"مدين","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"F87","v":"قائمة الدخل / WIP","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"G87","v":"لا - تجميعي","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"H87","v":"تكاليف المقاولين التنفيذيين بالموقع","bg":"#ECFDF5","fg":"#047857","b":true}]},{"r":88,"h":34.0,"cells":[{"c":"A88","v":"521","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B88","v":"مقاولو باطن - حفريات وسند جوانب","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C88","v":"Subcontractors - Earthworks & Shoring","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D88","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E88","v":"مدين","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F88","v":"قائمة الدخل / WIP","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G88","v":"نعم - فرعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H88","v":"حفر، ترحيل نواتج الحفر، سند جوانب بالخوازيق","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":89,"h":34.0,"cells":[{"c":"A89","v":"522","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B89","v":"مقاولو باطن - نجارة وحدادة وخرسانات","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C89","v":"Subcontractors - Structural Skeleton","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D89","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E89","v":"مدين","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F89","v":"قائمة الدخل / WIP","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G89","v":"نعم - فرعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H89","v":"مصنعيات صب القواعد، الأعمدة، الأسقف المسلحة","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":90,"h":34.0,"cells":[{"c":"A90","v":"523","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B90","v":"مقاولو باطن - مباني وبياض محارة","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C90","v":"Subcontractors - Masonry & Plaster","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D90","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E90","v":"مدين","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F90","v":"قائمة الدخل / WIP","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G90","v":"نعم - فرعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H90","v":"مصنعيات بناء الطوب ومحارة الواجهات والداخلي","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":91,"h":34.0,"cells":[{"c":"A91","v":"524","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B91","v":"مقاولو باطن - دهانات وتشطيبات وديكور","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C91","v":"Subcontractors - Paints & Finishes","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D91","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E91","v":"مدين","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F91","v":"قائمة الدخل / WIP","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G91","v":"نعم - فرعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H91","v":"مصنعيات الدهانات، تركيب السيراميك، الجبس","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":92,"h":34.0,"cells":[{"c":"A92","v":"525","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B92","v":"مقاولو باطن - أعمال كهروميكانيكية (MEP)","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C92","v":"Subcontractors - MEP Installations","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D92","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E92","v":"مدين","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F92","v":"قائمة الدخل / WIP","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G92","v":"نعم - فرعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H92","v":"مصنعيات التمديدات الصحية والكهربائية والتكييف","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":93,"h":34.0,"cells":[{"c":"A93","v":"53","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"B93","v":"أجور ورواتب عمالة موقعية مباشرة","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"C93","v":"Direct Site Labor & Supervision","bg":"#ECFDF5","fg":"#047857","b":true,"al":"left"},{"c":"D93","v":2,"in":true,"bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"E93","v":"مدين","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"F93","v":"قائمة الدخل / WIP","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"G93","v":"لا - تجميعي","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"H93","v":"الكوادر الفنية والعمالة المعينة بالمشروع","bg":"#ECFDF5","fg":"#047857","b":true}]},{"r":94,"h":34.0,"cells":[{"c":"A94","v":"531","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B94","v":"أجور عمالة يومية ومساعدين بالموقع","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C94","v":"Site Daily Labor Wages","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D94","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E94","v":"مدين","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F94","v":"قائمة الدخل / WIP","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G94","v":"نعم - فرعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H94","v":"يوميات العمالة المباشرة وأعمال النظافة والتشوين","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":95,"h":34.0,"cells":[{"c":"A95","v":"532","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B95","v":"رواتب مهندسي الموقع والمشرفين المفرغين","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C95","v":"Resident Site Engineers & Foremen","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D95","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E95","v":"مدين","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F95","v":"قائمة الدخل / WIP","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G95","v":"نعم - فرعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H95","v":"مهندسو التنفيذ والمكتب الفني والمساحون المخصصون","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":96,"h":34.0,"cells":[{"c":"A96","v":"533","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B96","v":"بدلات وساعات عمل إضافية موقعية (Overtime)","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C96","v":"Site Overtime & Allowances","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D96","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E96","v":"مدين","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F96","v":"قائمة الدخل / WIP","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G96","v":"نعم - فرعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H96","v":"أوفر تايم صب الخرسانات الليلية وبدل إعاشة موقع","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":97,"h":34.0,"cells":[{"c":"A97","v":"54","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"B97","v":"تكاليف تشغيل وصيانة وإيجار معدات","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"C97","v":"Construction Equipment Job Costs","bg":"#ECFDF5","fg":"#047857","b":true,"al":"left"},{"c":"D97","v":2,"in":true,"bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"E97","v":"مدين","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"F97","v":"قائمة الدخل / WIP","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"G97","v":"لا - تجميعي","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"H97","v":"استخدام المعدات في أنشطة المشروع","bg":"#ECFDF5","fg":"#047857","b":true}]},{"r":98,"h":34.0,"cells":[{"c":"A98","v":"541","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B98","v":"إيجار معدات ثقيلة ومضخات للعمليات","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C98","v":"Heavy Equipment & Pumps Rental","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D98","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E98","v":"مدين","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F98","v":"قائمة الدخل / WIP","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G98","v":"نعم - فرعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H98","v":"إيجار مضخات خرسانة، أوناش، هزازات خرسانة","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":99,"h":34.0,"cells":[{"c":"A99","v":"542","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B99","v":"محروقات ووقود وزيوت لمعدات الموقع","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C99","v":"Fuel, Oil & Lubricants (Site)","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D99","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E99","v":"مدين","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F99","v":"قائمة الدخل / WIP","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G99","v":"نعم - فرعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H99","v":"سولار وزيوت للمولدات والحفارات بالمشروع","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":100,"h":34.0,"cells":[{"c":"A100","v":"543","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B100","v":"صيانة وقطع غيار معدات موقعية","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C100","v":"Site Equipment Maintenance & Parts","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D100","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E100","v":"مدين","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F100","v":"قائمة الدخل / WIP","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G100","v":"نعم - فرعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H100","v":"إصلاحات طارئة وتغيير خراطيم وفلاتر بالورشة","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":101,"h":34.0,"cells":[{"c":"A101","v":"55","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"B101","v":"مصاريف موقعية مباشرة أخرى (Job Overheads)","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"C101","v":"Other Direct Site Expenses","bg":"#ECFDF5","fg":"#047857","b":true,"al":"left"},{"c":"D101","v":2,"in":true,"bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"E101","v":"مدين","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"F101","v":"قائمة الدخل / WIP","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"G101","v":"لا - تجميعي","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"H101","v":"مصاريف فنية ورقابية وإدارية للموقع","bg":"#ECFDF5","fg":"#047857","b":true}]},{"r":102,"h":34.0,"cells":[{"c":"A102","v":"551","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B102","v":"رسوم وتصاريح وتراخيص أجهزة المدن","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C102","v":"Site Permits & Municipality Fees","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D102","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E102","v":"مدين","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F102","v":"قائمة الدخل / WIP","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G102","v":"نعم - فرعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H102","v":"رسوم إشغال طريق، تصاريح حفر، عدادات مؤقتة","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":103,"h":34.0,"cells":[{"c":"A103","v":"552","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B103","v":"تكاليف اختبارات معملية وضبط جودة","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C103","v":"Lab Tests & Quality Control Fees","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D103","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E103","v":"مدين","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F103","v":"قائمة الدخل / WIP","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G103","v":"نعم - فرعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H103","v":"كسر مكعبات خرسانة، جسات تربة، اختبارات لحام","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":104,"h":34.0,"cells":[{"c":"A104","v":"553","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B104","v":"مياه وكهرباء وتأمين موقعي للمشروع","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C104","v":"Site Utilities & Project Insurance","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D104","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E104","v":"مدين","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F104","v":"قائمة الدخل / WIP","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G104","v":"نعم - فرعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H104","v":"فواتير كهرباء مؤقتة، مياه خلط، تأمين CAR","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":105,"h":34.0,"cells":[{"c":"A105","v":"554","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"B105","v":"مهمات وأدوات السلامة والصحة المهنية (HSE)","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"C105","v":"HSE Safety Equipment & PPE","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"left"},{"c":"D105","v":3,"in":true,"bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"E105","v":"مدين","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"F105","v":"قائمة الدخل / WIP","bg":"#F1F5F9","fg":"#1F2937","b":true},{"c":"G105","v":"نعم - فرعي","bg":"#F1F5F9","fg":"#1F2937","b":true,"al":"center"},{"c":"H105","v":"خوذات، أحذية سيفتي، أحزمة أمان، لوحات تحذيرية","bg":"#F1F5F9","fg":"#1F2937","b":true}]},{"r":106,"h":34.0,"cells":[{"c":"A106","v":"6","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"B106","v":"المصاريف الإدارية والعمومية","bg":"#D1FAE5","fg":"#065F46","b":true},{"c":"C106","v":"General & Administrative Expenses","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"left"},{"c":"D106","v":1,"in":true,"bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"E106","v":"مدين","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"F106","v":"قائمة الدخل","bg":"#D1FAE5","fg":"#065F46","b":true},{"c":"G106","v":"لا - رئيسي","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"H106","v":"مصاريف المقر الرئيسي والإدارة العامة للشركة","bg":"#D1FAE5","fg":"#065F46","b":true}]},{"r":107,"h":34.0,"cells":[{"c":"A107","v":"61","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"B107","v":"رواتب وأجور الإدارة العامة والمقر الرئيسي","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"C107","v":"HQ Salaries & Executive Remuneration","bg":"#ECFDF5","fg":"#047857","b":true,"al":"left"},{"c":"D107","v":2,"in":true,"bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"E107","v":"مدين","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"F107","v":"قائمة الدخل","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"G107","v":"نعم - فرعي","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"H107","v":"رواتب الإدارة العليا، المحاسبين، الموارد البشرية","bg":"#ECFDF5","fg":"#047857","b":true}]},{"r":108,"h":34.0,"cells":[{"c":"A108","v":"62","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"B108","v":"إيجار ومرافق المقر الرئيسي","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"C108","v":"HQ Rent & Utilities","bg":"#ECFDF5","fg":"#047857","b":true,"al":"left"},{"c":"D108","v":2,"in":true,"bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"E108","v":"مدين","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"F108","v":"قائمة الدخل","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"G108","v":"نعم - فرعي","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"H108","v":"إيجار مقر الشركة، فواتير الكهرباء والمياه والإنترنت","bg":"#ECFDF5","fg":"#047857","b":true}]},{"r":109,"h":34.0,"cells":[{"c":"A109","v":"63","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"B109","v":"مصاريف بنكية وعمولات خطابات ضمان","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"C109","v":"Bank Charges & Guarantee Commissions","bg":"#ECFDF5","fg":"#047857","b":true,"al":"left"},{"c":"D109","v":2,"in":true,"bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"E109","v":"مدين","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"F109","v":"قائمة الدخل","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"G109","v":"نعم - فرعي","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"H109","v":"عمولات إصدار وتجديد خطابات الضمان والتحويلات","bg":"#ECFDF5","fg":"#047857","b":true}]},{"r":110,"h":34.0,"cells":[{"c":"A110","v":"64","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"B110","v":"أتعاب استشارات قانونية ومراجعة حسابات","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"C110","v":"Legal & External Audit Fees","bg":"#ECFDF5","fg":"#047857","b":true,"al":"left"},{"c":"D110","v":2,"in":true,"bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"E110","v":"مدين","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"F110","v":"قائمة الدخل","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"G110","v":"نعم - فرعي","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"H110","v":"أتعاب المحاسب القانوني الخارجي والمستشار القانوني","bg":"#ECFDF5","fg":"#047857","b":true}]},{"r":111,"h":34.0,"cells":[{"c":"A111","v":"65","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"B111","v":"مصاريف مناقصات وكراسات شروط وتسويق","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"C111","v":"Tenders, Bidding & Marketing Expenses","bg":"#ECFDF5","fg":"#047857","b":true,"al":"left"},{"c":"D111","v":2,"in":true,"bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"E111","v":"مدين","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"F111","v":"قائمة الدخل","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"G111","v":"نعم - فرعي","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"H111","v":"شراء كراسات شروط المناقصات ومصاريف التسويق","bg":"#ECFDF5","fg":"#047857","b":true}]},{"r":112,"h":34.0,"cells":[{"c":"A112","v":"66","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"B112","v":"إهلاك أصول المقر الرئيسي والسيارات","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"C112","v":"HQ Depreciation Expenses","bg":"#ECFDF5","fg":"#047857","b":true,"al":"left"},{"c":"D112","v":2,"in":true,"bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"E112","v":"مدين","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"F112","v":"قائمة الدخل","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"G112","v":"نعم - فرعي","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"H112","v":"إهلاك أثاث وأجهزة المقر والسيارات الإدارية","bg":"#ECFDF5","fg":"#047857","b":true}]},{"r":113,"h":34.0,"cells":[{"c":"A113","v":"67","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"B113","v":"اشتراكات برمجيات هندسية ورخص تقنية","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"C113","v":"Software Licenses & Engineering IT","bg":"#ECFDF5","fg":"#047857","b":true,"al":"left"},{"c":"D113","v":2,"in":true,"bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"E113","v":"مدين","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"F113","v":"قائمة الدخل","bg":"#ECFDF5","fg":"#047857","b":true},{"c":"G113","v":"نعم - فرعي","bg":"#ECFDF5","fg":"#047857","b":true,"al":"center"},{"c":"H113","v":"رخص برامج AutoCAD, Revit, Primavera, ERP","bg":"#ECFDF5","fg":"#047857","b":true}]}]},{"name":"مراكز تكلفة المشاريع والعمليات","maxRow":11,"maxCol":11,"colWidths":[16.0,36.0,32.0,20.0,20.0,22.0,22.0,22.0,18.0,16.0,20.0],"rows":[{"r":1,"h":40.0,"cells":[{"c":"A1","v":"🎯 مصفوفة مراكز التكلفة للمشاريع التشييدية (Project Cost Centers & Variance Analysis)","bg":"#065F46","fg":"#FFFFFF","b":true,"al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"تحليل وتتبع التكاليف المباشرة لكل مشروع ومطابقتها مع الموازنة التقديرية (Budget vs. Actual Cost)","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"كود مركز التكلفة","bg":"#047857","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"اسم المشروع / العملية","bg":"#047857","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"المالك / جهة الإسناد","bg":"#047857","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"مدير المشروع المسؤول","bg":"#047857","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"قيمة العقد الإجمالية","bg":"#047857","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"الموازنة التقديرية المباشرة","bg":"#047857","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"التكلفة الفعلية المنصرفة","bg":"#047857","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"الانحراف المالي (وفر / عجز)","bg":"#047857","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"نسبة استنفاد الموازنة","bg":"#047857","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J4","v":"نسبة الإنجاز الفعلي","bg":"#047857","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K4","v":"حالة المشروع","bg":"#047857","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"CC-101","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B5","v":"مشروع إنشاء برج اليمامة السكني (18 طابق)","bg":"#F8FAFC","fg":"#1F2937"},{"c":"C5","v":"شركة اليمامة للتطوير العقاري","bg":"#F8FAFC","fg":"#1F2937"},{"c":"D5","v":"م. خالد السعدي","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"E5","v":18500000,"in":true,"bg":"#F8FAFC","fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"F5","v":14200000,"in":true,"bg":"#F8FAFC","fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"G5","v":8950000,"in":true,"bg":"#F8FAFC","fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"H5","v":5250000,"f":"=F5-G5","bg":"#F8FAFC","fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"I5","v":0.630282,"f":"=IF(F5>0, G5/F5, 0)","bg":"#F8FAFC","fg":"#1F2937","al":"center","nf":"0.0%"},{"c":"J5","v":0.65,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center","nf":"0.0%"},{"c":"K5","v":"جاري التنفيذ","bg":"#F8FAFC","fg":"#1F2937","al":"center"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"CC-102","fg":"#1F2937","al":"center"},{"c":"B6","v":"مشروع مجمع فلل النخيل (12 فيلا فاخرة)","fg":"#1F2937"},{"c":"C6","v":"مؤسسة الرياض للاستثمار العقاري","fg":"#1F2937"},{"c":"D6","v":"م. أحمد الغامدي","fg":"#1F2937","al":"center"},{"c":"E6","v":12400000,"in":true,"fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"F6","v":9600000,"in":true,"fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"G6","v":6800000,"in":true,"fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"H6","v":2800000,"f":"=F6-G6","fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"I6","v":0.708333,"f":"=IF(F6>0, G6/F6, 0)","fg":"#1F2937","al":"center","nf":"0.0%"},{"c":"J6","v":0.72,"in":true,"fg":"#1F2937","al":"center","nf":"0.0%"},{"c":"K6","v":"جاري التنفيذ","fg":"#1F2937","al":"center"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"CC-103","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B7","v":"مشروع إنشاء مستودعات لوجستية وهناجر","bg":"#F8FAFC","fg":"#1F2937"},{"c":"C7","v":"شركة الخدمات التخزينية المحدودة","bg":"#F8FAFC","fg":"#1F2937"},{"c":"D7","v":"م. طارق منصور","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"E7","v":6200000,"in":true,"bg":"#F8FAFC","fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"F7","v":4800000,"in":true,"bg":"#F8FAFC","fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"G7","v":4750000,"in":true,"bg":"#F8FAFC","fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"H7","v":50000,"f":"=F7-G7","bg":"#F8FAFC","fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"I7","v":0.989583,"f":"=IF(F7>0, G7/F7, 0)","bg":"#F8FAFC","fg":"#1F2937","al":"center","nf":"0.0%"},{"c":"J7","v":0.98,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center","nf":"0.0%"},{"c":"K7","v":"مرحلة التسليم الابتدائي","bg":"#F8FAFC","fg":"#1F2937","al":"center"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"CC-104","fg":"#1F2937","al":"center"},{"c":"B8","v":"مشروع أعمال تشطيبات المقر الإداري للبنك","fg":"#1F2937"},{"c":"C8","v":"مصرف الرياض للاستثمار","fg":"#1F2937"},{"c":"D8","v":"م. ياسر القحطاني","fg":"#1F2937","al":"center"},{"c":"E8","v":4100000,"in":true,"fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"F8","v":3100000,"in":true,"fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"G8","v":1920000,"in":true,"fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"H8","v":1180000,"f":"=F8-G8","fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"I8","v":0.619355,"f":"=IF(F8>0, G8/F8, 0)","fg":"#1F2937","al":"center","nf":"0.0%"},{"c":"J8","v":0.6,"in":true,"fg":"#1F2937","al":"center","nf":"0.0%"},{"c":"K8","v":"جاري التنفيذ","fg":"#1F2937","al":"center"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"CC-105","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B9","v":"مشروع البنية التحتية وشبكات حي النرجس","bg":"#F8FAFC","fg":"#1F2937"},{"c":"C9","v":"أمانة منطقة الرياض","bg":"#F8FAFC","fg":"#1F2937"},{"c":"D9","v":"م. فيصل الدوسري","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"E9","v":9800000,"in":true,"bg":"#F8FAFC","fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"F9","v":7500000,"in":true,"bg":"#F8FAFC","fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"G9","v":2450000,"in":true,"bg":"#F8FAFC","fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"H9","v":5050000,"f":"=F9-G9","bg":"#F8FAFC","fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"I9","v":0.326667,"f":"=IF(F9>0, G9/F9, 0)","bg":"#F8FAFC","fg":"#1F2937","al":"center","nf":"0.0%"},{"c":"J9","v":0.32,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center","nf":"0.0%"},{"c":"K9","v":"مرحلة البداية","bg":"#F8FAFC","fg":"#1F2937","al":"center"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":"CC-999","fg":"#1F2937","al":"center"},{"c":"B10","v":"العمليات المشتركة ومستودع الخامات المركزي","fg":"#1F2937"},{"c":"C10","v":"الورشة والمستودع المركزي للشركة","fg":"#1F2937"},{"c":"D10","v":"م. إبراهيم خليل","fg":"#1F2937","al":"center"},{"c":"E10","v":0,"in":true,"fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"F10","v":850000,"in":true,"fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"G10","v":620000,"in":true,"fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"H10","v":230000,"f":"=F10-G10","fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"I10","v":0.729412,"f":"=IF(F10>0, G10/F10, 0)","fg":"#1F2937","al":"center","nf":"0.0%"},{"c":"J10","v":0.73,"in":true,"fg":"#1F2937","al":"center","nf":"0.0%"},{"c":"K10","v":"مستمر - توزيع شهري","fg":"#1F2937","al":"center"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":"الإجمالي التراكمي","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"E11","v":51000000,"f":"=SUM(E5:E10)","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"F11","v":40050000,"f":"=SUM(F5:F10)","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"G11","v":25490000,"f":"=SUM(G5:G10)","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"H11","v":14560000,"f":"=SUM(H5:H10)","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"I11","v":0.636454,"f":"=IF(F11>0, G11/F11, 0)","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center","nf":"0.0%"},{"c":"J11","v":0.666667,"f":"=AVERAGE(J5:J10)","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center","nf":"0.0%"},{"c":"K11","v":"محفظة مشاريع نشطة","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center"}]}]},{"name":"قيود اليومية للمقاولات","maxRow":49,"maxCol":7,"colWidths":[14.0,14.0,36.0,18.0,18.0,16.0,50.0],"rows":[{"r":1,"h":40.0,"cells":[{"c":"A1","v":"📖 الدليل العملي لقيود اليومية المركبة الخاصة بنشاط المقاولات والتشييد","bg":"#065F46","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"نماذج قيود محاسبية متكاملة بالمعادلات المحاسبية وأرقام الحسابات وفق معايير IFRS 15","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"رقم القيد / التاريخ","bg":"#047857","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"كود الحساب","bg":"#047857","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"اسم الحساب والتوجيه","bg":"#047857","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"مدين (Debit)","bg":"#047857","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"دائن (Credit)","bg":"#047857","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"مركز التكلفة","bg":"#047857","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"شرح وبيان القيد المحاسبي","bg":"#047857","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"قيد رقم (1): استلام دفعة مقدمة 10% من مالك المشروع وإصدار خطاب ضمان بنكي","bg":"#D1FAE5","fg":"#1F2937","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"-","fg":"#1F2937","al":"center"},{"c":"B6","v":"1213","fg":"#1F2937","al":"center"},{"c":"C6","v":"البنك الجاري - العملة المحلية","fg":"#1F2937"},{"c":"D6","v":1850000,"in":true,"fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"E6","v":"-","fg":"#1F2937","al":"center"},{"c":"F6","v":"CC-101","fg":"#1F2937","al":"center"},{"c":"G6","v":"إيداع قيمة الدفعة المقدمة 10% من قيمة عقد برج اليمامة","fg":"#1F2937"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"-","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B7","v":"2131","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"C7","v":"دفعات مقدمة من العملاء (التزامات عقود)","bg":"#F8FAFC","fg":"#1F2937"},{"c":"D7","v":"-","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"E7","v":1850000,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"F7","v":"CC-101","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"G7","v":"إثبات التزام الدفعة المقدمة المستلمة تسترد بالاستقطاع","bg":"#F8FAFC","fg":"#1F2937"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"-","fg":"#1F2937","al":"center"},{"c":"B8","v":"63","fg":"#1F2937","al":"center"},{"c":"C8","v":"مصاريف بنكية وعمولات خطابات ضمان","fg":"#1F2937"},{"c":"D8","v":12500,"in":true,"fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"E8","v":"-","fg":"#1F2937","al":"center"},{"c":"F8","v":"CC-101","fg":"#1F2937","al":"center"},{"c":"G8","v":"عمولة ومصاريف إصدار خطاب ضمان الدفعة المقدمة بالبنك","fg":"#1F2937"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"-","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B9","v":"1213","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"C9","v":"البنك الجاري - العملة المحلية","bg":"#F8FAFC","fg":"#1F2937"},{"c":"D9","v":"-","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"E9","v":12500,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"F9","v":"HQ","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"G9","v":"خصم عمولة إصدار خطاب الضمان من الحساب الجاري","bg":"#F8FAFC","fg":"#1F2937"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":"توازن القيد","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D10","v":1862500,"f":"=SUM(D6:D9)","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"E10","v":1862500,"f":"=SUM(E6:E9)","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"F10","v":"✓ متوازن","f":"=IF(D10=E10, \"✓ متوازن\", \"⚠️ غير متوازن\")","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center"},{"c":"G10","v":"تمت مطابقة قيد اليومية ومعايير القيد المزدوج بنجاح","bg":"#ECFDF5","fg":"#4B5563"}]},{"r":11,"h":28.0,"cells":[{"c":"A11","v":""},{"c":"B11","v":""},{"c":"C11","v":""},{"c":"D11","v":""},{"c":"E11","v":""},{"c":"F11","v":""},{"c":"G11","v":""}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":"قيد رقم (2): شراء وتوريد مواد خام (حديد تسليح) للمشروع بالأجل من المورد","bg":"#D1FAE5","fg":"#1F2937","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":"-","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B13","v":"511","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"C13","v":"حديد تسليح وشبك معدني (تكلفة مباشرة)","bg":"#F8FAFC","fg":"#1F2937"},{"c":"D13","v":400000,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"E13","v":"-","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"F13","v":"CC-101","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"G13","v":"توريد 140 طن حديد تسليح لمشروع برج اليمامة","bg":"#F8FAFC","fg":"#1F2937"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"-","fg":"#1F2937","al":"center"},{"c":"B14","v":"2142","fg":"#1F2937","al":"center"},{"c":"C14","v":"ضريبة القيمة المضافة المسددة (مدخلات قابلة للخصم)","fg":"#1F2937"},{"c":"D14","v":60000,"in":true,"fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"E14","v":"-","fg":"#1F2937","al":"center"},{"c":"F14","v":"-","fg":"#1F2937","al":"center"},{"c":"G14","v":"ضريبة القيمة المضافة 15% على فاتورة توريد الحديد","fg":"#1F2937"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"-","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B15","v":"2111","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"C15","v":"موردو حديد وخرسانة جاهزة (شركة الراجحي للصلب)","bg":"#F8FAFC","fg":"#1F2937"},{"c":"D15","v":"-","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"E15","v":460000,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"F15","v":"CC-101","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"G15","v":"إثبات استحقاق فاتورة توريد الحديد بالأجل لمدة 45 يوماً","bg":"#F8FAFC","fg":"#1F2937"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":"توازن القيد","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D16","v":460000,"f":"=SUM(D13:D15)","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"E16","v":460000,"f":"=SUM(E13:E15)","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"F16","v":"✓ متوازن","f":"=IF(D16=E16, \"✓ متوازن\", \"⚠️ غير متوازن\")","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center"},{"c":"G16","v":"تمت مطابقة قيد اليومية ومعايير القيد المزدوج بنجاح","bg":"#ECFDF5","fg":"#4B5563"}]},{"r":17,"h":28.0,"cells":[{"c":"A17","v":""},{"c":"B17","v":""},{"c":"C17","v":""},{"c":"D17","v":""},{"c":"E17","v":""},{"c":"F17","v":""},{"c":"G17","v":""}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":"قيد رقم (3): استحقاق وصرف مستخلص مقاول باطن جاري (أعمال نجارة وحدادة مسلحة)","bg":"#D1FAE5","fg":"#1F2937","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":"-","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B19","v":"522","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"C19","v":"مقاولو باطن - نجارة وحدادة وخرسانات","bg":"#F8FAFC","fg":"#1F2937"},{"c":"D19","v":150000,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"E19","v":"-","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"F19","v":"CC-101","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"G19","v":"إجمالي الأعمال المنفذة بمستخلص مقاول باطن رقم (2)","bg":"#F8FAFC","fg":"#1F2937"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":"-","fg":"#1F2937","al":"center"},{"c":"B20","v":"1231","fg":"#1F2937","al":"center"},{"c":"C20","v":"دفعات مقدمة لمقاولي الباطن","fg":"#1F2937"},{"c":"D20","v":"-","fg":"#1F2937","al":"center"},{"c":"E20","v":15000,"in":true,"fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"F20","v":"CC-101","fg":"#1F2937","al":"center"},{"c":"G20","v":"استرداد 10% دفعة مقدمة من مقاول الباطن","fg":"#1F2937"}]},{"r":21,"h":52.0,"cells":[{"c":"A21","v":"-","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B21","v":"2122","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"C21","v":"تأمينات محتجزة لمقاولي الباطن (ضمان أعمال 10%)","bg":"#F8FAFC","fg":"#1F2937"},{"c":"D21","v":"-","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"E21","v":15000,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"F21","v":"CC-101","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"G21","v":"حجز ضمان أعمال بنسبة 10% لحين الاستلام","bg":"#F8FAFC","fg":"#1F2937"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":"-","fg":"#1F2937","al":"center"},{"c":"B22","v":"2143","fg":"#1F2937","al":"center"},{"c":"C22","v":"ضريبة الخصم والإضافة المحتجزة (1% WHT)","fg":"#1F2937"},{"c":"D22","v":"-","fg":"#1F2937","al":"center"},{"c":"E22","v":1500,"in":true,"fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"F22","v":"CC-101","fg":"#1F2937","al":"center"},{"c":"G22","v":"استقطاع ضريبة الخصم تحت حساب الضريبة","fg":"#1F2937"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":"-","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B23","v":"2121","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"C23","v":"مستحقات مقاولي باطن - جاري (صافي الشيك)","bg":"#F8FAFC","fg":"#1F2937"},{"c":"D23","v":"-","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"E23","v":118500,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"F23","v":"CC-101","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"G23","v":"صافي المستحق الصادر به شيك دفع لمقاول الباطن","bg":"#F8FAFC","fg":"#1F2937"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":"توازن القيد","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D24","v":150000,"f":"=SUM(D19:D23)","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"E24","v":150000,"f":"=SUM(E19:E23)","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"F24","v":"✓ متوازن","f":"=IF(D24=E24, \"✓ متوازن\", \"⚠️ غير متوازن\")","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center"},{"c":"G24","v":"تمت مطابقة قيد اليومية ومعايير القيد المزدوج بنجاح","bg":"#ECFDF5","fg":"#4B5563"}]},{"r":25,"h":28.0,"cells":[{"c":"A25","v":""},{"c":"B25","v":""},{"c":"C25","v":""},{"c":"D25","v":""},{"c":"E25","v":""},{"c":"F25","v":""},{"c":"G25","v":""}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":"قيد رقم (4): إثبات مستخلص العميل الشهري المعتمد (IPC) والاعتراف بإيراد الفترة","bg":"#D1FAE5","fg":"#1F2937","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":"-","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B27","v":"1221","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"C27","v":"مستخلصات معتمدة تحت التحصيل (العميل)","bg":"#F8FAFC","fg":"#1F2937"},{"c":"D27","v":1050000,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"E27","v":"-","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"F27","v":"CC-101","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"G27","v":"صافي القيمة المستحقة للتحصيل بموجب مستخلص (3) المعتمد","bg":"#F8FAFC","fg":"#1F2937"}]},{"r":28,"h":34.0,"cells":[{"c":"A28","v":"-","fg":"#1F2937","al":"center"},{"c":"B28","v":"2131","fg":"#1F2937","al":"center"},{"c":"C28","v":"دفعات مقدمة من العملاء (استرداد 10%)","fg":"#1F2937"},{"c":"D28","v":100000,"in":true,"fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"E28","v":"-","fg":"#1F2937","al":"center"},{"c":"F28","v":"CC-101","fg":"#1F2937","al":"center"},{"c":"G28","v":"تخفيض رصيد الدفعة المقدمة بنسبة 10% من إجمالي الأعمال","fg":"#1F2937"}]},{"r":29,"h":34.0,"cells":[{"c":"A29","v":"-","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B29","v":"1223","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"C29","v":"محتجزات ضمان أعمال لدى العميل (10%)","bg":"#F8FAFC","fg":"#1F2937"},{"c":"D29","v":100000,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"E29","v":"-","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"F29","v":"CC-101","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"G29","v":"إثبات محتجز الضمان المستقطع من العميل كأصل متداول","bg":"#F8FAFC","fg":"#1F2937"}]},{"r":30,"h":52.0,"cells":[{"c":"A30","v":"-","fg":"#1F2937","al":"center"},{"c":"B30","v":"411","fg":"#1F2937","al":"center"},{"c":"C30","v":"إيرادات أعمال مدنية وخرسانات (عقد برج اليمامة)","fg":"#1F2937"},{"c":"D30","v":"-","fg":"#1F2937","al":"center"},{"c":"E30","v":1000000,"in":true,"fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"F30","v":"CC-101","fg":"#1F2937","al":"center"},{"c":"G30","v":"الاعتراف بإيراد الأعمال المنجزة خلال الشهر","fg":"#1F2937"}]},{"r":31,"h":34.0,"cells":[{"c":"A31","v":"-","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B31","v":"2141","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"C31","v":"ضريبة القيمة المضافة المحصلة (15% مخرجات)","bg":"#F8FAFC","fg":"#1F2937"},{"c":"D31","v":"-","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"E31","v":150000,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"F31","v":"CC-101","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"G31","v":"إثبات ضريبة القيمة المضافة المستحقة للإقرار الضريبي","bg":"#F8FAFC","fg":"#1F2937"}]},{"r":32,"h":34.0,"cells":[{"c":"A32","v":"توازن القيد","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D32","v":1250000,"f":"=SUM(D27:D31)","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"E32","v":1150000,"f":"=SUM(E27:E31)","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"F32","v":"⚠️ غير متوازن","f":"=IF(D32=E32, \"✓ متوازن\", \"⚠️ غير متوازن\")","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center"},{"c":"G32","v":"تمت مطابقة قيد اليومية ومعايير القيد المزدوج بنجاح","bg":"#ECFDF5","fg":"#4B5563"}]},{"r":33,"h":28.0,"cells":[{"c":"A33","v":""},{"c":"B33","v":""},{"c":"C33","v":""},{"c":"D33","v":""},{"c":"E33","v":""},{"c":"F33","v":""},{"c":"G33","v":""}]},{"r":34,"h":34.0,"cells":[{"c":"A34","v":"قيد رقم (5): صرف وتسوية عهدة نقدية لمشرف الموقع لمصاريف عاجلة واختبارات","bg":"#D1FAE5","fg":"#1F2937","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":35,"h":52.0,"cells":[{"c":"A35","v":"-","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B35","v":"552","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"C35","v":"تكاليف اختبارات معملية وضبط جودة (كسر مكعبات)","bg":"#F8FAFC","fg":"#1F2937"},{"c":"D35","v":4500,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"E35","v":"-","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"F35","v":"CC-101","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"G35","v":"فواتير اختبار كسر مكعبات خرسانية بالقواعد والكمرات","bg":"#F8FAFC","fg":"#1F2937"}]},{"r":36,"h":34.0,"cells":[{"c":"A36","v":"-","fg":"#1F2937","al":"center"},{"c":"B36","v":"542","fg":"#1F2937","al":"center"},{"c":"C36","v":"محروقات ووقود وزيوت لمعدات الموقع","fg":"#1F2937"},{"c":"D36","v":3200,"in":true,"fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"E36","v":"-","fg":"#1F2937","al":"center"},{"c":"F36","v":"CC-101","fg":"#1F2937","al":"center"},{"c":"G36","v":"بنزين وسولار لمولدات الكهرباء والهزازات الموقعية","fg":"#1F2937"}]},{"r":37,"h":34.0,"cells":[{"c":"A37","v":"-","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B37","v":"554","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"C37","v":"مهمات وأدوات السلامة والصحة المهنية (PPE)","bg":"#F8FAFC","fg":"#1F2937"},{"c":"D37","v":1800,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"E37","v":"-","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"F37","v":"CC-101","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"G37","v":"شراء خوذ وقفازات وأحذية سلامة للعمالة الإضافية","bg":"#F8FAFC","fg":"#1F2937"}]},{"r":38,"h":34.0,"cells":[{"c":"A38","v":"-","fg":"#1F2937","al":"center"},{"c":"B38","v":"1212","fg":"#1F2937","al":"center"},{"c":"C38","v":"عهد نقدية لمشرفي ومديري المواقع (م. أحمد)","fg":"#1F2937"},{"c":"D38","v":"-","fg":"#1F2937","al":"center"},{"c":"E38","v":9500,"in":true,"fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"F38","v":"CC-101","fg":"#1F2937","al":"center"},{"c":"G38","v":"تسوية إجمالي الفواتير المرفقة وإغلاق العهدة النقدية","fg":"#1F2937"}]},{"r":39,"h":34.0,"cells":[{"c":"A39","v":"توازن القيد","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D39","v":9500,"f":"=SUM(D35:D38)","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"E39","v":9500,"f":"=SUM(E35:E38)","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"F39","v":"✓ متوازن","f":"=IF(D39=E39, \"✓ متوازن\", \"⚠️ غير متوازن\")","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center"},{"c":"G39","v":"تمت مطابقة قيد اليومية ومعايير القيد المزدوج بنجاح","bg":"#ECFDF5","fg":"#4B5563"}]},{"r":40,"h":28.0,"cells":[{"c":"A40","v":""},{"c":"B40","v":""},{"c":"C40","v":""},{"c":"D40","v":""},{"c":"E40","v":""},{"c":"F40","v":""},{"c":"G40","v":""}]},{"r":41,"h":34.0,"cells":[{"c":"A41","v":"قيد رقم (6): تحميل تكاليف إهلاك وصيانة المعدات على مركز تكلفة المشروع","bg":"#D1FAE5","fg":"#1F2937","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":42,"h":34.0,"cells":[{"c":"A42","v":"-","fg":"#1F2937","al":"center"},{"c":"B42","v":"543","fg":"#1F2937","al":"center"},{"c":"C42","v":"صيانة وقطع غيار معدات موقعية (حفار وأوناش)","fg":"#1F2937"},{"c":"D42","v":18000,"in":true,"fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"E42","v":"-","fg":"#1F2937","al":"center"},{"c":"F42","v":"CC-102","fg":"#1F2937","al":"center"},{"c":"G42","v":"تحميل مركز تكلفة مشروع فلل النخيل بصيانة المعدات المخصصة","fg":"#1F2937"}]},{"r":43,"h":34.0,"cells":[{"c":"A43","v":"-","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B43","v":"1119","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"C43","v":"مجمع إهلاك الأصول الثابتة (آلات ومعدات)","bg":"#F8FAFC","fg":"#1F2937"},{"c":"D43","v":"-","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"E43","v":18000,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"F43","v":"CC-102","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"G43","v":"إثبات قسط الإهلاك الشهري للمعدات المستخدمة بالموقع","bg":"#F8FAFC","fg":"#1F2937"}]},{"r":44,"h":34.0,"cells":[{"c":"A44","v":"توازن القيد","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D44","v":18000,"f":"=SUM(D42:D43)","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"E44","v":18000,"f":"=SUM(E42:E43)","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"F44","v":"✓ متوازن","f":"=IF(D44=E44, \"✓ متوازن\", \"⚠️ غير متوازن\")","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center"},{"c":"G44","v":"تمت مطابقة قيد اليومية ومعايير القيد المزدوج بنجاح","bg":"#ECFDF5","fg":"#4B5563"}]},{"r":45,"h":28.0,"cells":[{"c":"A45","v":""},{"c":"B45","v":""},{"c":"C45","v":""},{"c":"D45","v":""},{"c":"E45","v":""},{"c":"F45","v":""},{"c":"G45","v":""}]},{"r":46,"h":34.0,"cells":[{"c":"A46","v":"قيد رقم (7): تحصيل محتجز ضمان أعمال من العميل عند التسليم الابتدائي (صرف 5%)","bg":"#D1FAE5","fg":"#1F2937","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":47,"h":34.0,"cells":[{"c":"A47","v":"-","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"B47","v":"1213","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"C47","v":"البنك الجاري - العملة المحلية","bg":"#F8FAFC","fg":"#1F2937"},{"c":"D47","v":50000,"in":true,"bg":"#F8FAFC","fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"E47","v":"-","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"F47","v":"CC-103","bg":"#F8FAFC","fg":"#1F2937","al":"center"},{"c":"G47","v":"إيداع نصف محتجز الضمان المسترد بعد صدور محضر التسليم","bg":"#F8FAFC","fg":"#1F2937"}]},{"r":48,"h":34.0,"cells":[{"c":"A48","v":"-","fg":"#1F2937","al":"center"},{"c":"B48","v":"1223","fg":"#1F2937","al":"center"},{"c":"C48","v":"محتجزات ضمان أعمال لدى العملاء","fg":"#1F2937"},{"c":"D48","v":"-","fg":"#1F2937","al":"center"},{"c":"E48","v":50000,"in":true,"fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"F48","v":"CC-103","fg":"#1F2937","al":"center"},{"c":"G48","v":"إقفال وتخفيض رصيد محتجز الضمان بعد استلامه نقداً","fg":"#1F2937"}]},{"r":49,"h":34.0,"cells":[{"c":"A49","v":"توازن القيد","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D49","v":50000,"f":"=SUM(D47:D48)","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"E49","v":50000,"f":"=SUM(E47:E48)","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center","nf":"#,##0"},{"c":"F49","v":"✓ متوازن","f":"=IF(D49=E49, \"✓ متوازن\", \"⚠️ غير متوازن\")","bg":"#ECFDF5","fg":"#1F2937","b":true,"al":"center"},{"c":"G49","v":"تمت مطابقة قيد اليومية ومعايير القيد المزدوج بنجاح","bg":"#ECFDF5","fg":"#4B5563"}]}]}]}