{"slug":"crane-lifting-plan-and-rigging","sheets":[{"name":"بيانات_المشروع_ومواصفات_الونش","maxRow":27,"maxCol":6,"colWidths":[16.0,42.0,30.0,16.0,22.0,26.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"خطة رفع الأوناش المتحركة وعمليات التصبين الهندسي (Crane Lifting Plan & Rigging Study) — بيانات الرفع والمعدات","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":40.0,"cells":[{"c":"A2","v":"معايير السلامة المهنية: OSHA 1926.1400 و ASME B30.5 وإجراءات أرامكو السعودية للرفع الحرج GI 7.028","bg":"#2563EB","fg":"#E2E8F0","al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""}]},{"r":4,"h":36.0,"cells":[{"c":"A4","v":"1. بيانات المشروع والجهة المشرفة وفريق الرفع المعتمد","bg":"#E2E8F0","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"اسم المشروع:","b":true},{"c":"B5","v":"مشروع إنشاء محطة معالجة ومجمع مبانٍ صناعية ومستودعات لوجستية","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"E5","v":"رقم خطة الرفع:","b":true},{"c":"F5","v":"CLP-2026-088","fg":"#1E293B","al":"center"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"المقاول العام:","b":true},{"c":"B6","v":"شركة البنيان للإنشاءات والمقاولات العامة المتخصصة","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"E6","v":"تاريخ عملية الرفع:","b":true},{"c":"F6","v":"2026-10-11","fg":"#1E293B","al":"center"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"الاستشاري المشرف:","b":true},{"c":"B7","v":"مكتب الاستشارات الهندسية وفحص السلامة المهنية","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"E7","v":"تصنيف الرفع المبدئي:","b":true},{"c":"F7","v":"رفع حرج (Critical Lift > 75%)","fg":"#1E293B","al":"center"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"اسم مهندس الرفع (Lifting Eng):","b":true},{"c":"B8","v":"م. أحمد عبد الرحمن (حاصل على اعتماد فاحص أوناش)","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"E8","v":"هاتف الطوارئ بالموقع:","b":true},{"c":"F8","v":"+966 50 000 0000","fg":"#1E293B","al":"center"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"مسؤول التصبين (Certified Rigger):","b":true},{"c":"B9","v":"خالد المنصور (رخصة ريجر معتمدة المستوى الأول - Level 1)","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"E9","v":"رقم شهادة الكفاءة:","b":true},{"c":"F9","v":"RIG-CERT-8841","fg":"#1E293B","al":"center"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":"سائق ومشغل الونش (Operator):","b":true},{"c":"B10","v":"محمود إبراهيم (رخصة تشغيل معدات ثقيلة سارية الفحص)","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"E10","v":"صلاحية رخصة المشغل:","b":true},{"c":"F10","v":"2027-04-15","fg":"#1E293B","al":"center"}]},{"r":11,"h":28.0,"cells":[{"c":"A11","v":""},{"c":"B11","v":""},{"c":"C11","v":""},{"c":"D11","v":""},{"c":"E11","v":""},{"c":"F11","v":""}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":"2. المواصفات الفنية للونش المتحرك وجدول الأحمال (Crane Technical Specifications & Load Chart)","bg":"#E2E8F0","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":"طراز وموديل الونش:","b":true},{"c":"B13","v":"Liebherr LTM 1100-5.2 (All-Terrain Mobile Crane)","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"E13","v":"الحمولة القصوى المصنعية:","b":true},{"c":"F13","v":"100 طن متري @ 2.5م نصف قطر","b":true,"al":"center"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"رقم اللوحة / شاسيه الونش:","b":true},{"c":"B14","v":"KSA-9942-LTM / Chassis # 074128","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"E14","v":"شهادة فحص الونش الدورية:","b":true},{"c":"F14","v":"شهادة سارية طرف ثالث معتمد (TUV)","b":true,"al":"center"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"طول ذراع البوم المفرود (Boom):","b":true},{"c":"B15","v":"38.20 متر (Telescopic Main Boom)","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"E15","v":"زاوية ميل البوم (Boom Angle):","b":true},{"c":"F15","v":"68.5 درجة","b":true,"al":"center"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":"نصف قطر العمل الفعلي (Radius):","b":true},{"c":"B16","v":"16.00 متر (من مركز دوران الونش لمركز الثقل)","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"E16","v":"طول ذراع التمديد (Jib):","b":true},{"c":"F16","v":"بدون ذراع تمديد إضافي (0.00 م)","b":true,"al":"center"}]},{"r":17,"h":72.0,"cells":[{"c":"A17","v":"أثقال الموازنة الخلفية (Counterweight):","b":true},{"c":"B17","v":"26.0 طن متري (Full Counterweight Configuration)","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"E17","v":"امتداد الركائز (Outrigger Extension):","b":true},{"c":"F17","v":"100% مفرودة بالكامل (7.40م × 7.00م)","b":true,"al":"center"}]},{"r":18,"h":72.0,"cells":[{"c":"A18","v":"قدرة الونش المقننة بالجدول عند هذا النصف:","b":true},{"c":"B18","v":"17.40 طن متري (Chart Rated Capacity)","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"E18","v":"أقصى سرعة رياح مسموحة للرفع:","b":true},{"c":"F18","v":"9.8 م/ث (20 عقدة بحرية أو 35 كم/س)","b":true,"al":"center"}]},{"r":19,"h":28.0,"cells":[{"c":"A19","v":""},{"c":"B19","v":""},{"c":"C19","v":""},{"c":"D19","v":""},{"c":"E19","v":""},{"c":"F19","v":""}]},{"r":20,"h":36.0,"cells":[{"c":"A20","v":"3. قائمة التحقق البيئية والموقعية قبل بدء الرفع (Pre-Lift Site & Environmental Checklist)","bg":"#E2E8F0","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":21,"h":40.0,"cells":[{"c":"A21","v":"م","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B21","v":"بند الفحص الموقعي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C21","v":"المعيار والاشتراط الهندسي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D21","v":"حالة الاستيفاء","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E21","v":"المسؤول المنفذ","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F21","v":"ملاحظات","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":22,"h":52.0,"cells":[{"c":"A22","v":1,"b":true,"al":"center"},{"c":"B22","v":"خلو مسار الرفع ودوران البوم من خطوط الكهرباء الهوائية","fg":"#1E293B"},{"c":"C22","v":"مسافة أمان لا تقل عن 6.0 أمتار (OSHA Table A)","fg":"#64748B"},{"c":"D22","v":"✅ مستوفى وآمن","bg":"#ECFDF5","b":true,"al":"center"},{"c":"E22","v":"مسؤول السلامة HSE","fg":"#1E293B","al":"center"},{"c":"F22","v":"تم فصل التيار عن الخط المجاور","fg":"#1E293B"}]},{"r":23,"h":52.0,"cells":[{"c":"A23","v":2,"b":true,"al":"center"},{"c":"B23","v":"فحص صلابة واستواء الأرضية تحت ركائز الونش (Outrigger Pads)","fg":"#1E293B"},{"c":"C23","v":"استخدام وسادات فولاذية وألواح خشب صلب 1.5م × 1.5م","fg":"#64748B"},{"c":"D23","v":"✅ مستوفى وآمن","bg":"#ECFDF5","b":true,"al":"center"},{"c":"E23","v":"مهندس الموقع","fg":"#1E293B","al":"center"},{"c":"F23","v":"أرضية مدموكة بنسبة 95%","fg":"#1E293B"}]},{"r":24,"h":52.0,"cells":[{"c":"A24","v":3,"b":true,"al":"center"},{"c":"B24","v":"تطويق منطقة الرفع بالكامل بحواجز تحذيرية وشريط أمان","fg":"#1E293B"},{"c":"C24","v":"منع مرور الأفراد أسفل الحمل المعلق ومحيط التأرجح","fg":"#64748B"},{"c":"D24","v":"✅ مستوفى وآمن","bg":"#ECFDF5","b":true,"al":"center"},{"c":"E24","v":"مساعد التصبين Rigger","fg":"#1E293B","al":"center"},{"c":"F24","v":"تركيب لوحات تحذيرية واضحة","fg":"#1E293B"}]},{"r":25,"h":52.0,"cells":[{"c":"A25","v":4,"b":true,"al":"center"},{"c":"B25","v":"قياس سرعة الرياح بجهاز الأنيموميتر (Anemometer) عند قمة البوم","fg":"#1E293B"},{"c":"C25","v":"سرعة الرياح اللحظية أقل من 20 عقدة (35 كم/ساعة)","fg":"#64748B"},{"c":"D25","v":"✅ مستوفى وآمن","bg":"#ECFDF5","b":true,"al":"center"},{"c":"E25","v":"مشغل الونش","fg":"#1E293B","al":"center"},{"c":"F25","v":"السرعة المسجلة 14 عقدة","fg":"#1E293B"}]},{"r":26,"h":52.0,"cells":[{"c":"A26","v":5,"b":true,"al":"center"},{"c":"B26","v":"سلامة حبال التوجيه الأرضية (Tag Lines) والتحكم اليدوي","fg":"#1E293B"},{"c":"C26","v":"ربط حبلين توجيه قطن/نايلون على أطراف الحمل للتحكم","fg":"#64748B"},{"c":"D26","v":"✅ مستوفى وآمن","bg":"#ECFDF5","b":true,"al":"center"},{"c":"E26","v":"فريق التصبين Riggers","fg":"#1E293B","al":"center"},{"c":"F26","v":"أطوال الحبال 15 متراً","fg":"#1E293B"}]},{"r":27,"h":52.0,"cells":[{"c":"A27","v":6,"b":true,"al":"center"},{"c":"B27","v":"اختبار جهاز مانع اصطدام الهوك بقمة البوم (Anti-Two Block A2B)","fg":"#1E293B"},{"c":"C27","v":"فصل آلي لحركة رفع الواير عند اقتراب الهوك من البكرات","fg":"#64748B"},{"c":"D27","v":"✅ مستوفى وآمن","bg":"#ECFDF5","b":true,"al":"center"},{"c":"E27","v":"مشغل الونش","fg":"#1E293B","al":"center"},{"c":"F27","v":"تم اختباره قبل بدء المناورة","fg":"#1E293B"}]}]},{"name":"لوحة_المؤشرات_وقرار_الرفع","maxRow":19,"maxCol":6,"colWidths":[16.0,36.0,22.0,24.0,22.0,32.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"لوحة المؤشرات التنفيذية وقرار الرفع الحرج (Executive Lifting Decision & Safety Summary)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":40.0,"cells":[{"c":"A2","v":"مقارنة الحمل الإجمالي مع سعة الونش المقننة، نسبة التشغيل الاستيعابية، تصنيف الرفع، والقرار النهائي","bg":"#2563EB","fg":"#E2E8F0","al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"الحمل الإجمالي المرفوع (Gross Load)","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"سعة الونش المقننة عند 16م","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center"},{"c":"D4","v":"نسبة تشغيل الونش (Capacity Utilization)","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center"},{"c":"E4","v":"قرار الرفع وتصنيف الخطورة الإنشائية","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true}]},{"r":5,"h":48.0,"cells":[{"c":"A5","v":0,"f":"='حساب_الأحمال_والخصومات'!F16","bg":"#F1F5F9","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00","cs":2},{"skip":true},{"c":"C5","v":17.4,"in":true,"bg":"#F1F5F9","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"D5","v":0,"f":"=A5/C5","bg":"#F1F5F9","fg":"#B45309","b":true,"al":"center","nf":"0.0%"},{"c":"E5","v":"🟢 رفع اعتيادي آمن (Standard Lift)","f":"=IF(D5>0.90, \"🔴 مرفوض - تجاوز حد الأمان\", IF(D5>=0.75, \"🟡 رفع حرج معتمد (Critical Lift)\", \"🟢 رفع اعتيادي آمن (Standard Lift)\"))","bg":"#F1F5F9","fg":"#047857","b":true,"al":"center","cs":2},{"skip":true}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"طن متري (وزن الجسم الصافي + ملحقات التصبين)","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C6","v":"طن متري (وفق جدول حمولة Liebherr الرسمي)","bg":"#F1F5F9","fg":"#64748B","al":"center"},{"c":"D6","v":"نسبة الحمل الإجمالي لسعة الونش المقننة","bg":"#F1F5F9","fg":"#64748B","al":"center"},{"c":"E6","v":"يتطلب اعتماد خطة الرفع وتوقيع مهندس السلامة","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"مصفوفة مقارنة معايير الرفع وعوامل الأمان الموقعية (Safety Factors & Rigging Check Matrix)","bg":"#E2E8F0","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":40.0,"cells":[{"c":"A9","v":"م","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"المؤشر الهندسي للرفع","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"القيمة المحسوبة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"الحد المسموح به كودياً","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"حالة المطابقة والتقييم","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"المرجع الكودي والاشتراط","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":1,"b":true,"al":"center"},{"c":"B10","v":"نسبة استغلال سعة الونش (Capacity Utilization)","b":true},{"c":"C10","v":0,"f":"=D5","b":true,"al":"center","nf":"0.0%"},{"c":"D10","v":"أقل من 85% للرفع الحرج (أقل من 75% للاعتيادي)","fg":"#1E293B","al":"center"},{"c":"E10","v":"✅ مطابق للحد الآمن","f":"=IF(D5<=0.85, \"✅ مطابق للحد الآمن\", \"❌ غير مطابق\")","bg":"#ECFDF5","b":true,"al":"center"},{"c":"F10","v":"Aramco GI 7.028 / OSHA 1926.1400","fg":"#64748B"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":2,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":"عامل أمان أدوات التصبين والوايرات (Rigging Safety Factor)","bg":"#F8FAFC","b":true},{"c":"C11","v":0,"f":"='حساب_أحمال_التصبين_والوايرات'!G11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"D11","v":"لا يقل عن 5.0 إلى 1 (SF >= 5:1)","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E11","v":"❌ خطر تآكل","f":"=IF('حساب_أحمال_التصبين_والوايرات'!G11>=5.0, \"✅ معامل أمان ممتاز\", \"❌ خطر تآكل\")","bg":"#ECFDF5","b":true,"al":"center"},{"c":"F11","v":"ASME B30.9 Slings Safety Standards","bg":"#F8FAFC","fg":"#64748B"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":3,"b":true,"al":"center"},{"c":"B12","v":"زاوية ميل وايرات التصبين عن الأفق (Sling Angle)","b":true},{"c":"C12","v":60,"f":"='حساب_أحمال_التصبين_والوايرات'!C11","b":true,"al":"center"},{"c":"D12","v":"لا تقل الزاوية عن 45 درجة (يفضل >= 60°)","fg":"#1E293B","al":"center"},{"c":"E12","v":"✅ زاوية توزيع قوى مثالية","f":"=IF('حساب_أحمال_التصبين_والوايرات'!C11>=45, \"✅ زاوية توزيع قوى مثالية\", \"❌ زاوية حادة خطرة\")","bg":"#ECFDF5","b":true,"al":"center"},{"c":"F12","v":"OSHA Rigging Geometry Table","fg":"#64748B"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":4,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":"ضغط الركائز على التربة الموقعية (Outrigger Pad Pressure)","bg":"#F8FAFC","b":true},{"c":"C13","v":"المساحة الموزعة للضغط","f":"='ضغط_الركائز_وتسوية_التربة'!E12","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"D13","v":"أقل من قدرة تحمل التربة المسموحة (220 kN/m²)","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E13","v":"❌ خطر انغراس","f":"=IF('ضغط_الركائز_وتسوية_التربة'!E12<220, \"✅ توزيع آمن دون هبوط\", \"❌ خطر انغراس\")","bg":"#ECFDF5","b":true,"al":"center"},{"c":"F13","v":"SBC 303 Soils & Foundations Code","bg":"#F8FAFC","fg":"#64748B"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":5,"b":true,"al":"center"},{"c":"B14","v":"سرعة الرياح الموقعية اللحظية (Site Wind Speed)","b":true},{"c":"C14","v":"14 عقدة (7.2 م/ث)","b":true,"al":"center"},{"c":"D14","v":"أقصى سرعة مسموحة 20 عقدة (9.8 م/ث)","fg":"#1E293B","al":"center"},{"c":"E14","v":"✅ ضمن النطاق الآمن المسموح","bg":"#ECFDF5","b":true,"al":"center"},{"c":"F14","v":"Liebherr Operating Manual Safety Limits","fg":"#64748B"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":6,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B15","v":"الخلوص الرأسي والأفقي عن المنشآت المجاورة (Clearance)","bg":"#F8FAFC","b":true},{"c":"C15","v":"3.50 متر خلوص صافٍ","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D15","v":"لا يقل الخلوص عن 2.0 متر في أي اتجاه","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E15","v":"✅ هامش حركة آمن دون تصادم","bg":"#ECFDF5","b":true,"al":"center"},{"c":"F15","v":"ASME B30.5 Site Clearance Standards","bg":"#F8FAFC","fg":"#64748B"}]},{"r":16,"h":28.0,"cells":[{"c":"A16","v":""},{"c":"B16","v":""},{"c":"C16","v":""},{"c":"D16","v":""},{"c":"E16","v":""},{"c":"F16","v":""}]},{"r":17,"h":36.0,"cells":[{"c":"A17","v":"الاعتمادات والتوقيعات الرسمية لخطة الرفع (Official Engineering Approvals & Signatures)","bg":"#E2E8F0","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":"مسؤول التصبين المعتمد (Certified Rigger)","bg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"C18","v":"مهندس السلامة والصحة المهنية (HSE Manager)","bg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"E18","v":"مهندس الموقع / مدير المشروع (Project Manager)","bg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true}]},{"r":19,"h":72.0,"cells":[{"c":"A19","v":"الاسم:\nالتوقيع:\nالتاريخ:","fg":"#64748B","cs":2},{"skip":true},{"c":"C19","v":"الاسم:\nالتوقيع:\nالتاريخ:","fg":"#64748B","cs":2},{"skip":true},{"c":"E19","v":"الاسم:\nالتوقيع:\nالتاريخ:","fg":"#64748B","cs":2},{"skip":true}]}]},{"name":"حساب_الأحمال_والخصومات","maxRow":15,"maxCol":7,"colWidths":[16.0,42.0,16.0,20.0,20.0,20.0,34.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول تفصيل وحساب الحمل الصافي والخصومات الإجمالية (Net Load & Crane Deductions)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":40.0,"cells":[{"c":"A2","v":"معادلة الحمل الإجمالي: الحمل الإجمالي = الوزن الصافي للجسم + وزن الهوك + وزن الوايرات + كمرة التوزيع + البواقي","bg":"#2563EB","fg":"#E2E8F0","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":42.0,"cells":[{"c":"A4","v":"كود البند","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"بيان وتوصيف عنصر الحمل أو الخصم","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"العدد / الطول","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"الوزن الإفرادي (كجم)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"إجمالي الوزن (كجم)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"إجمالي الوزن (طن)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"طريقة التحقق والملاحظات الفنية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"L-01","b":true,"al":"center"},{"c":"B5","v":"الوزن الصافي للمعدة المراد رفعها (خزان ضغط / محول كهربائي رئيسي)","b":true},{"c":"C5","v":1,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D5","v":12500,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E5","v":12500,"f":"=C5*D5","b":true,"al":"center","nf":"#,##0.00"},{"c":"F5","v":12.5,"f":"=E5/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"G5","v":"وزن معتمد من شهادة الوزن المصنعية المرفقة","fg":"#64748B"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"D-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B6","v":"وزن الهوك الرئيسي والبكرات للونش (Main Hook Block - 3 Sheaves)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C6","v":1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D6","v":650,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E6","v":650,"f":"=C6*D6","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"F6","v":0.65,"f":"=E6/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G6","v":"مدون على لوحة بيانات الهوك المصنعية","bg":"#F8FAFC","fg":"#64748B"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"D-02","b":true,"al":"center"},{"c":"B7","v":"وزن هوك الخطف السريع الصغير (Auxiliary Ball / Headache Ball)","fg":"#1E293B"},{"c":"C7","v":1,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D7","v":180,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E7","v":180,"f":"=C7*D7","b":true,"al":"center","nf":"#,##0.00"},{"c":"F7","v":0.18,"f":"=E7/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"G7","v":"مربوط بالواير المساعد المرفوع","fg":"#64748B"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"D-03","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B8","v":"وزن كمرة التوزيع المعتمدة للتصبين (Spreader Lifting Beam 6m)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C8","v":1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D8","v":420,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E8","v":420,"f":"=C8*D8","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"F8","v":0.42,"f":"=E8/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G8","v":"كمرة IPE 300 معتمدة ومختبرة بأرقام تسلسلية","bg":"#F8FAFC","fg":"#64748B"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"D-04","b":true,"al":"center"},{"c":"B9","v":"وزن وايرات الصلب والتصبين الرئيسية (4-Leg Wire Rope Slings)","fg":"#1E293B"},{"c":"C9","v":4,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D9","v":38,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E9","v":152,"f":"=C9*D9","b":true,"al":"center","nf":"#,##0.00"},{"c":"F9","v":0.152,"f":"=E9/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"G9","v":"قطر 28 مم طول 6 أمتار مع مرابط Thimble","fg":"#64748B"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":"D-05","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B10","v":"وزن الأقفال والشناكل الفولاذية (Bow Shackles Gr 8.8)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C10","v":6,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D10","v":8.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E10","v":51,"f":"=C10*D10","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"F10","v":0.051,"f":"=E10/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G10","v":"أقفال حمولة 12 طن لكل قفل","bg":"#F8FAFC","fg":"#64748B"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"D-06","b":true,"al":"center"},{"c":"B11","v":"وزن حبال التوجيه والمشابك والأربطة الأرضية (Tag lines & Clamps)","fg":"#1E293B"},{"c":"C11","v":2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D11","v":12,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E11","v":24,"f":"=C11*D11","b":true,"al":"center","nf":"#,##0.00"},{"c":"F11","v":0.024,"f":"=E11/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"G11","v":"حبال غير موصلة للكهرباء للتحكم الموقعي","fg":"#64748B"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":"D-07","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B12","v":"خصم وزن ذراع التمديد المطوي على جانب البوم (Fly Jib Stowed Deduction)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C12","v":1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D12","v":350,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E12","v":350,"f":"=C12*D12","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"F12","v":0.35,"f":"=E12/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G12","v":"قيمة خصم ثابتة وفق كتالوج رافعة Liebherr","bg":"#F8FAFC","fg":"#64748B"}]},{"r":13,"h":36.0,"cells":[{"c":"A13","v":"الوزن الصافي للجسم المرفوع (Net Object Load)","bg":"#E2E8F0","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"E13","v":12500,"f":"=E5","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00"},{"c":"F13","v":12.5,"f":"=F5","bg":"#E2E8F0","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"G13","v":"وزن الحمولة الأساسية الصافية","bg":"#E2E8F0","b":true,"al":"center"}]},{"r":14,"h":36.0,"cells":[{"c":"A14","v":"إجمالي أوزان الخصومات والتصبين (Total Rigging & Crane Deductions)","bg":"#E2E8F0","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"E14","v":1827,"f":"=SUM(E6:E12)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00"},{"c":"F14","v":1.827,"f":"=SUM(F6:F12)","bg":"#E2E8F0","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"G14","v":"مجموع كافة الأوزان المضافة على الونش","bg":"#E2E8F0","b":true,"al":"center"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"الحمل الإجمالي المحسوب على الونش (Total Calculated Gross Load)","bg":"#FEF3C7","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"E15","v":14327,"f":"=E13+E14","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"F15","v":14.327,"f":"=F13+F14","bg":"#FEF3C7","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"G15","v":"يرحل مباشرة للوحة المؤشرات للمقارنة مع سعة الونش","bg":"#FEF3C7","b":true,"al":"center"}]}]},{"name":"حساب_أحمال_التصبين_والوايرات","maxRow":11,"maxCol":8,"colWidths":[22.0,20.0,20.0,20.0,20.0,22.0,20.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"حاسبة قوى الشد وزوايا وايرات التصبين واختيار الأقفال (Sling Tension & Rigging Hardware Calculator)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":40.0,"cells":[{"c":"A2","v":"معادلة الشد في الواير: الشد = (الحمل الإجمالي ÷ عدد الأطراف) × (1 ÷ جيب زاوية الميل sin θ) وفق ASME B30.9","bg":"#2563EB","fg":"#E2E8F0","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"الحالة وزاوية التصبين","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"عدد أطراف الوايرات (Legs)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"زاوية الميل مع الأفق (°)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"معامل زاوية الحمل (LAF)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"قوة الشد في الطرف (طن)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"حمولة تشغيل الواير WLL (طن)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"معامل الأمان الفعلي (SF)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"التقييم الهندسي والقرار","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"رفع رأسي مباشر (90 درجة)","b":true},{"c":"B5","v":4,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"C5","v":90,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"D5","v":1.0,"f":"=1/SIN(RADIANS(C5))","fg":"#1E293B","al":"center","nf":"0.000"},{"c":"E5","v":0,"f":"=('حساب_الأحمال_والخصومات'!$F$16/B5)*D5","b":true,"al":"center","nf":"#,##0.00"},{"c":"F5","v":22,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"G5","v":0,"f":"=F5/E5","fg":"#1E3A8A","b":true,"al":"center","nf":"0.00"},{"c":"H5","v":"🔴 خطر ومرفوض","f":"=IF(G5>=5.0, \"🟢 آمن ومطابق للكود\", IF(G5>=4.0, \"🟡 حرج - يتطلب تدقيقاً\", \"🔴 خطر ومرفوض\"))","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"زاوية مثالية نموذجية (60 درجة)","bg":"#F8FAFC","b":true},{"c":"B6","v":4,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"C6","v":60,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"D6","v":1.1547,"f":"=1/SIN(RADIANS(C6))","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.000"},{"c":"E6","v":0,"f":"=('حساب_الأحمال_والخصومات'!$F$16/B6)*D6","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"F6","v":22,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G6","v":0,"f":"=F6/E6","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"0.00"},{"c":"H6","v":"🔴 خطر ومرفوض","f":"=IF(G6>=5.0, \"🟢 آمن ومطابق للكود\", IF(G6>=4.0, \"🟡 حرج - يتطلب تدقيقاً\", \"🔴 خطر ومرفوض\"))","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"زاوية تشغيل مقبولة (45 درجة)","b":true},{"c":"B7","v":4,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"C7","v":45,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"D7","v":1.414214,"f":"=1/SIN(RADIANS(C7))","fg":"#1E293B","al":"center","nf":"0.000"},{"c":"E7","v":0,"f":"=('حساب_الأحمال_والخصومات'!$F$16/B7)*D7","b":true,"al":"center","nf":"#,##0.00"},{"c":"F7","v":22,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"G7","v":0,"f":"=F7/E7","fg":"#1E3A8A","b":true,"al":"center","nf":"0.00"},{"c":"H7","v":"🔴 خطر ومرفوض","f":"=IF(G7>=5.0, \"🟢 آمن ومطابق للكود\", IF(G7>=4.0, \"🟡 حرج - يتطلب تدقيقاً\", \"🔴 خطر ومرفوض\"))","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"زاوية حادة غير مفضلة (30 درجة)","bg":"#F8FAFC","b":true},{"c":"B8","v":4,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"C8","v":30,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"D8","v":1.999999,"f":"=1/SIN(RADIANS(C8))","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.000"},{"c":"E8","v":0,"f":"=('حساب_الأحمال_والخصومات'!$F$16/B8)*D8","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"F8","v":22,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G8","v":0,"f":"=F8/E8","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"0.00"},{"c":"H8","v":"🔴 خطر ومرفوض","f":"=IF(G8>=5.0, \"🟢 آمن ومطابق للكود\", IF(G8>=4.0, \"🟡 حرج - يتطلب تدقيقاً\", \"🔴 خطر ومرفوض\"))","bg":"#FEF3C7","b":true,"al":"center"}]},{"r":9,"h":28.0,"cells":[{"c":"A9","v":""},{"c":"B9","v":""},{"c":"C9","v":""},{"c":"D9","v":""},{"c":"E9","v":""},{"c":"F9","v":""},{"c":"G9","v":""},{"c":"H9","v":""}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":"مواصفات التصبين المختارة فعلياً لعملية الرفع بالمشروع (Design Configuration)","bg":"#E2E8F0","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":11,"h":38.0,"cells":[{"c":"A11","v":"التكوين المعتمد في الموقع:","bg":"#FEF3C7","b":true,"al":"center","cs":2},{"skip":true},{"c":"C11","v":60,"in":true,"bg":"#FEF3C7","b":true,"al":"center"},{"c":"D11","v":1.1547,"f":"=1/SIN(RADIANS(C11))","bg":"#FEF3C7","b":true,"al":"center","nf":"0.000"},{"c":"E11","v":0,"f":"=('حساب_الأحمال_والخصومات'!$F$16/4)*D11","bg":"#FEF3C7","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"F11","v":22,"in":true,"bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"G11","v":0,"f":"=F11/E11","bg":"#FEF3C7","fg":"#047857","b":true,"al":"center","nf":"0.00"},{"c":"H11","v":"🟢 معتمد للتنفيذ بالموقع","bg":"#FEF3C7","b":true,"al":"center"}]}]},{"name":"ضغط_الركائز_وتسوية_التربة","maxRow":15,"maxCol":6,"colWidths":[16.0,42.0,20.0,18.0,24.0,34.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"حسابات ردود أفعال ركائز الونش وضغط التربة المسموح به (Outrigger Reaction & Ground Bearing)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":40.0,"cells":[{"c":"A2","v":"حساب أقصى حمل على الركيزة الأكثر تحميلًا والتحقق من مساحة وسادة التوزيع لتفادي انغراس الونش","bg":"#2563EB","fg":"#E2E8F0","al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""}]},{"r":4,"h":42.0,"cells":[{"c":"A4","v":"كود الحساب","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"بيان المعامل الهندسي لضغط التربة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"القيمة الرقمية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"الوحدة الهندسية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"النتيجة والتحقق","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"الاشتراط والمعيار المرجعي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"OG-01","b":true,"al":"center"},{"c":"B5","v":"الوزن الكلي للونش متضمناً أثقال الموازنة والبوم (Crane Total Weight)","fg":"#1E293B"},{"c":"C5","v":60,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"D5","v":"طن متري","fg":"#1E293B","al":"center"},{"c":"E5","v":"وزن الونش الفارغ بكامل الثقل","b":true,"al":"center"},{"c":"F5","v":"Liebherr LTM 1100 Specification","fg":"#64748B"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"OG-02","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B6","v":"الحمل الإجمالي المرفوع بالهوك (Total Gross Load)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C6","v":0,"f":"='حساب_الأحمال_والخصومات'!F16","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"D6","v":"طن متري","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E6","v":"حمل منقول مباشرة للركائز","bg":"#F8FAFC","b":true,"al":"center"},{"c":"F6","v":"محسوب من تبويب الأحمال","bg":"#F8FAFC","fg":"#64748B"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"OG-03","b":true,"al":"center"},{"c":"B7","v":"معامل تركيز الحمل على الركيزة الحرجة (Distribution Factor k)","fg":"#1E293B"},{"c":"C7","v":0.75,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"D7","v":"معامل لا بعدي","fg":"#1E293B","al":"center"},{"c":"E7","v":"75% من الوزن يتركز على ركيزة واحدة أثناء الدوران","b":true,"al":"center"},{"c":"F7","v":"CIRIA C703 / ASME B30.5 Guide","fg":"#64748B"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"OG-04","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B8","v":"أقصى رد فعل على الركيزة الواحدة الأكثر حملاً (Max Outrigger Load P_max)","bg":"#F8FAFC","b":true},{"c":"C8","v":45,"f":"=(C5+C6)*C7","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"D8","v":"طن متري","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E8","v":"أقصى قوة عمودية على الركيزة","bg":"#F8FAFC","b":true,"al":"center"},{"c":"F8","v":"P_max = (W_crane + W_gross) * 0.75","bg":"#F8FAFC","fg":"#64748B"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"OG-05","b":true,"al":"center"},{"c":"B9","v":"أقصى قوة ركيزة بالكيلونيوتن (Max Load in kN)","fg":"#1E293B"},{"c":"C9","v":441.45,"f":"=C8*9.81","b":true,"al":"center","nf":"#,##0.00"},{"c":"D9","v":"كيلونيوتن (kN)","fg":"#1E293B","al":"center"},{"c":"E9","v":"تحويل الحمل لنيوتن","b":true,"al":"center"},{"c":"F9","v":"1 طن = 9.81 kN","fg":"#64748B"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":"OG-06","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B10","v":"طول وسادة توزيع الحمل الفولاذية / الخشبية (Mat Length L)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C10","v":1.8,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"D10","v":"متر (m)","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E10","v":"أبعاد وسادة التوزيع المستطيلة","bg":"#F8FAFC","b":true,"al":"center"},{"c":"F10","v":"مات مسبق الصنع من الصلب والخشب","bg":"#F8FAFC","fg":"#64748B"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":"OG-07","b":true,"al":"center"},{"c":"B11","v":"عرض وسادة توزيع الحمل (Mat Width W)","fg":"#1E293B"},{"c":"C11","v":1.8,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"D11","v":"متر (m)","fg":"#1E293B","al":"center"},{"c":"E11","v":"مساحة توزيع مناسبة","b":true,"al":"center"},{"c":"F11","v":"L x W = 3.24 m²","fg":"#64748B"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":"OG-08","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B12","v":"مساحة سطح التلامس لوسادة الركيزة (Mat Contact Area A)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C12","v":3.24,"f":"=C10*C11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"D12","v":"متر مربع (م²)","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E12","v":"المساحة الموزعة للضغط","bg":"#F8FAFC","b":true,"al":"center"},{"c":"F12","v":"A = 1.80 * 1.80 = 3.24 m²","bg":"#F8FAFC","fg":"#64748B"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":"OG-09","b":true,"al":"center"},{"c":"B13","v":"ضغط الركيزة الفعلي على التربة (Actual Ground Pressure q_act)","b":true},{"c":"C13","v":136.25,"f":"=C9/C12","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"D13","v":"كيلونيوتن/م² (kN/m²)","fg":"#1E293B","al":"center"},{"c":"E13","v":"الضغط الفعلي الواقع على الأرض","b":true,"al":"center"},{"c":"F13","v":"q_act = P(kN) / Area(m²)","fg":"#64748B"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"OG-10","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B14","v":"قدرة تحمل التربة المسموحة بالموقع (Allowable Soil Bearing Capacity)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C14","v":220,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"D14","v":"كيلونيوتن/م² (kN/m²)","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E14","v":"تقرير فحص التربة الجيوتقني","bg":"#F8FAFC","b":true,"al":"center"},{"c":"F14","v":"SBC 303 Geotechnical Report","bg":"#F8FAFC","fg":"#64748B"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"OG-11","b":true,"al":"center"},{"c":"B15","v":"عامل الأمان ضد هبوط وانغراس الركيزة (Bearing Safety Factor)","b":true},{"c":"C15","v":1.614679,"f":"=C14/C13","b":true,"al":"center","nf":"#,##0.00"},{"c":"D15","v":"معامل أمان","fg":"#1E293B","al":"center"},{"c":"E15","v":"🟢 آمن ومستقر تماماً","f":"=IF(C15>=1.20, \"🟢 آمن ومستقر تماماً\", \"🔴 خطر هبوط التربة\")","bg":"#ECFDF5","b":true,"al":"center"},{"c":"F15","v":"يجب ألا يقل عن 1.20","fg":"#64748B"}]}]}]}