{"slug":"deep-excavation-dewatering-wellpoint-and-deep-well-sizing-sheet","sheets":[{"name":"إعدادات_المشروع_والأسعار","maxRow":30,"maxCol":7,"colWidths":[16.0,62.0,15.0,22.0,18.0,22.0,48.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"شيت تصميم وحسابات نزح المياه الجوفية للحفريات العميقة بالحراب والآبار العميقة ومقايسة التشغيل","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"⚠️ تنبيه استرشادي: الأسعار والنسب والخصائص الهيدروجيولوجية المدخلة في هذا الشيت هي قيم استرشادية لمتوسطات السوق واختبارات الضخ. يرجى تعديل فئات الأسعار والعملة ومعامل نفاذية التربة أدناه بما يطابق تقرير جسات التربة والأسعار السائدة في بلد مشروعك.","bg":"#1E3A8A","fg":"#F8FAFC","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"📌 أولاً: بيانات المشروع التعاقدية ومحددات الموقع الجيوتقنية (Project Metadata & Site Parameters)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"اسم المشروع التعاقدي","bg":"#E2E8F0","b":true,"al":"center"},{"c":"B5","v":"مشروع برج الأبراج الفندقية والتجارية (3 طوابق قبو + أرضي + 30 طابقاً)","fg":"#1E293B","cs":2},{"skip":true},{"c":"D5","v":"المالك / جهة الإسناد","bg":"#E2E8F0","b":true,"al":"center"},{"c":"E5","v":"شركة الاستثمار والتطوير العقاري القابضة","fg":"#1E293B","cs":3},{"skip":true},{"skip":true}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"استشاري الأساسات والتربة","bg":"#E2E8F0","b":true,"al":"center"},{"c":"B6","v":"المكتب العربي للاستشارات الهندسية والجيوتقنية","fg":"#1E293B","cs":2},{"skip":true},{"c":"D6","v":"المقاول العام / المنفذ","bg":"#E2E8F0","b":true,"al":"center"},{"c":"E6","v":"شركة المقاولات الإنشائية الكبرى","fg":"#1E293B","cs":3},{"skip":true},{"skip":true}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"المقاول التخصصي للنزح","bg":"#E2E8F0","b":true,"al":"center"},{"c":"B7","v":"شركة الأساسات والأعمال الهيدرولوجية المتخصصة","fg":"#1E293B","cs":2},{"skip":true},{"c":"D7","v":"تاريخ إعداد الدراسة الفنية","bg":"#E2E8F0","b":true,"al":"center"},{"c":"E7","v":"أكتوبر 2026","fg":"#1E293B","cs":3},{"skip":true},{"skip":true}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"الطبقة الحاملة للمياه (Aquifer)","bg":"#E2E8F0","b":true,"al":"center"},{"c":"B8","v":"رمال متوسطة إلى خشنة مشبعة تعلو طبقة طينية صماء (Unconfined Aquifer)","fg":"#1E293B","cs":2},{"skip":true},{"c":"D8","v":"النظام المعتمد للنزح","bg":"#E2E8F0","b":true,"al":"center"},{"c":"E8","v":"آبار عميقة Deep Wells مع مضخات غاطسة وخط طرد حلقي","fg":"#1E293B","cs":3},{"skip":true},{"skip":true}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"الأكواد والمراجع القياسية","bg":"#E2E8F0","b":true,"al":"center"},{"c":"B9","v":"كود البناء السعودي SBC 301 / دليل CIRIA C750 / مواصفة USACE EM 1110-2-1901","fg":"#1E293B","cs":2},{"skip":true},{"c":"D9","v":"كود المستند والنسخة","bg":"#E2E8F0","b":true,"al":"center"},{"c":"E9","v":"DWT-DEEP-WELL-BOQ-2026-REV01","fg":"#1E293B","cs":3},{"skip":true},{"skip":true}]},{"r":10,"h":28.0,"cells":[{"c":"A10","v":""},{"c":"B10","v":""},{"c":"C10","v":""},{"c":"D10","v":""},{"c":"E10","v":""},{"c":"F10","v":""},{"c":"G10","v":""}]},{"r":11,"h":38.0,"cells":[{"c":"A11","v":"💰 ثانياً: العملة وفئات أسعار الحفر والتوريد ومعدات النزح وتكاليف التشغيل (Master Unit Rates & O&M)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":12,"h":40.0,"cells":[{"c":"A12","v":"كود البند","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B12","v":"بيان المادة أو الخدمة الهندسية","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C12","v":"الوحدة","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D12","v":"القيمة / الفئة المرجعية","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E12","v":"العملة المحددة","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F12","v":"محددات الأداء / السعة","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G12","v":"المواصفة والاشتراطات الهندسية","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":"RATE-CUR","b":true,"al":"center"},{"c":"B13","v":"العملة التعاقدية المعتمدة للمشروع","fg":"#1E293B"},{"c":"C13","v":"رمز العملة","b":true,"al":"center"},{"c":"D13","v":"ر.س SAR","b":true,"al":"center"},{"c":"E13","v":"-","fg":"#1E293B","al":"center"},{"c":"F13","v":"أساسية","b":true,"al":"center"},{"c":"G13","v":"الريال السعودي أو العملة المحلية المعتمدة في عقود الإنشاء","fg":"#64748B"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":"RATE-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B14","v":"حفر دوار Rotary Drilling لآبار النزح قطر 500 مم حتى عمق 22 م","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C14","v":"م.ط","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D14","v":220,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E14","v":"ر.س SAR","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F14","v":"قطر 500 مم","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G14","v":"حفر هيدروليكي دوار شاملاً سائل الحفر والتبطين المؤقت","bg":"#F8FAFC","fg":"#64748B"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":"RATE-02","b":true,"al":"center"},{"c":"B15","v":"توريد وإنزال مواسير ومصافي UPVC قطر 250 مم فئة ضغط Class 5","fg":"#1E293B"},{"c":"C15","v":"م.ط","b":true,"al":"center"},{"c":"D15","v":140,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E15","v":"ر.س SAR","fg":"#1E293B","al":"center"},{"c":"F15","v":"Class 5","b":true,"al":"center"},{"c":"G15","v":"مواسير مصمتة ومصافي مشقحة بالليزر بنسبة فتحات 15%","fg":"#64748B"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":"RATE-03","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B16","v":"توريد وإنزال مرشح زلطي كوارتز متدرج مقاس 2-4 مم حول المصافي","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C16","v":"م³","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D16","v":160,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E16","v":"ر.س SAR","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F16","v":"حبيبات 2-4 مم","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G16","v":"مطابق لمعيار Terzaghi لمنع انجراف حبيبات الرمال","bg":"#F8FAFC","fg":"#64748B"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":"RATE-04","b":true,"al":"center"},{"c":"B17","v":"تطهير وتنمية الآبار بالهواء المضغوط Air-lifting حتى نقاء المياه","fg":"#1E293B"},{"c":"C17","v":"بئر","b":true,"al":"center"},{"c":"D17","v":1800,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E17","v":"ر.س SAR","fg":"#1E293B","al":"center"},{"c":"F17","v":"8 ساعات/بئر","b":true,"al":"center"},{"c":"G17","v":"كمبروسر هواء ضغط عالي لتنظيف قاع البئر وإزالة الرواسب","fg":"#64748B"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":"RATE-05","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B18","v":"توريد وتركيب مضخات غاطسة ستانلس تصرف 35 م³/س رافع 30 م ولوحة تحكم","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C18","v":"مضخة","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D18","v":8500,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E18","v":"ر.س SAR","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F18","v":"سعة 35 م³/ساعة","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G18","v":"مضخة ستانلس ستيل AISI 304 مع كابلات غاطسة وصمام عدم رجوع","bg":"#F8FAFC","fg":"#64748B"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":"RATE-06","b":true,"al":"center"},{"c":"B19","v":"توريد وتركيب خط طرد حلقي رئيسي مواسير HDPE قطر 200 مم PN10","fg":"#1E293B"},{"c":"C19","v":"م.ط","b":true,"al":"center"},{"c":"D19","v":110,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E19","v":"ر.س SAR","fg":"#1E293B","al":"center"},{"c":"F19","v":"قطر 200 مم","b":true,"al":"center"},{"c":"G19","v":"لحام تناكبي Butt Fusion مع محابس عزل ووصلات التوصيل","fg":"#64748B"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":"RATE-07","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B20","v":"إنشاء خزان ترسيب وفصل رمال وزيوت ثلاثي الغرف سعة 45 م³ مع حواجز","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C20","v":"مقطوعية","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D20","v":28000,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E20","v":"ر.س SAR","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F20","v":"سعة 45 م³","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G20","v":"خزان خرساني/صاج مصفح 3 مراحل لتنقية المياه قبل الصرف","bg":"#F8FAFC","fg":"#64748B"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":"RATE-08","b":true,"al":"center"},{"c":"B21","v":"إيجار مولدات ديزل كاتمة 250 ك.ف.أ مع لوحة ATS احتياطية للتشغيل 24/7","fg":"#1E293B"},{"c":"C21","v":"شهر","b":true,"al":"center"},{"c":"D21","v":16500,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E21","v":"ر.س SAR","fg":"#1E293B","al":"center"},{"c":"F21","v":"قدرة 250 kVA","b":true,"al":"center"},{"c":"G21","v":"مولد أساسي ومولد احتياطي جاهز للعمل الفوري عند الانقطاع","fg":"#64748B"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":"RATE-09","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B22","v":"توريد وقود الديزل الموقعي لتشغيل محطة النزح 24/7 طوال المشروع","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C22","v":"لتر","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D22","v":1.15,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E22","v":"ر.س SAR","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F22","v":"ديزل موقعي","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G22","v":"الديزل السائد بالمملكة لتشغيل المولدات على مدار 24 ساعة","bg":"#F8FAFC","fg":"#64748B"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":"RATE-10","b":true,"al":"center"},{"c":"B23","v":"التشغيل والصيانة 24/7 بفريق هندسي وفنيين على مدار الساعة (شهرياً)","fg":"#1E293B"},{"c":"C23","v":"شهر","b":true,"al":"center"},{"c":"D23","v":36000,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E23","v":"ر.س SAR","fg":"#1E293B","al":"center"},{"c":"F23","v":"وردية 24 ساعة","b":true,"al":"center"},{"c":"G23","v":"مهندس موقع، فني ميكانيكا، فني كهرباء، وعمال تشغيل دائمون","fg":"#64748B"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":"RATE-11","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B24","v":"توريد وتركيب بيزوميترات لمراقبة منسوب المياه وحساسات رقمية Data Logger","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C24","v":"بئر مراقبة","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D24","v":3200,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E24","v":"ر.س SAR","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F24","v":"عمق 20 م","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G24","v":"بيزوميتر كاساجراندي مع مجس إلكتروني لتسجيل الهبوط دورياً","bg":"#F8FAFC","fg":"#64748B"}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":"RATE-12","b":true,"al":"center"},{"c":"B25","v":"أعمال الرصد المساحي الدقيق لهبوط المنشآت المجاورة وحائط السند (شهرياً)","fg":"#1E293B"},{"c":"C25","v":"شهر","b":true,"al":"center"},{"c":"D25","v":4500,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E25","v":"ر.س SAR","fg":"#1E293B","al":"center"},{"c":"F25","v":"تقرير أسبوعي","b":true,"al":"center"},{"c":"G25","v":"ميزان رقمي دقيق Precise Level لرصد نقاط الهبوط والتصدع","fg":"#64748B"}]},{"r":26,"h":52.0,"cells":[{"c":"A26","v":"RATE-13","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B26","v":"الفحوصات والتحاليل المخبرية البيئية الدورية لجودة المياه المنصرفة","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C26","v":"تقرير","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D26","v":1500,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E26","v":"ر.س SAR","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F26","v":"فحص شهري","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G26","v":"تحليل مختبر معتمد لنسبة الأملاح والعوالق والزيوت والرقم الهيدروجيني","bg":"#F8FAFC","fg":"#64748B"}]},{"r":27,"h":52.0,"cells":[{"c":"A27","v":"RATE-14","b":true,"al":"center"},{"c":"B27","v":"أعمال ردم وتطهير وحقن الآبار بروبة الأسمنت والبنتونيت بعد انتهاء المشروع","fg":"#1E293B"},{"c":"C27","v":"بئر","b":true,"al":"center"},{"c":"D27","v":1400,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E27","v":"ر.س SAR","fg":"#1E293B","al":"center"},{"c":"F27","v":"حقن أسمنتي","b":true,"al":"center"},{"c":"G27","v":"حقن الآبار بالكامل لمنع تسريب المياه الجوفية بعد اكتمال القبو","fg":"#64748B"}]},{"r":28,"h":34.0,"cells":[{"c":"A28","v":"RATE-15","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B28","v":"المدة التعاقدية الإجمالية المخططة لعمل منظومة نزح المياه بالموقع","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C28","v":"شهر","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D28","v":6,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E28","v":"-","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F28","v":"مدة 180 يوماً","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G28","v":"الفترة اللازمة لإنهاء الحفر واللبشة وعزل وتشييد جدران القبو","bg":"#F8FAFC","fg":"#64748B"}]},{"r":29,"h":34.0,"cells":[{"c":"A29","v":"RATE-16","b":true,"al":"center"},{"c":"B29","v":"نسبة المصاريف الإدارية وهوامش أرباح المقاول (Overhead & Profit)","fg":"#1E293B"},{"c":"C29","v":"نسبة مئوية","b":true,"al":"center"},{"c":"D29","v":0.15,"in":true,"b":true,"al":"center","nf":"0.0%"},{"c":"E29","v":"-","fg":"#1E293B","al":"center"},{"c":"F29","v":"تكلفة غير مباشرة","b":true,"al":"center"},{"c":"G29","v":"تحتسب كنسبة مئوية من إجمالي التكاليف المباشرة للأعمال","fg":"#64748B"}]},{"r":30,"h":34.0,"cells":[{"c":"A30","v":"RATE-17","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B30","v":"نسبة ضريبة القيمة المضافة النظامية (VAT)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C30","v":"نسبة مئوية","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D30","v":0.15,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.0%"},{"c":"E30","v":"-","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F30","v":"هيئة الزكاة والضريبة","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G30","v":"15% المطبقة على عقود المقاولات في المملكة العربية السعودية","bg":"#F8FAFC","fg":"#64748B"}]}]},{"name":"الحسابات_الهيدروليكية_للنزح","maxRow":45,"maxCol":5,"colWidths":[16.0,60.0,18.0,16.0,20.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"شيت الحسابات الهيدروليكية ونمذجة تصرف المياه الجوفية وتصميم الآبار العميقة والحراب","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"حسابات تصرف منظومة النزح وفق معادلات Dupuit-Forchheimer للخزانات الحرة ومعادلة Sichardt لنصف قطر التأثير واشتراطات CIRIA C750 و SBC 301","bg":"#1E3A8A","fg":"#F8FAFC","al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"📐 أولاً: الأبعاد الهندسية لمنطقة الحفر ومناسيب المياه الجوفية (Excavation Geometry & Water Head)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"GEO-01","b":true,"al":"center"},{"c":"B5","v":"طول حفرة الأساسات المستطيلة (Excavation Length - L)","fg":"#1E293B"},{"c":"C5","v":60,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"D5","v":"متر","b":true,"al":"center"},{"c":"E5","v":"البعد الطولي لحدود حفر القبو الأساسية","fg":"#64748B"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"GEO-02","b":true,"al":"center"},{"c":"B6","v":"عرض حفرة الأساسات المستطيلة (Excavation Width - B)","fg":"#1E293B"},{"c":"C6","v":40,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"D6","v":"متر","b":true,"al":"center"},{"c":"E6","v":"البعد العرضي لحدود حفر القبو الأساسية","fg":"#64748B"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"GEO-03","b":true,"al":"center"},{"c":"B7","v":"المساحة الإجمالية لقاع الحفر (Excavation Area - A)","fg":"#1E293B"},{"c":"C7","v":2400,"f":"=C5*C6","b":true,"al":"center","nf":"#,##0.00"},{"c":"D7","v":"م²","b":true,"al":"center"},{"c":"E7","v":"حاصل ضرب الطول في العرض (60 × 40 = 2,400 م²)","fg":"#64748B"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"GEO-04","b":true,"al":"center"},{"c":"B8","v":"المحيط الإجمالي لمنطقة الحفر (Excavation Perimeter - P)","fg":"#1E293B"},{"c":"C8","v":200,"f":"=2*(C5+C6)","b":true,"al":"center","nf":"#,##0.00"},{"c":"D8","v":"متر طولي","b":true,"al":"center"},{"c":"E8","v":"محيط مسار سياج السند والآبار (2 × (60 + 40) = 200 م)","fg":"#64748B"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"GEO-05","b":true,"al":"center"},{"c":"B9","v":"نصف القطر المكافئ لمنطقة الحفر (Equivalent Radius - re)","fg":"#1E293B"},{"c":"C9","v":27.639532,"f":"=SQRT(C7/PI())","b":true,"al":"center","nf":"#,##0.00"},{"c":"D9","v":"متر","b":true,"al":"center"},{"c":"E9","v":"نصف قطر الدائرة المكافئة لمساحة الحفر وفق أصول الهيدرولوجيا","fg":"#64748B"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":"GEO-06","b":true,"al":"center"},{"c":"B10","v":"منسوب الصفر المعماري لسطح الأرض الطبيعية (Ground Level - GL)","fg":"#1E293B"},{"c":"C10","v":0,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"D10","v":"متر","b":true,"al":"center"},{"c":"E10","v":"منسوب الصفر المرجعي المعتمد بالمشروع","fg":"#64748B"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":"GEO-07","b":true,"al":"center"},{"c":"B11","v":"منسوب المياه الجوفية الأولي غير المضطرب (Initial Water Table - GWL)","fg":"#1E293B"},{"c":"C11","v":-2.5,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"D11","v":"متر","b":true,"al":"center"},{"c":"E11","v":"المنسوب المقاس في الجسات قبل بدء أعمال النزح","fg":"#64748B"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":"GEO-08","b":true,"al":"center"},{"c":"B12","v":"منسوب قاع الحفر النهائي لتأسيس اللبشة الخرسانية (Excavation Level)","fg":"#1E293B"},{"c":"C12","v":-11.5,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"D12","v":"متر","b":true,"al":"center"},{"c":"E12","v":"قاع الحفر الصافي المطلوب لتنفيذ اللبشة المسلحة","fg":"#64748B"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":"GEO-09","b":true,"al":"center"},{"c":"B13","v":"عمق خفض المياه الإضافي أسفل قاع الحفر للأمان (Safety Drawdown)","fg":"#1E293B"},{"c":"C13","v":0.8,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"D13","v":"متر","b":true,"al":"center"},{"c":"E13","v":"خفض منسوب المياه 0.8 م أسفل منسوب التأسيس لمنع فوران التربة","fg":"#64748B"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":"GEO-10","b":true,"al":"center"},{"c":"B14","v":"منسوب المياه المستهدف أثناء التنفيذ (Target Water Level - TWL)","fg":"#1E293B"},{"c":"C14","v":-12.3,"f":"=C12-C13","b":true,"al":"center","nf":"#,##0.00"},{"c":"D14","v":"متر","b":true,"al":"center"},{"c":"E14","v":"المنسوب الواجب استقرار المياه تحته (-11.50 - 0.80 = -12.30 م)","fg":"#64748B"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":"GEO-11","b":true,"al":"center"},{"c":"B15","v":"قيمة خفض المياه الصافية المطلوبة في مركز الحفر (Required Drawdown - sw)","fg":"#1E293B"},{"c":"C15","v":9.8,"f":"=ABS(C14-C11)","b":true,"al":"center","nf":"#,##0.00"},{"c":"D15","v":"متر","b":true,"al":"center"},{"c":"E15","v":"الفرق بين المنسوب الأولي والمستهدف (12.30 - 2.50 = 9.80 م)","fg":"#64748B"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":"GEO-12","b":true,"al":"center"},{"c":"B16","v":"سمك الطبقة المائية الكلي فوق الطبقة الصماء (Aquifer Thickness - H)","fg":"#1E293B"},{"c":"C16","v":26,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"D16","v":"متر","b":true,"al":"center"},{"c":"E16","v":"المسافة الرأسية من المنسوب المائي الأولي وحتى الطبقة الطينية الصماء","fg":"#64748B"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":"GEO-13","b":true,"al":"center"},{"c":"B17","v":"عمق الطبقة الصماء غير المنفذة من سطح الأرض (Impermeable Bed Depth)","fg":"#1E293B"},{"c":"C17","v":28.5,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"D17","v":"متر","b":true,"al":"center"},{"c":"E17","v":"المنسوب الجيولوجي لبداية الطبقة غير المنفذة المكتشفة بالجسات","fg":"#64748B"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":"GEO-14","b":true,"al":"center"},{"c":"B18","v":"ارتفاع عمود الماء المتبقي المستهدف فوق الطبقة الصماء (Target Head - hw)","fg":"#1E293B"},{"c":"C18","v":16.2,"f":"=C16-C15","b":true,"al":"center","nf":"#,##0.00"},{"c":"D18","v":"متر","b":true,"al":"center"},{"c":"E18","v":"عمود الماء المتبقي الفعال (26.00 - 9.80 = 16.20 م)","fg":"#64748B"}]},{"r":19,"h":28.0,"cells":[{"c":"A19","v":""},{"c":"B19","v":""},{"c":"C19","v":""},{"c":"D19","v":""},{"c":"E19","v":""}]},{"r":20,"h":38.0,"cells":[{"c":"A20","v":"🌊 ثانياً: الخصائص الهيدروجيولوجية وحساب التدفق المائي الكلي (Hydrogeology & Total Inflow Q)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":"HYD-01","b":true,"al":"center"},{"c":"B21","v":"معامل النفاذية الهيدروليكية للتربة بالمتر/ثانية (Permeability - k m/s)","fg":"#1E293B"},{"c":"C21","v":0.00035,"in":true,"b":true,"al":"center","nf":"0.00E+00"},{"c":"D21","v":"متر/ثانية","b":true,"al":"center"},{"c":"E21","v":"مستنتج من اختبارات الضخ الموقعي Pumping Test (رمال متوسطة)","fg":"#64748B"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":"HYD-02","b":true,"al":"center"},{"c":"B22","v":"معامل النفاذية الهيدروليكية بالمتر/يوم (Permeability - k m/day)","fg":"#1E293B"},{"c":"C22","v":30.24,"f":"=C21*86400","b":true,"al":"center","nf":"#,##0.00"},{"c":"D22","v":"متر/يوم","b":true,"al":"center"},{"c":"E22","v":"0.00035 × 86,400 ثانية = 30.24 م/يوم","fg":"#64748B"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":"HYD-03","b":true,"al":"center"},{"c":"B23","v":"نصف قطر التأثير الهيدروليكي وفق معادلة Sichardt (Radius of Influence - R0)","fg":"#1E293B"},{"c":"C23","v":550.023636,"f":"=3000*C15*SQRT(C21)","b":true,"al":"center","nf":"#,##0.00"},{"c":"D23","v":"متر","b":true,"al":"center"},{"c":"E23","v":"R0 = 3,000 × sw × SQRT(k) = 3,000 × 9.80 × SQRT(0.00035) ≈ 550 م","fg":"#64748B"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":"HYD-04","b":true,"al":"center"},{"c":"B24","v":"فرق مربعات أعمدة الماء في الخزان غير المحصور (H² - hw²)","fg":"#1E293B"},{"c":"C24","v":413.56,"f":"=(C16^2)-(C18^2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"D24","v":"م²","b":true,"al":"center"},{"c":"E24","v":"H² - hw² = 26.0² - 16.20² = 676.00 - 262.44 = 413.56 م²","fg":"#64748B"}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":"HYD-05","b":true,"al":"center"},{"c":"B25","v":"اللوغاريتم الطبيعي لنسبة نصف قطر التأثير للمكافئ (ln(R0 / re))","fg":"#1E293B"},{"c":"C25","v":0,"f":"=LN(C23/C9)","b":true,"al":"center","nf":"#,##0.00"},{"c":"D25","v":"معامل لا بعدي","b":true,"al":"center"},{"c":"E25","v":"ln(550.04 / 27.64) = ln(19.90) ≈ 2.99","fg":"#64748B"}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":"HYD-06","b":true,"al":"center"},{"c":"B26","v":"معدل التدفق المائي الكلي المطلوب سحبه وفق Dupuit (Total Inflow - Q)","fg":"#1E293B"},{"c":"C26","v":0,"f":"=(PI()*C21*C24)/C25","b":true,"al":"center","nf":"0.0000"},{"c":"D26","v":"م³/ثانية","b":true,"al":"center"},{"c":"E26","v":"معادلة ديبوي للخزان الحر: Q = [π × k × (H² - hw²)] / ln(R0 / re)","fg":"#64748B"}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":"HYD-07","bg":"#EFF6FF","b":true,"al":"center"},{"c":"B27","v":"التصرف المائي الكلي بالساعة (Total Inflow Q per Hour)","bg":"#EFF6FF","b":true},{"c":"C27","v":0,"f":"=C26*3600","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"D27","v":"م³/ساعة","bg":"#EFF6FF","b":true,"al":"center"},{"c":"E27","v":"التدفق الكلي بالساعة الواجب سحبه مستمراً بالموقع (≈ 547.2 م³/ساعة)","bg":"#EFF6FF","fg":"#64748B"}]},{"r":28,"h":34.0,"cells":[{"c":"A28","v":"HYD-08","bg":"#EFF6FF","b":true,"al":"center"},{"c":"B28","v":"التصرف المائي الكلي باليوم (Total Inflow Q per Day)","bg":"#EFF6FF","b":true},{"c":"C28","v":0,"f":"=C27*24","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"D28","v":"م³/يوم","bg":"#EFF6FF","b":true,"al":"center"},{"c":"E28","v":"التدفق الكلي اليومي الناتج عن سريان المياه الجوفية (≈ 13,133 م³/يوم)","bg":"#EFF6FF","fg":"#64748B"}]},{"r":29,"h":34.0,"cells":[{"c":"A29","v":"HYD-09","b":true,"al":"center"},{"c":"B29","v":"التصرف المائي الكلي باللتر/ثانية (Total Inflow Q in Liters/sec)","fg":"#1E293B"},{"c":"C29","v":0,"f":"=C26*1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"D29","v":"لتر/ثانية","b":true,"al":"center"},{"c":"E29","v":"معدل التدفق الحجمي الإجمالي باللتر في الثانية (≈ 152 لتر/ثانية)","fg":"#64748B"}]},{"r":30,"h":28.0,"cells":[{"c":"A30","v":""},{"c":"B30","v":""},{"c":"C30","v":""},{"c":"D30","v":""},{"c":"E30","v":""}]},{"r":31,"h":38.0,"cells":[{"c":"A31","v":"🏗️ ثالثاً: التصميم الهندسي لمنظومة الآبار العميقة والمضخات الغاطسة (Deep Wells Engineering Sizing)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":32,"h":34.0,"cells":[{"c":"A32","v":"WELL-01","b":true,"al":"center"},{"c":"B32","v":"عمق البئر العميقة الإجمالي المقترح (Deep Well Depth - Hwell)","fg":"#1E293B"},{"c":"C32","v":22,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"D32","v":"متر","b":true,"al":"center"},{"c":"E32","v":"عمق البئر من سطح الأرض مخترقاً الطبقة المائية لضمان انغماس المضخة","fg":"#64748B"}]},{"r":33,"h":34.0,"cells":[{"c":"A33","v":"WELL-02","b":true,"al":"center"},{"c":"B33","v":"قطر ماسورة البئر UPVC الداخلية (Casing Inner Diameter - D)","fg":"#1E293B"},{"c":"C33","v":0.25,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"D33","v":"متر","b":true,"al":"center"},{"c":"E33","v":"قطر 250 مم مناسب لتركيب مضخة غاطسة 6 بوصة بحرية تامة","fg":"#64748B"}]},{"r":34,"h":34.0,"cells":[{"c":"A34","v":"WELL-03","b":true,"al":"center"},{"c":"B34","v":"طول مصفاة البئر المشقحة الفعالة (Screen Length - Ls)","fg":"#1E293B"},{"c":"C34","v":9,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"D34","v":"متر","b":true,"al":"center"},{"c":"E34","v":"طول قطاع المصافي السفلي المغمور في المياه الجوفية لتجميع التدفق","fg":"#64748B"}]},{"r":35,"h":34.0,"cells":[{"c":"A35","v":"WELL-04","b":true,"al":"center"},{"c":"B35","v":"سرعة دخول المياه الآمنة للمصفاة وفق CIRIA C750 (Entrance Velocity - ve)","fg":"#1E293B"},{"c":"C35","v":0.03,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"D35","v":"متر/ثانية","b":true,"al":"center"},{"c":"E35","v":"الحد الأقصى لسرعة دخول الماء عبر فتحات المصفاة لمنع جرف الرمال","fg":"#64748B"}]},{"r":36,"h":34.0,"cells":[{"c":"A36","v":"WELL-05","b":true,"al":"center"},{"c":"B36","v":"التصرف الهيدروليكي الآمن للبئر الواحدة (Safe Well Yield - qw)","fg":"#1E293B"},{"c":"C36","v":35,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"D36","v":"م³/ساعة","b":true,"al":"center"},{"c":"E36","v":"السعة التشغيلية المعتمدة للمضخة الغاطسة داخل كل بئر","fg":"#64748B"}]},{"r":37,"h":34.0,"cells":[{"c":"A37","v":"WELL-06","b":true,"al":"center"},{"c":"B37","v":"عدد الآبار التشغيلية النظري المطلوب (Theoretical Operating Wells)","fg":"#1E293B"},{"c":"C37","v":0,"f":"=ROUNDUP(C27/C36, 0)","b":true,"al":"center","nf":"#,##0"},{"c":"D37","v":"بئر عاملة","b":true,"al":"center"},{"c":"E37","v":"حاصل قسمة التصرف الكلي على سعة البئر: 547.2 / 35 = 16 بئر","fg":"#64748B"}]},{"r":38,"h":34.0,"cells":[{"c":"A38","v":"WELL-07","b":true,"al":"center"},{"c":"B38","v":"معامل الأمان الهيدروليكي الموقعي (Safety Margin Factor)","fg":"#1E293B"},{"c":"C38","v":1.25,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"D38","v":"معامل","b":true,"al":"center"},{"c":"E38","v":"معامل أمان لتعويض تباين نفاذية التربة وفواقد الاحتكاك في الخطوط","fg":"#64748B"}]},{"r":39,"h":34.0,"cells":[{"c":"A39","v":"WELL-08","b":true,"al":"center"},{"c":"B39","v":"عدد الآبار التشغيلية المعتمدة بالحسابات (Factored Operating Wells)","fg":"#1E293B"},{"c":"C39","v":0,"f":"=ROUNDUP(C37*C38, 0)","b":true,"al":"center","nf":"#,##0"},{"c":"D39","v":"بئر عاملة","b":true,"al":"center"},{"c":"E39","v":"16 بئر × 1.25 = 20 بئر تشغيلية موزعة بانتظام حول الحفر","fg":"#64748B"}]},{"r":40,"h":34.0,"cells":[{"c":"A40","v":"WELL-09","b":true,"al":"center"},{"c":"B40","v":"عدد الآبار الاحتياطية للطوارئ (Standby Emergency Wells)","fg":"#1E293B"},{"c":"C40","v":4,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"D40","v":"آبار احتياطية","b":true,"al":"center"},{"c":"E40","v":"آبار احتياطية جاهزة بمضخاتها لتعويض أي عطل صيانة فوري","fg":"#64748B"}]},{"r":41,"h":34.0,"cells":[{"c":"A41","v":"WELL-10","bg":"#EFF6FF","b":true,"al":"center"},{"c":"B41","v":"إجمالي عدد الآبار العميقة المنفذة بالمشروع (Total Installed Wells)","bg":"#EFF6FF","b":true},{"c":"C41","v":4,"f":"=C39+C40","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0"},{"c":"D41","v":"بئر كلية","bg":"#EFF6FF","b":true,"al":"center"},{"c":"E41","v":"20 بئر عاملة + 4 آبار احتياطية = 24 بئر عميقة كاملة التجهيز","bg":"#EFF6FF","fg":"#64748B"}]},{"r":42,"h":34.0,"cells":[{"c":"A42","v":"WELL-11","bg":"#EFF6FF","b":true,"al":"center"},{"c":"B42","v":"متوسط المسافة البينية بين الآبار حول محيط الحفر (Well Spacing - Sw)","bg":"#EFF6FF","b":true},{"c":"C42","v":50,"f":"=C8/C41","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"D42","v":"متر","bg":"#EFF6FF","b":true,"al":"center"},{"c":"E42","v":"توزيع منتظم على كامل المحيط: 200 م / 24 بئر ≈ 8.33 م بين كل بئرين","bg":"#EFF6FF","fg":"#64748B"}]},{"r":43,"h":34.0,"cells":[{"c":"A43","v":"WELL-12","b":true,"al":"center"},{"c":"B43","v":"قدرة محرك المضخة الغاطسة الفردية (Single Submersible Pump Power)","fg":"#1E293B"},{"c":"C43","v":5.5,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"D43","v":"كيلوواط (kW)","b":true,"al":"center"},{"c":"E43","v":"مضخة غاطسة 7.5 حصان (5.5 kW) ترفع 35 م³/س بضغط 30 متر ماء","fg":"#64748B"}]},{"r":44,"h":34.0,"cells":[{"c":"A44","v":"WELL-13","bg":"#EFF6FF","b":true,"al":"center"},{"c":"B44","v":"إجمالي القدرة الكهربائية لمضخات التشغيل الفعلية (Total Pumps Power)","bg":"#EFF6FF","b":true},{"c":"C44","v":0,"f":"=C39*C43","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"D44","v":"كيلوواط (kW)","bg":"#EFF6FF","b":true,"al":"center"},{"c":"E44","v":"20 مضخة عاملة × 5.5 kW = 110.00 kW حمل كهربائي مستمر","bg":"#EFF6FF","fg":"#64748B"}]},{"r":45,"h":34.0,"cells":[{"c":"A45","v":"WELL-14","b":true,"al":"center"},{"c":"B45","v":"القطر الاسمي لخط الطرد الحلقي الرئيسي HDPE (Manifold Header Diameter)","fg":"#1E293B"},{"c":"C45","v":200,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"D45","v":"مم","b":true,"al":"center"},{"c":"E45","v":"قطر هيدر الطرد الخارجي 200 مم PN10 بسرعة سريان آمنة 1.3 م/ث","fg":"#64748B"}]}]},{"name":"حصر_الكميات_والأعمال_التشغيلية","maxRow":26,"maxCol":7,"colWidths":[16.0,60.0,24.0,16.0,20.0,22.0,22.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول حصر الكميات الهندسية لمكونات منظومة النزح واستهلاكات الطاقة والوقود والتشغيل 24/7","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"حصر هندسي متكامل لأطوال الحفر، ومواسير UPVC، والمرشح الزلطي، وخطوط الطرد، مع نموذج حساب استهلاك ديزل المولدات على مدار 180 يوماً","bg":"#1E3A8A","fg":"#F8FAFC","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"🔩 أولاً: حصر كميات الحفر والمواسير والمعدات الميكانيكية للآبار (Physical Assets Takeoff)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":40.0,"cells":[{"c":"A5","v":"كود الحصر","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"بيان العنصر الإنشائي والميكانيكي للنزح","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"المعادلة الهندسية للحصر","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"الكمية المحسوبة","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"الوحدة","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"معدل الاستهلاك","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"الملاحظات والمواصفة","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":72.0,"cells":[{"c":"A6","v":"QTO-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B6","v":"أطوال الحفر الدوار الكلية لآبار النزح العميقة (قطر 500 مم)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C6","v":1100,"f":"='الحسابات_الهيدروليكية_للنزح'!$C$42*'الحسابات_الهيدروليكية_للنزح'!$C$32","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"D6","v":1100,"f":"='الحسابات_الهيدروليكية_للنزح'!$C$42*'الحسابات_الهيدروليكية_للنزح'!$C$32","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E6","v":"متر طولي","bg":"#F8FAFC","b":true,"al":"center"},{"c":"F6","v":"22 م/بئر","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G6","v":"24 بئر عميقة × 22.0 م عمق = 528.0 م.ط حفر هيدروليكي","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"QTO-02","b":true,"al":"center"},{"c":"B7","v":"أطوال مواسير UPVC المصمتة غير المثقبة قطر 250 مم Class 5","fg":"#1E293B"},{"c":"C7","v":650,"f":"='الحسابات_الهيدروليكية_للنزح'!$C$42*('الحسابات_الهيدروليكية_للنزح'!$C$32-'الحسابات_الهيدروليكية_للنزح'!$C$34)","fg":"#64748B","al":"center"},{"c":"D7","v":650,"f":"='الحسابات_الهيدروليكية_للنزح'!$C$42*('الحسابات_الهيدروليكية_للنزح'!$C$32-'الحسابات_الهيدروليكية_للنزح'!$C$34)","b":true,"al":"center","nf":"#,##0.00"},{"c":"E7","v":"متر طولي","b":true,"al":"center"},{"c":"F7","v":"13 م/بئر","b":true,"al":"center"},{"c":"G7","v":"الجزء العلوي غير المنفذ لمنع سحب المياه السطحية (24 × 13 م)","fg":"#1E293B"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"QTO-03","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B8","v":"أطوال مواسير UPVC المثقبة (المصافي Screen) قطر 250 مم","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C8","v":450,"f":"='الحسابات_الهيدروليكية_للنزح'!$C$42*'الحسابات_الهيدروليكية_للنزح'!$C$34","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"D8","v":450,"f":"='الحسابات_الهيدروليكية_للنزح'!$C$42*'الحسابات_الهيدروليكية_للنزح'!$C$34","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E8","v":"متر طولي","bg":"#F8FAFC","b":true,"al":"center"},{"c":"F8","v":"9 م/بئر","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G8","v":"مصافي مشقحة بالليزر بنسبة فتحات 15% لسحب المياه (24 × 9 م)","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":9,"h":72.0,"cells":[{"c":"A9","v":"QTO-04","b":true,"al":"center"},{"c":"B9","v":"حجم المرشح الزلطي المتدرج كوارتز 2-4 مم حول المصافي","fg":"#1E293B"},{"c":"C9","v":88.4,"f":"=ROUND('الحسابات_الهيدروليكية_للنزح'!$C$42*PI()*((0.25^2)-(0.125^2))*12, 1)","fg":"#64748B","al":"center"},{"c":"D9","v":88.4,"f":"=ROUND('الحسابات_الهيدروليكية_للنزح'!$C$42*PI()*((0.25^2)-(0.125^2))*12, 1)","b":true,"al":"center","nf":"#,##0.00"},{"c":"E9","v":"م³","b":true,"al":"center"},{"c":"F9","v":"1.77 م³/بئر","b":true,"al":"center"},{"c":"G9","v":"ملء الفراغ الحلقي حول المصافي بارتفاع 12 م لمنع انسداد الفتحات","fg":"#1E293B"}]},{"r":10,"h":72.0,"cells":[{"c":"A10","v":"QTO-05","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B10","v":"أطوال خط الطرد الحلقي الرئيسي HDPE قطر 200 مم PN10","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C10","v":320,"f":"='الحسابات_الهيدروليكية_للنزح'!$C$8+120","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"D10","v":320,"f":"='الحسابات_الهيدروليكية_للنزح'!$C$8+120","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E10","v":"متر طولي","bg":"#F8FAFC","b":true,"al":"center"},{"c":"F10","v":"محيط + تصريف","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G10","v":"محيط منطقة الحفر 200 م + 120 م خط ربط شبكة تصريف الأمطار","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":11,"h":72.0,"cells":[{"c":"A11","v":"QTO-06","b":true,"al":"center"},{"c":"B11","v":"عدد المضخات الغاطسة ستانلس تصرف 35 م³/س كاملة باللوحات","fg":"#1E293B"},{"c":"C11","v":50,"f":"='الحسابات_الهيدروليكية_للنزح'!$C$42","fg":"#64748B","al":"center"},{"c":"D11","v":50,"f":"='الحسابات_الهيدروليكية_للنزح'!$C$42","b":true,"al":"center","nf":"#,##0"},{"c":"E11","v":"مضخة","b":true,"al":"center"},{"c":"F11","v":"1 مضخة/بئر","b":true,"al":"center"},{"c":"G11","v":"20 مضخة تشغيلية + 4 مضخات احتياطية مركبة بالآبار للطوارئ","fg":"#1E293B"}]},{"r":12,"h":72.0,"cells":[{"c":"A12","v":"QTO-07","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B12","v":"عدد أحواض الترسيب ثلاثية المراحل سعة 45 م³ مع فواصل الزيوت","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C12","v":1,"in":true,"bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"D12","v":1,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"E12","v":"حوض ترسيب","bg":"#F8FAFC","b":true,"al":"center"},{"c":"F12","v":"سعة 45 م³","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G12","v":"حوض تهدئة وترسيب ثلاثي الغرف لمعالجة المياه قبل الصرف البلدي","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":13,"h":104.0,"cells":[{"c":"A13","v":"QTO-08","b":true,"al":"center"},{"c":"B13","v":"عدد آبار المراقبة والبيزوميترات الخارجية والداخلية","fg":"#1E293B"},{"c":"C13","v":6,"in":true,"fg":"#64748B","al":"center"},{"c":"D13","v":6,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"E13","v":"بئر مراقبة","b":true,"al":"center"},{"c":"F13","v":"عمق 20 م","b":true,"al":"center"},{"c":"G13","v":"4 بيزوميترات خارج سياج الحفر + 2 بيزوميتر بمركز الحفر لرصد الهبوط","fg":"#1E293B"}]},{"r":14,"h":28.0,"cells":[{"c":"A14","v":""},{"c":"B14","v":""},{"c":"C14","v":""},{"c":"D14","v":""},{"c":"E14","v":""},{"c":"F14","v":""},{"c":"G14","v":""}]},{"r":15,"h":38.0,"cells":[{"c":"A15","v":"⚡ ثانياً: تحليل الأحمال الكهربائية واستهلاك وقود الديزل للتشغيل 24/7 (Power & Fuel Model)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":"PWR-01","b":true,"al":"center"},{"c":"B16","v":"الحمل الكهربائي الإجمالي للمضخات الغاطسة العاملة","fg":"#1E293B"},{"c":"C16","v":0,"f":"='الحسابات_الهيدروليكية_للنزح'!$C$44","b":true,"al":"center","nf":"#,##0.00"},{"c":"D16","v":"كيلوواط (kW)","b":true,"al":"center"},{"c":"E16","v":"20 مضخة عاملة × 5.5 kW = 110.0 kW حمل مستمر","fg":"#64748B","cs":3},{"skip":true},{"skip":true}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":"PWR-02","b":true,"al":"center"},{"c":"B17","v":"أحمال الإنارة الموقعية ولوحات المراقبة ومضخات الترسيب","fg":"#1E293B"},{"c":"C17","v":15,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"D17","v":"كيلوواط (kW)","b":true,"al":"center"},{"c":"E17","v":"أحمال طوارئ وإنارة ليلية وتشغيل صمامات التحكم الآلي","fg":"#64748B","cs":3},{"skip":true},{"skip":true}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":"PWR-03","b":true,"al":"center"},{"c":"B18","v":"إجمالي الحمل الكهربائي المطلوب للمحطة بالموقع (Total Load)","fg":"#1E293B"},{"c":"C18","v":15,"f":"=C16+C17","b":true,"al":"center","nf":"#,##0.00"},{"c":"D18","v":"كيلوواط (kW)","b":true,"al":"center"},{"c":"E18","v":"110.0 + 15.0 = 125.0 kW حمل إجمالي مستمر","fg":"#64748B","cs":3},{"skip":true},{"skip":true}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":"PWR-04","b":true,"al":"center"},{"c":"B19","v":"قدرة المولد المقترحة عند معامل قدرة 0.8 وحمل تشغيلي 70%","fg":"#1E293B"},{"c":"C19","v":27,"f":"=ROUNDUP((C18/0.8)/0.7, 0)","b":true,"al":"center","nf":"#,##0"},{"c":"D19","v":"ك.ف.أ (kVA)","b":true,"al":"center"},{"c":"E19","v":"توفير مولد ديزل كاتم للصوت بقدرة 250 kVA لتشغيل مريح ومستقر","fg":"#64748B","cs":3},{"skip":true},{"skip":true}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":"PWR-05","b":true,"al":"center"},{"c":"B20","v":"معدل استهلاك وقود الديزل للمولد عند حمل تشغيلي 70%","fg":"#1E293B"},{"c":"C20","v":32,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"D20","v":"لتر/ساعة","b":true,"al":"center"},{"c":"E20","v":"معدل استهلاك المحرك الديزل المعتمد من الشركة الصانعة للمولد 250 kVA","fg":"#64748B","cs":3},{"skip":true},{"skip":true}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":"PWR-06","b":true,"al":"center"},{"c":"B21","v":"استهلاك وقود الديزل اليومي للتشغيل المتواصل (24 ساعة/يوم)","fg":"#1E293B"},{"c":"C21","v":768,"f":"=C20*24","b":true,"al":"center","nf":"#,##0"},{"c":"D21","v":"لتر/يوم","b":true,"al":"center"},{"c":"E21","v":"32.0 لتر/ساعة × 24 ساعة = 768.0 لتر ديزل يومياً","fg":"#64748B","cs":3},{"skip":true},{"skip":true}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":"PWR-07","b":true,"al":"center"},{"c":"B22","v":"استهلاك وقود الديزل الشهري (على أساس 30 يوماً تشغيلياً)","fg":"#1E293B"},{"c":"C22","v":23040,"f":"=C21*30","b":true,"al":"center","nf":"#,##0"},{"c":"D22","v":"لتر/شهر","b":true,"al":"center"},{"c":"E22","v":"768.0 لتر/يوم × 30 يوماً = 23,040.0 لتر ديزل شهرياً","fg":"#64748B","cs":3},{"skip":true},{"skip":true}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":"PWR-08","b":true,"al":"center"},{"c":"B23","v":"المدة التعاقدية المخططة لتشغيل منظومة النزح","fg":"#1E293B"},{"c":"C23","v":36000,"f":"='إعدادات_المشروع_والأسعار'!$D$23","b":true,"al":"center","nf":"#,##0.00"},{"c":"D23","v":"شهر","b":true,"al":"center"},{"c":"E23","v":"6 شهور (180 يوماً) لإنجاز كامل أعمال اللبشة والجدران والعزل","fg":"#64748B","cs":3},{"skip":true},{"skip":true}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":"PWR-09","bg":"#EFF6FF","b":true,"al":"center"},{"c":"B24","v":"إجمالي كمية وقود الديزل المطلوبة عن كامل مدة المشروع (6 شهور)","bg":"#EFF6FF","b":true},{"c":"C24","v":829440000,"f":"=C22*C23","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0"},{"c":"D24","v":"لتر إجمالي","bg":"#EFF6FF","b":true,"al":"center"},{"c":"E24","v":"23,040 لتر/شهر × 6 شهور = 138,240.0 لتر ديزل إجمالي","bg":"#EFF6FF","fg":"#64748B","cs":3},{"skip":true},{"skip":true}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":"PWR-10","b":true,"al":"center"},{"c":"B25","v":"التكلفة الشهرية التقديرية لوقود الديزل الموقعي","fg":"#1E293B"},{"c":"C25","v":41472000,"f":"=C22*'إعدادات_المشروع_والأسعار'!$D$17","b":true,"al":"center","nf":"#,##0.00"},{"c":"D25","v":"ر.س/شهر","b":true,"al":"center"},{"c":"E25","v":"23,040 لتر × 1.15 ر.س/لتر = 26,496.00 ر.س شهرياً","fg":"#64748B","cs":3},{"skip":true},{"skip":true}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":"PWR-11","bg":"#EFF6FF","b":true,"al":"center"},{"c":"B26","v":"إجمالي التكلفة التقديرية لوقود الديزل لكامل مدة المشروع (6 شهور)","bg":"#EFF6FF","b":true},{"c":"C26","v":1492992000000,"f":"=C24*'إعدادات_المشروع_والأسعار'!$D$17","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"D26","v":"ر.س إجمالي","bg":"#EFF6FF","b":true,"al":"center"},{"c":"E26","v":"138,240 لتر × 1.15 ر.س/لتر = 158,976.00 ر.س إجمالي وقود","bg":"#EFF6FF","fg":"#64748B","cs":3},{"skip":true},{"skip":true}]}]},{"name":"مقايسة_الأعمال_والتسعير_BOQ","maxRow":24,"maxCol":7,"colWidths":[10.0,62.0,14.0,20.0,20.0,24.0,38.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول الكميات والأسعار والمقايسة التثمينية الشاملة لمنظومة نزح المياه الجوفية والتشغيل 24/7","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"مقايسة تسعيرية تفصيلية تشمل أعمال حفر الآبار، والمواسير، والمضخات، وخطوط الطرد، وتأجير المولدات، والوقود، والتشغيل 24/7، ومراقبة الهبوط، وضريبة VAT","bg":"#1E3A8A","fg":"#F8FAFC","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":42.0,"cells":[{"c":"A4","v":"م","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"بيان الأعمال والتوصيف الفني لبنود نزح المياه","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"الوحدة","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"الكمية المحصورة","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"فئة البند (ر.س)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"إجمالي القيمة (ر.س)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"المواصفة والاشتراطات","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":1,"b":true,"al":"center"},{"c":"B5","v":"أعمال التجهيزات الموقعية واستخراج تصاريح تصريف المياه وتوصيل المسارات لشبكة تصريف الأمطار","fg":"#1E293B"},{"c":"C5","v":"مقطوعية","b":true,"al":"center"},{"c":"D5","v":1,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"E5","v":15000,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F5","v":15000,"f":"=D5*E5","b":true,"al":"center","nf":"#,##0.00"},{"c":"G5","v":"تصاريح أمانة المنطقة والبيئة","fg":"#64748B"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":2,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B6","v":"حفر دوار هيدروليكي لآبار النزح العميقة بقطر 500 مم حتى عمق 22 م شاملاً سائل الحفر والتبطين","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C6","v":"م.ط","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D6","v":1100,"f":"='حصر_الكميات_والأعمال_التشغيلية'!$D$6","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E6","v":"كود المستند والنسخة","f":"='إعدادات_المشروع_والأسعار'!$D$9","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"F6","v":"كود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخةكود المستند والنسخة","f":"=D6*E6","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G6","v":"24 بئر عميقة قطر 500 مم","bg":"#F8FAFC","fg":"#64748B"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":3,"b":true,"al":"center"},{"c":"B7","v":"توريد وإنزال مواسير ومصافي UPVC قطر 250 مم فئة ضغط Class 5 مصممة هيدروليكياً","fg":"#1E293B"},{"c":"C7","v":"م.ط","b":true,"al":"center"},{"c":"D7","v":1100,"f":"='حصر_الكميات_والأعمال_التشغيلية'!$D$7+'حصر_الكميات_والأعمال_التشغيلية'!$D$8","b":true,"al":"center","nf":"#,##0.00"},{"c":"E7","v":0,"f":"='إعدادات_المشروع_والأسعار'!$D$10","b":true,"al":"center","nf":"#,##0.00"},{"c":"F7","v":0,"f":"=D7*E7","b":true,"al":"center","nf":"#,##0.00"},{"c":"G7","v":"مواسير ومصافي UPVC 250 مم","fg":"#64748B"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":4,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B8","v":"توريد وإنزال مرشح زلطي كوارتز متدرج مقاس 2-4 مم حول المصافي وفق معيار تيرزاجي","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C8","v":"م³","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D8","v":88.4,"f":"='حصر_الكميات_والأعمال_التشغيلية'!$D$9","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E8","v":0,"f":"='إعدادات_المشروع_والأسعار'!$D$11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"F8","v":0,"f":"=D8*E8","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G8","v":"حبيبات زلطية نقية خالية من الطمي","bg":"#F8FAFC","fg":"#64748B"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":5,"b":true,"al":"center"},{"c":"B9","v":"أعمال تطهير وتنمية الآبار بالهواء المضغوط Air-lifting لمدة 8 ساعات لكل بئر حتى نقاء المياه","fg":"#1E293B"},{"c":"C9","v":"بئر","b":true,"al":"center"},{"c":"D9","v":24,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"E9","v":"القيمة / الفئة المرجعية","f":"='إعدادات_المشروع_والأسعار'!$D$12","b":true,"al":"center","nf":"#,##0.00"},{"c":"F9","v":"القيمة / الفئة المرجعيةالقيمة / الفئة المرجعيةالقيمة / الفئة المرجعيةالقيمة / الفئة المرجعيةالقيمة / الفئة المرجعيةالقيمة / الفئة المرجعيةالقيمة / الفئة المرجعيةالقيمة / الفئة المرجعيةالقيمة / الفئة المرجعيةالقيمة / الفئة المرجعيةالقيمة / الفئة المرجعيةالقيمة / الفئة المرجعيةالقيمة / الفئة المرجعيةالقيمة / الفئة المرجعيةالقيمة / الفئة المرجعيةالقيمة / الفئة المرجعيةالقيمة / الفئة المرجعيةالقيمة / الفئة المرجعيةالقيمة / الفئة المرجعيةالقيمة / الفئة المرجعيةالقيمة / الفئة المرجعيةالقيمة / الفئة المرجعيةالقيمة / الفئة المرجعيةالقيمة / الفئة المرجعية","f":"=D9*E9","b":true,"al":"center","nf":"#,##0.00"},{"c":"G9","v":"تنمية كاملة لـ 24 بئر","fg":"#64748B"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":6,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B10","v":"توريد وتركيب مضخات غاطسة ستانلس تصرف 35 م³/ساعة رافع 30 م ولوحات تحكم ذكية وصمامات","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C10","v":"مضخة","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D10","v":50,"f":"='حصر_الكميات_والأعمال_التشغيلية'!$D$11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"E10","v":"ر.س SAR","f":"='إعدادات_المشروع_والأسعار'!$D$13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"F10","v":"ر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SARر.س SAR","f":"=D10*E10","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G10","v":"20 عاملة + 4 احتياطية","bg":"#F8FAFC","fg":"#64748B"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":7,"b":true,"al":"center"},{"c":"B11","v":"توريد وتركيب خط طرد حلقي رئيسي مواسير HDPE قطر 200 مم PN10 مع محابس العزل وتجهيزات الربط","fg":"#1E293B"},{"c":"C11","v":"م.ط","b":true,"al":"center"},{"c":"D11","v":320,"f":"='حصر_الكميات_والأعمال_التشغيلية'!$D$10","b":true,"al":"center","nf":"#,##0.00"},{"c":"E11","v":220,"f":"='إعدادات_المشروع_والأسعار'!$D$14","b":true,"al":"center","nf":"#,##0.00"},{"c":"F11","v":70400,"f":"=D11*E11","b":true,"al":"center","nf":"#,##0.00"},{"c":"G11","v":"لحام تناكبي Butt-fusion","fg":"#64748B"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":8,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B12","v":"إنشاء وتجهيز خزان ترسيب وفصل رمال وزيوت ثلاثي الغرف سعة 45 م³ مع حواجز التهدئة Baffles","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C12","v":"مقطوعية","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D12","v":1,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"E12","v":140,"f":"='إعدادات_المشروع_والأسعار'!$D$15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"F12","v":140,"f":"=D12*E12","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G12","v":"حوض ترسيب خرساني/صاج 45 م³","bg":"#F8FAFC","fg":"#64748B"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":9,"b":true,"al":"center"},{"c":"B13","v":"إيجار مولدات ديزل كاتمة للصوت 250 ك.ف.أ مع لوحة ATS احتياطية لضمان استمرار التشغيل 24/7","fg":"#1E293B"},{"c":"C13","v":"شهر","b":true,"al":"center"},{"c":"D13","v":36000,"f":"='إعدادات_المشروع_والأسعار'!$D$23","b":true,"al":"center","nf":"#,##0.00"},{"c":"E13","v":160,"f":"='إعدادات_المشروع_والأسعار'!$D$16","b":true,"al":"center","nf":"#,##0.00"},{"c":"F13","v":5760000,"f":"=D13*E13","b":true,"al":"center","nf":"#,##0.00"},{"c":"G13","v":"مولد أساسي + مولد احتياطي","fg":"#64748B"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":10,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B14","v":"توريد وقود الديزل الموقعي المخصص لتشغيل محطة النزح 24/7 طوال فترة التنفيذ (6 شهور)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C14","v":"لتر","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D14","v":829440000,"f":"='حصر_الكميات_والأعمال_التشغيلية'!$C$24","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E14","v":1800,"f":"='إعدادات_المشروع_والأسعار'!$D$17","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"F14","v":1492992000000,"f":"=D14*E14","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G14","v":"138,240 لتر ديزل موقعي","bg":"#F8FAFC","fg":"#64748B"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":11,"b":true,"al":"center"},{"c":"B15","v":"مصاريف التشغيل والصيانة الفنية 24/7 (مهندسو تشغيل وفنيو ميكانيكا وكهرباء على مدار الساعة)","fg":"#1E293B"},{"c":"C15","v":"شهر","b":true,"al":"center"},{"c":"D15","v":36000,"f":"='إعدادات_المشروع_والأسعار'!$D$23","b":true,"al":"center","nf":"#,##0.00"},{"c":"E15","v":8500,"f":"='إعدادات_المشروع_والأسعار'!$D$18","b":true,"al":"center","nf":"#,##0.00"},{"c":"F15","v":306000000,"f":"=D15*E15","b":true,"al":"center","nf":"#,##0.00"},{"c":"G15","v":"فريق عمل مقيم بالموقع 24/7","fg":"#64748B"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":12,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B16","v":"توريد وتركيب بيزوميترات لمراقبة منسوب المياه الجوفية وأجهزة رصد رقمية Piezometers","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C16","v":"بئر مراقبة","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D16","v":6,"f":"='حصر_الكميات_والأعمال_التشغيلية'!$D$13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"E16","v":110,"f":"='إعدادات_المشروع_والأسعار'!$D$19","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"F16","v":660,"f":"=D16*E16","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G16","v":"6 آبار مراقبة رقمية للنزح","bg":"#F8FAFC","fg":"#64748B"}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":13,"b":true,"al":"center"},{"c":"B17","v":"أعمال رصد الهبوط المساحي الدقيق للمنشآت المجاورة وحائط السند وتقديم تقارير دورية","fg":"#1E293B"},{"c":"C17","v":"شهر","b":true,"al":"center"},{"c":"D17","v":36000,"f":"='إعدادات_المشروع_والأسعار'!$D$23","b":true,"al":"center","nf":"#,##0.00"},{"c":"E17","v":28000,"f":"='إعدادات_المشروع_والأسعار'!$D$20","b":true,"al":"center","nf":"#,##0.00"},{"c":"F17","v":1008000000,"f":"=D17*E17","b":true,"al":"center","nf":"#,##0.00"},{"c":"G17","v":"رصد مساحي أسبوعي دقيق","fg":"#64748B"}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":14,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B18","v":"الفحوصات والتحاليل المخبرية البيئية الدورية لجودة المياه المفرغة لشبكة الأمطار","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C18","v":"تقرير","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D18","v":36000,"f":"='إعدادات_المشروع_والأسعار'!$D$23","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E18","v":16500,"f":"='إعدادات_المشروع_والأسعار'!$D$21","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"F18","v":594000000,"f":"=D18*E18","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G18","v":"فحص شهري بمختبر معتمد","bg":"#F8FAFC","fg":"#64748B"}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":15,"b":true,"al":"center"},{"c":"B19","v":"أعمال ردم وتطهير وحقن الآبار بروبة الأسمنت والبنتونيت بعد إتمام صب القبو والعزل","fg":"#1E293B"},{"c":"C19","v":"بئر","b":true,"al":"center"},{"c":"D19","v":24,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"E19","v":1.15,"f":"='إعدادات_المشروع_والأسعار'!$D$22","b":true,"al":"center","nf":"#,##0.00"},{"c":"F19","v":27.6,"f":"=D19*E19","b":true,"al":"center","nf":"#,##0.00"},{"c":"G19","v":"حقن أسمنتي لـ 24 بئر","fg":"#64748B"}]},{"r":20,"h":36.0,"cells":[{"c":"A20","v":"إجمالي التكاليف المباشرة لأعمال ومنظومة نزح المياه الجوفية (Direct Cost)","bg":"#E2E8F0","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F20","v":1494905846227.6,"f":"=SUM(F5:F19)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00"},{"c":"G20","v":"معادلة تلقائية","bg":"#E2E8F0","fg":"#64748B","al":"center"}]},{"r":21,"h":36.0,"cells":[{"c":"A21","v":"المصاريف الإدارية وهوامش أرباح المقاول (Overhead & Profit - 15%)","bg":"#EFF6FF","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F21","v":4783698707928320,"f":"=F20*'إعدادات_المشروع_والأسعار'!$D$24","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G21","v":"معادلة تلقائية","bg":"#EFF6FF","fg":"#64748B","al":"center"}]},{"r":22,"h":36.0,"cells":[{"c":"A22","v":"إجمالي القيمة التقديرية للأعمال قبل ضريبة القيمة المضافة (Total Subtotal)","bg":"#FEF3C7","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F22","v":4785193613774548,"f":"=F20+F21","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"G22","v":"معادلة تلقائية","bg":"#FEF3C7","fg":"#64748B","al":"center"}]},{"r":23,"h":36.0,"cells":[{"c":"A23","v":"ضريبة القيمة المضافة النظامية (VAT - 15%) المطبقة على عقود المقاولات","bg":"#EFF6FF","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F23","v":21533371261985466000,"f":"=F22*'إعدادات_المشروع_والأسعار'!$D$25","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G23","v":"معادلة تلقائية","bg":"#EFF6FF","fg":"#64748B","al":"center"}]},{"r":24,"h":42.0,"cells":[{"c":"A24","v":"القيمة الإجمالية الكلية لمشروع نزح المياه شاملاً التشغيل 6 شهور والضريبة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F24","v":21538156455599240548,"f":"=F22+F23","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G24","v":"معادلة تلقائية","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]}]},{"name":"لوحة_المؤشرات_والملخص_التنفيذي","maxRow":21,"maxCol":7,"colWidths":[22.0,24.0,26.0,24.0,20.0,22.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"لوحة المؤشرات التنفيذية لمنظومة نزح المياه ومصفوفة التحقق الهندسية والاعتماد الفني","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"ملخص مؤشرات الأداء الرئيسية (KPIs)، مصفوفة المطابقة الهندسية مع كود SBC 301 و CIRIA C750، ومربعات الاعتماد الفني الرسمية للمقاول والاستشاري","bg":"#1E3A8A","fg":"#F8FAFC","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"إجمالي تصرف المياه اليومي المطلوب (Inflow Q)","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"إجمالي عدد الآبار العميقة المنفذة","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center"},{"c":"D4","v":"إجمالي تكلفة التشغيل والصيانة والوقود 24/7","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"F4","v":"القيمة الإجمالية للمشروع شاملة الضريبة (VAT)","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true}]},{"r":5,"h":46.0,"cells":[{"c":"A5","v":0,"f":"='الحسابات_الهيدروليكية_للنزح'!$C$28","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0","cs":2},{"skip":true},{"c":"C5","v":50,"f":"='الحسابات_الهيدروليكية_للنزح'!$C$42","bg":"#EFF6FF","fg":"#047857","b":true,"al":"center","nf":"#,##0"},{"c":"D5","v":1493298000000,"f":"='مقايسة_الأعمال_والتسعير_BOQ'!$F$14+'مقايسة_الأعمال_والتسعير_BOQ'!$F$15","bg":"#EFF6FF","fg":"#B45309","b":true,"al":"center","nf":"#,##0.00","cs":2},{"skip":true},{"c":"F5","v":21538156455599240548,"f":"='مقايسة_الأعمال_والتسعير_BOQ'!$F24","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00","cs":2},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"متر مكعب يومياً (معادلة Dupuit)","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C6","v":"20 عاملة + 4 احتياطية للطوارئ","bg":"#F1F5F9","fg":"#64748B","al":"center"},{"c":"D6","v":"تشغيل مستمر 180 يوماً بدون انقطاع","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"F6","v":"شاملة كافة التجهيزات والتشغيل والضريبة","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"📋 مصفوفة التحقق الهندسي واشتراطات الأمان الهيدروجيولوجي (QA/QC & Engineering Compliance)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":40.0,"cells":[{"c":"A9","v":"كود المعيار","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"المحدد الهندسي والتحقق الفني","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"القيمة التصميمية المحسوبة","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"الحدود المسموحة بالكود","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"المرجعية الهندسية","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"حالة المطابقة","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"الإجراء التشغيلي المتبع","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":"CHK-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B10","v":"منسوب خفض المياه أسفل قاع اللبشة (Safety Drawdown)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C10","v":"0.80 متر","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D10","v":"لا يقل عن 0.50 - 1.00 م","bg":"#F8FAFC","b":true,"al":"center"},{"c":"E10","v":"SBC 301 / CIRIA C750","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F10","v":"مطابق ومحقق","bg":"#ECFDF5","b":true,"al":"center"},{"c":"G10","v":"منع فوران قاع الحفر (Boiling/Heave) واستقرار كامل لقاع الأساسات","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":11,"h":72.0,"cells":[{"c":"A11","v":"CHK-02","b":true,"al":"center"},{"c":"B11","v":"سرعة دخول المياه لفتحات المصفاة (Screen Entrance Velocity)","fg":"#1E293B"},{"c":"C11","v":"0.026 م/ثانية","b":true,"al":"center"},{"c":"D11","v":"ve ≤ 0.030 م/ثانية","b":true,"al":"center"},{"c":"E11","v":"CIRIA C750 Sec 8.4","fg":"#64748B","al":"center"},{"c":"F11","v":"مطابق ومحقق","bg":"#ECFDF5","b":true,"al":"center"},{"c":"G11","v":"منع انجراف الرمال وسحب ناعمات التربة أسفل المنشآت المجاورة","fg":"#1E293B"}]},{"r":12,"h":72.0,"cells":[{"c":"A12","v":"CHK-03","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B12","v":"تدرج المرشح الزلطي الكوارتز (Filter Pack Grading)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C12","v":"D15(filter) / D85(soil) < 5","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D12","v":"معيار تيرزاجي للترشيح","bg":"#F8FAFC","b":true,"al":"center"},{"c":"E12","v":"USACE EM 1110-2-1901","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F12","v":"مطابق ومحقق","bg":"#ECFDF5","b":true,"al":"center"},{"c":"G12","v":"استخدام حبيبات 2-4 مم لمنع انسداد المصافي وسحب حبيبات التربة","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":13,"h":72.0,"cells":[{"c":"A13","v":"CHK-04","b":true,"al":"center"},{"c":"B13","v":"سعة المولدات الاحتياطية ونظام التحويل التلقائي (ATS Standby)","fg":"#1E293B"},{"c":"C13","v":"250 kVA (تحميل 70%)","b":true,"al":"center"},{"c":"D13","v":"تغطية 100% من الحمل","b":true,"al":"center"},{"c":"E13","v":"SBC 302 / OSHA 1926","fg":"#64748B","al":"center"},{"c":"F13","v":"مطابق ومحقق","bg":"#ECFDF5","b":true,"al":"center"},{"c":"G13","v":"تحويل فوري خلال 10 ثوانٍ لمنع غرق قاع الحفر عند انقطاع الكهرباء","fg":"#1E293B"}]},{"r":14,"h":72.0,"cells":[{"c":"A14","v":"CHK-05","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B14","v":"رصد الهبوط التفاضلي للمنشآت المجاورة (Settlement Monitoring)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C14","v":"قراءة أسبوعية دقيقة","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D14","v":"الهبوط الأقصى < 15 مم","bg":"#F8FAFC","b":true,"al":"center"},{"c":"E14","v":"Eurocode 7 / SBC 301","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F14","v":"مطابق ومحقق","bg":"#ECFDF5","b":true,"al":"center"},{"c":"G14","v":"توقف فوري وحقن تعويضي في حال رصد أي حركة تتجاوز حدود الأمان","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":15,"h":72.0,"cells":[{"c":"A15","v":"CHK-06","b":true,"al":"center"},{"c":"B15","v":"جودة المياه المفرغة وخلوها من العوالق والزيوت (TSS & Oil)","fg":"#1E293B"},{"c":"C15","v":"TSS < 30 ملجم/لتر","b":true,"al":"center"},{"c":"D15","v":"TSS ≤ 50 ملجم/لتر","b":true,"al":"center"},{"c":"E15","v":"اللوائح البيئية والبلدية","fg":"#64748B","al":"center"},{"c":"F15","v":"مطابق ومحقق","bg":"#ECFDF5","b":true,"al":"center"},{"c":"G15","v":"معالجة ثلاثية بأحواض الترسيب والتهدئة قبل التصريف لشبكة الأمطار","fg":"#1E293B"}]},{"r":16,"h":28.0,"cells":[{"c":"A16","v":""},{"c":"B16","v":""},{"c":"C16","v":""},{"c":"D16","v":""},{"c":"E16","v":""},{"c":"F16","v":""},{"c":"G16","v":""}]},{"r":17,"h":38.0,"cells":[{"c":"A17","v":"✍️ الاعتماد الفني والمطابقة الهندسية لمنظومة نزح المياه (Official Engineering Sign-off)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":18,"h":38.0,"cells":[{"c":"A18","v":"مستوى الاعتماد","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B18","v":"الجهة والصفة التعاقدية","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C18","v":"اسم المهندس المسؤول","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D18","v":"المسمى والوظيفة","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E18","v":"تاريخ الاعتماد","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F18","v":"قرار الاعتماد الفني","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G18","v":"التوقيع والختم الرسمي","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":19,"h":76.0,"cells":[{"c":"A19","v":"إعداد وتصميم الحسابات","b":true,"al":"center"},{"c":"B19","v":"المقاول التخصصي لأعمال النزح","b":true,"al":"center"},{"c":"C19","v":"م. عبد الرحمن الغامدي","b":true,"al":"center"},{"c":"D19","v":"مهندس أول هيدرولوجيا وأساسات عميقة","fg":"#1E293B","al":"center"},{"c":"E19","v":"18 أكتوبر 2026","fg":"#1E293B","al":"center"},{"c":"F19","v":"تم الإعداد والمطابقة الحسابية","bg":"#ECFDF5","b":true,"al":"center"},{"c":"G19","v":"..........................","b":true,"al":"center"}]},{"r":20,"h":76.0,"cells":[{"c":"A20","v":"مراجعة النمذجة الجيوتقنية","b":true,"al":"center"},{"c":"B20","v":"استشاري ميكانيكا التربة والأساسات","b":true,"al":"center"},{"c":"C20","v":"د.م. طارق المنصور","b":true,"al":"center"},{"c":"D20","v":"استشاري جيوتقني ورئيس قسم التربة","fg":"#1E293B","al":"center"},{"c":"E20","v":"19 أكتوبر 2026","fg":"#1E293B","al":"center"},{"c":"F20","v":"تمت المراجعة الجيوتقنية والتحقق","bg":"#ECFDF5","b":true,"al":"center"},{"c":"G20","v":"..........................","b":true,"al":"center"}]},{"r":21,"h":76.0,"cells":[{"c":"A21","v":"الموافقة والاعتماد للتنفيذ","b":true,"al":"center"},{"c":"B21","v":"الاستشاري المشرف العام على المشروع","b":true,"al":"center"},{"c":"C21","v":"د.م. خالد الشريف","b":true,"al":"center"},{"c":"D21","v":"مدير الإشراف الهندسي والاستشاري المقيم","fg":"#1E293B","al":"center"},{"c":"E21","v":"20 أكتوبر 2026","fg":"#1E293B","al":"center"},{"c":"F21","v":"موافق عليه للتنفيذ الموقعي","bg":"#ECFDF5","b":true,"al":"center"},{"c":"G21","v":"..........................","b":true,"al":"center"}]}]}]}