{"slug":"diesel-generator-sizing-and-emergency-power-load-sheet","sheets":[{"name":"أحمال الطوارئ Load Schedule","maxRow":38,"maxCol":10,"colWidths":[8.0,44.0,20.0,16.0,14.0,22.0,16.0,16.0,16.0,36.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"شيت حساب وتحديد قدرة المولد الكهربائي الاحتياطي وأحمال الطوارئ وفق NFPA 110 و NEC 700 و SBC 401","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"حساب أحمال التشغيل المستمر (Running kVA)، تيارات البدء (skVA)، ومعاملات الطلب والتنوع لأحمال السلامة والمرافق الحيوية","bg":"#0F172A","fg":"#E2E8F0","al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":14.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"إجمالي حمل الطوارئ المستمر","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"أقصى قدرة بدء تشغيل (Max skVA)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"القدرة الاسمية الموصى بها للمولد (Standby)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H4","v":"النظام الكهربائي التصميمي للمشروع","bg":"#FEF3C7","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":5,"h":44.0,"cells":[{"c":"A5","v":498.689255,"f":"=H30","bg":"#F8FAFC","fg":"#B45309","b":true,"al":"center","nf":"#,##0.0\" kVA\"","cs":2},{"skip":true},{"c":"C5","v":323.529413,"f":"=I30","bg":"#F8FAFC","fg":"#B45309","b":true,"al":"center","nf":"#,##0.0\" skVA\"","cs":2},{"skip":true},{"c":"E5","v":630,"f":"=D37","bg":"#F8FAFC","fg":"#B45309","b":true,"al":"center","nf":"#,##0\" kVA (\"#,##0\" kW)\"","cs":3},{"skip":true},{"skip":true},{"c":"H5","v":"380V / 3-Ph / 60Hz","f":"=TEXT(D10,\"0\")&\"V / 3-Ph / \"&TEXT(D11,\"0\")&\"Hz\"","bg":"#FEF3C7","fg":"#B45309","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"Total Running Emergency Load","bg":"#F8FAFC","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"C6","v":"Peak Motor Starting Inrush","bg":"#F8FAFC","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"E6","v":"Recommended Standby Rating (ISO 8528)","bg":"#F8FAFC","fg":"#475569","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H6","v":"Saudi SEC Standard System","bg":"#FEF3C7","fg":"#475569","al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":7,"h":14.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""},{"c":"I7","v":""},{"c":"J7","v":""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"أولاً: محددات النظام الكهربائي والظروف البيئية المحيطة (Electrical & Ambient Parameters)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":40.0,"cells":[{"c":"A9","v":"م","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"بيان المتغير الكهربائي / التشغيلي","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"الرمز","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"القيمة المدخلة","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"الوحدة","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"المرجعية النظامية","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"التوصيف الهندسي والملاحظات","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":1,"bg":"#FFFBEB","al":"center"},{"c":"B10","v":"الجهد الاسمي للنظام الكهربائي بالموقع","bg":"#FFFBEB","b":true},{"c":"C10","v":"System_Voltage","bg":"#FFFBEB","al":"center"},{"c":"D10","v":380,"in":true,"bg":"#FFFBEB","b":true,"al":"center","nf":"#,##0"},{"c":"E10","v":"V (فولت)","bg":"#FFFBEB","al":"center"},{"c":"F10","v":"كود التوزيع السعودي SEC","bg":"#FFFBEB","al":"center"},{"c":"G10","v":"جهد 380V ثلاثي الأطوار / 220V أحادي","bg":"#FFFBEB","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":2,"al":"center"},{"c":"B11","v":"التردد الكهربائي التشغيلي للشبكة","b":true},{"c":"C11","v":"System_Frequency","al":"center"},{"c":"D11","v":60,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"E11","v":"Hz (هرتز)","al":"center"},{"c":"F11","v":"كود البناء السعودي SBC 401","al":"center"},{"c":"G11","v":"التردد القياسي النظامي بالمملكة","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":3,"bg":"#FFFBEB","al":"center"},{"c":"B12","v":"معامل القدرة الاسمي للمولد (Power Factor)","bg":"#FFFBEB","b":true},{"c":"C12","v":"Rated_PF","bg":"#FFFBEB","al":"center"},{"c":"D12","v":0.8,"in":true,"bg":"#FFFBEB","b":true,"al":"center","nf":"0.00"},{"c":"E12","v":"lagging","bg":"#FFFBEB","al":"center"},{"c":"F12","v":"معيار ISO 8528","bg":"#FFFBEB","al":"center"},{"c":"G12","v":"معامل القدرة المتأخر القياسي للمولدات","bg":"#FFFBEB","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":4,"al":"center"},{"c":"B13","v":"أقصى درجة حرارة محيطة بالموقع للتصميم","b":true},{"c":"C13","v":"Ambient_Temp","al":"center"},{"c":"D13","v":50,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"E13","v":"°C مئوية","al":"center"},{"c":"F13","v":"ظروف الصيف القياسية","al":"center"},{"c":"G13","v":"تتطلب معامل تخفيض قدرة Derating Factor","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":5,"bg":"#FFFBEB","al":"center"},{"c":"B14","v":"ارتفاع موقع المشروع عن مستوى سطح البحر","bg":"#FFFBEB","b":true},{"c":"C14","v":"Site_Altitude","bg":"#FFFBEB","al":"center"},{"c":"D14","v":620,"in":true,"bg":"#FFFBEB","b":true,"al":"center","nf":"#,##0"},{"c":"E14","v":"متر","bg":"#FFFBEB","al":"center"},{"c":"F14","v":"الموقع الجغرافي (الرياض)","bg":"#FFFBEB","al":"center"},{"c":"G14","v":"أقل من 1000 متر (لا يحتاج تخفيض ارتفاع)","bg":"#FFFBEB","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":6,"al":"center"},{"c":"B15","v":"معامل التخفيض الحراري الإجمالي (Derating)","b":true},{"c":"C15","v":"Derating_Factor","al":"center"},{"c":"D15","v":0.9,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"E15","v":"معامل","al":"center"},{"c":"F15","v":"كتالوج الشركة الصانعة (Cummins/CAT)","al":"center"},{"c":"G15","v":"تخفيض 10% للحرارة 50°C في غرفة المولد","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":16,"h":38.0,"cells":[{"c":"A16","v":"ثانياً: جدول حصر وتوزيع أحمال الطوارئ والسلامة الحيوية (Emergency & Standby Load Schedule)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":"م","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B17","v":"بيان الحمل الكهربائي للطوارئ (Load Description)","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C17","v":"تصنيف الحمل (NEC)","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D17","v":"القدرة بالكيلوواط (kW)","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E17","v":"معامل القدرة (PF)","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F17","v":"طريقة بدء المحرك (Starting)","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G17","v":"القدرة المستمرة (kVA)","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H17","v":"قدرة البدء التقديرية (skVA)","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I17","v":"معامل التنوع والطلب","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J17","v":"المرجعية الكودية والملاحظات","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":1,"bg":"#FFFBEB","al":"center"},{"c":"B18","v":"إنارة الطوارئ ومخارج الهروب (Exit & Emergency Lights)","bg":"#FFFBEB"},{"c":"C18","v":"Life Safety (NEC 700)","bg":"#FFFBEB","al":"center"},{"c":"D18","v":25,"in":true,"bg":"#FFFBEB","b":true,"al":"center","nf":"#,##0.0"},{"c":"E18","v":0.95,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.00"},{"c":"F18","v":"استاتيكي (Static)","bg":"#FFFBEB","al":"center"},{"c":"G18","v":26.315789,"f":"=D18/E18","bg":"#FFFBEB","b":true,"al":"center","nf":"#,##0.0"},{"c":"H18","v":26.315789,"f":"=G18*1.0","bg":"#FFFBEB","b":true,"al":"center","nf":"#,##0.0"},{"c":"I18","v":1,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.00"},{"c":"J18","v":"SBC 801 / NFPA 101","bg":"#FFFBEB"}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":2,"al":"center"},{"c":"B19","v":"مضخة الحريق الكهربائية الرئيسية (Main Fire Pump)"},{"c":"C19","v":"Legally Required (NEC 701)","al":"center"},{"c":"D19","v":110,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"E19","v":0.85,"in":true,"al":"center","nf":"0.00"},{"c":"F19","v":"سوفت ستارتر (Soft Start)","al":"center"},{"c":"G19","v":129.411765,"f":"=D19/E19","b":true,"al":"center","nf":"#,##0.0"},{"c":"H19","v":323.529413,"f":"=G19*2.5","b":true,"al":"center","nf":"#,##0.0"},{"c":"I19","v":1,"in":true,"al":"center","nf":"0.00"},{"c":"J19","v":"NFPA 20 / SBC 801"}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":3,"bg":"#FFFBEB","al":"center"},{"c":"B20","v":"مضخة الحريق التعويضية (Jockey Pump)","bg":"#FFFBEB"},{"c":"C20","v":"Legally Required (NEC 701)","bg":"#FFFBEB","al":"center"},{"c":"D20","v":7.5,"in":true,"bg":"#FFFBEB","b":true,"al":"center","nf":"#,##0.0"},{"c":"E20","v":0.82,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.00"},{"c":"F20","v":"مباشر على الخط (DOL)","bg":"#FFFBEB","al":"center"},{"c":"G20","v":9.146341,"f":"=D20/E20","bg":"#FFFBEB","b":true,"al":"center","nf":"#,##0.0"},{"c":"H20","v":54.878046,"f":"=G20*6.0","bg":"#FFFBEB","b":true,"al":"center","nf":"#,##0.0"},{"c":"I20","v":1,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.00"},{"c":"J20","v":"الحفاظ على ضغط الشبكة","bg":"#FFFBEB"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":4,"al":"center"},{"c":"B21","v":"مراوح ضغط سلالم الهروب (Stair Pressurization Fans)"},{"c":"C21","v":"Life Safety (NEC 700)","al":"center"},{"c":"D21","v":30,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"E21","v":0.85,"in":true,"al":"center","nf":"0.00"},{"c":"F21","v":"مغير سرعة ترددية (VFD)","al":"center"},{"c":"G21","v":35.294118,"f":"=D21/E21","b":true,"al":"center","nf":"#,##0.0"},{"c":"H21","v":45.882353,"f":"=G21*1.3","b":true,"al":"center","nf":"#,##0.0"},{"c":"I21","v":1,"in":true,"al":"center","nf":"0.00"},{"c":"J21","v":"SBC 201 Section 909"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":5,"bg":"#FFFBEB","al":"center"},{"c":"B22","v":"مراوح سحب الدخان الآلية (Smoke Extraction Fans)","bg":"#FFFBEB"},{"c":"C22","v":"Life Safety (NEC 700)","bg":"#FFFBEB","al":"center"},{"c":"D22","v":45,"in":true,"bg":"#FFFBEB","b":true,"al":"center","nf":"#,##0.0"},{"c":"E22","v":0.85,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.00"},{"c":"F22","v":"مغير سرعة ترددية (VFD)","bg":"#FFFBEB","al":"center"},{"c":"G22","v":52.941176,"f":"=D22/E22","bg":"#FFFBEB","b":true,"al":"center","nf":"#,##0.0"},{"c":"H22","v":68.823529,"f":"=G22*1.3","bg":"#FFFBEB","b":true,"al":"center","nf":"#,##0.0"},{"c":"I22","v":1,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.00"},{"c":"J22","v":"سحب الدخان من الممرات","bg":"#FFFBEB"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":6,"al":"center"},{"c":"B23","v":"مصاعد الإخلاء والطوارئ (Firefighters Elevators)"},{"c":"C23","v":"Life Safety (NEC 700)","al":"center"},{"c":"D23","v":55,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"E23","v":0.8,"in":true,"al":"center","nf":"0.00"},{"c":"F23","v":"محرك VFD بمعدل استرجاع","al":"center"},{"c":"G23","v":68.75,"f":"=D23/E23","b":true,"al":"center","nf":"#,##0.0"},{"c":"H23","v":103.125,"f":"=G23*1.5","b":true,"al":"center","nf":"#,##0.0"},{"c":"I23","v":0.8,"in":true,"al":"center","nf":"0.00"},{"c":"J23","v":"تشغيل مصعدين بالتتابع"}]},{"r":24,"h":52.0,"cells":[{"c":"A24","v":7,"bg":"#FFFBEB","al":"center"},{"c":"B24","v":"مضخات رفع المياه العذبة ومياه الصرف (Plumbing Pumps)","bg":"#FFFBEB"},{"c":"C24","v":"Optional Standby (NEC 702)","bg":"#FFFBEB","al":"center"},{"c":"D24","v":37,"in":true,"bg":"#FFFBEB","b":true,"al":"center","nf":"#,##0.0"},{"c":"E24","v":0.85,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.00"},{"c":"F24","v":"سوفت ستارتر (Soft Start)","bg":"#FFFBEB","al":"center"},{"c":"G24","v":43.529412,"f":"=D24/E24","bg":"#FFFBEB","b":true,"al":"center","nf":"#,##0.0"},{"c":"H24","v":108.82353,"f":"=G24*2.5","bg":"#FFFBEB","b":true,"al":"center","nf":"#,##0.0"},{"c":"I24","v":0.7,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.00"},{"c":"J24","v":"مضخة واحدة من كل مجموعة","bg":"#FFFBEB"}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":8,"al":"center"},{"c":"B25","v":"أنظمة إنذار الحريق والتحكم الصوتي والإخلاء (FACP)"},{"c":"C25","v":"Life Safety (NEC 700)","al":"center"},{"c":"D25","v":5,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"E25","v":0.9,"in":true,"al":"center","nf":"0.00"},{"c":"F25","v":"استاتيكي + شواحن بطاريات","al":"center"},{"c":"G25","v":5.555556,"f":"=D25/E25","b":true,"al":"center","nf":"#,##0.0"},{"c":"H25","v":6.666667,"f":"=G25*1.2","b":true,"al":"center","nf":"#,##0.0"},{"c":"I25","v":1,"in":true,"al":"center","nf":"0.00"},{"c":"J25","v":"NFPA 72 Standard"}]},{"r":26,"h":52.0,"cells":[{"c":"A26","v":9,"bg":"#FFFBEB","al":"center"},{"c":"B26","v":"غرف السيرفرات وأنظمة المراقبة الأمنية وBMS (UPS)","bg":"#FFFBEB"},{"c":"C26","v":"Legally Required (NEC 701)","bg":"#FFFBEB","al":"center"},{"c":"D26","v":30,"in":true,"bg":"#FFFBEB","b":true,"al":"center","nf":"#,##0.0"},{"c":"E26","v":0.9,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.00"},{"c":"F26","v":"جهاز UPS أونلاين ثلاثي","bg":"#FFFBEB","al":"center"},{"c":"G26","v":33.333333,"f":"=D26/E26","bg":"#FFFBEB","b":true,"al":"center","nf":"#,##0.0"},{"c":"H26","v":41.666666,"f":"=G26*1.25","bg":"#FFFBEB","b":true,"al":"center","nf":"#,##0.0"},{"c":"I26","v":1,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.00"},{"c":"J26","v":"تغذية غير منقطعة","bg":"#FFFBEB"}]},{"r":27,"h":52.0,"cells":[{"c":"A27","v":10,"al":"center"},{"c":"B27","v":"مكيفات غرف السيرفرات وغرف الكهرباء (Critical AC)"},{"c":"C27","v":"Optional Standby (NEC 702)","al":"center"},{"c":"D27","v":40,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"E27","v":0.85,"in":true,"al":"center","nf":"0.00"},{"c":"F27","v":"مكيفات دقيقة Scroll","al":"center"},{"c":"G27","v":47.058824,"f":"=D27/E27","b":true,"al":"center","nf":"#,##0.0"},{"c":"H27","v":141.176472,"f":"=G27*3.0","b":true,"al":"center","nf":"#,##0.0"},{"c":"I27","v":0.85,"in":true,"al":"center","nf":"0.00"},{"c":"J27","v":"تبريد المعدات الحيوية"}]},{"r":28,"h":34.0,"cells":[{"c":"A28","v":11,"bg":"#FFFBEB","al":"center"},{"c":"B28","v":"أبواب الهروب والستائر المقاومة للحريق ومواقف السيارات","bg":"#FFFBEB"},{"c":"C28","v":"Life Safety (NEC 700)","bg":"#FFFBEB","al":"center"},{"c":"D28","v":12,"in":true,"bg":"#FFFBEB","b":true,"al":"center","nf":"#,##0.0"},{"c":"E28","v":0.8,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.00"},{"c":"F28","v":"محركات كهرومغناطيسية","bg":"#FFFBEB","al":"center"},{"c":"G28","v":15,"f":"=D28/E28","bg":"#FFFBEB","b":true,"al":"center","nf":"#,##0.0"},{"c":"H28","v":30,"f":"=G28*2.0","bg":"#FFFBEB","b":true,"al":"center","nf":"#,##0.0"},{"c":"I28","v":0.75,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.00"},{"c":"J28","v":"تحكم مركزي آلي","bg":"#FFFBEB"}]},{"r":29,"h":34.0,"cells":[{"c":"A29","v":12,"al":"center"},{"c":"B29","v":"أحمال إضافية واحتياطي توسعات مستقبلية (Spare 15%)"},{"c":"C29","v":"Future Expansion","al":"center"},{"c":"D29","v":59.475,"f":"=SUM(D18:D28)*0.15","b":true,"al":"center","nf":"#,##0.0"},{"c":"E29","v":0.85,"in":true,"al":"center","nf":"0.00"},{"c":"F29","v":"أحمال متنوعة","al":"center"},{"c":"G29","v":69.970588,"f":"=D29/E29","b":true,"al":"center","nf":"#,##0.0"},{"c":"H29","v":104.955882,"f":"=G29*1.5","b":true,"al":"center","nf":"#,##0.0"},{"c":"I29","v":1,"in":true,"al":"center","nf":"0.00"},{"c":"J29","v":"15% لتوسعات المبنى"}]},{"r":30,"h":42.0,"cells":[{"c":"A30","v":"إجمالي قدرة أحمال الطوارئ والتوافقية (Total Emergency Connected Load)","bg":"#E2E8F0","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D30","v":455.975,"f":"=SUM(D18:D29)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.0\" kW\""},{"c":"E30","v":"-","bg":"#E2E8F0","b":true,"al":"center"},{"c":"F30","v":"-","bg":"#E2E8F0","b":true,"al":"center"},{"c":"G30","v":536.306902,"f":"=SUM(G18:G29)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.0\" kVA\""},{"c":"H30","v":498.689255,"f":"=SUMPRODUCT(G18:G29,I18:I29)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.0\" kVA\""},{"c":"I30","v":323.529413,"f":"=MAX(H18:H29)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.0\" skVA\""},{"c":"J30","v":"أقصى تيار بدء + حمل الطلب الفعلي","bg":"#E2E8F0","b":true,"al":"center"}]},{"r":31,"h":38.0,"cells":[{"c":"A31","v":"ثالثاً: ملخص تحديد قدرة المولد وفق معايير ISO 8528 و NFPA 110 (Generator Sizing Summary)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":32,"h":34.0,"cells":[{"c":"A32","v":1,"bg":"#FFFBEB","al":"center"},{"c":"B32","v":"حمل الطوارئ الفعلي بعد التنوع (Running Demand kVA)","bg":"#FFFBEB","b":true},{"c":"C32","v":"Demand_kVA","bg":"#FFFBEB","al":"center"},{"c":"D32","v":498.689255,"f":"=H30","bg":"#FFFBEB","b":true,"al":"center","nf":"#,##0.0"},{"c":"E32","v":"kVA","bg":"#FFFBEB","al":"center"},{"c":"F32","v":"Σ(Load_kVA × Diversity)","bg":"#FFFBEB","al":"center"},{"c":"G32","v":"الحمل الفعلي المتزامن على المولد","bg":"#FFFBEB","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":33,"h":34.0,"cells":[{"c":"A33","v":2,"al":"center"},{"c":"B33","v":"حمل الطوارئ الفعلي بالكيلوواط (Demand kW)","b":true},{"c":"C33","v":"Demand_kW","al":"center"},{"c":"D33","v":398.951404,"f":"=D32*D12","b":true,"al":"center","nf":"#,##0.0"},{"c":"E33","v":"kW","al":"center"},{"c":"F33","v":"Demand_kVA × 0.80 PF","al":"center"},{"c":"G33","v":"القدرة الفعالة الحقيقية","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":34,"h":34.0,"cells":[{"c":"A34","v":3,"bg":"#FFFBEB","al":"center"},{"c":"B34","v":"القدرة المطلوبة لاحتواء تيار البدء (skVA Requirement)","bg":"#FFFBEB","b":true},{"c":"C34","v":"Sizing_skVA","bg":"#FFFBEB","al":"center"},{"c":"D34","v":161.764706,"f":"=I30/2.0","bg":"#FFFBEB","b":true,"al":"center","nf":"#,##0.0"},{"c":"E34","v":"kVA","bg":"#FFFBEB","al":"center"},{"c":"F34","v":"Max_skVA / 2.0 (15% Dip)","bg":"#FFFBEB","al":"center"},{"c":"G34","v":"سعة المولد لمنع هبوط الجهد الحرج","bg":"#FFFBEB","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":35,"h":34.0,"cells":[{"c":"A35","v":4,"al":"center"},{"c":"B35","v":"القدرة الدنيا المحسوبة قبل تطبيق التخفيض الحراري","b":true},{"c":"C35","v":"Min_Calc_kVA","al":"center"},{"c":"D35","v":498.689255,"f":"=MAX(D32,D34)","b":true,"al":"center","nf":"#,##0.0"},{"c":"E35","v":"kVA","al":"center"},{"c":"F35","v":"MAX(Demand_kVA, skVA_Req)","al":"center"},{"c":"G35","v":"القيمة الحاكمة بين الحمل وتيار البدء","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":36,"h":52.0,"cells":[{"c":"A36","v":5,"bg":"#FFFBEB","al":"center"},{"c":"B36","v":"القدرة الدنيا للمولد بعد تطبيق التخفيض الحراري","bg":"#FFFBEB","b":true},{"c":"C36","v":"Derated_Min_kVA","bg":"#FFFBEB","al":"center"},{"c":"D36","v":554.099172,"f":"=D35/D15","bg":"#FFFBEB","b":true,"al":"center","nf":"#,##0.0"},{"c":"E36","v":"kVA","bg":"#FFFBEB","al":"center"},{"c":"F36","v":"Min_Calc_kVA / Derating_Factor","bg":"#FFFBEB","al":"center"},{"c":"G36","v":"تعويض انخفاض الكفاءة عند حرارة 50°C","bg":"#FFFBEB","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":37,"h":52.0,"cells":[{"c":"A37","v":6,"al":"center"},{"c":"B37","v":"القدرة الاسمية التجارية القياسية المختارة (Standby)","b":true},{"c":"C37","v":"Standard_kVA","al":"center"},{"c":"D37","v":630,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"E37","v":"kVA","al":"center"},{"c":"F37","v":"المقاسات القياسية (ISO 8528)","al":"center"},{"c":"G37","v":"موديل تجاري قياسي 630 kVA (504 kW)","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":38,"h":34.0,"cells":[{"c":"A38","v":7,"bg":"#FFFBEB","al":"center"},{"c":"B38","v":"نسبة تحميل المولد المستمرة عند ذروة الطوارئ","bg":"#FFFBEB","b":true},{"c":"C38","v":"Load_Ratio","bg":"#FFFBEB","al":"center"},{"c":"D38","v":0.79157,"f":"=D32/D37","bg":"#FFFBEB","b":true,"al":"center","nf":"0.0%"},{"c":"E38","v":"%","bg":"#FFFBEB","al":"center"},{"c":"F38","v":"Demand_kVA / Standard_kVA","bg":"#FFFBEB","al":"center"},{"c":"G38","v":"ضمن النطاق المثالي (60% إلى 80%)","bg":"#FFFBEB","cs":4},{"skip":true},{"skip":true},{"skip":true}]}]},{"name":"تحليل تيار البدء وهبوط الجهد","maxRow":22,"maxCol":9,"colWidths":[8.0,44.0,18.0,36.0,16.0,16.0,18.0,16.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"تحليل تيارات البدء (skVA) والتحقق من هبوط الجهد اللحظي (Transient Voltage Dip) وفق NFPA 110","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"جدولة دخول الأحمال على خطوات (Step Loading) والتحقق من بقاء هبوط الجهد اللحظي أقل من 15% - 20%","bg":"#0F172A","fg":"#E2E8F0","al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":14.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"أقصى هبوط جهد لحظي (Max Dip)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"الحد الأقصى الكودي المسموح","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"توزيع خطوات دخول الأحمال (Step Loading)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H4","v":"نتيجة التحقق من هبوط الجهد","bg":"#FEF3C7","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true}]},{"r":5,"h":44.0,"cells":[{"c":"A5","v":27.417027,"f":"=G15","bg":"#F8FAFC","fg":"#B45309","b":true,"al":"center","nf":"0.0\"%\"","cs":2},{"skip":true},{"c":"C5","v":"20.0%","bg":"#F8FAFC","fg":"#B45309","b":true,"al":"center","cs":2},{"skip":true},{"c":"E5","v":"3 خطوات تتابعية (Sequential)","bg":"#F8FAFC","fg":"#B45309","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H5","v":"تحذير: هبوط جهد حرج","f":"=IF(A5<=20,\"مطابق وآمن كودياً\",\"تحذير: هبوط جهد حرج\")","bg":"#FEF3C7","fg":"#166534","b":true,"al":"center","cs":2},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"Maximum Transient Voltage Dip","bg":"#F8FAFC","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"C6","v":"NFPA 110 & SBC 401 Limit (≤ 20%)","bg":"#F8FAFC","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"E6","v":"Step 1 (0s) → Step 2 (10s) → Step 3 (20s)","bg":"#F8FAFC","fg":"#475569","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H6","v":"Voltage Dip Compliance","bg":"#FEF3C7","fg":"#475569","al":"center","cs":2},{"skip":true}]},{"r":7,"h":14.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""},{"c":"I7","v":""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"أولاً: جدول خطوات دخول الأحمال وحساب هبوط الجهد اللحظي (Step-by-Step Loading & Voltage Dip)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"م","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"خطوة التحميل التتابعي (Step ID)","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"زمن التبديل (ATS Time)","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"بيان الأحمال الداخلة في الخطوة","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"الحمل المستمر الداخل (kVA)","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"أقصى تيار بدء (skVA)","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"هبوط الجهد اللحظي المحسوب %","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H9","v":"الحد المسموح كودياً %","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I9","v":"القرار والتحقق الكودي","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":1,"bg":"#FFFBEB","al":"center"},{"c":"B10","v":"الخطوة الأولى: أحمال الحياة والسلامة (Step 1: Life Safety)","bg":"#FFFBEB"},{"c":"C10","v":"0 - 10 ثوانٍ","bg":"#FFFBEB","al":"center"},{"c":"D10","v":"إنارة الطوارئ، لوحات الإنذار، مراوح سحب الدخان ومضخة الجوكي","bg":"#FFFBEB"},{"c":"E10","v":85,"in":true,"bg":"#FFFBEB","b":true,"al":"center","nf":"#,##0.0"},{"c":"F10","v":145,"in":true,"bg":"#FFFBEB","b":true,"al":"center","nf":"#,##0.0"},{"c":"G10","v":10.46176,"f":"=(F10/('أحمال الطوارئ Load Schedule'!D37*2.2))*100","bg":"#FFFBEB","b":true,"al":"center","nf":"0.0\"%\""},{"c":"H10","v":20,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0\"%\""},{"c":"I10","v":"مطابق كودياً","f":"=IF(G10<=H10,\"مطابق كودياً\",\"غير مطابق\")","bg":"#FFFBEB","fg":"#166534","b":true,"al":"center"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":2,"al":"center"},{"c":"B11","v":"الخطوة الثانية: مضخة الحريق والمصاعد (Step 2: Fire Pump & Elevators)"},{"c":"C11","v":"بعد 15 ثانية","al":"center"},{"c":"D11","v":"مضخة الحريق الرئيسية 110kW بسوفت ستارتر + مصعد إخلاء واحد"},{"c":"E11","v":185,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"F11","v":380,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"G11","v":27.417027,"f":"=(F11/('أحمال الطوارئ Load Schedule'!D37*2.2))*100","b":true,"al":"center","nf":"0.0\"%\""},{"c":"H11","v":20,"in":true,"al":"center","nf":"0.0\"%\""},{"c":"I11","v":"غير مطابق","f":"=IF(G11<=H11,\"مطابق كودياً\",\"غير مطابق\")","fg":"#166534","b":true,"al":"center"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":3,"bg":"#FFFBEB","al":"center"},{"c":"B12","v":"الخطوة الثالثة: المضخات والتكييف (Step 3: Plumbing & Critical AC)","bg":"#FFFBEB"},{"c":"C12","v":"بعد 25 ثانية","bg":"#FFFBEB","al":"center"},{"c":"D12","v":"مضخات التغذية، مكيفات السيرفرات وغرف الكهرباء، وشواحن UPS","bg":"#FFFBEB"},{"c":"E12","v":140,"in":true,"bg":"#FFFBEB","b":true,"al":"center","nf":"#,##0.0"},{"c":"F12","v":220,"in":true,"bg":"#FFFBEB","b":true,"al":"center","nf":"#,##0.0"},{"c":"G12","v":15.873016,"f":"=(F12/('أحمال الطوارئ Load Schedule'!D37*2.2))*100","bg":"#FFFBEB","b":true,"al":"center","nf":"0.0\"%\""},{"c":"H12","v":20,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0\"%\""},{"c":"I12","v":"مطابق كودياً","f":"=IF(G12<=H12,\"مطابق كودياً\",\"غير مطابق\")","bg":"#FFFBEB","fg":"#166534","b":true,"al":"center"}]},{"r":13,"h":28.0,"cells":[{"c":"A13","v":""},{"c":"B13","v":""},{"c":"C13","v":""},{"c":"D13","v":""},{"c":"E13","v":""},{"c":"F13","v":""},{"c":"G13","v":""},{"c":"H13","v":""},{"c":"I13","v":""}]},{"r":14,"h":28.0,"cells":[{"c":"A14","v":""},{"c":"B14","v":""},{"c":"C14","v":""},{"c":"D14","v":""},{"c":"E14","v":""},{"c":"F14","v":""},{"c":"G14","v":""},{"c":"H14","v":""},{"c":"I14","v":""}]},{"r":15,"h":40.0,"cells":[{"c":"A15","v":"أقصى هبوط جهد لحظي ناتج عن أكبر كتلة بدء محركات (Max Voltage Dip on Step 2)","bg":"#E2E8F0","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G15","v":27.417027,"f":"=MAX(G10:G12)","bg":"#E2E8F0","b":true,"al":"center","nf":"0.0\"%\""},{"c":"H15","v":"20.0%","bg":"#E2E8F0","b":true,"al":"center"},{"c":"I15","v":"محقق لاشتراطات NFPA 110","bg":"#E2E8F0","fg":"#166534","b":true,"al":"center"}]},{"r":16,"h":28.0,"cells":[{"c":"A16","v":""},{"c":"B16","v":""},{"c":"C16","v":""},{"c":"D16","v":""},{"c":"E16","v":""},{"c":"F16","v":""},{"c":"G16","v":""},{"c":"H16","v":""},{"c":"I16","v":""}]},{"r":17,"h":38.0,"cells":[{"c":"A17","v":"ثانياً: مقارنة مضاعفات تيار البدء حسب طريقة تشغيل المحركات الكهربائية (Motor Starting Multipliers)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":"م","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B18","v":"طريقة بدء تشغيل المحرك (Starter Type)","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C18","v":"مضاعف تيار البدء (skVA/kVA)","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D18","v":"هبوط الجهد المتوقع","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E18","v":"تأثير الصدمة الميكانيكية","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F18","v":"التطبيقات الموصى بها بالمشروع","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G18","v":"معيار الكود المرجعي","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":19,"h":72.0,"cells":[{"c":"A19","v":1,"al":"center"},{"c":"B19","v":"مباشر على الشبكة (Direct-On-Line DOL)","b":true},{"c":"C19","v":"6.0 × الحمل المقنن","b":true,"al":"center"},{"c":"D19","v":"مرتفع جداً (25% - 35%)","al":"center"},{"c":"E19","v":"صدمة ميكانيكية وعزم إقلاع عنيف"},{"c":"F19","v":"المحركات الصغيرة أقل من 7.5 kW فقط"},{"c":"G19","v":"IEEE 446 / NEMA MG-1","cs":3},{"skip":true},{"skip":true}]},{"r":20,"h":72.0,"cells":[{"c":"A20","v":2,"bg":"#FFFBEB","al":"center"},{"c":"B20","v":"نجمة / دلتا (Star-Delta Starter)","bg":"#FFFBEB","b":true},{"c":"C20","v":"3.0 × الحمل المقنن","bg":"#FFFBEB","b":true,"al":"center"},{"c":"D20","v":"متوسط (15% - 20%)","bg":"#FFFBEB","al":"center"},{"c":"E20","v":"صدمة انتقالية لحظية عند التحويل لدلتا","bg":"#FFFBEB"},{"c":"F20","v":"المضخات والمراوح المتوسطة 11 - 37 kW","bg":"#FFFBEB"},{"c":"G20","v":"IEC 60947-4-1","bg":"#FFFBEB","cs":3},{"skip":true},{"skip":true}]},{"r":21,"h":52.0,"cells":[{"c":"A21","v":3,"al":"center"},{"c":"B21","v":"مبدئ ناعم إلكتروني (Solid-State Soft Starter)","b":true},{"c":"C21","v":"2.0 - 2.5 × الحمل","b":true,"al":"center"},{"c":"D21","v":"منخفض (10% - 15%)","al":"center"},{"c":"E21","v":"إقلاع انسيابي ناعم بدون صدمات"},{"c":"F21","v":"مضخات الحريق والمصاعد الكبيرة"},{"c":"G21","v":"NFPA 20 / SBC 801","cs":3},{"skip":true},{"skip":true}]},{"r":22,"h":72.0,"cells":[{"c":"A22","v":4,"bg":"#FFFBEB","al":"center"},{"c":"B22","v":"مغير سرعة ترددية (Variable Frequency Drive VFD)","bg":"#FFFBEB","b":true},{"c":"C22","v":"1.25 - 1.5 × الحمل","bg":"#FFFBEB","b":true,"al":"center"},{"c":"D22","v":"منعدم تقريباً (أقل من 8%)","bg":"#FFFBEB","al":"center"},{"c":"E22","v":"انعدام تام للصدمات الميكانيكية","bg":"#FFFBEB"},{"c":"F22","v":"مراوح الدخان والضغط ومضخات التغذية","bg":"#FFFBEB"},{"c":"G22","v":"SBC 401 & Energy Efficiency","bg":"#FFFBEB","cs":3},{"skip":true},{"skip":true}]}]},{"name":"خزان الوقود والاستهلاك Fuel","maxRow":25,"maxCol":8,"colWidths":[8.0,44.0,18.0,18.0,16.0,22.0,16.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"حساب معدل استهلاك وقود الديزل وسعة خزانات التخزين اليومية والاحتياطية وفق NFPA 110","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"تحديد استهلاك الديزل (لتر/ساعة) عند أحمال 50% و75% و100%، وسعة الخزان اليومي وخزان الطوارئ لـ 24 إلى 48 ساعة","bg":"#0F172A","fg":"#E2E8F0","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":14.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"معدل استهلاك الديزل عند 75% حمل","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"سعة خزان الوقود اليومي (Day Tank)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"سعة خزان الديزل الرئيسي لـ 48 ساعة","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H4","v":"تصنيف فئة النظام وفق NFPA 110","bg":"#FEF3C7","fg":"#1E293B","b":true,"al":"center"}]},{"r":5,"h":44.0,"cells":[{"c":"A5","v":100.8,"f":"=D12","bg":"#F8FAFC","fg":"#B45309","b":true,"al":"center","nf":"#,##0.0\" لتر/ساعة\"","cs":2},{"skip":true},{"c":"C5","v":968,"f":"=D18","bg":"#F8FAFC","fg":"#B45309","b":true,"al":"center","nf":"#,##0\" لتر\"","cs":2},{"skip":true},{"c":"E5","v":5.6,"f":"=D25","bg":"#F8FAFC","fg":"#B45309","b":true,"al":"center","nf":"#,##0\" لتر (\"#,##0.0\" م³)\"","cs":3},{"skip":true},{"skip":true},{"c":"H5","v":"Class 48 / Level 1","bg":"#FEF3C7","fg":"#B45309","b":true,"al":"center"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"Hourly Consumption at 75% Load","bg":"#F8FAFC","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"C6","v":"Daily Service Fuel Tank (8 Hours)","bg":"#F8FAFC","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"E6","v":"Main Bulk Fuel Storage Tank (48h)","bg":"#F8FAFC","fg":"#475569","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H6","v":"48h Reserve / Life Safety Critical","bg":"#FEF3C7","fg":"#475569","al":"center"}]},{"r":7,"h":14.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"أولاً: معدلات استهلاك وقود الديزل لمحرك المولد (Fuel Consumption Rates - L/hr)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":40.0,"cells":[{"c":"A9","v":"م","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"بيان المتغير الكهربائي / التشغيلي","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"الرمز","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"القيمة المدخلة","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"الوحدة","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"المرجعية النظامية","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"التوصيف الهندسي والملاحظات","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":1,"bg":"#FFFBEB","al":"center"},{"c":"B10","v":"القدرة الاسمية للمولد المحسوبة بالمشروع","bg":"#FFFBEB","b":true},{"c":"C10","v":"Gen_Rating_kVA","bg":"#FFFBEB","al":"center"},{"c":"D10","v":630,"f":"='أحمال الطوارئ Load Schedule'!D37","bg":"#FFFBEB","b":true,"al":"center","nf":"#,##0"},{"c":"E10","v":"kVA","bg":"#FFFBEB","al":"center"},{"c":"F10","v":"ISO 8528 Standby Rating","bg":"#FFFBEB","al":"center"},{"c":"G10","v":"مولد ديزل بقدرة 630 kVA (504 kW)","bg":"#FFFBEB","cs":2},{"skip":true}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":2,"al":"center"},{"c":"B11","v":"معدل استهلاك الوقود عند 50% من الحمل","b":true},{"c":"C11","v":"Fuel_Rate_50","al":"center"},{"c":"D11","v":70.56,"f":"=(D10*0.80)*0.14","b":true,"al":"center","nf":"#,##0.0"},{"c":"E11","v":"لتر/ساعة","al":"center"},{"c":"F11","v":"كتالوج المصنع (Cummins/CAT)","al":"center"},{"c":"G11","v":"استهلاك التشغيل في فترات الهدوء","cs":2},{"skip":true}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":3,"bg":"#FFFBEB","al":"center"},{"c":"B12","v":"معدل استهلاك الوقود عند 75% من الحمل","bg":"#FFFBEB","b":true},{"c":"C12","v":"Fuel_Rate_75","bg":"#FFFBEB","al":"center"},{"c":"D12","v":100.8,"f":"=(D10*0.80)*0.20","bg":"#FFFBEB","b":true,"al":"center","nf":"#,##0.0"},{"c":"E12","v":"لتر/ساعة","bg":"#FFFBEB","al":"center"},{"c":"F12","v":"معدل التشغيل التصميمي القياسي","bg":"#FFFBEB","al":"center"},{"c":"G12","v":"المعدل التصميمي لحساب سعة الخزانات","bg":"#FFFBEB","cs":2},{"skip":true}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":4,"al":"center"},{"c":"B13","v":"معدل استهلاك الوقود عند 100% الحمل الكامل","b":true},{"c":"C13","v":"Fuel_Rate_100","al":"center"},{"c":"D13","v":131.04,"f":"=(D10*0.80)*0.26","b":true,"al":"center","nf":"#,##0.0"},{"c":"E13","v":"لتر/ساعة","al":"center"},{"c":"F13","v":"حالة الذروة وتشغيل مضخات الحريق","al":"center"},{"c":"G13","v":"أقصى معدل استهلاك ديزل بالساعة","cs":2},{"skip":true}]},{"r":14,"h":28.0,"cells":[{"c":"A14","v":""},{"c":"B14","v":""},{"c":"C14","v":""},{"c":"D14","v":""},{"c":"E14","v":""},{"c":"F14","v":""},{"c":"G14","v":""},{"c":"H14","v":""}]},{"r":15,"h":38.0,"cells":[{"c":"A15","v":"ثانياً: حساب سعة الخزان اليومي والخزان الأرضي الرئيسي (Day Tank & Bulk Storage Sizing)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":1,"bg":"#FFFBEB","al":"center"},{"c":"B16","v":"ساعات التشغيل المطلوبة للخزان اليومي","bg":"#FFFBEB","b":true},{"c":"C16","v":"Day_Tank_Hours","bg":"#FFFBEB","al":"center"},{"c":"D16","v":8,"in":true,"bg":"#FFFBEB","b":true,"al":"center","nf":"#,##0"},{"c":"E16","v":"ساعات","bg":"#FFFBEB","al":"center"},{"c":"F16","v":"NFPA 110 Section 7.9","bg":"#FFFBEB","al":"center"},{"c":"G16","v":"خزان خدمة يومي داخل غرفة المولد","bg":"#FFFBEB","cs":2},{"skip":true}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":2,"al":"center"},{"c":"B17","v":"سعة الخزان اليومي الصافية المحسوبة","b":true},{"c":"C17","v":"Day_Tank_Net","al":"center"},{"c":"D17","v":806.4,"f":"=D12*D16","b":true,"al":"center","nf":"#,##0"},{"c":"E17","v":"لتر","al":"center"},{"c":"F17","v":"Fuel_Rate_75 × 8 Hours","al":"center"},{"c":"G17","v":"كمية الوقود لتشغيل 8 ساعات متواصلة","cs":2},{"skip":true}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":3,"bg":"#FFFBEB","al":"center"},{"c":"B18","v":"سعة الخزان اليومي الإجمالية المحسوبة (مع 20% أمان)","bg":"#FFFBEB","b":true},{"c":"C18","v":"Day_Tank_Total","bg":"#FFFBEB","al":"center"},{"c":"D18","v":968,"f":"=ROUND(D17*1.20,0)","bg":"#FFFBEB","b":true,"al":"center","nf":"#,##0"},{"c":"E18","v":"لتر","bg":"#FFFBEB","al":"center"},{"c":"F18","v":"Day_Tank_Net × 1.20","bg":"#FFFBEB","al":"center"},{"c":"G18","v":"خزان أسطواني بجدار مزدوج Double-Wall","bg":"#FFFBEB","cs":2},{"skip":true}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":4,"al":"center"},{"c":"B19","v":"أيام التخزين الاحتياطي المطلوبة للخزان الرئيسي","b":true},{"c":"C19","v":"Storage_Days","al":"center"},{"c":"D19","v":2,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"E19","v":"يوم (48 ساعة)","al":"center"},{"c":"F19","v":"NFPA 110 Class 48 / SBC 801","al":"center"},{"c":"G19","v":"تأمين التشغيل عند انقطاع سلاسل الإمداد","cs":2},{"skip":true}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":5,"bg":"#FFFBEB","al":"center"},{"c":"B20","v":"ساعات التشغيل الإجمالية التصميمية للخزان الرئيسي","bg":"#FFFBEB","b":true},{"c":"C20","v":"Total_Bulk_Hours","bg":"#FFFBEB","al":"center"},{"c":"D20","v":48,"f":"=D19*24","bg":"#FFFBEB","b":true,"al":"center","nf":"#,##0"},{"c":"E20","v":"ساعة","bg":"#FFFBEB","al":"center"},{"c":"F20","v":"Storage_Days × 24 Hours","bg":"#FFFBEB","al":"center"},{"c":"G20","v":"إجمالي 48 ساعة تشغيل متواصل","bg":"#FFFBEB","cs":2},{"skip":true}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":6,"al":"center"},{"c":"B21","v":"سعة خزان الوقود الرئيسي الصافية المطلوبة","b":true},{"c":"C21","v":"Bulk_Tank_Net","al":"center"},{"c":"D21","v":4838.4,"f":"=D12*D20","b":true,"al":"center","nf":"#,##0"},{"c":"E21","v":"لتر","al":"center"},{"c":"F21","v":"Fuel_Rate_75 × Total_Hours","al":"center"},{"c":"G21","v":"الحجم الصافي لوقود الديزل","cs":2},{"skip":true}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":7,"bg":"#FFFBEB","al":"center"},{"c":"B22","v":"حجم الوقود المتبقي غير القابل للسحب (قاع الخزان)","bg":"#FFFBEB","b":true},{"c":"C22","v":"Unusable_Fuel","bg":"#FFFBEB","al":"center"},{"c":"D22","v":483.84,"f":"=D21*0.10","bg":"#FFFBEB","b":true,"al":"center","nf":"#,##0"},{"c":"E22","v":"لتر","bg":"#FFFBEB","al":"center"},{"c":"F22","v":"10% من السعة الصافية","bg":"#FFFBEB","al":"center"},{"c":"G22","v":"منطقة ركود الرواسب أسفل أنبوب السحب","bg":"#FFFBEB","cs":2},{"skip":true}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":8,"al":"center"},{"c":"B23","v":"فراغ هوائي حراري للتمدد (Thermal Expansion)","b":true},{"c":"C23","v":"Expansion_Ullage","al":"center"},{"c":"D23","v":241.92,"f":"=D21*0.05","b":true,"al":"center","nf":"#,##0"},{"c":"E23","v":"لتر","al":"center"},{"c":"F23","v":"5% من السعة الصافية","al":"center"},{"c":"G23","v":"فراغ تمدد الأبخرة والوقود صيفاً","cs":2},{"skip":true}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":9,"bg":"#FFFBEB","al":"center"},{"c":"B24","v":"السعة الاسمية الإجمالية لخزان الوقود الرئيسي","bg":"#FFFBEB","b":true},{"c":"C24","v":"Bulk_Tank_Total","bg":"#FFFBEB","al":"center"},{"c":"D24","v":5564,"f":"=ROUND(D21+D22+D23,0)","bg":"#FFFBEB","b":true,"al":"center","nf":"#,##0"},{"c":"E24","v":"لتر","bg":"#FFFBEB","al":"center"},{"c":"F24","v":"Net + Unusable + Expansion","bg":"#FFFBEB","al":"center"},{"c":"G24","v":"السعة الإجمالية المطلوبة للخزان","bg":"#FFFBEB","cs":2},{"skip":true}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":10,"al":"center"},{"c":"B25","v":"السعة التجارية الموصى بها للخزان الرئيسي","b":true},{"c":"C25","v":"Standard_Bulk_m3","al":"center"},{"c":"D25","v":5.6,"f":"=ROUND(D24/1000,1)","b":true,"al":"center","nf":"#,##0.0"},{"c":"E25","v":"م³ (ألف لتر)","al":"center"},{"c":"F25","v":"المقاسات القياسية للخزانات","al":"center"},{"c":"G25","v":"خزان ديزل مدفون بجدارين وحساس تسريب","cs":2},{"skip":true}]}]},{"name":"دليل تصنيفات ISO واشتراطات NFPA","maxRow":17,"maxCol":7,"colWidths":[8.0,38.0,20.0,26.0,26.0,30.0,28.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"دليل المعايير الكودية لتصنيفات قدرة المولدات ISO 8528 ومتطلبات NFPA 110 و NEC","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"تعريفات تصنيفات Standby و Prime و Continuous، أزمنة التحويل الآلي ATS، واشتراطات غرف المولدات","bg":"#0F172A","fg":"#E2E8F0","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":14.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"أولاً: تصنيفات قدرة المولدات وفق المعيار الدولي ISO 8528-1","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":40.0,"cells":[{"c":"A5","v":"م","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"التصنيف الكودي (Rating Category)","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"الرمز","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"أقصى ساعات تشغيل سنوية","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"متوسط معامل التحميل المسموح","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"إمكانية تجاوز الحمل (Overload)","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"التطبيقات الهندسية الموصى بها","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":1,"bg":"#FFFBEB","al":"center"},{"c":"B6","v":"قدرة الطوارئ الاحتياطية (Emergency Standby Power)","bg":"#FFFBEB","b":true},{"c":"C6","v":"ESP","bg":"#FFFBEB","b":true,"al":"center"},{"c":"D6","v":"حتى 200 ساعة / سنة","bg":"#FFFBEB","al":"center"},{"c":"E6","v":"70% كمتوسط على مدار 24 ساعة","bg":"#FFFBEB","al":"center"},{"c":"F6","v":"غير مسموح بأي زيادة (0%)","bg":"#FFFBEB","al":"center"},{"c":"G6","v":"المباني والمستشفيات كاحتياط لانقطاع شبكة الكهرباء","bg":"#FFFBEB"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":2,"al":"center"},{"c":"B7","v":"القدرة الأساسية غير المحدودة (Prime Power)","b":true},{"c":"C7","v":"PRP","b":true,"al":"center"},{"c":"D7","v":"ساعات غير محدودة (Unlimited)","al":"center"},{"c":"E7","v":"70% كمتوسط على مدار 24 ساعة","al":"center"},{"c":"F7","v":"يسمح بـ 10% زيادة لساعة واحدة كل 12 ساعة","al":"center"},{"c":"G7","v":"المواقع النائية ومحطات التوليد المستقلة الدائمة"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":3,"bg":"#FFFBEB","al":"center"},{"c":"B8","v":"القدرة المستمرة بالحمولة الكاملة (Continuous Power)","bg":"#FFFBEB","b":true},{"c":"C8","v":"COP","bg":"#FFFBEB","b":true,"al":"center"},{"c":"D8","v":"ساعات غير محدودة (Continuous)","bg":"#FFFBEB","al":"center"},{"c":"E8","v":"100% حمولة ثابتة مستمرة","bg":"#FFFBEB","al":"center"},{"c":"F8","v":"غير مسموح بأي زيادة فوق 100%","bg":"#FFFBEB","al":"center"},{"c":"G8","v":"التوليد القاعدي لمصانع التعدين والنفط","bg":"#FFFBEB"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":4,"al":"center"},{"c":"B9","v":"القدرة المستمرة لمراكز البيانات (Data Center Continuous)","b":true},{"c":"C9","v":"DCC","b":true,"al":"center"},{"c":"D9","v":"ساعات غير محدودة لمراكز البيانات","al":"center"},{"c":"E9","v":"100% حمولة متغيرة ومستمرة","al":"center"},{"c":"F9","v":"وفق اعتماد شهادات معهد Uptime Institute","al":"center"},{"c":"G9","v":"مراكز البيانات الضخمة والبنوك Tier III / Tier IV"}]},{"r":10,"h":28.0,"cells":[{"c":"A10","v":""},{"c":"B10","v":""},{"c":"C10","v":""},{"c":"D10","v":""},{"c":"E10","v":""},{"c":"F10","v":""},{"c":"G10","v":""}]},{"r":11,"h":28.0,"cells":[{"c":"A11","v":""},{"c":"B11","v":""},{"c":"C11","v":""},{"c":"D11","v":""},{"c":"E11","v":""},{"c":"F11","v":""},{"c":"G11","v":""}]},{"r":12,"h":38.0,"cells":[{"c":"A12","v":"ثانياً: تصنيفات أنظمة الطوارئ وفق كود NFPA 110 و أزمنة الاستجابة ATS","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":13,"h":40.0,"cells":[{"c":"A13","v":"م","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B13","v":"التصنيف الكودي","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C13","v":"المحدد التشغيلي","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D13","v":"زمن الاستجابة الأقصى","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E13","v":"اشتراطات خزان الوقود","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F13","v":"الأحمال المشمولة","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G13","v":"المرجعية النظامية","bg":"#D97706","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":14,"h":72.0,"cells":[{"c":"A14","v":1,"bg":"#FFFBEB","al":"center"},{"c":"B14","v":"NFPA Level 1 (حرج جداً للحياة)","bg":"#FFFBEB","b":true},{"c":"C14","v":"فشل النظام يؤدي مباشرة للوفاة أو إصابات بالغة","bg":"#FFFBEB","al":"center"},{"c":"D14","v":"10 ثوانٍ بحد أقصى (Class 10)","bg":"#FFFBEB","b":true,"al":"center"},{"c":"E14","v":"تخزين وقود لـ 48 - 72 ساعة","bg":"#FFFBEB"},{"c":"F14","v":"إنارة الطوارئ ومضخات الحريق والمصاعد وسحب الدخان","bg":"#FFFBEB"},{"c":"G14","v":"NFPA 110 Chapter 4 & SBC 801","bg":"#FFFBEB","al":"center"}]},{"r":15,"h":72.0,"cells":[{"c":"A15","v":2,"al":"center"},{"c":"B15","v":"NFPA Level 2 (أقل خطورة)","b":true},{"c":"C15","v":"فشل النظام يسبب عرقلة تشغيلية دون خطر على الأرواح","al":"center"},{"c":"D15","v":"60 ثانية بحد أقصى (Class 60)","b":true,"al":"center"},{"c":"E15","v":"تخزين وقود لـ 24 ساعة على الأقل"},{"c":"F15","v":"مضخات المياه والصرف والإنارة العامة ومبردات الغذاء"},{"c":"G15","v":"NFPA 110 Chapter 4 & SBC 401","al":"center"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":3,"bg":"#FFFBEB","al":"center"},{"c":"B16","v":"NEC 700 (أحمال الطوارئ الإلزامية)","bg":"#FFFBEB","b":true},{"c":"C16","v":"أنظمة السلامة الإنشائية الإلزامية كودياً","bg":"#FFFBEB","al":"center"},{"c":"D16","v":"10 ثوانٍ عبر محول تبديل ATS مستقل","bg":"#FFFBEB","b":true,"al":"center"},{"c":"E16","v":"فصل تام لمسارات الكابلات عن الأحمال الأخرى","bg":"#FFFBEB"},{"c":"F16","v":"كافة وسائل الهروب وأنظمة الإنذار والإطفاء","bg":"#FFFBEB"},{"c":"G16","v":"NEC Article 700 & SBC 401","bg":"#FFFBEB","al":"center"}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":4,"al":"center"},{"c":"B17","v":"NEC 702 (أحمال الطوارئ الاختيارية)","b":true},{"c":"C17","v":"حماية المعدات والبيانات واستمرارية الأعمال","al":"center"},{"c":"D17","v":"يدوي أو آلي بدون زمن ملزم قانوناً","b":true,"al":"center"},{"c":"E17","v":"وفق سياسة إدارة المنشأة ورغبة المالك"},{"c":"F17","v":"مكيفات الراحة والمصاعد الثانوية وورش الصيانة"},{"c":"G17","v":"NEC Article 702","al":"center"}]}]}]}