{"slug":"domestic-water-booster-pump-and-pressure-tank-sizing-sheet","sheets":[{"name":"حساب وحدات التغذية والتدفق WSFU","maxRow":39,"maxCol":9,"colWidths":[8.0,45.0,16.0,18.0,16.0,16.0,18.0,18.0,38.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"شيت حساب وتصميم مضخات رفع المياه ومجموعات التعزيز Booster Pumps وفق IPC و SBC 701 و ASPE","bg":"#0C4A6E","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"حساب تدفق الذروة عبر منحنى هنتر (Hunter's Curve)، تقدير وحدات التغذية WSFU، وتحديد استهلاك الأجهزة المتزامن","bg":"#0F172A","fg":"#E2E8F0","al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":14.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"إجمالي وحدات التغذية بالمبنى","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"تدفق الذروة التصميمي (Hunter)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"التدفق التصميمي المكافئ بالمتر المكعب/ساعة","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H4","v":"نظام الطرد المعتمد بالمبنى","bg":"#E0F2FE","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true}]},{"r":5,"h":44.0,"cells":[{"c":"A5","v":1345.7,"f":"=G32","bg":"#F8FAFC","fg":"#0C4A6E","b":true,"al":"center","nf":"#,##0\" WSFU\"","cs":2},{"skip":true},{"c":"C5","v":0,"f":"=H34","bg":"#F8FAFC","fg":"#0C4A6E","b":true,"al":"center","nf":"#,##0.0\" GPM\"","cs":2},{"skip":true},{"c":"E5","v":0,"f":"=C5*0.2271","bg":"#F8FAFC","fg":"#0C4A6E","b":true,"al":"center","nf":"#,##0.00\" م³/ساعة\"","cs":3},{"skip":true},{"skip":true},{"c":"H5","v":"خزانات طرد هادئة","f":"=IF(D13=\"صناديق طرد (Flush Tank)\",\"خزانات طرد هادئة\",\"صمامات فلاشوميتر\")","bg":"#E0F2FE","fg":"#0C4A6E","b":true,"al":"center","cs":2},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"Total Water Supply Fixture Units","bg":"#F8FAFC","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"C6","v":"Peak Design Flow Rate (GPM)","bg":"#F8FAFC","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"E6","v":"Q_peak (m³/h) = GPM × 0.227125","bg":"#F8FAFC","fg":"#475569","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H6","v":"IPC System Classification","bg":"#E0F2FE","fg":"#475569","al":"center","cs":2},{"skip":true}]},{"r":7,"h":14.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""},{"c":"I7","v":""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"أولاً: البيانات المعمارية ونظام التغذية بالمبنى (Building Parameters & Diversity Factors)","bg":"#0C4A6E","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":40.0,"cells":[{"c":"A9","v":"م","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"بيان المتغير المعماري / الهيدروليكي","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"الرمز","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"القيمة المدخلة","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"الوحدة","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"المرجعية النظامية","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"التوصيف الهندسي والملاحظات","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":1,"bg":"#F0F9FF","al":"center"},{"c":"B10","v":"نوع الإشغال وطبيعة نشاط المبنى","bg":"#F0F9FF","b":true},{"c":"C10","v":"Building_Type","bg":"#F0F9FF","al":"center"},{"c":"D10","v":"برج سكني متعدد الطوابق","bg":"#F0F9FF","b":true,"al":"center"},{"c":"E10","v":"تصنيف","bg":"#F0F9FF","al":"center"},{"c":"F10","v":"SBC 701 Chapter 6","bg":"#F0F9FF","al":"center"},{"c":"G10","v":"شقق سكنية عائلية مخدومة","bg":"#F0F9FF","cs":3},{"skip":true},{"skip":true}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":2,"al":"center"},{"c":"B11","v":"عدد الطوابق الإجمالي فوق الأرض","b":true},{"c":"C11","v":"Floors_Count","al":"center"},{"c":"D11","v":12,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"E11","v":"طابق","al":"center"},{"c":"F11","v":"المخطط المعماري","al":"center"},{"c":"G11","v":"يشمل الطابق الأرضي و11 طابق متكرر","cs":3},{"skip":true},{"skip":true}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":3,"bg":"#F0F9FF","al":"center"},{"c":"B12","v":"عدد الوحدات السكنية / الشقق بالمبنى","bg":"#F0F9FF","b":true},{"c":"C12","v":"Apartments_Num","bg":"#F0F9FF","al":"center"},{"c":"D12","v":48,"in":true,"bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0"},{"c":"E12","v":"شقة","bg":"#F0F9FF","al":"center"},{"c":"F12","v":"المخطط المعماري","bg":"#F0F9FF","al":"center"},{"c":"G12","v":"4 شقق سكنية في كل طابق","bg":"#F0F9FF","cs":3},{"skip":true},{"skip":true}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":4,"al":"center"},{"c":"B13","v":"نظام طرد المراحيض الغالب بالمشروع","b":true},{"c":"C13","v":"Flush_System","al":"center"},{"c":"D13","v":"صناديق طرد (Flush Tank)","b":true,"al":"center"},{"c":"E13","v":"نوع","al":"center"},{"c":"F13","v":"IPC Table 604.10","al":"center"},{"c":"G13","v":"تستخدم صناديق طرد عادية موفرة للمياه","cs":3},{"skip":true},{"skip":true}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":5,"bg":"#F0F9FF","al":"center"},{"c":"B14","v":"معامل التزامن الكودي المطبق","bg":"#F0F9FF","b":true},{"c":"C14","v":"Diversity_Factor","bg":"#F0F9FF","al":"center"},{"c":"D14","v":0.85,"in":true,"bg":"#F0F9FF","b":true,"al":"center","nf":"0.00"},{"c":"E14","v":"معامل","bg":"#F0F9FF","al":"center"},{"c":"F14","v":"ASPE Data Book Vol 2","bg":"#F0F9FF","al":"center"},{"c":"G14","v":"معامل تخفيض التزامن للأبراج السكنية","bg":"#F0F9FF","cs":3},{"skip":true},{"skip":true}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":6,"al":"center"},{"c":"B15","v":"الضغط الإيجابي للشبكة العمومية عند السحب","b":true},{"c":"C15","v":"Mains_Pressure","al":"center"},{"c":"D15","v":0,"in":true,"b":true,"al":"center","nf":"0.00 \"bar\""},{"c":"E15","v":"bar","al":"center"},{"c":"F15","v":"تصميم خزان مكسور","al":"center"},{"c":"G15","v":"السحب من خزان تخزين أرضي مكسور (Atmospheric)","cs":3},{"skip":true},{"skip":true}]},{"r":16,"h":38.0,"cells":[{"c":"A16","v":"ثانياً: جدول حصر وتوزيع الأجهزة الصحية ووحدات التغذية WSFU (IPC Table 604.10 & SBC 701)","bg":"#0C4A6E","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":"م","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B17","v":"بيان الجهاز الصحي (Plumbing Fixture)","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C17","v":"فئة الاستخدام","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D17","v":"العدد الإجمالي بالمبنى","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E17","v":"وحدات التغذية للبارد (CWS)","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F17","v":"وحدات التغذية للحار (HWS)","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G17","v":"إجمالي WSFU للبند","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H17","v":"التدفق المقابل (GPM)","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I17","v":"المرجعية والملاحظات الكودية","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":1,"bg":"#F0F9FF","al":"center"},{"c":"B18","v":"مرحاض غربي بصندوق طرد (Water Closet - Flush Tank)","bg":"#F0F9FF"},{"c":"C18","v":"سكني خاص","bg":"#F0F9FF","al":"center"},{"c":"D18","v":96,"in":true,"bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0"},{"c":"E18","v":2.2,"in":true,"bg":"#F0F9FF","al":"center","nf":"#,##0.0"},{"c":"F18","v":0,"in":true,"bg":"#F0F9FF","al":"center","nf":"#,##0.0"},{"c":"G18","v":211.2,"f":"=D18*MAX(E18,F18)","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"H18","v":29.568,"f":"=G18*0.14","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"I18","v":"حمام رئيسي + ضيوف للشقق","bg":"#F0F9FF"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":2,"al":"center"},{"c":"B19","v":"حوض غسيل أيدي منزلي (Lavatory - Private)"},{"c":"C19","v":"سكني خاص","al":"center"},{"c":"D19","v":112,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"E19","v":1,"in":true,"al":"center","nf":"#,##0.0"},{"c":"F19","v":1,"in":true,"al":"center","nf":"#,##0.0"},{"c":"G19","v":196,"f":"=D19*(E19+F19*0.75)","b":true,"al":"center","nf":"#,##0.0"},{"c":"H19","v":27.44,"f":"=G19*0.14","b":true,"al":"center","nf":"#,##0.0"},{"c":"I19","v":"مغاسل الشقق السكنية"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":3,"bg":"#F0F9FF","al":"center"},{"c":"B20","v":"دوش استحمام منزلي (Shower Head)","bg":"#F0F9FF"},{"c":"C20","v":"سكني خاص","bg":"#F0F9FF","al":"center"},{"c":"D20","v":48,"in":true,"bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0"},{"c":"E20","v":1.5,"in":true,"bg":"#F0F9FF","al":"center","nf":"#,##0.0"},{"c":"F20","v":1.5,"in":true,"bg":"#F0F9FF","al":"center","nf":"#,##0.0"},{"c":"G20","v":126,"f":"=D20*(E20+F20*0.75)","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"H20","v":17.64,"f":"=G20*0.14","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"I20","v":"كبائن الاستحمام المنفصلة","bg":"#F0F9FF"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":4,"al":"center"},{"c":"B21","v":"حوض بانيو استحمام مع دوش (Bathtub with Shower)"},{"c":"C21","v":"سكني خاص","al":"center"},{"c":"D21","v":48,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"E21","v":1.5,"in":true,"al":"center","nf":"#,##0.0"},{"c":"F21","v":1.5,"in":true,"al":"center","nf":"#,##0.0"},{"c":"G21","v":126,"f":"=D21*(E21+F21*0.75)","b":true,"al":"center","nf":"#,##0.0"},{"c":"H21","v":17.64,"f":"=G21*0.14","b":true,"al":"center","nf":"#,##0.0"},{"c":"I21","v":"أحواض الاستحمام بالحمامات"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":5,"bg":"#F0F9FF","al":"center"},{"c":"B22","v":"شطاف صحي ميكانيكي (Bidet / Shattaf)","bg":"#F0F9FF"},{"c":"C22","v":"سكني خاص","bg":"#F0F9FF","al":"center"},{"c":"D22","v":96,"in":true,"bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0"},{"c":"E22","v":1.5,"in":true,"bg":"#F0F9FF","al":"center","nf":"#,##0.0"},{"c":"F22","v":1.5,"in":true,"bg":"#F0F9FF","al":"center","nf":"#,##0.0"},{"c":"G22","v":252,"f":"=D22*(E22+F22*0.75)","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"H22","v":35.28,"f":"=G22*0.14","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"I22","v":"شطافات النظافة الشخصية","bg":"#F0F9FF"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":6,"al":"center"},{"c":"B23","v":"مجلى مطبخ منزلي (Kitchen Sink)"},{"c":"C23","v":"سكني خاص","al":"center"},{"c":"D23","v":48,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"E23","v":1.5,"in":true,"al":"center","nf":"#,##0.0"},{"c":"F23","v":1.5,"in":true,"al":"center","nf":"#,##0.0"},{"c":"G23","v":126,"f":"=D23*(E23+F23*0.75)","b":true,"al":"center","nf":"#,##0.0"},{"c":"H23","v":17.64,"f":"=G23*0.14","b":true,"al":"center","nf":"#,##0.0"},{"c":"I23","v":"مطابخ الشقق السكنية"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":7,"bg":"#F0F9FF","al":"center"},{"c":"B24","v":"غسالة صحون آلية (Domestic Dishwasher)","bg":"#F0F9FF"},{"c":"C24","v":"سكني خاص","bg":"#F0F9FF","al":"center"},{"c":"D24","v":48,"in":true,"bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0"},{"c":"E24","v":1.5,"in":true,"bg":"#F0F9FF","al":"center","nf":"#,##0.0"},{"c":"F24","v":0,"in":true,"bg":"#F0F9FF","al":"center","nf":"#,##0.0"},{"c":"G24","v":72,"f":"=D24*E24","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"H24","v":10.08,"f":"=G24*0.14","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"I24","v":"تغذية مياه باردة للمطبخ","bg":"#F0F9FF"}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":8,"al":"center"},{"c":"B25","v":"غسالة ملابس أوتوماتيك (Clothes Washer 8kg)"},{"c":"C25","v":"سكني خاص","al":"center"},{"c":"D25","v":48,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"E25","v":1.5,"in":true,"al":"center","nf":"#,##0.0"},{"c":"F25","v":1.5,"in":true,"al":"center","nf":"#,##0.0"},{"c":"G25","v":126,"f":"=D25*(E25+F25*0.75)","b":true,"al":"center","nf":"#,##0.0"},{"c":"H25","v":17.64,"f":"=G25*0.14","b":true,"al":"center","nf":"#,##0.0"},{"c":"I25","v":"غرف الغسيل المنفصلة"}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":9,"bg":"#F0F9FF","al":"center"},{"c":"B26","v":"حوض خدمة وغسيل أرضي (Service / Mop Basin)","bg":"#F0F9FF"},{"c":"C26","v":"خدمي عام","bg":"#F0F9FF","al":"center"},{"c":"D26","v":12,"in":true,"bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0"},{"c":"E26","v":2.5,"in":true,"bg":"#F0F9FF","al":"center","nf":"#,##0.0"},{"c":"F26","v":2.5,"in":true,"bg":"#F0F9FF","al":"center","nf":"#,##0.0"},{"c":"G26","v":52.5,"f":"=D26*(E26+F26*0.75)","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"H26","v":7.35,"f":"=G26*0.14","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"I26","v":"غرف النظافة والخدمة بكل دور","bg":"#F0F9FF"}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":10,"al":"center"},{"c":"B27","v":"حوض غسيل أيدي عام (Lavatory - Public)"},{"c":"C27","v":"تجاري / إداري","al":"center"},{"c":"D27","v":8,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"E27","v":1.5,"in":true,"al":"center","nf":"#,##0.0"},{"c":"F27","v":1.5,"in":true,"al":"center","nf":"#,##0.0"},{"c":"G27","v":21,"f":"=D27*(E27+F27*0.75)","b":true,"al":"center","nf":"#,##0.0"},{"c":"H27","v":2.94,"f":"=G27*0.14","b":true,"al":"center","nf":"#,##0.0"},{"c":"I27","v":"دورات مياه الاستقبال واللوبي"}]},{"r":28,"h":34.0,"cells":[{"c":"A28","v":11,"bg":"#F0F9FF","al":"center"},{"c":"B28","v":"مرحاض بصندوق طرد عام (Water Closet - Public Tank)","bg":"#F0F9FF"},{"c":"C28","v":"تجاري / إداري","bg":"#F0F9FF","al":"center"},{"c":"D28","v":4,"in":true,"bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0"},{"c":"E28","v":3,"in":true,"bg":"#F0F9FF","al":"center","nf":"#,##0.0"},{"c":"F28","v":0,"in":true,"bg":"#F0F9FF","al":"center","nf":"#,##0.0"},{"c":"G28","v":12,"f":"=D28*E28","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"H28","v":1.68,"f":"=G28*0.14","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"I28","v":"دورات مياه اللوبي بالدور الأرضي","bg":"#F0F9FF"}]},{"r":29,"h":34.0,"cells":[{"c":"A29","v":12,"al":"center"},{"c":"B29","v":"مبولة جدارية بصمام طرد (Urinal - Flush Tank)"},{"c":"C29","v":"خدمي عام","al":"center"},{"c":"D29","v":4,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"E29","v":2,"in":true,"al":"center","nf":"#,##0.0"},{"c":"F29","v":0,"in":true,"al":"center","nf":"#,##0.0"},{"c":"G29","v":8,"f":"=D29*E29","b":true,"al":"center","nf":"#,##0.0"},{"c":"H29","v":1.12,"f":"=G29*0.14","b":true,"al":"center","nf":"#,##0.0"},{"c":"I29","v":"مباول دورات مياه اللوبي"}]},{"r":30,"h":34.0,"cells":[{"c":"A30","v":13,"bg":"#F0F9FF","al":"center"},{"c":"B30","v":"حنفية ري خارجية ومكافحة غسيل (Hose Bibb 3/4\")","bg":"#F0F9FF"},{"c":"C30","v":"خارجي","bg":"#F0F9FF","al":"center"},{"c":"D30","v":4,"in":true,"bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0"},{"c":"E30","v":3,"in":true,"bg":"#F0F9FF","al":"center","nf":"#,##0.0"},{"c":"F30","v":0,"in":true,"bg":"#F0F9FF","al":"center","nf":"#,##0.0"},{"c":"G30","v":12,"f":"=D30*E30","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"H30","v":1.68,"f":"=G30*0.14","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"I30","v":"ري الحدائق ومواقف السيارات","bg":"#F0F9FF"}]},{"r":31,"h":34.0,"cells":[{"c":"A31","v":14,"al":"center"},{"c":"B31","v":"مخرج مياه إضافي للصيانة وغسيل الخزانات"},{"c":"C31","v":"صيانة","al":"center"},{"c":"D31","v":2,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"E31","v":2.5,"in":true,"al":"center","nf":"#,##0.0"},{"c":"F31","v":0,"in":true,"al":"center","nf":"#,##0.0"},{"c":"G31","v":5,"f":"=D31*E31","b":true,"al":"center","nf":"#,##0.0"},{"c":"H31","v":0.7,"f":"=G31*0.14","b":true,"al":"center","nf":"#,##0.0"},{"c":"I31","v":"سطح المبنى وغرفة المضخات"}]},{"r":32,"h":42.0,"cells":[{"c":"A32","v":"إجمالي وحدات التغذية الكلية للمبنى (Total WSFU Demand)","bg":"#E2E8F0","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D32","v":578,"f":"=SUM(D18:D31)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0"},{"c":"E32","v":"-","bg":"#E2E8F0","b":true,"al":"center"},{"c":"F32","v":"-","bg":"#E2E8F0","b":true,"al":"center"},{"c":"G32","v":1345.7,"f":"=SUM(G18:G31)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.0"},{"c":"H32","v":188.398,"f":"=SUM(H18:H31)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.0"},{"c":"I32","v":"مجموع وحدات التغذية المحسوبة","bg":"#E2E8F0","b":true,"al":"center"}]},{"r":33,"h":38.0,"cells":[{"c":"A33","v":"ثالثاً: معادلة منحنى هنتر لحساب تدفق الذروة التصميمي (Hunter's Curve Peak Flow Rate)","bg":"#0C4A6E","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":34,"h":52.0,"cells":[{"c":"A34","v":1,"bg":"#F0F9FF","al":"center"},{"c":"B34","v":"إجمالي وحدات التغذية الفعلية بعد التزامن","bg":"#F0F9FF","b":true},{"c":"C34","v":"WSFU_Design","bg":"#F0F9FF","al":"center"},{"c":"D34","v":1143.845,"f":"=G32*D14","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"E34","v":"WSFU","bg":"#F0F9FF","al":"center"},{"c":"F34","v":"WSFU × Diversity_Factor","bg":"#F0F9FF","al":"center"},{"c":"G34","v":"تخفيض التزامن للأبراج السكنية","bg":"#F0F9FF","cs":3},{"skip":true},{"skip":true}]},{"r":35,"h":52.0,"cells":[{"c":"A35","v":2,"al":"center"},{"c":"B35","v":"تدفق الذروة التصميمي عبر معادلة هنتر (GPM)","b":true},{"c":"C35","v":"Q_Peak_GPM","al":"center"},{"c":"D35","v":136.19225,"f":"=IF(D34<=100, 0.25*D34+8, IF(D34<=500, 0.14*D34+19, IF(D34<=1000, 0.08*D34+49, 0.05*D34+79)))","b":true,"al":"center","nf":"#,##0.00"},{"c":"E35","v":"GPM","al":"center"},{"c":"F35","v":"Hunter's Curve (Flush Tank)","al":"center"},{"c":"G35","v":"جالون أمريكي في الدقيقة","cs":3},{"skip":true},{"skip":true}]},{"r":36,"h":34.0,"cells":[{"c":"A36","v":3,"bg":"#F0F9FF","al":"center"},{"c":"B36","v":"تدفق الذروة المكافئ باللتر في الدقيقة (L/min)","bg":"#F0F9FF","b":true},{"c":"C36","v":"Q_Peak_LPM","bg":"#F0F9FF","al":"center"},{"c":"D36","v":515.543505,"f":"=D35*3.78541","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E36","v":"L/min","bg":"#F0F9FF","al":"center"},{"c":"F36","v":"GPM × 3.78541","bg":"#F0F9FF","al":"center"},{"c":"G36","v":"لتر مياه في الدقيقة الواحدة","bg":"#F0F9FF","cs":3},{"skip":true},{"skip":true}]},{"r":37,"h":34.0,"cells":[{"c":"A37","v":4,"al":"center"},{"c":"B37","v":"تدفق الذروة المكافئ بالمتر المكعب/ساعة (m³/h)","b":true},{"c":"C37","v":"Q_Peak_m3h","al":"center"},{"c":"D37","v":30.932665,"f":"=D35*0.227125","b":true,"al":"center","nf":"#,##0.00"},{"c":"E37","v":"م³/ساعة","al":"center"},{"c":"F37","v":"GPM × 0.227125","al":"center"},{"c":"G37","v":"التدفق المعتمد لاختيار المضخات","cs":3},{"skip":true},{"skip":true}]},{"r":38,"h":34.0,"cells":[{"c":"A38","v":5,"bg":"#F0F9FF","al":"center"},{"c":"B38","v":"تدفق المضخة الواحدة في نظام (1D + 1S)","bg":"#F0F9FF","b":true},{"c":"C38","v":"Q_Pump_1D1S","bg":"#F0F9FF","al":"center"},{"c":"D38","v":30.932665,"f":"=D37","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E38","v":"م³/ساعة","bg":"#F0F9FF","al":"center"},{"c":"F38","v":"100% من تدفق الذروة","bg":"#F0F9FF","al":"center"},{"c":"G38","v":"مضخة تعمل والأخرى احتياطية 100%","bg":"#F0F9FF","cs":3},{"skip":true},{"skip":true}]},{"r":39,"h":34.0,"cells":[{"c":"A39","v":6,"al":"center"},{"c":"B39","v":"تدفق المضخة الواحدة في نظام (2D + 1S)","b":true},{"c":"C39","v":"Q_Pump_2D1S","al":"center"},{"c":"D39","v":15.466333,"f":"=D37/2","b":true,"al":"center","nf":"#,##0.00"},{"c":"E39","v":"م³/ساعة","al":"center"},{"c":"F39","v":"50% من تدفق الذروة","al":"center"},{"c":"G39","v":"مضختان عاملتان + مضخة احتياطية 50%","cs":3},{"skip":true},{"skip":true}]}]},{"name":"حساب ضغط ومواصفات المضخات TDH","maxRow":43,"maxCol":9,"colWidths":[8.0,44.0,16.0,18.0,18.0,16.0,16.0,24.0,38.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"حساب ضغط الرفع الديناميكي الكلي (TDH) وقدرة محركات مضخات المياه Booster Pumps","bg":"#0C4A6E","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"حساب الفواقد الاحتكاكية، الارتفاع الاستاتيكي، الضغط المتبقي عند أبعد جهاز صحي، وقدرة المحرك وفق SBC 701 و ASPE","bg":"#0F172A","fg":"#E2E8F0","al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":14.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"التدفق الكلي المطلوب للمجموعة","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"ضغط الرفع الكلي (Head - TDH)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"الضغط المكافئ لمجموعة الضخ (bar)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H4","v":"قدرة محرك المضخة الواحدة","bg":"#E0F2FE","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true}]},{"r":5,"h":44.0,"cells":[{"c":"A5","v":30.932665,"f":"='حساب وحدات التغذية والتدفق WSFU'!D37","bg":"#F8FAFC","fg":"#0C4A6E","b":true,"al":"center","nf":"#,##0.00\" م³/ساعة\"","cs":2},{"skip":true},{"c":"C5","v":90.255,"f":"=E32","bg":"#F8FAFC","fg":"#0C4A6E","b":true,"al":"center","nf":"#,##0.0\" متر عمود ماء\"","cs":2},{"skip":true},{"c":"E5","v":8.851133,"f":"=C5/10.197","bg":"#F8FAFC","fg":"#0C4A6E","b":true,"al":"center","nf":"#,##0.00\" bar\"","cs":3},{"skip":true},{"skip":true},{"c":"H5","v":3.803866,"f":"=D39","bg":"#E0F2FE","fg":"#0C4A6E","b":true,"al":"center","nf":"#,##0.0\" kW (\"0.0\" HP)\"","cs":2},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"Total Booster Set Capacity","bg":"#F8FAFC","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"C6","v":"Total Dynamic Head (m.w.c)","bg":"#F8FAFC","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"E6","v":"Discharge Working Pressure","bg":"#F8FAFC","fg":"#475569","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H6","v":"Rated Motor Power (kW / HP)","bg":"#E0F2FE","fg":"#475569","al":"center","cs":2},{"skip":true}]},{"r":7,"h":14.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""},{"c":"I7","v":""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"أولاً: محددات المسار الهيدروليكي وشبكة التوزيع (Hydraulic Path & Elevation Parameters)","bg":"#0C4A6E","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":40.0,"cells":[{"c":"A9","v":"م","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"بيان المتغير المعماري / الهيدروليكي","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"الرمز","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"القيمة المدخلة","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"الوحدة","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"المرجعية النظامية","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"التوصيف الهندسي والملاحظات","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":1,"bg":"#F0F9FF","al":"center"},{"c":"B10","v":"الارتفاع الاستاتيكي الرأسي حتى أعلى جهاز صحي","bg":"#F0F9FF","b":true},{"c":"C10","v":"H_Static","bg":"#F0F9FF","al":"center"},{"c":"D10","v":42,"in":true,"bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"E10","v":"متر","bg":"#F0F9FF","al":"center"},{"c":"F10","v":"المخطط المعماري","bg":"#F0F9FF","al":"center"},{"c":"G10","v":"من قاع خزان السحب حتى أعلى دوش بالطابق 12","bg":"#F0F9FF","cs":3},{"skip":true},{"skip":true}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":2,"al":"center"},{"c":"B11","v":"الضغط المتبقي الأدنى المطلوب عند أبعد جهاز","b":true},{"c":"C11","v":"H_Residual","al":"center"},{"c":"D11","v":20.4,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"E11","v":"متر","al":"center"},{"c":"F11","v":"SBC 701 Section 604","al":"center"},{"c":"G11","v":"ما يعادل 2.0 bar (29.0 PSI) لضمان تدفق ممتاز","cs":3},{"skip":true},{"skip":true}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":3,"bg":"#F0F9FF","al":"center"},{"c":"B12","v":"الطول الفعلي لأطول مسار أنابيب (سحب + طرد)","bg":"#F0F9FF","b":true},{"c":"C12","v":"Pipe_Length","bg":"#F0F9FF","al":"center"},{"c":"D12","v":75,"in":true,"bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"E12","v":"متر","bg":"#F0F9FF","al":"center"},{"c":"F12","v":"مخططات السباكة MEP","bg":"#F0F9FF","al":"center"},{"c":"G12","v":"أطول مسار هيدروليكي للمياه من المضخة للأخير","bg":"#F0F9FF","cs":3},{"skip":true},{"skip":true}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":4,"al":"center"},{"c":"B13","v":"مادة أنابيب التغذية ومعامل الاحتكاك","b":true},{"c":"C13","v":"Pipe_Material","al":"center"},{"c":"D13","v":"PPR / PEX (C=150)","b":true,"al":"center"},{"c":"E13","v":"C-Factor","al":"center"},{"c":"F13","v":"Hazen-Williams C=150","al":"center"},{"c":"G13","v":"بولي بروبيلين عالي النعومة منخفض الاحتكاك","cs":3},{"skip":true},{"skip":true}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":5,"bg":"#F0F9FF","al":"center"},{"c":"B14","v":"القطر الداخلي لأنبوب الصاعد الرئيسي","bg":"#F0F9FF","b":true},{"c":"C14","v":"Pipe_Dia_mm","bg":"#F0F9FF","al":"center"},{"c":"D14","v":75,"in":true,"bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"E14","v":"ملم (2.5\")","bg":"#F0F9FF","al":"center"},{"c":"F14","v":"الحسابات الهيدروليكية","bg":"#F0F9FF","al":"center"},{"c":"G14","v":"سرعة الجريان التصميمية = 1.45 م/ث (أقل من 2.4)","bg":"#F0F9FF","cs":3},{"skip":true},{"skip":true}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":6,"al":"center"},{"c":"B15","v":"فقد الاحتكاك الخطي لكل 100 متر طول","b":true},{"c":"C15","v":"Unit_Friction","al":"center"},{"c":"D15","v":4.2,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E15","v":"م/100م","al":"center"},{"c":"F15","v":"Hazen-Williams Formula","al":"center"},{"c":"G15","v":"معدل فقد الضغط الاحتكاكي بالأنابيب","cs":3},{"skip":true},{"skip":true}]},{"r":16,"h":38.0,"cells":[{"c":"A16","v":"ثانياً: تفصيل مكونات ضغط الرفع الكلي TDH وفواقد المحابس والأجهزة (Head Losses Breakdown)","bg":"#0C4A6E","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":"م","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B17","v":"عنصر الفقد الهيدروليكي / الضغط (Head Component)","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C17","v":"النوع / الفئة","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D17","v":"الكمية / الطول المكافئ","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E17","v":"فقد الضغط (متر عمود ماء)","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F17","v":"الضغط المكافئ (bar)","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G17","v":"النسبة من الإجمالي %","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H17","v":"المرجعية الهندسية","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I17","v":"الملاحظات واشتراطات الكود","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":1,"bg":"#F0F9FF","al":"center"},{"c":"B18","v":"الارتفاع الاستاتيكي الرأسي (Static Elevation Head)","bg":"#F0F9FF"},{"c":"C18","v":"استاتيكي","bg":"#F0F9FF","al":"center"},{"c":"D18","v":42,"in":true,"bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"E18","v":42,"f":"=D10","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F18","v":4.118858,"f":"=E18/10.197","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G18","v":0,"f":"=E18/$E$32","bg":"#F0F9FF","al":"center","nf":"0.0%"},{"c":"H18","v":"المناسيب المعمارية","bg":"#F0F9FF","al":"center"},{"c":"I18","v":"فارق الارتفاع بين المضخة وأعلى جهاز صحي","bg":"#F0F9FF"}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":2,"al":"center"},{"c":"B19","v":"الضغط المتبقي المطلوب عند أبعد مخرج (Residual Pressure)"},{"c":"C19","v":"تشغيلي","al":"center"},{"c":"D19","v":1,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"E19","v":20.4,"f":"=D11","b":true,"al":"center","nf":"#,##0.00"},{"c":"F19","v":2.000588,"f":"=E19/10.197","b":true,"al":"center","nf":"#,##0.00"},{"c":"G19","v":0,"f":"=E19/$E$32","al":"center","nf":"0.0%"},{"c":"H19","v":"SBC 701 Section 604","al":"center"},{"c":"I19","v":"الضغط الكافي لتشغيل الدوش والشطاف بكفاءة"}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":3,"bg":"#F0F9FF","al":"center"},{"c":"B20","v":"فقد الاحتكاك في الأنابيب المستقيمة (Pipe Friction Loss)","bg":"#F0F9FF"},{"c":"C20","v":"احتكاكي","bg":"#F0F9FF","al":"center"},{"c":"D20","v":75,"in":true,"bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"E20","v":3.15,"f":"=D12*(D15/100)","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F20","v":0.308914,"f":"=E20/10.197","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G20","v":0,"f":"=E20/$E$32","bg":"#F0F9FF","al":"center","nf":"0.0%"},{"c":"H20","v":"معادلة هيزن ويليامز","bg":"#F0F9FF","al":"center"},{"c":"I20","v":"فقد الاحتكاك على طول المسار 75 متر","bg":"#F0F9FF"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":4,"al":"center"},{"c":"B21","v":"فواقد الأكوع والوصلات الميكانيكية (Elbows & Tees)"},{"c":"C21","v":"قطع خاصة","al":"center"},{"c":"D21","v":14,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"E21","v":1.8,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F21","v":0.176523,"f":"=E21/10.197","b":true,"al":"center","nf":"#,##0.00"},{"c":"G21","v":0,"f":"=E21/$E$32","al":"center","nf":"0.0%"},{"c":"H21","v":"ASPE Equivalent Length","al":"center"},{"c":"I21","v":"طول مكافئ للأكواع 90° والوصلات"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":5,"bg":"#F0F9FF","al":"center"},{"c":"B22","v":"محبس عدم رجوع طارد للمضخة (Silent Check Valve)","bg":"#F0F9FF"},{"c":"C22","v":"محابس","bg":"#F0F9FF","al":"center"},{"c":"D22","v":2,"in":true,"bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"E22","v":2.5,"in":true,"bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F22","v":0.24517,"f":"=E22/10.197","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G22","v":0,"f":"=E22/$E$32","bg":"#F0F9FF","al":"center","nf":"0.0%"},{"c":"H22","v":"بيانات المصنع","bg":"#F0F9FF","al":"center"},{"c":"I22","v":"محبس صامت مانع للمطرقة المائية","bg":"#F0F9FF"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":6,"al":"center"},{"c":"B23","v":"محبس عزل كروي / بوابة (Isolation Gate Valves)"},{"c":"C23","v":"محابس","al":"center"},{"c":"D23","v":6,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"E23","v":0.8,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F23","v":0.078454,"f":"=E23/10.197","b":true,"al":"center","nf":"#,##0.00"},{"c":"G23","v":0,"f":"=E23/$E$32","al":"center","nf":"0.0%"},{"c":"H23","v":"ASPE Data Book","al":"center"},{"c":"I23","v":"محابس العزل على خطوط السحب والطرد"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":7,"bg":"#F0F9FF","al":"center"},{"c":"B24","v":"مصفاة مياه على السحب (Y-Strainer)","bg":"#F0F9FF"},{"c":"C24","v":"تنقية","bg":"#F0F9FF","al":"center"},{"c":"D24","v":1,"in":true,"bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"E24","v":1.5,"in":true,"bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F24","v":0.147102,"f":"=E24/10.197","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G24","v":0,"f":"=E24/$E$32","bg":"#F0F9FF","al":"center","nf":"0.0%"},{"c":"H24","v":"كتالوج المصنع","bg":"#F0F9FF","al":"center"},{"c":"I24","v":"فلترة الرواسب لحماية ريش المضخات","bg":"#F0F9FF"}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":8,"al":"center"},{"c":"B25","v":"عداد قياس تدفق المياه الرئيسي (Bulk Water Meter)"},{"c":"C25","v":"أجهزة قياس","al":"center"},{"c":"D25","v":1,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"E25","v":3.2,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F25","v":0.313818,"f":"=E25/10.197","b":true,"al":"center","nf":"#,##0.00"},{"c":"G25","v":0,"f":"=E25/$E$32","al":"center","nf":"0.0%"},{"c":"H25","v":"AWWA Standard","al":"center"},{"c":"I25","v":"فقد الضغط عبر العداد الميكانيكي"}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":9,"bg":"#F0F9FF","al":"center"},{"c":"B26","v":"مانع ارتداد المياه المزدوج (Double Check Backflow)","bg":"#F0F9FF"},{"c":"C26","v":"حماية صحية","bg":"#F0F9FF","al":"center"},{"c":"D26","v":1,"in":true,"bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"E26","v":3.5,"in":true,"bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F26","v":0.343238,"f":"=E26/10.197","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G26","v":0,"f":"=E26/$E$32","bg":"#F0F9FF","al":"center","nf":"0.0%"},{"c":"H26","v":"SBC 701 Section 608","bg":"#F0F9FF","al":"center"},{"c":"I26","v":"حماية شبكة المياه من التلوث العكسي","bg":"#F0F9FF"}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":10,"al":"center"},{"c":"B27","v":"فواقد الموزع الرئيسي داخل غرفة المضخات (Manifold)"},{"c":"C27","v":"توزيع","al":"center"},{"c":"D27","v":1,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"E27","v":1.2,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F27","v":0.117682,"f":"=E27/10.197","b":true,"al":"center","nf":"#,##0.00"},{"c":"G27","v":0,"f":"=E27/$E$32","al":"center","nf":"0.0%"},{"c":"H27","v":"MEP Room Losses","al":"center"},{"c":"I27","v":"فواقد خطوط الربط والتجميع"}]},{"r":28,"h":34.0,"cells":[{"c":"A28","v":11,"bg":"#F0F9FF","al":"center"},{"c":"B28","v":"فواقد مخفض ضغط رئيسي للطوابق السفلية (PRV)","bg":"#F0F9FF"},{"c":"C28","v":"تنظيم","bg":"#F0F9FF","al":"center"},{"c":"D28","v":1,"in":true,"bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"E28","v":2,"in":true,"bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F28","v":0.196136,"f":"=E28/10.197","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G28","v":0,"f":"=E28/$E$32","bg":"#F0F9FF","al":"center","nf":"0.0%"},{"c":"H28","v":"ASPE Standard","bg":"#F0F9FF","al":"center"},{"c":"I28","v":"فقد الضغط الداخلي لصمام التنظيم","bg":"#F0F9FF"}]},{"r":29,"h":34.0,"cells":[{"c":"A29","v":12,"al":"center"},{"c":"B29","v":"هامش أمان تصميمي هيدروليكي (Safety Factor 10%)"},{"c":"C29","v":"أمان","al":"center"},{"c":"D29","v":1,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"E29","v":8.205,"f":"=(SUM(E18:E28))*0.10","b":true,"al":"center","nf":"#,##0.00"},{"c":"F29","v":0.804648,"f":"=E29/10.197","b":true,"al":"center","nf":"#,##0.00"},{"c":"G29","v":0,"f":"=E29/$E$32","al":"center","nf":"0.0%"},{"c":"H29","v":"Good Engineering Practice","al":"center"},{"c":"I29","v":"10% لمواجهة تقادم الأنابيب والترسبات"}]},{"r":30,"h":28.0,"cells":[{"c":"A30","v":""},{"c":"B30","v":""},{"c":"C30","v":""},{"c":"D30","v":""},{"c":"E30","v":""},{"c":"F30","v":""},{"c":"G30","v":""},{"c":"H30","v":""},{"c":"I30","v":""}]},{"r":31,"h":28.0,"cells":[{"c":"A31","v":""},{"c":"B31","v":""},{"c":"C31","v":""},{"c":"D31","v":""},{"c":"E31","v":""},{"c":"F31","v":""},{"c":"G31","v":""},{"c":"H31","v":""},{"c":"I31","v":""}]},{"r":32,"h":42.0,"cells":[{"c":"A32","v":"ضغط الرفع الديناميكي الكلي المعتمد (Total Dynamic Head - TDH)","bg":"#E2E8F0","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"E32","v":90.255,"f":"=SUM(E18:E29)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00\" m\""},{"c":"F32","v":8.851133,"f":"=E32/10.197","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00\" bar\""},{"c":"G32","v":0,"f":"=SUM(G18:G29)","bg":"#E2E8F0","b":true,"al":"center","nf":"100.0%"},{"c":"H32","v":"إجمالي ضغط الرفع المطلوب للمضخات","bg":"#E2E8F0","b":true,"al":"center","cs":2},{"skip":true}]},{"r":33,"h":38.0,"cells":[{"c":"A33","v":"ثالثاً: حساب القدرة الهيدروليكية وقدرة المحرك الكهربائي (Pump Power & Motor Sizing)","bg":"#0C4A6E","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":34,"h":52.0,"cells":[{"c":"A34","v":1,"bg":"#F0F9FF","al":"center"},{"c":"B34","v":"تكوين مجموعة الضخ المختارة","bg":"#F0F9FF","b":true},{"c":"C34","v":"Pump_Set_Config","bg":"#F0F9FF","al":"center"},{"c":"D34","v":"مجموعة ثلاثية (2 Duty + 1 Standby)","bg":"#F0F9FF","b":true,"al":"center"},{"c":"E34","v":"تكوين","bg":"#F0F9FF","al":"center"},{"c":"F34","v":"ASPE Design Practice","bg":"#F0F9FF","al":"center"},{"c":"G34","v":"مضختان تعملان بنسبة 50% لكل منهما + مضخة احتياط","bg":"#F0F9FF","cs":3},{"skip":true},{"skip":true}]},{"r":35,"h":34.0,"cells":[{"c":"A35","v":2,"al":"center"},{"c":"B35","v":"معدل التدفق للمضخة الواحدة (50% من الذروة)","b":true},{"c":"C35","v":"Q_Single_m3h","al":"center"},{"c":"D35","v":15.466333,"f":"='حساب وحدات التغذية والتدفق WSFU'!D39","b":true,"al":"center","nf":"#,##0.00"},{"c":"E35","v":"م³/ساعة","al":"center"},{"c":"F35","v":"Q_Peak / 2","al":"center"},{"c":"G35","v":"سعة المضخة الفردية عند الذروة","cs":3},{"skip":true},{"skip":true}]},{"r":36,"h":34.0,"cells":[{"c":"A36","v":3,"bg":"#F0F9FF","al":"center"},{"c":"B36","v":"معدل التدفق للمضخة باللتر/ثانية (L/s)","bg":"#F0F9FF","b":true},{"c":"C36","v":"Q_Single_LPS","bg":"#F0F9FF","al":"center"},{"c":"D36","v":4.296204,"f":"=D35/3.6","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E36","v":"L/s","bg":"#F0F9FF","al":"center"},{"c":"F36","v":"Q (m³/h) / 3.6","bg":"#F0F9FF","al":"center"},{"c":"G36","v":"التدفق الحجمي بالوحدات الدولية","bg":"#F0F9FF","cs":3},{"skip":true},{"skip":true}]},{"r":37,"h":52.0,"cells":[{"c":"A37","v":4,"al":"center"},{"c":"B37","v":"كفاءة المضخة الهيدروليكية التقديرية","b":true},{"c":"C37","v":"Hydraulic_Eff","al":"center"},{"c":"D37","v":0.68,"in":true,"b":true,"al":"center","nf":"0.0%"},{"c":"E37","v":"%","al":"center"},{"c":"F37","v":"كتالوج المضخات (Grundfos/Wilo)","al":"center"},{"c":"G37","v":"كفاءة المروحة والموزع الهيدروليكي 68%","cs":3},{"skip":true},{"skip":true}]},{"r":38,"h":34.0,"cells":[{"c":"A38","v":5,"bg":"#F0F9FF","al":"center"},{"c":"B38","v":"كفاءة المحرك الكهربائي (IE3 Premium)","bg":"#F0F9FF","b":true},{"c":"C38","v":"Motor_Eff","bg":"#F0F9FF","al":"center"},{"c":"D38","v":0.88,"in":true,"bg":"#F0F9FF","b":true,"al":"center","nf":"0.0%"},{"c":"E38","v":"%","bg":"#F0F9FF","al":"center"},{"c":"F38","v":"معيار الكفاءة IE3","bg":"#F0F9FF","al":"center"},{"c":"G38","v":"محرك كهربائي عالي الكفاءة موفر للطاقة","bg":"#F0F9FF","cs":3},{"skip":true},{"skip":true}]},{"r":39,"h":34.0,"cells":[{"c":"A39","v":6,"al":"center"},{"c":"B39","v":"القدرة الهيدروليكية الصافية للمياه (Water Power)","b":true},{"c":"C39","v":"Hydraulic_Power","al":"center"},{"c":"D39","v":3.803866,"f":"=(9.81*D36*E32)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"E39","v":"kW","al":"center"},{"c":"F39","v":"(ρ·g·Q·H)/1000","al":"center"},{"c":"G39","v":"الطاقة الفعلية المنقولة لكتلة المياه","cs":3},{"skip":true},{"skip":true}]},{"r":40,"h":52.0,"cells":[{"c":"A40","v":7,"bg":"#F0F9FF","al":"center"},{"c":"B40","v":"قدرة المحرك على عمود الدوران (Brake Power)","bg":"#F0F9FF","b":true},{"c":"C40","v":"Shaft_Power","bg":"#F0F9FF","al":"center"},{"c":"D40","v":5.593921,"f":"=D39/D37","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E40","v":"kW","bg":"#F0F9FF","al":"center"},{"c":"F40","v":"Hydraulic_Power / Hyd_Eff","bg":"#F0F9FF","al":"center"},{"c":"G40","v":"القدرة الميكانيكية على عمود المضخة","bg":"#F0F9FF","cs":3},{"skip":true},{"skip":true}]},{"r":41,"h":52.0,"cells":[{"c":"A41","v":8,"al":"center"},{"c":"B41","v":"القدرة الكهربائية المقننة المطلوبة للمحرك (15% Margin)","b":true},{"c":"C41","v":"Rated_Motor_kW","al":"center"},{"c":"D41","v":7.310238,"f":"=(D40/D38)*1.15","b":true,"al":"center","nf":"#,##0.00"},{"c":"E41","v":"kW","al":"center"},{"c":"F41","v":"Shaft_Power / Motor_Eff × 1.15","al":"center"},{"c":"G41","v":"القدرة الاسمية الموصى بها للمحرك بالكيلوواط","cs":3},{"skip":true},{"skip":true}]},{"r":42,"h":34.0,"cells":[{"c":"A42","v":9,"bg":"#F0F9FF","al":"center"},{"c":"B42","v":"القدرة الحصانية للمحرك (Horsepower - HP)","bg":"#F0F9FF","b":true},{"c":"C42","v":"Rated_Motor_HP","bg":"#F0F9FF","al":"center"},{"c":"D42","v":9.803029,"f":"=D41*1.341","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E42","v":"HP","bg":"#F0F9FF","al":"center"},{"c":"F42","v":"kW × 1.341","bg":"#F0F9FF","al":"center"},{"c":"G42","v":"القدرة المقابلة بالحصان الميكانيكي","bg":"#F0F9FF","cs":3},{"skip":true},{"skip":true}]},{"r":43,"h":52.0,"cells":[{"c":"A43","v":10,"al":"center"},{"c":"B43","v":"نظام التحكم والتشغيل المعتمد للمضخات","b":true},{"c":"C43","v":"Control_System","al":"center"},{"c":"D43","v":"مغيرات سرعة ترددية VFD مستقلة","b":true,"al":"center"},{"c":"E43","v":"تحكم","al":"center"},{"c":"F43","v":"SBC 701 & Energy Code","al":"center"},{"c":"G43","v":"تحكم ذكي بالضغط المستمر وترشيد الطاقة 40%","cs":3},{"skip":true},{"skip":true}]}]},{"name":"حساب خزان الضغط وخزان السحب","maxRow":30,"maxCol":8,"colWidths":[8.0,44.0,16.0,18.0,16.0,18.0,16.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"حساب سعة خزان الضغط الهيدرونيوماتيكي وخزان التخزين الأرضي وفق معايير ASPE و SBC 701","bg":"#0C4A6E","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"تحديد السعة الاسمية لخزان الحجاب الحاجز (Diaphragm Tank)، ضغوط التشغيل، وسعة خزان التخزين الأرضي لـ 24-48 ساعة","bg":"#0F172A","fg":"#E2E8F0","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":14.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"السعة الاسمية لخزان الضغط (L)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"الحجم الفعال للسحب (Acceptance)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"نطاق ضغوط تشغيل وإيقاف المضخة","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H4","v":"سعة خزان المياه الأرضي الإجمالي","bg":"#E0F2FE","fg":"#1E293B","b":true,"al":"center"}]},{"r":5,"h":44.0,"cells":[{"c":"A5","v":891.254585,"f":"=D18","bg":"#F8FAFC","fg":"#0C4A6E","b":true,"al":"center","nf":"#,##0\" لتر\"","cs":2},{"skip":true},{"c":"C5","v":96.664581,"f":"=D16","bg":"#F8FAFC","fg":"#0C4A6E","b":true,"al":"center","nf":"#,##0.0\" لتر\"","cs":2},{"skip":true},{"c":"E5","v":"8.9 0 / 10.1 0","f":"=TEXT(D10,\"0.0\")&\" bar (تشغيل) / \"&TEXT(D11,\"0.0\")&\" bar (فصل)\"","bg":"#F8FAFC","fg":"#0C4A6E","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H5","v":55.2,"f":"=D29","bg":"#E0F2FE","fg":"#0C4A6E","b":true,"al":"center","nf":"#,##0.0\" م³\""}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"Nominal Pressure Tank Size","bg":"#F8FAFC","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"C6","v":"Useful Draw-off Water Volume","bg":"#F8FAFC","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"E6","v":"Cut-in / Cut-out Pressure Range","bg":"#F8FAFC","fg":"#475569","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H6","v":"Ground Storage Break Tank Capacity","bg":"#E0F2FE","fg":"#475569","al":"center"}]},{"r":7,"h":14.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"أولاً: حساب سعة وضغوط خزان الضغط الهيدرونيوماتيكي (Diaphragm Pressure Tank Sizing - ASPE)","bg":"#0C4A6E","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":40.0,"cells":[{"c":"A9","v":"م","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"بيان المتغير المعماري / الهيدروليكي","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"الرمز","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"القيمة المدخلة","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"الوحدة","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"المرجعية النظامية","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"التوصيف الهندسي والملاحظات","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":1,"bg":"#F0F9FF","al":"center"},{"c":"B10","v":"ضغط بدء تشغيل المضخة (Cut-in Pressure)","bg":"#F0F9FF","b":true},{"c":"C10","v":"P_Cut_in","bg":"#F0F9FF","al":"center"},{"c":"D10","v":8.851133,"f":"='حساب ضغط ومواصفات المضخات TDH'!F32","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"E10","v":"bar","bg":"#F0F9FF","al":"center"},{"c":"F10","v":"ضغط النظام الكلي عند المضخة","bg":"#F0F9FF","al":"center"},{"c":"G10","v":"تبدأ المضخة بالدوران فور هبوط الضغط لهذا الحد","bg":"#F0F9FF","cs":2},{"skip":true}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":2,"al":"center"},{"c":"B11","v":"ضغط إيقاف المضخة (Cut-out Pressure)","b":true},{"c":"C11","v":"P_Cut_out","al":"center"},{"c":"D11","v":10.051133,"f":"=D10+1.2","b":true,"al":"center","nf":"#,##0.0"},{"c":"E11","v":"bar","al":"center"},{"c":"F11","v":"P_Cut_in + 1.2 bar","al":"center"},{"c":"G11","v":"الضغط الأعلى الذي تفصل عنده المضخة","cs":2},{"skip":true}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":3,"bg":"#F0F9FF","al":"center"},{"c":"B12","v":"ضغط الشحن المسبق لوسادة الهواء (Pre-charge)","bg":"#F0F9FF","b":true},{"c":"C12","v":"P_Precharge","bg":"#F0F9FF","al":"center"},{"c":"D12","v":8.651133,"f":"=D10-0.2","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"E12","v":"bar","bg":"#F0F9FF","al":"center"},{"c":"F12","v":"P_Cut_in - 0.2 bar","bg":"#F0F9FF","al":"center"},{"c":"G12","v":"ضغط شحن النيتروجين/الهواء بالخزان فارغاً","bg":"#F0F9FF","cs":2},{"skip":true}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":4,"al":"center"},{"c":"B13","v":"أقصى عدد تشغيلات مسموح بها للمحرك بالساعة","b":true},{"c":"C13","v":"Max_Starts_hr","al":"center"},{"c":"D13","v":12,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"E13","v":"تشغيلة/ساعة","al":"center"},{"c":"F13","v":"معيار NEMA / IEC 60034","al":"center"},{"c":"G13","v":"لحماية ملفات المحرك الكهربائي من السخونة","cs":2},{"skip":true}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":5,"bg":"#F0F9FF","al":"center"},{"c":"B14","v":"أقل زمن تشغيل مستمر للمضخة في الدورة","bg":"#F0F9FF","b":true},{"c":"C14","v":"Min_Run_Time","bg":"#F0F9FF","al":"center"},{"c":"D14","v":1.5,"in":true,"bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"E14","v":"دقيقة","bg":"#F0F9FF","al":"center"},{"c":"F14","v":"ASPE Design Standard","bg":"#F0F9FF","al":"center"},{"c":"G14","v":"زمن الدورة التشغيلية الواحدة لمنع التردد السريع","bg":"#F0F9FF","cs":2},{"skip":true}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":6,"al":"center"},{"c":"B15","v":"تدفق المضخة الواحدة باللتر/دقيقة","b":true},{"c":"C15","v":"Q_Single_LPM","al":"center"},{"c":"D15","v":257.772217,"f":"='حساب ضغط ومواصفات المضخات TDH'!D35*(1000/60)","b":true,"al":"center","nf":"#,##0.0"},{"c":"E15","v":"لتر/دقيقة","al":"center"},{"c":"F15","v":"سعة المضخة الفردية","al":"center"},{"c":"G15","v":"معدل الضخ الفعلي أثناء التشغيل","cs":2},{"skip":true}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":7,"bg":"#F0F9FF","al":"center"},{"c":"B16","v":"حجم السحب الفعال المطلوب للخزان (Acceptance)","bg":"#F0F9FF","b":true},{"c":"C16","v":"V_Acceptance","bg":"#F0F9FF","al":"center"},{"c":"D16","v":96.664581,"f":"=(D15*D14)/4","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"E16","v":"لتر","bg":"#F0F9FF","al":"center"},{"c":"F16","v":"(Q_pump × t_run) / 4","bg":"#F0F9FF","al":"center"},{"c":"G16","v":"كمية المياه المفرغة بين دورات التشغيل","bg":"#F0F9FF","cs":2},{"skip":true}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":8,"al":"center"},{"c":"B17","v":"معامل كفاءة تمدد الخزان (Acceptance Factor)","b":true},{"c":"C17","v":"Factor_PR","al":"center"},{"c":"D17","v":0.108459,"f":"=1-((D10+1.013)/(D11+1.013))","b":true,"al":"center","nf":"0.000"},{"c":"E17","v":"معامل","al":"center"},{"c":"F17","v":"Boyle's Law: 1-(P1/P2) abs","al":"center"},{"c":"G17","v":"نسبة الاستفادة الحجمية من السعة الاسمية","cs":2},{"skip":true}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":9,"bg":"#F0F9FF","al":"center"},{"c":"B18","v":"السعة الاسمية الإجمالية المحسوبة للخزان","bg":"#F0F9FF","b":true},{"c":"C18","v":"V_Nominal_Calc","bg":"#F0F9FF","al":"center"},{"c":"D18","v":891.254585,"f":"=D16/D17","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"E18","v":"لتر","bg":"#F0F9FF","al":"center"},{"c":"F18","v":"V_Acceptance / Factor_PR","bg":"#F0F9FF","al":"center"},{"c":"G18","v":"الحجم النظري الإجمالي لخزان الضغط","bg":"#F0F9FF","cs":2},{"skip":true}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":10,"al":"center"},{"c":"B19","v":"السعة التجارية الموصى بها لخزان الضغط","b":true},{"c":"C19","v":"V_Commercial","al":"center"},{"c":"D19","v":300,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"E19","v":"لتر","al":"center"},{"c":"F19","v":"المقاسات القياسية المعتمدة","al":"center"},{"c":"G19","v":"خزان ضغط بحجاب حاجز (Diaphragm) 16 bar","cs":2},{"skip":true}]},{"r":20,"h":28.0,"cells":[{"c":"A20","v":""},{"c":"B20","v":""},{"c":"C20","v":""},{"c":"D20","v":""},{"c":"E20","v":""},{"c":"F20","v":""},{"c":"G20","v":""},{"c":"H20","v":""}]},{"r":21,"h":38.0,"cells":[{"c":"A21","v":"ثانياً: حساب سعة خزان المياه الأرضي المكسور للتخزين (Ground Break Tank Storage - SBC 701)","bg":"#0C4A6E","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":22,"h":40.0,"cells":[{"c":"A22","v":"م","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B22","v":"بيان المتغير المعماري / الهيدروليكي","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C22","v":"الرمز","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D22","v":"القيمة المدخلة","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E22","v":"الوحدة","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F22","v":"المرجعية النظامية","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G22","v":"التوصيف الهندسي والملاحظات","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true}]},{"r":23,"h":52.0,"cells":[{"c":"A23","v":1,"al":"center"},{"c":"B23","v":"عدد القاطنين والمستخدمين التقديري بالمبنى","b":true},{"c":"C23","v":"Occupant_Count","al":"center"},{"c":"D23","v":240,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"E23","v":"شخص","al":"center"},{"c":"F23","v":"المخطط المعماري (48 شقة × 5)","al":"center"},{"c":"G23","v":"متوسط كثافة إشغال 5 أفراد لكل شقة سكنية","cs":2},{"skip":true}]},{"r":24,"h":52.0,"cells":[{"c":"A24","v":2,"bg":"#F0F9FF","al":"center"},{"c":"B24","v":"معدل استهلاك الفرد اليومي من المياه","bg":"#F0F9FF","b":true},{"c":"C24","v":"Daily_Per_Capita","bg":"#F0F9FF","al":"center"},{"c":"D24","v":200,"in":true,"bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"E24","v":"لتر/فرد/يوم","bg":"#F0F9FF","al":"center"},{"c":"F24","v":"كود البناء السعودي SBC 701","bg":"#F0F9FF","al":"center"},{"c":"G24","v":"المعدل القياسي للشقق السكنية بالمملكة","bg":"#F0F9FF","cs":2},{"skip":true}]},{"r":25,"h":52.0,"cells":[{"c":"A25","v":3,"al":"center"},{"c":"B25","v":"إجمالي الاستهلاك اليومي الصافي للمبنى","b":true},{"c":"C25","v":"Daily_Demand_m3","al":"center"},{"c":"D25","v":48,"f":"=(D23*D24)/1000","b":true,"al":"center","nf":"#,##0.0"},{"c":"E25","v":"م³/يوم","al":"center"},{"c":"F25","v":"(الأفراد × الاستهلاك) / 1000","al":"center"},{"c":"G25","v":"الاستهلاك اليومي الطبيعي للمبنى","cs":2},{"skip":true}]},{"r":26,"h":52.0,"cells":[{"c":"A26","v":4,"bg":"#F0F9FF","al":"center"},{"c":"B26","v":"فترة التخزين الاحتياطي المطلوبة للطوارئ","bg":"#F0F9FF","b":true},{"c":"C26","v":"Storage_Duration","bg":"#F0F9FF","al":"center"},{"c":"D26","v":24,"in":true,"bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"E26","v":"ساعة (1 يوم)","bg":"#F0F9FF","al":"center"},{"c":"F26","v":"اشتراطات الدفاع المدني والبلدية","bg":"#F0F9FF","al":"center"},{"c":"G26","v":"تأمين التغذية المستمرة في حال انقطاع الشبكة","bg":"#F0F9FF","cs":2},{"skip":true}]},{"r":27,"h":52.0,"cells":[{"c":"A27","v":5,"al":"center"},{"c":"B27","v":"سعة التخزين الأساسية المطلوبة للاستهلاك","b":true},{"c":"C27","v":"Base_Storage_m3","al":"center"},{"c":"D27","v":48,"f":"=D25*(D26/24)","b":true,"al":"center","nf":"#,##0.0"},{"c":"E27","v":"م³","al":"center"},{"c":"F27","v":"الاستهلاك اليومي × أيام التخزين","al":"center"},{"c":"G27","v":"حجم المياه الصافي المطلوب للاستخدام المنزلي","cs":2},{"skip":true}]},{"r":28,"h":34.0,"cells":[{"c":"A28","v":6,"bg":"#F0F9FF","al":"center"},{"c":"B28","v":"احتياطي إضافي للخدمات وغسيل الخزان (15%)","bg":"#F0F9FF","b":true},{"c":"C28","v":"Safety_Reserve","bg":"#F0F9FF","al":"center"},{"c":"D28","v":7.2,"f":"=D27*0.15","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"E28","v":"م³","bg":"#F0F9FF","al":"center"},{"c":"F28","v":"15% من سعة التخزين","bg":"#F0F9FF","al":"center"},{"c":"G28","v":"هامش أمان إضافي للرواسب والمرافق العامة","bg":"#F0F9FF","cs":2},{"skip":true}]},{"r":29,"h":52.0,"cells":[{"c":"A29","v":7,"al":"center"},{"c":"B29","v":"السعة التخزينية الإجمالية المطلوبة للخزان الأرضي","b":true},{"c":"C29","v":"Total_Break_Tank_m3","al":"center"},{"c":"D29","v":55.2,"f":"=D27+D28","b":true,"al":"center","nf":"#,##0.0"},{"c":"E29","v":"م³","al":"center"},{"c":"F29","v":"Base_Storage + Safety_Reserve","al":"center"},{"c":"G29","v":"السعة المعتمدة لبناء الخزان الخرساني","cs":2},{"skip":true}]},{"r":30,"h":34.0,"cells":[{"c":"A30","v":8,"bg":"#F0F9FF","al":"center"},{"c":"B30","v":"أبعاد الخزان المقترحة (الطول × العرض × الارتفاع)","bg":"#F0F9FF","b":true},{"c":"C30","v":"Tank_Dimensions","bg":"#F0F9FF","al":"center"},{"c":"D30","v":"5.0 م × 4.5 م × 2.8 م","bg":"#F0F9FF","b":true,"al":"center"},{"c":"E30","v":"أبعاد","bg":"#F0F9FF","al":"center"},{"c":"F30","v":"المخطط الإنشائي","bg":"#F0F9FF","al":"center"},{"c":"G30","v":"ارتفاع الماء الفعال = 2.5 م + 0.3 م فراغ هوائي","bg":"#F0F9FF","cs":2},{"skip":true}]}]},{"name":"دليل الأكواد ومعاملات الأجهزة","maxRow":20,"maxCol":7,"colWidths":[8.0,38.0,24.0,28.0,35.0,28.0,18.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"دليل المراجع الهندسية وجداول قيم WSFU وفواقد الاحتكاك وفق IPC و ASPE و SBC 701","bg":"#0C4A6E","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"جداول السرعات المسموحة، معاملات خشونة الأنابيب، اشتراطات الحماية من المطرقة المائية، ومعايير التركيب","bg":"#0F172A","fg":"#E2E8F0","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":14.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"أولاً: السرعات التصميمية ومعاملات الخشونة للأنابيب وفق كود SBC 701 و ASPE","bg":"#0C4A6E","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"م","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"مادة الأنبوب (Pipe Material)","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"معامل الخشونة C","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"السرعة الموصى بها (م/ث)","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"أقصى سرعة مسموحة (م/ث)","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"التطبيقات الشائعة بالمشروع","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"اشتراطات الكود المرجعية","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":1,"bg":"#F0F9FF","al":"center"},{"c":"B6","v":"بولي بروبيلين عشوائي (PPR - Type 3)","bg":"#F0F9FF","b":true},{"c":"C6","v":150,"in":true,"bg":"#F0F9FF","b":true,"al":"center"},{"c":"D6","v":"1.2 - 1.8 م/ث","bg":"#F0F9FF","al":"center"},{"c":"E6","v":"2.4 م/ث","bg":"#F0F9FF","al":"center"},{"c":"F6","v":"شبكات المياه الباردة والساخنة الداخلية","bg":"#F0F9FF"},{"c":"G6","v":"DIN 8077/8078 & SBC 701","bg":"#F0F9FF"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":2,"al":"center"},{"c":"B7","v":"بولي إيثيلين شبكي (PEX / PEX-AL-PEX)","b":true},{"c":"C7","v":150,"in":true,"b":true,"al":"center"},{"c":"D7","v":"1.0 - 1.5 م/ث","al":"center"},{"c":"E7","v":"2.1 م/ث","al":"center"},{"c":"F7","v":"التمديدات داخل الشقق والحمامات"},{"c":"G7","v":"ASTM F876 & IPC Chapter 6"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":3,"bg":"#F0F9FF","al":"center"},{"c":"B8","v":"كلوريد البوليفينيل المكلور (CPVC)","bg":"#F0F9FF","b":true},{"c":"C8","v":150,"in":true,"bg":"#F0F9FF","b":true,"al":"center"},{"c":"D8","v":"1.2 - 1.8 م/ث","bg":"#F0F9FF","al":"center"},{"c":"E8","v":"2.4 م/ث","bg":"#F0F9FF","al":"center"},{"c":"F8","v":"خطوط التغذية الرئيسية والصواعد","bg":"#F0F9FF"},{"c":"G8","v":"ASTM D2846 & SBC 701","bg":"#F0F9FF"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":4,"al":"center"},{"c":"B9","v":"نحاس غير ملحوم (Seamless Copper Type L)","b":true},{"c":"C9","v":140,"in":true,"b":true,"al":"center"},{"c":"D9","v":"1.5 - 2.0 م/ث","al":"center"},{"c":"E9","v":"2.4 م/ث (بارد) / 1.5 م/ث (ساخن)","al":"center"},{"c":"F9","v":"شبكات المستشفيات والفنادق الفاخرة"},{"c":"G9","v":"ASTM B88 & SBC 701 Section 605"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":5,"bg":"#F0F9FF","al":"center"},{"c":"B10","v":"حديد دكتايل مبطن بالإيبوكسي (Ductile Iron)","bg":"#F0F9FF","b":true},{"c":"C10","v":130,"in":true,"bg":"#F0F9FF","b":true,"al":"center"},{"c":"D10","v":"1.5 - 2.2 م/ث","bg":"#F0F9FF","al":"center"},{"c":"E10","v":"2.7 م/ث","bg":"#F0F9FF","al":"center"},{"c":"F10","v":"خطوط السحب والضخ الرئيسية الكبيرة","bg":"#F0F9FF"},{"c":"G10","v":"AWWA C151 & SBC 701","bg":"#F0F9FF"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":6,"al":"center"},{"c":"B11","v":"ستانلس ستيل (Stainless Steel 316L)","b":true},{"c":"C11","v":150,"in":true,"b":true,"al":"center"},{"c":"D11","v":"1.5 - 2.4 م/ث","al":"center"},{"c":"E11","v":"3.0 م/ث","al":"center"},{"c":"F11","v":"غرف المضخات وموزعات التغذية Manifolds"},{"c":"G11","v":"EN 10312 & Food Grade Systems"}]},{"r":12,"h":28.0,"cells":[{"c":"A12","v":""},{"c":"B12","v":""},{"c":"C12","v":""},{"c":"D12","v":""},{"c":"E12","v":""},{"c":"F12","v":""},{"c":"G12","v":""}]},{"r":13,"h":38.0,"cells":[{"c":"A13","v":"ثانياً: متطلبات السلامة والتركيب وحماية مجموعة الضخ (Installation & Quality Standard)","bg":"#0C4A6E","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":14,"h":40.0,"cells":[{"c":"A14","v":"م","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B14","v":"البند / المتطلب الهندسي","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C14","v":"النظام المطبق","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D14","v":"المواصفة الفنية","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E14","v":"الغرض والهدف الهندسي","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F14","v":"إجراء الفحص والاستلام","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G14","v":"حالة التطبيق","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":1,"al":"center"},{"c":"B15","v":"حماية المضخات من التشغيل الجاف (Dry-Run Protection)","b":true},{"c":"C15","v":"حساس مستوى Float/Sensor","al":"center"},{"c":"D15","v":"فصل آلي عند انخفاض مستوى خزان السحب"},{"c":"E15","v":"حماية ميكانيكال سيل وريش المضخة من التلف"},{"c":"F15","v":"فحص اختبار انقطاع الماء الحقيقي"},{"c":"G15","v":"إلزامي كودياً","fg":"#166534","b":true,"al":"center"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":2,"bg":"#F0F9FF","al":"center"},{"c":"B16","v":"صمامات تخفيف الضغط الزائد (Pressure Relief Valve - PRV)","bg":"#F0F9FF","b":true},{"c":"C16","v":"صمام أمان ميكانيكي هيدروليكي","bg":"#F0F9FF","al":"center"},{"c":"D16","v":"معاير عند 10% أعلى من أقصى ضغط تشغيلي","bg":"#F0F9FF"},{"c":"E16","v":"حماية الشبكة والأنابيب من الانفجار المفاجئ","bg":"#F0F9FF"},{"c":"F16","v":"معايرة بمانومتر معتمد","bg":"#F0F9FF"},{"c":"G16","v":"إلزامي كودياً","bg":"#F0F9FF","fg":"#166534","b":true,"al":"center"}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":3,"al":"center"},{"c":"B17","v":"مخمدات الاهتزاز الميكانيكية (Vibration Isolators)","b":true},{"c":"C17","v":"وصلات مرنة Flexible Joints","al":"center"},{"c":"D17","v":"وصلات مطاطية مزدوجة على السحب والطرد"},{"c":"E17","v":"عزل اهتزازات المحركات عن شبكة مواسير المبنى"},{"c":"F17","v":"فحص التثبيت وعدم انتقال الضوضاء"},{"c":"G17","v":"إلزامي كودياً","fg":"#166534","b":true,"al":"center"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":4,"bg":"#F0F9FF","al":"center"},{"c":"B18","v":"مانع المطرقة المائية (Water Hammer Arrestor)","bg":"#F0F9FF","b":true},{"c":"C18","v":"غرف هوائية معتمدة PDI-WH 201","bg":"#F0F9FF","al":"center"},{"c":"D18","v":"تركيب على خطوط الطرد الرئيسية وقرب المحابس السريعة","bg":"#F0F9FF"},{"c":"E18","v":"امتصاص موجات الصدمة الهيدروليكية العكسية","bg":"#F0F9FF"},{"c":"F18","v":"فحص الضغط عند الفصل المفاجئ","bg":"#F0F9FF"},{"c":"G18","v":"موصى به كودياً","bg":"#F0F9FF","fg":"#92400E","b":true,"al":"center"}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":5,"al":"center"},{"c":"B19","v":"التبادل الآلي بين المضخات (Duty-Cycle Auto Alternation)","b":true},{"c":"C19","v":"لوحة تحكم ذكية PLC / VFD","al":"center"},{"c":"D19","v":"تبادل دورات التشغيل كل 24 ساعة لضمان تساوي الإهلاك"},{"c":"E19","v":"إطالة عمر المحركات ومنع تيبس المضخة الاحتياطية"},{"c":"F19","v":"محاكاة دورات التبادل الآلي"},{"c":"G19","v":"إلزامي كودياً","fg":"#166534","b":true,"al":"center"}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":6,"bg":"#F0F9FF","al":"center"},{"c":"B20","v":"شهادات الاعتماد الصحي لمياه الشرب (Potable Water Cert)","bg":"#F0F9FF","b":true},{"c":"C20","v":"طلاءات وأجزاء ملامسة للمياه","bg":"#F0F9FF","al":"center"},{"c":"D20","v":"مطابقة معيار NSF/ANSI 61 أو WRAS البريطاني","bg":"#F0F9FF"},{"c":"E20","v":"ضمان عدم تلوث المياه أو تفاعل المواد كيميائياً","bg":"#F0F9FF"},{"c":"F20","v":"مراجعة شهادات اختبار المورد","bg":"#F0F9FF"},{"c":"G20","v":"إلزامي نظامياً","bg":"#F0F9FF","fg":"#166534","b":true,"al":"center"}]}]}]}