{"slug":"duplex-and-penthouse-finishing-boq","sheets":[{"name":"لوحة الملخص ومحددات الدوبلكس","maxRow":26,"maxCol":10,"colWidths":[3.0,11.0,32.0,48.0,18.0,15.0,16.0,15.0,24.0,28.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":""},{"c":"B1","v":"نموذج مقايسة تشطيب شقة دوبلكس وبنتهاوس شاملة السلم الداخلي وعزل وتجهيز الروف","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":""},{"c":"B2","v":"حصر كميات ومقايسة تفصيلية بالمعادلات لتشطيب وحدات الدوبلكس والبنتهاوس (دورين + سلم داخلي + روف مفتوح) شاملة فصل أسعار الخامات والمصنعيات ومقارنة أنظمة السلالم","fg":"#475569","al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":""},{"c":"B4","v":"أولاً: محددات ومساحات وحدة الدوبلكس / البنتهاوس (خلايا الإدخال الزرقاء قابلة للتعديل)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":""},{"c":"B5","v":"مسطح الدور السفلي (م²):","bg":"#E2E8F0","b":true,"al":"center","cs":2},{"skip":true},{"c":"D5","v":160,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"E5","v":"مسطح الدور العلوي (م²):","bg":"#E2E8F0","b":true,"al":"center"},{"c":"F5","v":140,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G5","v":"مسطح الروف المفتوح (م²):","bg":"#E2E8F0","b":true,"al":"center"},{"c":"H5","v":90,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I5","v":"إجمالي المساحة الكلية (م²):","bg":"#E2E8F0","b":true,"al":"center"},{"c":"J5","v":390,"f":"=D5+F5+H5","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0"}]},{"r":6,"h":28.0,"cells":[{"c":"A6","v":""},{"c":"B6","v":""},{"c":"C6","v":""},{"c":"D6","v":""},{"c":"E6","v":""},{"c":"F6","v":""},{"c":"G6","v":""},{"c":"H6","v":""},{"c":"I6","v":""},{"c":"J6","v":""}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":"إجمالي مسطح الدوبلكس والروف","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"D7","v":"إجمالي تكلفة البنود المباشرة","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"F7","v":"تكلفة السلم الداخلي وتجهيز الروف","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"H7","v":"أتعاب الإشراف الهندسي والاحتياطي (12%)","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"J7","v":"الإجمالي العام للمقايسة","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center"}]},{"r":8,"h":46.0,"cells":[{"c":"A8","v":""},{"c":"B8","v":390,"f":"=J5","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0","cs":2},{"skip":true},{"c":"D8","v":1569025,"f":"=E23","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0","cs":2},{"skip":true},{"c":"F8","v":450935,"f":"=E14+E16+E22","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0","cs":2},{"skip":true},{"c":"H8","v":188283,"f":"=D8*0.12","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0","cs":2},{"skip":true},{"c":"J8","v":1757308,"f":"=D8+H8","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":""},{"c":"B9","v":"مجموع الدورين (300م²) + الروف (90م²)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"D9","v":"شامل الخامات والمصنعيات لـ 10 أقسام","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"F9","v":"السلم + عزل الروف + البرجولة واللاندسكيب","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"H9","v":"إدارة تنفيذية (7%) + احتياطي طوارئ (5%)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"J9","v":"الميزانية الشاملة لتسليم المفتاح","bg":"#F8FAFC","fg":"#64748B","al":"center"}]},{"r":10,"h":28.0,"cells":[{"c":"A10","v":""},{"c":"B10","v":""},{"c":"C10","v":""},{"c":"D10","v":""},{"c":"E10","v":""},{"c":"F10","v":""},{"c":"G10","v":""},{"c":"H10","v":""},{"c":"I10","v":""},{"c":"J10","v":""}]},{"r":11,"h":38.0,"cells":[{"c":"A11","v":""},{"c":"B11","v":"ثانياً: ملخص التكاليف التقديرية لأقسام تشطيب الدوبلكس والبنتهاوس (مربوط آلياً بجدول الكميات التفصيلي)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":""},{"c":"B12","v":"رقم القسم","bg":"#E2E8F0","b":true,"al":"center"},{"c":"C12","v":"القسم التخصصي لأعمال الدوبلكس والبنتهاوس","bg":"#E2E8F0","b":true,"al":"center"},{"c":"D12","v":"نطاق الأعمال الهندسية المشمولة","bg":"#E2E8F0","b":true,"al":"center"},{"c":"E12","v":"إجمالي تكلفة القسم","bg":"#E2E8F0","b":true,"al":"center"},{"c":"F12","v":"النسبة من الإجمالي (%)","bg":"#E2E8F0","b":true,"al":"center"},{"c":"G12","v":"تكلفة المتر المسطح","bg":"#E2E8F0","b":true,"al":"center"},{"c":"H12","v":"المدة الزمنية","bg":"#E2E8F0","b":true,"al":"center"},{"c":"I12","v":"طريقة التعاقد المقترحة","bg":"#E2E8F0","b":true,"al":"center"},{"c":"J12","v":"المرجع الهندسي للاستلام","bg":"#E2E8F0","b":true,"al":"center"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":""},{"c":"B13","v":"القسم 1","b":true,"al":"center"},{"c":"C13","v":"أعمال التعديلات المعمارية وتدعيم فتحة السلم الداخلي","b":true},{"c":"D13","v":"تكسير، تعديل مباني الدورين، وتدعيم فتحة سقف الدوبلكس بكمر حديد IPE","fg":"#1E293B"},{"c":"E13","v":67600,"f":"='جدول كميات الدوبلكس التفصيلي'!K10","b":true,"al":"center","nf":"#,##0"},{"c":"F13","v":0,"f":"=E13/$E$23","b":true,"al":"center","nf":"0.0%"},{"c":"G13","v":0,"f":"=E13/$J$5","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"H13","v":"2 أسبوع","fg":"#1E293B","al":"center"},{"c":"I13","v":"مقاول تخصصي + إشراف إنشائي","fg":"#1E293B","al":"center"},{"c":"J13","v":"الكود الإنشائي ECP 203 / SBC 301","fg":"#1E293B"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":""},{"c":"B14","v":"القسم 2","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C14","v":"أعمال إنشاء وتكسية السلم الداخلي للدوبلكس والدرابزين","bg":"#F8FAFC","b":true},{"c":"D14","v":"تصنيع الهيكل، تكسية النوائم والقوائم، الهاندرل الزجاجي، وإضاءة الدرج المخفية","bg":"#F8FAFC","fg":"#1E293B"},{"c":"E14","v":152700,"f":"='جدول كميات الدوبلكس التفصيلي'!K16","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"F14","v":0,"f":"=E14/$E$23","bg":"#F8FAFC","b":true,"al":"center","nf":"0.0%"},{"c":"G14","v":0,"f":"=E14/$J$5","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"H14","v":"3 أسابيع","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"I14","v":"ورشة ستيل ورخام وأخشاب","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"J14","v":"معايير بلونديل للسلالم (2R+G = 62cm)","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":""},{"c":"B15","v":"القسم 3","b":true,"al":"center"},{"c":"C15","v":"أعمال السباكة المزدوجة للدورين ومضخة ضغط المياه والصرف","b":true},{"c":"D15","v":"تأسيس تغذية وصرف لـ 4 حمامات + مطبخ + أوفيس علوي + مضخة تقوية ضغط المياه","fg":"#1E293B"},{"c":"E15","v":90250,"f":"='جدول كميات الدوبلكس التفصيلي'!K22","b":true,"al":"center","nf":"#,##0"},{"c":"F15","v":0,"f":"=E15/$E$23","b":true,"al":"center","nf":"0.0%"},{"c":"G15","v":0,"f":"=E15/$J$5","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"H15","v":"3 أسابيع","fg":"#1E293B","al":"center"},{"c":"I15","v":"شركة سباكة معتمدة + ضمان","fg":"#1E293B","al":"center"},{"c":"J15","v":"كود الأعمال الصحية (ضغط اختبار 10 بار)","fg":"#1E293B"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":""},{"c":"B16","v":"القسم 4","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C16","v":"أعمال العزل المائي والحراري المتكامل للروف والحمامات","bg":"#F8FAFC","b":true},{"c":"D16","v":"نظام عزل الأسطح المقلوب/التقليدي للروف (مائي + حراري + ميول) وعزل الحمامات","bg":"#F8FAFC","fg":"#1E293B"},{"c":"E16","v":102035,"f":"='جدول كميات الدوبلكس التفصيلي'!K28","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"F16","v":0,"f":"=E16/$E$23","bg":"#F8FAFC","b":true,"al":"center","nf":"0.0%"},{"c":"G16","v":0,"f":"=E16/$J$5","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"H16","v":"2 أسبوع","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"I16","v":"مقاول عزل كيميائي متخصص","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"J16","v":"الكود المصري والسعودي لعزل الأسطح","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":""},{"c":"B17","v":"القسم 5","b":true,"al":"center"},{"c":"C17","v":"أعمال الكهرباء واللوحات المستقلة للدورين والانتركم والسمارت","b":true},{"c":"D17","v":"تأسيس لوحتي قواطع للدورين، ربط الدفيات على السلم، وتأسيس الصوتيات والإنترنت","fg":"#1E293B"},{"c":"E17","v":139100,"f":"='جدول كميات الدوبلكس التفصيلي'!K34","b":true,"al":"center","nf":"#,##0"},{"c":"F17","v":0,"f":"=E17/$E$23","b":true,"al":"center","nf":"0.0%"},{"c":"G17","v":0,"f":"=E17/$J$5","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"H17","v":"3 أسابيع","fg":"#1E293B","al":"center"},{"c":"I17","v":"مهندس وفني كهرباء وتحكم","fg":"#1E293B","al":"center"},{"c":"J17","v":"كود التمديدات الكهربائية IEC / SBC 401","fg":"#1E293B"}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":""},{"c":"B18","v":"القسم 6","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C18","v":"أعمال بياض المحارة والجبس بورد وتأسيس التكييفات","bg":"#F8FAFC","b":true},{"c":"D18","v":"محارة بؤج وأوتار للدورين ودروة الروف، جبس بورد، وتأسيس مواسير الفريون","bg":"#F8FAFC","fg":"#1E293B"},{"c":"E18","v":199440,"f":"='جدول كميات الدوبلكس التفصيلي'!K40","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"F18","v":0,"f":"=E18/$E$23","bg":"#F8FAFC","b":true,"al":"center","nf":"0.0%"},{"c":"G18","v":0,"f":"=E18/$J$5","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"H18","v":"4 أسابيع","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"I18","v":"طقم محارة + جبس + تكييف","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"J18","v":"استلام بالقدة الألومنيوم وميزان الليزر","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":""},{"c":"B19","v":"القسم 7","b":true,"al":"center"},{"c":"C19","v":"أعمال البورسلين والسيراميك والرخام وبورسلين الروف الخارجي","b":true},{"c":"D19","v":"أرضيات الريسبشن، غرف النوم، الحمامات، وأرضيات التراس المقاومة للعوامل الجوية","fg":"#1E293B"},{"c":"E19","v":263200,"f":"='جدول كميات الدوبلكس التفصيلي'!K46","b":true,"al":"center","nf":"#,##0"},{"c":"F19","v":0,"f":"=E19/$E$23","b":true,"al":"center","nf":"0.0%"},{"c":"G19","v":0,"f":"=E19/$J$5","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"H19","v":"3 أسابيع","fg":"#1E293B","al":"center"},{"c":"I19","v":"معلم تركيب بورسلين ورخام","fg":"#1E293B","al":"center"},{"c":"J19","v":"لصق كيميائي + كلبسات تسوية Leveling Clips","fg":"#1E293B"}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":""},{"c":"B20","v":"القسم 8","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C20","v":"أعمال الأبواب الخشبية والمصفحة وقطاعات الألوميتال البانوراما","bg":"#F8FAFC","b":true},{"c":"D20","v":"بابا الدوبلكس المصفحان، الأبواب الداخلية، وواجهة البانوراما الزجاجية للتراس","bg":"#F8FAFC","fg":"#1E293B"},{"c":"E20","v":243950,"f":"='جدول كميات الدوبلكس التفصيلي'!K52","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"F20","v":0,"f":"=E20/$E$23","bg":"#F8FAFC","b":true,"al":"center","nf":"0.0%"},{"c":"G20","v":0,"f":"=E20/$J$5","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"H20","v":"3 أسابيع","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"I20","v":"مصنع ألوميتال/UPVC ومنجرة","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"J20","v":"زجاج دبل عازل للصوت والحرارة (6+12+6 مم)","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":21,"h":52.0,"cells":[{"c":"A21","v":""},{"c":"B21","v":"القسم 9","b":true,"al":"center"},{"c":"C21","v":"أعمال الدهانات الداخلية والديكورات وتكسيات الحوائط","b":true},{"c":"D21","v":"تأسيس وتشطيب دهانات الدورين، تكسيات بديل الخشب والرخام، ودهان دروة الروف","fg":"#1E293B"},{"c":"E21","v":114550,"f":"='جدول كميات الدوبلكس التفصيلي'!K57","b":true,"al":"center","nf":"#,##0"},{"c":"F21","v":0,"f":"=E21/$E$23","b":true,"al":"center","nf":"0.0%"},{"c":"G21","v":0,"f":"=E21/$J$5","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"H21","v":"3 أسابيع","fg":"#1E293B","al":"center"},{"c":"I21","v":"مقاول نقاشة وديكورات","fg":"#1E293B","al":"center"},{"c":"J21","v":"دهانات جوتن فينوماستيك + جوتاشيلد للروف","fg":"#1E293B"}]},{"r":22,"h":52.0,"cells":[{"c":"A22","v":""},{"c":"B22","v":"القسم 10","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C22","v":"التشطيبات النهائية وتجهيز الروف والبرجولة واللاندسكيب","bg":"#F8FAFC","b":true},{"c":"D22","v":"الأطقم الصحية، وحدات الإنارة، البرجولة، منطقة الشواء (BBQ)، والنجيل الصناعي","bg":"#F8FAFC","fg":"#1E293B"},{"c":"E22","v":196200,"f":"='جدول كميات الدوبلكس التفصيلي'!K63","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"F22","v":0,"f":"=E22/$E$23","bg":"#F8FAFC","b":true,"al":"center","nf":"0.0%"},{"c":"G22","v":0,"f":"=E22/$J$5","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"H22","v":"3 أسابيع","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"I22","v":"شركات التشطيب واللاندسكيب","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"J22","v":"إضاءة خارجية IP65 وتجربة كافة الأنظمة","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":23,"h":44.0,"cells":[{"c":"A23","v":""},{"c":"B23","v":"إجمالي تكلفة البنود المباشرة لتشطيب الدوبلكس والبنتهاوس (صافي قبل الإشراف والاحتياطي)","bg":"#FEF3C7","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"E23","v":1569025,"f":"=SUM(E13:E22)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0"},{"c":"F23","v":0,"f":"=SUM(F13:F22)","bg":"#FEF3C7","b":true,"al":"center","nf":"0.0%"},{"c":"G23","v":4023.141026,"f":"=E23/J5","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0"},{"c":"H23","v":"18 - 22 أسبوعاً","bg":"#FEF3C7","b":true,"al":"center"},{"c":"I23","v":"تسليم مفتاح متكامل","bg":"#FEF3C7","b":true,"al":"center"},{"c":"J23","v":"مطابق لجدول الكميات التفصيلي","bg":"#FEF3C7","b":true,"al":"center"}]},{"r":24,"h":28.0,"cells":[{"c":"A24","v":""},{"c":"B24","v":""},{"c":"C24","v":""},{"c":"D24","v":""},{"c":"E24","v":""},{"c":"F24","v":""},{"c":"G24","v":""},{"c":"H24","v":""},{"c":"I24","v":""},{"c":"J24","v":""}]},{"r":25,"h":36.0,"cells":[{"c":"A25","v":""},{"c":"B25","v":"إعداد المكتب الفني / مهندس المقايسات","bg":"#E2E8F0","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"E25","v":"مراجعة المهندس الاستشاري المشرف","bg":"#E2E8F0","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H25","v":"موافقة مالك وحدة الدوبلكس / البنتهاوس","bg":"#E2E8F0","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":26,"h":52.0,"cells":[{"c":"A26","v":""},{"c":"B26","v":"المهندس: .........................................\nالتوقيع: ................... التاريخ: ..../..../2026","fg":"#475569","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"E26","v":"المهندس: .........................................\nالتوقيع: ................... التاريخ: ..../..../2026","fg":"#475569","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H26","v":"المالك: ...........................................\nالتوقيع: ................... التاريخ: ..../..../2026","fg":"#475569","al":"center","cs":3},{"skip":true},{"skip":true}]}]},{"name":"جدول كميات الدوبلكس التفصيلي","maxRow":64,"maxCol":12,"colWidths":[3.0,11.0,60.0,11.0,12.0,12.0,14.0,14.0,14.0,15.0,18.0,36.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":""},{"c":"B1","v":"جدول الكميات والمقايسة التفصيلية لتشطيب شقة دوبلكس وبنتهاوس (خامات + مصنعيات - 10 أقسام)","b":true,"al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":""},{"c":"B2","v":"حصر تفصيلي لـ 40 بنداً تشغيلياً يغطي الدور السفلي (استقبال ومعيشة)، الدور العلوي (غرف النوم)، السلم الداخلي، وشبكات وعزل وتجهيز الروف الخارجي","fg":"#475569","al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":""},{"c":"B4","v":"كود البند","bg":"#E2E8F0","b":true,"al":"center"},{"c":"C4","v":"بيان الأعمال والمواصفات الفنية التفصيلية للبند","bg":"#E2E8F0","b":true,"al":"center"},{"c":"D4","v":"الوحدة","bg":"#E2E8F0","b":true,"al":"center"},{"c":"E4","v":"العدد / الطول","bg":"#E2E8F0","b":true,"al":"center"},{"c":"F4","v":"المعامل / العرض","bg":"#E2E8F0","b":true,"al":"center"},{"c":"G4","v":"الكمية المحسوبة","bg":"#E2E8F0","b":true,"al":"center"},{"c":"H4","v":"فئة الخامات","bg":"#E2E8F0","b":true,"al":"center"},{"c":"I4","v":"فئة المصنعية","bg":"#E2E8F0","b":true,"al":"center"},{"c":"J4","v":"إجمالي الفئة","bg":"#E2E8F0","b":true,"al":"center"},{"c":"K4","v":"إجمالي تكلفة البند","bg":"#E2E8F0","b":true,"al":"center"},{"c":"L4","v":"ضوابط التنفيذ والاستلام الهندسي","bg":"#E2E8F0","b":true,"al":"center"}]},{"r":5,"h":38.0,"cells":[{"c":"A5","v":""},{"c":"B5","v":"القسم الأول: أعمال التعديلات المعمارية وتدعيم فتحة السلم الداخلي — (تكسير، تعديل مباني الدورين، وتدعيم فتحة سقف الدوبلكس بكمر حديد IPE)","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":""},{"c":"B6","v":"01-01","b":true,"al":"center"},{"c":"C6","v":"تكسير وإزالة الحوائط غير الحاملة لتوسعة ريسبشن الدور السفلي وفتح مطبخ أمريكي شامل نقل المخلفات","fg":"#1E293B"},{"c":"D6","v":"مقطوعية","fg":"#1E293B","al":"center"},{"c":"E6","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F6","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G6","v":1,"f":"=E6*F6","b":true,"al":"center","nf":"#,##0"},{"c":"H6","v":4500,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I6","v":11500,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J6","v":16000,"f":"=H6+I6","b":true,"al":"center","nf":"#,##0"},{"c":"K6","v":16000,"f":"=G6*J6","b":true,"al":"center","nf":"#,##0"},{"c":"L6","v":"عدم المساس بالأعمدة أو الكمرات الخرسانية","fg":"#1E293B"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":"01-02","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C7","v":"قص وتعديل فتحة السلم الداخلي ببلاطة الدور العلوي وتدعيم الحواف بكمر حديد (IPE 160) ومسامير أنكر إيبوكسية","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D7","v":"مقطوعية","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E7","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F7","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G7","v":1,"f":"=E7*F7","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"H7","v":16500,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I7","v":7500,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J7","v":24000,"f":"=H7+I7","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"K7","v":24000,"f":"=G7*J7","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L7","v":"تحت إشراف مهندس إنشائي وبمنشار ليزر بدون تكسير اهتزازي","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":""},{"c":"B8","v":"01-03","b":true,"al":"center"},{"c":"C8","v":"بناء حوائط التعديلات المعمارية بالدورين وتعديل فتحات الأبواب والحمامات بطوب طفلي مصمت ومونة أسمنتية","fg":"#1E293B"},{"c":"D8","v":"م2","fg":"#1E293B","al":"center"},{"c":"E8","v":45,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F8","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G8","v":45,"f":"=E8*F8","b":true,"al":"center","nf":"#,##0"},{"c":"H8","v":210,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I8","v":110,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J8","v":320,"f":"=H8+I8","b":true,"al":"center","nf":"#,##0"},{"c":"K8","v":14400,"f":"=G8*J8","b":true,"al":"center","nf":"#,##0"},{"c":"L8","v":"ربط المباني بالخرسانة بكانات حديد كل 3 مداميك","fg":"#1E293B"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":""},{"c":"B9","v":"01-04","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C9","v":"تشوين الخامات بالونش الهيدروليكي للدورين والروف وتنزيل ونقل الردش بسيارات القلاب العمومية","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D9","v":"نقلة","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E9","v":6,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F9","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G9","v":6,"f":"=E9*F9","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"H9","v":800,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I9","v":1400,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J9","v":2200,"f":"=H9+I9","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"K9","v":13200,"f":"=G9*J9","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L9","v":"تنظيف الموقع تماماً قبل بدء تأسيس الشبكات","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":10,"h":40.0,"cells":[{"c":"A10","v":""},{"c":"B10","v":"إجمالي القسم الأول: أعمال التعديلات المعمارية وتدعيم فتحة السلم الداخلي","bg":"#F1F5F9","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H10","v":35250,"f":"=SUMPRODUCT(G6:G9,H6:H9)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"I10","v":32350,"f":"=SUMPRODUCT(G6:G9,I6:I9)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"J10","v":"إجمالي القسم:","bg":"#F1F5F9","b":true,"al":"center"},{"c":"K10","v":67600,"f":"=SUM(K6:K9)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"L10","v":"يرحل تلقائياً للوحة الملخص (القسم 1)","bg":"#F1F5F9","b":true,"al":"center"}]},{"r":11,"h":38.0,"cells":[{"c":"A11","v":""},{"c":"B11","v":"القسم الثاني: أعمال إنشاء وتكسية السلم الداخلي للدوبلكس والدرابزين — (تصنيع الهيكل، تكسية النوائم والقوائم، الهاندرل الزجاجي، وإضاءة الدرج المخفية)","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":""},{"c":"B12","v":"02-01","b":true,"al":"center"},{"c":"C12","v":"توريد وتركيب شاسيه سلم داخلي هيكل معدني (Steel Structure) علب وكمر حديد مدهون برايمر إيبوكسي مانع للصدأ","fg":"#1E293B"},{"c":"D12","v":"درجة","fg":"#1E293B","al":"center"},{"c":"E12","v":18,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F12","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G12","v":18,"f":"=E12*F12","b":true,"al":"center","nf":"#,##0"},{"c":"H12","v":2200,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I12","v":950,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J12","v":3150,"f":"=H12+I12","b":true,"al":"center","nf":"#,##0"},{"c":"K12","v":56700,"f":"=G12*J12","b":true,"al":"center","nf":"#,##0"},{"c":"L12","v":"التثبيت بفلانشات حديد 12 مم وجوايط كيميائية Hilti","fg":"#1E293B"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":""},{"c":"B13","v":"02-02","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C13","v":"توريد وتركيب كسوة درجات السلم (نوائم تخانة 4 سم + قوائم 2 سم + البسطة) من الرخام المستورد أو خشب الأرو الطبيعي","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D13","v":"درجة","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E13","v":18,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F13","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G13","v":18,"f":"=E13*F13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"H13","v":1850,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I13","v":550,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J13","v":2400,"f":"=H13+I13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"K13","v":43200,"f":"=G13*J13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L13","v":"توحيد ارتفاع القائمة (16.5 سم) وعرض النائمة (29 سم)","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":""},{"c":"B14","v":"02-03","b":true,"al":"center"},{"c":"C14","v":"توريد وتركيب درابزين سلم وفراغ الدوبلكس من زجاج سيكوريت 12 مم محمل على بوستات أو كوابيل استانلس 304 وكوبستة خشب","fg":"#1E293B"},{"c":"D14","v":"م.ط","fg":"#1E293B","al":"center"},{"c":"E14","v":14,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F14","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G14","v":14,"f":"=E14*F14","b":true,"al":"center","nf":"#,##0"},{"c":"H14","v":2400,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I14","v":600,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J14","v":3000,"f":"=H14+I14","b":true,"al":"center","nf":"#,##0"},{"c":"K14","v":42000,"f":"=G14*J14","b":true,"al":"center","nf":"#,##0"},{"c":"L14","v":"اختبار متانة تثبيت الزجاج وعدم وجود أي اهتزاز أفقي","fg":"#1E293B"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":""},{"c":"B15","v":"02-04","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C15","v":"تأسيس وتوريد وتركيب إضاءة ليد بروفايل مخفية أسفل أنف كل درجة سلم مع حساس حركة أوتوماتيكي (Motion Sensor)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D15","v":"درجة","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E15","v":18,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F15","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G15","v":18,"f":"=E15*F15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"H15","v":420,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I15","v":180,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J15","v":600,"f":"=H15+I15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"K15","v":10800,"f":"=G15*J15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L15","v":"تأسيس خراطيم الإضاءة والترانس قبل تركيب كسوة الدرج","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":16,"h":40.0,"cells":[{"c":"A16","v":""},{"c":"B16","v":"إجمالي القسم الثاني: أعمال إنشاء وتكسية السلم الداخلي للدوبلكس والدرابزين","bg":"#F1F5F9","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H16","v":114060,"f":"=SUMPRODUCT(G12:G15,H12:H15)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"I16","v":38640,"f":"=SUMPRODUCT(G12:G15,I12:I15)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"J16","v":"إجمالي القسم:","bg":"#F1F5F9","b":true,"al":"center"},{"c":"K16","v":152700,"f":"=SUM(K12:K15)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"L16","v":"يرحل تلقائياً للوحة الملخص (القسم 2)","bg":"#F1F5F9","b":true,"al":"center"}]},{"r":17,"h":38.0,"cells":[{"c":"A17","v":""},{"c":"B17","v":"القسم الثالث: أعمال السباكة المزدوجة للدورين ومضخة ضغط المياه والصرف — (تأسيس تغذية وصرف لـ 4 حمامات + مطبخ + أوفيس علوي + مضخة تقوية ضغط المياه)","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":""},{"c":"B18","v":"03-01","b":true,"al":"center"},{"c":"C18","v":"تأسيس شبكة تغذية وصرف لعدد (3 حمامات رئيسية + حمام ضيوف) بمواسير بولي بروبلين PPR ألماني وصرف معلق","fg":"#1E293B"},{"c":"D18","v":"حمام","fg":"#1E293B","al":"center"},{"c":"E18","v":4,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F18","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G18","v":4,"f":"=E18*F18","b":true,"al":"center","nf":"#,##0"},{"c":"H18","v":7800,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I18","v":3200,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J18","v":11000,"f":"=H18+I18","b":true,"al":"center","nf":"#,##0"},{"c":"K18","v":44000,"f":"=G18*J18","b":true,"al":"center","nf":"#,##0"},{"c":"L18","v":"شهادة ضمان وكبس الشركة المصنعة على ضغط 10 بار","fg":"#1E293B"}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":""},{"c":"B19","v":"03-02","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C19","v":"تأسيس سباكة المطبخ الرئيسي بالدور السفلي + أوفيس خدمة (Kitchenette) بالدور العلوي وتجهيز الفلاتر والغسالات","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D19","v":"نقطة","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E19","v":2,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F19","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G19","v":2,"f":"=E19*F19","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"H19","v":5400,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I19","v":2100,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J19","v":7500,"f":"=H19+I19","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"K19","v":15000,"f":"=G19*J19","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L19","v":"فصل خط صرف المطبخ بعمود مستقل لمنع ارتداد الروائح","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":""},{"c":"B20","v":"03-03","b":true,"al":"center"},{"c":"C20","v":"توريد وتركيب 3 صناديق طرد دفن بالحائط (Geberit / Grohe) شاملة الشاسيه الحديدي المحمل ومحبس الدفن","fg":"#1E293B"},{"c":"D20","v":"عدد","fg":"#1E293B","al":"center"},{"c":"E20","v":3,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F20","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G20","v":3,"f":"=E20*F20","b":true,"al":"center","nf":"#,##0"},{"c":"H20","v":5900,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I20","v":750,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J20","v":6650,"f":"=H20+I20","b":true,"al":"center","nf":"#,##0"},{"c":"K20","v":19950,"f":"=G20*J20","b":true,"al":"center","nf":"#,##0"},{"c":"L20","v":"ضبط منسوب الشاسيه على +1.00 متر من شرب تشطيب الأرضية","fg":"#1E293B"}]},{"r":21,"h":52.0,"cells":[{"c":"A21","v":""},{"c":"B21","v":"03-04","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C21","v":"توريد وتركيب مضخة تقوية ضغط مياه أوتوماتيكية انفرتر صامتة (Booster Pump) لتغذية الدور العلوي والروف بكفاءة","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D21","v":"مقطوعية","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E21","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F21","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G21","v":1,"f":"=E21*F21","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"H21","v":9500,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I21","v":1800,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J21","v":11300,"f":"=H21+I21","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"K21","v":11300,"f":"=G21*J21","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L21","v":"تركيب رداد عدم رجوع وقاعدة كاوتشوك مانعة للاهتزاز","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":22,"h":40.0,"cells":[{"c":"A22","v":""},{"c":"B22","v":"إجمالي القسم الثالث: أعمال السباكة المزدوجة للدورين ومضخة ضغط المياه والصرف","bg":"#F1F5F9","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H22","v":69200,"f":"=SUMPRODUCT(G18:G21,H18:H21)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"I22","v":21050,"f":"=SUMPRODUCT(G18:G21,I18:I21)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"J22","v":"إجمالي القسم:","bg":"#F1F5F9","b":true,"al":"center"},{"c":"K22","v":90250,"f":"=SUM(K18:K21)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"L22","v":"يرحل تلقائياً للوحة الملخص (القسم 3)","bg":"#F1F5F9","b":true,"al":"center"}]},{"r":23,"h":38.0,"cells":[{"c":"A23","v":""},{"c":"B23","v":"القسم الرابع: أعمال العزل المائي والحراري المتكامل للروف والحمامات — (نظام عزل الأسطح المقلوب/التقليدي للروف (مائي + حراري + ميول) وعزل الحمامات)","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":24,"h":52.0,"cells":[{"c":"A24","v":""},{"c":"B24","v":"04-01","b":true,"al":"center"},{"c":"C24","v":"عزل أرضيات وحوائط 4 حمامات والمطبخ بمادة أسمنتية بوليمرية مرنة (SikaTop Seal-107) وجهين متعامدين مع شاش فايبر","fg":"#1E293B"},{"c":"D24","v":"م2","fg":"#1E293B","al":"center"},{"c":"E24","v":52,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F24","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G24","v":52,"f":"=E24*F24","b":true,"al":"center","nf":"#,##0"},{"c":"H24","v":210,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I24","v":95,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J24","v":305,"f":"=H24+I24","b":true,"al":"center","nf":"#,##0"},{"c":"K24","v":15860,"f":"=G24*J24","b":true,"al":"center","nf":"#,##0"},{"c":"L24","v":"عمل رقبة زجاجة واختبار الغمر بالماء لمدة 48 ساعة","fg":"#1E293B"}]},{"r":25,"h":52.0,"cells":[{"c":"A25","v":""},{"c":"B25","v":"04-02","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C25","v":"توريد وتنفيذ عزل مائي لسطح الروف والتراس بلفائف الممبرين البيتوميني المسلح بالبوليستر (تخانة 4 مم) مع دهان البرايمر","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D25","v":"م2","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E25","v":105,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F25","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G25","v":105,"f":"=E25*F25","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"H25","v":260,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I25","v":85,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J25","v":345,"f":"=H25+I25","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"K25","v":36225,"f":"=G25*J25","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L25","v":"رفع العزل على الدروة 25 سم ولحام الركوب 10 سم بالبشبوري","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":26,"h":52.0,"cells":[{"c":"A26","v":""},{"c":"B26","v":"04-03","b":true,"al":"center"},{"c":"C26","v":"توريد وتركيب ألواح عزل حراري للروف من البوليسترين المبثوق عالي الكثافة (XPS 36 kg/m3 - تخانة 5 سم) لحماية الدور العلوي","fg":"#1E293B"},{"c":"D26","v":"م2","fg":"#1E293B","al":"center"},{"c":"E26","v":90,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F26","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G26","v":90,"f":"=E26*F26","b":true,"al":"center","nf":"#,##0"},{"c":"H26","v":240,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I26","v":45,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J26","v":285,"f":"=H26+I26","b":true,"al":"center","nf":"#,##0"},{"c":"K26","v":25650,"f":"=G26*J26","b":true,"al":"center","nf":"#,##0"},{"c":"L26","v":"رص الألواح بنظام عاشق ومعشوق وتغطيتها بطبقة جيوتكستيل","fg":"#1E293B"}]},{"r":27,"h":52.0,"cells":[{"c":"A27","v":""},{"c":"B27","v":"04-04","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C27","v":"صب طبقة خرسانة ميول رغوية خفيفة (Foam Concrete) للروف بمتوسط سمك 7 سم بميول 1% نحو جرجوري صرف الأمطار","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D27","v":"م2","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E27","v":90,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F27","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G27","v":90,"f":"=E27*F27","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"H27","v":190,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I27","v":80,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J27","v":270,"f":"=H27+I27","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"K27","v":24300,"f":"=G27*J27","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L27","v":"تركيب جرجوري صرف أمطار بصفاية مانعة لانسداد الأوراق","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":28,"h":40.0,"cells":[{"c":"A28","v":""},{"c":"B28","v":"إجمالي القسم الرابع: أعمال العزل المائي والحراري المتكامل للروف والحمامات","bg":"#F1F5F9","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H28","v":76920,"f":"=SUMPRODUCT(G24:G27,H24:H27)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"I28","v":25115,"f":"=SUMPRODUCT(G24:G27,I24:I27)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"J28","v":"إجمالي القسم:","bg":"#F1F5F9","b":true,"al":"center"},{"c":"K28","v":102035,"f":"=SUM(K24:K27)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"L28","v":"يرحل تلقائياً للوحة الملخص (القسم 4)","bg":"#F1F5F9","b":true,"al":"center"}]},{"r":29,"h":38.0,"cells":[{"c":"A29","v":""},{"c":"B29","v":"القسم الخامس: أعمال الكهرباء واللوحات المستقلة للدورين والانتركم والسمارت — (تأسيس لوحتي قواطع للدورين، ربط الدفيات على السلم، وتأسيس الصوتيات والإنترنت)","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":30,"h":52.0,"cells":[{"c":"A30","v":""},{"c":"B30","v":"05-01","b":true,"al":"center"},{"c":"C30","v":"توريد وتأسيس شبكة الكهرباء والإنارة والبرايز للدورين والروف بأسلاك السويدي الأصلية وخراطيم وعلب هندسية","fg":"#1E293B"},{"c":"D30","v":"نقطة","fg":"#1E293B","al":"center"},{"c":"E30","v":180,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F30","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G30","v":180,"f":"=E30*F30","b":true,"al":"center","nf":"#,##0"},{"c":"H30","v":310,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I30","v":130,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J30","v":440,"f":"=H30+I30","b":true,"al":"center","nf":"#,##0"},{"c":"K30","v":79200,"f":"=G30*J30","b":true,"al":"center","nf":"#,##0"},{"c":"L30","v":"فصل دوائر الإنارة عن البرايز وتكويد الألوان لكل فازة","fg":"#1E293B"}]},{"r":31,"h":52.0,"cells":[{"c":"A31","v":""},{"c":"B31","v":"05-02","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C31","v":"توريد وتركيب 2 لوحة قواطع أوتوماتيكية (لوحة رئيسية 24 خط للدور السفلي + لوحة فرعية 18 خط للدور العلوي) بقواطع حماية إيرث ليكدج","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D31","v":"لوحة","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E31","v":2,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F31","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G31","v":2,"f":"=E31*F31","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"H31","v":7800,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I31","v":1600,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J31","v":9400,"f":"=H31+I31","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"K31","v":18800,"f":"=G31*J31","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L31","v":"تغذية لوحة الدور العلوي بكابل نحاس رئيسي مستقل 16 مم2","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":32,"h":52.0,"cells":[{"c":"A32","v":""},{"c":"B32","v":"05-03","b":true,"al":"center"},{"c":"C32","v":"تأسيس خطوط القوى المستقلة للتكييفات والسخانات والأفران ومضخة المياه والجاكوزي (أسلاك 4 مم2 و 6 مم2)","fg":"#1E293B"},{"c":"D32","v":"خط","fg":"#1E293B","al":"center"},{"c":"E32","v":14,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F32","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G32","v":14,"f":"=E32*F32","b":true,"al":"center","nf":"#,##0"},{"c":"H32","v":1350,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I32","v":250,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J32","v":1600,"f":"=H32+I32","b":true,"al":"center","nf":"#,##0"},{"c":"K32","v":22400,"f":"=G32*J32","b":true,"al":"center","nf":"#,##0"},{"c":"L32","v":"مفتاح بتشينو/شنايدر ثنائي القطب مع قاطع خاص باللوحة","fg":"#1E293B"}]},{"r":33,"h":52.0,"cells":[{"c":"A33","v":""},{"c":"B33","v":"05-04","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C33","v":"تأسيس شبكة التيار الخفيف والربط الداخلي بين الدورين (انتركم داخلي، مقويات Wi-Fi Access Points بكل دور، دش مركزي، وكاميرات الروف)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D33","v":"مقطوعية","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E33","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F33","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G33","v":1,"f":"=E33*F33","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"H33","v":14500,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I33","v":4200,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J33","v":18700,"f":"=H33+I33","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"K33","v":18700,"f":"=G33*J33","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L33","v":"سحب كابلات Cat6 نحاس صافي داخل خراطيم مستقلة عن القوى","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":34,"h":40.0,"cells":[{"c":"A34","v":""},{"c":"B34","v":"إجمالي القسم الخامس: أعمال الكهرباء واللوحات المستقلة للدورين والانتركم والسمارت","bg":"#F1F5F9","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H34","v":104800,"f":"=SUMPRODUCT(G30:G33,H30:H33)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"I34","v":34300,"f":"=SUMPRODUCT(G30:G33,I30:I33)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"J34","v":"إجمالي القسم:","bg":"#F1F5F9","b":true,"al":"center"},{"c":"K34","v":139100,"f":"=SUM(K30:K33)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"L34","v":"يرحل تلقائياً للوحة الملخص (القسم 5)","bg":"#F1F5F9","b":true,"al":"center"}]},{"r":35,"h":38.0,"cells":[{"c":"A35","v":""},{"c":"B35","v":"القسم السادس: أعمال بياض المحارة والجبس بورد وتأسيس التكييفات — (محارة بؤج وأوتار للدورين ودروة الروف، جبس بورد، وتأسيس مواسير الفريون)","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":36,"h":52.0,"cells":[{"c":"A36","v":""},{"c":"B36","v":"06-01","b":true,"al":"center"},{"c":"C36","v":"أعمال بياض المحارة الداخلي للدورين وحوائط دروة الروف (طرطشة مسمارية + بؤج وأوتار بميزان الليزر + شبك فايبر + ملء)","fg":"#1E293B"},{"c":"D36","v":"م2","fg":"#1E293B","al":"center"},{"c":"E36","v":780,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F36","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G36","v":780,"f":"=E36*F36","b":true,"al":"center","nf":"#,##0"},{"c":"H36","v":58,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I36","v":57,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J36","v":115,"f":"=H36+I36","b":true,"al":"center","nf":"#,##0"},{"c":"K36","v":89700,"f":"=G36*J36","b":true,"al":"center","nf":"#,##0"},{"c":"L36","v":"استواء تام بالقدة 3 متر وتأميم زوايا الأعمدة والفتحات","fg":"#1E293B"}]},{"r":37,"h":52.0,"cells":[{"c":"A37","v":""},{"c":"B37","v":"06-02","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C37","v":"توريد وتركيب أسقف معلقة جبس بورد (كناوف أبيض وأخضر مقاوم للرطوبة) بالدورين مع بيوت الستائر ومسارات الماجناتيك تراك","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D37","v":"م2","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E37","v":240,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F37","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G37","v":240,"f":"=E37*F37","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"H37","v":175,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I37","v":105,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J37","v":280,"f":"=H37+I37","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"K37","v":67200,"f":"=G37*J37","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L37","v":"تعليق الشاسيهات بتشابيك حديد مجلفن وصاج تخانة 0.45 مم","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":38,"h":52.0,"cells":[{"c":"A38","v":""},{"c":"B38","v":"06-03","b":true,"al":"center"},{"c":"C38","v":"تأسيس ومد مواسير النحاس المعزولة وصرف الفريون لعدد 6 أجهزة تكييف بالدورين شاملة الحوامل والكبس بالنيتروجين","fg":"#1E293B"},{"c":"D38","v":"جهاز","fg":"#1E293B","al":"center"},{"c":"E38","v":6,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F38","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G38","v":6,"f":"=E38*F38","b":true,"al":"center","nf":"#,##0"},{"c":"H38","v":3900,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I38","v":950,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J38","v":4850,"f":"=H38+I38","b":true,"al":"center","nf":"#,##0"},{"c":"K38","v":29100,"f":"=G38*J38","b":true,"al":"center","nf":"#,##0"},{"c":"L38","v":"صرف التكييفات على بيبة الحمام بمداد مائل بدون أي كوع حاد","fg":"#1E293B"}]},{"r":39,"h":52.0,"cells":[{"c":"A39","v":""},{"c":"B39","v":"06-04","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C39","v":"توريد وتركيب قواطع وتجاليد جبس بورد عازلة للصوت والخصوصية (مع صوف صخري داخلي) ببئر السلم وغرفة الماستر","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D39","v":"م2","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E39","v":28,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F39","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G39","v":28,"f":"=E39*F39","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"H39","v":340,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I39","v":140,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J39","v":480,"f":"=H39+I39","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"K39","v":13440,"f":"=G39*J39","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L39","v":"حشو صوف صخري كثافة 50 كجم/م3 لمنع انتقال الصوت بين الدورين","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":40,"h":40.0,"cells":[{"c":"A40","v":""},{"c":"B40","v":"إجمالي القسم السادس: أعمال بياض المحارة والجبس بورد وتأسيس التكييفات","bg":"#F1F5F9","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H40","v":120160,"f":"=SUMPRODUCT(G36:G39,H36:H39)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"I40","v":79280,"f":"=SUMPRODUCT(G36:G39,I36:I39)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"J40","v":"إجمالي القسم:","bg":"#F1F5F9","b":true,"al":"center"},{"c":"K40","v":199440,"f":"=SUM(K36:K39)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"L40","v":"يرحل تلقائياً للوحة الملخص (القسم 6)","bg":"#F1F5F9","b":true,"al":"center"}]},{"r":41,"h":38.0,"cells":[{"c":"A41","v":""},{"c":"B41","v":"القسم السابع: أعمال البورسلين والسيراميك والرخام وبورسلين الروف الخارجي — (أرضيات الريسبشن، غرف النوم، الحمامات، وأرضيات التراس المقاومة للعوامل الجوية)","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":42,"h":52.0,"cells":[{"c":"A42","v":""},{"c":"B42","v":"07-01","b":true,"al":"center"},{"c":"C42","v":"توريد وتركيب أرضيات بورسلين ليزر (مقاس 60×120 سم فرز أول) للريسبشن والمعيشة والطرقات بالدورين بمادة لصق كيميائية","fg":"#1E293B"},{"c":"D42","v":"م2","fg":"#1E293B","al":"center"},{"c":"E42","v":165,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F42","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G42","v":165,"f":"=E42*F42","b":true,"al":"center","nf":"#,##0"},{"c":"H42","v":420,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I42","v":110,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J42","v":530,"f":"=H42+I42","b":true,"al":"center","nf":"#,##0"},{"c":"K42","v":87450,"f":"=G42*J42","b":true,"al":"center","nf":"#,##0"},{"c":"L42","v":"استخدام كلبسات التسوية والصلايب 1.5 مم ومادة سقي إيبوكسية","fg":"#1E293B"}]},{"r":43,"h":52.0,"cells":[{"c":"A43","v":""},{"c":"B43","v":"07-02","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C43","v":"توريد وتركيب أرضيات غرف النوم بالدور العلوي (بورسلين باركيه أو باركيه HDF ألماني AC4 مع الفوم والوزرات)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D43","v":"م2","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E43","v":110,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F43","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G43","v":110,"f":"=E43*F43","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"H43","v":460,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I43","v":90,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J43","v":550,"f":"=H43+I43","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"K43","v":60500,"f":"=G43*J43","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L43","v":"تركيب الباركيه HDF بعد انتهاء النقاشة تماماً لمنع الرطوبة","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":44,"h":52.0,"cells":[{"c":"A44","v":""},{"c":"B44","v":"07-03","b":true,"al":"center"},{"c":"C44","v":"توريد وتركيب سيراميك وبورسلين أرضيات وحوائط 4 حمامات والمطبخ شامل الوزرات ومعابر الرخام وجلسات الشبابيك","fg":"#1E293B"},{"c":"D44","v":"م2","fg":"#1E293B","al":"center"},{"c":"E44","v":190,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F44","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G44","v":190,"f":"=E44*F44","b":true,"al":"center","nf":"#,##0"},{"c":"H44","v":330,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I44","v":95,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J44","v":425,"f":"=H44+I44","b":true,"al":"center","nf":"#,##0"},{"c":"K44","v":80750,"f":"=G44*J44","b":true,"al":"center","nf":"#,##0"},{"c":"L44","v":"ضبط ميول أرضيات الحمامات والشاور نحو البيبة الطولية","fg":"#1E293B"}]},{"r":45,"h":52.0,"cells":[{"c":"A45","v":""},{"c":"B45","v":"07-04","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C45","v":"توريد وتركيب أرضيات الروف والتراس المفتوح من البورسلين الخارجي الخشن المقاوم للانزلاق والعوامل الجوية (Anti-Slip R11)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D45","v":"م2","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E45","v":75,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F45","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G45","v":75,"f":"=E45*F45","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"H45","v":360,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I45","v":100,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J45","v":460,"f":"=H45+I45","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"K45","v":34500,"f":"=G45*J45","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L45","v":"عمل فواصل تمدد مرنة بالسطح بمسافات منتظمة لمنع التطبيل","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":46,"h":40.0,"cells":[{"c":"A46","v":""},{"c":"B46","v":"إجمالي القسم السابع: أعمال البورسلين والسيراميك والرخام وبورسلين الروف الخارجي","bg":"#F1F5F9","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H46","v":209600,"f":"=SUMPRODUCT(G42:G45,H42:H45)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"I46","v":53600,"f":"=SUMPRODUCT(G42:G45,I42:I45)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"J46","v":"إجمالي القسم:","bg":"#F1F5F9","b":true,"al":"center"},{"c":"K46","v":263200,"f":"=SUM(K42:K45)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"L46","v":"يرحل تلقائياً للوحة الملخص (القسم 7)","bg":"#F1F5F9","b":true,"al":"center"}]},{"r":47,"h":38.0,"cells":[{"c":"A47","v":""},{"c":"B47","v":"القسم الثامن: أعمال الأبواب الخشبية والمصفحة وقطاعات الألوميتال البانوراما — (بابا الدوبلكس المصفحان، الأبواب الداخلية، وواجهة البانوراما الزجاجية للتراس)","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":48,"h":52.0,"cells":[{"c":"A48","v":""},{"c":"B48","v":"08-01","b":true,"al":"center"},{"c":"C48","v":"توريد وتركيب باب الشقة الرئيسي المصفح بالدور السفلي + باب مصفح إضافي لمدخل الدور العلوي أو الروف","fg":"#1E293B"},{"c":"D48","v":"عدد","fg":"#1E293B","al":"center"},{"c":"E48","v":2,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F48","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G48","v":2,"f":"=E48*F48","b":true,"al":"center","nf":"#,##0"},{"c":"H48","v":14500,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I48","v":1200,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J48","v":15700,"f":"=H48+I48","b":true,"al":"center","nf":"#,##0"},{"c":"K48","v":31400,"f":"=G48*J48","b":true,"al":"center","nf":"#,##0"},{"c":"L48","v":"تصفيح فولاذي كامل وعزل صوف صخري وكالون تركي مزدوج","fg":"#1E293B"}]},{"r":49,"h":52.0,"cells":[{"c":"A49","v":""},{"c":"B49","v":"08-02","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C49","v":"توريد وتركيب الأبواب الخشبية الداخلية للغرف والحمامات (خشب سويدي كبس قشرة أرو طبيعي شاملة الحلوق والدهان والإكسسوار)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D49","v":"عدد","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E49","v":9,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F49","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G49","v":9,"f":"=E49*F49","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"H49","v":4800,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I49","v":750,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J49","v":5550,"f":"=H49+I49","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"K49","v":49950,"f":"=G49*J49","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L49","v":"مفصلات وكوالين استانلس 304 وعزل كعب أبواب الحمامات","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":50,"h":52.0,"cells":[{"c":"A50","v":""},{"c":"B50","v":"08-03","b":true,"al":"center"},{"c":"C50","v":"توريد وتركيب شبابيك الغرف والحمامات والمطابخ بالدورين قطاع UPVC أو ألوميتال جامبو زجاج مزدوج وسلك بليسيه","fg":"#1E293B"},{"c":"D50","v":"م2","fg":"#1E293B","al":"center"},{"c":"E50","v":26,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F50","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G50","v":26,"f":"=E50*F50","b":true,"al":"center","nf":"#,##0"},{"c":"H50","v":3400,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I50","v":350,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J50","v":3750,"f":"=H50+I50","b":true,"al":"center","nf":"#,##0"},{"c":"K50","v":97500,"f":"=G50*J50","b":true,"al":"center","nf":"#,##0"},{"c":"L50","v":"حقن فوم وحول الحلق وسيليكون خارجي مقاوم للأشعة UV","fg":"#1E293B"}]},{"r":51,"h":52.0,"cells":[{"c":"A51","v":""},{"c":"B51","v":"08-04","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C51","v":"توريد وتركيب بوابة بانوراما زجاجية جرارة (Heavy Duty Sliding Panorama) فاصلة بين معيشة الدور العلوي وتراس الروف","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D51","v":"م2","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E51","v":14,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F51","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G51","v":14,"f":"=E51*F51","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"H51","v":4200,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I51","v":450,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J51","v":4650,"f":"=H51+I51","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"K51","v":65100,"f":"=G51*J51","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L51","v":"زجاج سيكوريت دبل جلاس عازل للحرارة مع عجل تحميلي مزدوج","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":52,"h":40.0,"cells":[{"c":"A52","v":""},{"c":"B52","v":"إجمالي القسم الثامن: أعمال الأبواب الخشبية والمصفحة وقطاعات الألوميتال البانوراما","bg":"#F1F5F9","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H52","v":219400,"f":"=SUMPRODUCT(G48:G51,H48:H51)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"I52","v":24550,"f":"=SUMPRODUCT(G48:G51,I48:I51)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"J52","v":"إجمالي القسم:","bg":"#F1F5F9","b":true,"al":"center"},{"c":"K52","v":243950,"f":"=SUM(K48:K51)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"L52","v":"يرحل تلقائياً للوحة الملخص (القسم 8)","bg":"#F1F5F9","b":true,"al":"center"}]},{"r":53,"h":38.0,"cells":[{"c":"A53","v":""},{"c":"B53","v":"القسم التاسع: أعمال الدهانات الداخلية والديكورات وتكسيات الحوائط — (تأسيس وتشطيب دهانات الدورين، تكسيات بديل الخشب والرخام، ودهان دروة الروف)","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":54,"h":52.0,"cells":[{"c":"A54","v":""},{"c":"B54","v":"09-01","b":true,"al":"center"},{"c":"C54","v":"تأسيس وتشطيب دهانات الحوائط والأسقف للدورين (سيلر مائي + 3 سكينة معجون + بطانة + وجهين جوتن فينوماستيك قابل للغسيل)","fg":"#1E293B"},{"c":"D54","v":"م2","fg":"#1E293B","al":"center"},{"c":"E54","v":720,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F54","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G54","v":720,"f":"=E54*F54","b":true,"al":"center","nf":"#,##0"},{"c":"H54","v":52,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I54","v":48,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J54","v":100,"f":"=H54+I54","b":true,"al":"center","nf":"#,##0"},{"c":"K54","v":72000,"f":"=G54*J54","b":true,"al":"center","nf":"#,##0"},{"c":"L54","v":"تلقيط المعجون على كشاف إضاءة كاشف قبل دهان الوجه النهائي","fg":"#1E293B"}]},{"r":55,"h":52.0,"cells":[{"c":"A55","v":""},{"c":"B55","v":"09-02","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C55","v":"توريد وتركيب ديكورات جدارية بالريسبشن وحائط السلم (ألواح بديل الرخام UV، تكسيات بديل الخشب WPC، وبانوهات فيوتك)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D55","v":"م2","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E55","v":35,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F55","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G55","v":35,"f":"=E55*F55","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"H55","v":680,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I55","v":220,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J55","v":900,"f":"=H55+I55","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"K55","v":31500,"f":"=G55*J55","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L55","v":"اللصق بسيليكون عالي القوة وموزونة برأسيات الليزر","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":56,"h":52.0,"cells":[{"c":"A56","v":""},{"c":"B56","v":"09-03","b":true,"al":"center"},{"c":"C56","v":"تأسيس وتشطيب حوائط ودروة الروف الخارجي بدهان واجهات أكريليك مقاوم للشمس والأمطار والرطوبة (Jotashield / Saveto)","fg":"#1E293B"},{"c":"D56","v":"م2","fg":"#1E293B","al":"center"},{"c":"E56","v":85,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F56","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G56","v":85,"f":"=E56*F56","b":true,"al":"center","nf":"#,##0"},{"c":"H56","v":75,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I56","v":55,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J56","v":130,"f":"=H56+I56","b":true,"al":"center","nf":"#,##0"},{"c":"K56","v":11050,"f":"=G56*J56","b":true,"al":"center","nf":"#,##0"},{"c":"L56","v":"معالجة أي شروخ بمعجون إيبوكسي خارجي قبل الدهان","fg":"#1E293B"}]},{"r":57,"h":40.0,"cells":[{"c":"A57","v":""},{"c":"B57","v":"إجمالي القسم التاسع: أعمال الدهانات الداخلية والديكورات وتكسيات الحوائط","bg":"#F1F5F9","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H57","v":67615,"f":"=SUMPRODUCT(G54:G56,H54:H56)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"I57","v":46935,"f":"=SUMPRODUCT(G54:G56,I54:I56)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"J57","v":"إجمالي القسم:","bg":"#F1F5F9","b":true,"al":"center"},{"c":"K57","v":114550,"f":"=SUM(K54:K56)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"L57","v":"يرحل تلقائياً للوحة الملخص (القسم 9)","bg":"#F1F5F9","b":true,"al":"center"}]},{"r":58,"h":38.0,"cells":[{"c":"A58","v":""},{"c":"B58","v":"القسم العاشر: التشطيبات النهائية وتجهيز الروف والبرجولة واللاندسكيب — (الأطقم الصحية، وحدات الإنارة، البرجولة، منطقة الشواء (BBQ)، والنجيل الصناعي)","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":59,"h":52.0,"cells":[{"c":"A59","v":""},{"c":"B59","v":"10-01","b":true,"al":"center"},{"c":"C59","v":"توريد وتركيب الأطقم الصحية، القواعد المعلقة، وحدات الأحواض، الخلاطات، وكبائن الشاور الزجاجية لعدد 4 حمامات","fg":"#1E293B"},{"c":"D59","v":"حمام","fg":"#1E293B","al":"center"},{"c":"E59","v":4,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F59","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G59","v":4,"f":"=E59*F59","b":true,"al":"center","nf":"#,##0"},{"c":"H59","v":14500,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I59","v":2500,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J59","v":17000,"f":"=H59+I59","b":true,"al":"center","nf":"#,##0"},{"c":"K59","v":68000,"f":"=G59*J59","b":true,"al":"center","nf":"#,##0"},{"c":"L59","v":"اختبار عمل كافة الخلاطات وصناديق الطرد وعدم وجود أي تسريب","fg":"#1E293B"}]},{"r":60,"h":52.0,"cells":[{"c":"A60","v":""},{"c":"B60","v":"10-02","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C60","v":"توريد وتركيب تشطيبات الكهرباء النهائية للدورين (اللقم، المفاتيح، البرايز، السبوتات، الليد بروفايل، والنجف)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D60","v":"مقطوعية","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E60","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F60","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G60","v":1,"f":"=E60*F60","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"H60","v":36000,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I60","v":8500,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J60","v":44500,"f":"=H60+I60","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"K60","v":44500,"f":"=G60*J60","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L60","v":"تسمية كافة القواطع بجدول إرشادي داخل اللوحتين","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":61,"h":52.0,"cells":[{"c":"A61","v":""},{"c":"B61","v":"10-03","b":true,"al":"center"},{"c":"C61","v":"توريد وتركيب برجولة روف خارجية (خشب معالج عزيزي/سويدي أو ألومنيوم قطاع خشبي) شاملة التغطية بالبولي كربونيت والإضاءة","fg":"#1E293B"},{"c":"D61","v":"م2","fg":"#1E293B","al":"center"},{"c":"E61","v":24,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F61","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G61","v":24,"f":"=E61*F61","b":true,"al":"center","nf":"#,##0"},{"c":"H61","v":1850,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I61","v":450,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J61","v":2300,"f":"=H61+I61","b":true,"al":"center","nf":"#,##0"},{"c":"K61","v":55200,"f":"=G61*J61","b":true,"al":"center","nf":"#,##0"},{"c":"L61","v":"تثبيت أعمدة البرجولة دون ثقب طبقة العزل المائي للسطح","fg":"#1E293B"}]},{"r":62,"h":52.0,"cells":[{"c":"A62","v":""},{"c":"B62","v":"10-04","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C62","v":"تجهيز ركن شواء وأوفيس خارجي بالروف (رخام جرانيت + حوض + شواية مبنية) مع فرش نجيل صناعي كثيف وأحواض زهور وإضاءة لاندسكيب IP65","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D62","v":"مقطوعية","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E62","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"F62","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"G62","v":1,"f":"=E62*F62","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"H62","v":22000,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I62","v":6500,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"J62","v":28500,"f":"=H62+I62","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"K62","v":28500,"f":"=G62*J62","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L62","v":"استخدام كشافات وبرايز خارجية وتربروف IP65 مقاومة للأمطار","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":63,"h":40.0,"cells":[{"c":"A63","v":""},{"c":"B63","v":"إجمالي القسم العاشر: التشطيبات النهائية وتجهيز الروف والبرجولة واللاندسكيب","bg":"#F1F5F9","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H63","v":160400,"f":"=SUMPRODUCT(G59:G62,H59:H62)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"I63","v":35800,"f":"=SUMPRODUCT(G59:G62,I59:I62)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"J63","v":"إجمالي القسم:","bg":"#F1F5F9","b":true,"al":"center"},{"c":"K63","v":196200,"f":"=SUM(K59:K62)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"L63","v":"يرحل تلقائياً للوحة الملخص (القسم 10)","bg":"#F1F5F9","b":true,"al":"center"}]},{"r":64,"h":46.0,"cells":[{"c":"A64","v":""},{"c":"B64","v":"الإجمالي العام لتكلفة البنود المباشرة لتشطيب الدوبلكس والبنتهاوس والروف (10 أقسام)","bg":"#FEF3C7","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H64","v":1177405,"f":"=H10+H16+H22+H28+H34+H40+H46+H52+H57+H63","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0"},{"c":"I64","v":391620,"f":"=I10+I16+I22+I28+I34+I40+I46+I52+I57+I63","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0"},{"c":"J64","v":"الإجمالي المباشر:","bg":"#FEF3C7","b":true,"al":"center"},{"c":"K64","v":1569025,"f":"=K10+K16+K22+K28+K34+K40+K46+K52+K57+K63","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0"},{"c":"L64","v":"شامل الخامات والمصنعيات لكافة المراحل","bg":"#FEF3C7","b":true,"al":"center"}]}]},{"name":"مقارنة بدائل السلم الداخلي","maxRow":14,"maxCol":10,"colWidths":[3.0,6.0,30.0,14.0,38.0,16.0,38.0,16.0,38.0,16.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":""},{"c":"B1","v":"مصفوفة المقارنة الهندسية والمالية لبدائل السلم الداخلي لشقق الدوبلكس (18 درجة قياسية)","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":""},{"c":"B2","v":"مقارنة تفصيلية بين 3 أنظمة إنشائية ومعمارية للسلم الداخلي (خرساني بالرخام - هيكل حديد بالخشب الأرو - سلم كابولي طائر بالزجاج) لتسهيل اتخاذ القرار الهندسي والمالي","fg":"#475569","al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":""},{"c":"B4","v":"تحليل التكلفة والمواصفات الفنية لأنظمة سلالم الدوبلكس الثلاثة (لارتفاع صافي 3.00 م = 18 قائمة × 16.7 سم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":42.0,"cells":[{"c":"A5","v":""},{"c":"B5","v":"م","bg":"#E2E8F0","b":true,"al":"center"},{"c":"C5","v":"عنصر المقارنة / الجزء التنفيذي","bg":"#E2E8F0","b":true,"al":"center"},{"c":"D5","v":"الكمية القياسية","bg":"#E2E8F0","b":true,"al":"center"},{"c":"E5","v":"البديل (1): سلم خرساني مكسو رخام","bg":"#E2E8F0","b":true,"al":"center"},{"c":"F5","v":"تكلفة البديل (1)","bg":"#E2E8F0","b":true,"al":"center"},{"c":"G5","v":"البديل (2): سلم حديد مكسو خشب أرو","bg":"#E2E8F0","b":true,"al":"center"},{"c":"H5","v":"تكلفة البديل (2)","bg":"#E2E8F0","b":true,"al":"center"},{"c":"I5","v":"البديل (3): سلم كابولي طائر + زجاج","bg":"#E2E8F0","b":true,"al":"center"},{"c":"J5","v":"تكلفة البديل (3)","bg":"#E2E8F0","b":true,"al":"center"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":""},{"c":"B6","v":1,"in":true,"fg":"#1E293B","al":"center"},{"c":"C6","v":"الهيكل الإنشائي والتثبيت","b":true},{"c":"D6","v":"18 درجة","fg":"#1E293B","al":"center"},{"c":"E6","v":"شدة خشبية وتزريع أشاير حديد وصب خرسانة مسلحة","bg":"#F0FDF4","fg":"#1E293B"},{"c":"F6","v":28000,"in":true,"bg":"#F0FDF4","b":true,"al":"center","nf":"#,##0"},{"c":"G6","v":"تصنيع فخذتين كمر حديد IPE/علب وتثبيت بفلانشات أنكر","bg":"#EFF6FF","fg":"#1E293B"},{"c":"H6","v":42000,"in":true,"bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0"},{"c":"I6","v":"تثبيت كمر حديد مدفون بالحائط الخرساني وكوابيل طائرة","bg":"#FAF5FF","fg":"#1E293B"},{"c":"J6","v":58000,"in":true,"bg":"#FAF5FF","b":true,"al":"center","nf":"#,##0"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":2,"in":true,"fg":"#1E293B","al":"center"},{"c":"C7","v":"كسوة النوائم والقوائم (الدرج)","b":true},{"c":"D7","v":"18 درجة","fg":"#1E293B","al":"center"},{"c":"E7","v":"نوائم رخام امبرادور/بريشيا 4 سم + قوائم 2 سم","bg":"#F0FDF4","fg":"#1E293B"},{"c":"F7","v":36000,"in":true,"bg":"#F0FDF4","b":true,"al":"center","nf":"#,##0"},{"c":"G7","v":"صناديق درجات خشب أرو طبيعي المجفف تخانة 5 سم","bg":"#EFF6FF","fg":"#1E293B"},{"c":"H7","v":48600,"in":true,"bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0"},{"c":"I7","v":"علب خشب جوز تركي أو أرو طبيعي مغلفة بالكامل للدرجة","bg":"#FAF5FF","fg":"#1E293B"},{"c":"J7","v":63000,"in":true,"bg":"#FAF5FF","b":true,"al":"center","nf":"#,##0"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":""},{"c":"B8","v":3,"in":true,"fg":"#1E293B","al":"center"},{"c":"C8","v":"الدرابزين والهاندرل والحماية","b":true},{"c":"D8","v":"14 م.ط","fg":"#1E293B","al":"center"},{"c":"E8","v":"درابزين حديد فورجيه أو استانلس مع كوبستة خشب","bg":"#F0FDF4","fg":"#1E293B"},{"c":"F8","v":25200,"in":true,"bg":"#F0FDF4","b":true,"al":"center","nf":"#,##0"},{"c":"G8","v":"درابزين زجاج سيكوريت 12 مم على بوستات استانلس 304","bg":"#EFF6FF","fg":"#1E293B"},{"c":"H8","v":39200,"in":true,"bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0"},{"c":"I8","v":"زجاج سيكوريت دبل تريبل 10+10 مم غاطس بدون قوائم","bg":"#FAF5FF","fg":"#1E293B"},{"c":"J8","v":56000,"in":true,"bg":"#FAF5FF","b":true,"al":"center","nf":"#,##0"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":""},{"c":"B9","v":4,"in":true,"fg":"#1E293B","al":"center"},{"c":"C9","v":"تجليد وتشطيب بطنية السلم","b":true},{"c":"D9","v":"12 م2","fg":"#1E293B","al":"center"},{"c":"E9","v":"بياض محارة ومعجون ودهان بلاستيك لبطنية الخرسانة","bg":"#F0FDF4","fg":"#1E293B"},{"c":"F9","v":4800,"in":true,"bg":"#F0FDF4","b":true,"al":"center","nf":"#,##0"},{"c":"G9","v":"تجليد بطنية وجوانب الحديد بالجبس بورد أو الخشب","bg":"#EFF6FF","fg":"#1E293B"},{"c":"H9","v":11400,"in":true,"bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0"},{"c":"I9","v":"لا يحتاج تجليد بطنية (درجات طائرة مفتوحة بالكامل)","bg":"#FAF5FF","fg":"#1E293B"},{"c":"J9","v":0,"in":true,"bg":"#FAF5FF","b":true,"al":"center","nf":"#,##0"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":""},{"c":"B10","v":5,"in":true,"fg":"#1E293B","al":"center"},{"c":"C10","v":"الإضاءة المخفية للدرج (LED)","b":true},{"c":"D10","v":"18 درجة","fg":"#1E293B","al":"center"},{"c":"E10","v":"ليد بروفايل أسفل أنف الرخام مع ترانس ومفتاح دفياتير","bg":"#F0FDF4","fg":"#1E293B"},{"c":"F10","v":8100,"in":true,"bg":"#F0FDF4","b":true,"al":"center","nf":"#,##0"},{"c":"G10","v":"ليد بروفايل غاطس بفرزات الخشب مع حساس حركة ذكي","bg":"#EFF6FF","fg":"#1E293B"},{"c":"H10","v":10800,"in":true,"bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0"},{"c":"I10","v":"ليد بروفايل محيطي بكل درجة طائرة مع حساس حركة","bg":"#FAF5FF","fg":"#1E293B"},{"c":"J10","v":14400,"in":true,"bg":"#FAF5FF","b":true,"al":"center","nf":"#,##0"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":""},{"c":"B11","v":6,"in":true,"fg":"#1E293B","al":"center"},{"c":"C11","v":"وزرات الحائط الجانبية للسلم","b":true},{"c":"D11","v":"14 م.ط","fg":"#1E293B","al":"center"},{"c":"E11","v":"وزرة رخام ماشية مع الدرج بارتفاع 10 سم","bg":"#F0FDF4","fg":"#1E293B"},{"c":"F11","v":4200,"in":true,"bg":"#F0FDF4","b":true,"al":"center","nf":"#,##0"},{"c":"G11","v":"وزرة خشب أرو طبيعي ماشية مع ميول السلم","bg":"#EFF6FF","fg":"#1E293B"},{"c":"H11","v":6300,"in":true,"bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0"},{"c":"I11","v":"بدون وزرة ظاهرة (تثبيت مخفي مباشر داخل الحائط)","bg":"#FAF5FF","fg":"#1E293B"},{"c":"J11","v":2800,"in":true,"bg":"#FAF5FF","b":true,"al":"center","nf":"#,##0"}]},{"r":12,"h":48.0,"cells":[{"c":"A12","v":""},{"c":"B12","v":"الوزن الإنشائي واستغلال المساحة أسفل السلم","bg":"#E2E8F0","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"E12","v":"وزن ثقيل على البلاطة - يصلح لعمل مخزن مغلق أسفله","bg":"#F0FDF4","fg":"#1E293B","al":"center","cs":2},{"skip":true},{"c":"G12","v":"وزن خفيف جداً - يعطي اتساعاً بصرياً للريسبشن","bg":"#EFF6FF","fg":"#1E293B","al":"center","cs":2},{"skip":true},{"c":"I12","v":"يتطلب حائطاً خرسانياً أو كمرة حديد مدفونة بالحائط","bg":"#FAF5FF","fg":"#1E293B","al":"center","cs":2},{"skip":true}]},{"r":13,"h":48.0,"cells":[{"c":"A13","v":""},{"c":"B13","v":"مدة التصنيع والتنفيذ بالموقع","bg":"#E2E8F0","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"E13","v":"18 إلى 25 يوم عمل (صب ومعالجة + رخام)","bg":"#F0FDF4","fg":"#1E293B","al":"center","cs":2},{"skip":true},{"c":"G13","v":"10 إلى 14 يوم عمل (تصنيع بالورشة وتركيب جاف)","bg":"#EFF6FF","fg":"#1E293B","al":"center","cs":2},{"skip":true},{"c":"I13","v":"14 إلى 18 يوم عمل (تأسيس مبكر قبل المحارة)","bg":"#FAF5FF","fg":"#1E293B","al":"center","cs":2},{"skip":true}]},{"r":14,"h":44.0,"cells":[{"c":"A14","v":""},{"c":"B14","v":"إجمالي التكلفة التقديرية للسلم الداخلي الكامل (18 درجة)","bg":"#FEF3C7","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"E14","v":"إجمالي سلم خرساني + رخام","bg":"#FEF3C7","b":true,"al":"center"},{"c":"F14","v":106300,"f":"=SUM(F6:F11)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0"},{"c":"G14","v":"إجمالي سلم حديد + خشب أرو","bg":"#FEF3C7","b":true,"al":"center"},{"c":"H14","v":158300,"f":"=SUM(H6:H11)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0"},{"c":"I14","v":"إجمالي سلم كابولي طائر VIP","bg":"#FEF3C7","b":true,"al":"center"},{"c":"J14","v":194200,"f":"=SUM(J6:J11)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0"}]}]},{"name":"حاسبة عزل وتجهيز الروف","maxRow":13,"maxCol":10,"colWidths":[3.0,13.0,32.0,48.0,12.0,15.0,16.0,16.0,18.0,42.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":""},{"c":"B1","v":"حاسبة كميات وتكاليف عزل وتجهيز روف البنتهاوس والتراس المفتوح (نظام الـ 7 طبقات القياسي)","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":""},{"c":"B2","v":"حاسبة تلقائية مربوطة بمساحة الروف في اللوحة الرئيسية لحساب كميات رولات الممبرين، ألواح الفوم الحراري، خرسانة الميول، البورسلين الخارجي، والبرجولة","fg":"#475569","al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":""},{"c":"B4","v":"جدول حصر الخامات والتكاليف التلقائي لنظام عزل وتشطيب الروف (مربوط بمساحة الروف = 90 م²)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":""},{"c":"B5","v":"ترتيب الطبقة","bg":"#E2E8F0","b":true,"al":"center"},{"c":"C5","v":"اسم الطبقة / البند في نظام الروف","bg":"#E2E8F0","b":true,"al":"center"},{"c":"D5","v":"المواصفة الهندسية للخامة","bg":"#E2E8F0","b":true,"al":"center"},{"c":"E5","v":"وحدة القياس","bg":"#E2E8F0","b":true,"al":"center"},{"c":"F5","v":"معامل الهالك / الركوب","bg":"#E2E8F0","b":true,"al":"center"},{"c":"G5","v":"الكمية المطلوبة للتوريد","bg":"#E2E8F0","b":true,"al":"center"},{"c":"H5","v":"سعر الوحدة شامل التركيب","bg":"#E2E8F0","b":true,"al":"center"},{"c":"I5","v":"إجمالي التكلفة","bg":"#E2E8F0","b":true,"al":"center"},{"c":"J5","v":"الوظيفة الهندسية وشرط الاستلام","bg":"#E2E8F0","b":true,"al":"center"}]},{"r":6,"h":54.0,"cells":[{"c":"A6","v":""},{"c":"B6","v":"الطبقة (1)","b":true,"al":"center"},{"c":"C6","v":"نظافة السطح ورقبة الزجاجة والبرايمر","b":true},{"c":"D6","v":"مونة أديبوند 45 درجة بزاوية الدروة + دهان برايمر بيتوميني نفطي","fg":"#1E293B"},{"c":"E6","v":"م2","fg":"#1E293B","al":"center"},{"c":"F6","v":1.15,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"0.00"},{"c":"G6","v":103.5,"f":"='لوحة الملخص ومحددات الدوبلكس'!$H$5 * F6","b":true,"al":"center","nf":"#,##0.0"},{"c":"H6","v":65,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I6","v":6727.5,"f":"=G6*H6","b":true,"al":"center","nf":"#,##0"},{"c":"J6","v":"تجهيز السطح وغلق المسام وضمان التصاق لفائف الممبرين","fg":"#1E293B"}]},{"r":7,"h":54.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":"الطبقة (2)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C7","v":"لفائف العزل المائي (Bituminous Membrane)","bg":"#F8FAFC","b":true},{"c":"D7","v":"لفائف بيتومين مسلح بالبوليستر تخانة 4 مم (ركوب 10 سم + رفع على الدروة)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"E7","v":"م2","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F7","v":1.2,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"0.00"},{"c":"G7","v":108,"f":"='لوحة الملخص ومحددات الدوبلكس'!$H$5 * F7","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"H7","v":280,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I7","v":30240,"f":"=G7*H7","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"J7","v":"منع تسرب مياه الأمطار والري نهائياً (اختبار غمر 48 ساعة)","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":8,"h":54.0,"cells":[{"c":"A8","v":""},{"c":"B8","v":"الطبقة (3)","b":true,"al":"center"},{"c":"C8","v":"ألواح العزل الحراري المبثوق (XPS Foam)","b":true},{"c":"D8","v":"ألواح فوم أزرق بوليسترين مبثوق كثافة 36 كجم/م3 تخانة 5 سم","fg":"#1E293B"},{"c":"E8","v":"م2","fg":"#1E293B","al":"center"},{"c":"F8","v":1.05,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"0.00"},{"c":"G8","v":94.5,"f":"='لوحة الملخص ومحددات الدوبلكس'!$H$5 * F8","b":true,"al":"center","nf":"#,##0.0"},{"c":"H8","v":270,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I8","v":25515,"f":"=G8*H8","b":true,"al":"center","nf":"#,##0"},{"c":"J8","v":"خفض حرارة سقف الدور العلوي بمقدار 7 إلى 9 درجات مئوية","fg":"#1E293B"}]},{"r":9,"h":54.0,"cells":[{"c":"A9","v":""},{"c":"B9","v":"الطبقة (4)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C9","v":"طبقة الفلتر والحماية (Geotextile Sheet)","bg":"#F8FAFC","b":true},{"c":"D9","v":"لفائف قماش غير منسوج جيوتكستيل وزن 200 جم/م2","bg":"#F8FAFC","fg":"#1E293B"},{"c":"E9","v":"م2","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F9","v":1.12,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"0.00"},{"c":"G9","v":100.8,"f":"='لوحة الملخص ومحددات الدوبلكس'!$H$5 * F9","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"H9","v":45,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I9","v":4536,"f":"=G9*H9","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"J9","v":"فصل وحماية ألواح العزل الحراري والمائي من خرسانة الميول","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":10,"h":54.0,"cells":[{"c":"A10","v":""},{"c":"B10","v":"الطبقة (5)","b":true,"al":"center"},{"c":"C10","v":"خرسانة الميول الخفيفة وجرجوري المطر","b":true},{"c":"D10","v":"صب خرسانة رغوية بميول 1% على أوتار نحو المزراب وجرجوري الصرف","fg":"#1E293B"},{"c":"E10","v":"م2","fg":"#1E293B","al":"center"},{"c":"F10","v":1,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"0.00"},{"c":"G10","v":90,"f":"='لوحة الملخص ومحددات الدوبلكس'!$H$5 * F10","b":true,"al":"center","nf":"#,##0.0"},{"c":"H10","v":270,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I10","v":24300,"f":"=G10*H10","b":true,"al":"center","nf":"#,##0"},{"c":"J10","v":"منع تجمع برك المياه على السطح وتوجيهها لعمود صرف المطر","fg":"#1E293B"}]},{"r":11,"h":54.0,"cells":[{"c":"A11","v":""},{"c":"B11","v":"الطبقة (6)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C11","v":"أرضيات البورسلين الخارجي والنجيل الصناعي","bg":"#F8FAFC","b":true},{"c":"D11","v":"بورسلين خارجي Anti-Slip R11 (80% من المسطح) + نجيل صناعي لاندسكيب (20%)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"E11","v":"م2","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F11","v":1.08,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"0.00"},{"c":"G11","v":97.2,"f":"='لوحة الملخص ومحددات الدوبلكس'!$H$5 * F11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"H11","v":460,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I11","v":44712,"f":"=G11*H11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"J11","v":"سطح تشطيب نهائي آمن ضد الانزلاق ومقاوم لأشعة الشمس","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":12,"h":54.0,"cells":[{"c":"A12","v":""},{"c":"B12","v":"الطبقة (7)","b":true,"al":"center"},{"c":"C12","v":"البرجولة وجلسة الروف ومنطقة الشواء BBQ","b":true},{"c":"D12","v":"برجولة (25% من مساحة الروف) + بار شواء بحوض رخام وإضاءة خارجية IP65","fg":"#1E293B"},{"c":"E12","v":"م2 برجولة","fg":"#1E293B","al":"center"},{"c":"F12","v":0.28,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"0.00"},{"c":"G12","v":25.2,"f":"='لوحة الملخص ومحددات الدوبلكس'!$H$5 * F12","b":true,"al":"center","nf":"#,##0.0"},{"c":"H12","v":3100,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"I12","v":78120,"f":"=G12*H12","b":true,"al":"center","nf":"#,##0"},{"c":"J12","v":"استغلال الروف كمنطقة معيشة واستقبال خارجية متكاملة","fg":"#1E293B"}]},{"r":13,"h":44.0,"cells":[{"c":"A13","v":""},{"c":"B13","v":"إجمالي تكلفة نظام العزل المائي والحراري والتشطيب الكامل للروف والبرجولة","bg":"#FEF3C7","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"I13","v":214150.5,"f":"=SUM(I6:I12)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0"},{"c":"J13","v":2379.45,"f":"=I13/'لوحة الملخص ومحددات الدوبلكس'!$H$5","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0\" / م² روف\""}]}]}]}