{"slug":"electrical-cable-lengths-and-voltage-drop-short-circuit-sizing-sheet","sheets":[{"name":"ملخص مقايسة الكابلات والقواطع","maxRow":19,"maxCol":10,"colWidths":[8.0,60.0,15.0,16.0,13.0,13.0,13.0,18.0,13.0,26.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"شيت حصر أطوال الكابلات الكهربائية وحساب هبوط الجهد Voltage Drop وتيار القصر Short Circuit لشبكات القوى والإنارة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"نموذج تشغيلي لمهندسي الكهرباء والمكتب الفني لتصميم مقاطع الكابلات والقواطع وفحص هبوط الجهد وتيار القصر وفق الكود السعودي SBC 401 ومعيار IEC 60364","bg":"#EFF6FF","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"أولاً: المعاملات الكهربائية للمشروع وجهد الشبكة وقدرة المحول ومعاملات التسعير (مدخلات قابلة للتعديل)","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":1,"b":true,"al":"center"},{"c":"B5","v":"اسم المشروع / المبنى:","b":true},{"c":"C5","v":"مبنى إداري وتجاري — تغذية جهد منخفض 400V","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","cs":2},{"skip":true},{"c":"E5","v":"جهد الخط الثلاثي الطور (فولت):","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"G5","v":400,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H5","v":"قدرة محول التغذية (kVA):","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"J5","v":1000,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":6,"h":36.0,"cells":[{"c":"A6","v":2,"b":true,"al":"center"},{"c":"B6","v":"ممانعة المحول النسبية Z%:","b":true},{"c":"C6","v":0.05,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.00%","cs":2},{"skip":true},{"c":"E6","v":"أقصى هبوط جهد مسموح للقوى %:","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"G6","v":0.05,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.00%"},{"c":"H6","v":"نسبة ضريبة القيمة المضافة VAT:","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"J6","v":0.15,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.00%"}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":3,"b":true,"al":"center"},{"c":"B7","v":"تيار القصر عند أطراف المحول (kA):","b":true},{"c":"C7","v":28.86836,"f":"=(J5/(1.732*(G5/1000)))/C6/1000","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\"","cs":2},{"skip":true},{"c":"E7","v":"معامل مقاومة النحاس الحراري k:","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"G7","v":143,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H7","v":"نسبة الإشراف والاختبارات الهندسية:","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"J7","v":0.05,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.00%"}]},{"r":8,"h":28.0,"cells":[{"c":"A8","v":""},{"c":"B8","v":""},{"c":"C8","v":""},{"c":"D8","v":""},{"c":"E8","v":""},{"c":"F8","v":""},{"c":"G8","v":""},{"c":"H8","v":""},{"c":"I8","v":""},{"c":"J8","v":""}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"إجمالي الأحمال الكهربائية المحسوبة (kW)","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C9","v":"أقصى نسبة هبوط جهد مسجلة بالشبكة (VD%)","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"F9","v":"إجمالي أطوال الكابلات والأسلاك بالهدر (م.ط)","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"H9","v":"إجمالي مقايسة الكابلات واللوحات شاملة الضريبة","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":10,"h":46.0,"cells":[{"c":"A10","v":576.5,"f":"='حساب هبوط الجهد ومقاطع الكابل'!C18","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\"","cs":2},{"skip":true},{"c":"C10","v":0.015481,"f":"='حساب هبوط الجهد ومقاطع الكابل'!M18","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"0.00%","cs":3},{"skip":true},{"skip":true},{"c":"F10","v":6539.73,"f":"='حصر أطوال الكابلات وتيار القصر'!G16","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\"","cs":2},{"skip":true},{"c":"H10","v":0,"f":"=I19","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\"","cs":3},{"skip":true},{"skip":true}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"كيلوواط إجمالي أحمال اللوحات الرئيسية والفرعية","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C11","v":"مسموح لغاية 3% للإنارة و5% للقوى وفق SBC 401","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"F11","v":"متر طولي شامل هدر المسارات والترميل","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"H11","v":"شاملة الكابلات والأسلاك واللوحات والمصنعيات","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":12,"h":38.0,"cells":[{"c":"A12","v":"ثانياً: جدول خلاصة مقايسة الكابلات الكهربائية وأسلاك الإنارة والقوى ولوحات التوزيع","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":"م","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B13","v":"بيان قسم الأعمال الكهربائية والكابلات واللوحات","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C13","v":"الوحدة","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D13","v":"الأطوال الصافية","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E13","v":"الكمية بالتوريد والهدر","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F13","v":"تكلفة توريد الكابلات","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G13","v":"نهايات وسكاكين وجلب","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H13","v":"مصنعيات السحب والتركيب","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I13","v":"الإجمالي الكلي للبند","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J13","v":"المرجع الهندسي في الشيت","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":1,"b":true,"al":"center"},{"c":"B14","v":"كابلات القوى النحاسية الرئيسية المسلحة وغير المسلحة (XLPE/SWA/PVC & XLPE/PVC)","b":true},{"c":"C14","v":"م.ط","al":"center"},{"c":"D14","v":698,"f":"=SUM('حصر أطوال الكابلات وتيار القصر'!E6:E11)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E14","v":746.93,"f":"=SUM('حصر أطوال الكابلات وتيار القصر'!G6:G11)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F14","v":107808.9,"f":"=SUM('حصر أطوال الكابلات وتيار القصر'!K6:K11)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G14","v":8624.712,"f":"=F14*0.08","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H14","v":15131,"f":"=SUM('حصر أطوال الكابلات وتيار القصر'!L6:L11)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I14","v":131564.612,"f":"=F14+G14+H14","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J14","v":"تبويب حصر الكابلات (بنود 1-6)","al":"center"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":2,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B15","v":"كابلات التغذية الفرعية وأسلاك دوائر الإنارة والمآخذ والتكييف (Cu PVC / LSOH)","bg":"#F8FAFC","b":true},{"c":"C15","v":"م.ط","bg":"#F8FAFC","al":"center"},{"c":"D15","v":5280,"f":"=SUM('حصر أطوال الكابلات وتيار القصر'!E12:E15)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E15","v":5792.8,"f":"=SUM('حصر أطوال الكابلات وتيار القصر'!G12:G15)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F15","v":21838.35,"f":"=SUM('حصر أطوال الكابلات وتيار القصر'!K12:K15)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G15","v":2183.835,"f":"=F15*0.1","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H15","v":10925,"f":"=SUM('حصر أطوال الكابلات وتيار القصر'!L12:L15)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I15","v":34947.185,"f":"=F15+G15+H15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J15","v":"تبويب حصر الكابلات (بنود 7-10)","bg":"#F8FAFC","al":"center"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":3,"b":true,"al":"center"},{"c":"B16","v":"لوحات التوزيع الرئيسية والفرعية والقواطع المقولبة والفرعية (MDB, SMDBs & DBs)","b":true},{"c":"C16","v":"لوحة","al":"center"},{"c":"D16","v":6,"f":"=COUNT('حصر أطوال الكابلات وتيار القصر'!A19:A24)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E16","v":6,"f":"=D16","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F16","v":99400,"f":"=SUM('حصر أطوال الكابلات وتيار القصر'!L19:L24)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G16","v":5964,"f":"=F16*0.06","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H16","v":13750,"f":"=SUM('حصر أطوال الكابلات وتيار القصر'!M19:M24)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I16","v":119114,"f":"=F16+G16+H16","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J16","v":"تبويب تيار القصر واللوحات","al":"center"}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":4,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B17","v":"حوامل الكابلات المجلفنة (Cable Trays) وشبكة التأريض واختبارات الميجر والتسليم","bg":"#F8FAFC","b":true},{"c":"C17","v":"مقطوعية","bg":"#F8FAFC","al":"center"},{"c":"D17","v":1,"f":"=1","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E17","v":1,"f":"=1","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F17","v":18500,"f":"=18500","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G17","v":2400,"f":"=2400","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H17","v":7600,"f":"=7600","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I17","v":28500,"f":"=F17+G17+H17","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J17","v":"تبويب اختبارات الكابلات","bg":"#F8FAFC","al":"center"}]},{"r":18,"h":44.0,"cells":[{"c":"A18","v":"إجمالي التكلفة المباشرة لأعمال الكابلات والأسلاك ولوحات التوزيع","bg":"#DBEAFE","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F18","v":247547.25,"f":"=SUM(F14:F17)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G18","v":19172.547,"f":"=SUM(G14:G17)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H18","v":47406,"f":"=SUM(H14:H17)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I18","v":314125.797,"f":"=SUM(I14:I17)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J18","v":"قبل الضريبة","bg":"#DBEAFE","b":true,"al":"center"}]},{"r":19,"h":44.0,"cells":[{"c":"A19","v":"إجمالي المقايسة شامل الإشراف والاختبارات وضريبة القيمة المضافة VAT (15%)","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F19","v":0,"f":"=F18*(1+$J$7)*(1+$J$6)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G19","v":0,"f":"=G18*(1+$J$7)*(1+$J$6)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H19","v":0,"f":"=H18*(1+$J$7)*(1+$J$6)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I19","v":0,"f":"=I18*(1+$J$7)*(1+$J$6)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J19","v":"شامل الضريبة والإشراف","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"}]}]},{"name":"حساب هبوط الجهد ومقاطع الكابل","maxRow":18,"maxCol":14,"colWidths":[8.0,56.0,13.0,11.0,13.0,13.0,12.0,13.0,16.0,13.0,14.0,13.0,13.0,18.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول حساب التيار التصميمي واختيار القواطع ومقاطع الكابلات وحساب هبوط الجهد (Voltage Drop) وفق SBC 401","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":14},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"يحسب تيار الحمل (Ib)، ويطبق معاملات تصحيح الحرارة والتجاور (Derating Factor)، ويحسب هبوط الجهد بالفولت والنسبة المئوية ويتحقق من عدم تجاوز الحدود","bg":"#EFF6FF","b":true,"al":"center","cs":14},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""},{"c":"N3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"جدول الحسابات الهندسية لمقاطع الكابلات والقواطع الكهربائية وهبوط الجهد (Voltage Drop Schedule — 400V 3-Phase)","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":14},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"م","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"مسار المغذي الكهربائي (من لوحة المصدر إلى اللوحة / الحمل)","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"الحمل (kW)","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"معامل القدرة","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"تيار الحمل Ib (A)","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"القاطع In (A)","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"معامل التصحيح K","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"سعة الكابل Iz' (A)","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I5","v":"مقطع الكابل النحاسي","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J5","v":"طول المسار (م)","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K5","v":"mV / A / m","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L5","v":"هبوط الجهد (V)","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M5","v":"نسبة الهبوط VD%","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"N5","v":"حالة المطابقة للكود","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":38.0,"cells":[{"c":"A6","v":1,"b":true,"al":"center"},{"c":"B6","v":"المغذي الرئيسي من المحول إلى اللوحة الرئيسية MDB (كابلان متوازيان)","b":true},{"c":"C6","v":480,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D6","v":0.85,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E6","v":815.106643,"f":"=(C6*1000)/(1.732*'ملخص مقايسة الكابلات والقواطع'!$G$5*D6)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F6","v":1000,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G6","v":0.82,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H6","v":1033.2,"f":"=1260*G6","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I6","v":"2×(4×240 mm²)","b":true,"al":"center"},{"c":"J6","v":35,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K6","v":0.095,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L6","v":2.71023,"f":"=(E6*J6*K6)/1000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M6","v":0.006776,"f":"=L6/'ملخص مقايسة الكابلات والقواطع'!$G$5","fg":"#008000","b":true,"al":"center","nf":"0.00%"},{"c":"N6","v":"مطابق للكود SBC 401","f":"=IF(AND(F6>=E6,H6>=F6,M6<=0.03),\"مطابق للكود SBC 401\",\"يلزم تكبير الكابل\")","b":true,"al":"center"}]},{"r":7,"h":38.0,"cells":[{"c":"A7","v":2,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B7","v":"مغذي لوحة التوزيع الفرعية للدور الأرضي SMDB-GF من MDB","bg":"#F8FAFC","b":true},{"c":"C7","v":115,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D7","v":0.85,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E7","v":195.285967,"f":"=(C7*1000)/(1.732*'ملخص مقايسة الكابلات والقواطع'!$G$5*D7)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F7","v":250,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G7","v":0.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H7","v":276,"f":"=345*G7","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I7","v":"4×150 + 70 mm²","bg":"#F8FAFC","b":true,"al":"center"},{"c":"J7","v":42,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K7","v":0.3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L7","v":2.460603,"f":"=(E7*J7*K7)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M7","v":0.006152,"f":"=L7/'ملخص مقايسة الكابلات والقواطع'!$G$5","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"0.00%"},{"c":"N7","v":"مطابق للكود SBC 401","f":"=IF(AND(F7>=E7,H7>=F7,M7<=0.03),\"مطابق للكود SBC 401\",\"يلزم تكبير الكابل\")","bg":"#F8FAFC","b":true,"al":"center"}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":3,"b":true,"al":"center"},{"c":"B8","v":"مغذي لوحة التوزيع الفرعية للدور الأول SMDB-FF من MDB","b":true},{"c":"C8","v":92,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D8","v":0.85,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E8","v":156.228773,"f":"=(C8*1000)/(1.732*'ملخص مقايسة الكابلات والقواطع'!$G$5*D8)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F8","v":200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G8","v":0.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H8","v":212,"f":"=265*G8","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I8","v":"4×95 + 50 mm²","b":true,"al":"center"},{"c":"J8","v":55,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K8","v":0.45,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L8","v":3.866662,"f":"=(E8*J8*K8)/1000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M8","v":0.009667,"f":"=L8/'ملخص مقايسة الكابلات والقواطع'!$G$5","fg":"#008000","b":true,"al":"center","nf":"0.00%"},{"c":"N8","v":"مطابق للكود SBC 401","f":"=IF(AND(F8>=E8,H8>=F8,M8<=0.03),\"مطابق للكود SBC 401\",\"يلزم تكبير الكابل\")","b":true,"al":"center"}]},{"r":9,"h":38.0,"cells":[{"c":"A9","v":4,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B9","v":"مغذي لوحة التوزيع الفرعية للدور الثاني SMDB-SF من MDB","bg":"#F8FAFC","b":true},{"c":"C9","v":78,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D9","v":0.85,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E9","v":132.45483,"f":"=(C9*1000)/(1.732*'ملخص مقايسة الكابلات والقواطع'!$G$5*D9)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F9","v":160,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G9","v":0.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H9","v":212,"f":"=265*G9","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I9","v":"4×95 + 50 mm²","bg":"#F8FAFC","b":true,"al":"center"},{"c":"J9","v":68,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K9","v":0.45,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L9","v":4.053118,"f":"=(E9*J9*K9)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M9","v":0.010133,"f":"=L9/'ملخص مقايسة الكابلات والقواطع'!$G$5","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"0.00%"},{"c":"N9","v":"مطابق للكود SBC 401","f":"=IF(AND(F9>=E9,H9>=F9,M9<=0.03),\"مطابق للكود SBC 401\",\"يلزم تكبير الكابل\")","bg":"#F8FAFC","b":true,"al":"center"}]},{"r":10,"h":38.0,"cells":[{"c":"A10","v":5,"b":true,"al":"center"},{"c":"B10","v":"مغذي لوحة التكييف المركزي والشيلر بالسطح MCC-HVAC من MDB","b":true},{"c":"C10","v":135,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D10","v":0.82,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E10","v":237.635893,"f":"=(C10*1000)/(1.732*'ملخص مقايسة الكابلات والقواطع'!$G$5*D10)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F10","v":315,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G10","v":0.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H10","v":324,"f":"=405*G10","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I10","v":"4×185 + 95 mm²","b":true,"al":"center"},{"c":"J10","v":75,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K10","v":0.25,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L10","v":4.455673,"f":"=(E10*J10*K10)/1000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M10","v":0.011139,"f":"=L10/'ملخص مقايسة الكابلات والقواطع'!$G$5","fg":"#008000","b":true,"al":"center","nf":"0.00%"},{"c":"N10","v":"مطابق للكود SBC 401","f":"=IF(AND(F10>=E10,H10>=F10,M10<=0.03),\"مطابق للكود SBC 401\",\"يلزم تكبير الكابل\")","b":true,"al":"center"}]},{"r":11,"h":38.0,"cells":[{"c":"A11","v":6,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":"مغذي لوحة المصاعد الكهربائية DB-ELEVATOR (مقاوم للحريق) من MDB","bg":"#F8FAFC","b":true},{"c":"C11","v":32,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D11","v":0.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E11","v":57.736721,"f":"=(C11*1000)/(1.732*'ملخص مقايسة الكابلات والقواطع'!$G$5*D11)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F11","v":80,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G11","v":0.82,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H11","v":94.3,"f":"=115*G11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I11","v":"4×25 + 16 mm²","bg":"#F8FAFC","b":true,"al":"center"},{"c":"J11","v":65,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K11","v":1.65,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L11","v":6.192263,"f":"=(E11*J11*K11)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M11","v":0.015481,"f":"=L11/'ملخص مقايسة الكابلات والقواطع'!$G$5","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"0.00%"},{"c":"N11","v":"مطابق للكود SBC 401","f":"=IF(AND(F11>=E11,H11>=F11,M11<=0.03),\"مطابق للكود SBC 401\",\"يلزم تكبير الكابل\")","bg":"#F8FAFC","b":true,"al":"center"}]},{"r":12,"h":38.0,"cells":[{"c":"A12","v":7,"b":true,"al":"center"},{"c":"B12","v":"مغذي لوحة مضخات الحريق والمياه MCC-PUMPS من قاطع الطوارئ","b":true},{"c":"C12","v":28,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D12","v":0.82,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E12","v":49.287444,"f":"=(C12*1000)/(1.732*'ملخص مقايسة الكابلات والقواطع'!$G$5*D12)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F12","v":63,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G12","v":0.82,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H12","v":75.44,"f":"=92*G12","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I12","v":"4×16 + 16 mm²","b":true,"al":"center"},{"c":"J12","v":48,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K12","v":2.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L12","v":5.914493,"f":"=(E12*J12*K12)/1000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M12","v":0.014786,"f":"=L12/'ملخص مقايسة الكابلات والقواطع'!$G$5","fg":"#008000","b":true,"al":"center","nf":"0.00%"},{"c":"N12","v":"مطابق للكود SBC 401","f":"=IF(AND(F12>=E12,H12>=F12,M12<=0.03),\"مطابق للكود SBC 401\",\"يلزم تكبير الكابل\")","b":true,"al":"center"}]},{"r":13,"h":38.0,"cells":[{"c":"A13","v":8,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":"مغذي لوحة إنارة ومآخذ الجناح الشرقي DB-L1 من SMDB-GF","bg":"#F8FAFC","b":true},{"c":"C13","v":24,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D13","v":0.9,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E13","v":38.491147,"f":"=(C13*1000)/(1.732*'ملخص مقايسة الكابلات والقواطع'!$G$5*D13)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F13","v":50,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G13","v":0.82,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H13","v":59.04,"f":"=72*G13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I13","v":"4×10 + 10 mm²","bg":"#F8FAFC","b":true,"al":"center"},{"c":"J13","v":32,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K13","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L13","v":4.926867,"f":"=(E13*J13*K13)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M13","v":0.012317,"f":"=L13/'ملخص مقايسة الكابلات والقواطع'!$G$5","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"0.00%"},{"c":"N13","v":"مطابق للكود SBC 401","f":"=IF(AND(F13>=E13,H13>=F13,M13<=0.03),\"مطابق للكود SBC 401\",\"يلزم تكبير الكابل\")","bg":"#F8FAFC","b":true,"al":"center"}]},{"r":14,"h":38.0,"cells":[{"c":"A14","v":9,"b":true,"al":"center"},{"c":"B14","v":"مغذي لوحة إنارة ومآخذ الجناح الغربي DB-L2 من SMDB-GF","b":true},{"c":"C14","v":22,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D14","v":0.9,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E14","v":35.283551,"f":"=(C14*1000)/(1.732*'ملخص مقايسة الكابلات والقواطع'!$G$5*D14)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F14","v":50,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G14","v":0.82,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H14","v":59.04,"f":"=72*G14","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I14","v":"4×10 + 10 mm²","b":true,"al":"center"},{"c":"J14","v":38,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K14","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L14","v":5.3631,"f":"=(E14*J14*K14)/1000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M14","v":0.013408,"f":"=L14/'ملخص مقايسة الكابلات والقواطع'!$G$5","fg":"#008000","b":true,"al":"center","nf":"0.00%"},{"c":"N14","v":"مطابق للكود SBC 401","f":"=IF(AND(F14>=E14,H14>=F14,M14<=0.03),\"مطابق للكود SBC 401\",\"يلزم تكبير الكابل\")","b":true,"al":"center"}]},{"r":15,"h":38.0,"cells":[{"c":"A15","v":10,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B15","v":"مغذي لوحة وحدات التكييف المدمجة DB-AC1 من SMDB-FF","bg":"#F8FAFC","b":true},{"c":"C15","v":36,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D15","v":0.85,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E15","v":61.132998,"f":"=(C15*1000)/(1.732*'ملخص مقايسة الكابلات والقواطع'!$G$5*D15)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F15","v":80,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G15","v":0.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H15","v":92,"f":"=115*G15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I15","v":"4×25 + 16 mm²","bg":"#F8FAFC","b":true,"al":"center"},{"c":"J15","v":40,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K15","v":1.65,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L15","v":4.034778,"f":"=(E15*J15*K15)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M15","v":0.010087,"f":"=L15/'ملخص مقايسة الكابلات والقواطع'!$G$5","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"0.00%"},{"c":"N15","v":"مطابق للكود SBC 401","f":"=IF(AND(F15>=E15,H15>=F15,M15<=0.03),\"مطابق للكود SBC 401\",\"يلزم تكبير الكابل\")","bg":"#F8FAFC","b":true,"al":"center"}]},{"r":16,"h":38.0,"cells":[{"c":"A16","v":11,"b":true,"al":"center"},{"c":"B16","v":"دائرة تغذية سخان مياه مركزي ومضخة تدوير من DB-ROOF","b":true},{"c":"C16","v":9,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D16","v":0.98,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E16","v":13.25588,"f":"=(C16*1000)/(1.732*'ملخص مقايسة الكابلات والقواطع'!$G$5*D16)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F16","v":25,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G16","v":0.85,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H16","v":35.7,"f":"=42*G16","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I16","v":"4×6 + 6 mm²","b":true,"al":"center"},{"c":"J16","v":28,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K16","v":6.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L16","v":2.52392,"f":"=(E16*J16*K16)/1000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M16","v":0.00631,"f":"=L16/'ملخص مقايسة الكابلات والقواطع'!$G$5","fg":"#008000","b":true,"al":"center","nf":"0.00%"},{"c":"N16","v":"مطابق للكود SBC 401","f":"=IF(AND(F16>=E16,H16>=F16,M16<=0.03),\"مطابق للكود SBC 401\",\"يلزم تكبير الكابل\")","b":true,"al":"center"}]},{"r":17,"h":38.0,"cells":[{"c":"A17","v":12,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B17","v":"دائرة إنارة خارجية وواجهة معمارية LED من لوحة الخدمات DB-EXT","bg":"#F8FAFC","b":true},{"c":"C17","v":5.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D17","v":0.92,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E17","v":8.629129,"f":"=(C17*1000)/(1.732*'ملخص مقايسة الكابلات والقواطع'!$G$5*D17)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F17","v":16,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G17","v":0.85,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H17","v":27.2,"f":"=32*G17","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I17","v":"4×4 + 4 mm²","bg":"#F8FAFC","b":true,"al":"center"},{"c":"J17","v":45,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K17","v":10.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L17","v":3.96077,"f":"=(E17*J17*K17)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M17","v":0.009902,"f":"=L17/'ملخص مقايسة الكابلات والقواطع'!$G$5","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"0.00%"},{"c":"N17","v":"مطابق للكود SBC 401","f":"=IF(AND(F17>=E17,H17>=F17,M17<=0.03),\"مطابق للكود SBC 401\",\"يلزم تكبير الكابل\")","bg":"#F8FAFC","b":true,"al":"center"}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":"إجمالي أحمال المغذيات وأطوال المسارات وأقصى نسبة هبوط جهد","bg":"#DBEAFE","b":true,"cs":2},{"skip":true},{"c":"C18","v":576.5,"f":"=SUM(C7:C17)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D18","v":0.865833,"f":"=AVERAGE(D6:D17)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E18","v":815.106643,"f":"=MAX(E6:E17)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F18","v":1000,"f":"=MAX(F6:F17)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G18","v":0.816667,"f":"=AVERAGE(G6:G17)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H18","v":1033.2,"f":"=MAX(H6:H17)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I18","v":"12 دائرة رئيسية وفرعية","bg":"#DBEAFE","b":true,"al":"center"},{"c":"J18","v":571,"f":"=SUM(J6:J17)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K18","v":2.695417,"f":"=AVERAGE(K6:K17)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L18","v":6.192263,"f":"=MAX(L6:L17)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M18","v":0.015481,"f":"=MAX(M6:M17)","bg":"#DBEAFE","b":true,"al":"center","nf":"0.00%"},{"c":"N18","v":"جميع الدوائر ≤ 3%","bg":"#DBEAFE","b":true,"al":"center"}]}]},{"name":"حصر أطوال الكابلات وتيار القصر","maxRow":24,"maxCol":13,"colWidths":[8.0,56.0,15.0,12.0,14.0,12.0,15.0,14.0,13.0,13.0,16.0,13.0,13.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"دفتر حصر أطوال الكابلات والأسلاك الكهربائية بالبكرات واللفات وحساب تيار القصر (Short Circuit) للوحات","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"يحسب إجمالي أطوال الكابلات شاملة هدر المسارات والترميل، ويحولها لبكرات/لفات بـ ROUNDUP، ويحسب تيار القصر الثلاثي (Isc kA) والسعة القطعية للقواطع","bg":"#EFF6FF","b":true,"al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"أولاً: جدول حصر أطوال الكابلات الكهربائية وأسلاك الإنارة والقوى وتقريب البكرات واللفات لأمر الشراء","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"م","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"توصيف الكابل أو السلك النحاسي ونوع العزل والتسليح","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"المقطع (mm²)","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"الوحدة","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"الطول الصافي (م)","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"نسبة الهدر %","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"الطول بالهدر (م)","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"طول اللفة/البكرة","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I5","v":"عدد اللفات/البكرات","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J5","v":"سعر المتر","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K5","v":"تكلفة التوريد","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L5","v":"تكلفة السحب","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M5","v":"إجمالي البند","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":36.0,"cells":[{"c":"A6","v":1,"b":true,"al":"center"},{"c":"B6","v":"كابل قوى نحاسي مسلح جهد منخفض Cu/XLPE/SWA/PVC — مغذي MDB الرئيسي","b":true},{"c":"C6","v":"4×240 mm²","al":"center"},{"c":"D6","v":"م.ط","al":"center"},{"c":"E6","v":75,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F6","v":0.06,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.00%"},{"c":"G6","v":79.5,"f":"=E6*(1+F6)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H6","v":100,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I6","v":1,"f":"=ROUNDUP(G6/H6, 0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J6","v":390,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K6","v":31005,"f":"=G6*J6","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L6","v":3375,"f":"=E6*45","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M6","v":34380,"f":"=K6+L6","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":2,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B7","v":"كابل قوى نحاسي مسلح Cu/XLPE/SWA/PVC — مغذي شيلر التكييف MCC-HVAC","bg":"#F8FAFC","b":true},{"c":"C7","v":"4×185+95 mm²","bg":"#F8FAFC","al":"center"},{"c":"D7","v":"م.ط","bg":"#F8FAFC","al":"center"},{"c":"E7","v":80,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F7","v":0.06,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.00%"},{"c":"G7","v":84.8,"f":"=E7*(1+F7)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H7","v":100,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I7","v":1,"f":"=ROUNDUP(G7/H7, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J7","v":310,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K7","v":26288,"f":"=G7*J7","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L7","v":3040,"f":"=E7*38","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M7","v":29328,"f":"=K7+L7","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":8,"h":36.0,"cells":[{"c":"A8","v":3,"b":true,"al":"center"},{"c":"B8","v":"كابل قوى نحاسي Cu/XLPE/PVC — مغذي لوحة الدور الأرضي SMDB-GF","b":true},{"c":"C8","v":"4×150+70 mm²","al":"center"},{"c":"D8","v":"م.ط","al":"center"},{"c":"E8","v":48,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F8","v":0.06,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.00%"},{"c":"G8","v":50.88,"f":"=E8*(1+F8)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H8","v":100,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I8","v":1,"f":"=ROUNDUP(G8/H8, 0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J8","v":245,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K8","v":12465.6,"f":"=G8*J8","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L8","v":1536,"f":"=E8*32","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M8","v":14001.6,"f":"=K8+L8","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":9,"h":36.0,"cells":[{"c":"A9","v":4,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B9","v":"كابل قوى نحاسي Cu/XLPE/PVC — مغذيات لوحات الأدوار SMDB-FF & SF","bg":"#F8FAFC","b":true},{"c":"C9","v":"4×95+50 mm²","bg":"#F8FAFC","al":"center"},{"c":"D9","v":"م.ط","bg":"#F8FAFC","al":"center"},{"c":"E9","v":130,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F9","v":0.07,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.00%"},{"c":"G9","v":139.1,"f":"=E9*(1+F9)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H9","v":100,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I9","v":2,"f":"=ROUNDUP(G9/H9, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J9","v":162,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K9","v":22534.2,"f":"=G9*J9","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L9","v":3120,"f":"=E9*24","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M9","v":25654.2,"f":"=K9+L9","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":5,"b":true,"al":"center"},{"c":"B10","v":"كابل قوى نحاسي مقاوم للحريق Fire Resistant — للمصاعد ومضخات الحريق","b":true},{"c":"C10","v":"4×25+16 mm²","al":"center"},{"c":"D10","v":"م.ط","al":"center"},{"c":"E10","v":155,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F10","v":0.07,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.00%"},{"c":"G10","v":165.85,"f":"=E10*(1+F10)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H10","v":100,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I10","v":2,"f":"=ROUNDUP(G10/H10, 0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J10","v":58,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K10","v":9619.3,"f":"=G10*J10","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L10","v":2170,"f":"=E10*14","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M10","v":11789.3,"f":"=K10+L10","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":6,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":"كابل قوى نحاسي فرعي Cu/XLPE/PVC — لتغذية اللوحات الفرعية DBs","bg":"#F8FAFC","b":true},{"c":"C11","v":"4×10+10 mm²","bg":"#F8FAFC","al":"center"},{"c":"D11","v":"م.ط","bg":"#F8FAFC","al":"center"},{"c":"E11","v":210,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F11","v":0.08,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.00%"},{"c":"G11","v":226.8,"f":"=E11*(1+F11)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H11","v":100,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I11","v":3,"f":"=ROUNDUP(G11/H11, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J11","v":26,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K11","v":5896.8,"f":"=G11*J11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L11","v":1890,"f":"=E11*9","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M11","v":7786.8,"f":"=K11+L11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":7,"b":true,"al":"center"},{"c":"B12","v":"أسلاك نحاسية معزولة LSOH/PVC داخل المواسير — دوائر السخانات والمكيفات","b":true},{"c":"C12","v":"6.0 mm²","al":"center"},{"c":"D12","v":"م.ط","al":"center"},{"c":"E12","v":850,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F12","v":0.1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.00%"},{"c":"G12","v":935.0,"f":"=E12*(1+F12)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H12","v":100,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I12","v":10,"f":"=ROUNDUP(G12/H12, 0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J12","v":4.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K12","v":3927,"f":"=G12*J12","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L12","v":2125,"f":"=E12*2.5","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M12","v":6052,"f":"=K12+L12","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":13,"h":36.0,"cells":[{"c":"A13","v":8,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":"أسلاك نحاسية معزولة LSOH/PVC داخل المواسير — دوائر القوى والبرايز","bg":"#F8FAFC","b":true},{"c":"C13","v":"4.0 mm²","bg":"#F8FAFC","al":"center"},{"c":"D13","v":"م.ط","bg":"#F8FAFC","al":"center"},{"c":"E13","v":1650,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F13","v":0.1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.00%"},{"c":"G13","v":1815.0,"f":"=E13*(1+F13)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H13","v":100,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I13","v":19,"f":"=ROUNDUP(G13/H13, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J13","v":2.85,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K13","v":5172.75,"f":"=G13*J13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L13","v":3300,"f":"=E13*2","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M13","v":8472.75,"f":"=K13+L13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":14,"h":36.0,"cells":[{"c":"A14","v":9,"b":true,"al":"center"},{"c":"B14","v":"أسلاك نحاسية معزولة LSOH/PVC داخل المواسير — دوائر الإنارة الداخلية","b":true},{"c":"C14","v":"2.5 mm²","al":"center"},{"c":"D14","v":"م.ط","al":"center"},{"c":"E14","v":2400,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F14","v":0.1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.00%"},{"c":"G14","v":2640,"f":"=E14*(1+F14)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H14","v":100,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I14","v":27,"f":"=ROUNDUP(G14/H14, 0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J14","v":1.85,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K14","v":4884,"f":"=G14*J14","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L14","v":3600,"f":"=E14*1.5","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M14","v":8484,"f":"=K14+L14","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":15,"h":36.0,"cells":[{"c":"A15","v":10,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B15","v":"سلك وكابل تأريض نحاسي مجدول أصفر/أخضر Earthing Conductor","bg":"#F8FAFC","b":true},{"c":"C15","v":"16 - 50 mm²","bg":"#F8FAFC","al":"center"},{"c":"D15","v":"م.ط","bg":"#F8FAFC","al":"center"},{"c":"E15","v":380,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F15","v":0.06,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.00%"},{"c":"G15","v":402.8,"f":"=E15*(1+F15)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H15","v":100,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I15","v":5,"f":"=ROUNDUP(G15/H15, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J15","v":19.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K15","v":7854.6,"f":"=G15*J15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L15","v":1900,"f":"=E15*5","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M15","v":9754.6,"f":"=K15+L15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":16,"h":42.0,"cells":[{"c":"A16","v":"إجمالي حصر أطوال الكابلات والأسلاك الكهربائية والتكاليف","bg":"#DBEAFE","b":true,"cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"E16","v":5978,"f":"=SUM(E6:E15)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F16","v":0.076,"f":"=AVERAGE(F6:F15)","bg":"#DBEAFE","b":true,"al":"center","nf":"0.00%"},{"c":"G16","v":6539.73,"f":"=SUM(G6:G15)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H16","v":100,"f":"=AVERAGE(H6:H15)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I16","v":71,"f":"=SUM(I6:I15)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J16","v":121.94,"f":"=AVERAGE(J6:J15)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K16","v":129647.25,"f":"=SUM(K6:K15)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L16","v":26056,"f":"=SUM(L6:L15)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M16","v":155703.25,"f":"=SUM(M6:M15)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":17,"h":38.0,"cells":[{"c":"A17","v":"ثانياً: جدول حساب تيار القصر الثلاثي (Short Circuit Isc kA) والسعة القطعية للقواطع (Icu) وفحص التدريع الحراري للكابل","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":"م","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B18","v":"لوحة التوزيع الكهربائية وموقعها في الشبكة","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C18","v":"ممانعة المصدر Zs (mΩ)","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D18","v":"ممانعة الكابل Zc (mΩ)","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E18","v":"الممانعة الكلية Zt (mΩ)","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F18","v":"تيار القصر Isc (kA)","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G18","v":"سعة قطع القاطع Icu (kA)","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H18","v":"زمن الفصل t (ثانية)","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I18","v":"أقل مقطع حراري Smin","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J18","v":"المقطع المنفذ (mm²)","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K18","v":"حالة التحمل الحراري","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L18","v":"سعر توريد اللوحة","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M18","v":"مصنعية التركيب","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":19,"h":38.0,"cells":[{"c":"A19","v":1,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B19","v":"اللوحة العمومية الرئيسية MDB (قاطع هوائي ACB 1600A)","bg":"#F8FAFC","b":true},{"c":"C19","v":8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D19","v":2.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E19","v":10.2,"f":"=C19+D19","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F19","v":22.641851,"f":"=('ملخص مقايسة الكابلات والقواطع'!$G$5/1.732)/E19","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G19","v":50,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H19","v":0.3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I19","v":86.723444,"f":"=(F19*1000*SQRT(H19))/'ملخص مقايسة الكابلات والقواطع'!$G$7","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J19","v":480,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K19","v":"آمن (Icu>Isc & S>Smin)","f":"=IF(AND(G19>=F19,J19>=I19),\"آمن (Icu>Isc & S>Smin)\",\"مراجعة القاطع/الكابل\")","bg":"#F8FAFC","b":true,"al":"center"},{"c":"L19","v":38500,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M19","v":4200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":20,"h":38.0,"cells":[{"c":"A20","v":2,"b":true,"al":"center"},{"c":"B20","v":"لوحة التوزيع الفرعية للدور الأرضي SMDB-GF (MCCB 250A)","b":true},{"c":"C20","v":10.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D20","v":6.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E20","v":17,"f":"=C20+D20","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F20","v":13.585111,"f":"=('ملخص مقايسة الكابلات والقواطع'!$G$5/1.732)/E20","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G20","v":36,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H20","v":0.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I20","v":42.485639,"f":"=(F20*1000*SQRT(H20))/'ملخص مقايسة الكابلات والقواطع'!$G$7","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J20","v":150,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K20","v":"آمن (Icu>Isc & S>Smin)","f":"=IF(AND(G20>=F20,J20>=I20),\"آمن (Icu>Isc & S>Smin)\",\"مراجعة القاطع/الكابل\")","b":true,"al":"center"},{"c":"L20","v":9800,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M20","v":1400,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":21,"h":38.0,"cells":[{"c":"A21","v":3,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B21","v":"لوحة التوزيع الفرعية للدور الأول SMDB-FF (MCCB 200A)","bg":"#F8FAFC","b":true},{"c":"C21","v":10.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D21","v":11.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E21","v":21.7,"f":"=C21+D21","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F21","v":10.642713,"f":"=('ملخص مقايسة الكابلات والقواطع'!$G$5/1.732)/E21","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G21","v":25,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H21","v":0.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I21","v":33.283678,"f":"=(F21*1000*SQRT(H21))/'ملخص مقايسة الكابلات والقواطع'!$G$7","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J21","v":95,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K21","v":"آمن (Icu>Isc & S>Smin)","f":"=IF(AND(G21>=F21,J21>=I21),\"آمن (Icu>Isc & S>Smin)\",\"مراجعة القاطع/الكابل\")","bg":"#F8FAFC","b":true,"al":"center"},{"c":"L21","v":8600,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M21","v":1250,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":22,"h":38.0,"cells":[{"c":"A22","v":4,"b":true,"al":"center"},{"c":"B22","v":"لوحة التكييف المركزي بالسطح MCC-HVAC (MCCB 315A)","b":true},{"c":"C22","v":10.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D22","v":9.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E22","v":20,"f":"=C22+D22","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F22","v":11.547344,"f":"=('ملخص مقايسة الكابلات والقواطع'!$G$5/1.732)/E22","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G22","v":36,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H22","v":0.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I22","v":36.112792,"f":"=(F22*1000*SQRT(H22))/'ملخص مقايسة الكابلات والقواطع'!$G$7","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J22","v":185,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K22","v":"آمن (Icu>Isc & S>Smin)","f":"=IF(AND(G22>=F22,J22>=I22),\"آمن (Icu>Isc & S>Smin)\",\"مراجعة القاطع/الكابل\")","b":true,"al":"center"},{"c":"L22","v":14200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M22","v":1800,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":23,"h":38.0,"cells":[{"c":"A23","v":5,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B23","v":"لوحة المصاعد ومضخات الحريق ATS & Emergency Panel","bg":"#F8FAFC","b":true},{"c":"C23","v":10.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D23","v":24.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E23","v":34.7,"f":"=C23+D23","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F23","v":6.65553,"f":"=('ملخص مقايسة الكابلات والقواطع'!$G$5/1.732)/E23","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G23","v":25,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H23","v":0.15,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I23","v":18.025704,"f":"=(F23*1000*SQRT(H23))/'ملخص مقايسة الكابلات والقواطع'!$G$7","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J23","v":25,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K23","v":"آمن (Icu>Isc & S>Smin)","f":"=IF(AND(G23>=F23,J23>=I23),\"آمن (Icu>Isc & S>Smin)\",\"مراجعة القاطع/الكابل\")","bg":"#F8FAFC","b":true,"al":"center"},{"c":"L23","v":11500,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M23","v":1500,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":24,"h":38.0,"cells":[{"c":"A24","v":6,"b":true,"al":"center"},{"c":"B24","v":"مجموعة لوحات الإنارة والقوى الفرعية (6 لوحات DBs 100A)","b":true},{"c":"C24","v":17,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D24","v":32,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E24","v":49,"f":"=C24+D24","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F24","v":4.713202,"f":"=('ملخص مقايسة الكابلات والقواطع'!$G$5/1.732)/E24","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G24","v":15,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H24","v":0.1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I24","v":10.422695,"f":"=(F24*1000*SQRT(H24))/'ملخص مقايسة الكابلات والقواطع'!$G$7","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J24","v":10,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K24","v":"مراجعة القاطع/الكابل","f":"=IF(AND(G24>=F24,J24>=I24),\"آمن (Icu>Isc & S>Smin)\",\"مراجعة القاطع/الكابل\")","b":true,"al":"center"},{"c":"L24","v":16800,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M24","v":3600,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]}]},{"name":"استلام واختبار الكابلات كهرباء","maxRow":15,"maxCol":8,"colWidths":[8.0,58.0,16.0,13.0,13.0,13.0,13.0,28.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"قائمة الفحص والاستلام الميداني واختبارات مقاومة العزل (Megger Test) للكابلات ولوحات التوزيع (QA/QC Checklist)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"تغطي استلام البكرات، سحب الكابلات، أنصاف أقطار الانحناء، اختبار الميجر (1000V DC)، عزم ربط البارات (Torque)، والتأريض وفق كود SBC 401","bg":"#EFF6FF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"جدول الفحص والاستلام الهندسي والاختبارات الكهربائية للكابلات ولوحات التوزيع (Electrical QA/QC Checklist)","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":42.0,"cells":[{"c":"A5","v":"م","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"بند الفحص والاختبار الكهربائي الميداني للكابلات واللوحات","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"المرحلة","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"الكود المرجعي","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"معيار القبول","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"جهاز الفحص","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"حالة المطابقة","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"ملاحظات مهندس الكهرباء","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":1,"b":true,"al":"center"},{"c":"B6","v":"مطابقة مقاطع الكابلات ونوع العزل (XLPE / LSOH) وشهادات اختبار المصنع مع الجداول التصميمية قبل السحب","b":true},{"c":"C6","v":"توريد المواد","al":"center"},{"c":"D6","v":"SBC 401 / IEC 60502","b":true,"al":"center"},{"c":"E6","v":"تطابق 100% للمقطع","al":"center"},{"c":"F6","v":"فحص البكرات","al":"center"},{"c":"G6","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"H6","v":"التأكد من سلامة الغلاف الخارجي"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":2,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B7","v":"فحص استواء ونظافة حوامل الكابلات (Cable Trays) والمواسير وعدم تجاوز نسبة الامتلاء 40% للمواسير","bg":"#F8FAFC","b":true},{"c":"C7","v":"مسارات السحب","bg":"#F8FAFC","al":"center"},{"c":"D7","v":"SBC 401 / NEC 310","bg":"#F8FAFC","b":true,"al":"center"},{"c":"E7","v":"امتلاء ≤ 40%","bg":"#F8FAFC","al":"center"},{"c":"F7","v":"شريط القياس","bg":"#F8FAFC","al":"center"},{"c":"G7","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"H7","v":"تركيب جلب حماية الأطراف Bushings","bg":"#F8FAFC"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":3,"b":true,"al":"center"},{"c":"B8","v":"الالتزام بالحد الأدنى لنصف قطر انحناء الكابل (Bending Radius ≥ 12×D للكابلات المسلحة و 8×D لغير المسلحة)","b":true},{"c":"C8","v":"سحب الكابلات","al":"center"},{"c":"D8","v":"IEC 60364-5-52","b":true,"al":"center"},{"c":"E8","v":"≥ 12× قطر الكابل","al":"center"},{"c":"F8","v":"قياس الزوايا","al":"center"},{"c":"G8","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"H8","v":"منع عصر أو التواء الكابل أثناء السحب"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":4,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B9","v":"فحص خنادق الكابلات المدفونة (عمق 80 سم، فرشة رمل ناعم، طوب حماية، وشريط تحذيري أصفر على عمق 30 سم)","bg":"#F8FAFC","b":true},{"c":"C9","v":"الكابلات الأرضية","bg":"#F8FAFC","al":"center"},{"c":"D9","v":"SBC 401 / SEC","bg":"#F8FAFC","b":true,"al":"center"},{"c":"E9","v":"عمق ≥ 80 سم","bg":"#F8FAFC","al":"center"},{"c":"F9","v":"القامة والمتر","bg":"#F8FAFC","al":"center"},{"c":"G9","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"H9","v":"ترك مسافة 15 سم بين الكابلات","bg":"#F8FAFC"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":5,"b":true,"al":"center"},{"c":"B10","v":"إجراء اختبار مقاومة العزل (Insulation Resistance Test - Megger) بجهد 1000V DC لمدة دقيقة بين الفازات والأرضي","b":true},{"c":"C10","v":"اختبار الميجر","al":"center"},{"c":"D10","v":"IEC 60364-6","b":true,"al":"center"},{"c":"E10","v":"مقاومة ≥ 100 MΩ","al":"center"},{"c":"F10","v":"جهاز الميجر 1000V","al":"center"},{"c":"G10","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"H10","v":"قبل وبعد سحب الكابل والترميل"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":6,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":"إجراء اختبار الاستمرارية (Continuity Test) وتطابق تتابع الفازات (Phase Sequence R-Y-B / L1-L2-L3)","bg":"#F8FAFC","b":true},{"c":"C11","v":"اختبار الأطراف","bg":"#F8FAFC","al":"center"},{"c":"D11","v":"SBC 401","bg":"#F8FAFC","b":true,"al":"center"},{"c":"E11","v":"تتابع صحيح 100%","bg":"#F8FAFC","al":"center"},{"c":"F11","v":"Phase Sequence Meter","bg":"#F8FAFC","al":"center"},{"c":"G11","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"H11","v":"ترقيم الكابلات ببطاقات غير قابلة للصدأ","bg":"#F8FAFC"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":7,"b":true,"al":"center"},{"c":"B12","v":"كبس نهايات الكابلات النحاسية (Cable Lugs) بالمكبس الهيدروليكي السداسي وتغليفها بالـ Heat Shrink الملون","b":true},{"c":"C12","v":"النهايات والجلاندات","al":"center"},{"c":"D12","v":"BS 6121 / IEC","b":true,"al":"center"},{"c":"E12","v":"كبس محكم بدون فراغ","al":"center"},{"c":"F12","v":"مكبس هيدروليكي","al":"center"},{"c":"G12","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"H12","v":"استخدام جلاندات نحاس للكابل المسلح"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":8,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":"ربط نهايات الكابلات على البارات والقواطع باستخدام مفتاح العزم المعاير (Torque Wrench) ووضع علامة الفحص","bg":"#F8FAFC","b":true},{"c":"C13","v":"ربط اللوحات","bg":"#F8FAFC","al":"center"},{"c":"D13","v":"IEC 61439","bg":"#F8FAFC","b":true,"al":"center"},{"c":"E13","v":"عزم قياسي N.m","bg":"#F8FAFC","al":"center"},{"c":"F13","v":"مفتاح العزم Torque","bg":"#F8FAFC","al":"center"},{"c":"G13","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"H13","v":"منع ارتخاء الوصلات وسخونة القاطع","bg":"#F8FAFC"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":9,"b":true,"al":"center"},{"c":"B14","v":"قياس مقاومة شبكة التأريض العام (Earthing Grid) وتأريض جسم اللوحات وحوامل الكابلات والتسليح المعدني SWA","b":true},{"c":"C14","v":"التأريض والحماية","al":"center"},{"c":"D14","v":"SBC 401 / IEEE 80","b":true,"al":"center"},{"c":"E14","v":"مقاومة ≤ 2 إلى 5 أوم","al":"center"},{"c":"F14","v":"Earth Tester","al":"center"},{"c":"G14","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"H14","v":"ربط نحاس التأريض ببارة PE"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":10,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B15","v":"فحص توازن الأحمال بين الفازات الثلاث (Unbalance ≤ 10%) والتصوير الحراري للوحات (Thermal Imaging) تحت الحمل","bg":"#F8FAFC","b":true},{"c":"C15","v":"التشغيل التجريبي","bg":"#F8FAFC","al":"center"},{"c":"D15","v":"SBC 401 / NFPA 70B","bg":"#F8FAFC","b":true,"al":"center"},{"c":"E15","v":"عدم وجود نقاط ساخنة","bg":"#F8FAFC","al":"center"},{"c":"F15","v":"كاميرا حرارية + كلامب","bg":"#F8FAFC","al":"center"},{"c":"G15","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"H15","v":"تثبيت مخطط SLD بباب كل لوحة","bg":"#F8FAFC"}]}]}]}