{"slug":"electrical-transformer-sizing-and-short-circuit-calculation-sheet","sheets":[{"name":"أحمال المبنى Load Schedule","maxRow":21,"maxCol":8,"colWidths":[8.0,48.0,22.0,18.0,22.0,18.0,22.0,45.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول حصر الأحمال الكهربائية الكلية ومعاملات الطلب والقدرة الظاهرية للمشروع (Load Schedule & Maximum Demand)","bg":"#0A2540","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"وفق معايير الجمعية الأمريكية لمهندسي الكهرباء IEEE 141 (Red Book) واشتراطات كود البناء السعودي الكهربائي SBC 401","bg":"#1E3A8A","fg":"#E2E8F0","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"اسم المشروع:","bg":"#F8FAFC","fg":"#1E293B","b":true},{"c":"B4","v":"برج الأعمال الإداري والمركز التجاري المتعدد","fg":"#1E293B"},{"c":"C4","v":""},{"c":"D4","v":"رقم الحساب الهندسي:","bg":"#F8FAFC","fg":"#1E293B","b":true},{"c":"E4","v":"ELEC-TR-2026-088","fg":"#1E293B"},{"c":"F4","v":""},{"c":"G4","v":"تاريخ التصميم:","bg":"#F8FAFC","fg":"#1E293B","b":true},{"c":"H4","v":"2026-10-11م","fg":"#1E293B"}]},{"r":5,"h":72.0,"cells":[{"c":"A5","v":"المكتب الاستشاري:","bg":"#F8FAFC","fg":"#1E293B","b":true},{"c":"B5","v":"دار التصاميم الهندسية الكهروميكانيكية","fg":"#1E293B"},{"c":"C5","v":""},{"c":"D5","v":"الجهد الثانوي للمشروع:","bg":"#F8FAFC","fg":"#1E293B","b":true},{"c":"E5","v":"400 / 230V (3-Phase, 4-Wire, 60Hz)","fg":"#1E293B"},{"c":"F5","v":""},{"c":"G5","v":"جهد التغذية الرئيسي:","bg":"#F8FAFC","fg":"#1E293B","b":true},{"c":"H5","v":"13.8 kV (شبكة التوزيع المتوسطة)","fg":"#1E293B"}]},{"r":6,"h":28.0,"cells":[{"c":"A6","v":""},{"c":"B6","v":""},{"c":"C6","v":""},{"c":"D6","v":""},{"c":"E6","v":""},{"c":"F6","v":""},{"c":"G6","v":""},{"c":"H6","v":""}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"م","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B7","v":"تصنيف ونوع الحمل الكهربائي (Load Description)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C7","v":"الحمل المتصل الكلي (Connected kW)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D7","v":"معامل الطلب (Demand Factor - DF)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E7","v":"أقصى حمل طلب فعلي (Demand kW)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F7","v":"معامل القدرة (Power Factor - PF)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G7","v":"القدرة الظاهرية المطلوبة (Demand kVA)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H7","v":"ملاحظات التغذية والتوزيع","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":8,"h":36.0,"cells":[{"c":"A8","v":1,"fg":"#1E293B","b":true,"al":"center"},{"c":"B8","v":"إنارة المكاتب والممرات والمواقف (LED Lighting System)","fg":"#1E293B"},{"c":"C8","v":140,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"D8","v":0.9,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"E8","v":126,"f":"=C8*D8","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"F8","v":0.95,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G8","v":132.631579,"f":"=E8/F8","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"H8","v":"توزيع متوازن على 3 فازات مع تحكم ذكي DALI","fg":"#1E293B"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":2,"bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center"},{"c":"B9","v":"مخارج القوى والأفياش العامة (Small Power Sockets & Appliances)","bg":"#F1F5F9","fg":"#1E293B"},{"c":"C9","v":185,"in":true,"bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"D9","v":0.5,"in":true,"bg":"#F1F5F9","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"E9","v":92.5,"f":"=C9*D9","bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"F9","v":0.85,"in":true,"bg":"#F1F5F9","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G9","v":108.823529,"f":"=E9/F9","bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"H9","v":"تطبيق معامل طلب 50% وفق الكود للمباني الإدارية","bg":"#F1F5F9","fg":"#1E293B"}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":3,"fg":"#1E293B","b":true,"al":"center"},{"c":"B10","v":"مبردات التكييف المركزية (Water-Cooled Centrifugal Chillers)","fg":"#1E293B"},{"c":"C10","v":620,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"D10","v":0.85,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"E10","v":527,"f":"=C10*D10","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"F10","v":0.88,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G10","v":598.863636,"f":"=E10/F10","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"H10","v":"وحدتان سعة 180 طن تبريد لكل وحدة مع بادئ حركة VFD","fg":"#1E293B"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":4,"bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center"},{"c":"B11","v":"وحدات مناولة الهواء ومراوح التهوية (AHUs & FAHUs & Exhaust Fans)","bg":"#F1F5F9","fg":"#1E293B"},{"c":"C11","v":110,"in":true,"bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"D11","v":0.8,"in":true,"bg":"#F1F5F9","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"E11","v":88,"f":"=C11*D11","bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"F11","v":0.85,"in":true,"bg":"#F1F5F9","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G11","v":103.529412,"f":"=E11/F11","bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"H11","v":"لوحات تحكم بمحركات VFD لتنظيم سريان الهواء","bg":"#F1F5F9","fg":"#1E293B"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":5,"fg":"#1E293B","b":true,"al":"center"},{"c":"B12","v":"المصاعد والسلالم الكهربائية (Passenger Elevators & Escalators)","fg":"#1E293B"},{"c":"C12","v":95,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"D12","v":0.7,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"E12","v":66.5,"f":"=C12*D12","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"F12","v":0.82,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G12","v":81.097561,"f":"=E12/F12","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"H12","v":"4 مصاعد ركاب سرعة 2.5 م/ث مع استرجاع طاقة ريجين","fg":"#1E293B"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":6,"bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center"},{"c":"B13","v":"مضخات المياه والتغذية والصرف (Domestic Booster & Sump Pumps)","bg":"#F1F5F9","fg":"#1E293B"},{"c":"C13","v":45,"in":true,"bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"D13","v":0.65,"in":true,"bg":"#F1F5F9","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"E13","v":29.25,"f":"=C13*D13","bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"F13","v":0.85,"in":true,"bg":"#F1F5F9","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G13","v":34.411765,"f":"=E13/F13","bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"H13","v":"مضخات رفع رأسية متغيرة السرعة متناوبة","bg":"#F1F5F9","fg":"#1E293B"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":7,"fg":"#1E293B","b":true,"al":"center"},{"c":"B14","v":"مركز البيانات والخوادم وغرفة الاتصالات (Data Center & IT Server UPS)","fg":"#1E293B"},{"c":"C14","v":80,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"D14","v":0.9,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"E14","v":72,"f":"=C14*D14","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"F14","v":0.98,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G14","v":73.469388,"f":"=E14/F14","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"H14","v":"تغذية عبر أجهزة UPS مزدوجة التحويل نقية","fg":"#1E293B"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":8,"bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center"},{"c":"B15","v":"مضخات الحريق والأنظمة الحيوية للطوارئ (Fire Fighting Pumps - Standby)","bg":"#F1F5F9","fg":"#1E293B"},{"c":"C15","v":130,"in":true,"bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"D15","v":0.3,"in":true,"bg":"#F1F5F9","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"E15","v":39,"f":"=C15*D15","bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"F15","v":0.85,"in":true,"bg":"#F1F5F9","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G15","v":45.882353,"f":"=E15/F15","bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"H15","v":"حمل طوارئ متقطع يغذى أيضاً من المولد الاحتياطي","bg":"#F1F5F9","fg":"#1E293B"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":9,"fg":"#1E293B","b":true,"al":"center"},{"c":"B16","v":"مطابخ وكافيهات ومعدات تسخين (Kitchen Equipment & Water Heaters)","fg":"#1E293B"},{"c":"C16","v":65,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"D16","v":0.6,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"E16","v":39,"f":"=C16*D16","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"F16","v":0.95,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G16","v":41.052632,"f":"=E16/F16","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"H16","v":"سخانات مياه شمسية مساندة ومعدات خدمات","fg":"#1E293B"}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":10,"bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center"},{"c":"B17","v":"توسعات مستقبلية واحتياطي أمان (Future Growth & Spare Capacity 20%)","bg":"#F1F5F9","fg":"#1E293B"},{"c":"C17","v":150,"in":true,"bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"D17","v":0.75,"in":true,"bg":"#F1F5F9","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"E17","v":112.5,"f":"=C17*D17","bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"F17","v":0.88,"in":true,"bg":"#F1F5F9","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G17","v":127.840909,"f":"=E17/F17","bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"H17","v":"هامش استيعابي مخصص لأي إضافات أو تعديلات للمستأجرين","bg":"#F1F5F9","fg":"#1E293B"}]},{"r":18,"h":40.0,"cells":[{"c":"A18","v":"الإجمالي التراكمي للأحمال المتصلة والطلب (Cumulative Sum)","bg":"#E2E8F0","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"C18","v":1620,"f":"=SUM(C8:C17)","bg":"#E2E8F0","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"D18","v":0.735648,"f":"=E18/C18","bg":"#E2E8F0","fg":"#1E293B","b":true,"al":"center","nf":"0.00"},{"c":"E18","v":1191.75,"f":"=SUM(E8:E17)","bg":"#E2E8F0","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"F18","v":0.884348,"f":"=E18/G18","bg":"#E2E8F0","fg":"#1E293B","b":true,"al":"center","nf":"0.00"},{"c":"G18","v":1347.602764,"f":"=SUM(G8:G17)","bg":"#E2E8F0","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"H18","v":"مجموع أحمال الطلب غير المتزامنة","bg":"#E2E8F0","fg":"#1E293B","b":true,"al":"center"}]},{"r":19,"h":28.0,"cells":[{"c":"A19","v":""},{"c":"B19","v":""},{"c":"C19","v":""},{"c":"D19","v":""},{"c":"E19","v":""},{"c":"F19","v":""},{"c":"G19","v":""},{"c":"H19","v":""}]},{"r":20,"h":36.0,"cells":[{"c":"A20","v":"معامل التباين والتزامن الإجمالي للمبنى (Group Diversity Factor):","fg":"#1E293B","b":true,"cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"E20","v":1.15,"in":true,"fg":"#0A2540","b":true,"al":"center","nf":"0.00"},{"c":"F20","v":"تطبيق معامل تباين 1.15 لعدم تزامن عمل كافة الأحمال معاً في نفس اللحظة","fg":"#1E293B","cs":3},{"skip":true},{"skip":true}]},{"r":21,"h":40.0,"cells":[{"c":"A21","v":"صافي أقصى حمل ذروة متزامن للمشروع (Net Coincident Peak Demand kVA):","fg":"#1E293B","b":true,"cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"E21","v":1171.82849,"f":"=G18/E20","bg":"#EFF6FF","fg":"#0A2540","b":true,"al":"center","nf":"#,##0.0"},{"c":"F21","v":"كيلو فولت أمبير (kVA) - وهي القيمة الحاكمة لتحديد سعة المحول","fg":"#475569","b":true,"cs":3},{"skip":true},{"skip":true}]}]},{"name":"سعة واختيار المحول Sizing","maxRow":18,"maxCol":7,"colWidths":[8.0,48.0,22.0,18.0,26.0,26.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"حسابات تحديد سعة ومواصفات المحول واختيار سعة المحطة (Transformer Sizing & Rating Selection)","bg":"#0A2540","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"وفق معيار IEEE 141 ودليل التوزيع لشركة الكهرباء السعودية SEC وكود البناء السعودي SBC 401","bg":"#1E3A8A","fg":"#E2E8F0","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"أولاً: المعايير التصميمية وسعة المحول المحسوبة (Calculated vs Target Loading)","bg":"#D97706","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":36.0,"cells":[{"c":"A5","v":"أقصى حمل طلب متزامن للمشروع (Net Peak Demand):","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C5","v":1171.82849,"f":"='أحمال المبنى Load Schedule'!E21","fg":"#0A2540","b":true,"al":"center","nf":"#,##0.0"},{"c":"D5","v":"kVA","fg":"#475569","b":true,"al":"center"},{"c":"E5","v":"منقول من جدول حصر الأحمال الكلي","fg":"#1E293B","cs":3},{"skip":true},{"skip":true}]},{"r":6,"h":36.0,"cells":[{"c":"A6","v":"نسبة التحميل التشغيلي المستهدفة (Target Loading Factor):","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C6","v":0.8,"in":true,"fg":"#0A2540","b":true,"al":"center","nf":"0.0%"},{"c":"D6","v":"80.0%","fg":"#475569","b":true,"al":"center"},{"c":"E6","v":"الحد القياسي لضمان العمر الافتراضي وكفاءة المحول القصوى","fg":"#1E293B","cs":3},{"skip":true},{"skip":true}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":"القدرة التصميمية الدنيا المطلوبة للمحول (Minimum Required Rating):","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C7","v":0,"f":"=B5/B6","fg":"#0A2540","b":true,"al":"center","nf":"#,##0.0"},{"c":"D7","v":"kVA","fg":"#475569","b":true,"al":"center"},{"c":"E7","v":"S_req = Peak kVA / Loading Factor","fg":"#1E293B","cs":3},{"skip":true},{"skip":true}]},{"r":8,"h":36.0,"cells":[{"c":"A8","v":"السعة الاسمية القياسية المختارة للمحول (Selected Standard Rating):","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C8","v":1500,"in":true,"fg":"#0A2540","b":true,"al":"center","nf":"#,##0.0"},{"c":"D8","v":"kVA","fg":"#475569","b":true,"al":"center"},{"c":"E8","v":"سعة قياسية وفق تصنيف شركة الكهرباء (Standard Rating)","fg":"#1E293B","cs":3},{"skip":true},{"skip":true}]},{"r":9,"h":28.0,"cells":[{"c":"A9","v":""},{"c":"B9","v":""},{"c":"C9","v":""},{"c":"D9","v":""},{"c":"E9","v":""},{"c":"F9","v":""},{"c":"G9","v":""}]},{"r":10,"h":38.0,"cells":[{"c":"A10","v":"ثانياً: الخصائص الكهربائية والتشغيلية للمحول المختار (Transformer Electrical Specifications)","bg":"#D97706","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"م","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B11","v":"الخاصية والمعامل الكهربائي (Parameter)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C11","v":"القيمة التصميمية (Design Value)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D11","v":"الوحدة (Unit)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E11","v":"المواصفة والمرجع القياسي (Standard Ref)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true},{"c":"G11","v":"الحالة والتقييم الفني","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":1,"fg":"#1E293B","b":true,"al":"center"},{"c":"B12","v":"نوع المحول ووسط التبريد (Transformer Type & Cooling)","fg":"#1E293B"},{"c":"C12","v":"Cast Resin Dry Type (AN)","fg":"#1E293B","b":true,"al":"center"},{"c":"D12","v":"-","fg":"#1E293B","al":"center"},{"c":"E12","v":"IEC 60076-11 / محول جاف راتنجي آمن داخل المبنى","fg":"#1E293B","cs":2},{"skip":true},{"c":"G12","v":"مطابق وموصى به","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":13,"h":36.0,"cells":[{"c":"A13","v":2,"bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center"},{"c":"B13","v":"الجهد الابتدائي المقنن (Rated Primary Voltage - V1)","bg":"#F1F5F9","fg":"#1E293B"},{"c":"C13","v":13800,"in":true,"bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","nf":"#,##0"},{"c":"D13","v":"V (13.8 kV)","bg":"#F1F5F9","fg":"#1E293B","al":"center"},{"c":"E13","v":"شبكة الجهد المتوسط لشركة الكهرباء السعودية SEC","bg":"#F1F5F9","fg":"#1E293B","cs":2},{"skip":true},{"c":"G13","v":"مطابق للشبكة","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":14,"h":36.0,"cells":[{"c":"A14","v":3,"fg":"#1E293B","b":true,"al":"center"},{"c":"B14","v":"الجهد الثانوي المقنن (Rated Secondary Voltage - V2)","fg":"#1E293B"},{"c":"C14","v":400,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"0.0"},{"c":"D14","v":"V (400/230V)","fg":"#1E293B","al":"center"},{"c":"E14","v":"3-Phase, 4-Wire, Neutral Grounded","fg":"#1E293B","cs":2},{"skip":true},{"c":"G14","v":"مطابق للأحمال","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":15,"h":36.0,"cells":[{"c":"A15","v":4,"bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center"},{"c":"B15","v":"التردد الاسمي للتشغيل (Rated Frequency)","bg":"#F1F5F9","fg":"#1E293B"},{"c":"C15","v":60,"in":true,"bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","nf":"#,##0"},{"c":"D15","v":"Hz","bg":"#F1F5F9","fg":"#1E293B","al":"center"},{"c":"E15","v":"التردد القياسي الموحد بالمملكة العربية السعودية","bg":"#F1F5F9","fg":"#1E293B","cs":2},{"skip":true},{"c":"G15","v":"مطابق للشبكة","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":16,"h":36.0,"cells":[{"c":"A16","v":5,"fg":"#1E293B","b":true,"al":"center"},{"c":"B16","v":"تيار الحمل الكامل الثانوي (Rated Full Load Current - Ifl)","fg":"#1E293B"},{"c":"C16","v":2165.063509,"f":"=C8*1000/(SQRT(3)*C14)","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"D16","v":"A (Amperes)","fg":"#1E293B","al":"center"},{"c":"E16","v":"Ifl = S / (sqrt(3) * V2) = 1500kVA / (1.732 * 400V)","fg":"#1E293B","cs":2},{"skip":true},{"c":"G16","v":"تيار اسمي 2,165 أمبير","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":17,"h":36.0,"cells":[{"c":"A17","v":6,"bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center"},{"c":"B17","v":"نسبة التحميل الفعلية للمحول (Actual Operating Loading)","bg":"#F1F5F9","fg":"#1E293B"},{"c":"C17","v":78.121899,"f":"=(C5/C8)*100","bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","nf":"0.0"},{"c":"D17","v":"%","bg":"#F1F5F9","fg":"#1E293B","al":"center"},{"c":"E17","v":"نسبة التحميل الحقيقية عند ذروة استهلاك المبنى","bg":"#F1F5F9","fg":"#1E293B","cs":2},{"skip":true},{"c":"G17","v":"تحميل مثالي < 85%","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":18,"h":36.0,"cells":[{"c":"A18","v":7,"fg":"#1E293B","b":true,"al":"center"},{"c":"B18","v":"نسبة المعاوقة الكهربائية للمحول (Impedance Voltage - Z%)","fg":"#1E293B"},{"c":"C18","v":6,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"0.00"},{"c":"D18","v":"%","fg":"#1E293B","al":"center"},{"c":"E18","v":"IEC 60076 Standard Impedance for 1500 kVA","fg":"#1E293B","cs":2},{"skip":true},{"c":"G18","v":"قيمة كودية قياسية","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]}]},{"name":"تيارات القصر Short Circuit","maxRow":24,"maxCol":6,"colWidths":[8.0,48.0,22.0,18.0,26.0,26.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"حساب تيارات القصر وفواقد المحول واختيار القاطع الرئيسي (Short Circuit & Fault Level Calculations)","bg":"#0A2540","fg":"#FFFFFF","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"وفق معايير IEEE 242 (Buff Book) وكود التوزيع السعودي وسعة القطع لقواطع الهواء ACB","bg":"#1E3A8A","fg":"#E2E8F0","al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"أولاً: تيار القصر المتماثل عند قضبان التوزيع الرئيسية (LV Busbar Short Circuit Calculation)","bg":"#D97706","fg":"#FFFFFF","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":36.0,"cells":[{"c":"A5","v":"سعة المحول الاسمية (Transformer Rating):","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C5","v":1500,"f":"='سعة واختيار المحول Sizing'!C8","fg":"#0A2540","b":true,"al":"center","nf":"#,##0"},{"c":"D5","v":"kVA","fg":"#475569","b":true,"al":"center"},{"c":"E5","v":"سعة المحول المختار 1500 kVA","fg":"#1E293B","cs":2},{"skip":true}]},{"r":6,"h":36.0,"cells":[{"c":"A6","v":"الجهد الثانوي بين الأطوار (Secondary Line Voltage - V2):","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C6","v":400,"f":"='سعة واختيار المحول Sizing'!C14","fg":"#0A2540","b":true,"al":"center","nf":"#,##0"},{"c":"D6","v":"V","fg":"#475569","b":true,"al":"center"},{"c":"E6","v":"الجهد الاسمي 400 فولت","fg":"#1E293B","cs":2},{"skip":true}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":"تيار الحمل الكامل الثانوي للمحول (Full Load Current - Ifl):","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C7","v":2165.063509,"f":"='سعة واختيار المحول Sizing'!C16","fg":"#0A2540","b":true,"al":"center","nf":"#,##0"},{"c":"D7","v":"A","fg":"#475569","b":true,"al":"center"},{"c":"E7","v":"Ifl = 2,165.1 أمبير","fg":"#1E293B","cs":2},{"skip":true}]},{"r":8,"h":36.0,"cells":[{"c":"A8","v":"نسبة المعاوقة الكلية للمحول (Transformer Impedance - Z%):","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C8","v":6,"f":"='سعة واختيار المحول Sizing'!C18","fg":"#0A2540","b":true,"al":"center","nf":"0.00"},{"c":"D8","v":"%","fg":"#475569","b":true,"al":"center"},{"c":"E8","v":"Z = 6.0% وفق IEC 60076","fg":"#1E293B","cs":2},{"skip":true}]},{"r":9,"h":36.0,"cells":[{"c":"A9","v":"تيار القصر المتماثل ثلاثي الأوجه (3-Phase Symmetrical Isc):","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C9","v":36.084392,"f":"=C7/(C8/100)/1000","fg":"#0A2540","b":true,"al":"center","nf":"0.00"},{"c":"D9","v":"kA","fg":"#475569","b":true,"al":"center"},{"c":"E9","v":"Isc = Ifl / (Z%) = 36.08 kA","fg":"#1E293B","cs":2},{"skip":true}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":"سعة القصر الظاهرية للوحة التوزيع (Fault Level Capacity):","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C10","v":25.0,"f":"=SQRT(3)*C6*C9/1000","fg":"#0A2540","b":true,"al":"center","nf":"0.00"},{"c":"D10","v":"MVA","fg":"#475569","b":true,"al":"center"},{"c":"E10","v":"Fault MVA = sqrt(3) * V2 * Isc = 25.0 MVA","fg":"#1E293B","cs":2},{"skip":true}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"سعة القطع الدنيا المطلوبة للقاطع الرئيسي (Required ACB Breaking Capacity):","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C11","v":45.10549,"f":"=C9*1.25","fg":"#0A2540","b":true,"al":"center","nf":"0.00"},{"c":"D11","v":"kA","fg":"#475569","b":true,"al":"center"},{"c":"E11","v":"تطبيق معامل أمان 25% إضافي (Icu >= 45.1 kA)","fg":"#1E293B","cs":2},{"skip":true}]},{"r":12,"h":28.0,"cells":[{"c":"A12","v":""},{"c":"B12","v":""},{"c":"C12","v":""},{"c":"D12","v":""},{"c":"E12","v":""},{"c":"F12","v":""}]},{"r":13,"h":38.0,"cells":[{"c":"A13","v":"ثانياً: فواقد المحول الكهربائية والأحمال الحرارية لتهوية وتكييف الغرفة (Losses & Substation Heat Dissipation)","bg":"#D97706","fg":"#FFFFFF","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":14,"h":36.0,"cells":[{"c":"A14","v":"فواقد اللاحمل في القلب الحديدي (No-Load Iron Core Losses - P0):","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C14","v":3.2,"in":true,"fg":"#0A2540","b":true,"al":"center","nf":"0.00"},{"c":"D14","v":"kW","fg":"#475569","b":true,"al":"center"},{"c":"E14","v":"فواقد مستمرة على مدار الساعة وثابتة","fg":"#1E293B","cs":2},{"skip":true}]},{"r":15,"h":36.0,"cells":[{"c":"A15","v":"فواقد الحمل في الملفات النحاسية (Full-Load Copper Losses - Pk):","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C15","v":14.5,"in":true,"fg":"#0A2540","b":true,"al":"center","nf":"0.00"},{"c":"D15","v":"kW","fg":"#475569","b":true,"al":"center"},{"c":"E15","v":"فواقد متغيرة تتناسب مع مربع تيار الحمل","fg":"#1E293B","cs":2},{"skip":true}]},{"r":16,"h":36.0,"cells":[{"c":"A16","v":"إجمالي الفواقد التشغيلية الفعلية (Total Actual Losses at Peak):","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C16","v":12.049395,"f":"=C14+C15*(('سعة واختيار المحول Sizing'!C17/100)^2)","fg":"#0A2540","b":true,"al":"center","nf":"0.00"},{"c":"D16","v":"kW","fg":"#475569","b":true,"al":"center"},{"c":"E16","v":"P_total = P0 + Pk * (Loading%)^2 = 12.16 kW","fg":"#1E293B","cs":2},{"skip":true}]},{"r":17,"h":36.0,"cells":[{"c":"A17","v":"الحرارة المتولدة المطلوب تبديدها (Heat Dissipation Rate):","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C17","v":41114.222655,"f":"=C16*3412.14","fg":"#0A2540","b":true,"al":"center","nf":"#,##0"},{"c":"D17","v":"BTU/h","fg":"#475569","b":true,"al":"center"},{"c":"E17","v":"1 kW = 3,412.14 BTU/hr = 41,500 BTU/h","fg":"#1E293B","cs":2},{"skip":true}]},{"r":18,"h":36.0,"cells":[{"c":"A18","v":"سعة التكييف المطلوبة لغرفة المحول (Required Substation AC Sizing):","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C18","v":3.426185,"f":"=C17/12000","fg":"#0A2540","b":true,"al":"center","nf":"0.00"},{"c":"D18","v":"طن تبريد (TR)","fg":"#475569","b":true,"al":"center"},{"c":"E18","v":"سعة التبريد اللازمة للحفاظ على حرارة الغرفة دون 35°م","fg":"#1E293B","cs":2},{"skip":true}]},{"r":19,"h":28.0,"cells":[{"c":"A19","v":""},{"c":"B19","v":""},{"c":"C19","v":""},{"c":"D19","v":""},{"c":"E19","v":""},{"c":"F19","v":""}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":"القرار الهندسي والتوصية الفنية النهائية للمشروع:","fg":"#1E293B","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":21,"h":46.0,"cells":[{"c":"A21","v":"محول قدرة 1500 kVA جاف Cast 0 يحقق تحميل تشغيلي مثالي بنسبة 78.1% مع قاطع رئيسي ACB سعة 2500A وبسعة قطع لا تقل عن 50 kA ومكيف هواء قدرة 3.4 طن تبريد.","f":"=\"محول قدرة 1500 kVA جاف Cast Resin (13.8kV/400V) يحقق تحميل تشغيلي مثالي بنسبة \" & TEXT('سعة واختيار المحول Sizing'!C17, \"0.0\") & \"% مع قاطع رئيسي ACB سعة 2500A وبسعة قطع لا تقل عن 50 kA ومكيف هواء قدرة \" & TEXT(C18, \"0.0\") & \" طن تبريد.\"","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":22,"h":28.0,"cells":[{"c":"A22","v":""},{"c":"B22","v":""},{"c":"C22","v":""},{"c":"D22","v":""},{"c":"E22","v":""},{"c":"F22","v":""}]},{"r":23,"h":36.0,"cells":[{"c":"A23","v":"مهندس تصميم القوى والشبكات (Electrical Design Eng)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true},{"c":"C23","v":"مهندس التدقيق ومطابقة كود الكهرباء (Lead QA/QC Eng)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"F23","v":"المهندس الاستشاري الكهروميكانيكي المقيم","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":24,"h":72.0,"cells":[{"c":"A24","v":"الاسم: م. ماجد السهلي\nالتوقيع: .....................\nالتاريخ: 2026-10-11م","fg":"#1E293B","cs":2},{"skip":true},{"c":"C24","v":"الاسم: م. عبد الله الشهري\nالتوقيع: .....................\nالتاريخ: 2026-10-11م","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"F24","v":"الاسم: م. عثمان الدوسري\nالتوقيع: .....................\nالتاريخ: 2026-10-11م","fg":"#1E293B"}]}]}]}