{"slug":"facade-scaffolding-and-external-cladding-stone-marble-qto-sheet","sheets":[{"name":"إعدادات_المشروع_والأسعار","maxRow":28,"maxCol":7,"colWidths":[16.0,62.0,15.0,22.0,18.0,22.0,48.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"شيت حصر كميات ومقايسة تكسيات الواجهات الخارجية بالحجر الطبيعي والرخام الميكانيكي وسقالات التشغيل","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"⚠️ تنبيه استرشادي: الأسعار والنسب والكميات المدخلة في هذا الشيت هي قيم استرشادية لمتوسطات السوق. يرجى تعديل فئات الأسعار والعملة ومواصفات التثبيت أدناه بما يطابق أسعار التوريد والمصنعيات السائدة في بلد مشروعك.","bg":"#1E3A8A","fg":"#F8FAFC","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"📌 أولاً: بيانات المشروع التعاقدية ومواصفات الواجهات والسقالات (Project Metadata)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"اسم المشروع","bg":"#E2E8F0","b":true,"al":"center"},{"c":"B5","v":"مشروع برج الأندلس الإداري والتجاري (أرضي + 6 طوابق + سترة)","fg":"#1E293B","cs":2},{"skip":true},{"c":"D5","v":"المالك / جهة العمل","bg":"#E2E8F0","b":true,"al":"center"},{"c":"E5","v":"شركة التطوير العقاري المعمارية","fg":"#1E293B","cs":3},{"skip":true},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"الاستشاري المشرف","bg":"#E2E8F0","b":true,"al":"center"},{"c":"B6","v":"مكتب العمارة والإنشاء للاستشارات الهندسية","fg":"#1E293B","cs":2},{"skip":true},{"c":"D6","v":"المقاول العام / المتخصص","bg":"#E2E8F0","b":true,"al":"center"},{"c":"E6","v":"شركة البنيان الحديث للمقاولات العامة","fg":"#1E293B","cs":3},{"skip":true},{"skip":true}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"موقع المشروع والمدينة","bg":"#E2E8F0","b":true,"al":"center"},{"c":"B7","v":"الرياض - المملكة العربية السعودية","fg":"#1E293B","cs":2},{"skip":true},{"c":"D7","v":"تاريخ إعداد الدراسة","bg":"#E2E8F0","b":true,"al":"center"},{"c":"E7","v":"أكتوبر 2026","fg":"#1E293B","cs":3},{"skip":true},{"skip":true}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"النظام الإنشائي للواجهة","bg":"#E2E8F0","b":true,"al":"center"},{"c":"B8","v":"تثبيت ميكانيكي صامت بكانات وزوايا ستانلس ستيل 304 مع فراغ هوائي 40 مم","fg":"#1E293B","cs":2},{"skip":true},{"c":"D8","v":"نوع السقالات المعتمدة","bg":"#E2E8F0","b":true,"al":"center"},{"c":"E8","v":"سقالات معدنية نموذجية (Cuplock Heavy Duty Scaffolding)","fg":"#1E293B","cs":3},{"skip":true},{"skip":true}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"الأكواد المرجعية","bg":"#E2E8F0","b":true,"al":"center"},{"c":"B9","v":"ASTM C1242 / SBC 201 / SBC 801 / OSHA 1926 Subpart L","fg":"#1E293B","cs":2},{"skip":true},{"c":"D9","v":"كود المستند الهندسي","bg":"#E2E8F0","b":true,"al":"center"},{"c":"E9","v":"FAC-QTO-BOQ-SCAFF-2026-REV01","fg":"#1E293B","cs":3},{"skip":true},{"skip":true}]},{"r":10,"h":28.0,"cells":[{"c":"A10","v":""},{"c":"B10","v":""},{"c":"C10","v":""},{"c":"D10","v":""},{"c":"E10","v":""},{"c":"F10","v":""},{"c":"G10","v":""}]},{"r":11,"h":38.0,"cells":[{"c":"A11","v":"💰 ثانياً: العملة وفئات أسعار التوريد والتركيب وتأجير السقالات (Rates & Pricing Master Table)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":12,"h":40.0,"cells":[{"c":"A12","v":"كود البند","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B12","v":"بيان المادة أو الخدمة التشغيلية","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C12","v":"الوحدة","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D12","v":"القيمة / الفئة المرجعية","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E12","v":"العملة المحددة","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F12","v":"نسبة التحمل / الأمان","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G12","v":"ملاحظات وتوصيف المواصفة","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":"RATE-CUR","b":true,"al":"center"},{"c":"B13","v":"العملة التعاقدية المعتمدة للمشروع","fg":"#1E293B"},{"c":"C13","v":"رمز العملة","b":true,"al":"center"},{"c":"D13","v":"ر.س SAR","b":true,"al":"center"},{"c":"E13","v":"-","fg":"#1E293B","al":"center"},{"c":"F13","v":"أساسية","b":true,"al":"center"},{"c":"G13","v":"الريال السعودي أو العملة المحلية المعتمدة في عقود المقاولة","fg":"#64748B"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":"RATE-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B14","v":"توريد حجر الرياض الطبيعي المجلي/الممشط سمك 30 مم نخب أول","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C14","v":"م²","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D14","v":165,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E14","v":"ر.س SAR","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F14","v":"8.0% هالك","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G14","v":"مطابق لمواصفة ASTM C568 ومقاوم للتفتت والأملاح","bg":"#F8FAFC","fg":"#64748B"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"RATE-02","b":true,"al":"center"},{"c":"B15","v":"توريد رخام ترافنتينو بيج سمك 30 مم للتطعيمات والبانوهات","fg":"#1E293B"},{"c":"C15","v":"م²","b":true,"al":"center"},{"c":"D15","v":245,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E15","v":"ر.س SAR","fg":"#1E293B","al":"center"},{"c":"F15","v":"8.0% هالك","b":true,"al":"center"},{"c":"G15","v":"مطابق لمواصفة ASTM C503 عالي الكثافة مع ملء المسام بريزين شفاف","fg":"#64748B"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":"RATE-03","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B16","v":"مصنعية تركيب الحجر الطبيعي والرخام ميكانيكياً وضبط المناسيب","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C16","v":"م²","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D16","v":115,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E16","v":"ر.س SAR","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F16","v":"شامل العمالة","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G16","v":"تشمل فنيي التركيب والمساعدين ومعدات الليزر وميزان الشيرب","bg":"#F8FAFC","fg":"#64748B"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":"RATE-04","b":true,"al":"center"},{"c":"B17","v":"توريد وتركيب عوازل حرارية صوف صخري Rockwool سمك 50 مم كثافة 50 كجم/م³","fg":"#1E293B"},{"c":"C17","v":"م²","b":true,"al":"center"},{"c":"D17","v":34,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E17","v":"ر.س SAR","fg":"#1E293B","al":"center"},{"c":"F17","v":"SBC 801","b":true,"al":"center"},{"c":"G17","v":"غير قابل للاحتراق ومغلف بطبقة رقائق ألومنيوم مقواة","fg":"#64748B"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":"RATE-05","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B18","v":"توريد زوايا وكانات التثبيت الميكانيكي ستانلس ستيل 304 وفيشر M10","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C18","v":"م²","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D18","v":48,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E18","v":"ر.س SAR","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F18","v":"ASTM C1242","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G18","v":"كانات سمك 4 مم وزوايا L-Angles مع مسامير توسعية مجلفنة","bg":"#F8FAFC","fg":"#64748B"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":"RATE-06","b":true,"al":"center"},{"c":"B19","v":"معالجة وحقن فواصل التمدد الإنشائية بمعجون بولي يوريثان وباك رينج","fg":"#1E293B"},{"c":"C19","v":"م.ط","b":true,"al":"center"},{"c":"D19","v":18,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E19","v":"ر.س SAR","fg":"#1E293B","al":"center"},{"c":"F19","v":"مرونة عالية","b":true,"al":"center"},{"c":"G19","v":"سيكافليكس أو ما يماثله مقاوم للأشعة فوق البنفسجية UV","fg":"#64748B"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":"RATE-07","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B20","v":"توريد وتركيب رخام كاشفات الجلسات والسواقط للنوافذ والمداخل","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C20","v":"م.ط","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D20","v":65,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E20","v":"ر.س SAR","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F20","v":"كشف غاطس","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G20","v":"شامل جلي الحواف وشطف الزوايا وميزاب تسييل المياه","bg":"#F8FAFC","fg":"#64748B"}]},{"r":21,"h":52.0,"cells":[{"c":"A21","v":"RATE-08","b":true,"al":"center"},{"c":"B21","v":"توريد وتركيب أغطية دروة السطح Coping Stone سمك 40 مم مع ميزاب","fg":"#1E293B"},{"c":"C21","v":"م.ط","b":true,"al":"center"},{"c":"D21","v":85,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E21","v":"ر.س SAR","fg":"#1E293B","al":"center"},{"c":"F21","v":"مقاوم للأمطار","b":true,"al":"center"},{"c":"G21","v":"مزود بقطرة مياه سفلية (Drip Groove) لمنع تسريب المياه للواجهة","fg":"#64748B"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":"RATE-09","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B22","v":"دهان وتشريب الواجهات بسيلر سيليكوني شفاف طارد للمياه والأتربة","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C22","v":"م²","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D22","v":15,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E22","v":"ر.س SAR","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F22","v":"حماية 5 سنوات","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G22","v":"Silicone Water Repellent Sealer غير مغير للون الحجر","bg":"#F8FAFC","fg":"#64748B"}]},{"r":23,"h":52.0,"cells":[{"c":"A23","v":"RATE-10","b":true,"al":"center"},{"c":"B23","v":"أعمال تركيب وتشوين وفك سقالات الواجهات المعدنية النموذجية","fg":"#1E293B"},{"c":"C23","v":"م²","b":true,"al":"center"},{"c":"D23","v":14.5,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E23","v":"ر.س SAR","fg":"#1E293B","al":"center"},{"c":"F23","v":"OSHA 1926","b":true,"al":"center"},{"c":"G23","v":"نظام Cuplock شامل الألواح المعدنية والدرابزينات وسلالم الصعود","fg":"#64748B"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":"RATE-11","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B24","v":"تكلفة إيجار سقالات الواجهات الشهرية طوال فترة العمل بالموقع","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C24","v":"م²/شهر","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D24","v":8.5,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E24","v":"ر.س SAR","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F24","v":"إيجار شهري","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G24","v":"تحتسب شهرياً على كامل المسطح المغطى بالسقالات","bg":"#F8FAFC","fg":"#64748B"}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":"RATE-12","b":true,"al":"center"},{"c":"B25","v":"المدة التقديرية لإيجار السقالات بالموقع","fg":"#1E293B"},{"c":"C25","v":"شهر","b":true,"al":"center"},{"c":"D25","v":4,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E25","v":"-","fg":"#1E293B","al":"center"},{"c":"F25","v":"فترة التنفيذ","b":true,"al":"center"},{"c":"G25","v":"المدة الإجمالية المخططة لتركيب وتشطيب الواجهات بالكامل","fg":"#64748B"}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":"RATE-13","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B26","v":"نسبة الهالك المعتمدة في توريد الحجر والرخام","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C26","v":"نسبة مئوية","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D26","v":0.08,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.0%"},{"c":"E26","v":"-","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F26","v":"أمان التوريد","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G26","v":"تضاف على المسطحات الصافية لتعويض القص والكسر والتركيب","bg":"#F8FAFC","fg":"#64748B"}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":"RATE-14","b":true,"al":"center"},{"c":"B27","v":"نسبة المصاريف الإدارية وهوامش أرباح المقاول (Overhead & Profit)","fg":"#1E293B"},{"c":"C27","v":"نسبة مئوية","b":true,"al":"center"},{"c":"D27","v":0.15,"in":true,"b":true,"al":"center","nf":"0.0%"},{"c":"E27","v":"-","fg":"#1E293B","al":"center"},{"c":"F27","v":"تكلفة غير مباشرة","b":true,"al":"center"},{"c":"G27","v":"تحتسب كنسبة مئوية من إجمالي التكاليف المباشرة للأعمال","fg":"#64748B"}]},{"r":28,"h":34.0,"cells":[{"c":"A28","v":"RATE-15","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B28","v":"نسبة ضريبة القيمة المضافة النظامية (VAT)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C28","v":"نسبة مئوية","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D28","v":0.15,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.0%"},{"c":"E28","v":"-","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F28","v":"هيئة الزكاة والضريبة","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G28","v":"15% المطبقة على عقود المقاولات في المملكة العربية السعودية","bg":"#F8FAFC","fg":"#64748B"}]}]},{"name":"حصر_مسطحات_الواجهات_والفتحات","maxRow":32,"maxCol":9,"colWidths":[16.0,58.0,10.0,18.0,18.0,22.0,20.0,20.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول حصر المسطحات الإجمالية وتفاصيل خصم الفتحات وكشف السواقط للواجهات الأربع","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"حصر هندسي تفصيلي وفق أصول القياس المعماري وكود البناء السعودي SBC 201: خصم كامل للفتحات مع إضافة مسطحات الجلسات والسواقط (Reveals & Jambs)","bg":"#1E3A8A","fg":"#F8FAFC","al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""}]},{"r":4,"h":42.0,"cells":[{"c":"A4","v":"كود الواجهة","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"توصيف الواجهة المعمارية / الفتحات","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"العدد","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"الطول / العرض (م)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"الارتفاع (م)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"المسطح الإجمالي (م²)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"خصم الفتحات (م²)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"إضافة السواقط (م²)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"صافي مسطح التكسية (م²)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"ELEV-N","fg":"#1E293B","al":"center"},{"c":"B5","v":"الواجهة الشمالية الرئيسية - مسطح الحائط الخرساني والمباني الإجمالي","fg":"#1E293B"},{"c":"C5","v":1,"in":true,"fg":"#1E293B","al":"center"},{"c":"D5","v":28,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E5","v":22.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F5","v":630,"f":"=C5*D5*E5","b":true,"al":"center","nf":"#,##0.00"},{"c":"G5","v":0,"in":true,"fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"H5","v":0,"in":true,"fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"I5","v":630,"f":"=F5-G5+H5","b":true,"al":"center","nf":"#,##0.00"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"ELEV-N-W1","fg":"#1E293B","al":"center"},{"c":"B6","v":"  - خصم فتحات النوافذ البانورامية الكبيرة طراز W1","fg":"#1E293B"},{"c":"C6","v":8,"in":true,"fg":"#1E293B","al":"center"},{"c":"D6","v":2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E6","v":2.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F6","v":0,"in":true,"fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"G6","v":35.2,"f":"=C6*D6*E6","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"H6","v":0,"in":true,"fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"I6","v":0,"in":true,"b":true,"al":"center","nf":"#,##0.00"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"ELEV-N-W2","fg":"#1E293B","al":"center"},{"c":"B7","v":"  - خصم فتحات النوافذ المتوسطة المتكررة طراز W2","fg":"#1E293B"},{"c":"C7","v":12,"in":true,"fg":"#1E293B","al":"center"},{"c":"D7","v":1.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E7","v":1.8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F7","v":0,"in":true,"fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"G7","v":32.4,"f":"=C7*D7*E7","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"H7","v":0,"in":true,"fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"I7","v":0,"in":true,"b":true,"al":"center","nf":"#,##0.00"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"ELEV-N-D1","fg":"#1E293B","al":"center"},{"c":"B8","v":"  - خصم فتحة المدخل الزجاجي الرئيسي طراز D1","fg":"#1E293B"},{"c":"C8","v":1,"in":true,"fg":"#1E293B","al":"center"},{"c":"D8","v":4,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E8","v":3.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F8","v":0,"in":true,"fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"G8","v":14,"f":"=C8*D8*E8","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"H8","v":0,"in":true,"fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"I8","v":0,"in":true,"b":true,"al":"center","nf":"#,##0.00"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"ELEV-N-REV","fg":"#1E293B","al":"center"},{"c":"B9","v":"  - إضافة مسطح كشف الجلسات والسواقط الغاطسة (عمق 0.25 م)","fg":"#1E293B"},{"c":"C9","v":21,"in":true,"fg":"#1E293B","al":"center"},{"c":"D9","v":5.4,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E9","v":0.25,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F9","v":0,"in":true,"fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"G9","v":0,"in":true,"fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"H9","v":28.35,"f":"=C9*D9*E9","bg":"#ECFDF5","b":true,"al":"center","nf":"#,##0.00"},{"c":"I9","v":0,"in":true,"b":true,"al":"center","nf":"#,##0.00"}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":"ELEV-N-NET","bg":"#EFF6FF","b":true,"al":"center"},{"c":"B10","v":"صافي مسطح تكسيات الواجهة الشمالية الرئيسية (حجر ورخام)","bg":"#EFF6FF","b":true},{"c":"C10","v":1,"in":true,"bg":"#EFF6FF","b":true,"al":"center"},{"c":"D10","v":"-","bg":"#EFF6FF","fg":"#1E293B","al":"center"},{"c":"E10","v":"-","bg":"#EFF6FF","fg":"#1E293B","al":"center"},{"c":"F10","v":0,"in":true,"bg":"#EFF6FF","fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"G10","v":0,"in":true,"bg":"#EFF6FF","fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"H10","v":0,"in":true,"bg":"#EFF6FF","fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"I10","v":576.75,"f":"=F5-(G6+G7+G8)+H9","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":"ELEV-S","fg":"#1E293B","al":"center"},{"c":"B11","v":"الواجهة الجنوبية الخلفية - مسطح الحائط الخرساني والمباني الإجمالي","fg":"#1E293B"},{"c":"C11","v":1,"in":true,"fg":"#1E293B","al":"center"},{"c":"D11","v":28,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E11","v":22.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F11","v":630,"f":"=C11*D11*E11","b":true,"al":"center","nf":"#,##0.00"},{"c":"G11","v":0,"in":true,"fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"H11","v":0,"in":true,"fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"I11","v":630,"f":"=F11-G11+H11","b":true,"al":"center","nf":"#,##0.00"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":"ELEV-S-W2","fg":"#1E293B","al":"center"},{"c":"B12","v":"  - خصم فتحات النوافذ القياسية المتكررة طراز W2","fg":"#1E293B"},{"c":"C12","v":16,"in":true,"fg":"#1E293B","al":"center"},{"c":"D12","v":1.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E12","v":1.8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F12","v":0,"in":true,"fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"G12","v":43.2,"f":"=C12*D12*E12","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"H12","v":0,"in":true,"fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"I12","v":0,"in":true,"b":true,"al":"center","nf":"#,##0.00"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":"ELEV-S-W3","fg":"#1E293B","al":"center"},{"c":"B13","v":"  - خصم فتحات نوافذ الخدمات والمطابخ طراز W3","fg":"#1E293B"},{"c":"C13","v":10,"in":true,"fg":"#1E293B","al":"center"},{"c":"D13","v":1,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E13","v":1.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F13","v":0,"in":true,"fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"G13","v":12,"f":"=C13*D13*E13","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"H13","v":0,"in":true,"fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"I13","v":0,"in":true,"b":true,"al":"center","nf":"#,##0.00"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":"ELEV-S-REV","fg":"#1E293B","al":"center"},{"c":"B14","v":"  - إضافة مسطح كشف الجلسات والسواقط الغاطسة (عمق 0.25 م)","fg":"#1E293B"},{"c":"C14","v":26,"in":true,"fg":"#1E293B","al":"center"},{"c":"D14","v":4.4,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E14","v":0.25,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F14","v":0,"in":true,"fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"G14","v":0,"in":true,"fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"H14","v":28.6,"f":"=C14*D14*E14","bg":"#ECFDF5","b":true,"al":"center","nf":"#,##0.00"},{"c":"I14","v":0,"in":true,"b":true,"al":"center","nf":"#,##0.00"}]},{"r":15,"h":36.0,"cells":[{"c":"A15","v":"ELEV-S-NET","bg":"#EFF6FF","b":true,"al":"center"},{"c":"B15","v":"صافي مسطح تكسيات الواجهة الجنوبية الخلفية (حجر ورخام)","bg":"#EFF6FF","b":true},{"c":"C15","v":1,"in":true,"bg":"#EFF6FF","b":true,"al":"center"},{"c":"D15","v":"-","bg":"#EFF6FF","fg":"#1E293B","al":"center"},{"c":"E15","v":"-","bg":"#EFF6FF","fg":"#1E293B","al":"center"},{"c":"F15","v":0,"in":true,"bg":"#EFF6FF","fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"G15","v":0,"in":true,"bg":"#EFF6FF","fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"H15","v":0,"in":true,"bg":"#EFF6FF","fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"I15","v":603.4,"f":"=F11-(G12+G13)+H14","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":"ELEV-E","fg":"#1E293B","al":"center"},{"c":"B16","v":"الواجهة الشرقية الجانبية - مسطح الحائط الخرساني والمباني الإجمالي","fg":"#1E293B"},{"c":"C16","v":1,"in":true,"fg":"#1E293B","al":"center"},{"c":"D16","v":18.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E16","v":22.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F16","v":416.25,"f":"=C16*D16*E16","b":true,"al":"center","nf":"#,##0.00"},{"c":"G16","v":0,"in":true,"fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"H16","v":0,"in":true,"fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"I16","v":416.25,"f":"=F16-G16+H16","b":true,"al":"center","nf":"#,##0.00"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":"ELEV-E-W2","fg":"#1E293B","al":"center"},{"c":"B17","v":"  - خصم فتحات النوافذ المتكررة طراز W2","fg":"#1E293B"},{"c":"C17","v":12,"in":true,"fg":"#1E293B","al":"center"},{"c":"D17","v":1.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E17","v":1.8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F17","v":0,"in":true,"fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"G17","v":32.4,"f":"=C17*D17*E17","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"H17","v":0,"in":true,"fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"I17","v":0,"in":true,"b":true,"al":"center","nf":"#,##0.00"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":"ELEV-E-REV","fg":"#1E293B","al":"center"},{"c":"B18","v":"  - إضافة مسطح كشف الجلسات والسواقط الغاطسة (عمق 0.25 م)","fg":"#1E293B"},{"c":"C18","v":12,"in":true,"fg":"#1E293B","al":"center"},{"c":"D18","v":4.4,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E18","v":0.25,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F18","v":0,"in":true,"fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"G18","v":0,"in":true,"fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"H18","v":13.2,"f":"=C18*D18*E18","bg":"#ECFDF5","b":true,"al":"center","nf":"#,##0.00"},{"c":"I18","v":0,"in":true,"b":true,"al":"center","nf":"#,##0.00"}]},{"r":19,"h":36.0,"cells":[{"c":"A19","v":"ELEV-E-NET","bg":"#EFF6FF","b":true,"al":"center"},{"c":"B19","v":"صافي مسطح تكسيات الواجهة الشرقية الجانبية (حجر ورخام)","bg":"#EFF6FF","b":true},{"c":"C19","v":1,"in":true,"bg":"#EFF6FF","b":true,"al":"center"},{"c":"D19","v":"-","bg":"#EFF6FF","fg":"#1E293B","al":"center"},{"c":"E19","v":"-","bg":"#EFF6FF","fg":"#1E293B","al":"center"},{"c":"F19","v":0,"in":true,"bg":"#EFF6FF","fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"G19","v":0,"in":true,"bg":"#EFF6FF","fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"H19","v":0,"in":true,"bg":"#EFF6FF","fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"I19","v":397.05,"f":"=F16-G17+H18","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":"ELEV-W","fg":"#1E293B","al":"center"},{"c":"B20","v":"الواجهة الغربية الجانبية - مسطح الحائط الخرساني والمباني الإجمالي","fg":"#1E293B"},{"c":"C20","v":1,"in":true,"fg":"#1E293B","al":"center"},{"c":"D20","v":18.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E20","v":22.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F20","v":416.25,"f":"=C20*D20*E20","b":true,"al":"center","nf":"#,##0.00"},{"c":"G20","v":0,"in":true,"fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"H20","v":0,"in":true,"fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"I20","v":416.25,"f":"=F20-G20+H20","b":true,"al":"center","nf":"#,##0.00"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":"ELEV-W-W2","fg":"#1E293B","al":"center"},{"c":"B21","v":"  - خصم فتحات النوافذ المتكررة طراز W2","fg":"#1E293B"},{"c":"C21","v":10,"in":true,"fg":"#1E293B","al":"center"},{"c":"D21","v":1.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E21","v":1.8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F21","v":0,"in":true,"fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"G21","v":27,"f":"=C21*D21*E21","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"H21","v":0,"in":true,"fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"I21","v":0,"in":true,"b":true,"al":"center","nf":"#,##0.00"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":"ELEV-W-REV","fg":"#1E293B","al":"center"},{"c":"B22","v":"  - إضافة مسطح كشف الجلسات والسواقط الغاطسة (عمق 0.25 م)","fg":"#1E293B"},{"c":"C22","v":10,"in":true,"fg":"#1E293B","al":"center"},{"c":"D22","v":4.4,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E22","v":0.25,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F22","v":0,"in":true,"fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"G22","v":0,"in":true,"fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"H22","v":11,"f":"=C22*D22*E22","bg":"#ECFDF5","b":true,"al":"center","nf":"#,##0.00"},{"c":"I22","v":0,"in":true,"b":true,"al":"center","nf":"#,##0.00"}]},{"r":23,"h":36.0,"cells":[{"c":"A23","v":"ELEV-W-NET","bg":"#EFF6FF","b":true,"al":"center"},{"c":"B23","v":"صافي مسطح تكسيات الواجهة الغربية الجانبية (حجر ورخام)","bg":"#EFF6FF","b":true},{"c":"C23","v":1,"in":true,"bg":"#EFF6FF","b":true,"al":"center"},{"c":"D23","v":"-","bg":"#EFF6FF","fg":"#1E293B","al":"center"},{"c":"E23","v":"-","bg":"#EFF6FF","fg":"#1E293B","al":"center"},{"c":"F23","v":0,"in":true,"bg":"#EFF6FF","fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"G23","v":0,"in":true,"bg":"#EFF6FF","fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"H23","v":0,"in":true,"bg":"#EFF6FF","fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"I23","v":400.25,"f":"=F20-G21+H22","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":"ELEV-PAR","fg":"#1E293B","al":"center"},{"c":"B24","v":"سترة السطح والملحق العلوي (المحيط الخارجي بالكامل)","fg":"#1E293B"},{"c":"C24","v":1,"in":true,"fg":"#1E293B","al":"center"},{"c":"D24","v":93,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E24","v":1.4,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F24","v":130.2,"f":"=C24*D24*E24","b":true,"al":"center","nf":"#,##0.00"},{"c":"G24","v":0,"in":true,"fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"H24","v":0,"in":true,"fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"I24","v":130.2,"f":"=F24-G24+H24","b":true,"al":"center","nf":"#,##0.00"}]},{"r":25,"h":36.0,"cells":[{"c":"A25","v":"ELEV-PAR-NET","bg":"#EFF6FF","b":true,"al":"center"},{"c":"B25","v":"صافي مسطح تكسيات سترة السطح والمشايات العلوية","bg":"#EFF6FF","b":true},{"c":"C25","v":1,"in":true,"bg":"#EFF6FF","b":true,"al":"center"},{"c":"D25","v":"-","bg":"#EFF6FF","fg":"#1E293B","al":"center"},{"c":"E25","v":"-","bg":"#EFF6FF","fg":"#1E293B","al":"center"},{"c":"F25","v":0,"in":true,"bg":"#EFF6FF","fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"G25","v":0,"in":true,"bg":"#EFF6FF","fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"H25","v":0,"in":true,"bg":"#EFF6FF","fg":"#64748B","al":"center","nf":"#,##0.00"},{"c":"I25","v":130.2,"f":"=F24","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":26,"h":28.0,"cells":[{"c":"A26","v":""},{"c":"B26","v":""},{"c":"C26","v":""},{"c":"D26","v":""},{"c":"E26","v":""},{"c":"F26","v":""},{"c":"G26","v":""},{"c":"H26","v":""},{"c":"I26","v":""}]},{"r":27,"h":38.0,"cells":[{"c":"A27","v":"إجمالي المسطحات الإجمالية لكافة الواجهات (Gross Facade Area)","bg":"#E2E8F0","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F27","v":2222.7,"f":"=F5+F11+F16+F20+F24","b":true,"al":"center","nf":"#,##0.00"},{"c":"G27","v":196.2,"f":"=G6+G7+G8+G12+G13+G17+G21","b":true,"al":"center","nf":"#,##0.00"},{"c":"H27","v":81.15,"f":"=H9+H14+H18+H22","b":true,"al":"center","nf":"#,##0.00"},{"c":"I27","v":2107.65,"f":"=I10+I15+I19+I23+I25","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":28,"h":34.0,"cells":[{"c":"A28","v":"إجمالي مسطح تكسية حجر الرياض الطبيعي (75% من الصافي)","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G28","v":1580.7375,"f":"=I27*0.75","b":true,"al":"center","nf":"#,##0.00","cs":2},{"skip":true},{"c":"I28","v":"م²","b":true,"al":"center"}]},{"r":29,"h":34.0,"cells":[{"c":"A29","v":"إجمالي مسطح تكسية رخام ترافنتينو للتطعيمات (25% من الصافي)","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G29","v":526.9125,"f":"=I27*0.25","b":true,"al":"center","nf":"#,##0.00","cs":2},{"skip":true},{"c":"I29","v":"م²","b":true,"al":"center"}]},{"r":30,"h":34.0,"cells":[{"c":"A30","v":"كمية حجر الرياض المطلوبة للتوريد شاملة الهالك (8%)","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G30","v":"م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²","f":"=I28*(1+'إعدادات_المشروع_والأسعار'!$D$21)","b":true,"al":"center","nf":"#,##0.00","cs":2},{"skip":true},{"c":"I30","v":"م²","b":true,"al":"center"}]},{"r":31,"h":34.0,"cells":[{"c":"A31","v":"كمية رخام الترافنتينو المطلوبة للتوريد شاملة الهالك (8%)","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G31","v":"م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²","f":"=I29*(1+'إعدادات_المشروع_والأسعار'!$D$21)","b":true,"al":"center","nf":"#,##0.00","cs":2},{"skip":true},{"c":"I31","v":"م²","b":true,"al":"center"}]},{"r":32,"h":34.0,"cells":[{"c":"A32","v":"إجمالي أطوال أغطية دروة السطح Coping Stone (متر طولي)","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G32","v":93,"in":true,"b":true,"al":"center","nf":"#,##0.00","cs":2},{"skip":true},{"c":"I32","v":"م.ط","b":true,"al":"center"}]}]},{"name":"حسابات_سقالات_الواجهات","maxRow":30,"maxCol":7,"colWidths":[16.0,60.0,20.0,15.0,22.0,24.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"شيت الحسابات الهندسية لسقالات الواجهات المعدنية Cuplock وحصر التكاليف التشغيلية والإيجار","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"تصميم منظومة السقالات المعدنية للواجهات وفق اشتراطات السلامة المهنية OSHA 1926 Subpart L و ANSI A10.8 وحساب التكاليف المباشرة والإيجار الشهري","bg":"#1E3A8A","fg":"#F8FAFC","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"📐 أولاً: الأبعاد الهندسية لمنظومة سقالات الواجهات (Scaffolding Geometry & Standards)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"SCAF-P01","b":true,"al":"center"},{"c":"B5","v":"المحيط الخارجي الإجمالي لمسار السقالات حول المبنى","fg":"#1E293B"},{"c":"C5","v":93,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"D5","v":"متر طولي","b":true,"al":"center"},{"c":"E5","v":"محيط المبنى الإجمالي للأربع واجهات","fg":"#64748B","cs":3},{"skip":true},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"SCAF-P02","b":true,"al":"center"},{"c":"B6","v":"ارتفاع السقالة التشغيلي الكلي شامل الدروة والدرابزين","fg":"#1E293B"},{"c":"C6","v":24,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"D6","v":"متر","b":true,"al":"center"},{"c":"E6","v":"ارتفاع الواجهات 22.5 م + درابزين أمان علوي 1.5 م","fg":"#64748B","cs":3},{"skip":true},{"skip":true}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"SCAF-P03","b":true,"al":"center"},{"c":"B7","v":"إجمالي مسطح الاتصال الخارجي المغطى بالسقالات (Scaffolding Surface)","fg":"#1E293B"},{"c":"C7","v":2232,"f":"=C5*C6","b":true,"al":"center","nf":"#,##0.00"},{"c":"D7","v":"م²","b":true,"al":"center"},{"c":"E7","v":"حاصل ضرب المحيط في الارتفاع الكلي (93 × 24)","fg":"#64748B","cs":3},{"skip":true},{"skip":true}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"SCAF-P04","b":true,"al":"center"},{"c":"B8","v":"طول الباكية القياسية النموذجية (Standard Bay Length)","fg":"#1E293B"},{"c":"C8","v":2.4,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"D8","v":"متر","b":true,"al":"center"},{"c":"E8","v":"المسافة الأفقية بين القوائم الرأسية (نظام Cuplock)","fg":"#64748B","cs":3},{"skip":true},{"skip":true}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"SCAF-P05","b":true,"al":"center"},{"c":"B9","v":"عرض ممر السقالة التشغيلي (Scaffold Width / Bay Width)","fg":"#1E293B"},{"c":"C9","v":1.2,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"D9","v":"متر","b":true,"al":"center"},{"c":"E9","v":"عرض مناسب لتشوين الحجر وحركة عمال التركيب","fg":"#64748B","cs":3},{"skip":true},{"skip":true}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":"SCAF-P06","b":true,"al":"center"},{"c":"B10","v":"ارتفاع الحطة الواحدة (Lift Height / Vertical Spacing)","fg":"#1E293B"},{"c":"C10","v":2,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"D10","v":"متر","b":true,"al":"center"},{"c":"E10","v":"ارتفاع قياسي مريح وفق معايير OSHA للعمل الموقعي","fg":"#64748B","cs":3},{"skip":true},{"skip":true}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":"SCAF-P07","b":true,"al":"center"},{"c":"B11","v":"عدد الحطات الرأسية الكاملة (Number of Working Lifts)","fg":"#1E293B"},{"c":"C11","v":12,"f":"=C6/C10","b":true,"al":"center","nf":"#,##0.00"},{"c":"D11","v":"حطة","b":true,"al":"center"},{"c":"E11","v":"24 م / 2 م = 12 حطة رأسية","fg":"#64748B","cs":3},{"skip":true},{"skip":true}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":"SCAF-P08","b":true,"al":"center"},{"c":"B12","v":"عدد الباكيات الأفقية على كامل المحيط (Number of Bays)","fg":"#1E293B"},{"c":"C12","v":39,"f":"=ROUNDUP(C5/C8, 0)","b":true,"al":"center","nf":"#,##0.00"},{"c":"D12","v":"باكية","b":true,"al":"center"},{"c":"E12","v":"93 م / 2.4 م = 39 باكية أفقية","fg":"#64748B","cs":3},{"skip":true},{"skip":true}]},{"r":13,"h":28.0,"cells":[{"c":"A13","v":""},{"c":"B13","v":""},{"c":"C13","v":""},{"c":"D13","v":""},{"c":"E13","v":""},{"c":"F13","v":""},{"c":"G13","v":""}]},{"r":14,"h":38.0,"cells":[{"c":"A14","v":"🔩 ثانياً: حصر عناصر ومكونات السقالة النموذجية وأدوات الأمان (Scaffolding Elements Takeoff)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":15,"h":40.0,"cells":[{"c":"A15","v":"كود العنصر","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B15","v":"توصيف عنصر السقالة والمعدات","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C15","v":"معادلة الحصر الهندسي","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D15","v":"الكمية المحسوبة","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E15","v":"الوحدة","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F15","v":"معدل الأمان","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G15","v":"المطابقة والملاحظات","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":"SCAF-E01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B16","v":"القوائم الرأسية Cuplock Standards طول 3.0 م مع كؤوس الربط","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C16","v":640,"f":"=(C12+1)*2*8","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"D16","v":640,"f":"=(C12+1)*2*8","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"E16","v":"عدد","bg":"#F8FAFC","b":true,"al":"center"},{"c":"F16","v":"أمان 4:1","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G16","v":"أنابيب صلب مجلفن قطر 48.3 مم سمك 3.2 مم","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":"SCAF-E02","b":true,"al":"center"},{"c":"B17","v":"البرندات الطولية Ledgers طول 2.40 م ذات النهايات المروية","fg":"#1E293B"},{"c":"C17","v":936,"f":"=C12*2*C11","fg":"#64748B","al":"center"},{"c":"D17","v":936,"f":"=C12*2*C11","b":true,"al":"center","nf":"#,##0"},{"c":"E17","v":"عدد","b":true,"al":"center"},{"c":"F17","v":"نظام قفل آلي","b":true,"al":"center"},{"c":"G17","v":"ربط القوائم طولياً في كل حطة لمنع التحنيب","fg":"#1E293B"}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":"SCAF-E03","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B18","v":"البرندات العرضية Transoms طول 1.20 م","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C18","v":480,"f":"=(C12+1)*C11","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"D18","v":480,"f":"=(C12+1)*C11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"E18","v":"عدد","bg":"#F8FAFC","b":true,"al":"center"},{"c":"F18","v":"حمل 250 كجم/م²","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G18","v":"حمل ألواح الصاج وتشيل أوزان الحجر ومعدات التركيب","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":"SCAF-E04","b":true,"al":"center"},{"c":"B19","v":"ألواح المشايات المعدنية المقاومة للانزلاق (Metal Steel Planks)","fg":"#1E293B"},{"c":"C19","v":468,"f":"=C12*3*4","fg":"#64748B","al":"center"},{"c":"D19","v":468,"f":"=C12*3*4","b":true,"al":"center","nf":"#,##0"},{"c":"E19","v":"لوح","b":true,"al":"center"},{"c":"F19","v":"مانع للانزلاق","b":true,"al":"center"},{"c":"G19","v":"تغطية 4 حطات تشغيلية متزامنة بعرض 3 ألواح","fg":"#1E293B"}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":"SCAF-E05","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B20","v":"مرابط التثبيت الجدارية مع الحائط الإنشائي (Wall Ties & Anchors)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C20","v":93,"f":"=(C5/6)*(C6/4)","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"D20","v":93,"f":"=(C5/6)*(C6/4)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"E20","v":"رابط جداري","bg":"#F8FAFC","b":true,"al":"center"},{"c":"F20","v":"OSHA 1926","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G20","v":"تثبيت كل 4 م رأسي وكل 6 م أفقي لمقاومة قوى الرياح","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":21,"h":52.0,"cells":[{"c":"A21","v":"SCAF-E06","b":true,"al":"center"},{"c":"B21","v":"شبك حماية خارجي مانع لتساقط الركام والأدوات (Debris Safety Netting)","fg":"#1E293B"},{"c":"C21","v":2232,"f":"=C7","fg":"#64748B","al":"center"},{"c":"D21","v":2232,"f":"=C7","b":true,"al":"center","nf":"#,##0"},{"c":"E21","v":"م²","b":true,"al":"center"},{"c":"F21","v":"حماية المارة","b":true,"al":"center"},{"c":"G21","v":"تغطية كامل مسطح السقالات الخارجي بشبك بولي إيثيلين","fg":"#1E293B"}]},{"r":22,"h":52.0,"cells":[{"c":"A22","v":"SCAF-E07","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B22","v":"سلالم صعود معدنية داخلية مع درابزين أمان (Access Ladders)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C22","v":12,"f":"=C11","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"D22","v":12,"f":"=C11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"E22","v":"سلم","bg":"#F8FAFC","b":true,"al":"center"},{"c":"F22","v":"صعود آمن","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G22","v":"سلم داخلي لكل حطة مع فتحة وصول مجهزة بباب غالق","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":23,"h":28.0,"cells":[{"c":"A23","v":""},{"c":"B23","v":""},{"c":"C23","v":""},{"c":"D23","v":""},{"c":"E23","v":""},{"c":"F23","v":""},{"c":"G23","v":""}]},{"r":24,"h":38.0,"cells":[{"c":"A24","v":"💵 ثالثاً: التحليل المالي وتكاليف التركيب والإيجار الشهري للسقالات (Scaffolding Financial Model)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":"SCAF-C01","b":true,"al":"center"},{"c":"B25","v":"مسطح السقالات الإجمالي الخاضع للتركيب والفك والإيجار","fg":"#1E293B"},{"c":"C25","v":2232,"f":"=C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"D25","v":"م²","b":true,"al":"center"},{"c":"E25","v":"-","b":true,"al":"center"},{"c":"F25","v":"المسطح الإجمالي للواجهات المغطاة","fg":"#64748B","cs":2},{"skip":true}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":"SCAF-C02","b":true,"al":"center"},{"c":"B26","v":"تكلفة مصنعية تركيب وفك وتشوين السقالات بالموقع","fg":"#1E293B"},{"c":"C26","v":48,"f":"='إعدادات_المشروع_والأسعار'!$D$18","b":true,"al":"center","nf":"#,##0.00"},{"c":"D26","v":"ر.س/م²","b":true,"al":"center"},{"c":"E26","v":"تكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقعتكلفة مصنعية تركيب وفك وتشوين السقالات بالموقع","f":"=B26*C26","b":true,"al":"center","nf":"#,##0.00"},{"c":"F26","v":"حاصل ضرب المسطح في فئة التركيب والفك","fg":"#64748B","cs":2},{"skip":true}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":"SCAF-C03","b":true,"al":"center"},{"c":"B27","v":"مدة إيجار السقالات المخططة لكامل مراحل المشروع","fg":"#1E293B"},{"c":"C27","v":65,"f":"='إعدادات_المشروع_والأسعار'!$D$20","b":true,"al":"center","nf":"#,##0.00"},{"c":"D27","v":"شهر","b":true,"al":"center"},{"c":"E27","v":"-","b":true,"al":"center"},{"c":"F27","v":"4 شهور لإنجاز كامل أعمال التكسيات","fg":"#64748B","cs":2},{"skip":true}]},{"r":28,"h":34.0,"cells":[{"c":"A28","v":"SCAF-C04","b":true,"al":"center"},{"c":"B28","v":"فئة الإيجار الشهري للمتر المربع من السقالات","fg":"#1E293B"},{"c":"C28","v":18,"f":"='إعدادات_المشروع_والأسعار'!$D$19","b":true,"al":"center","nf":"#,##0.00"},{"c":"D28","v":"ر.س/م²/شهر","b":true,"al":"center"},{"c":"E28","v":"-","b":true,"al":"center"},{"c":"F28","v":"فئة تأجير السوق المعتمدة في شيت الأسعار","fg":"#64748B","cs":2},{"skip":true}]},{"r":29,"h":34.0,"cells":[{"c":"A29","v":"SCAF-C05","b":true,"al":"center"},{"c":"B29","v":"إجمالي تكلفة إيجار السقالات عن كامل مدة المشروع (4 شهور)","fg":"#1E293B"},{"c":"C29","v":"","f":"=B26*C28*C29","b":true,"al":"center","nf":"#,##0.00"},{"c":"D29","v":"ر.س","b":true,"al":"center"},{"c":"E29","v":"","f":"=B26*C28*C29","b":true,"al":"center","nf":"#,##0.00"},{"c":"F29","v":"مسطح السقالات × فئة الإيجار الشهري × عدد الشهور","fg":"#64748B","cs":2},{"skip":true}]},{"r":30,"h":34.0,"cells":[{"c":"A30","v":"SCAF-C06","bg":"#EFF6FF","b":true,"al":"center"},{"c":"B30","v":"إجمالي التكلفة الاستثمارية الكلية لبند السقالات (تركيب + إيجار)","bg":"#EFF6FF","b":true},{"c":"C30","v":0,"f":"=E27+E30","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"D30","v":"ر.س","bg":"#EFF6FF","b":true,"al":"center"},{"c":"E30","v":0,"f":"=E27+E30","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F30","v":"مجموع تكلفة التركيب والفك + إجمالي الإيجار","bg":"#EFF6FF","fg":"#64748B","cs":2},{"skip":true}]}]},{"name":"مقايسة_الأعمال_والتسعير_BOQ","maxRow":25,"maxCol":7,"colWidths":[8.0,64.0,14.0,20.0,20.0,24.0,38.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول الكميات والأسعار والمقايسة التثمينية الشاملة لتكسيات الواجهات بالحجر والرخام والسقالات","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"مقايسة تسعيرية متكاملة تشمل المواد والمصنعيات وأنظمة التثبيت الميكانيكي والعوازل وسقالات الواجهات والمصاريف الإدارية وضريبة VAT","bg":"#1E3A8A","fg":"#F8FAFC","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":42.0,"cells":[{"c":"A4","v":"م","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"بيان الأعمال والتوصيف الفني للبند المعماري","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"الوحدة","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"الكمية المحصورة","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"فئة البند (ر.س)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"إجمالي القيمة (ر.س)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"المرجعية والملاحظات","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":1,"b":true,"al":"center"},{"c":"B5","v":"توريد حجر الرياض الطبيعي المجلي/الممشط سمك 30 مم نخب أول للواجهات شاملاً الهالك المعتمد (8%)","fg":"#1E293B"},{"c":"C5","v":"م²","b":true,"al":"center"},{"c":"D5","v":526.9125,"f":"='حصر_مسطحات_الواجهات_والفتحات'!$G$29","b":true,"al":"center","nf":"#,##0.00"},{"c":"E5","v":"كود المستند الهندسي","f":"='إعدادات_المشروع_والأسعار'!$D$9","b":true,"al":"center","nf":"#,##0.00"},{"c":"F5","v":0,"f":"=D5*E5","b":true,"al":"center","nf":"#,##0.00"},{"c":"G5","v":"ASTM C568 نخب أول","fg":"#64748B"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":2,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B6","v":"توريد رخام ترافنتينو بيج سمك 30 مم للتطعيمات والبانوهات المعمارية شاملاً الهالك (8%)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C6","v":"م²","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D6","v":"م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²","f":"='حصر_مسطحات_الواجهات_والفتحات'!$G$30","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E6","v":0,"f":"='إعدادات_المشروع_والأسعار'!$D$10","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"F6","v":"","f":"=D6*E6","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G6","v":"ASTM C503 عالي الكثافة","bg":"#F8FAFC","fg":"#64748B"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":3,"b":true,"al":"center"},{"c":"B7","v":"توريد زوايا وكانات التثبيت الميكانيكي ستانلس ستيل 304 ومسامير التثبيت التوسعية M10","fg":"#1E293B"},{"c":"C7","v":"م²","b":true,"al":"center"},{"c":"D7","v":2107.65,"f":"='حصر_مسطحات_الواجهات_والفتحات'!$I$27","b":true,"al":"center","nf":"#,##0.00"},{"c":"E7","v":"ر.س SAR","f":"='إعدادات_المشروع_والأسعار'!$D$13","b":true,"al":"center","nf":"#,##0.00"},{"c":"F7","v":0,"f":"=D7*E7","b":true,"al":"center","nf":"#,##0.00"},{"c":"G7","v":"ASTM C1242 ستانلس 304","fg":"#64748B"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":4,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B8","v":"مصنعية تركيب الحجر الطبيعي والرخام ميكانيكياً وفق خطوط الشيرب والوزنات الرأسية والأفقية","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C8","v":"م²","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D8","v":2107.65,"f":"='حصر_مسطحات_الواجهات_والفتحات'!$I$27","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E8","v":0,"f":"='إعدادات_المشروع_والأسعار'!$D$11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"F8","v":0,"f":"=D8*E8","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G8","v":"عمالة ماهرة متخصصة","bg":"#F8FAFC","fg":"#64748B"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":5,"b":true,"al":"center"},{"c":"B9","v":"توريد وتركيب عازل حراري صوف صخري Rockwool سمك 50 مم كثافة 50 كجم/م³ مع قماش الفايبر","fg":"#1E293B"},{"c":"C9","v":"م²","b":true,"al":"center"},{"c":"D9","v":2107.65,"f":"='حصر_مسطحات_الواجهات_والفتحات'!$I$27","b":true,"al":"center","nf":"#,##0.00"},{"c":"E9","v":"القيمة / الفئة المرجعية","f":"='إعدادات_المشروع_والأسعار'!$D$12","b":true,"al":"center","nf":"#,##0.00"},{"c":"F9","v":0,"f":"=D9*E9","b":true,"al":"center","nf":"#,##0.00"},{"c":"G9","v":"SBC 801 غير قابل للاحتراق","fg":"#64748B"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":6,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B10","v":"معالجة وحقن فواصل التمدد الإنشائية وفواصل الحجر بمعجون بولي يوريثان وباك رينج مطاطي","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C10","v":"م.ط","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D10","v":420,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E10","v":165,"f":"='إعدادات_المشروع_والأسعار'!$D$14","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"F10","v":69300,"f":"=D10*E10","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G10","v":"سيكافليكس مقاوم لـ UV","bg":"#F8FAFC","fg":"#64748B"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":7,"b":true,"al":"center"},{"c":"B11","v":"توريد وتركيب رخام كاشفات الجلسات والسواقط للنوافذ والمداخل بعمق 25 سم وشطف الحواف","fg":"#1E293B"},{"c":"C11","v":"م.ط","b":true,"al":"center"},{"c":"D11","v":260,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E11","v":245,"f":"='إعدادات_المشروع_والأسعار'!$D$15","b":true,"al":"center","nf":"#,##0.00"},{"c":"F11","v":63700,"f":"=D11*E11","b":true,"al":"center","nf":"#,##0.00"},{"c":"G11","v":"شامل ميازيب تصريف المياه","fg":"#64748B"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":8,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B12","v":"توريد وتركيب أغطية دروة السطح Coping Stone سمك 40 مم مع ميزاب قطرة ماء سفلية","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C12","v":"م.ط","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D12","v":"م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²","f":"='حصر_مسطحات_الواجهات_والفتحات'!$G$31","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E12","v":115,"f":"='إعدادات_المشروع_والأسعار'!$D$16","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"F12","v":"م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²م²","f":"=D12*E12","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G12","v":"حماية الواجهات من الأمطار","bg":"#F8FAFC","fg":"#64748B"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":9,"b":true,"al":"center"},{"c":"B13","v":"أعمال دهان وتشريب الحجر بالمواد العازلة الشفافة السيلر السيليكوني المقاوم للأتربة والرطوبة","fg":"#1E293B"},{"c":"C13","v":"م²","b":true,"al":"center"},{"c":"D13","v":2107.65,"f":"='حصر_مسطحات_الواجهات_والفتحات'!$I$27","b":true,"al":"center","nf":"#,##0.00"},{"c":"E13","v":34,"f":"='إعدادات_المشروع_والأسعار'!$D$17","b":true,"al":"center","nf":"#,##0.00"},{"c":"F13","v":71660.1,"f":"=D13*E13","b":true,"al":"center","nf":"#,##0.00"},{"c":"G13","v":"حماية 5 سنوات بدون تغيير اللون","fg":"#64748B"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":10,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B14","v":"إجراء اختبارات موقعية معتمدة لسحب كانات التثبيت الميكانيكي (Pull-out Test) عبر مختبر معتمد","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C14","v":"مقطوعية","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D14","v":1,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E14","v":8500,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"F14","v":8500,"f":"=D14*E14","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G14","v":"شهادة معايرة معتمدة","bg":"#F8FAFC","fg":"#64748B"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":11,"b":true,"al":"center"},{"c":"B15","v":"أعمال تركيب وتشوين وفك سقالات الواجهات المعدنية النموذجية Cuplock لكامل محيط المبنى","fg":"#1E293B"},{"c":"C15","v":"م²","b":true,"al":"center"},{"c":"D15","v":2232,"f":"='حسابات_سقالات_الواجهات'!$C$7","b":true,"al":"center","nf":"#,##0.00"},{"c":"E15","v":48,"f":"='إعدادات_المشروع_والأسعار'!$D$18","b":true,"al":"center","nf":"#,##0.00"},{"c":"F15","v":107136,"f":"=D15*E15","b":true,"al":"center","nf":"#,##0.00"},{"c":"G15","v":"OSHA 1926 Subpart L","fg":"#64748B"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":12,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B16","v":"إيجار سقالات الواجهات المعدنية الشهرية طوال فترة تنفيذ أعمال التكسيات (4 شهور)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C16","v":"م²/شهر","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D16","v":8928,"f":"='حسابات_سقالات_الواجهات'!$C$7*4","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E16","v":18,"f":"='إعدادات_المشروع_والأسعار'!$D$19","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"F16","v":160704,"f":"=D16*E16","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G16","v":"إيجار شهري تعاقدي","bg":"#F8FAFC","fg":"#64748B"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":13,"b":true,"al":"center"},{"c":"B17","v":"توريد وتركيب شبك حماية ومظلات أمان علوية وسفلية لحماية المشاة والسيارات بالمحيط","fg":"#1E293B"},{"c":"C17","v":"مقطوعية","b":true,"al":"center"},{"c":"D17","v":1,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E17","v":12000,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F17","v":12000,"f":"=D17*E17","b":true,"al":"center","nf":"#,##0.00"},{"c":"G17","v":"اشتراطات السلامة والبلديات","fg":"#64748B"}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":14,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B18","v":"حماية وتغطية الواجهات الزجاجية والألومنيوم وفتحات التكييف بشرائح البولي إيثيلين المقوى","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C18","v":"مقطوعية","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D18","v":1,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E18","v":7500,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"F18","v":7500,"f":"=D18*E18","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G18","v":"حماية أثناء الرش والجلي","bg":"#F8FAFC","fg":"#64748B"}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":15,"b":true,"al":"center"},{"c":"B19","v":"أعمال التنظيف الكيميائي النهائي للواجهات بضغط الماء والمواد المنظفة الخاصة بالحجر","fg":"#1E293B"},{"c":"C19","v":"م²","b":true,"al":"center"},{"c":"D19","v":2107.65,"f":"='حصر_مسطحات_الواجهات_والفتحات'!$I$27","b":true,"al":"center","nf":"#,##0.00"},{"c":"E19","v":6.5,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F19","v":13699.725,"f":"=D19*E19","b":true,"al":"center","nf":"#,##0.00"},{"c":"G19","v":"تسليم استشاري نهائي","fg":"#64748B"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":16,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B20","v":"إعداد واعتماد المخططات التنفيذية As-Built ورسومات الشوب دروينج وتفريد الواجهات","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C20","v":"مقطوعية","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D20","v":1,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E20","v":9500,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"F20","v":9500,"f":"=D20*E20","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G20","v":"مخططات وتفريدات نهائية","bg":"#F8FAFC","fg":"#64748B"}]},{"r":21,"h":38.0,"cells":[{"c":"A21","v":"إجمالي التكاليف المباشرة لكافة بنود الواجهات والسقالات (Total Direct Cost)","bg":"#E2E8F0","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F21","v":523699.825,"f":"=SUM(F5:F20)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G21","v":"مجموع الـ 16 بنداً المباشرة","fg":"#64748B"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":"المصاريف الإدارية وهوامش الأرباح للمقاول (Overhead & Profit 15%)","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F22","v":7855497.375,"f":"=F21*'إعدادات_المشروع_والأسعار'!$D$22","b":true,"al":"center","nf":"#,##0.00"},{"c":"G22","v":"15% من التكاليف المباشرة","fg":"#64748B"}]},{"r":23,"h":36.0,"cells":[{"c":"A23","v":"إجمالي القيمة التقديرية قبل ضريبة القيمة المضافة (Total Before VAT)","bg":"#E2E8F0","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F23","v":8379197.2,"f":"=F21+F22","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00"},{"c":"G23","v":"مباشر + غير مباشر","fg":"#64748B"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":"ضريبة القيمة المضافة النظامية (VAT 15%)","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F24","v":121498359.4,"f":"=F23*'إعدادات_المشروع_والأسعار'!$D$23","b":true,"al":"center","nf":"#,##0.00"},{"c":"G24","v":"15% ضريبة نظامية","fg":"#64748B"}]},{"r":25,"h":44.0,"cells":[{"c":"A25","v":"القيمة الإجمالية التعاقدية للمشروع شاملة الضريبة (Grand Total with VAT)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F25","v":129877556.6,"f":"=F23+F24","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G25","v":"شامل المواد والمصنعيات والسقالات والضريبة","fg":"#64748B"}]}]},{"name":"لوحة_المؤشرات_والملخص_التنفيذي","maxRow":21,"maxCol":7,"colWidths":[22.0,24.0,26.0,24.0,20.0,22.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"لوحة المؤشرات التنفيذية ومصفوفة التحقق الهندسي وتكاليف تكسيات الواجهات والسقالات","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"ملخص مؤشرات الأداء الفنية والمالية ومطابقة مواصفات التثبيت الميكانيكي ASTM C1242 ومعايير السلامة OSHA 1926 واعتماد الاستشاري","bg":"#1E3A8A","fg":"#F8FAFC","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"مسطح التكسيات الصافي للواجهات","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"مسطح السقالات الخارجي الإجمالي","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"متوسط تكلفة المتر المربع الشامل","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center"},{"c":"F4","v":"إجمالي القيمة التقديرية للمشروع","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true}]},{"r":5,"h":46.0,"cells":[{"c":"A5","v":2107.65,"f":"='حصر_مسطحات_الواجهات_والفتحات'!$I$27","bg":"#F1F5F9","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0\" م²\"","cs":2},{"skip":true},{"c":"C5","v":2232,"f":"='حسابات_سقالات_الواجهات'!$C$7","bg":"#F1F5F9","fg":"#B45309","b":true,"al":"center","nf":"#,##0.0\" م²\"","cs":2},{"skip":true},{"c":"E5","v":0,"f":"=F25/'حصر_مسطحات_الواجهات_والفتحات'!$I$27","bg":"#F1F5F9","fg":"#047857","b":true,"al":"center","nf":"#,##0.00\" ر.س/م²\""},{"c":"F5","v":129877556.6,"f":"='مقايسة_الأعمال_والتسعير_BOQ'!$F$25","bg":"#F1F5F9","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00\" ر.س\"","cs":2},{"skip":true}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"صافي المسطح بعد خصم الفتحات والسواقط","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C6","v":"محيط 93 م × ارتفاع 24 م (نظام Cuplock)","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"E6","v":"شامل المواد والمصنعية والسقالات والضريبة","bg":"#F1F5F9","fg":"#64748B","al":"center"},{"c":"F6","v":"شاملة ضريبة القيمة المضافة VAT 15%","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"📋 مصفوفة التحقق الهندسي ومطابقة معايير الكود السعودي والأمريكي (Compliance Matrix)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":40.0,"cells":[{"c":"A9","v":"البند والمعيار الهندسي","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"الكود المرجعي القياسي","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"المواصفة المعتمدة في التصميم","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"حالة التحقق الهندسي","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"مستوى الأمان","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"الإجراء الموقعي المطلوب","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"المسؤول عن الفحص","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":10,"h":72.0,"cells":[{"c":"A10","v":"تثبيت الحجر الميكانيكي","bg":"#F8FAFC","b":true},{"c":"B10","v":"ASTM C1242","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C10","v":"كانات وزوايا ستانلس ستيل 304 مع فراغ هوائي 40 مم","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D10","v":"محقق ومطابق","bg":"#ECFDF5","b":true,"al":"center"},{"c":"E10","v":"معامل أمان 3.0","bg":"#F8FAFC","b":true,"al":"center"},{"c":"F10","v":"فحص مقاسات الكانات وسمك 4 مم وعدم استخدام حديد مجلفن","bg":"#F8FAFC","fg":"#1E293B"},{"c":"G10","v":"استشاري الواجهات","bg":"#F8FAFC","b":true,"al":"center"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"اختبار سحب الكانات الموقعي","b":true},{"c":"B11","v":"ASTM E488","b":true,"al":"center"},{"c":"C11","v":"إجراء اختبار شد وسحب ميكانيكي (Pull-out Test) في الموقع","fg":"#1E293B"},{"c":"D11","v":"محقق ومطابق","bg":"#ECFDF5","b":true,"al":"center"},{"c":"E11","v":"قوة سحب ≥ 6.5 kN","b":true,"al":"center"},{"c":"F11","v":"سحب 10 عينات عشوائية عبر مختبر مستقل معتمد","fg":"#1E293B"},{"c":"G11","v":"مهندس ضبط الجودة QC","b":true,"al":"center"}]},{"r":12,"h":72.0,"cells":[{"c":"A12","v":"الأمان ومقاومة الرياح","bg":"#F8FAFC","b":true},{"c":"B12","v":"SBC 201 / ASCE 7","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C12","v":"حساب ضغوط الرياح التصميمية عند ارتفاع 24 م (المنطقة الوسطى)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D12","v":"محقق ومطابق","bg":"#ECFDF5","b":true,"al":"center"},{"c":"E12","v":"ضغط تصميمي 1.25 kN/m²","bg":"#F8FAFC","b":true,"al":"center"},{"c":"F12","v":"التأكد من عمق تثبيت الفيشر M10 في الخرسانة ≥ 70 مم","bg":"#F8FAFC","fg":"#1E293B"},{"c":"G12","v":"المكتب الفني للمشروع","bg":"#F8FAFC","b":true,"al":"center"}]},{"r":13,"h":72.0,"cells":[{"c":"A13","v":"العزل الحراري ومقاومة الحريق","b":true},{"c":"B13","v":"SBC 801 / ASTM C612","b":true,"al":"center"},{"c":"C13","v":"ألواح صوف صخري Rockwool سمك 50 مم غير قابلة للاحتراق","fg":"#1E293B"},{"c":"D13","v":"محقق ومطابق","bg":"#ECFDF5","b":true,"al":"center"},{"c":"E13","v":"صنف A1 Non-combustible","b":true,"al":"center"},{"c":"F13","v":"تركيب حواجز لهب أفقية (Cavity Fire Stops) عند كل طابق","fg":"#1E293B"},{"c":"G13","v":"مهندس السلامة HSE","b":true,"al":"center"}]},{"r":14,"h":72.0,"cells":[{"c":"A14","v":"السلامة الهندسية للسقالات","bg":"#F8FAFC","b":true},{"c":"B14","v":"OSHA 1926 Subpart L","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C14","v":"نظام Cuplock بحمل تشغيلي 250 كجم/م² مع مرابط جدارية","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D14","v":"محقق ومطابق","bg":"#ECFDF5","b":true,"al":"center"},{"c":"E14","v":"معامل أمان 4:1","bg":"#F8FAFC","b":true,"al":"center"},{"c":"F14","v":"فحص المرابط الجدارية كل 4 م وإصدار كارت السقالة الأخضر","bg":"#F8FAFC","fg":"#1E293B"},{"c":"G14","v":"مفتش السقالات المعتمد","bg":"#F8FAFC","b":true,"al":"center"}]},{"r":15,"h":72.0,"cells":[{"c":"A15","v":"فواصل التمدد ومعالجة الواجهات","b":true},{"c":"B15","v":"ASTM C920","b":true,"al":"center"},{"c":"C15","v":"فواصل تمدد كل 6 م أفقي ورأسي بمعجون بولي يوريثان مقاوم لـ UV","fg":"#1E293B"},{"c":"D15","v":"محقق ومطابق","bg":"#ECFDF5","b":true,"al":"center"},{"c":"E15","v":"مرونة حركة ±25%","b":true,"al":"center"},{"c":"F15","v":"التأكد من وضع الباك رينج وضبط عمق المعجون نصف العرض","fg":"#1E293B"},{"c":"G15","v":"مهندس الموقع المعماري","b":true,"al":"center"}]},{"r":16,"h":28.0,"cells":[{"c":"A16","v":""},{"c":"B16","v":""},{"c":"C16","v":""},{"c":"D16","v":""},{"c":"E16","v":""},{"c":"F16","v":""},{"c":"G16","v":""}]},{"r":17,"h":38.0,"cells":[{"c":"A17","v":"✍️ ثالثاً: دورة المراجعة والاعتماد الفني الرسمية (Engineering Sign-off Matrix)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":18,"h":40.0,"cells":[{"c":"A18","v":"المستوى الفني والمسؤولية","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B18","v":"الجهة المعنية","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C18","v":"اسم المهندس المسؤول","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D18","v":"المسمى الوظيفي","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E18","v":"تاريخ المراجعة","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F18","v":"قرار الاعتماد","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G18","v":"التوقيع والختم الرسمي","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":19,"h":76.0,"cells":[{"c":"A19","v":"إعداد وتفريد الحسابات","b":true,"al":"center"},{"c":"B19","v":"المكتب الفني للمقاول","b":true,"al":"center"},{"c":"C19","v":"م. عبد الرحمن الشهري","b":true,"al":"center"},{"c":"D19","v":"مهندس أول مكتب فني وحصر كميات","fg":"#1E293B","al":"center"},{"c":"E19","v":"18 أكتوبر 2026","fg":"#1E293B","al":"center"},{"c":"F19","v":"تم الإعداد والمطابقة","bg":"#ECFDF5","b":true,"al":"center"},{"c":"G19","v":"..........................","b":true,"al":"center"}]},{"r":20,"h":76.0,"cells":[{"c":"A20","v":"مراجعة الجودة والسلامة","b":true,"al":"center"},{"c":"B20","v":"إدارة ضبط الجودة والسلامة","b":true,"al":"center"},{"c":"C20","v":"م. فهد القحطاني","b":true,"al":"center"},{"c":"D20","v":"مدير ضبط الجودة QC ومفتش السقالات","fg":"#1E293B","al":"center"},{"c":"E20","v":"19 أكتوبر 2026","fg":"#1E293B","al":"center"},{"c":"F20","v":"تمت المراجعة والتحقق","bg":"#ECFDF5","b":true,"al":"center"},{"c":"G20","v":"..........................","b":true,"al":"center"}]},{"r":21,"h":76.0,"cells":[{"c":"A21","v":"الاعتماد التعاقدي النهائي","b":true,"al":"center"},{"c":"B21","v":"الاستشاري المشرف","b":true,"al":"center"},{"c":"C21","v":"د.م. خالد المنصور","b":true,"al":"center"},{"c":"D21","v":"استشاري العمارة والواجهات المشرف","fg":"#1E293B","al":"center"},{"c":"E21","v":"20 أكتوبر 2026","fg":"#1E293B","al":"center"},{"c":"F21","v":"معتمد للتنفيذ الموقعي","bg":"#ECFDF5","b":true,"al":"center"},{"c":"G21","v":"..........................","b":true,"al":"center"}]}]}]}