{"slug":"fire-fighting-pump-capacity-and-water-tank-sizing-calculation-sheet","sheets":[{"name":"حساب سعة خزان الحريق Tank","maxRow":30,"maxCol":8,"colWidths":[8.0,48.0,18.0,18.0,16.0,32.0,28.0,38.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"شيت حساب سعة خزان مياه مكافحة الحريق الإنشائي وفق NFPA 22 و SBC 801","fg":"#8B0000","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"نموذج تشغيلي هيدروليكي لحساب حجم التخزين الصافي والإجمالي لخزانات مياه الإطفاء بناءً على تصنيف درجة الخطورة ومعدلات تدفق الرشاشات وعساكر الحريق","fg":"#555555","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":34.0,"cells":[{"c":"A3","v":"إجمالي التدفق المطلوب","bg":"#FFF5F5","fg":"#555555","b":true,"al":"center","cs":2},{"skip":true},{"c":"C3","v":"زمن التشغيل الكودي","bg":"#FFF5F5","fg":"#555555","b":true,"al":"center","cs":2},{"skip":true},{"c":"E3","v":"سعة التخزين الصافية","bg":"#FFF5F5","fg":"#555555","b":true,"al":"center","cs":2},{"skip":true},{"c":"G3","v":"السعة الإجمالية للخزان","bg":"#FFF5F5","fg":"#555555","b":true,"al":"center","cs":2},{"skip":true}]},{"r":4,"h":46.0,"cells":[{"c":"A4","v":"1,250 GPM","bg":"#FFF5F5","fg":"#8B0000","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"90 دقيقة","bg":"#FFF5F5","fg":"#8B0000","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"426 م³","bg":"#FFF5F5","fg":"#8B0000","b":true,"al":"center","cs":2},{"skip":true},{"c":"G4","v":"490 م³","bg":"#FFF5F5","fg":"#8B0000","b":true,"al":"center","cs":2},{"skip":true}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"رشاشات + عساكر خرطوم (Hose Stream)","bg":"#FFF5F5","fg":"#777777","al":"center","cs":2},{"skip":true},{"c":"C5","v":"NFPA 13 / SBC 801 (Ordinary Hazard 2)","bg":"#FFF5F5","fg":"#777777","al":"center","cs":2},{"skip":true},{"c":"E5","v":"حجم المياه الفعال الصافي المطلوب","bg":"#FFF5F5","fg":"#777777","al":"center","cs":2},{"skip":true},{"c":"G5","v":"متضمنة الفائض والخلوص الحجمي 15%","bg":"#FFF5F5","fg":"#777777","al":"center","cs":2},{"skip":true}]},{"r":6,"h":24.0,"cells":[{"c":"A6","v":""},{"c":"B6","v":""},{"c":"C6","v":""},{"c":"D6","v":""},{"c":"E6","v":""},{"c":"F6","v":""},{"c":"G6","v":""},{"c":"H6","v":""}]},{"r":7,"h":38.0,"cells":[{"c":"A7","v":"أولاً: مدخلات تصنيف درجة الخطورة ومعدلات التدفق التصميمية (Design Hazard Parameters)","bg":"#A52A2A","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":8,"h":42.0,"cells":[{"c":"A8","v":"م","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B8","v":"بيان المتغير / المعيار الكودي","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C8","v":"الرمز الهندسي","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D8","v":"القيمة المدخلة","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E8","v":"الوحدة الهندسية","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F8","v":"المرجع الكودي والمعياري","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G8","v":"حساب مكافئ التدفق (L/min)","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H8","v":"ملاحظات واعتبارات التصميم","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":9,"h":36.0,"cells":[{"c":"A9","v":1,"fg":"#111111","al":"center"},{"c":"B9","v":"نوع إشغال المبنى وتصنيف الخطورة","fg":"#111111","b":true},{"c":"C9","v":"Occupancy Hazard","fg":"#111111","al":"center"},{"c":"D9","v":"خطورة عادية - مجموعة 2","fg":"#111111","b":true,"al":"center"},{"c":"E9","v":"-","fg":"#111111","al":"center"},{"c":"F9","v":"NFPA 13 (Sec 5.3) / SBC 801","fg":"#111111","al":"center"},{"c":"G9","v":"-","fg":"#111111","b":true,"al":"center"},{"c":"H9","v":"مستودعات تجارية / مباني متعددة الاستخدامات","fg":"#111111","al":"center"}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":2,"fg":"#111111","al":"center"},{"c":"B10","v":"زمن تشغيل منظومة الإطفاء الأدنى المطلوب","fg":"#111111","b":true},{"c":"C10","v":"Duration (t)","fg":"#111111","al":"center"},{"c":"D10","v":90,"in":true,"fg":"#111111","b":true,"al":"center"},{"c":"E10","v":"دقيقة (Min)","fg":"#111111","al":"center"},{"c":"F10","v":"NFPA 13 (Table 11.2.3.1.2)","fg":"#111111","al":"center"},{"c":"G10","v":"-","fg":"#111111","b":true,"al":"center"},{"c":"H10","v":"إلزامي للخطورة العادية (60 إلى 90 دقيقة)","fg":"#111111","al":"center"}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":3,"fg":"#111111","al":"center"},{"c":"B11","v":"معدل تدفق شبكة الرشاشات التلقائية الهيدروليكي","fg":"#111111","b":true},{"c":"C11","v":"Q_sprinkler","fg":"#111111","al":"center"},{"c":"D11","v":750,"in":true,"fg":"#111111","b":true,"al":"center","nf":"#,##0"},{"c":"E11","v":"GPM","fg":"#111111","al":"center"},{"c":"F11","v":"NFPA 13 / Hydraulic Calc","fg":"#111111","al":"center"},{"c":"G11","v":2839.0575,"f":"=D11*3.78541","fg":"#111111","b":true,"al":"center","nf":"#,##0"},{"c":"H11","v":"شامل مساحة التصميم وكثافة التدفق الفعلي","fg":"#111111","al":"center"}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":4,"fg":"#111111","al":"center"},{"c":"B12","v":"معدل تدفق عساكر الإطفاء وخراطيم المبنى","fg":"#111111","b":true},{"c":"C12","v":"Q_hose","fg":"#111111","al":"center"},{"c":"D12","v":500,"in":true,"fg":"#111111","b":true,"al":"center","nf":"#,##0"},{"c":"E12","v":"GPM","fg":"#111111","al":"center"},{"c":"F12","v":"NFPA 14 / SBC 801 (Class I)","fg":"#111111","al":"center"},{"c":"G12","v":1892.705,"f":"=D12*3.78541","fg":"#111111","b":true,"al":"center","nf":"#,##0"},{"c":"H12","v":"مخصص لفرق الدفاع المدني وعساكر الحريق","fg":"#111111","al":"center"}]},{"r":13,"h":36.0,"cells":[{"c":"A13","v":5,"fg":"#111111","al":"center"},{"c":"B13","v":"إجمالي معدل التدفق الهيدروليكي للمشروع","fg":"#111111","b":true},{"c":"C13","v":"Q_total","fg":"#111111","al":"center"},{"c":"D13","v":1250,"f":"=D11+D12","bg":"#FDE8E8","fg":"#8B0000","b":true,"al":"center","nf":"#,##0"},{"c":"E13","v":"GPM","fg":"#111111","al":"center"},{"c":"F13","v":"NFPA 13 / NFPA 20","fg":"#111111","al":"center"},{"c":"G13","v":4731.7625,"f":"=D13*3.78541","bg":"#FDE8E8","fg":"#8B0000","b":true,"al":"center","nf":"#,##0"},{"c":"H13","v":"التدفق الإجمالي المغذي للشبكة بالكامل","fg":"#111111","al":"center"}]},{"r":14,"h":36.0,"cells":[{"c":"A14","v":6,"fg":"#111111","al":"center"},{"c":"B14","v":"معامل أمان التدفق ومصادر التغذية الخارجية","fg":"#111111","b":true},{"c":"C14","v":"Safety Factor","fg":"#111111","al":"center"},{"c":"D14","v":1,"in":true,"fg":"#111111","b":true,"al":"center"},{"c":"E14","v":"-","fg":"#111111","al":"center"},{"c":"F14","v":"SBC 801 / Engineering Standard","fg":"#111111","al":"center"},{"c":"G14","v":"-","fg":"#111111","b":true,"al":"center"},{"c":"H14","v":"في حال عدم توفر تغذية بلدية مستمرة يعتمد 1.0","fg":"#111111","al":"center"}]},{"r":15,"h":24.0,"cells":[{"c":"A15","v":""},{"c":"B15","v":""},{"c":"C15","v":""},{"c":"D15","v":""},{"c":"E15","v":""},{"c":"F15","v":""},{"c":"G15","v":""},{"c":"H15","v":""}]},{"r":16,"h":38.0,"cells":[{"c":"A16","v":"ثانياً: حسابات حجم المياه الصافي والأبعاد الإنشائية لخزان الخرسانة المسلحة (Tank Geometry & Sizing)","bg":"#A52A2A","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":17,"h":42.0,"cells":[{"c":"A17","v":"م","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B17","v":"العنصر الهندسي وأبعاد الخزان","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C17","v":"رمز المعادلة","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D17","v":"القيمة المحسوبة","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E17","v":"الوحدة","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F17","v":"المعادلة الرياضية الكودية","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G17","v":"التحقق والامتثال الكودي","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H17","v":"مواصفات التنفيذ الإنشائي","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":18,"h":36.0,"cells":[{"c":"A18","v":1,"fg":"#111111","al":"center"},{"c":"B18","v":"حجم المياه الصافي المطلوب تخزينه بالغالون","fg":"#111111","b":true},{"c":"C18","v":"V_net_gal","fg":"#111111","al":"center"},{"c":"D18","v":112500,"f":"=D13*D10","bg":"#FDE8E8","fg":"#8B0000","b":true,"al":"center","nf":"#,##0"},{"c":"E18","v":"US Gallon","fg":"#111111","al":"center"},{"c":"F18","v":"Q_total × Duration (min)","fg":"#111111","al":"center"},{"c":"G18","v":"يحقق اشتراطات NFPA 22","fg":"#111111","al":"center"},{"c":"H18","v":"السعة المائية المطلوبة تشغيلياً دون انقطاع","fg":"#111111","al":"center"}]},{"r":19,"h":36.0,"cells":[{"c":"A19","v":2,"fg":"#111111","al":"center"},{"c":"B19","v":"حجم المياه الصافي المطلوب تخزينه بالمتر المكعب","fg":"#111111","b":true},{"c":"C19","v":"V_net_m3","fg":"#111111","al":"center"},{"c":"D19","v":425.858625,"f":"=D18*3.78541/1000","bg":"#FDE8E8","fg":"#8B0000","b":true,"al":"center","nf":"#,##0.00"},{"c":"E19","v":"م³ (m³)","fg":"#111111","al":"center"},{"c":"F19","v":"V_net_gal × 0.00378541","fg":"#111111","al":"center"},{"c":"G19","v":"يحقق متطلبات الدفاع المدني","fg":"#111111","al":"center"},{"c":"H19","v":"الحجم الفعال بين ماسورة السحب وعوامة الفائض","fg":"#111111","al":"center"}]},{"r":20,"h":36.0,"cells":[{"c":"A20","v":3,"fg":"#111111","al":"center"},{"c":"B20","v":"الارتفاع المائي الفعال التصميمي للخزان","fg":"#111111","b":true},{"c":"C20","v":"H_effective","fg":"#111111","al":"center"},{"c":"D20","v":3.5,"in":true,"fg":"#111111","b":true,"al":"center","nf":"0.00"},{"c":"E20","v":"متر (m)","fg":"#111111","al":"center"},{"c":"F20","v":"معيار إنشائي وهيدروليكي","fg":"#111111","al":"center"},{"c":"G20","v":"عمق مائي آمن لمنع التكهف","fg":"#111111","al":"center"},{"c":"H20","v":"العمق التشغيلي لمياه الإطفاء الصافية","fg":"#111111","al":"center"}]},{"r":21,"h":36.0,"cells":[{"c":"A21","v":4,"fg":"#111111","al":"center"},{"c":"B21","v":"مساحة مسقط الخزان الأفقية المطلوبة","fg":"#111111","b":true},{"c":"C21","v":"Area_req","fg":"#111111","al":"center"},{"c":"D21","v":121.673893,"f":"=D19/D20","fg":"#111111","b":true,"al":"center","nf":"#,##0.00"},{"c":"E21","v":"م² (m²)","fg":"#111111","al":"center"},{"c":"F21","v":"V_net_m3 / H_effective","fg":"#111111","al":"center"},{"c":"G21","v":"مساحة إنشائية كافية","fg":"#111111","al":"center"},{"c":"H21","v":"المساحة المائية الصافية قبل الجدران الفاصلة","fg":"#111111","al":"center"}]},{"r":22,"h":36.0,"cells":[{"c":"A22","v":5,"fg":"#111111","al":"center"},{"c":"B22","v":"طول الخزان الداخلي المقترح","fg":"#111111","b":true},{"c":"C22","v":"Length (L)","fg":"#111111","al":"center"},{"c":"D22","v":12.5,"in":true,"fg":"#111111","b":true,"al":"center","nf":"0.00"},{"c":"E22","v":"متر (m)","fg":"#111111","al":"center"},{"c":"F22","v":"أبعاد الموقع المعمارية","fg":"#111111","al":"center"},{"c":"G22","v":"طول ملائم لغرفة المضخات المجاورة","fg":"#111111","al":"center"},{"c":"H22","v":"خرسانة مسلحة عازلة للسوائل C35","fg":"#111111","al":"center"}]},{"r":23,"h":36.0,"cells":[{"c":"A23","v":6,"fg":"#111111","al":"center"},{"c":"B23","v":"عرض الخزان الداخلي المقترح","fg":"#111111","b":true},{"c":"C23","v":"Width (W)","fg":"#111111","al":"center"},{"c":"D23","v":10,"in":true,"fg":"#111111","b":true,"al":"center","nf":"0.00"},{"c":"E23","v":"متر (m)","fg":"#111111","al":"center"},{"c":"F23","v":"Area_req / Length","fg":"#111111","al":"center"},{"c":"G23","v":"W ≥ Area_req / L","fg":"#111111","al":"center"},{"c":"H23","v":"نسبة أبعاد مستطيلة متوازنة 1.25","fg":"#111111","al":"center"}]},{"r":24,"h":36.0,"cells":[{"c":"A24","v":7,"fg":"#111111","al":"center"},{"c":"B24","v":"ارتفاع الخلوص المائي الحر العلوي (Freeboard)","fg":"#111111","b":true},{"c":"C24","v":"H_freeboard","fg":"#111111","al":"center"},{"c":"D24","v":0.3,"in":true,"fg":"#111111","b":true,"al":"center","nf":"0.00"},{"c":"E24","v":"متر (m)","fg":"#111111","al":"center"},{"c":"F24","v":"NFPA 22 (Min 300 mm)","fg":"#111111","al":"center"},{"c":"G24","v":"يحقق اشتراطات فتحة الفائض","fg":"#111111","al":"center"},{"c":"H24","v":"مسافة أمان بين سطح الماء وأسفل السقف","fg":"#111111","al":"center"}]},{"r":25,"h":36.0,"cells":[{"c":"A25","v":8,"fg":"#111111","al":"center"},{"c":"B25","v":"ارتفاع المياه الميتة وقمع منع الدوامات (Vortex)","fg":"#111111","b":true},{"c":"C25","v":"H_dead","fg":"#111111","al":"center"},{"c":"D25","v":0.4,"in":true,"fg":"#111111","b":true,"al":"center","nf":"0.00"},{"c":"E25","v":"متر (m)","fg":"#111111","al":"center"},{"c":"F25","v":"NFPA 20 / NFPA 22 Plate","fg":"#111111","al":"center"},{"c":"G25","v":"يمنع سحب الهواء إلى المضخات","fg":"#111111","al":"center"},{"c":"H25","v":"خلوص مانع الدوامات أسفل ماسورة السحب","fg":"#111111","al":"center"}]},{"r":26,"h":36.0,"cells":[{"c":"A26","v":9,"fg":"#111111","al":"center"},{"c":"B26","v":"الارتفاع الإجمالي الإنشائي للخزان الداخلي","fg":"#111111","b":true},{"c":"C26","v":"H_gross","fg":"#111111","al":"center"},{"c":"D26","v":4.2,"f":"=D20+D24+D25","bg":"#FDE8E8","fg":"#8B0000","b":true,"al":"center","nf":"0.00"},{"c":"E26","v":"متر (m)","fg":"#111111","al":"center"},{"c":"F26","v":"H_effective + H_free + H_dead","fg":"#111111","al":"center"},{"c":"G26","v":"مطابق للقطاع الإنشائي المخطط","fg":"#111111","al":"center"},{"c":"H26","v":"العمق الكلي الصافي من القاع إلى أسفل السقف","fg":"#111111","al":"center"}]},{"r":27,"h":36.0,"cells":[{"c":"A27","v":10,"fg":"#111111","al":"center"},{"c":"B27","v":"الحجم الإجمالي الهندسي للخزان المنفذ","fg":"#111111","b":true},{"c":"C27","v":"V_gross_m3","fg":"#111111","al":"center"},{"c":"D27","v":525,"f":"=D22*D23*D26","bg":"#FDE8E8","fg":"#8B0000","b":true,"al":"center","nf":"#,##0.00"},{"c":"E27","v":"م³ (m³)","fg":"#111111","al":"center"},{"c":"F27","v":"Length × Width × H_gross","fg":"#111111","al":"center"},{"c":"G27","v":"يوفر معامل سعة إضافي 23%","fg":"#111111","al":"center"},{"c":"H27","v":"السعة الاستيعابية الشاملة لكافة الخلوصات","fg":"#111111","al":"center"}]},{"r":28,"h":28.0,"cells":[{"c":"A28","v":""},{"c":"B28","v":""},{"c":"C28","v":""},{"c":"D28","v":""},{"c":"E28","v":""},{"c":"F28","v":""},{"c":"G28","v":""},{"c":"H28","v":""}]},{"r":29,"h":34.0,"cells":[{"c":"A29","v":"مهندس التصميم الكهروميكانيكي (MEP)","bg":"#F5E6E6","fg":"#8B0000","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D29","v":"مهندس استشاري الحماية من الحريق والسلامة","bg":"#F5E6E6","fg":"#8B0000","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G29","v":"مدير الإدارة الفنية والمكتب الهندسي","bg":"#F5E6E6","fg":"#8B0000","b":true,"al":"center","cs":2},{"skip":true}]},{"r":30,"h":76.0,"cells":[{"c":"A30","v":"الاسم:\nالتوقيع:\nالتاريخ:","fg":"#111111","cs":3},{"skip":true},{"skip":true},{"c":"D30","v":"الاسم:\nالتوقيع:\nالتاريخ:","fg":"#111111","cs":3},{"skip":true},{"skip":true},{"c":"G30","v":"الاسم:\nالتوقيع:\nالتاريخ:","fg":"#111111","cs":2},{"skip":true}]}]},{"name":"حساب هيد وقدرة المضخات Pump","maxRow":31,"maxCol":8,"colWidths":[8.0,48.0,18.0,18.0,18.0,18.0,32.0,38.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"شيت حساب هيد وضغط وقدرة مضخات مكافحة الحريق الإنشائية NFPA 20 و SBC 801","fg":"#8B0000","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"حساب الفواقد الهيدروليكية بالشبكة الأكثر حرجاً والضغط الإستاتيكي والديناميكي الكلي (TDH) وقدرة المحرك الكهربائي ومحرك الديزل ومضخة الجوكي","fg":"#555555","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":34.0,"cells":[{"c":"A3","v":"التدفق الكودي التصميمي","bg":"#FFF5F5","fg":"#555555","b":true,"al":"center","cs":2},{"skip":true},{"c":"C3","v":"الضاغط الهيدروليكي الكلي","bg":"#FFF5F5","fg":"#555555","b":true,"al":"center","cs":2},{"skip":true},{"c":"E3","v":"قدرة محرك المضخة (BHP)","bg":"#FFF5F5","fg":"#555555","b":true,"al":"center","cs":2},{"skip":true},{"c":"G3","v":"مضخة الجوكي المساعدة","bg":"#FFF5F5","fg":"#555555","b":true,"al":"center","cs":2},{"skip":true}]},{"r":4,"h":46.0,"cells":[{"c":"A4","v":"1,250 GPM","bg":"#FFF5F5","fg":"#8B0000","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"145 PSI (10.0 bar)","bg":"#FFF5F5","fg":"#8B0000","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"150 HP","bg":"#FFF5F5","fg":"#8B0000","b":true,"al":"center","cs":2},{"skip":true},{"c":"G4","v":"20 GPM @ 160 PSI","bg":"#FFF5F5","fg":"#8B0000","b":true,"al":"center","cs":2},{"skip":true}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"Rated Flow Q (NFPA 20 Standard)","bg":"#FFF5F5","fg":"#777777","al":"center","cs":2},{"skip":true},{"c":"C5","v":"Total Dynamic Head (TDH)","bg":"#FFF5F5","fg":"#777777","al":"center","cs":2},{"skip":true},{"c":"E5","v":"Brake Horsepower @ 75% Efficiency","bg":"#FFF5F5","fg":"#777777","al":"center","cs":2},{"skip":true},{"c":"G5","v":"لتعويض التسريبات وتثبيت ضغط الشبكة","bg":"#FFF5F5","fg":"#777777","al":"center","cs":2},{"skip":true}]},{"r":6,"h":24.0,"cells":[{"c":"A6","v":""},{"c":"B6","v":""},{"c":"C6","v":""},{"c":"D6","v":""},{"c":"E6","v":""},{"c":"F6","v":""},{"c":"G6","v":""},{"c":"H6","v":""}]},{"r":7,"h":38.0,"cells":[{"c":"A7","v":"أولاً: تفريغ عناصر الضغط الهيدروليكي والفواقد الاحتكاكية للمسار الأكثر حرجاً (Hydraulic Head Losses)","bg":"#A52A2A","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":8,"h":42.0,"cells":[{"c":"A8","v":"م","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B8","v":"مكونات الضغط والفاقد الهيدروليكي","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C8","v":"رمز المتغير","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D8","v":"الضغط (PSI)","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E8","v":"الضغط (متر ماء)","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F8","v":"الضغط (Bar)","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G8","v":"معادلة الحساب والأساس الكودي","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H8","v":"ملاحظات وتفاصيل المسار الحرج","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":9,"h":36.0,"cells":[{"c":"A9","v":1,"fg":"#111111","al":"center"},{"c":"B9","v":"الضغط المتبقي المطلوب عند أبعد نقطة حرجة (عسكري سطح)","fg":"#111111","b":true},{"c":"C9","v":"P_residual","fg":"#111111","al":"center"},{"c":"D9","v":100,"in":true,"fg":"#111111","b":true,"al":"center","nf":"#,##0.0"},{"c":"E9","v":70.324,"f":"=D9*0.70324","fg":"#111111","b":true,"al":"center","nf":"#,##0.0"},{"c":"F9","v":6.89476,"f":"=D9*0.0689476","fg":"#111111","b":true,"al":"center","nf":"#,##0.0"},{"c":"G9","v":"NFPA 14 (Class I Standpipe)","fg":"#111111","al":"center"},{"c":"H9","v":"الحد الأدنى لضغط خرطوم 2.5 بوصة لمكافحة الحريق","fg":"#111111","al":"center"}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":2,"fg":"#111111","al":"center"},{"c":"B10","v":"الارتفاع الإستاتيكي الرأسي بين محور المضخة وأعلى نقطة","fg":"#111111","b":true},{"c":"C10","v":"H_static","fg":"#111111","al":"center"},{"c":"D10","v":42.67,"in":true,"fg":"#111111","b":true,"al":"center","nf":"#,##0.0"},{"c":"E10","v":30,"in":true,"fg":"#111111","b":true,"al":"center","nf":"#,##0.0"},{"c":"F10","v":2.941995,"f":"=E10*0.0980665","fg":"#111111","b":true,"al":"center","nf":"#,##0.0"},{"c":"G10","v":"Static Elevation Head (Z2 - Z1)","fg":"#111111","al":"center"},{"c":"H10","v":"ارتفاع مبنى 8 أدوار متكررة + ملحق السطح","fg":"#111111","al":"center"}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":3,"fg":"#111111","al":"center"},{"c":"B11","v":"الفواقد الاحتكاكية في المواسير المستقيمة الرئيسية","fg":"#111111","b":true},{"c":"C11","v":"P_friction_pipe","fg":"#111111","al":"center"},{"c":"D11","v":18.5,"in":true,"fg":"#111111","b":true,"al":"center","nf":"#,##0.0"},{"c":"E11","v":13.00994,"f":"=D11*0.70324","fg":"#111111","b":true,"al":"center","nf":"#,##0.0"},{"c":"F11","v":1.275531,"f":"=D11*0.0689476","fg":"#111111","b":true,"al":"center","nf":"#,##0.0"},{"c":"G11","v":"Hazen-Williams Formula (C=120)","fg":"#111111","al":"center"},{"c":"H11","v":"طول مسار 120م بمواسير صلب غير ملحومة 6 بوصة","fg":"#111111","al":"center"}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":4,"fg":"#111111","al":"center"},{"c":"B12","v":"الفواقد الاحتكاكية في القطع الخاصة والمحابس (Fittings)","fg":"#111111","b":true},{"c":"C12","v":"P_fittings","fg":"#111111","al":"center"},{"c":"D12","v":8.2,"in":true,"fg":"#111111","b":true,"al":"center","nf":"#,##0.0"},{"c":"E12","v":5.766568,"f":"=D12*0.70324","fg":"#111111","b":true,"al":"center","nf":"#,##0.0"},{"c":"F12","v":0.56537,"f":"=D12*0.0689476","fg":"#111111","b":true,"al":"center","nf":"#,##0.0"},{"c":"G12","v":"Equivalent Length Method","fg":"#111111","al":"center"},{"c":"H12","v":"أكواع 90، تي، محابس عدم رجوع، ومحابس سكينة","fg":"#111111","al":"center"}]},{"r":13,"h":36.0,"cells":[{"c":"A13","v":5,"fg":"#111111","al":"center"},{"c":"B13","v":"فاقد الضغط في محبس الإنذار ومجموعة فحص التدفق","fg":"#111111","b":true},{"c":"C13","v":"P_devices","fg":"#111111","al":"center"},{"c":"D13","v":7.5,"in":true,"fg":"#111111","b":true,"al":"center","nf":"#,##0.0"},{"c":"E13","v":5.2743,"f":"=D13*0.70324","fg":"#111111","b":true,"al":"center","nf":"#,##0.0"},{"c":"F13","v":0.517107,"f":"=D13*0.0689476","fg":"#111111","b":true,"al":"center","nf":"#,##0.0"},{"c":"G13","v":"Alarm Check Valve & Backflow","fg":"#111111","al":"center"},{"c":"H13","v":"هبوط ضغط مانع الارتداد ومحبس إنذار الرشاشات","fg":"#111111","al":"center"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":6,"fg":"#111111","al":"center"},{"c":"B14","v":"معامل أمان إضافي لهبوط الضغط المستقبلي بالشبكة","fg":"#111111","b":true},{"c":"C14","v":"P_safety","fg":"#111111","al":"center"},{"c":"D14","v":5,"in":true,"fg":"#111111","b":true,"al":"center","nf":"#,##0.0"},{"c":"E14","v":3.5162,"f":"=D14*0.70324","fg":"#111111","b":true,"al":"center","nf":"#,##0.0"},{"c":"F14","v":0.344738,"f":"=D14*0.0689476","fg":"#111111","b":true,"al":"center","nf":"#,##0.0"},{"c":"G14","v":"Engineering Margin (5%)","fg":"#111111","al":"center"},{"c":"H14","v":"تحسباً لترسبات المواسير وتآكلها على المدى الطويل","fg":"#111111","al":"center"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":7,"bg":"#FDE8E8","fg":"#8B0000","b":true,"al":"center"},{"c":"B15","v":"إجمالي الضاغط الديناميكي الكلي المطلوب للمضخة (TDH)","bg":"#FDE8E8","fg":"#8B0000","b":true},{"c":"C15","v":"TDH_total","bg":"#FDE8E8","fg":"#8B0000","b":true,"al":"center"},{"c":"D15","v":181.87,"f":"=SUM(D9:D14)","bg":"#FDE8E8","fg":"#8B0000","b":true,"al":"center","nf":"#,##0.0"},{"c":"E15","v":127.891008,"f":"=SUM(E9:E14)","bg":"#FDE8E8","fg":"#8B0000","b":true,"al":"center","nf":"#,##0.0"},{"c":"F15","v":12.539501,"f":"=SUM(F9:F14)","bg":"#FDE8E8","fg":"#8B0000","b":true,"al":"center","nf":"#,##0.0"},{"c":"G15","v":"TDH = Presidual + Hstatic + Hlosses","bg":"#FDE8E8","fg":"#8B0000","b":true,"al":"center"},{"c":"H15","v":"الضاغط الكودي المحسوب لتوريد واختبار مضخة الحريق","bg":"#FDE8E8","fg":"#8B0000","b":true,"al":"center"}]},{"r":16,"h":28.0,"cells":[{"c":"A16","v":""},{"c":"B16","v":""},{"c":"C16","v":""},{"c":"D16","v":""},{"c":"E16","v":""},{"c":"F16","v":""},{"c":"G16","v":""},{"c":"H16","v":""}]},{"r":17,"h":24.0,"cells":[{"c":"A17","v":""},{"c":"B17","v":""},{"c":"C17","v":""},{"c":"D17","v":""},{"c":"E17","v":""},{"c":"F17","v":""},{"c":"G17","v":""},{"c":"H17","v":""}]},{"r":18,"h":38.0,"cells":[{"c":"A18","v":"ثانياً: حساب قدرات محركات مضخات الحريق ومنحنى الأداء الكودي (Pump Sizing & BHP)","bg":"#A52A2A","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":19,"h":42.0,"cells":[{"c":"A19","v":"م","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B19","v":"عنصر المضخة ونقطة التشغيل","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C19","v":"رمز الخاصية","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D19","v":"القيمة التصميمية","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E19","v":"الوحدة","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F19","v":"معادلة الحساب الكودية","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G19","v":"اشتراطات كود NFPA 20","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H19","v":"ملاحظات الفحص والتدقيق","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":1,"fg":"#111111","al":"center"},{"c":"B20","v":"معدل التدفق الاسمي التصميمي للمضخة الرئيسية","fg":"#111111","b":true},{"c":"C20","v":"Rated Flow (Qn)","fg":"#111111","al":"center"},{"c":"D20","v":1250,"in":true,"bg":"#FDE8E8","fg":"#8B0000","b":true,"al":"center","nf":"#,##0"},{"c":"E20","v":"GPM","fg":"#111111","al":"center"},{"c":"F20","v":"Design Flow Requirement","fg":"#111111","al":"center"},{"c":"G20","v":"نقطة الأداء 100% تدفق","fg":"#111111","al":"center"},{"c":"H20","v":"مضخة طرد مركزي مجزأة أفقياً Split Case","fg":"#111111","al":"center"}]},{"r":21,"h":36.0,"cells":[{"c":"A21","v":2,"fg":"#111111","al":"center"},{"c":"B21","v":"الضاغط الاسمي التصميمي للمضخة الرئيسية","fg":"#111111","b":true},{"c":"C21","v":"Rated Head (Hn)","fg":"#111111","al":"center"},{"c":"D21","v":181.87,"f":"=D15","bg":"#FDE8E8","fg":"#8B0000","b":true,"al":"center","nf":"#,##0.0"},{"c":"E21","v":"PSI","fg":"#111111","al":"center"},{"c":"F21","v":"Calculated TDH Total","fg":"#111111","al":"center"},{"c":"G21","v":"نقطة الأداء 100% ضغط","fg":"#111111","al":"center"},{"c":"H21","v":"الضغط الاسمي عند التدفق التصميمي 100%","fg":"#111111","al":"center"}]},{"r":22,"h":52.0,"cells":[{"c":"A22","v":3,"fg":"#111111","al":"center"},{"c":"B22","v":"كفاءة المضخة الهيدروليكية التقديرية","fg":"#111111","b":true},{"c":"C22","v":"Efficiency (η)","fg":"#111111","al":"center"},{"c":"D22","v":0.72,"in":true,"fg":"#111111","b":true,"al":"center","nf":"0.00"},{"c":"E22","v":"-","fg":"#111111","al":"center"},{"c":"F22","v":"Pump Manufacturer Curve","fg":"#111111","al":"center"},{"c":"G22","v":"كفاءة قياسية 70% - 78%","fg":"#111111","al":"center"},{"c":"H22","v":"المحددة لحساب أقصى حمل على المحرك","fg":"#111111","al":"center"}]},{"r":23,"h":52.0,"cells":[{"c":"A23","v":4,"fg":"#111111","al":"center"},{"c":"B23","v":"القدرة الفرملية المطلوبة على عمود المضخة (BHP)","fg":"#111111","b":true},{"c":"C23","v":"BHP_calc","fg":"#111111","al":"center"},{"c":"D23","v":184.185475,"f":"=(D20*D21*2.31)/(3960*D22)","bg":"#FDE8E8","fg":"#8B0000","b":true,"al":"center","nf":"#,##0.0"},{"c":"E23","v":"حصان ميكانيكي (HP)","fg":"#111111","al":"center"},{"c":"F23","v":"(Q × H_ft) / (3960 × η)","fg":"#111111","al":"center"},{"c":"G23","v":"تغطي نقطة التدفق الأقصى 150% تدفق كودياً","fg":"#111111","al":"center"},{"c":"H23","v":""}]},{"r":24,"h":52.0,"cells":[{"c":"A24","v":5,"fg":"#111111","al":"center"},{"c":"B24","v":"قدرة المحرك الكهربائي التصميمية للمضخة الأساسية","fg":"#111111","b":true},{"c":"C24","v":"Motor Rating","fg":"#111111","al":"center"},{"c":"D24","v":150,"in":true,"bg":"#FDE8E8","fg":"#8B0000","b":true,"al":"center","nf":"#,##0"},{"c":"E24","v":"حصان (HP)","fg":"#111111","al":"center"},{"c":"F24","v":"Next Standard NEMA Size","fg":"#111111","al":"center"},{"c":"G24","v":"محرك كهربائي ذو عزم بدء تشغيل عالي Squirrel Cage","fg":"#111111","al":"center"},{"c":"H24","v":"لوحة تحكم مع مفتاح تحويل تلقائي ATS","fg":"#111111","al":"center"}]},{"r":25,"h":52.0,"cells":[{"c":"A25","v":6,"fg":"#111111","al":"center"},{"c":"B25","v":"قدرة محرك الديزل التصميمية للمضخة الاحتياطية","fg":"#111111","b":true},{"c":"C25","v":"Diesel Engine HP","fg":"#111111","al":"center"},{"c":"D25","v":175,"in":true,"bg":"#FDE8E8","fg":"#8B0000","b":true,"al":"center","nf":"#,##0"},{"c":"E25","v":"حصان (HP)","fg":"#111111","al":"center"},{"c":"F25","v":"Derated for Temp/Altitude","fg":"#111111","al":"center"},{"c":"G25","v":"يشمل تخفيض 10% لدرجة حرارة الجو 50°م","fg":"#111111","al":"center"},{"c":"H25","v":"مع تانك وقود يومي يكفي تشغيل مستمر 8 ساعات","fg":"#111111","al":"center"}]},{"r":26,"h":52.0,"cells":[{"c":"A26","v":7,"fg":"#111111","al":"center"},{"c":"B26","v":"أقصى ضغط للمضخة عند الغلق التام (Shut-off Churn)","fg":"#111111","b":true},{"c":"C26","v":"P_churn","fg":"#111111","al":"center"},{"c":"D26","v":218.244,"f":"=D21*1.20","bg":"#FDE8E8","fg":"#8B0000","b":true,"al":"center","nf":"#,##0.0"},{"c":"E26","v":"PSI","fg":"#111111","al":"center"},{"c":"F26","v":"NFPA 20 (≤ 140% of Rated)","fg":"#111111","al":"center"},{"c":"G26","v":"ضمن الحدود الكودية المسموحة (≤ 140%)","fg":"#111111","al":"center"},{"c":"H26","v":"الضغط داخل الشبكة عند إغلاق كافة المخارج","fg":"#111111","al":"center"}]},{"r":27,"h":52.0,"cells":[{"c":"A27","v":8,"fg":"#111111","al":"center"},{"c":"B27","v":"معدل تدفق مضخة الجوكي المساعدة (Jockey Pump)","fg":"#111111","b":true},{"c":"C27","v":"Q_jockey","fg":"#111111","al":"center"},{"c":"D27","v":20,"in":true,"fg":"#111111","b":true,"al":"center","nf":"#,##0"},{"c":"E27","v":"GPM","fg":"#111111","al":"center"},{"c":"F27","v":"NFPA 20 (1% of Qn or 10-20 GPM)","fg":"#111111","al":"center"},{"c":"G27","v":"لتعويض الفواقد دون تشغيل المضخة الكبرى","fg":"#111111","al":"center"},{"c":"H27","v":"مضخة رأسية متعددة المراحل Vertical Multistage","fg":"#111111","al":"center"}]},{"r":28,"h":52.0,"cells":[{"c":"A28","v":9,"fg":"#111111","al":"center"},{"c":"B28","v":"الضاغط الهيدروليكي الاسمي لمضخة الجوكي","fg":"#111111","b":true},{"c":"C28","v":"H_jockey","fg":"#111111","al":"center"},{"c":"D28","v":228.244,"f":"=D26+10","fg":"#111111","b":true,"al":"center","nf":"#,##0.0"},{"c":"E28","v":"PSI","fg":"#111111","al":"center"},{"c":"F28","v":"Churn Pressure + 10 PSI","fg":"#111111","al":"center"},{"c":"G28","v":"ضغط الإيقاف أعلى من ضغط Churn الرئيسي","fg":"#111111","al":"center"},{"c":"H28","v":"لمنع تذبذب الضغط وإشعال المضخات الرئيسية خطأ","fg":"#111111","al":"center"}]},{"r":29,"h":28.0,"cells":[{"c":"A29","v":""},{"c":"B29","v":""},{"c":"C29","v":""},{"c":"D29","v":""},{"c":"E29","v":""},{"c":"F29","v":""},{"c":"G29","v":""},{"c":"H29","v":""}]},{"r":30,"h":34.0,"cells":[{"c":"A30","v":"مهندس التصميم الكهروميكانيكي (MEP)","bg":"#F5E6E6","fg":"#8B0000","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D30","v":"مهندس استشاري الحماية من الحريق والسلامة","bg":"#F5E6E6","fg":"#8B0000","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G30","v":"مدير الإدارة الفنية والمكتب الهندسي","bg":"#F5E6E6","fg":"#8B0000","b":true,"al":"center","cs":2},{"skip":true}]},{"r":31,"h":76.0,"cells":[{"c":"A31","v":"الاسم:\nالتوقيع:\nالتاريخ:","fg":"#111111","cs":3},{"skip":true},{"skip":true},{"c":"D31","v":"الاسم:\nالتوقيع:\nالتاريخ:","fg":"#111111","cs":3},{"skip":true},{"skip":true},{"c":"G31","v":"الاسم:\nالتوقيع:\nالتاريخ:","fg":"#111111","cs":2},{"skip":true}]}]},{"name":"حصر غرفة المضخات BOQ","maxRow":24,"maxCol":8,"colWidths":[10.0,62.0,12.0,12.0,18.0,22.0,34.0,36.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"مقايسة وحصر بنود تجهيز غرفة مضخات الحريق وملحقاتها وفق كود NFPA 20","fg":"#8B0000","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"جدول حصر الكميات والمواصفات الفنية المحددة للمضخات الكهربائية والديزل والجوكي ولوحات التحكم وخطوط الاختبار والصمامات","fg":"#555555","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"جدول حصر بنود ومعدات محطة ضخ مياه الإطفاء المطابقة لمعايير (UL Listed / FM Approved)","bg":"#A52A2A","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":42.0,"cells":[{"c":"A5","v":"بند","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"توصيف بند الأعمال والمعدات الهندسية","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"الوحدة","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"الكمية","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"سعر الوحدة (ر.س)","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"إجمالي القيمة (ر.س)","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"المواصفة والاعتماد الكودي","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"ملاحظات التوريد والتركيب","bg":"#8B0000","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"1.01","fg":"#111111","b":true,"al":"center"},{"c":"B6","v":"توريد وتركيب مضخة حريق كهربائية رئيسية نوع Split Case سعة 1250 GPM وضغط 145 PSI مع محرك 150 حصان وقاعدة عزل اهتزازات","fg":"#111111","b":true},{"c":"C6","v":"طقم","fg":"#111111","al":"center"},{"c":"D6","v":1,"in":true,"fg":"#111111","b":true,"al":"center"},{"c":"E6","v":145000,"in":true,"fg":"#111111","al":"center","nf":"#,##0"},{"c":"F6","v":145000,"f":"=D6*E6","fg":"#111111","b":true,"al":"center","nf":"#,##0"},{"c":"G6","v":"UL Listed / FM Approved / NFPA 20","fg":"#111111","al":"center"},{"c":"H6","v":"شاملة فلانشات السحب والطرد ومانع الحركة","fg":"#111111","al":"center"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"1.02","fg":"#111111","b":true,"al":"center"},{"c":"B7","v":"توريد وتركيب مضخة حريق ديزل احتياطية سعة 1250 GPM وضغط 145 PSI مع محرك ديزل 175 حصان وخزان وقود يومي وبطاريات بدء","fg":"#111111","b":true},{"c":"C7","v":"طقم","fg":"#111111","al":"center"},{"c":"D7","v":1,"in":true,"fg":"#111111","b":true,"al":"center"},{"c":"E7","v":185000,"in":true,"fg":"#111111","al":"center","nf":"#,##0"},{"c":"F7","v":185000,"f":"=D7*E7","fg":"#111111","b":true,"al":"center","nf":"#,##0"},{"c":"G7","v":"UL Listed / FM Approved / NFPA 20","fg":"#111111","al":"center"},{"c":"H7","v":"شاملة مبادل حراري وشكمان عادم معزول حرارياً","fg":"#111111","al":"center"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"1.03","fg":"#111111","b":true,"al":"center"},{"c":"B8","v":"توريد وتركيب مضخة جوكي مساعدة رأسية متعددة المراحل سعة 20 GPM وضغط 160 PSI مع محرك كهربائي 7.5 حصان","fg":"#111111","b":true},{"c":"C8","v":"طقم","fg":"#111111","al":"center"},{"c":"D8","v":1,"in":true,"fg":"#111111","b":true,"al":"center"},{"c":"E8","v":18000,"in":true,"fg":"#111111","al":"center","nf":"#,##0"},{"c":"F8","v":18000,"f":"=D8*E8","fg":"#111111","b":true,"al":"center","nf":"#,##0"},{"c":"G8","v":"UL Listed / NFPA 20","fg":"#111111","al":"center"},{"c":"H8","v":"للحفاظ على ضغط الشبكة تلقائياً ضد التسريب","fg":"#111111","al":"center"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"1.04","fg":"#111111","b":true,"al":"center"},{"c":"B9","v":"لوحة تحكم أوتوماتيكية لمضخة الحريق الكهربائية مع مفتاح تحويل تلقائي مدمج ATS وفق مواصفات الدفاع المدني","fg":"#111111","b":true},{"c":"C9","v":"لوحة","fg":"#111111","al":"center"},{"c":"D9","v":1,"in":true,"fg":"#111111","b":true,"al":"center"},{"c":"E9","v":65000,"in":true,"fg":"#111111","al":"center","nf":"#,##0"},{"c":"F9","v":65000,"f":"=D9*E9","fg":"#111111","b":true,"al":"center","nf":"#,##0"},{"c":"G9","v":"UL Listed / NEMA 2 / NFPA 20","fg":"#111111","al":"center"},{"c":"H9","v":"مع شاشة رقمية لبيانات الجهد والتيار وسجل الأعطال","fg":"#111111","al":"center"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":"1.05","fg":"#111111","b":true,"al":"center"},{"c":"B10","v":"لوحة تحكم أوتوماتيكية لمضخة الحريق الديزل مع شاحن بطاريات مزدوج ذكي ونظام إنذار سمعي وبصري","fg":"#111111","b":true},{"c":"C10","v":"لوحة","fg":"#111111","al":"center"},{"c":"D10","v":1,"in":true,"fg":"#111111","b":true,"al":"center"},{"c":"E10","v":55000,"in":true,"fg":"#111111","al":"center","nf":"#,##0"},{"c":"F10","v":55000,"f":"=D10*E10","fg":"#111111","b":true,"al":"center","nf":"#,##0"},{"c":"G10","v":"UL Listed / NEMA 2 / NFPA 20","fg":"#111111","al":"center"},{"c":"H10","v":"تتضمن نظام اختبار أسبوعي دوري أوتوماتيكي","fg":"#111111","al":"center"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"1.06","fg":"#111111","b":true,"al":"center"},{"c":"B11","v":"لوحة تحكم مضخة الجوكي مع مفتاح تشغيل/إيقاف يدوي وأوتوماتيكي ومفتاح ضغط ميكانيكي حساس","fg":"#111111","b":true},{"c":"C11","v":"لوحة","fg":"#111111","al":"center"},{"c":"D11","v":1,"in":true,"fg":"#111111","b":true,"al":"center"},{"c":"E11","v":12000,"in":true,"fg":"#111111","al":"center","nf":"#,##0"},{"c":"F11","v":12000,"f":"=D11*E11","fg":"#111111","b":true,"al":"center","nf":"#,##0"},{"c":"G11","v":"UL / IEC Standard","fg":"#111111","al":"center"},{"c":"H11","v":"شاملة قواطع الحماية المغناطيسية والحرارية","fg":"#111111","al":"center"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":"1.07","fg":"#111111","b":true,"al":"center"},{"c":"B12","v":"عداد قياس التدفق الهيدروليكي الرئيسي (Flow Meter) قطر 8 بوصة لمعايرة وفحص منحنى أداء المضخات","fg":"#111111","b":true},{"c":"C12","v":"عدد","fg":"#111111","al":"center"},{"c":"D12","v":1,"in":true,"fg":"#111111","b":true,"al":"center"},{"c":"E12","v":22000,"in":true,"fg":"#111111","al":"center","nf":"#,##0"},{"c":"F12","v":22000,"f":"=D12*E12","fg":"#111111","b":true,"al":"center","nf":"#,##0"},{"c":"G12","v":"FM Approved / NFPA 20","fg":"#111111","al":"center"},{"c":"H12","v":"مع محابس عزل وفلتر تنقية وقراءات مباشرة","fg":"#111111","al":"center"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":"1.08","fg":"#111111","b":true,"al":"center"},{"c":"B13","v":"محبس تصريف الضغط الزائد الرئيسي (Main Relief Valve) قطر 6 بوصة مع قمع الرؤية المخروطي (Waste Cone)","fg":"#111111","b":true},{"c":"C13","v":"طقم","fg":"#111111","al":"center"},{"c":"D13","v":1,"in":true,"fg":"#111111","b":true,"al":"center"},{"c":"E13","v":28000,"in":true,"fg":"#111111","al":"center","nf":"#,##0"},{"c":"F13","v":28000,"f":"=D13*E13","fg":"#111111","b":true,"al":"center","nf":"#,##0"},{"c":"G13","v":"UL/FM Approved / NFPA 20","fg":"#111111","al":"center"},{"c":"H13","v":"مخصص لمضخة الديزل لحماية الشبكة من فرط الضغط","fg":"#111111","al":"center"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"1.09","fg":"#111111","b":true,"al":"center"},{"c":"B14","v":"مجموعة خط اختبار المضخات الخارجي (Test Header) قطر 8 بوصة مع 4 مخارج نحاسية 2.5 بوصة وأغطية وسلاسل","fg":"#111111","b":true},{"c":"C14","v":"طقم","fg":"#111111","al":"center"},{"c":"D14","v":1,"in":true,"fg":"#111111","b":true,"al":"center"},{"c":"E14","v":24000,"in":true,"fg":"#111111","al":"center","nf":"#,##0"},{"c":"F14","v":24000,"f":"=D14*E14","fg":"#111111","b":true,"al":"center","nf":"#,##0"},{"c":"G14","v":"UL/FM Approved / NFPA 20","fg":"#111111","al":"center"},{"c":"H14","v":"تركب على الجدار الخارجي لفحص التدفق","fg":"#111111","al":"center"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"1.10","fg":"#111111","b":true,"al":"center"},{"c":"B15","v":"محابس سكينة ذات ساق صاعد OS&Y مع مفاتيح مراقبة إلكترونية Tamper Switch لأقطار 6 و 8 و 10 بوصة","fg":"#111111","b":true},{"c":"C15","v":"عدد","fg":"#111111","al":"center"},{"c":"D15","v":8,"in":true,"fg":"#111111","b":true,"al":"center"},{"c":"E15","v":4500,"in":true,"fg":"#111111","al":"center","nf":"#,##0"},{"c":"F15","v":36000,"f":"=D15*E15","fg":"#111111","b":true,"al":"center","nf":"#,##0"},{"c":"G15","v":"UL/FM Approved / Class 175","fg":"#111111","al":"center"},{"c":"H15","v":"ربط كامل مع لوحة إنذار الحريق المركزية","fg":"#111111","al":"center"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":"1.11","fg":"#111111","b":true,"al":"center"},{"c":"B16","v":"محابس عدم رجوع مانعة للارتداد نوع Dual-Door Check Valve قطر 8 بوصة لخطوط طرد المضخات","fg":"#111111","b":true},{"c":"C16","v":"عدد","fg":"#111111","al":"center"},{"c":"D16","v":3,"in":true,"fg":"#111111","b":true,"al":"center"},{"c":"E16","v":5200,"in":true,"fg":"#111111","al":"center","nf":"#,##0"},{"c":"F16","v":15600,"f":"=D16*E16","fg":"#111111","b":true,"al":"center","nf":"#,##0"},{"c":"G16","v":"UL/FM Approved / Class 250","fg":"#111111","al":"center"},{"c":"H16","v":"مصنوعة من حديد الدكتايل مع سيل فحص هيدروليكي","fg":"#111111","al":"center"}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":"1.12","fg":"#111111","b":true,"al":"center"},{"c":"B17","v":"وصلات تمدد مطاطية مرنة مزدوجة الكرات (Flexible Connectors) لأقطار 6 و 8 و 10 بوصة لعزل الاهتزازات","fg":"#111111","b":true},{"c":"C17","v":"عدد","fg":"#111111","al":"center"},{"c":"D17","v":6,"in":true,"fg":"#111111","b":true,"al":"center"},{"c":"E17","v":2100,"in":true,"fg":"#111111","al":"center","nf":"#,##0"},{"c":"F17","v":12600,"f":"=D17*E17","fg":"#111111","b":true,"al":"center","nf":"#,##0"},{"c":"G17","v":"UL Listed / High Pressure Rating","fg":"#111111","al":"center"},{"c":"H17","v":"تتحمل حتى ضغط تشغيلي 300 PSI","fg":"#111111","al":"center"}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":"1.13","fg":"#111111","b":true,"al":"center"},{"c":"B18","v":"أنابيب صلب غير ملحومة Schedule 40 قطر 8 و 6 و 4 بوصة لتجميعات غرف المضخات مع الدهان الحراري الأحمر","fg":"#111111","b":true},{"c":"C18","v":"م.ط","fg":"#111111","al":"center"},{"c":"D18","v":65,"in":true,"fg":"#111111","b":true,"al":"center"},{"c":"E18","v":550,"in":true,"fg":"#111111","al":"center","nf":"#,##0"},{"c":"F18","v":35750,"f":"=D18*E18","fg":"#111111","b":true,"al":"center","nf":"#,##0"},{"c":"G18","v":"ASTM A53 Grade B / NFPA 13","fg":"#111111","al":"center"},{"c":"H18","v":"وصلات لحام أو جروف فكتوليك معتمدة لدى جهات الفحص","fg":"#111111","al":"center"}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":"1.14","fg":"#111111","b":true,"al":"center"},{"c":"B19","v":"مجموعات حساسات الضغط النحاسية (Pressure Sensing Lines) بقطر 1/2 بوصة مع محابس عدم رجوع خرمية","fg":"#111111","b":true},{"c":"C19","v":"طقم","fg":"#111111","al":"center"},{"c":"D19","v":3,"in":true,"fg":"#111111","b":true,"al":"center"},{"c":"E19","v":3500,"in":true,"fg":"#111111","al":"center","nf":"#,##0"},{"c":"F19","v":10500,"f":"=D19*E19","fg":"#111111","b":true,"al":"center","nf":"#,##0"},{"c":"G19","v":"NFPA 20 (Sec 4.30)","fg":"#111111","al":"center"},{"c":"H19","v":"مصنوعة من النحاس الأحمر غير القابل للصدأ","fg":"#111111","al":"center"}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":"1.15","fg":"#111111","b":true,"al":"center"},{"c":"B20","v":"أعمال الاختبارات الهيدروليكية الميدانية ومعايرة التدفق والضغط وإصدار تقرير الفحص والتشغيل التجريبي","fg":"#111111","b":true},{"c":"C20","v":"مقطوعية","fg":"#111111","al":"center"},{"c":"D20","v":1,"in":true,"fg":"#111111","b":true,"al":"center"},{"c":"E20","v":18000,"in":true,"fg":"#111111","al":"center","nf":"#,##0"},{"c":"F20","v":18000,"f":"=D20*E20","fg":"#111111","b":true,"al":"center","nf":"#,##0"},{"c":"G20","v":"NFPA 20 Commissioning Standard","fg":"#111111","al":"center"},{"c":"H20","v":"بحضور استشاري المشروع ومندوب الدفاع المدني","fg":"#111111","al":"center"}]},{"r":21,"h":42.0,"cells":[{"c":"A21","v":"إجمالي القيمة التقديرية لمحطة ضخ مياه مكافحة الحريق (غير شامل ضريبة القيمة المضافة):","fg":"#8B0000","b":true,"al":"left","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F21","v":682450,"f":"=SUM(F6:F20)","bg":"#FDE8E8","fg":"#8B0000","b":true,"al":"center","nf":"#,##0 ر.س"},{"c":"G21","v":""},{"c":"H21","v":""}]},{"r":22,"h":28.0,"cells":[{"c":"A22","v":""},{"c":"B22","v":""},{"c":"C22","v":""},{"c":"D22","v":""},{"c":"E22","v":""},{"c":"F22","v":""},{"c":"G22","v":""},{"c":"H22","v":""}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":"مهندس التصميم الكهروميكانيكي (MEP)","bg":"#F5E6E6","fg":"#8B0000","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D23","v":"مهندس استشاري الحماية من الحريق والسلامة","bg":"#F5E6E6","fg":"#8B0000","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G23","v":"مدير الإدارة الفنية والمكتب الهندسي","bg":"#F5E6E6","fg":"#8B0000","b":true,"al":"center","cs":2},{"skip":true}]},{"r":24,"h":76.0,"cells":[{"c":"A24","v":"الاسم:\nالتوقيع:\nالتاريخ:","fg":"#111111","cs":3},{"skip":true},{"skip":true},{"c":"D24","v":"الاسم:\nالتوقيع:\nالتاريخ:","fg":"#111111","cs":3},{"skip":true},{"skip":true},{"c":"G24","v":"الاسم:\nالتوقيع:\nالتاريخ:","fg":"#111111","cs":2},{"skip":true}]}]}]}