{"slug":"fire-fighting-sprinklers-boq","sheets":[{"name":"لوحة التحكم وملخص التكاليف","maxRow":17,"maxCol":8,"colWidths":[8.0,45.0,25.0,24.0,20.0,35.0,16.0,25.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"مقايسة وجدول كميات شبكات مكافحة الحريق والرشاشات ومحطات المضخات (FIRE FIGHTING BOQ)","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"وفقاً لاشتراطات كود الحريق السعودي (SBC 801) والمعايير الأمريكية المعتمدة (NFPA 13, 14, 20, 2001) ومتطلبات الدفاع المدني","bg":"#0F172A","fg":"#FFFFFF","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"اسم المشروع:","bg":"#F1F5F9","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"مشروع الأبراج السكنية والتجارية - العاصمة","cs":2},{"skip":true},{"c":"E4","v":"مسطح البناء الإجمالي:","bg":"#F1F5F9","b":true,"al":"center"},{"c":"F4","v":12500,"in":true,"fg":"#991B1B","b":true,"al":"center","nf":"#,##0\" م²\""},{"c":"G4","v":"تصنيف درجة الخطورة:","bg":"#F1F5F9","b":true,"al":"center"},{"c":"H4","v":"خطورة عادية (Ordinary Hazard Gr. 1)","b":true,"al":"center"}]},{"r":5,"h":28.0,"cells":[{"c":"A5","v":""},{"c":"B5","v":""},{"c":"C5","v":""},{"c":"D5","v":""},{"c":"E5","v":""},{"c":"F5","v":""},{"c":"G5","v":""},{"c":"H5","v":""}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"إجمالي قيمة أنظمة الإطفاء","bg":"#F8FAFC","fg":"#64748B","b":true,"al":"center","cs":2},{"skip":true},{"c":"C6","v":"تكلفة المتر المربع من البناء","bg":"#F8FAFC","fg":"#64748B","b":true,"al":"center","cs":2},{"skip":true},{"c":"E6","v":"عدد رؤوس الرشاشات التقديرية","bg":"#F8FAFC","fg":"#64748B","b":true,"al":"center","cs":2},{"skip":true},{"c":"G6","v":"قدرة مضخات الحريق الإجمالية","bg":"#F8FAFC","fg":"#64748B","b":true,"al":"center","cs":2},{"skip":true}]},{"r":7,"h":42.0,"cells":[{"c":"A7","v":0,"f":"=E17","bg":"#F8FAFC","fg":"#991B1B","b":true,"al":"center","nf":"#,##0.00 \"ر.س\"","cs":2},{"skip":true},{"c":"C7","v":0,"f":"=A7/F4","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00 \"ر.س/م²\"","cs":2},{"skip":true},{"c":"E7","v":0,"f":"='تفاصيل المقايسة'!D10","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0\" رشاش\"","cs":2},{"skip":true},{"c":"G7","v":"1000 GPM @ 12 Bar","bg":"#F8FAFC","b":true,"al":"center","cs":2},{"skip":true}]},{"r":8,"h":28.0,"cells":[{"c":"A8","v":""},{"c":"B8","v":""},{"c":"C8","v":""},{"c":"D8","v":""},{"c":"E8","v":""},{"c":"F8","v":""},{"c":"G8","v":""},{"c":"H8","v":""}]},{"r":9,"h":40.0,"cells":[{"c":"A9","v":"م","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"النظام والشبكة الإنشائية لمكافحة الحريق","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"المعيار والكود الحاكم","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"القيمة التقديرية (ر.س)","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"النسبة من الإجمالي (%)","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"المواصفات الفنية المعتمدة","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"حالة الاعتماد","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H9","v":"الملاحظات التعاقدية","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":1,"al":"center"},{"c":"B10","v":"شبكة رشاشات المياه التلقائية ومحابس التحكم (Sprinklers & ZCV)"},{"c":"C10","v":"NFPA 13 / SBC 801","al":"center"},{"c":"D10","v":70900,"f":"='تفاصيل المقايسة'!F16","nf":"#,##0.00"},{"c":"E10","v":0,"f":"=D10/$D$17","al":"center","nf":"0.00%"},{"c":"F10","v":"مواسير حديد أسود جدول 40 ورشاشات UL/FM"},{"c":"G10","v":"معتمد","al":"center"},{"c":"H10","v":"تغطي كافة الأدوار والمواقف"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":2,"al":"center"},{"c":"B11","v":"شبكة صناديق خراطيم الحريق ومدافع المياه (Fire Hose Cabinets)"},{"c":"C11","v":"NFPA 14 / SBC 801","al":"center"},{"c":"D11","v":346500,"f":"='تفاصيل المقايسة'!F23","nf":"#,##0.00"},{"c":"E11","v":0,"f":"=D11/$D$17","al":"center","nf":"0.00%"},{"c":"F11","v":"صناديق ستانلس ستيل ضغط عالي مع محبس 2.5 بوصة"},{"c":"G11","v":"معتمد","al":"center"},{"c":"H11","v":"صندوق لكل 800 م² ومخرج سلم"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":3,"al":"center"},{"c":"B12","v":"محطة مضخات الحريق المتكاملة (Fire Pumps Set)"},{"c":"C12","v":"NFPA 20 / UL/FM","al":"center"},{"c":"D12","v":0,"f":"='تفاصيل المقايسة'!F30","nf":"#,##0.00"},{"c":"E12","v":0,"f":"=D12/$D$17","al":"center","nf":"0.00%"},{"c":"F12","v":"مضخة ديزل + كهرباء 1000 GPM + جوكي مع اللوحات"},{"c":"G12","v":"معتمد","al":"center"},{"c":"H12","v":"شهادة UL/FM معتمدة للدفاع المدني"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":4,"al":"center"},{"c":"B13","v":"شبكات الإطفاء بالغاز النظيف لغرف السيرفرات (Clean Agent FM200)"},{"c":"C13","v":"NFPA 2001 / ISO 14520","al":"center"},{"c":"D13","v":0,"f":"='تفاصيل المقايسة'!F37","nf":"#,##0.00"},{"c":"E13","v":0,"f":"=D13/$D$17","al":"center","nf":"0.00%"},{"c":"F13","v":"نظام غمر كلي FM-200 لغرف الداتا والمحولات"},{"c":"G13","v":"معتمد","al":"center"},{"c":"H13","v":"صديق للبيئة مع لوحة إطلاق غاز"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":5,"al":"center"},{"c":"B14","v":"طفايات الحريق اليدوية ومعدات السلامة المتنقلة (Extinguishers)"},{"c":"C14","v":"NFPA 10 / SBC 801","al":"center"},{"c":"D14","v":0,"f":"='تفاصيل المقايسة'!F43","nf":"#,##0.00"},{"c":"E14","v":0,"f":"=D14/$D$17","al":"center","nf":"0.00%"},{"c":"F14","v":"طفايات بودرة جافة 6 كجم + ثاني أكسيد الكربون 5 كجم"},{"c":"G14","v":"معتمد","al":"center"},{"c":"H14","v":"توزيع وفق مسافات الانتقال 15م"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":6,"al":"center"},{"c":"B15","v":"أعمال الفحص الميداني واختبار الضغط الهيدروليكي والتراخيص"},{"c":"C15","v":"NFPA 25 / الدفاع المدني","al":"center"},{"c":"D15","v":45000,"in":true,"nf":"#,##0.00"},{"c":"E15","v":0,"f":"=D15/$D$17","al":"center","nf":"0.00%"},{"c":"F15","v":"اختبار الضغط الهيدروستاتيكي 200 PSI لمدّة ساعتين"},{"c":"G15","v":"معتمد","al":"center"},{"c":"H15","v":"شامل إصدار شهادة الدفاع المدني"}]},{"r":16,"h":28.0,"cells":[{"c":"A16","v":""},{"c":"B16","v":""},{"c":"C16","v":""},{"c":"D16","v":""},{"c":"E16","v":""},{"c":"F16","v":""},{"c":"G16","v":""},{"c":"H16","v":""}]},{"r":17,"h":42.0,"cells":[{"c":"A17","v":"إجمالي القيمة التقديرية لأنظمة الإطفاء قبل الضريبة (Subtotal)","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D17","v":462400,"f":"=SUM(D10:D15)","bg":"#991B1B","fg":"#FFFFFF","b":true,"nf":"#,##0.00"},{"c":"E17","v":0,"f":"=SUM(E10:E15)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"0.00%"},{"c":"F17","v":"شامل الاختبارات الهيدروليكية ورخص السلامة","f":"=\"شامل الاختبارات الهيدروليكية ورخص السلامة\"","bg":"#0F172A","fg":"#FFFFFF","al":"center","cs":3},{"skip":true},{"skip":true}]}]},{"name":"تفاصيل المقايسة","maxRow":33,"maxCol":8,"colWidths":[12.0,55.0,12.0,14.0,18.0,22.0,20.0,25.0],"rows":[{"r":1,"h":48.0,"cells":[{"c":"A1","v":"جدول الكميات والأسعار التفصيلي لشبكات مكافحة الحريق والإنذار (DETAILED BOQ)","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":28.0,"cells":[{"c":"A2","v":""},{"c":"B2","v":""},{"c":"C2","v":""},{"c":"D2","v":""},{"c":"E2","v":""},{"c":"F2","v":""},{"c":"G2","v":""},{"c":"H2","v":""}]},{"r":3,"h":38.0,"cells":[{"c":"A3","v":"رقم البند","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B3","v":"بيان وتوصيف الأعمال والتوريدات الميكانيكية","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C3","v":"الوحدة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D3","v":"الكمية","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E3","v":"سعر الوحدة (ر.س)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F3","v":"إجمالي القيمة (ر.س)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G3","v":"الاعتماد والكود","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H3","v":"الملاحظات الفنية","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":4,"h":36.0,"cells":[{"c":"A4","v":"أولاً: شبكة الرشاشات التلقائية ومحابس التحكم (Fire Sprinklers & Valves)","bg":"#991B1B","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":72.0,"cells":[{"c":"A5","v":"1.1","al":"center"},{"c":"B5","v":"توريد وتركيب رؤوس رشاشات مياه أوتوماتيكية زجاجية (Pendent / Upright) درجة حرارة 68°م معتمدة UL/FM قطر 1/2 بوصة مع غطاء روزيتة نيكل كروم"},{"c":"C5","v":"عدد","al":"center"},{"c":"D5","v":1450,"in":true,"nf":"#,##0.00"},{"c":"E5","v":48,"in":true,"nf":"#,##0.00"},{"c":"F5","v":69600,"f":"=D5*E5","nf":"#,##0.00"},{"c":"G5","v":"NFPA 13 / UL","al":"center"},{"c":"H5","v":"شامل الوصلات المرنة والتعليق"}]},{"r":6,"h":72.0,"cells":[{"c":"A6","v":"1.2","al":"center"},{"c":"B6","v":"توريد وتركيب مواسير حديد أسود غير ملحومة غير مجلفنة جدول 40 (ASTM A53 Gr. B) قطر 2 إلى 4 بوصة للشبكة الرئيسية ومجمعات الرشاشات"},{"c":"C6","v":"م.ط","al":"center"},{"c":"D6","v":1850,"in":true,"nf":"#,##0.00"},{"c":"E6","v":115,"in":true,"nf":"#,##0.00"},{"c":"F6","v":212750,"f":"=D6*E6","nf":"#,##0.00"},{"c":"G6","v":"ASTM A53 / UL","al":"center"},{"c":"H6","v":"شامل الدهان الإيبوكسي الأحمر واللحام والتعليق"}]},{"r":7,"h":72.0,"cells":[{"c":"A7","v":"1.3","al":"center"},{"c":"B7","v":"توريد وتركيب مواسير شبكة التوزيع الفرعية قطر 1 إلى 1.5 بوصة جدول 40 مع كافة لوازم الوصلات الفيتنج المسننة 300 PSI المعتمدة"},{"c":"C7","v":"م.ط","al":"center"},{"c":"D7","v":3200,"in":true,"nf":"#,##0.00"},{"c":"E7","v":58,"in":true,"nf":"#,##0.00"},{"c":"F7","v":185600,"f":"=D7*E7","nf":"#,##0.00"},{"c":"G7","v":"UL / FM Listed","al":"center"},{"c":"H7","v":"توصيلات الرشاشات الفرعية"}]},{"r":8,"h":72.0,"cells":[{"c":"A8","v":"1.4","al":"center"},{"c":"B8","v":"توريد وتركيب محابس تحكم قطاعية (Zone Control Valve Assembly) قطر 4 بوصة تشمل محبس فراشة مراقب كهربائياً وحساس تدفق مياه ومحبس فحص وتصريف"},{"c":"C8","v":"طقم","al":"center"},{"c":"D8","v":8,"in":true,"nf":"#,##0.00"},{"c":"E8","v":3850,"in":true,"nf":"#,##0.00"},{"c":"F8","v":30800,"f":"=D8*E8","nf":"#,##0.00"},{"c":"G8","v":"NFPA 13 / UL","al":"center"},{"c":"H8","v":"طقم لكل دور وموقف سيارات"}]},{"r":9,"h":72.0,"cells":[{"c":"A9","v":"1.5","al":"center"},{"c":"B9","v":"توريد وتركيب وصلة الدفاع المدني الثنائية الخارجية (Siamese Fire Department Connection 4\"x2.5\"x2.5\") كاملة مع محبس عدم رجوع"},{"c":"C9","v":"طقم","al":"center"},{"c":"D9","v":2,"in":true,"nf":"#,##0.00"},{"c":"E9","v":2800,"in":true,"nf":"#,##0.00"},{"c":"F9","v":5600,"f":"=D9*E9","nf":"#,##0.00"},{"c":"G9","v":"NFPA 14 / UL","al":"center"},{"c":"H9","v":"لضخ سيارات الإطفاء الخارجية"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":"إجمالي شبكة الرشاشات التلقائية ومحابس التحكم","bg":"#F1F5F9","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F10","v":504350,"f":"=SUM(F5:F9)","bg":"#F1F5F9","fg":"#991B1B","b":true,"nf":"#,##0.00"},{"c":"G10","v":"","bg":"#F1F5F9","cs":2},{"skip":true}]},{"r":11,"h":28.0,"cells":[{"c":"A11","v":""},{"c":"B11","v":""},{"c":"C11","v":""},{"c":"D11","v":""},{"c":"E11","v":""},{"c":"F11","v":""},{"c":"G11","v":""},{"c":"H11","v":""}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":"ثانياً: شبكة صناديق خراطيم الحريق ومدافع المياه (Fire Hose Cabinets & Standpipes)","bg":"#991B1B","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":13,"h":72.0,"cells":[{"c":"A13","v":"2.1","al":"center"},{"c":"B13","v":"توريد وتركيب صندوق حريق ستانلس ستيل غاطس/ظاهر يشمل بكرة خرطوم مطاطي 1 بوصة بطول 30 متر مع قاذف نحاسي ومحبس زاوية 2.5 بوصة معتمد"},{"c":"C13","v":"عدد","al":"center"},{"c":"D13","v":18,"in":true,"nf":"#,##0.00"},{"c":"E13","v":2650,"in":true,"nf":"#,##0.00"},{"c":"F13","v":0,"f":"=D12*E12","nf":"#,##0.00"},{"c":"G13","v":"NFPA 14 / UL","al":"center"},{"c":"H13","v":"صندوق لكل طابق ومخرج هروب"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"2.2","al":"center"},{"c":"B14","v":"توريد وتركيب ماسورة صاعدة جافة/رطبة (Fire Standpipe) قطر 4 بوصة جدول 40 متصلة بوصلة الدفاع المدني ومحابس تصريف القاع"},{"c":"C14","v":"م.ط","al":"center"},{"c":"D14","v":160,"in":true,"nf":"#,##0.00"},{"c":"E14","v":145,"in":true,"nf":"#,##0.00"},{"c":"F14","v":47700,"f":"=D13*E13","nf":"#,##0.00"},{"c":"G14","v":"SBC 801 / NFPA 14","al":"center"},{"c":"H14","v":"شامل مثبتات الزلازل والعوازل"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"2.3","al":"center"},{"c":"B15","v":"توريد وتركيب صمام إنزال نحاسي (Landing Valve 2.5\") في مهابط السلالم مع غطاء وسلسلة"},{"c":"C15","v":"عدد","al":"center"},{"c":"D15","v":12,"in":true,"nf":"#,##0.00"},{"c":"E15","v":650,"in":true,"nf":"#,##0.00"},{"c":"F15","v":23200,"f":"=D14*E14","nf":"#,##0.00"},{"c":"G15","v":"BS 5041 / UL","al":"center"},{"c":"H15","v":"لاستخدام فرق الدفاع المدني"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":"إجمالي شبكة صناديق خراطيم الحريق ومدافع المياه","bg":"#F1F5F9","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F16","v":70900,"f":"=SUM(F13:F15)","bg":"#F1F5F9","fg":"#991B1B","b":true,"nf":"#,##0.00"},{"c":"G16","v":"","bg":"#F1F5F9","cs":2},{"skip":true}]},{"r":17,"h":28.0,"cells":[{"c":"A17","v":""},{"c":"B17","v":""},{"c":"C17","v":""},{"c":"D17","v":""},{"c":"E17","v":""},{"c":"F17","v":""},{"c":"G17","v":""},{"c":"H17","v":""}]},{"r":18,"h":36.0,"cells":[{"c":"A18","v":"ثالثاً: محطة مضخات الحريق الرئيسية والاحتياطية (UL/FM Fire Pumps Set)","bg":"#991B1B","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":19,"h":72.0,"cells":[{"c":"A19","v":"3.1","al":"center"},{"c":"B19","v":"توريد وتركيب واختبار مضخة حريق رئيسية تعمل بمحرك كهربائي قدرة 1000 GPM عند ضغط 12 بار (175 PSI) معتمدة UL/FM مع لوحة التشغيل الأوتوماتيكية"},{"c":"C19","v":"طقم","al":"center"},{"c":"D19","v":1,"in":true,"nf":"#,##0.00"},{"c":"E19","v":145000,"in":true,"nf":"#,##0.00"},{"c":"F19","v":0,"f":"=D18*E18","nf":"#,##0.00"},{"c":"G19","v":"NFPA 20 / UL/FM","al":"center"},{"c":"H19","v":"شامل ممتصات الاهتزاز والوصلات"}]},{"r":20,"h":72.0,"cells":[{"c":"A20","v":"3.2","al":"center"},{"c":"B20","v":"توريد وتركيب واختبار مضخة حريق احتياطية تعمل بمحرك ديزل قدرة 1000 GPM عند ضغط 12 بار كاملة مع خزان وقود ديزل وبطاريتين وشاحن أوتوماتيكي"},{"c":"C20","v":"طقم","al":"center"},{"c":"D20","v":1,"in":true,"nf":"#,##0.00"},{"c":"E20","v":185000,"in":true,"nf":"#,##0.00"},{"c":"F20","v":145000,"f":"=D19*E19","nf":"#,##0.00"},{"c":"G20","v":"NFPA 20 / UL/FM","al":"center"},{"c":"H20","v":"جاهزية تشغيل فورية عند انقطاع الكهرباء"}]},{"r":21,"h":72.0,"cells":[{"c":"A21","v":"3.3","al":"center"},{"c":"B21","v":"توريد وتركيب مضخة تعويض الضغط (Jockey Pump) قدرة 30 GPM عند ضغط 13 بار مع لوحة تحكم أوتوماتيكية لتعويض التسريب بالشبكة"},{"c":"C21","v":"طقم","al":"center"},{"c":"D21","v":1,"in":true,"nf":"#,##0.00"},{"c":"E21","v":16500,"in":true,"nf":"#,##0.00"},{"c":"F21","v":185000,"f":"=D20*E20","nf":"#,##0.00"},{"c":"G21","v":"NFPA 20 / UL","al":"center"},{"c":"H21","v":"شامل مقاييس الضغط والمحابس"}]},{"r":22,"h":52.0,"cells":[{"c":"A22","v":"3.4","al":"center"},{"c":"B22","v":"توريد وتركيب محابس السحب والطرد وصمام تصريف الضغط الزائد ومقياس تدفق المياه (Flow Meter) ومجمع الاختبارات الميداني"},{"c":"C22","v":"مقطوع","al":"center"},{"c":"D22","v":1,"in":true,"nf":"#,##0.00"},{"c":"E22","v":38000,"in":true,"nf":"#,##0.00"},{"c":"F22","v":16500,"f":"=D21*E21","nf":"#,##0.00"},{"c":"G22","v":"UL / FM Listed","al":"center"},{"c":"H22","v":"شبكة التوصيل بغرفة المضخات"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":"إجمالي محطة مضخات الحريق الرئيسية والاحتياطية","bg":"#F1F5F9","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F23","v":346500,"f":"=SUM(F19:F22)","bg":"#F1F5F9","fg":"#991B1B","b":true,"nf":"#,##0.00"},{"c":"G23","v":"","bg":"#F1F5F9","cs":2},{"skip":true}]},{"r":24,"h":28.0,"cells":[{"c":"A24","v":""},{"c":"B24","v":""},{"c":"C24","v":""},{"c":"D24","v":""},{"c":"E24","v":""},{"c":"F24","v":""},{"c":"G24","v":""},{"c":"H24","v":""}]},{"r":25,"h":36.0,"cells":[{"c":"A25","v":"رابعاً: شبكات الإطفاء التلقائي بالغاز النظيف لغرف الكهرباء والسيرفرات (Clean Agent FM200)","bg":"#991B1B","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":26,"h":72.0,"cells":[{"c":"A26","v":"4.1","al":"center"},{"c":"B26","v":"توريد وتركيب واختبار نظام غمر كلي بغاز FM-200 (HFC-227ea) معتمد UL/FM يشمل أسطوانات الغاز سعة 120 لتر وصمامات التفريغ وفوهات الرش وشبكة الأنابيب"},{"c":"C26","v":"طقم","al":"center"},{"c":"D26","v":2,"in":true,"nf":"#,##0.00"},{"c":"E26","v":65000,"in":true,"nf":"#,##0.00"},{"c":"F26","v":0,"f":"=D25*E25","nf":"#,##0.00"},{"c":"G26","v":"NFPA 2001 / UL","al":"center"},{"c":"H26","v":"لغرف السيرفرات وغرفة المحولات"}]},{"r":27,"h":72.0,"cells":[{"c":"A27","v":"4.2","al":"center"},{"c":"B27","v":"توريد وتركيب لوحة إطلاق وتحكم بالغاز متصلة بكواشف دخان متقاطعة (Cross-Zoning Detectors) وسارينة إنذار وزر إيقاف يدوي طارئ"},{"c":"C27","v":"طقم","al":"center"},{"c":"D27","v":2,"in":true,"nf":"#,##0.00"},{"c":"E27","v":14500,"in":true,"nf":"#,##0.00"},{"c":"F27","v":130000,"f":"=D26*E26","nf":"#,##0.00"},{"c":"G27","v":"NFPA 72 / UL","al":"center"},{"c":"H27","v":"نظام كشف وتحكم مبكر متكامل"}]},{"r":28,"h":34.0,"cells":[{"c":"A28","v":"إجمالي شبكات الإطفاء التلقائي بالغاز النظيف لغرف الكهرباء والسيرفرات","bg":"#F1F5F9","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F28","v":130000,"f":"=SUM(F26:F27)","bg":"#F1F5F9","fg":"#991B1B","b":true,"nf":"#,##0.00"},{"c":"G28","v":"","bg":"#F1F5F9","cs":2},{"skip":true}]},{"r":29,"h":28.0,"cells":[{"c":"A29","v":""},{"c":"B29","v":""},{"c":"C29","v":""},{"c":"D29","v":""},{"c":"E29","v":""},{"c":"F29","v":""},{"c":"G29","v":""},{"c":"H29","v":""}]},{"r":30,"h":36.0,"cells":[{"c":"A30","v":"خامساً: طفايات الحريق اليدوية ومعدات السلامة (Portable Fire Extinguishers)","bg":"#991B1B","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":31,"h":52.0,"cells":[{"c":"A31","v":"5.1","al":"center"},{"c":"B31","v":"توريد وتركيب طفايات حريق بودرة جافة متعددة الأغراض (ABC Dry Chemical) سعة 6 كجم مع كابول التثبيت الجداري وخرطوم الرش"},{"c":"C31","v":"عدد","al":"center"},{"c":"D31","v":45,"in":true,"nf":"#,##0.00"},{"c":"E31","v":160,"in":true,"nf":"#,##0.00"},{"c":"F31","v":0,"f":"=D30*E30","nf":"#,##0.00"},{"c":"G31","v":"NFPA 10 / SASO","al":"center"},{"c":"H31","v":"توزيع بالأدوار والممرات"}]},{"r":32,"h":52.0,"cells":[{"c":"A32","v":"5.2","al":"center"},{"c":"B32","v":"توريد وتركيب طفايات حريق غاز ثاني أكسيد الكربون (CO2) سعة 5 كجم لغرف اللوحات الكهربائية ومولدات الديزل"},{"c":"C32","v":"عدد","al":"center"},{"c":"D32","v":25,"in":true,"nf":"#,##0.00"},{"c":"E32","v":290,"in":true,"nf":"#,##0.00"},{"c":"F32","v":7200,"f":"=D31*E31","nf":"#,##0.00"},{"c":"G32","v":"NFPA 10 / SASO","al":"center"},{"c":"H32","v":"إطفاء حرائق التجهيزات الكهربائية"}]},{"r":33,"h":34.0,"cells":[{"c":"A33","v":"إجمالي طفايات الحريق اليدوية ومعدات السلامة","bg":"#F1F5F9","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F33","v":7200,"f":"=SUM(F31:F32)","bg":"#F1F5F9","fg":"#991B1B","b":true,"nf":"#,##0.00"},{"c":"G33","v":"","bg":"#F1F5F9","cs":2},{"skip":true}]}]}]}