{"slug":"firefighting-hydraulic-pipe-sizing-and-hazen-williams-sheet","sheets":[{"name":"لوحة المؤشرات ومضخة الحريق","maxRow":22,"maxCol":9,"colWidths":[8.0,32.0,16.0,24.0,18.0,28.0,28.0,20.0,36.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"الحسابات الهيدروليكية لشبكات إطفاء الحريق بالرشاشات | NFPA 13 & SBC 801","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"قالب تشغيلي لحساب الفواقد الاحتكاكية بمعادلة هازن-ويليامز وتحديد نقطة تشغيل مضخة الحريق والضغط المتبقي عند أبعد رشاش حرج","bg":"#1E293B","fg":"#FEE2E2","al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":14.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"معدل تدفق مضخة الحريق (Flow Q)","bg":"#FEF2F2","fg":"#991B1B","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"ضغط المضخة الكلي المطلوب (Head)","bg":"#FEF2F2","fg":"#991B1B","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"ضغط أبعد رشاش حرج (Residual P)","bg":"#FEF2F2","fg":"#991B1B","b":true,"al":"center","cs":2},{"skip":true},{"c":"G4","v":"قدرة محرك مضخة الحريق المعتمدة","bg":"#FEF2F2","fg":"#991B1B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":5,"h":36.0,"cells":[{"c":"A5","v":"500 GPM (1,893 L/min)","bg":"#FEF2F2","b":true,"al":"center","cs":2},{"skip":true},{"c":"C5","v":"7.80 bar (113.1 psi)","bg":"#FEF2F2","b":true,"al":"center","cs":2},{"skip":true},{"c":"E5","v":"1.20 bar (17.4 psi)","bg":"#FEF2F2","b":true,"al":"center","cs":2},{"skip":true},{"c":"G5","v":"45 kW (60 HP) | كفاءة 72%","bg":"#FEF2F2","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"يغطي منطقة تشغيل 1500 قدم2 + خراطيم","bg":"#FEF2F2","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"C6","v":"ضغط الاحتكاك + الارتفاع + المتبقي","bg":"#FEF2F2","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"E6","v":"أعلى من الحد الأدنى لكود NFPA (0.5 bar)","bg":"#FEF2F2","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"G6","v":"مضخة مدرجة UL ومطابقة FM Global","bg":"#FEF2F2","fg":"#475569","al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":7,"h":16.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""},{"c":"I7","v":""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"بيانات تصنيف خطورة الإشغال والمعايير الهندسية لشبكة الإطفاء بالمبنى","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":40.0,"cells":[{"c":"A9","v":"م","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"المعامل والمتطلب التصميمي","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"الرمز الهندسي","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"القيمة التصميمية","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"الوحدة","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"المرجع الكودي المعتمد","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"طريقة التحقق والحساب","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H9","v":"حالة المطابقة","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I9","v":"ملاحظات التوصيف والتنفيذ","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":1,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B10","v":"تصنيف خطورة الإشغال الإنشائي","bg":"#F8FAFC","b":true},{"c":"C10","v":"Occupancy Hazard","bg":"#F8FAFC","al":"center"},{"c":"D10","v":"خطورة عادية (Ordinary Hazard 1)","bg":"#F8FAFC","fg":"#991B1B","b":true,"al":"center"},{"c":"E10","v":"تصنيف","bg":"#F8FAFC","al":"center"},{"c":"F10","v":"NFPA 13 Chapter 5 / SBC 801","bg":"#F8FAFC"},{"c":"G10","v":"طبيعة الاستخدام والمواد المخزنة","bg":"#F8FAFC"},{"c":"H10","v":"معتمد (PASS)","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"I10","v":"مواقف سيارات ومخازن خفيفة ومكاتب","bg":"#F8FAFC"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":2,"b":true,"al":"center"},{"c":"B11","v":"كثافة التصميم الهيدروليكية المطلوبة","b":true},{"c":"C11","v":"Density","al":"center"},{"c":"D11","v":0.15,"in":true,"fg":"#991B1B","b":true,"al":"center"},{"c":"E11","v":"gpm/ft2 (6.1 L/min/m2)","al":"center"},{"c":"F11","v":"NFPA 13 Figure 19.3.3.1.1"},{"c":"G11","v":"منحنى الكثافة مقابل مساحة التشغيل"},{"c":"H11","v":"مطابق (PASS)","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"I11","v":"كثافة تغطي خطورة Ordinary 1"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":3,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B12","v":"مساحة التشغيل الهيدروليكية الأكثر حرجاً","bg":"#F8FAFC","b":true},{"c":"C12","v":"Design Area","bg":"#F8FAFC","al":"center"},{"c":"D12","v":1500,"in":true,"bg":"#F8FAFC","fg":"#991B1B","b":true,"al":"center"},{"c":"E12","v":"قدم2 (139 م2)","bg":"#F8FAFC","al":"center"},{"c":"F12","v":"NFPA 13 Section 19.3.3.1","bg":"#F8FAFC"},{"c":"G12","v":"مساحة التشغيل المعتمدة بنظام الأنابيب الرطبة","bg":"#F8FAFC"},{"c":"H12","v":"مطابق (PASS)","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"I12","v":"أبعد 12 رشاش في الدور الأخير","bg":"#F8FAFC"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":4,"b":true,"al":"center"},{"c":"B13","v":"معامل تدفق الرشاش القياسي","b":true},{"c":"C13","v":"K-Factor","al":"center"},{"c":"D13","v":5.6,"in":true,"fg":"#991B1B","b":true,"al":"center"},{"c":"E13","v":"GPM/(psi)^0.5 [80 SI]","al":"center"},{"c":"F13","v":"NFPA 13 Table 7.2.2.1"},{"c":"G13","v":"فوهات رشاشات قياسية 1/2 بوصة"},{"c":"H13","v":"معتمد (PASS)","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"I13","v":"رشاشات متدلية Pendent Quick Response"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":5,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B14","v":"إضافة تدفق خراطيم الإطفاء الداخلية","bg":"#F8FAFC","b":true},{"c":"C14","v":"Hose Stream","bg":"#F8FAFC","al":"center"},{"c":"D14","v":250,"in":true,"bg":"#F8FAFC","fg":"#991B1B","b":true,"al":"center"},{"c":"E14","v":"GPM (946 L/min)","bg":"#F8FAFC","al":"center"},{"c":"F14","v":"NFPA 13 Table 19.3.3.1.2","bg":"#F8FAFC"},{"c":"G14","v":"اشتراط الدفاع المدني لخراطيم المبنى","bg":"#F8FAFC"},{"c":"H14","v":"محسوب (PASS)","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"I14","v":"مضاف لحمل مضخة الحريق الإجمالية","bg":"#F8FAFC"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":6,"b":true,"al":"center"},{"c":"B15","v":"نوع وأنابيب شبكة مكافحة الحريق","b":true},{"c":"C15","v":"Pipe Material","al":"center"},{"c":"D15","v":"صلب أسود غير ملحوم Schedule 40","fg":"#991B1B","b":true,"al":"center"},{"c":"E15","v":"نوع","al":"center"},{"c":"F15","v":"ASTM A53 / ASTM A795"},{"c":"G15","v":"معامل هازن ويليامز C = 120"},{"c":"H15","v":"مطابق (PASS)","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"I15","v":"وصلات محززة Grooved Fittings معتمدة UL"}]},{"r":16,"h":40.0,"cells":[{"c":"A16","v":"الخلاصة الهيدروليكية لمضخة الحريق","bg":"#F1F5F9","fg":"#991B1B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D16","v":"المضخة المختارة: 500 GPM @ 7.8 bar (113 psi) تغطي كامل متطلبات الشبكة والخراطيم بفائض أمان 15%","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":17,"h":16.0,"cells":[{"c":"A17","v":""},{"c":"B17","v":""},{"c":"C17","v":""},{"c":"D17","v":""},{"c":"E17","v":""},{"c":"F17","v":""},{"c":"G17","v":""},{"c":"H17","v":""},{"c":"I17","v":""}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":"بيانات اعتماد الحسابات الهيدروليكية والمصادقة الفنية للدفاع المدني","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":19,"h":36.0,"cells":[{"c":"A19","v":"مهندس مكافحة الحريق المصمم (Fire Protection Eng.)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D19","v":"استشاري السلامة والحماية من الحريق (Safety Consultant)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G19","v":"مدير تنفيذ الأعمال الكهروميكانيكية (MEP Contractor)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":20,"h":36.0,"cells":[{"c":"A20","v":"الاسم: م. ماجد الحربي | كود الاعتماد: NFPA-FPE-412","cs":3},{"skip":true},{"skip":true},{"c":"D20","v":"المكتب الهندسي: مكتب استشارات السلامة الهندسية المعتمد","cs":3},{"skip":true},{"skip":true},{"c":"G20","v":"شركة المقاولات: شركة أنظمة الحريق الكهروميكانيكية","cs":3},{"skip":true},{"skip":true}]},{"r":21,"h":36.0,"cells":[{"c":"A21","v":"التاريخ: 11 / 10 / 2026 م","cs":3},{"skip":true},{"skip":true},{"c":"D21","v":"حالة الاعتماد: معتمد ومطابق لاشتراطات الدفاع المدني","cs":3},{"skip":true},{"skip":true},{"c":"G21","v":"التاريخ: 11 / 10 / 2026 م","cs":3},{"skip":true},{"skip":true}]},{"r":22,"h":42.0,"cells":[{"c":"A22","v":"التوقيع والختم: ............................................","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D22","v":"التوقيع والختم: ............................................","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G22","v":"التوقيع والختم: ............................................","al":"center","cs":3},{"skip":true},{"skip":true}]}]},{"name":"الحساب الهيدروليكي للمسار الحرج","maxRow":12,"maxCol":13,"colWidths":[34.0,18.0,18.0,20.0,14.0,16.0,18.0,20.0,20.0,20.0,16.0,18.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول الحسابات الهيدروليكية التفصيلية للمسار الأكثر حرجاً (Hydraulic Calculations Sheet)","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"حساب فواقد الاحتكاك في الأنابيب والقطع المكافئة بمعادلة هازن-ويليامز من أبعد رشاش (Node 1) وحتى طرد مضخة الحريق الرئيسية (Pump Discharge)","bg":"#1E293B","fg":"#FEE2E2","al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":14.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"قطاع الأنبوب (Node - Node)","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"القطر الاسمي (بوصة)","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"القطر الداخلي d (مم)","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"التدفق المار Q (L/min)","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"معامل هازن C","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"الطول الحقيقي (م)","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"طول القطع المكافئة (م)","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"الطول المكافئ الإجمالي (م)","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"الفاقد بالمتر (bar/m)","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J4","v":"فاقد احتكاك القطاع (bar)","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K4","v":"فرق الارتفاع (م)","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L4","v":"ضغط الارتفاع (bar)","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M4","v":"الضغط الكلي عند العقدة (bar)","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"N1 - N2 (أبعد رشاش إلى الرشاش المجاور)"},{"c":"B5","v":"1.0 بوصة","al":"center"},{"c":"C5","v":27.3,"in":true,"al":"center"},{"c":"D5","v":85,"in":true,"al":"center"},{"c":"E5","v":120,"in":true,"al":"center"},{"c":"F5","v":3.2,"in":true,"al":"center"},{"c":"G5","v":0.8,"in":true,"al":"center"},{"c":"H5","v":4,"f":"=F5+G5","b":true,"al":"center","nf":"0.00"},{"c":"I5","v":0.032403,"f":"=605000*(D5^1.85)/((E5^1.85)*(C5^4.87))","al":"center","nf":"0.0000"},{"c":"J5","v":0.129612,"f":"=H5*I5","b":true,"al":"center","nf":"0.000"},{"c":"K5","v":0,"in":true,"al":"center","nf":"0.0"},{"c":"L5","v":0,"f":"=K5*0.0981","al":"center","nf":"0.00"},{"c":"M5","v":1.2,"in":true,"b":true,"al":"center","nf":"0.00"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"N2 - N3 (فرع الرشاشات المتكرر 2)","bg":"#F8FAFC"},{"c":"B6","v":"1.25 بوصة","bg":"#F8FAFC","al":"center"},{"c":"C6","v":35.1,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"D6","v":170,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E6","v":120,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F6","v":3.2,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G6","v":1.1,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H6","v":4.3,"f":"=F6+G6","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"I6","v":0.034352,"f":"=605000*(D6^1.85)/((E6^1.85)*(C6^4.87))","bg":"#F8FAFC","al":"center","nf":"0.0000"},{"c":"J6","v":0.147714,"f":"=H6*I6","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"K6","v":0,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"L6","v":0,"f":"=K6*0.0981","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"M6","v":1.34,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"N3 - N4 (نهاية خط الفرع إلى الفرعي المجمع)"},{"c":"B7","v":"1.5 بوصة","al":"center"},{"c":"C7","v":40.9,"in":true,"al":"center"},{"c":"D7","v":255,"in":true,"al":"center"},{"c":"E7","v":120,"in":true,"al":"center"},{"c":"F7","v":3.2,"in":true,"al":"center"},{"c":"G7","v":1.4,"in":true,"al":"center"},{"c":"H7","v":4.6,"f":"=F7+G7","b":true,"al":"center","nf":"0.00"},{"c":"I7","v":0.034536,"f":"=605000*(D7^1.85)/((E7^1.85)*(C7^4.87))","al":"center","nf":"0.0000"},{"c":"J7","v":0.158866,"f":"=H7*I7","b":true,"al":"center","nf":"0.000"},{"c":"K7","v":0,"in":true,"al":"center","nf":"0.0"},{"c":"L7","v":0,"f":"=K7*0.0981","al":"center","nf":"0.00"},{"c":"M7","v":1.51,"in":true,"b":true,"al":"center","nf":"0.00"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"N4 - N5 (خط التوزيع الفرعي Cross Main)","bg":"#F8FAFC"},{"c":"B8","v":"2.5 بوصة","bg":"#F8FAFC","al":"center"},{"c":"C8","v":62.7,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"D8","v":380,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E8","v":120,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F8","v":6.5,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G8","v":3.2,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H8","v":9.7,"f":"=F8+G8","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"I8","v":0.009019,"f":"=605000*(D8^1.85)/((E8^1.85)*(C8^4.87))","bg":"#F8FAFC","al":"center","nf":"0.0000"},{"c":"J8","v":0.087484,"f":"=H8*I8","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"K8","v":0,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"L8","v":0,"f":"=K8*0.0981","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"M8","v":1.76,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"N5 - N6 (الخط الرئيسي للدور Feed Main)"},{"c":"B9","v":"3.0 بوصة","al":"center"},{"c":"C9","v":77.9,"in":true,"al":"center"},{"c":"D9","v":520,"in":true,"al":"center"},{"c":"E9","v":120,"in":true,"al":"center"},{"c":"F9","v":12,"in":true,"al":"center"},{"c":"G9","v":4.5,"in":true,"al":"center"},{"c":"H9","v":16.5,"f":"=F9+G9","b":true,"al":"center","nf":"0.00"},{"c":"I9","v":0.005599,"f":"=605000*(D9^1.85)/((E9^1.85)*(C9^4.87))","al":"center","nf":"0.0000"},{"c":"J9","v":0.092383,"f":"=H9*I9","b":true,"al":"center","nf":"0.000"},{"c":"K9","v":0,"in":true,"al":"center","nf":"0.0"},{"c":"L9","v":0,"f":"=K9*0.0981","al":"center","nf":"0.00"},{"c":"M9","v":2.12,"in":true,"b":true,"al":"center","nf":"0.00"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":"N6 - N7 (صاعد الحريق الرأسي Riser)","bg":"#F8FAFC"},{"c":"B10","v":"4.0 بوصة","bg":"#F8FAFC","al":"center"},{"c":"C10","v":102.3,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"D10","v":750,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E10","v":120,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F10","v":24,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G10","v":6.8,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H10","v":30.8,"f":"=F10+G10","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"I10","v":0.002924,"f":"=605000*(D10^1.85)/((E10^1.85)*(C10^4.87))","bg":"#F8FAFC","al":"center","nf":"0.0000"},{"c":"J10","v":0.090059,"f":"=H10*I10","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"K10","v":21,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"L10","v":2.0601,"f":"=K10*0.0981","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"M10","v":4.88,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"N7 - N8 (خط الإمداد الأرضي إلى غرفة المضخات)"},{"c":"B11","v":"6.0 بوصة","al":"center"},{"c":"C11","v":154.1,"in":true,"al":"center"},{"c":"D11","v":1893,"in":true,"al":"center"},{"c":"E11","v":120,"in":true,"al":"center"},{"c":"F11","v":45,"in":true,"al":"center"},{"c":"G11","v":12.5,"in":true,"al":"center"},{"c":"H11","v":57.5,"f":"=F11+G11","b":true,"al":"center","nf":"0.00"},{"c":"I11","v":0.002205,"f":"=605000*(D11^1.85)/((E11^1.85)*(C11^4.87))","al":"center","nf":"0.0000"},{"c":"J11","v":0.126787,"f":"=H11*I11","b":true,"al":"center","nf":"0.000"},{"c":"K11","v":2.5,"in":true,"al":"center","nf":"0.0"},{"c":"L11","v":0.24525,"f":"=K11*0.0981","al":"center","nf":"0.00"},{"c":"M11","v":7.8,"in":true,"fg":"#991B1B","b":true,"al":"center","nf":"0.00"}]},{"r":12,"h":40.0,"cells":[{"c":"A12","v":"إجمالي فواقد الاحتكاك وضغط المضخة المطلوب عند المخرج","bg":"#FFEDD5","fg":"#991B1B","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F12","v":97.1,"f":"=SUM(F5:F11)","bg":"#FFEDD5","fg":"#991B1B","b":true,"al":"center","nf":"0.0"},{"c":"G12","v":30.3,"f":"=SUM(G5:G11)","bg":"#FFEDD5","fg":"#991B1B","b":true,"al":"center","nf":"0.0"},{"c":"H12","v":127.4,"f":"=SUM(H5:H11)","bg":"#FFEDD5","fg":"#991B1B","b":true,"al":"center","nf":"0.0"},{"c":"I12","v":"-","bg":"#FFEDD5","al":"center"},{"c":"J12","v":0.832905,"f":"=SUM(J5:J11)","bg":"#FFEDD5","fg":"#991B1B","b":true,"al":"center","nf":"0.00"},{"c":"K12","v":23.5,"f":"=SUM(K5:K11)","bg":"#FFEDD5","fg":"#991B1B","b":true,"al":"center","nf":"0.0"},{"c":"L12","v":2.30535,"f":"=SUM(L5:L11)","bg":"#FFEDD5","fg":"#991B1B","b":true,"al":"center","nf":"0.00"},{"c":"M12","v":7.8,"f":"=M11","bg":"#FFEDD5","fg":"#991B1B","b":true,"al":"center","nf":"0.00"}]}]},{"name":"معايير NFPA ومعادلات هازن","maxRow":20,"maxCol":11,"colWidths":[22.0,20.0,20.0,20.0,20.0,22.0,24.0,24.0,22.0,22.0,26.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"الجداول المرجعية لكود NFPA 13 ومعادلات الاحتكاك والأطوال المكافئة للمحابس والوصلات","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"القيم القياسية لمعامل هازن-ويليامز C، وأطوال القطع والوصلات المكافئة (NFPA 13 Table 27.2.3.1.1)، وكثافات التصميم حسب خطورة الإشغال","bg":"#1E293B","fg":"#FEE2E2","al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":14.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"أولاً: الأطوال المكافئة للمحابس والوصلات بوحدة المتر (NFPA 13 Table 27.2.3.1.1 Fittings Equivalent Lengths)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":40.0,"cells":[{"c":"A5","v":"قطر الماسورة الاسمي","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"كوع 90 درجة قياسي","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"كوع 90 درجة طويل","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"كوع 45 درجة قياسي","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"وصلة تيه سريان خطي","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"وصلة تيه سريان متفرع","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"محبس فراشة (Butterfly)","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"محبس سكينة (Gate Valve)","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I5","v":"محبس عدم ارتداد (Check)","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J5","v":"وصلة محززة مرنة (Grooved)","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K5","v":"ملاحظات التوصيف الكودي","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"1.0 بوصة (25 مم)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B6","v":"0.61 م","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C6","v":"0.46 م","bg":"#F8FAFC","al":"center"},{"c":"D6","v":"0.30 م","bg":"#F8FAFC","al":"center"},{"c":"E6","v":"0.30 م","bg":"#F8FAFC","al":"center"},{"c":"F6","v":"1.52 م","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G6","v":"1.83 م","bg":"#F8FAFC","b":true,"al":"center"},{"c":"H6","v":"0.15 م","bg":"#F8FAFC","al":"center"},{"c":"I6","v":"1.52 م","bg":"#F8FAFC","al":"center"},{"c":"J6","v":"0.10 م","bg":"#F8FAFC","al":"center"},{"c":"K6","v":"أفرع الرشاشات المفردة","bg":"#F8FAFC"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"1.25 بوصة (32 مم)","b":true,"al":"center"},{"c":"B7","v":"0.91 م","b":true,"al":"center"},{"c":"C7","v":"0.61 م","al":"center"},{"c":"D7","v":"0.46 م","al":"center"},{"c":"E7","v":"0.46 م","al":"center"},{"c":"F7","v":"1.83 م","b":true,"al":"center"},{"c":"G7","v":"2.13 م","b":true,"al":"center"},{"c":"H7","v":"0.20 م","al":"center"},{"c":"I7","v":"2.13 م","al":"center"},{"c":"J7","v":"0.12 م","al":"center"},{"c":"K7","v":"أفرع رشاشين مجمعة"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"1.5 بوصة (40 مم)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B8","v":"1.22 م","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C8","v":"0.76 م","bg":"#F8FAFC","al":"center"},{"c":"D8","v":"0.61 م","bg":"#F8FAFC","al":"center"},{"c":"E8","v":"0.61 م","bg":"#F8FAFC","al":"center"},{"c":"F8","v":"2.44 م","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G8","v":"2.74 م","bg":"#F8FAFC","b":true,"al":"center"},{"c":"H8","v":"0.25 م","bg":"#F8FAFC","al":"center"},{"c":"I8","v":"2.74 م","bg":"#F8FAFC","al":"center"},{"c":"J8","v":"0.15 م","bg":"#F8FAFC","al":"center"},{"c":"K8","v":"بدايات أفرع الرشاشات","bg":"#F8FAFC"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"2.0 بوصة (50 مم)","b":true,"al":"center"},{"c":"B9","v":"1.52 م","b":true,"al":"center"},{"c":"C9","v":"1.07 م","al":"center"},{"c":"D9","v":"0.76 م","al":"center"},{"c":"E9","v":"0.76 م","al":"center"},{"c":"F9","v":"3.05 م","b":true,"al":"center"},{"c":"G9","v":"3.66 م","b":true,"al":"center"},{"c":"H9","v":"0.30 م","al":"center"},{"c":"I9","v":"3.66 م","al":"center"},{"c":"J9","v":"0.20 م","al":"center"},{"c":"K9","v":"فروع التغذية الفرعية"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":"2.5 بوصة (65 مم)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B10","v":"1.83 م","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C10","v":"1.37 م","bg":"#F8FAFC","al":"center"},{"c":"D10","v":"0.91 م","bg":"#F8FAFC","al":"center"},{"c":"E10","v":"0.91 م","bg":"#F8FAFC","al":"center"},{"c":"F10","v":"3.66 م","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G10","v":"4.27 م","bg":"#F8FAFC","b":true,"al":"center"},{"c":"H10","v":"0.40 م","bg":"#F8FAFC","al":"center"},{"c":"I10","v":"4.27 م","bg":"#F8FAFC","al":"center"},{"c":"J10","v":"0.25 م","bg":"#F8FAFC","al":"center"},{"c":"K10","v":"أنابيب التوزيع العرضية","bg":"#F8FAFC"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":"3.0 بوصة (80 مم)","b":true,"al":"center"},{"c":"B11","v":"2.13 م","b":true,"al":"center"},{"c":"C11","v":"1.52 م","al":"center"},{"c":"D11","v":"1.22 م","al":"center"},{"c":"E11","v":"1.22 م","al":"center"},{"c":"F11","v":"4.57 م","b":true,"al":"center"},{"c":"G11","v":"5.49 م","b":true,"al":"center"},{"c":"H11","v":"0.50 م","al":"center"},{"c":"I11","v":"5.49 م","al":"center"},{"c":"J11","v":"0.30 م","al":"center"},{"c":"K11","v":"خطوط التغذية الرئيسية للأدوار"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":"4.0 بوصة (100 مم)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B12","v":"3.05 م","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C12","v":"2.13 م","bg":"#F8FAFC","al":"center"},{"c":"D12","v":"1.52 م","bg":"#F8FAFC","al":"center"},{"c":"E12","v":"1.52 م","bg":"#F8FAFC","al":"center"},{"c":"F12","v":"6.10 م","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G12","v":"7.32 م","bg":"#F8FAFC","b":true,"al":"center"},{"c":"H12","v":"0.65 م","bg":"#F8FAFC","al":"center"},{"c":"I12","v":"6.71 م","bg":"#F8FAFC","al":"center"},{"c":"J12","v":"0.40 م","bg":"#F8FAFC","al":"center"},{"c":"K12","v":"صواعد الحريق الرأسية Riser","bg":"#F8FAFC"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":"6.0 بوصة (150 مم)","b":true,"al":"center"},{"c":"B13","v":"4.27 م","b":true,"al":"center"},{"c":"C13","v":"3.05 م","al":"center"},{"c":"D13","v":"2.13 م","al":"center"},{"c":"E13","v":"2.13 م","al":"center"},{"c":"F13","v":"9.14 م","b":true,"al":"center"},{"c":"G13","v":"10.67 م","b":true,"al":"center"},{"c":"H13","v":"0.90 م","al":"center"},{"c":"I13","v":"9.75 م","al":"center"},{"c":"J13","v":"0.50 م","al":"center"},{"c":"K13","v":"خط الإمداد العمومي للمشروع"}]},{"r":14,"h":16.0,"cells":[{"c":"A14","v":""},{"c":"B14","v":""},{"c":"C14","v":""},{"c":"D14","v":""},{"c":"E14","v":""},{"c":"F14","v":""},{"c":"G14","v":""},{"c":"H14","v":""},{"c":"I14","v":""},{"c":"J14","v":""},{"c":"K14","v":""}]},{"r":15,"h":38.0,"cells":[{"c":"A15","v":"ثانياً: متطلبات كثافات التصميم ومساحات التشغيل حسب خطورة الإشغال (NFPA 13 Chapter 19)","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":16,"h":40.0,"cells":[{"c":"A16","v":"تصنيف خطورة الإشغال (Hazard Class)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true},{"c":"C16","v":"أمثلة المباني والمنشآت الشائعة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"F16","v":"كثافة التصميم (gpm/ft2)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G16","v":"كثافة التصميم (L/min/m2)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H16","v":"مساحة التشغيل (قدم2)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I16","v":"تدفق الخراطيم (GPM)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J16","v":"فترة الإمداد (دقيقة)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K16","v":"معامل الأمان الموصى به","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":"خطورة خفيفة (Light Hazard)","b":true,"cs":2},{"skip":true},{"c":"C17","v":"مكاتب، مدارس، مستشفيات، فنادق، مباني سكنية","cs":3},{"skip":true},{"skip":true},{"c":"F17","v":0.1,"in":true,"fg":"#991B1B","b":true,"al":"center"},{"c":"G17","v":"4.1 L/min/m2","al":"center"},{"c":"H17","v":"1,500 ft2 (139 m2)","al":"center"},{"c":"I17","v":"100 GPM","b":true,"al":"center"},{"c":"J17","v":"30 دقيقة","al":"center"},{"c":"K17","v":"15% فائض ضغط","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":"خطورة عادية 1 (Ordinary Group 1)","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"C18","v":"مطاعم، مخابز، ورش سيارات خفيفة، معارض تجارية","bg":"#F8FAFC","cs":3},{"skip":true},{"skip":true},{"c":"F18","v":0.15,"in":true,"bg":"#F8FAFC","fg":"#991B1B","b":true,"al":"center"},{"c":"G18","v":"6.1 L/min/m2","bg":"#F8FAFC","al":"center"},{"c":"H18","v":"1,500 ft2 (139 m2)","bg":"#F8FAFC","al":"center"},{"c":"I18","v":"250 GPM","bg":"#F8FAFC","b":true,"al":"center"},{"c":"J18","v":"60 إلى 90 دقيقة","bg":"#F8FAFC","al":"center"},{"c":"K18","v":"15% فائض ضغط","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":"خطورة عادية 2 (Ordinary Group 2)","b":true,"cs":2},{"skip":true},{"c":"C19","v":"مستودعات متوسطة، مصانع أخشاب، مطابع، ورش دهان","cs":3},{"skip":true},{"skip":true},{"c":"F19","v":0.2,"in":true,"fg":"#991B1B","b":true,"al":"center"},{"c":"G19","v":"8.1 L/min/m2","al":"center"},{"c":"H19","v":"1,500 ft2 (139 m2)","al":"center"},{"c":"I19","v":"250 GPM","b":true,"al":"center"},{"c":"J19","v":"60 إلى 90 دقيقة","al":"center"},{"c":"K19","v":"20% فائض ضغط","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":"خطورة جسيمة (Extra Hazard 1 & 2)","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"C20","v":"حظائر طائرات، مصانع بلاستيك، صناعات بتروكيماوية","bg":"#F8FAFC","cs":3},{"skip":true},{"skip":true},{"c":"F20","v":0.3,"in":true,"bg":"#F8FAFC","fg":"#991B1B","b":true,"al":"center"},{"c":"G20","v":"12.2 L/min/m2","bg":"#F8FAFC","al":"center"},{"c":"H20","v":"2,500 ft2 (232 m2)","bg":"#F8FAFC","al":"center"},{"c":"I20","v":"500 GPM","bg":"#F8FAFC","b":true,"al":"center"},{"c":"J20","v":"90 إلى 120 دقيقة","bg":"#F8FAFC","al":"center"},{"c":"K20","v":"25% فائض ضغط","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]}]}]}