{"slug":"firefighting-sprinkler-network-fire-pumps-and-fire-alarm-boq-sheet","sheets":[{"name":"1_حصر_الرشاشات_والمواسير_NFPA","maxRow":14,"maxCol":13,"colWidths":[16.0,60.0,17.0,13.0,13.0,13.0,13.0,13.0,13.0,13.0,13.0,13.0,13.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"شيت حصر وحساب كميات شبكة الإطفاء المائي والرشاشات التلقائية وخزان الحريق (NFPA 13, 14 & 20 — BOQ-MEP-190)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":52.0,"cells":[{"c":"A2","v":"حساب أعداد رؤوس الرشاشات التلقائية، أطوال مواسير الحديد الأسود الجدولي (ASTM A53 Sch 40)، صناديق الحريق، وسعة خزان الإطفاء","bg":"#1E293B","fg":"#E2E8F0","b":true,"al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":52.0,"cells":[{"c":"A3","v":"المساحة التصميمية لتغطية الرشاش (م2):","bg":"#E2E8F0","b":true,"cs":2},{"skip":true},{"c":"C3","v":12,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"D3","v":"تصرف طلمبة الحريق (GPM):","bg":"#E2E8F0","b":true,"cs":2},{"skip":true},{"c":"F3","v":750,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"G3","v":"زمن التشغيل التصميمي (دقيقة):","bg":"#E2E8F0","b":true,"cs":2},{"skip":true},{"c":"I3","v":60,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J3","v":"سعة خزان الحريق المطلوبة (م3):","bg":"#E2E8F0","b":true,"cs":2},{"skip":true},{"c":"L3","v":170.3,"f":"=ROUND((F3*I3*3.7854)/1000,1)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.0"},{"c":"M3","v":"م3 مياه إطفاء","bg":"#E2E8F0","b":true,"al":"center"}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"جدول حصر شبكة الرشاشات التلقائية ومواسير الحديد الأسود (Sch 40) وصناديق الإطفاء لكل دور ومستوى معماري","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":128.0,"cells":[{"c":"A5","v":"كود الدور","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"بيان الطابق / المنطقة وتصنيف الخطورة (NFPA 13 Hazard Class)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"المساحة المخدومة (م2)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"مساحة تغطية الرشاش (م2)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"عدد الرشاشات المحسوب","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"مواسير فرعية 1\"–1.5\" (م.ط)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"مواسير فرعية 2\"–2.5\" (م.ط)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"مواسير رئيسية 3\"–4\" (م.ط)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I5","v":"صواعد وهيدر 6\" (م.ط)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J5","v":"إجمالي أطوال المواسير (م.ط)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K5","v":"مجموعة محابس الزون ZCV","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L5","v":"صناديق الحريق FHC","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M5","v":"طفايات الحريق اليدوية (6 كجم)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":199.9,"cells":[{"c":"A6","v":"FL-B2","b":true,"al":"center"},{"c":"B6","v":"البدروم الثاني (جراج السيارات وغرفة الطلمبات) — خطورة عادية مجموعة 1 (رشاشات Upright)"},{"c":"C6","v":2400,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"D6","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"E6","v":200,"f":"=ROUNDUP(C6/D6,0)","b":true,"al":"center","nf":"#,##0"},{"c":"F6","v":560,"f":"=ROUND(E6*2.8,0)","b":true,"al":"center","nf":"#,##0"},{"c":"G6","v":190,"f":"=ROUND(E6*0.95,0)","b":true,"al":"center","nf":"#,##0"},{"c":"H6","v":110,"f":"=ROUND(E6*0.55,0)","b":true,"al":"center","nf":"#,##0"},{"c":"I6","v":18,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J6","v":878,"f":"=SUM(F6:I6)","b":true,"al":"center","nf":"#,##0"},{"c":"K6","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L6","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"M6","v":8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"}]},{"r":7,"h":175.9,"cells":[{"c":"A7","v":"FL-B1","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B7","v":"البدروم الأول (مواقف السيارات والمخازن والخدمات) — خطورة عادية مجموعة 1 (رشاشات Upright)","bg":"#F8FAFC"},{"c":"C7","v":2400,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"D7","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"E7","v":200,"f":"=ROUNDUP(C7/D7,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"F7","v":560,"f":"=ROUND(E7*2.8,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"G7","v":190,"f":"=ROUND(E7*0.95,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"H7","v":110,"f":"=ROUND(E7*0.55,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"I7","v":16,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J7","v":876,"f":"=SUM(F7:I7)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"K7","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L7","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"M7","v":8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"}]},{"r":8,"h":175.9,"cells":[{"c":"A8","v":"FL-GF","b":true,"al":"center"},{"c":"B8","v":"الدور الأرضي (بهو المدخل، المعارض التجارية، وغرف الكهرباء) — خطورة خفيفة/عادية (Pendent)"},{"c":"C8","v":1850,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"D8","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"E8","v":155,"f":"=ROUNDUP(C8/D8,0)","b":true,"al":"center","nf":"#,##0"},{"c":"F8","v":434,"f":"=ROUND(E8*2.8,0)","b":true,"al":"center","nf":"#,##0"},{"c":"G8","v":147,"f":"=ROUND(E8*0.95,0)","b":true,"al":"center","nf":"#,##0"},{"c":"H8","v":85,"f":"=ROUND(E8*0.55,0)","b":true,"al":"center","nf":"#,##0"},{"c":"I8","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J8","v":678,"f":"=SUM(F8:I8)","b":true,"al":"center","nf":"#,##0"},{"c":"K8","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L8","v":3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"M8","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"}]},{"r":9,"h":199.9,"cells":[{"c":"A9","v":"FL-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B9","v":"الدور الأول الإداري (المكاتب المفتوحة وقاعات الاجتماعات) — خطورة خفيفة (رشاشات Pendent)","bg":"#F8FAFC"},{"c":"C9","v":1750,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"D9","v":14,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"E9","v":125,"f":"=ROUNDUP(C9/D9,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"F9","v":350,"f":"=ROUND(E9*2.8,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"G9","v":119,"f":"=ROUND(E9*0.95,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"H9","v":69,"f":"=ROUND(E9*0.55,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"I9","v":10,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J9","v":548,"f":"=SUM(F9:I9)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"K9","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L9","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"M9","v":5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"}]},{"r":10,"h":151.9,"cells":[{"c":"A10","v":"FL-02","b":true,"al":"center"},{"c":"B10","v":"الدور الثاني الإداري (المكاتب الإدارية والعيادات) — خطورة خفيفة (رشاشات Pendent)"},{"c":"C10","v":1750,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"D10","v":14,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"E10","v":125,"f":"=ROUNDUP(C10/D10,0)","b":true,"al":"center","nf":"#,##0"},{"c":"F10","v":350,"f":"=ROUND(E10*2.8,0)","b":true,"al":"center","nf":"#,##0"},{"c":"G10","v":119,"f":"=ROUND(E10*0.95,0)","b":true,"al":"center","nf":"#,##0"},{"c":"H10","v":69,"f":"=ROUND(E10*0.55,0)","b":true,"al":"center","nf":"#,##0"},{"c":"I10","v":10,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J10","v":548,"f":"=SUM(F10:I10)","b":true,"al":"center","nf":"#,##0"},{"c":"K10","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L10","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"M10","v":5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"}]},{"r":11,"h":151.9,"cells":[{"c":"A11","v":"FL-03","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":"الدور الثالث المتكرر (الأجنحة الإدارية والممرات) — خطورة خفيفة (رشاشات Pendent)","bg":"#F8FAFC"},{"c":"C11","v":1750,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"D11","v":14,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"E11","v":125,"f":"=ROUNDUP(C11/D11,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"F11","v":350,"f":"=ROUND(E11*2.8,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"G11","v":119,"f":"=ROUND(E11*0.95,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"H11","v":69,"f":"=ROUND(E11*0.55,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"I11","v":10,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J11","v":548,"f":"=SUM(F11:I11)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"K11","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L11","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"M11","v":5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"}]},{"r":12,"h":199.9,"cells":[{"c":"A12","v":"FL-04","b":true,"al":"center"},{"c":"B12","v":"الدور الرابع المتكرر (المكاتب التنفيذية وصالات التدريب) — خطورة خفيفة (رشاشات Pendent)"},{"c":"C12","v":1750,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"D12","v":14,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"E12","v":125,"f":"=ROUNDUP(C12/D12,0)","b":true,"al":"center","nf":"#,##0"},{"c":"F12","v":350,"f":"=ROUND(E12*2.8,0)","b":true,"al":"center","nf":"#,##0"},{"c":"G12","v":119,"f":"=ROUND(E12*0.95,0)","b":true,"al":"center","nf":"#,##0"},{"c":"H12","v":69,"f":"=ROUND(E12*0.55,0)","b":true,"al":"center","nf":"#,##0"},{"c":"I12","v":10,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J12","v":548,"f":"=SUM(F12:I12)","b":true,"al":"center","nf":"#,##0"},{"c":"K12","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L12","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"M12","v":5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"}]},{"r":13,"h":151.9,"cells":[{"c":"A13","v":"FL-RF","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":"دور السطح وغرف المصاعد والمراوح (وصلات الدفاع المدني ومدافع السطح) — خطورة عادية","bg":"#F8FAFC"},{"c":"C13","v":650,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"D13","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"E13","v":55,"f":"=ROUNDUP(C13/D13,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"F13","v":154,"f":"=ROUND(E13*2.8,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"G13","v":52,"f":"=ROUND(E13*0.95,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"H13","v":30,"f":"=ROUND(E13*0.55,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"I13","v":14,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J13","v":250,"f":"=SUM(F13:I13)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"K13","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L13","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"M13","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"}]},{"r":14,"h":72.0,"cells":[{"c":"A14","v":"إجمالي كميات شبكة الإطفاء المائي والرشاشات والمواسير للمبنى","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true},{"c":"C14","v":14300,"f":"=SUM(C6:C13)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"D14","v":13,"f":"=AVERAGE(D6:D13)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.0"},{"c":"E14","v":1110,"f":"=SUM(E6:E13)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"F14","v":3108,"f":"=SUM(F6:F13)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"G14","v":1055,"f":"=SUM(G6:G13)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"H14","v":611,"f":"=SUM(H6:H13)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"I14","v":100,"f":"=SUM(I6:I13)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"J14","v":4874,"f":"=SUM(J6:J13)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"K14","v":11,"f":"=SUM(K6:K13)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"L14","v":21,"f":"=SUM(L6:L13)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"M14","v":46,"f":"=SUM(M6:M13)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"}]}]},{"name":"2_حصر_شبكة_إنذار_الحريق_NFPA72","maxRow":14,"maxCol":13,"colWidths":[16.0,58.0,17.0,13.0,13.0,13.0,13.0,13.0,13.0,13.0,13.0,13.0,13.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"شيت حصر وحساب كميات شبكة إنذار الحريق المعنونة والكواشف واللوبات (Addressable Fire Alarm — NFPA 72)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":52.0,"cells":[{"c":"A2","v":"حصر كواشف الدخان الضوئية وكواشف الحرارة والكواسر اليدوية والأجراس الفلاشر ووحدات المراقبة والتحكم وحساب سعة اللوبات والكابلات المقاومة للحريق","bg":"#1E293B","fg":"#E2E8F0","b":true,"al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":52.0,"cells":[{"c":"A3","v":"مساحة تغطية كاشف الدخان الواحد (م2 — NFPA 72):","bg":"#E2E8F0","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"D3","v":60,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"E3","v":"أقصى عدد نقاط مسموح باللوب الواحد (مع 20% احتياطي):","bg":"#E2E8F0","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"H3","v":125,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"I3","v":"إجمالي عدد اللوبات المطلوبة بلوحة الإنذار (FACP Loops):","bg":"#E2E8F0","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"L3","v":3,"f":"=ROUNDUP(K14/H3,0)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0"},{"c":"M3","v":"لوب معنون (Loop)","bg":"#E2E8F0","b":true,"al":"center"}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"جدول حصر نقاط شبكة إنذار الحريق المعنونة والكابلات المقاومة للحريق (FP200 + EMT) لكل دور","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":104.0,"cells":[{"c":"A5","v":"كود الدور","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"بيان الطابق والفراغات المحمية بشبكة الإنذار","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"المساحة (م2)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"كاشف دخان ضوئي Optical","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"كاشف حرارة / مزدوج Heat","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"كاسر زجاج يدوي MCP","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"سارينة بفلاشر Horn/Strobe","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"وحدات مراقبة وتحكم Modules","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I5","v":"وحدة عزل قصر Isolator","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J5","v":"إجمالي نقاط اللوب بالدور","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K5","v":"الإجمالي تراكمياً","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L5","v":"كابل مقاوم للحريق 2×1.5 مم2 (م.ط)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M5","v":"مواسير EMT 20 مم (م.ط)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":128.0,"cells":[{"c":"A6","v":"FL-B2","b":true,"al":"center"},{"c":"B6","v":"البدروم الثاني (جراج السيارات وغرف الطلمبات والخزانات)"},{"c":"C6","v":2400,"f":"='1_حصر_الرشاشات_والمواسير_NFPA'!C6","fg":"#008000","b":true,"al":"center","nf":"#,##0"},{"c":"D6","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"E6","v":26,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"F6","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"G6","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"H6","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"I6","v":3,"f":"=ROUNDUP(SUM(D6:H6)/20,0)","b":true,"al":"center","nf":"#,##0"},{"c":"J6","v":55,"f":"=SUM(D6:I6)","b":true,"al":"center","nf":"#,##0"},{"c":"K6","v":55,"f":"=SUM($J$6:J6)","b":true,"al":"center","nf":"#,##0"},{"c":"L6","v":468,"f":"=ROUND(J6*8.5,0)","b":true,"al":"center","nf":"#,##0"},{"c":"M6","v":421,"f":"=ROUND(L6*0.9,0)","b":true,"al":"center","nf":"#,##0"}]},{"r":7,"h":72.0,"cells":[{"c":"A7","v":"FL-B1","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B7","v":"البدروم الأول (مواقف السيارات والورش والمخازن)","bg":"#F8FAFC"},{"c":"C7","v":2400,"f":"='1_حصر_الرشاشات_والمواسير_NFPA'!C7","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0"},{"c":"D7","v":14,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"E7","v":24,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"F7","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"G7","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"H7","v":5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"I7","v":3,"f":"=ROUNDUP(SUM(D7:H7)/20,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"J7","v":54,"f":"=SUM(D7:I7)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"K7","v":109,"f":"=SUM($J$6:J7)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L7","v":459,"f":"=ROUND(J7*8.5,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"M7","v":413,"f":"=ROUND(L7*0.9,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"}]},{"r":8,"h":151.9,"cells":[{"c":"A8","v":"FL-GF","b":true,"al":"center"},{"c":"B8","v":"الدور الأرضي (المدخل الرئيسي، المعارض، وغرف المحولات واللوحات)"},{"c":"C8","v":1850,"f":"='1_حصر_الرشاشات_والمواسير_NFPA'!C8","fg":"#008000","b":true,"al":"center","nf":"#,##0"},{"c":"D8","v":28,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"E8","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"F8","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"G8","v":5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"H8","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"I8","v":3,"f":"=ROUNDUP(SUM(D8:H8)/20,0)","b":true,"al":"center","nf":"#,##0"},{"c":"J8","v":52,"f":"=SUM(D8:I8)","b":true,"al":"center","nf":"#,##0"},{"c":"K8","v":161,"f":"=SUM($J$6:J8)","b":true,"al":"center","nf":"#,##0"},{"c":"L8","v":442,"f":"=ROUND(J8*8.5,0)","b":true,"al":"center","nf":"#,##0"},{"c":"M8","v":398,"f":"=ROUND(L8*0.9,0)","b":true,"al":"center","nf":"#,##0"}]},{"r":9,"h":104.0,"cells":[{"c":"A9","v":"FL-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B9","v":"الدور الأول الإداري (المكاتب، الطرقات، والأوفيس)","bg":"#F8FAFC"},{"c":"C9","v":1750,"f":"='1_حصر_الرشاشات_والمواسير_NFPA'!C9","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0"},{"c":"D9","v":30,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"E9","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"F9","v":3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"G9","v":3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"H9","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"I9","v":3,"f":"=ROUNDUP(SUM(D9:H9)/20,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"J9","v":47,"f":"=SUM(D9:I9)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"K9","v":208,"f":"=SUM($J$6:J9)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L9","v":400,"f":"=ROUND(J9*8.5,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"M9","v":360,"f":"=ROUND(L9*0.9,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"}]},{"r":10,"h":72.0,"cells":[{"c":"A10","v":"FL-02","b":true,"al":"center"},{"c":"B10","v":"الدور الثاني الإداري (المكاتب والغرف التقنية)"},{"c":"C10","v":1750,"f":"='1_حصر_الرشاشات_والمواسير_NFPA'!C10","fg":"#008000","b":true,"al":"center","nf":"#,##0"},{"c":"D10","v":30,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"E10","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"F10","v":3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"G10","v":3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"H10","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"I10","v":3,"f":"=ROUNDUP(SUM(D10:H10)/20,0)","b":true,"al":"center","nf":"#,##0"},{"c":"J10","v":47,"f":"=SUM(D10:I10)","b":true,"al":"center","nf":"#,##0"},{"c":"K10","v":255,"f":"=SUM($J$6:J10)","b":true,"al":"center","nf":"#,##0"},{"c":"L10","v":400,"f":"=ROUND(J10*8.5,0)","b":true,"al":"center","nf":"#,##0"},{"c":"M10","v":360,"f":"=ROUND(L10*0.9,0)","b":true,"al":"center","nf":"#,##0"}]},{"r":11,"h":104.0,"cells":[{"c":"A11","v":"FL-03","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":"الدور الثالث المتكرر (الأجنحة الإدارية والممرات)","bg":"#F8FAFC"},{"c":"C11","v":1750,"f":"='1_حصر_الرشاشات_والمواسير_NFPA'!C11","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0"},{"c":"D11","v":30,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"E11","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"F11","v":3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"G11","v":3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"H11","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"I11","v":3,"f":"=ROUNDUP(SUM(D11:H11)/20,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"J11","v":47,"f":"=SUM(D11:I11)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"K11","v":302,"f":"=SUM($J$6:J11)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L11","v":400,"f":"=ROUND(J11*8.5,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"M11","v":360,"f":"=ROUND(L11*0.9,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"}]},{"r":12,"h":104.0,"cells":[{"c":"A12","v":"FL-04","b":true,"al":"center"},{"c":"B12","v":"الدور الرابع المتكرر (المكاتب وقاعات الاجتماعات)"},{"c":"C12","v":1750,"f":"='1_حصر_الرشاشات_والمواسير_NFPA'!C12","fg":"#008000","b":true,"al":"center","nf":"#,##0"},{"c":"D12","v":30,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"E12","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"F12","v":3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"G12","v":3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"H12","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"I12","v":3,"f":"=ROUNDUP(SUM(D12:H12)/20,0)","b":true,"al":"center","nf":"#,##0"},{"c":"J12","v":47,"f":"=SUM(D12:I12)","b":true,"al":"center","nf":"#,##0"},{"c":"K12","v":349,"f":"=SUM($J$6:J12)","b":true,"al":"center","nf":"#,##0"},{"c":"L12","v":400,"f":"=ROUND(J12*8.5,0)","b":true,"al":"center","nf":"#,##0"},{"c":"M12","v":360,"f":"=ROUND(L12*0.9,0)","b":true,"al":"center","nf":"#,##0"}]},{"r":13,"h":104.0,"cells":[{"c":"A13","v":"FL-RF","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":"دور السطح وغرف ماكينات المصاعد والتكييف المركزي","bg":"#F8FAFC"},{"c":"C13","v":650,"f":"='1_حصر_الرشاشات_والمواسير_NFPA'!C13","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0"},{"c":"D13","v":10,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"E13","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"F13","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"G13","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"H13","v":5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"I13","v":2,"f":"=ROUNDUP(SUM(D13:H13)/20,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"J13","v":25,"f":"=SUM(D13:I13)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"K13","v":374,"f":"=SUM($J$6:J13)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L13","v":212,"f":"=ROUND(J13*8.5,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"M13","v":191,"f":"=ROUND(L13*0.9,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"إجمالي كميات وأجهزة وكابلات شبكة إنذار الحريق للمبنى","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true},{"c":"C14","v":14300,"f":"=SUM(C6:C13)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"D14","v":184,"f":"=SUM(D6:D13)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"E14","v":76,"f":"=SUM(E6:E13)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"F14","v":26,"f":"=SUM(F6:F13)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"G14","v":27,"f":"=SUM(G6:G13)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"H14","v":38,"f":"=SUM(H6:H13)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"I14","v":23,"f":"=SUM(I6:I13)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"J14","v":374,"f":"=SUM(J6:J13)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"K14","v":374,"f":"=J14","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"L14","v":3181,"f":"=SUM(L6:L13)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"M14","v":2863,"f":"=SUM(M6:M13)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"}]}]},{"name":"3_مقايسة_الحريق_والإنذار_NFPA","maxRow":19,"maxCol":9,"colWidths":[16.0,60.0,19.0,13.0,13.0,13.0,13.0,13.0,13.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول الكميات والمقايسة التثمينية المتكاملة لأعمال شبكات إطفاء وإنذار الحريق (MEP Fire Protection BOQ)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":52.0,"cells":[{"c":"A2","v":"ربط آلي للكميات من شيت الإطفاء المائي وشيت الإنذار المعنون مع تسعير التوريد والتركيب والاختبار والتسليم للدفاع المدني","bg":"#1E293B","fg":"#E2E8F0","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":38.0,"cells":[{"c":"A3","v":"جدول تسعير بنود الإطفاء المائي، الغاز النظيف (FM-200)، وشبكة إنذار الحريق المعنونة (UL / FM Listed)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":4,"h":151.9,"cells":[{"c":"A4","v":"كود البند","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"بيان البند الهندسي والمواصفات الفنية (NFPA / UL / FM Listed)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"وحدة القياس","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"الكمية الإجمالية","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"فئة التوريد للوحدة","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"فئة التركيب والاختبار","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"إجمالي فئة الوحدة","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"إجمالي قيمة البند","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"نسبة الوزن المالي (%)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":175.9,"cells":[{"c":"A5","v":"FP-01","b":true,"al":"center"},{"c":"B5","v":"توريد وتركيب مجموعة طلمبات إطفاء حريق ثلاثية (كهرباء + ديزل + جوكي 750 GPM @ 9 Bar — UL/FM)"},{"c":"C5","v":"مجموعة","b":true,"al":"center"},{"c":"D5","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"E5","v":265000,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F5","v":25000,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G5","v":290000,"f":"=E5+F5","al":"center","nf":"#,##0.00"},{"c":"H5","v":290000,"f":"=ROUND(D5*G5,2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"I5","v":0,"f":"=H5/$H$17","al":"center","nf":"0.0%"}]},{"r":6,"h":151.9,"cells":[{"c":"A6","v":"FP-02","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B6","v":"توريد وتركيب رؤوس رشاشات تلقائية زجاجية 68°C (Pendent & Upright K=5.6 — UL/FM)","bg":"#F8FAFC"},{"c":"C6","v":"عدد","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D6","v":1110,"f":"='1_حصر_الرشاشات_والمواسير_NFPA'!E14","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0"},{"c":"E6","v":65,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F6","v":45,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G6","v":110,"f":"=E6+F6","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"H6","v":122100,"f":"=ROUND(D6*G6,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"I6","v":0,"f":"=H6/$H$17","bg":"#F8FAFC","al":"center","nf":"0.0%"}]},{"r":7,"h":223.9,"cells":[{"c":"A7","v":"FP-03","b":true,"al":"center"},{"c":"B7","v":"توريد وتركيب مواسير حديد أسود غير ملحوم جدول 40 (Seamless Sch 40) أقطار 1\" إلى 2.5\" شاملة الفيتنج"},{"c":"C7","v":"م.ط","b":true,"al":"center"},{"c":"D7","v":4163,"f":"='1_حصر_الرشاشات_والمواسير_NFPA'!F14+'1_حصر_الرشاشات_والمواسير_NFPA'!G14","fg":"#008000","b":true,"al":"center","nf":"#,##0"},{"c":"E7","v":115,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F7","v":55,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G7","v":170,"f":"=E7+F7","al":"center","nf":"#,##0.00"},{"c":"H7","v":707710,"f":"=ROUND(D7*G7,2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"I7","v":0,"f":"=H7/$H$17","al":"center","nf":"0.0%"}]},{"r":8,"h":247.9,"cells":[{"c":"A8","v":"FP-04","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B8","v":"توريد وتركيب مواسير حديد أسود جدول 40 للشبكة الرئيسية والصواعد أقطار 3\" إلى 6\" بالوصلات الميكانيكية Grooved","bg":"#F8FAFC"},{"c":"C8","v":"م.ط","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D8","v":711,"f":"='1_حصر_الرشاشات_والمواسير_NFPA'!H14+'1_حصر_الرشاشات_والمواسير_NFPA'!I14","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0"},{"c":"E8","v":290,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F8","v":95,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G8","v":385,"f":"=E8+F8","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"H8","v":273735,"f":"=ROUND(D8*G8,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"I8","v":0,"f":"=H8/$H$17","bg":"#F8FAFC","al":"center","nf":"0.0%"}]},{"r":9,"h":223.9,"cells":[{"c":"A9","v":"FP-05","b":true,"al":"center"},{"c":"B9","v":"توريد وتركيب مجموعة محابس تحكم المنطقة (Zone Control Valve Assembly — OS&Y + Flow Switch + Test & Drain)"},{"c":"C9","v":"مجموعة","b":true,"al":"center"},{"c":"D9","v":11,"f":"='1_حصر_الرشاشات_والمواسير_NFPA'!K14","fg":"#008000","b":true,"al":"center","nf":"#,##0"},{"c":"E9","v":5400,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F9","v":1200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G9","v":6600,"f":"=E9+F9","al":"center","nf":"#,##0.00"},{"c":"H9","v":72600,"f":"=ROUND(D9*G9,2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"I9","v":0,"f":"=H9/$H$17","al":"center","nf":"0.0%"}]},{"r":10,"h":199.9,"cells":[{"c":"A10","v":"FP-06","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B10","v":"توريد وتركيب صناديق حريق حائطية مزدوجة (FHC — خرطوم مطاطي 30م + خرطوم قماشي + طفاية)","bg":"#F8FAFC"},{"c":"C10","v":"عدد","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D10","v":21,"f":"='1_حصر_الرشاشات_والمواسير_NFPA'!L14","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0"},{"c":"E10","v":2850,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F10","v":550,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G10","v":3400,"f":"=E10+F10","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"H10","v":71400,"f":"=ROUND(D10*G10,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"I10","v":0,"f":"=H10/$H$17","bg":"#F8FAFC","al":"center","nf":"0.0%"}]},{"r":11,"h":199.9,"cells":[{"c":"A11","v":"FP-07","b":true,"al":"center"},{"c":"B11","v":"توريد وتركيب طفايات حريق يدوية (بودرة جافة 6 كجم + ثاني أكسيد الكربون CO2) شاملة الحامل"},{"c":"C11","v":"عدد","b":true,"al":"center"},{"c":"D11","v":46,"f":"='1_حصر_الرشاشات_والمواسير_NFPA'!M14","fg":"#008000","b":true,"al":"center","nf":"#,##0"},{"c":"E11","v":240,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F11","v":40,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G11","v":280,"f":"=E11+F11","al":"center","nf":"#,##0.00"},{"c":"H11","v":12880,"f":"=ROUND(D11*G11,2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"I11","v":0,"f":"=H11/$H$17","al":"center","nf":"0.0%"}]},{"r":12,"h":247.9,"cells":[{"c":"A12","v":"FP-08","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B12","v":"نظام إطفاء آلي بالغاز النظيف (FM-200 / Novec 1230) لغرف الخوادم والمحولات الكهربائية شاملاً الأسطوانة واللوحة","bg":"#F8FAFC"},{"c":"C12","v":"نظام متكامل","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D12","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"E12","v":48000,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F12","v":7500,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G12","v":55500,"f":"=E12+F12","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"H12","v":111000,"f":"=ROUND(D12*G12,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"I12","v":0,"f":"=H12/$H$17","bg":"#F8FAFC","al":"center","nf":"0.0%"}]},{"r":13,"h":199.9,"cells":[{"c":"A13","v":"FA-01","b":true,"al":"center"},{"c":"B13","v":"لوحة التحكم الرئيسية لإنذار الحريق المعنونة (Addressable FACP — 4 Loops) شاملة البطاريات والربط BMS"},{"c":"C13","v":"عدد","b":true,"al":"center"},{"c":"D13","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"E13","v":28500,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F13","v":4500,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G13","v":33000,"f":"=E13+F13","al":"center","nf":"#,##0.00"},{"c":"H13","v":33000,"f":"=ROUND(D13*G13,2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"I13","v":0,"f":"=H13/$H$17","al":"center","nf":"0.0%"}]},{"r":14,"h":175.9,"cells":[{"c":"A14","v":"FA-02","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B14","v":"توريد وتركيب وبرمجة كواشف الدخان الضوئية وكواشف الحرارة المعنونة شاملة القاعدة (UL Listed)","bg":"#F8FAFC"},{"c":"C14","v":"عدد","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D14","v":260,"f":"='2_حصر_شبكة_إنذار_الحريق_NFPA72'!D14+'2_حصر_شبكة_إنذار_الحريق_NFPA72'!E14","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0"},{"c":"E14","v":210,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F14","v":65,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G14","v":275,"f":"=E14+F14","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"H14","v":71500,"f":"=ROUND(D14*G14,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"I14","v":0,"f":"=H14/$H$17","bg":"#F8FAFC","al":"center","nf":"0.0%"}]},{"r":15,"h":223.9,"cells":[{"c":"A15","v":"FA-03","b":true,"al":"center"},{"c":"B15","v":"توريد وتركيب الكواسر الزجاجية اليدوية (MCP) والأجراس الفلاشر (Horn/Strobe) ووحدات المراقبة والتحكم والعزل"},{"c":"C15","v":"عدد","b":true,"al":"center"},{"c":"D15","v":114,"f":"=SUM('2_حصر_شبكة_إنذار_الحريق_NFPA72'!F14:I14)","fg":"#008000","b":true,"al":"center","nf":"#,##0"},{"c":"E15","v":320,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F15","v":85,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G15","v":405,"f":"=E15+F15","al":"center","nf":"#,##0.00"},{"c":"H15","v":46170,"f":"=ROUND(D15*G15,2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"I15","v":0,"f":"=H15/$H$17","al":"center","nf":"0.0%"}]},{"r":16,"h":199.9,"cells":[{"c":"A16","v":"FA-04","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B16","v":"توريد وتمديد كابلات مقاومة للحريق (2×1.5 mm² FP200 Red) داخل مواسير معدنية (EMT 20mm)","bg":"#F8FAFC"},{"c":"C16","v":"م.ط","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D16","v":3181,"f":"='2_حصر_شبكة_إنذار_الحريق_NFPA72'!L14","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0"},{"c":"E16","v":24,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F16","v":14,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G16","v":38,"f":"=E16+F16","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"H16","v":120878,"f":"=ROUND(D16*G16,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"I16","v":0,"f":"=H16/$H$17","bg":"#F8FAFC","al":"center","nf":"0.0%"}]},{"r":17,"h":42.0,"cells":[{"c":"A17","v":"إجمالي تكلفة توريد وتركيب واختبار شبكات إطفاء وإنذار الحريق قبل الضريبة","bg":"#E2E8F0","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H17","v":1932973,"f":"=SUM(H5:H16)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00"},{"c":"I17","v":0,"f":"=SUM(I5:I16)","bg":"#E2E8F0","b":true,"al":"center","nf":"0.0%"}]},{"r":18,"h":42.0,"cells":[{"c":"A18","v":"ضريبة القيمة المضافة المقررة (VAT %)","bg":"#E2E8F0","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G18","v":0.15,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"H18","v":289945.95,"f":"=ROUND(H17*G18,2)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00"},{"c":"I18","v":"-","bg":"#E2E8F0","b":true,"al":"center"}]},{"r":19,"h":46.0,"cells":[{"c":"A19","v":"الإجمالي العام لمقايسة شبكات إطفاء وإنذار الحريق شاملاً الضريبة والتشغيل","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H19","v":2222918.95,"f":"=H17+H18","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"I19","v":"100.0%","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"}]}]}]}