{"slug":"firefighting-sprinkler-piping-pumps-and-addressable-fire-alarm-system-boq-sheet","sheets":[{"name":"1_مقايسة_الحريق_BOQ","maxRow":22,"maxCol":10,"colWidths":[14.0,62.0,13.0,15.0,16.0,15.0,17.0,18.0,19.0,15.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"شيت حصر وتسعير أنظمة إطفاء وإنذار الحريق والرشاشات الآلية والصناديق والمضخات (Firefighting & Alarm BOQ — BOQ-MEP-206)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":54.0,"cells":[{"c":"A2","v":"المرجع الهندسي القياسي: الكود الأمريكي للحماية من الحريق NFPA 13, 14, 20 & 72 | كود الحريق السعودي SBC 801 | الكود المصري للحريق — الخلايا الصفراء قابلة للتعديل","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":18.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"تكلفة شبكات مواسير الإطفاء والرشاشات والصناديق","bg":"#FEE2E2","fg":"#991B1B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D4","v":"تكلفة مضخات الحريق UL/FM ووصلات الدفاع المدني","bg":"#FEE2E2","fg":"#991B1B","b":true,"al":"center","cs":2},{"skip":true},{"c":"F4","v":"تكلفة منظومة إنذار الحريق المعنونة والكواشف","bg":"#FEE2E2","fg":"#991B1B","b":true,"al":"center","cs":2},{"skip":true},{"c":"H4","v":"الإجمالي العام لمقايسة الحريق شامل الضريبة","bg":"#FEE2E2","fg":"#991B1B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":5,"h":46.0,"cells":[{"c":"A5","v":389193.6,"f":"=SUM(I9:I13)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\"","cs":3},{"skip":true},{"skip":true},{"c":"D5","v":166800,"f":"=SUM(I14:I15)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\"","cs":2},{"skip":true},{"c":"F5","v":193797.6,"f":"=SUM(I16:I18)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\"","cs":2},{"skip":true},{"c":"H5","v":896750.28,"f":"=I22","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\"","cs":3},{"skip":true},{"skip":true}]},{"r":6,"h":18.0,"cells":[{"c":"A6","v":""},{"c":"B6","v":""},{"c":"C6","v":""},{"c":"D6","v":""},{"c":"E6","v":""},{"c":"F6","v":""},{"c":"G6","v":""},{"c":"H6","v":""},{"c":"I6","v":""},{"c":"J6","v":""}]},{"r":7,"h":38.0,"cells":[{"c":"A7","v":"أولاً: جدول حصر وتسعير شبكات مواسير الإطفاء (Sch.40)، الرشاشات الآلية، الصناديق، مضخات UL/FM، ونظام الإنذار المعنون","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"كود البند","bg":"#B91C1C","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B8","v":"بيان وتوصيف أنظمة مكافحة وإنذار الحريق والمواصفة القياسية","bg":"#B91C1C","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C8","v":"الوحدة","bg":"#B91C1C","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D8","v":"عدد الأدوار / المناطق","bg":"#B91C1C","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E8","v":"الكمية لكل دور / منطقة","bg":"#B91C1C","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F8","v":"نسبة الهالك والوصلات %","bg":"#B91C1C","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G8","v":"إجمالي الكمية شاملة الهالك","bg":"#B91C1C","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H8","v":"سعر الوحدة الشامل","bg":"#B91C1C","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I8","v":"إجمالي تكلفة البند","bg":"#B91C1C","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J8","v":"الوزن المالي %","bg":"#B91C1C","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"FIR-01","b":true,"al":"center"},{"c":"B9","v":"توريد وتركيب مواسير حريق فولاذية سوداء غير ملحومة للفرعيات (ASTM A53 Gr.B Sch.40 — أقطار 1\" إلى 2\") بالقطع والدهان الأحمر"},{"c":"C9","v":"م.ط","b":true,"al":"center"},{"c":"D9","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E9","v":260,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F9","v":0.08,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G9","v":1684.8,"f":"=ROUND(D9*E9*(1+F9), 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H9","v":72,"f":"='3_إعدادات_أسعار_الحريق'!$F$9","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I9","v":121305.6,"f":"=ROUND(G9*H9, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J9","v":0,"f":"=IF($I$19>0, I9/$I$19, 0)","al":"center","nf":"0.0%"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":"FIR-02","bg":"#FEF2F2","b":true,"al":"center"},{"c":"B10","v":"توريد وتركيب خطوط رئيسية وصواعد حريق بوصلات جروفد ميكانيكية (Grooved Main Pipes Sch.40 — أقطار 3\" إلى 6\") بالتحاميل الزلزالية","bg":"#FEF2F2"},{"c":"C10","v":"م.ط","bg":"#FEF2F2","b":true,"al":"center"},{"c":"D10","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E10","v":85,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F10","v":0.06,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G10","v":540.6,"f":"=ROUND(D10*E10*(1+F10), 2)","bg":"#FEF2F2","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H10","v":200,"f":"='3_إعدادات_أسعار_الحريق'!$F$10","bg":"#FEF2F2","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I10","v":108120,"f":"=ROUND(G10*H10, 2)","bg":"#FEF2F2","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J10","v":0,"f":"=IF($I$19>0, I10/$I$19, 0)","bg":"#FEF2F2","al":"center","nf":"0.0%"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"FIR-03","b":true,"al":"center"},{"c":"B11","v":"توريد وتركيب رشاشات مياه إطفاء آلية (UL/FM Automatic Sprinklers — Pendent & Upright 68°C K=5.6) شاملة الوصلات المرنة والروزتة"},{"c":"C11","v":"عدد","b":true,"al":"center"},{"c":"D11","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E11","v":95,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F11","v":0.02,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G11","v":581.4,"f":"=ROUND(D11*E11*(1+F11), 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H11","v":120,"f":"='3_إعدادات_أسعار_الحريق'!$F$11","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I11","v":69768,"f":"=ROUND(G11*H11, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J11","v":0,"f":"=IF($I$19>0, I11/$I$19, 0)","al":"center","nf":"0.0%"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":"FIR-04","bg":"#FEF2F2","b":true,"al":"center"},{"c":"B12","v":"توريد وتركيب صناديق إطفاء حريق حائطية مزدوجة من الاستانلس/الصاج (FHC — خرطوم مطاطي 30م + كتاني 2.5\" + طفاية بودرة 6كجم + CO2)","bg":"#FEF2F2"},{"c":"C12","v":"عدد","bg":"#FEF2F2","b":true,"al":"center"},{"c":"D12","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E12","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F12","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G12","v":24,"f":"=ROUND(D12*E12*(1+F12), 2)","bg":"#FEF2F2","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H12","v":2000,"f":"='3_إعدادات_أسعار_الحريق'!$F$12","bg":"#FEF2F2","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I12","v":48000,"f":"=ROUND(G12*H12, 2)","bg":"#FEF2F2","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J12","v":0,"f":"=IF($I$19>0, I12/$I$19, 0)","bg":"#FEF2F2","al":"center","nf":"0.0%"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":"FIR-05","b":true,"al":"center"},{"c":"B13","v":"توريد وتركيب مجموعة محابس تحكم وإنذار لكل دور (Zone Control Valve Assembly ZCV — محبس بوابة OS&Y + Flow Switch + Test/Drain)"},{"c":"C13","v":"مجموعة","b":true,"al":"center"},{"c":"D13","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E13","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F13","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G13","v":12,"f":"=ROUND(D13*E13*(1+F13), 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H13","v":3500,"f":"='3_إعدادات_أسعار_الحريق'!$F$13","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I13","v":42000,"f":"=ROUND(G13*H13, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J13","v":0,"f":"=IF($I$19>0, I13/$I$19, 0)","al":"center","nf":"0.0%"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"FIR-06","bg":"#FEF2F2","b":true,"al":"center"},{"c":"B14","v":"توريد وتركيب منظومة مضخات حريق ثلاثية مدرجة UL/FM (750 GPM @ 9 Bar — مضخة كهربائية + ديزل + جوكي + لوحات التحكم والـ PRV)","bg":"#FEF2F2"},{"c":"C14","v":"مجموعة","bg":"#FEF2F2","b":true,"al":"center"},{"c":"D14","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E14","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F14","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G14","v":1,"f":"=ROUND(D14*E14*(1+F14), 2)","bg":"#FEF2F2","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H14","v":150000,"f":"='3_إعدادات_أسعار_الحريق'!$F$14","bg":"#FEF2F2","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I14","v":150000,"f":"=ROUND(G14*H14, 2)","bg":"#FEF2F2","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J14","v":0,"f":"=IF($I$19>0, I14/$I$19, 0)","bg":"#FEF2F2","al":"center","nf":"0.0%"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"FIR-07","b":true,"al":"center"},{"c":"B15","v":"توريد وتركيب وصلات دفاع مدني خارجية ثنائية (Siamese Connection 4\"×2.5\"×2.5\") وعساكر حريق خارجية ومحابس عدم رجوع"},{"c":"C15","v":"عدد","b":true,"al":"center"},{"c":"D15","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E15","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F15","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G15","v":6,"f":"=ROUND(D15*E15*(1+F15), 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H15","v":2800,"f":"='3_إعدادات_أسعار_الحريق'!$F$15","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I15","v":16800,"f":"=ROUND(G15*H15, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J15","v":0,"f":"=IF($I$19>0, I15/$I$19, 0)","al":"center","nf":"0.0%"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":"FIR-08","bg":"#FEF2F2","b":true,"al":"center"},{"c":"B16","v":"توريد وتركيب وبرمجة لوحة إنذار حريق معنونة ذكية (Addressable Fire Alarm Control Panel FACP — 4 Loops) بالبطاريات ولوحة التكرار","bg":"#FEF2F2"},{"c":"C16","v":"لوحة","bg":"#FEF2F2","b":true,"al":"center"},{"c":"D16","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E16","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F16","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G16","v":2,"f":"=ROUND(D16*E16*(1+F16), 2)","bg":"#FEF2F2","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H16","v":12000,"f":"='3_إعدادات_أسعار_الحريق'!$F$16","bg":"#FEF2F2","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I16","v":24000,"f":"=ROUND(G16*H16, 2)","bg":"#FEF2F2","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J16","v":0,"f":"=IF($I$19>0, I16/$I$19, 0)","bg":"#FEF2F2","al":"center","nf":"0.0%"}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":"FIR-09","b":true,"al":"center"},{"c":"B17","v":"توريد وتركيب كواشف دخان ضوئية وحرارية معنونة، كواسر زجاجية، وسراين فلاشروع (UL Listed Addressable Detectors, MCPs & Sounders)"},{"c":"C17","v":"نقطة","b":true,"al":"center"},{"c":"D17","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E17","v":82,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F17","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G17","v":492,"f":"=ROUND(D17*E17*(1+F17), 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H17","v":225,"f":"='3_إعدادات_أسعار_الحريق'!$F$17","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I17","v":110700,"f":"=ROUND(G17*H17, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J17","v":0,"f":"=IF($I$19>0, I17/$I$19, 0)","al":"center","nf":"0.0%"}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":"FIR-10","bg":"#FEF2F2","b":true,"al":"center"},{"c":"B18","v":"توريد وتمديد كابلات إنذار حريق مقاومة للحريق (Fire-Resistant Shielded Cables FP200 — 2×1.5 mm2) داخل مواسير EMT مجلفنة","bg":"#FEF2F2"},{"c":"C18","v":"م.ط","bg":"#FEF2F2","b":true,"al":"center"},{"c":"D18","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E18","v":380,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F18","v":0.08,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G18","v":2462.4,"f":"=ROUND(D18*E18*(1+F18), 2)","bg":"#FEF2F2","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H18","v":24,"f":"='3_إعدادات_أسعار_الحريق'!$F$18","bg":"#FEF2F2","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I18","v":59097.6,"f":"=ROUND(G18*H18, 2)","bg":"#FEF2F2","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J18","v":0,"f":"=IF($I$19>0, I18/$I$19, 0)","bg":"#FEF2F2","al":"center","nf":"0.0%"}]},{"r":19,"h":42.0,"cells":[{"c":"A19","v":"إجمالي تكلفة أنظمة مكافحة الحريق المائية ومنظومة الإنذار المعنونة المباشرة","bg":"#E2E8F0","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"I19","v":749791.2,"f":"=SUM(I9:I18)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J19","v":0,"f":"=SUM(J9:J18)","bg":"#E2E8F0","b":true,"al":"center","nf":"0.0%"}]},{"r":20,"h":42.0,"cells":[{"c":"A20","v":"مخصص الاختبار الهيدروستاتيكي (14 بار لمدة ساعتين) والتشغيل وإصدار شهادة الدفاع المدني (Testing & Commissioning 4%)","bg":"#E2E8F0","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"I20","v":29991.65,"f":"=ROUND(I19*'3_إعدادات_أسعار_الحريق'!$D$5, 2)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J20","v":"","bg":"#E2E8F0","b":true,"al":"center"}]},{"r":21,"h":42.0,"cells":[{"c":"A21","v":"ضريبة القيمة المضافة على أعمال التوريد والتركيب (VAT 15%)","bg":"#E2E8F0","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"I21","v":116967.43,"f":"=ROUND((I19+I20)*'3_إعدادات_أسعار_الحريق'!$D$4, 2)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J21","v":"","bg":"#E2E8F0","b":true,"al":"center"}]},{"r":22,"h":46.0,"cells":[{"c":"A22","v":"الإجمالي العام لمقايسة أنظمة مكافحة وإنذار الحريق شامل الضريبة والاختبارات","bg":"#DCFCE7","fg":"#065F46","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"I22","v":896750.28,"f":"=I19+I20+I21","bg":"#DCFCE7","fg":"#065F46","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J22","v":"","bg":"#DCFCE7","fg":"#065F46","b":true,"al":"center"}]}]},{"name":"2_حساب_الرشاشات_ومضخة_NFPA","maxRow":11,"maxCol":9,"colWidths":[14.0,54.0,15.0,16.0,13.0,13.0,13.0,17.0,13.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"حاسبة تغطية الرشاشات الآلية (NFPA 13)، التدفق الهيدروليكي وخزان الإطفاء (NFPA 20)، وسعة لوبات الإنذار (NFPA 72)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":54.0,"cells":[{"c":"A2","v":"يتحقق من مطابقة أعداد الرشاشات وكواشف الإنذار وأعواد المواسير الفولاذية (6م) مع متطلبات كود NFPA والدفاع المدني","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":18.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"ثانياً: جدول التصميم الهيدروليكي وتفريد أعواد مواسير الحريق (6م)، التدفق GPM، وحجم خزان الحريق بالمتر المكعب","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"كود النظام","bg":"#B91C1C","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"بيان منظومة الحريق ومعيار التصميم في كود NFPA","bg":"#B91C1C","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"إجمالي الكمية بالمقايسة","bg":"#B91C1C","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"المعامل القياسي للوحدة","bg":"#B91C1C","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"عدد أعواد المواسير / اللوبات","bg":"#B91C1C","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"التدفق التصميمي (GPM)","bg":"#B91C1C","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"زمن التشغيل القياسي (دقيقة)","bg":"#B91C1C","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"سعة خزان الحريق (جالون)","bg":"#B91C1C","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I5","v":"سعة خزان الحريق (م3)","bg":"#B91C1C","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"NFP-PIP1","b":true,"al":"center"},{"c":"B6","v":"مواسير فرعيات شبكة الرشاشات Sch.40 أقطار 1\"-2\" (طول العود 6.0 م — FIR-01)"},{"c":"C6","v":1684.8,"f":"='1_مقايسة_الحريق_BOQ'!G9","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D6","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E6","v":281,"f":"=ROUND(C6/D6, 0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F6","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G6","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H6","v":0,"f":"=ROUND(F6*G6, 0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I6","v":0,"f":"=ROUND(H6*0.00378541, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"NFP-PIP2","bg":"#FEF2F2","b":true,"al":"center"},{"c":"B7","v":"مواسير الصواعد والخطوط الرئيسية Grooved Sch.40 أقطار 3\"-6\" (طول العود 6.0 م — FIR-02)","bg":"#FEF2F2"},{"c":"C7","v":540.6,"f":"='1_مقايسة_الحريق_BOQ'!G10","bg":"#FEF2F2","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D7","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E7","v":90,"f":"=ROUND(C7/D7, 0)","bg":"#FEF2F2","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F7","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G7","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H7","v":0,"f":"=ROUND(F7*G7, 0)","bg":"#FEF2F2","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I7","v":0,"f":"=ROUND(H7*0.00378541, 2)","bg":"#FEF2F2","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"NFP-SPR","b":true,"al":"center"},{"c":"B8","v":"منظومة الرشاشات الآلية لمنطقة التصميم الحرجة (Ordinary Hazard 1500 ft2 @ 0.15 GPM/ft2 — FIR-03)"},{"c":"C8","v":581.4,"f":"='1_مقايسة_الحريق_BOQ'!G11","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D8","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E8","v":48,"f":"=ROUND(C8/D8, 0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F8","v":250,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G8","v":60,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H8","v":15000,"f":"=ROUND(F8*G8, 0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I8","v":56.78,"f":"=ROUND(H8*0.00378541, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"NFP-FHC","bg":"#FEF2F2","b":true,"al":"center"},{"c":"B9","v":"منظومة صناديق الحريق والصواعد (Standpipe & Hose Streams NFPA 14 — FIR-04)","bg":"#FEF2F2"},{"c":"C9","v":24,"f":"='1_مقايسة_الحريق_BOQ'!G12","bg":"#FEF2F2","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D9","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E9","v":6,"f":"=ROUND(C9/D9, 0)","bg":"#FEF2F2","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F9","v":500,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G9","v":60,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H9","v":30000,"f":"=ROUND(F9*G9, 0)","bg":"#FEF2F2","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I9","v":113.56,"f":"=ROUND(H9*0.00378541, 2)","bg":"#FEF2F2","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":"NFP-ALM","b":true,"al":"center"},{"c":"B10","v":"نقاط كواشف الإنذار المعنونة وتوزيعها على اللوبات (سعة اللوب الآمنة 125 نقطة — FIR-09)"},{"c":"C10","v":492,"f":"='1_مقايسة_الحريق_BOQ'!G17","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D10","v":125,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E10","v":4,"f":"=ROUND(C10/D10, 0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F10","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G10","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H10","v":0,"f":"=ROUND(F10*G10, 0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I10","v":0,"f":"=ROUND(H10*0.00378541, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"إجمالي أطوال ونقاط الشبكة، التدفق الكلي لمضخة الحريق (750 GPM)، وسعة خزان الحريق المطلوبة (م3)","bg":"#DCFCE7","fg":"#065F46","b":true,"cs":2},{"skip":true},{"c":"C11","v":3322.8,"f":"=SUM(C6:C10)","bg":"#DCFCE7","fg":"#065F46","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D11","v":30.6,"f":"=AVERAGE(D6:D10)","bg":"#DCFCE7","fg":"#065F46","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E11","v":429,"f":"=SUM(E6:E10)","bg":"#DCFCE7","fg":"#065F46","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F11","v":750,"f":"=SUM(F6:F10)","bg":"#DCFCE7","fg":"#065F46","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G11","v":60,"f":"=MAX(G6:G10)","bg":"#DCFCE7","fg":"#065F46","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H11","v":45000,"f":"=SUM(H6:H10)","bg":"#DCFCE7","fg":"#065F46","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I11","v":170.34,"f":"=SUM(I6:I10)","bg":"#DCFCE7","fg":"#065F46","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]}]},{"name":"3_إعدادات_أسعار_الحريق","maxRow":18,"maxCol":7,"colWidths":[16.0,58.0,16.0,18.0,13.0,20.0,22.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"إعدادات الفئات السعرية لأنظمة مكافحة وإنذار الحريق (توريد المواسير والمعدات UL/FM + مصنعية التركيب والبرمجة)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":54.0,"cells":[{"c":"A2","v":"عدّل أسعار التوريد أو المصنعية في الخلايا الصفراء لتحديث مقايسة الحريق تلقائياً","bg":"#991B1B","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":36.0,"cells":[{"c":"A3","v":"عملة المقايسة والتسعير","bg":"#FEF2F2","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"D3","v":"SAR (ريال سعودي)","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"E3","v":"معامل هندسي ومالي مرتبط بمقايسة الحريق وحاسبة NFPA","cs":3},{"skip":true},{"skip":true}]},{"r":4,"h":36.0,"cells":[{"c":"A4","v":"نسبة ضريبة القيمة المضافة (VAT %)","bg":"#FEF2F2","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"D4","v":0.15,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"E4","v":"معامل هندسي ومالي مرتبط بمقايسة الحريق وحاسبة NFPA","cs":3},{"skip":true},{"skip":true}]},{"r":5,"h":36.0,"cells":[{"c":"A5","v":"نسبة مخصص الاختبار الهيدروستاتيكي (14 بار) وفحص الدفاع المدني %","bg":"#FEF2F2","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"D5","v":0.04,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"E5","v":"معامل هندسي ومالي مرتبط بمقايسة الحريق وحاسبة NFPA","cs":3},{"skip":true},{"skip":true}]},{"r":6,"h":36.0,"cells":[{"c":"A6","v":"المساحة التصميمية لتغطية الرشاش الواحد في الخطورة العادية (م2/رشاش)","bg":"#FEF2F2","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"D6","v":12.1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E6","v":"معامل هندسي ومالي مرتبط بمقايسة الحريق وحاسبة NFPA","cs":3},{"skip":true},{"skip":true}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":"ضغط الاختبار الهيدروستاتيكي القياسي لشبكة مواسير الحريق وفق NFPA 13 (بار)","bg":"#FEF2F2","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"D7","v":13.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E7","v":"معامل هندسي ومالي مرتبط بمقايسة الحريق وحاسبة NFPA","cs":3},{"skip":true},{"skip":true}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"كود البند","bg":"#B91C1C","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B8","v":"بيان بند مكافحة / إنذار الحريق","bg":"#B91C1C","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C8","v":"الوحدة","bg":"#B91C1C","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D8","v":"تكلفة توريد المعدات والمواد","bg":"#B91C1C","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E8","v":"مصنعية التركيب والاختبار","bg":"#B91C1C","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F8","v":"إجمالي سعر الوحدة الشامل","bg":"#B91C1C","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G8","v":"المرجع القياسي (NFPA / UL)","bg":"#B91C1C","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":9,"h":38.0,"cells":[{"c":"A9","v":"FIR-01","b":true,"al":"center"},{"c":"B9","v":"مواسير حريق فولاذية غير ملحومة للفرعيات Sch.40 (أقطار 1\"-2\")"},{"c":"C9","v":"م.ط","b":true,"al":"center"},{"c":"D9","v":48,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E9","v":24,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F9","v":72,"f":"=ROUND(D9+E9, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G9","v":"ASTM A53 Gr.B / NFPA 13","al":"center"}]},{"r":10,"h":38.0,"cells":[{"c":"A10","v":"FIR-02","bg":"#FEF2F2","b":true,"al":"center"},{"c":"B10","v":"خطوط رئيسية وصواعد حريق بوصلات جروفد Sch.40 (أقطار 3\"-6\")","bg":"#FEF2F2"},{"c":"C10","v":"م.ط","bg":"#FEF2F2","b":true,"al":"center"},{"c":"D10","v":145,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E10","v":55,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F10","v":200,"f":"=ROUND(D10+E10, 2)","bg":"#FEF2F2","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G10","v":"UL/FM Grooved Sch.40","bg":"#FEF2F2","al":"center"}]},{"r":11,"h":38.0,"cells":[{"c":"A11","v":"FIR-03","b":true,"al":"center"},{"c":"B11","v":"رشاش مياه إطفاء آلي (UL/FM Sprinkler 68°C) بالوصلة المرنة"},{"c":"C11","v":"عدد","b":true,"al":"center"},{"c":"D11","v":85,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E11","v":35,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F11","v":120,"f":"=ROUND(D11+E11, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G11","v":"NFPA 13 K=5.6 UL/FM","al":"center"}]},{"r":12,"h":38.0,"cells":[{"c":"A12","v":"FIR-04","bg":"#FEF2F2","b":true,"al":"center"},{"c":"B12","v":"صندوق إطفاء حريق حائطي مزدوج كامل بالخراطيم والطفايات","bg":"#FEF2F2"},{"c":"C12","v":"عدد","bg":"#FEF2F2","b":true,"al":"center"},{"c":"D12","v":1650,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E12","v":350,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F12","v":2000,"f":"=ROUND(D12+E12, 2)","bg":"#FEF2F2","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G12","v":"NFPA 14 Class III FHC","bg":"#FEF2F2","al":"center"}]},{"r":13,"h":38.0,"cells":[{"c":"A13","v":"FIR-05","b":true,"al":"center"},{"c":"B13","v":"مجموعة محابس تحكم وإنذار للدور (ZCV OS&Y + Flow Switch)"},{"c":"C13","v":"مجموعة","b":true,"al":"center"},{"c":"D13","v":2800,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E13","v":700,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F13","v":3500,"f":"=ROUND(D13+E13, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G13","v":"UL/FM Zone Control Valve","al":"center"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"FIR-06","bg":"#FEF2F2","b":true,"al":"center"},{"c":"B14","v":"مجموعة مضخات حريق ثلاثية مدرجة UL/FM (750 GPM @ 9 Bar)","bg":"#FEF2F2"},{"c":"C14","v":"مجموعة","bg":"#FEF2F2","b":true,"al":"center"},{"c":"D14","v":135000,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E14","v":15000,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F14","v":150000,"f":"=ROUND(D14+E14, 2)","bg":"#FEF2F2","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G14","v":"NFPA 20 Electric+Diesel+Jockey","bg":"#FEF2F2","al":"center"}]},{"r":15,"h":38.0,"cells":[{"c":"A15","v":"FIR-07","b":true,"al":"center"},{"c":"B15","v":"وصلة دفاع مدني خارجية ثنائية وعساكر حريق خارجية"},{"c":"C15","v":"عدد","b":true,"al":"center"},{"c":"D15","v":2200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E15","v":600,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F15","v":2800,"f":"=ROUND(D15+E15, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G15","v":"NFPA 14 Siamese & Hydrant","al":"center"}]},{"r":16,"h":38.0,"cells":[{"c":"A16","v":"FIR-08","bg":"#FEF2F2","b":true,"al":"center"},{"c":"B16","v":"لوحة إنذار حريق معنونة ذكية (Addressable FACP — 4 Loops)","bg":"#FEF2F2"},{"c":"C16","v":"لوحة","bg":"#FEF2F2","b":true,"al":"center"},{"c":"D16","v":9500,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E16","v":2500,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F16","v":12000,"f":"=ROUND(D16+E16, 2)","bg":"#FEF2F2","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G16","v":"NFPA 72 / UL 864 FACP","bg":"#FEF2F2","al":"center"}]},{"r":17,"h":38.0,"cells":[{"c":"A17","v":"FIR-09","b":true,"al":"center"},{"c":"B17","v":"كاشف دخان/حرارة معنون، كاسر زجاجي، أو سارينة بفلاشر"},{"c":"C17","v":"نقطة","b":true,"al":"center"},{"c":"D17","v":160,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E17","v":65,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F17","v":225,"f":"=ROUND(D17+E17, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G17","v":"NFPA 72 / UL 268 Detector","al":"center"}]},{"r":18,"h":38.0,"cells":[{"c":"A18","v":"FIR-10","bg":"#FEF2F2","b":true,"al":"center"},{"c":"B18","v":"كابلات إنذار مقاومة للحريق (FP200 2×1.5mm2) بمواسير EMT","bg":"#FEF2F2"},{"c":"C18","v":"م.ط","bg":"#FEF2F2","b":true,"al":"center"},{"c":"D18","v":14,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E18","v":10,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F18","v":24,"f":"=ROUND(D18+E18, 2)","bg":"#FEF2F2","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G18","v":"BS 7629 / EN 50200 FP200","bg":"#FEF2F2","al":"center"}]}]}]}