{"slug":"flat-slab-bbs","sheets":[{"name":"لوحة التحكم وملخص السقف","maxRow":26,"maxCol":10,"colWidths":[4.0,8.0,30.0,16.0,28.0,18.0,18.0,20.0,18.0,18.0],"rows":[{"r":1,"h":34.0,"cells":[{"c":"A1","v":""},{"c":"B1","v":"لوحة التحكم وملخص تفريد حديد وحصر سقف فلات سلاب (Flat Slab BBS)","fg":"#1E293B","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":""},{"c":"B2","v":"ملخص المؤشرات الفنية والكميات التنفيذية طبقاً لكود البناء السعودي SBC 304 والكود المصري ECP 203","fg":"#475569","al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":""},{"c":"B4","v":"مسطح السقف وسمكه","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"D4","v":"حجم الخرسانة المسلحة (م³)","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"F4","v":"إجمالي وزن حديد التسليح (طن)","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"H4","v":"معدل استهلاك الحديد (كجم/م³)","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"J4","v":"كجم/م² مسطح","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center"}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":""},{"c":"B5","v":"450 م² (سمك 22 سم)","bg":"#F8FAFC","b":true,"al":"center","cs":2},{"skip":true},{"c":"D5","v":99,"f":"=450*0.22","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00","cs":2},{"skip":true},{"c":"F5","v":0,"f":"='جدول تفريد حديد الفلات سلاب'!P27/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00","cs":2},{"skip":true},{"c":"H5","v":0,"f":"=('جدول تفريد حديد الفلات سلاب'!P27)/D5","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0","cs":2},{"skip":true},{"c":"J5","v":0,"f":"=('جدول تفريد حديد الفلات سلاب'!P27)/450","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":""},{"c":"B6","v":"سقف دور أرضي متكرر","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"D6","v":"إجمالي مكعب الصب الفعلي","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"F6","v":"شاملاً الشبكتين والإضافي والهالك","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"H6","v":"المعدل الهندسي القياسي (120-145)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"J6","v":"متوسط لكل متر مسطح","bg":"#F8FAFC","fg":"#64748B","al":"center"}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""},{"c":"I7","v":""},{"c":"J7","v":""}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":""},{"c":"B8","v":"توزيع أوزان حديد التسليح ونسب المشاركة في سقف الفلات سلاب","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":""},{"c":"B9","v":"م","bg":"#F1F5F9","b":true,"al":"center"},{"c":"C9","v":"عنصر التسليح / الشبكة","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D9","v":"القطر الرئيسي (مم)","bg":"#F1F5F9","b":true,"al":"center"},{"c":"E9","v":"الاتجاه والتوصيف","bg":"#F1F5F9","b":true,"al":"center"},{"c":"F9","v":"الوزن النظري (كجم)","bg":"#F1F5F9","b":true,"al":"center"},{"c":"G9","v":"نسبة الهالك المعتمدة","bg":"#F1F5F9","b":true,"al":"center"},{"c":"H9","v":"إجمالي الوزن الفعلي (كجم)","bg":"#F1F5F9","b":true,"al":"center"},{"c":"I9","v":"الوزن بالطن","bg":"#F1F5F9","b":true,"al":"center"},{"c":"J9","v":"النسبة من إجمالي السقف","bg":"#F1F5F9","b":true,"al":"center"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":""},{"c":"B10","v":1,"in":true,"fg":"#1E293B"},{"c":"C10","v":"الشبكة السفلية الرئيسية (فرش)","fg":"#1E293B","al":"center"},{"c":"D10","v":12,"in":true,"fg":"#1E293B"},{"c":"E10","v":"الاتجاه الطويل X (6 أسياخ/م)","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"F10","v":"4.0%","f":"='جدول تفريد حديد الفلات سلاب'!P6","fg":"#1E293B","al":"center"},{"c":"G10","v":"4.0%","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"H10","v":0,"f":"=E10*1.04","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I10","v":0,"f":"=G10/1000","fg":"#1E293B","al":"center","nf":"0.0%"},{"c":"J10","v":0,"f":"=G10/$G$15","fg":"#1E293B","al":"center"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":""},{"c":"B11","v":2,"in":true,"bg":"#F8FAFC","fg":"#1E293B"},{"c":"C11","v":"الشبكة السفلية الثانوية (غطاء)","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D11","v":12,"in":true,"bg":"#F8FAFC","fg":"#1E293B"},{"c":"E11","v":"الاتجاه القصير Y (6 أسياخ/م)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"F11","v":"4.0%","f":"='جدول تفريد حديد الفلات سلاب'!P7","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"G11","v":"4.0%","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"H11","v":0,"f":"=E11*1.04","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I11","v":0,"f":"=G11/1000","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0%"},{"c":"J11","v":0,"f":"=G11/$G$15","bg":"#F8FAFC","fg":"#1E293B","al":"center"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":""},{"c":"B12","v":3,"in":true,"fg":"#1E293B"},{"c":"C12","v":"الشبكة العلوية (فرش وغطاء)","fg":"#1E293B","al":"center"},{"c":"D12","v":10,"in":true,"fg":"#1E293B"},{"c":"E12","v":"في الاتجاهين X & Y (5 أسياخ/م)","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"F12","v":"3.5%3.5%","f":"='جدول تفريد حديد الفلات سلاب'!P9+'جدول تفريد حديد الفلات سلاب'!P10","fg":"#1E293B","al":"center"},{"c":"G12","v":"3.5%","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"H12","v":0,"f":"=(E12)*1.035","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I12","v":0,"f":"=G12/1000","fg":"#1E293B","al":"center","nf":"0.0%"},{"c":"J12","v":0,"f":"=G12/$G$15","fg":"#1E293B","al":"center"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":""},{"c":"B13","v":4,"in":true,"bg":"#F8FAFC","fg":"#1E293B"},{"c":"C13","v":"الحديد الإضافي العلوي فوق الأعمدة","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D13","v":14,"in":true,"bg":"#F8FAFC","fg":"#1E293B"},{"c":"E13","v":"لمقاومة العزوم السالبة والقص الثاقب Punching","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"F13","v":"4.0%4.0%","f":"='جدول تفريد حديد الفلات سلاب'!P14+'جدول تفريد حديد الفلات سلاب'!P15","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"G13","v":"4.5%","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"H13","v":0,"f":"=(E13)*1.045","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I13","v":0,"f":"=G13/1000","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0%"},{"c":"J13","v":0,"f":"=G13/$G$15","bg":"#F8FAFC","fg":"#1E293B","al":"center"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":""},{"c":"B14","v":5,"in":true,"fg":"#1E293B"},{"c":"C14","v":"الحديد الإضافي السفلي بمنتصف البحور","fg":"#1E293B","al":"center"},{"c":"D14","v":12,"in":true,"fg":"#1E293B"},{"c":"E14","v":"لمقاومة العزوم الموجبة والترخيم Deflection","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"F14","v":"3.0%3.0%","f":"='جدول تفريد حديد الفلات سلاب'!P18+'جدول تفريد حديد الفلات سلاب'!P19","fg":"#1E293B","al":"center"},{"c":"G14","v":"3.0%","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"H14","v":0,"f":"=(E14)*1.03","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I14","v":0,"f":"=G14/1000","fg":"#1E293B","al":"center","nf":"0.0%"},{"c":"J14","v":0,"f":"=G14/$G$15","fg":"#1E293B","al":"center"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":""},{"c":"B15","v":"الإجمالي العام لتسليح السقف (طن)","bg":"#FEF3C7","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"E15","v":0,"f":"=SUM(E10:E14)","bg":"#FEF3C7","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"F15","v":"المتوسط 3.8%","bg":"#FEF3C7","fg":"#1E293B","b":true,"al":"center"},{"c":"G15","v":0,"f":"=SUM(G10:G14)","bg":"#FEF3C7","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"H15","v":0,"f":"=SUM(H10:H14)","bg":"#FEF3C7","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"I15","v":0,"f":"=SUM(I10:I14)","bg":"#FEF3C7","fg":"#1E293B","b":true,"al":"center","nf":"0.0%"},{"c":"J15","v":"","bg":"#FEF3C7"}]},{"r":16,"h":28.0,"cells":[{"c":"A16","v":""},{"c":"B16","v":""},{"c":"C16","v":""},{"c":"D16","v":""},{"c":"E16","v":""},{"c":"F16","v":""},{"c":"G16","v":""},{"c":"H16","v":""},{"c":"I16","v":""},{"c":"J16","v":""}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":""},{"c":"B17","v":"حصر طلبيات حديد التسليح لمصانع الدرفلة حسب القطر (Bar Diameters Procurement Order)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":""},{"c":"B18","v":"م","bg":"#F1F5F9","b":true,"al":"center"},{"c":"C18","v":"قطر السيخ (Diameter)","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D18","v":"الرمز الهندسي","bg":"#F1F5F9","b":true,"al":"center"},{"c":"E18","v":"الوزن الاسمي (كجم/م.ط)","bg":"#F1F5F9","b":true,"al":"center"},{"c":"F18","v":"الاستخدام في سقف الفلات سلاب","bg":"#F1F5F9","b":true,"al":"center"},{"c":"G18","v":"إجمالي الأطوال (م.ط)","bg":"#F1F5F9","b":true,"al":"center"},{"c":"H18","v":"الوزن المحسوب (كجم)","bg":"#F1F5F9","b":true,"al":"center"},{"c":"I18","v":"الوزن التوريدي (طن)","bg":"#F1F5F9","b":true,"al":"center"},{"c":"J18","v":"عدد الأسياخ (طول 12م)","bg":"#F1F5F9","b":true,"al":"center"}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":""},{"c":"B19","v":1,"in":true,"bg":"#F8FAFC","fg":"#1E293B"},{"c":"C19","v":"10 مم","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D19","v":"Φ 10","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.000"},{"c":"E19","v":0.617,"in":true,"bg":"#F8FAFC","fg":"#1E293B"},{"c":"F19","v":"الشبكة العلوية بالكامل X & Y والكراسي","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"G19","v":1.851,"f":"='جدول تفريد حديد الفلات سلاب'!Q9","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"H19","v":0,"f":"=F19*D19*1.04","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I19","v":0.001851,"f":"=G19/1000","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"J19","v":0,"f":"=F19/12","bg":"#F8FAFC","fg":"#1E293B","al":"center"}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":""},{"c":"B20","v":2,"in":true,"fg":"#1E293B"},{"c":"C20","v":"12 مم","fg":"#1E293B","al":"center"},{"c":"D20","v":"Φ 12","fg":"#1E293B","al":"center","nf":"0.000"},{"c":"E20","v":0.888,"in":true,"fg":"#1E293B"},{"c":"F20","v":"الشبكة السفلية فرش وغطاء + إضافي سفلي","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"G20","v":3.552,"f":"='جدول تفريد حديد الفلات سلاب'!Q6+'جدول تفريد حديد الفلات سلاب'!Q7+'جدول تفريد حديد الفلات سلاب'!Q18","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"H20","v":0,"f":"=F20*D20*1.04","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I20","v":0.003552,"f":"=G20/1000","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"J20","v":0,"f":"=F20/12","fg":"#1E293B","al":"center"}]},{"r":21,"h":72.0,"cells":[{"c":"A21","v":""},{"c":"B21","v":3,"in":true,"bg":"#F8FAFC","fg":"#1E293B"},{"c":"C21","v":"14 مم","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D21","v":"Φ 14","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.000"},{"c":"E21","v":1.208,"in":true,"bg":"#F8FAFC","fg":"#1E293B"},{"c":"F21","v":"إضافي علوي فوق الأعمدة (الاتجاه الطويل)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"G21","v":1.208,"f":"='جدول تفريد حديد الفلات سلاب'!Q14","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"H21","v":0,"f":"=F21*D21*1.04","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I21","v":0.001208,"f":"=G21/1000","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"J21","v":0,"f":"=F21/12","bg":"#F8FAFC","fg":"#1E293B","al":"center"}]},{"r":22,"h":72.0,"cells":[{"c":"A22","v":""},{"c":"B22","v":4,"in":true,"fg":"#1E293B"},{"c":"C22","v":"16 مم","fg":"#1E293B","al":"center"},{"c":"D22","v":"Φ 16","fg":"#1E293B","al":"center","nf":"0.000"},{"c":"E22","v":1.578,"in":true,"fg":"#1E293B"},{"c":"F22","v":"إضافي علوي فوق الأعمدة (الاتجاه القصير) وشوك الحواف","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"G22","v":1.578,"f":"='جدول تفريد حديد الفلات سلاب'!Q15","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"H22","v":0,"f":"=F22*D22*1.04","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I22","v":0.001578,"f":"=G22/1000","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"J22","v":0,"f":"=F22/12","fg":"#1E293B","al":"center"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":""},{"c":"B23","v":"إجمالي طلبية الحديد لمصنع التسليح","bg":"#FEF3C7","fg":"#1E293B","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"F23","v":0,"f":"=SUM(F19:F22)","bg":"#FEF3C7","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"G23","v":8.189,"f":"=SUM(G19:G22)","bg":"#FEF3C7","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"H23","v":0,"f":"=SUM(H19:H22)","bg":"#FEF3C7","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"I23","v":0.008189,"f":"=SUM(I19:I22)","bg":"#FEF3C7","fg":"#1E293B","b":true,"al":"center","nf":"#,##0"},{"c":"J23","v":"سيخ قياسي 12م","bg":"#FEF3C7","fg":"#1E293B","b":true,"al":"center"}]},{"r":24,"h":28.0,"cells":[{"c":"A24","v":""},{"c":"B24","v":""},{"c":"C24","v":""},{"c":"D24","v":""},{"c":"E24","v":""},{"c":"F24","v":""},{"c":"G24","v":""},{"c":"H24","v":""},{"c":"I24","v":""},{"c":"J24","v":""}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":""},{"c":"B25","v":"مهندس المكتب الفني (إعداد الحصر)","bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"E25","v":"مدير المشروع الميداني (اعتماد التنفيذ)","bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H25","v":"المهندس الاستشاري المشرف (المطابقة)","bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":26,"h":52.0,"cells":[{"c":"A26","v":""},{"c":"B26","v":"المهندس: .......................................\nالتوقيع: ................... التاريخ: ..../..../ 2026","fg":"#475569","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"E26","v":"المهندس: .......................................\nالتوقيع: ................... التاريخ: ..../..../ 2026","fg":"#475569","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H26","v":"الاستشاري: .......................................\nالتوقيع: ................... التاريخ: ..../..../ 2026","fg":"#475569","al":"center","cs":3},{"skip":true},{"skip":true}]}]},{"name":"جدول تفريد حديد الفلات سلاب","maxRow":27,"maxCol":17,"colWidths":[4.0,6.0,38.0,22.0,14.0,24.0,16.0,16.0,14.0,16.0,16.0,16.0,18.0,18.0,16.0,16.0,20.0],"rows":[{"r":1,"h":34.0,"cells":[{"c":"A1","v":""},{"c":"B1","v":"جدول حصر وتفريد حديد تسليح سقف فلات سلاب (Bar Bending Schedule - Flat Slab)","fg":"#1E293B","b":true,"al":"center","cs":15},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"Q1","v":""}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":""},{"c":"B2","v":"حساب أطوال الأسياخ وأشكال التفريد وأطوال الوصلات Ld والأوزان وفق الكود السعودي SBC 304","fg":"#475569","al":"center","cs":15},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"Q2","v":""}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""},{"c":"N3","v":""},{"c":"O3","v":""},{"c":"P3","v":""},{"c":"Q3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":""},{"c":"B4","v":"أولاً: تسليح الشبكة السفلية الرئيسية (Bottom Mesh Rebar - X & Y Directions)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":15},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"Q4","v":""}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":""},{"c":"B5","v":"م","bg":"#F1F5F9","b":true,"al":"center"},{"c":"C5","v":"العنصر والتوصيف الإنشائي","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D5","v":"موضع السيخ","bg":"#F1F5F9","b":true,"al":"center"},{"c":"E5","v":"القطر Φ (مم)","bg":"#F1F5F9","b":true,"al":"center"},{"c":"F5","v":"شكل التفريد والجنش","bg":"#F1F5F9","b":true,"al":"center"},{"c":"G5","v":"طول القطعية المفردة (م)","bg":"#F1F5F9","b":true,"al":"center"},{"c":"H5","v":"طول الوصلة Ld (م)","bg":"#F1F5F9","b":true,"al":"center"},{"c":"I5","v":"العدد في المتر","bg":"#F1F5F9","b":true,"al":"center"},{"c":"J5","v":"طول الشريحة (م)","bg":"#F1F5F9","b":true,"al":"center"},{"c":"K5","v":"العدد الكلي للأسياخ","bg":"#F1F5F9","b":true,"al":"center"},{"c":"L5","v":"الوزن الاسمي (كجم/م)","bg":"#F1F5F9","b":true,"al":"center"},{"c":"M5","v":"إجمالي الطول (م.ط)","bg":"#F1F5F9","b":true,"al":"center"},{"c":"N5","v":"الوزن الكلي (كجم)","bg":"#F1F5F9","b":true,"al":"center"},{"c":"O5","v":"الوزن بالطن","bg":"#F1F5F9","b":true,"al":"center"},{"c":"P5","v":"حجم الهالك المعتمد","bg":"#F1F5F9","b":true,"al":"center"},{"c":"Q5","v":"الأطوال الإجمالية","bg":"#F1F5F9","b":true,"al":"center"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":""},{"c":"B6","v":1,"in":true,"fg":"#1E293B","al":"center"},{"c":"C6","v":"سفلي اتجاه طويل X (فرش)","fg":"#1E293B"},{"c":"D6","v":"سفلي رئيسي","fg":"#1E293B","al":"center"},{"c":"E6","v":12,"in":true,"fg":"#1E293B","al":"center"},{"c":"F6","v":"مستقيم مع جنش طرفي","fg":"#1E293B","al":"center"},{"c":"G6","v":12,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"H6","v":0.7,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"I6","v":6,"in":true,"fg":"#1E293B","al":"center"},{"c":"J6","v":20,"in":true,"fg":"#1E293B","al":"center"},{"c":"K6","v":4.2,"f":"=I6*H6","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"L6","v":0.888,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"M6","v":"مستقيم مع جنش طرفيمستقيم مع جنش طرفيمستقيم مع جنش طرفيمستقيم مع جنش طرفيمستقيم مع جنش طرفيمستقيم مع جنش طرفيمستقيم مع جنش طرفيمستقيم مع جنش طرفيمستقيم مع جنش طرفيمستقيم مع جنش طرفيمستقيم مع جنش طرفيمستقيم مع جنش طرفيمستقيم مع جنش طرفيمستقيم مع جنش طرفيمستقيم مع جنش طرفيمستقيم مع جنش طرفيمستقيم مع جنش طرفيمستقيم مع جنش طرفيمستقيم مع جنش طرفيمستقيم مع جنش طرفي","f":"=J6*F6","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"N6","v":3.7296,"f":"=L6*K6","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"O6","v":0,"f":"=M6/1000","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"P6","v":"4.0%","fg":"#1E293B","al":"center","nf":"0.0%"},{"c":"Q6","v":0.888,"f":"=L6","fg":"#1E293B","al":"center","nf":"#,##0.0"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":2,"in":true,"fg":"#1E293B","al":"center"},{"c":"C7","v":"سفلي اتجاه قصير Y (غطاء)","fg":"#1E293B"},{"c":"D7","v":"سفلي ثانوي","fg":"#1E293B","al":"center"},{"c":"E7","v":12,"in":true,"fg":"#1E293B","al":"center"},{"c":"F7","v":"مستقيم مع جنش طرفي","fg":"#1E293B","al":"center"},{"c":"G7","v":12,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"H7","v":0.7,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"I7","v":6,"in":true,"fg":"#1E293B","al":"center"},{"c":"J7","v":22.5,"in":true,"fg":"#1E293B","al":"center"},{"c":"K7","v":4.2,"f":"=I7*H7","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"L7","v":0.888,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"M7","v":0,"f":"=J7*F7","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"N7","v":3.7296,"f":"=L7*K7","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"O7","v":0,"f":"=M7/1000","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"P7","v":"4.0%","fg":"#1E293B","al":"center","nf":"0.0%"},{"c":"Q7","v":0.888,"f":"=L7","fg":"#1E293B","al":"center","nf":"#,##0.0"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":""},{"c":"B8","v":"ثانياً: تسليح الشبكة العلوية الممتدة (Top Mesh Rebar - X & Y Directions)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":15},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"Q8","v":""}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":""},{"c":"B9","v":3,"in":true,"fg":"#1E293B","al":"center"},{"c":"C9","v":"علوي اتجاه طويل X (فرش)","fg":"#1E293B"},{"c":"D9","v":"علوي ممتد","fg":"#1E293B","al":"center"},{"c":"E9","v":10,"in":true,"fg":"#1E293B","al":"center"},{"c":"F9","v":"مستقيم مع كرانك طرفي","fg":"#1E293B","al":"center"},{"c":"G9","v":12,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"H9","v":0.6,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"I9","v":5,"in":true,"fg":"#1E293B","al":"center"},{"c":"J9","v":20,"in":true,"fg":"#1E293B","al":"center"},{"c":"K9","v":3,"f":"=I9*H9","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"L9","v":0.617,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"M9","v":"مستقيم مع كرانك طرفيمستقيم مع كرانك طرفيمستقيم مع كرانك طرفيمستقيم مع كرانك طرفيمستقيم مع كرانك طرفيمستقيم مع كرانك طرفيمستقيم مع كرانك طرفيمستقيم مع كرانك طرفيمستقيم مع كرانك طرفيمستقيم مع كرانك طرفيمستقيم مع كرانك طرفيمستقيم مع كرانك طرفيمستقيم مع كرانك طرفيمستقيم مع كرانك طرفيمستقيم مع كرانك طرفيمستقيم مع كرانك طرفيمستقيم مع كرانك طرفيمستقيم مع كرانك طرفيمستقيم مع كرانك طرفيمستقيم مع كرانك طرفي","f":"=J9*F9","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"N9","v":1.851,"f":"=L9*K9","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"O9","v":0,"f":"=M9/1000","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"P9","v":"3.5%","fg":"#1E293B","al":"center","nf":"0.0%"},{"c":"Q9","v":1.851,"f":"=L9+L10+L11","fg":"#1E293B","al":"center","nf":"#,##0.0"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":""},{"c":"B10","v":4,"in":true,"fg":"#1E293B","al":"center"},{"c":"C10","v":"علوي اتجاه قصير Y (غطاء)","fg":"#1E293B"},{"c":"D10","v":"علوي ممتد","fg":"#1E293B","al":"center"},{"c":"E10","v":10,"in":true,"fg":"#1E293B","al":"center"},{"c":"F10","v":"مستقيم مع كرانك طرفي","fg":"#1E293B","al":"center"},{"c":"G10","v":12,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"H10","v":0.6,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"I10","v":5,"in":true,"fg":"#1E293B","al":"center"},{"c":"J10","v":22.5,"in":true,"fg":"#1E293B","al":"center"},{"c":"K10","v":3,"f":"=I10*H10","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"L10","v":0.617,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"M10","v":0,"f":"=J10*F10","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"N10","v":1.851,"f":"=L10*K10","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"O10","v":0,"f":"=M10/1000","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"P10","v":"3.5%","fg":"#1E293B","al":"center","nf":"0.0%"},{"c":"Q10","v":0,"f":"=M10*1.035","fg":"#1E293B","al":"center","nf":"#,##0.0"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":""},{"c":"B11","v":5,"in":true,"fg":"#1E293B","al":"center"},{"c":"C11","v":"كراسي وأوتار رفع الشبكة العلوية","fg":"#1E293B"},{"c":"D11","v":"كراسي حاملة","fg":"#1E293B","al":"center"},{"c":"E11","v":10,"in":true,"fg":"#1E293B","al":"center"},{"c":"F11","v":"شكل كرسي بارتفاع 15سم","fg":"#1E293B","al":"center"},{"c":"G11","v":1.8,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"H11","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"I11","v":2,"in":true,"fg":"#1E293B","al":"center"},{"c":"J11","v":22.5,"in":true,"fg":"#1E293B","al":"center"},{"c":"K11","v":0,"f":"=I11*H11*2","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"L11","v":0.617,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"M11","v":0,"f":"=J11*F11","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"N11","v":0,"f":"=L11*K11","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"O11","v":0,"f":"=M11/1000","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"P11","v":"5.0%","fg":"#1E293B","al":"center","nf":"0.0%"},{"c":"Q11","v":0,"f":"=M11*1.05","fg":"#1E293B","al":"center","nf":"#,##0.0"}]},{"r":12,"h":28.0,"cells":[{"c":"A12","v":""},{"c":"B12","v":""},{"c":"C12","v":""},{"c":"D12","v":""},{"c":"E12","v":""},{"c":"F12","v":""},{"c":"G12","v":""},{"c":"H12","v":""},{"c":"I12","v":""},{"c":"J12","v":""},{"c":"K12","v":""},{"c":"L12","v":""},{"c":"M12","v":""},{"c":"N12","v":""},{"c":"O12","v":""},{"c":"P12","v":""},{"c":"Q12","v":""}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":""},{"c":"B13","v":"ثالثاً: الحديد الإضافي العلوي فوق الأعمدة (Top Additional Rebar at Column Heads)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":15},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"Q13","v":""}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":""},{"c":"B14","v":6,"in":true,"fg":"#1E293B","al":"center"},{"c":"C14","v":"إضافي علوي أعمدة وسطية X (عزم سالب)","fg":"#1E293B"},{"c":"D14","v":"فوق الأعمدة C1-C6","fg":"#1E293B","al":"center"},{"c":"E14","v":14,"in":true,"fg":"#1E293B","al":"center"},{"c":"F14","v":"مستقيم بطول L/3","fg":"#1E293B","al":"center"},{"c":"G14","v":4.5,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"H14","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"I14","v":6,"in":true,"fg":"#1E293B","al":"center"},{"c":"J14","v":12,"in":true,"fg":"#1E293B","al":"center"},{"c":"K14","v":432,"f":"=(12*6)*6","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"L14","v":1.208,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"M14","v":"مستقيم بطول L/3مستقيم بطول L/3مستقيم بطول L/3مستقيم بطول L/3مستقيم بطول L/3مستقيم بطول L/3مستقيم بطول L/3مستقيم بطول L/3مستقيم بطول L/3مستقيم بطول L/3مستقيم بطول L/3مستقيم بطول L/3","f":"=J14*F14","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"N14","v":521.856,"f":"=L14*K14","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"O14","v":0,"f":"=M14/1000","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"P14","v":"4.0%","fg":"#1E293B","al":"center","nf":"0.0%"},{"c":"Q14","v":1.208,"f":"=L14","fg":"#1E293B","al":"center","nf":"#,##0.0"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":""},{"c":"B15","v":7,"in":true,"fg":"#1E293B","al":"center"},{"c":"C15","v":"إضافي علوي أعمدة وسطية Y (عزم سالب)","fg":"#1E293B"},{"c":"D15","v":"فوق الأعمدة C1-C6","fg":"#1E293B","al":"center"},{"c":"E15","v":16,"in":true,"fg":"#1E293B","al":"center"},{"c":"F15","v":"مستقيم بطول L/3","fg":"#1E293B","al":"center"},{"c":"G15","v":4.5,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"H15","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"I15","v":6,"in":true,"fg":"#1E293B","al":"center"},{"c":"J15","v":12,"in":true,"fg":"#1E293B","al":"center"},{"c":"K15","v":432,"f":"=(12*6)*6","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"L15","v":1.578,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"M15","v":"مستقيم بطول L/3مستقيم بطول L/3مستقيم بطول L/3مستقيم بطول L/3مستقيم بطول L/3مستقيم بطول L/3مستقيم بطول L/3مستقيم بطول L/3مستقيم بطول L/3مستقيم بطول L/3مستقيم بطول L/3مستقيم بطول L/3","f":"=J15*F15","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"N15","v":681.696,"f":"=L15*K15","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"O15","v":0,"f":"=M15/1000","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"P15","v":"4.0%","fg":"#1E293B","al":"center","nf":"0.0%"},{"c":"Q15","v":1.578,"f":"=L15","fg":"#1E293B","al":"center","nf":"#,##0.0"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":""},{"c":"B16","v":8,"in":true,"fg":"#1E293B","al":"center"},{"c":"C16","v":"شوك أطراف البلاطة والواجهات (كوابيل)","fg":"#1E293B"},{"c":"D16","v":"حواف السقف","fg":"#1E293B","al":"center"},{"c":"E16","v":12,"in":true,"fg":"#1E293B","al":"center"},{"c":"F16","v":"شوكة على شكل حرف U","fg":"#1E293B","al":"center"},{"c":"G16","v":2.2,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"H16","v":0.6,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"I16","v":5,"in":true,"fg":"#1E293B","al":"center"},{"c":"J16","v":25,"in":true,"fg":"#1E293B","al":"center"},{"c":"K16","v":3,"f":"=I16*H16","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"L16","v":0.888,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"M16","v":"شوكة على شكل حرف Uشوكة على شكل حرف Uشوكة على شكل حرف Uشوكة على شكل حرف Uشوكة على شكل حرف Uشوكة على شكل حرف Uشوكة على شكل حرف Uشوكة على شكل حرف Uشوكة على شكل حرف Uشوكة على شكل حرف Uشوكة على شكل حرف Uشوكة على شكل حرف Uشوكة على شكل حرف Uشوكة على شكل حرف Uشوكة على شكل حرف Uشوكة على شكل حرف Uشوكة على شكل حرف Uشوكة على شكل حرف Uشوكة على شكل حرف Uشوكة على شكل حرف Uشوكة على شكل حرف Uشوكة على شكل حرف Uشوكة على شكل حرف Uشوكة على شكل حرف Uشوكة على شكل حرف U","f":"=J16*F16","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"N16","v":2.664,"f":"=L16*K16","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"O16","v":0,"f":"=M16/1000","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"P16","v":"3.0%","fg":"#1E293B","al":"center","nf":"0.0%"},{"c":"Q16","v":0,"f":"=M16*1.03","fg":"#1E293B","al":"center","nf":"#,##0.0"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":""},{"c":"B17","v":"رابعاً: الحديد الإضافي السفلي بمنتصف البحور (Bottom Additional Rebar at Mid-Spans)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":15},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"Q17","v":""}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":""},{"c":"B18","v":9,"in":true,"fg":"#1E293B","al":"center"},{"c":"C18","v":"إضافي سفلي بحور رئيسية X (عزم موجب)","fg":"#1E293B"},{"c":"D18","v":"منتصف البحر B1-B4","fg":"#1E293B","al":"center"},{"c":"E18","v":12,"in":true,"fg":"#1E293B","al":"center"},{"c":"F18","v":"مستقيم بطول 0.6L","fg":"#1E293B","al":"center"},{"c":"G18","v":5,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"H18","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"I18","v":5,"in":true,"fg":"#1E293B","al":"center"},{"c":"J18","v":10,"in":true,"fg":"#1E293B","al":"center"},{"c":"K18","v":200,"f":"=(10*5)*4","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"L18","v":0.888,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"M18","v":"مستقيم بطول 0.6Lمستقيم بطول 0.6Lمستقيم بطول 0.6Lمستقيم بطول 0.6Lمستقيم بطول 0.6Lمستقيم بطول 0.6Lمستقيم بطول 0.6Lمستقيم بطول 0.6Lمستقيم بطول 0.6Lمستقيم بطول 0.6L","f":"=J18*F18","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"N18","v":177.6,"f":"=L18*K18","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"O18","v":0,"f":"=M18/1000","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"P18","v":"3.0%","fg":"#1E293B","al":"center","nf":"0.0%"},{"c":"Q18","v":1.776,"f":"=L18+L19","fg":"#1E293B","al":"center","nf":"#,##0.0"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":""},{"c":"B19","v":10,"in":true,"fg":"#1E293B","al":"center"},{"c":"C19","v":"إضافي سفلي بحور ثانوية Y (عزم موجب)","fg":"#1E293B"},{"c":"D19","v":"منتصف البحر B5-B8","fg":"#1E293B","al":"center"},{"c":"E19","v":12,"in":true,"fg":"#1E293B","al":"center"},{"c":"F19","v":"مستقيم بطول 0.6L","fg":"#1E293B","al":"center"},{"c":"G19","v":5,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"H19","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"I19","v":5,"in":true,"fg":"#1E293B","al":"center"},{"c":"J19","v":10,"in":true,"fg":"#1E293B","al":"center"},{"c":"K19","v":200,"f":"=(10*5)*4","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"L19","v":0.888,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"M19","v":"مستقيم بطول 0.6Lمستقيم بطول 0.6Lمستقيم بطول 0.6Lمستقيم بطول 0.6Lمستقيم بطول 0.6Lمستقيم بطول 0.6Lمستقيم بطول 0.6Lمستقيم بطول 0.6Lمستقيم بطول 0.6Lمستقيم بطول 0.6L","f":"=J19*F19","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"N19","v":177.6,"f":"=L19*K19","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"O19","v":0,"f":"=M19/1000","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"P19","v":"3.0%","fg":"#1E293B","al":"center","nf":"0.0%"},{"c":"Q19","v":0,"f":"=M19*1.03","fg":"#1E293B","al":"center","nf":"#,##0.0"}]},{"r":20,"h":28.0,"cells":[{"c":"A20","v":""},{"c":"B20","v":""},{"c":"C20","v":""},{"c":"D20","v":""},{"c":"E20","v":""},{"c":"F20","v":""},{"c":"G20","v":""},{"c":"H20","v":""},{"c":"I20","v":""},{"c":"J20","v":""},{"c":"K20","v":""},{"c":"L20","v":""},{"c":"M20","v":""},{"c":"N20","v":""},{"c":"O20","v":""},{"c":"P20","v":""},{"c":"Q20","v":""}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":""},{"c":"B21","v":"خامساً: فواتير فتحات الدكت والمصاعد وكمرات الحافة (Openings Trimmers & Edge Beams)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":15},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"Q21","v":""}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":""},{"c":"B22","v":11,"in":true,"fg":"#1E293B","al":"center"},{"c":"C22","v":"فواتير حول فتحات المصاعد والمناور","fg":"#1E293B"},{"c":"D22","v":"محيط الفتحات","fg":"#1E293B","al":"center"},{"c":"E22","v":16,"in":true,"fg":"#1E293B","al":"center"},{"c":"F22","v":"علوي وسفلي 3 أسياخ بالجهة","fg":"#1E293B","al":"center"},{"c":"G22","v":4,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"H22","v":0.8,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"I22","v":6,"in":true,"fg":"#1E293B","al":"center"},{"c":"J22","v":8,"in":true,"fg":"#1E293B","al":"center"},{"c":"K22","v":24,"f":"=6*4","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"L22","v":1.578,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"M22","v":"علوي وسفلي 3 أسياخ بالجهةعلوي وسفلي 3 أسياخ بالجهةعلوي وسفلي 3 أسياخ بالجهةعلوي وسفلي 3 أسياخ بالجهةعلوي وسفلي 3 أسياخ بالجهةعلوي وسفلي 3 أسياخ بالجهةعلوي وسفلي 3 أسياخ بالجهةعلوي وسفلي 3 أسياخ بالجهة","f":"=J22*F22","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"N22","v":37.872,"f":"=L22*K22","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"O22","v":0,"f":"=M22/1000","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"P22","v":"4.0%","fg":"#1E293B","al":"center","nf":"0.0%"},{"c":"Q22","v":0,"f":"=M22*1.04","fg":"#1E293B","al":"center","nf":"#,##0.0"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":""},{"c":"B23","v":12,"in":true,"fg":"#1E293B","al":"center"},{"c":"C23","v":"تسليح كمرة الحافة الطرفية (Margin Beam)","fg":"#1E293B"},{"c":"D23","v":"حافة البلاطة الخارجية","fg":"#1E293B","al":"center"},{"c":"E23","v":14,"in":true,"fg":"#1E293B","al":"center"},{"c":"F23","v":"علوي وسفلي 4 أسياخ","fg":"#1E293B","al":"center"},{"c":"G23","v":12,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"H23","v":0.7,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"I23","v":4,"in":true,"fg":"#1E293B","al":"center"},{"c":"J23","v":15,"in":true,"fg":"#1E293B","al":"center"},{"c":"K23","v":24,"f":"=4*6","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"L23","v":1.208,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"M23","v":"علوي وسفلي 4 أسياخعلوي وسفلي 4 أسياخعلوي وسفلي 4 أسياخعلوي وسفلي 4 أسياخعلوي وسفلي 4 أسياخعلوي وسفلي 4 أسياخعلوي وسفلي 4 أسياخعلوي وسفلي 4 أسياخعلوي وسفلي 4 أسياخعلوي وسفلي 4 أسياخعلوي وسفلي 4 أسياخعلوي وسفلي 4 أسياخعلوي وسفلي 4 أسياخعلوي وسفلي 4 أسياخعلوي وسفلي 4 أسياخ","f":"=J23*F23","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"N23","v":28.992,"f":"=L23*K23","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"O23","v":0,"f":"=M23/1000","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"P23","v":"4.0%","fg":"#1E293B","al":"center","nf":"0.0%"},{"c":"Q23","v":0,"f":"=M23*1.04","fg":"#1E293B","al":"center","nf":"#,##0.0"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":""},{"c":"B24","v":13,"in":true,"fg":"#1E293B","al":"center"},{"c":"C24","v":"كانات كمرة الحافة الطرفية (Ties)","fg":"#1E293B"},{"c":"D24","v":"كانات مقفولة","fg":"#1E293B","al":"center"},{"c":"E24","v":10,"in":true,"fg":"#1E293B","al":"center"},{"c":"F24","v":"كانة صندوقية 20×15 سم","fg":"#1E293B","al":"center"},{"c":"G24","v":0.9,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"H24","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"I24","v":5,"in":true,"fg":"#1E293B","al":"center"},{"c":"J24","v":85,"in":true,"fg":"#1E293B","al":"center"},{"c":"K24","v":425,"f":"=85*5","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"L24","v":0.617,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"M24","v":"كانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سمكانة صندوقية 20×15 سم","f":"=J24*F24","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"N24","v":262.225,"f":"=L24*K24","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"O24","v":0,"f":"=M24/1000","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"P24","v":"5.0%","fg":"#1E293B","al":"center","nf":"0.0%"},{"c":"Q24","v":0,"f":"=M24*1.05","fg":"#1E293B","al":"center","nf":"#,##0.0"}]},{"r":25,"h":28.0,"cells":[{"c":"A25","v":""},{"c":"B25","v":""},{"c":"C25","v":""},{"c":"D25","v":""},{"c":"E25","v":""},{"c":"F25","v":""},{"c":"G25","v":""},{"c":"H25","v":""},{"c":"I25","v":""},{"c":"J25","v":""},{"c":"K25","v":""},{"c":"L25","v":""},{"c":"M25","v":""},{"c":"N25","v":""},{"c":"O25","v":""},{"c":"P25","v":""},{"c":"Q25","v":""}]},{"r":26,"h":28.0,"cells":[{"c":"A26","v":""},{"c":"B26","v":""},{"c":"C26","v":""},{"c":"D26","v":""},{"c":"E26","v":""},{"c":"F26","v":""},{"c":"G26","v":""},{"c":"H26","v":""},{"c":"I26","v":""},{"c":"J26","v":""},{"c":"K26","v":""},{"c":"L26","v":""},{"c":"M26","v":""},{"c":"N26","v":""},{"c":"O26","v":""},{"c":"P26","v":""},{"c":"Q26","v":""}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":""},{"c":"B27","v":"الإجمالي العام لتفريد حديد سقف الفلات سلاب كاملاً (طن)","bg":"#FEF3C7","fg":"#1E293B","b":true,"al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"M27","v":0,"f":"=SUM(M6:M7)+SUM(M9:M11)+SUM(M14:M16)+SUM(M18:M19)+SUM(M22:M24)","bg":"#FEF3C7","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"N27","v":0,"f":"=M27/1000","bg":"#FEF3C7","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"O27","v":"المتوسط 3.9%","bg":"#FEF3C7","fg":"#1E293B","b":true,"al":"center"},{"c":"P27","v":0,"f":"=SUM(P6:P7)+SUM(P9:P11)+SUM(P14:P16)+SUM(P18:P19)+SUM(P22:P24)","bg":"#FEF3C7","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"Q27","v":""}]}]},{"name":"إعدادات الكود وأوزان الأسياخ","maxRow":21,"maxCol":9,"colWidths":[4.0,6.0,24.0,22.0,26.0,22.0,22.0,26.0,13.0],"rows":[{"r":1,"h":34.0,"cells":[{"c":"A1","v":""},{"c":"B1","v":"ثوابت كود البناء وأوزان حديد التسليح القياسية وأطوال الوصلات Ld","fg":"#1E293B","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"I1","v":""}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":""},{"c":"B2","v":"الأوزان النوعية القياسية (كجم/م.ط) وأطوال الركوب للشد والضغط طبقاً لكود SBC 304 و ECP 203","fg":"#475569","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"I2","v":""}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""}]},{"r":4,"h":72.0,"cells":[{"c":"A4","v":""},{"c":"B4","v":"م","bg":"#F1F5F9","b":true,"al":"center"},{"c":"C4","v":"القطر الاسمي (مم)","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D4","v":"الرمز الهندسي","bg":"#F1F5F9","b":true,"al":"center"},{"c":"E4","v":"الوزن النظري (D²/162)","bg":"#F1F5F9","b":true,"al":"center"},{"c":"F4","v":"مساحة المقطع (مم²)","bg":"#F1F5F9","b":true,"al":"center"},{"c":"G4","v":"طول وصلة الشد (60Φ)","bg":"#F1F5F9","b":true,"al":"center"},{"c":"H4","v":"طول وصلة الضغط (40Φ)","bg":"#F1F5F9","b":true,"al":"center"},{"c":"I4","v":"أقصى مسافة بين الأسياخ (سم)","bg":"#F1F5F9","b":true,"al":"center"}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":""},{"c":"B5","v":1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"C5","v":8,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D5","v":"Φ 8","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E5","v":0.395,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.000"},{"c":"F5","v":50.3,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"G5","v":0.48,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"H5","v":0.32,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"I5","v":20,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":""},{"c":"B6","v":2,"in":true,"fg":"#1E293B","al":"center"},{"c":"C6","v":10,"in":true,"fg":"#1E293B","al":"center"},{"c":"D6","v":"Φ 10","fg":"#1E293B","al":"center"},{"c":"E6","v":0.617,"in":true,"fg":"#1E293B","al":"center","nf":"0.000"},{"c":"F6","v":78.5,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"G6","v":0.6,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"H6","v":0.4,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"I6","v":20,"in":true,"fg":"#1E293B","al":"center"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":3,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"C7","v":12,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D7","v":"Φ 12","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E7","v":0.888,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.000"},{"c":"F7","v":113.1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"G7","v":0.72,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"H7","v":0.48,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"I7","v":20,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":""},{"c":"B8","v":4,"in":true,"fg":"#1E293B","al":"center"},{"c":"C8","v":14,"in":true,"fg":"#1E293B","al":"center"},{"c":"D8","v":"Φ 14","fg":"#1E293B","al":"center"},{"c":"E8","v":1.208,"in":true,"fg":"#1E293B","al":"center","nf":"0.000"},{"c":"F8","v":153.9,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"G8","v":0.84,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"H8","v":0.56,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"I8","v":20,"in":true,"fg":"#1E293B","al":"center"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":""},{"c":"B9","v":5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"C9","v":16,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D9","v":"Φ 16","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E9","v":1.578,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.000"},{"c":"F9","v":201.1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"G9","v":0.96,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"H9","v":0.64,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"I9","v":20,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":""},{"c":"B10","v":6,"in":true,"fg":"#1E293B","al":"center"},{"c":"C10","v":18,"in":true,"fg":"#1E293B","al":"center"},{"c":"D10","v":"Φ 18","fg":"#1E293B","al":"center"},{"c":"E10","v":2,"in":true,"fg":"#1E293B","al":"center","nf":"0.000"},{"c":"F10","v":254.5,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"G10","v":1.08,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"H10","v":0.72,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"I10","v":18,"in":true,"fg":"#1E293B","al":"center"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":""},{"c":"B11","v":7,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"C11","v":20,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D11","v":"Φ 20","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E11","v":2.466,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.000"},{"c":"F11","v":314.2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"G11","v":1.2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"H11","v":0.8,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"I11","v":18,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":""},{"c":"B12","v":8,"in":true,"fg":"#1E293B","al":"center"},{"c":"C12","v":22,"in":true,"fg":"#1E293B","al":"center"},{"c":"D12","v":"Φ 22","fg":"#1E293B","al":"center"},{"c":"E12","v":2.984,"in":true,"fg":"#1E293B","al":"center","nf":"0.000"},{"c":"F12","v":380.1,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"G12","v":1.32,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"H12","v":0.88,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"I12","v":16,"in":true,"fg":"#1E293B","al":"center"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":""},{"c":"B13","v":9,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"C13","v":25,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D13","v":"Φ 25","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E13","v":3.853,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.000"},{"c":"F13","v":490.9,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"G13","v":1.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"H13","v":1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"I13","v":15,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":""},{"c":"B14","v":10,"in":true,"fg":"#1E293B","al":"center"},{"c":"C14","v":32,"in":true,"fg":"#1E293B","al":"center"},{"c":"D14","v":"Φ 32","fg":"#1E293B","al":"center"},{"c":"E14","v":6.313,"in":true,"fg":"#1E293B","al":"center","nf":"0.000"},{"c":"F14","v":804.2,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"G14","v":1.92,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"H14","v":1.28,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"I14","v":15,"in":true,"fg":"#1E293B","al":"center"}]},{"r":15,"h":28.0,"cells":[{"c":"A15","v":""},{"c":"B15","v":""},{"c":"C15","v":""},{"c":"D15","v":""},{"c":"E15","v":""},{"c":"F15","v":""},{"c":"G15","v":""},{"c":"H15","v":""},{"c":"I15","v":""}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":""},{"c":"B16","v":"اشتراطات التصميم والتنفيذ الإلزامية للأسقف اللاكمرية (SBC 304 Key Rules)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"I16","v":""}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":""},{"c":"B17","v":1,"in":true,"fg":"#1E293B","b":true,"al":"center"},{"c":"C17","v":"الغطاء الخرساني الصافي (Concrete Cover)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"E17","v":"يجب ألا يقل الغطاء الخرساني الصافي للبلاطات اللاكمرية عن 20 مم للأسطح الداخلية و 25 مم للأسطح الخارجية المعرضة للعوامل الجوية.","fg":"#475569","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"I17","v":""}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":""},{"c":"B18","v":2,"in":true,"fg":"#1E293B","b":true,"al":"center"},{"c":"C18","v":"الحد الأدنى لسمك البلاطة (Minimum Thickness)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"E18","v":"يجب ألا يقل سمك بلاطة الفلات سلاب عن L/30 للبلاطات بدون سقوط (Drop Panels) وعن L/33 للبلاطات ذات السقوط لمنع حدوث ترخيم طويل الأجل (Deflection).","fg":"#475569","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"I18","v":""}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":""},{"c":"B19","v":3,"in":true,"fg":"#1E293B","b":true,"al":"center"},{"c":"C19","v":"أماكن وصلات حديد التسليح (Lap Splice Locations)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"E19","v":"تكون وصلات الشبكة السفلية عند خطوط الأعمدة (عزم موجب يقترب من الصفر)، وتكون وصلات الشبكة العلوية في منتصف البحور بين الأعمدة (عزم سالب يقترب من الصفر).","fg":"#475569","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"I19","v":""}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":""},{"c":"B20","v":4,"in":true,"fg":"#1E293B","b":true,"al":"center"},{"c":"C20","v":"مقاومة القص الثاقب (Punching Shear Capacity)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"E20","v":"يجب تدقيق إجهاد القص الثاقب على بعد d/2 من وجه العمود، وفي حال عدم كفاية سمك الخرسانة يتم استخدام سقوط للأعمدة (Drop Panel) أو تيجان (Column Heads) أو كانات قص (Stud Rails).","fg":"#475569","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"I20","v":""}]},{"r":21,"h":52.0,"cells":[{"c":"A21","v":""},{"c":"B21","v":5,"in":true,"fg":"#1E293B","b":true,"al":"center"},{"c":"C21","v":"الحديد الإضافي المقاوم للترخيم (Deflection Control)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"E21","v":"يجب ألا تقل نسبة تسليح الانكماش والحرارة في أي اتجاه عن 0.0018 من مساحة المقطع الخرساني الكلي (Ag) لحديد عالي المقاومة رتبة B400D/B500D.","fg":"#475569","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"I21","v":""}]}]}]}