{"slug":"flat-slab-punching-shear-and-drop-panel-design-sheet","sheets":[{"name":"فحص القص الثاقب للبلاطة Flat","maxRow":48,"maxCol":7,"colWidths":[8.0,58.0,16.0,22.0,14.0,34.0,40.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"حساب وتصميم ومراجعة القص الثاقب للبلاطات اللاكمرية Flat Slab وفق SBC 304 وACI 318","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"تحليل القطاع الحرج للقص، تأثير اللامركزية وعزم الانحناء غير المتزن، مقاومة الخرسانة، والتحقق الكودي الشامل","bg":"#0F172A","fg":"#E2E8F0","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":14.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"إجهاد القص الأقصى المؤثر (vu)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"مقاومة الخرسانة التصميمية (φvc)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"نسبة الاستخدام والتحميل (Ratio)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"G4","v":"القرار الإنشائي الكودي","bg":"#E0F2FE","fg":"#1E293B","b":true,"al":"center"}]},{"r":5,"h":44.0,"cells":[{"c":"A5","v":0.239484,"f":"=D37","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00\" MPa\"","cs":2},{"skip":true},{"c":"C5","v":2.793385,"f":"=D42","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00\" MPa\"","cs":2},{"skip":true},{"c":"E5","v":2.249324,"f":"=D43","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00%","cs":2},{"skip":true},{"c":"G5","v":"حرج - يتطلب معالجة","f":"=IF(E5<=1.0,\"آمن إنشائياً\",\"حرج - يتطلب معالجة\")","bg":"#E0F2FE","fg":"#991B1B","b":true,"al":"center"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"إجهاد القص الكلي (مباشر + لامركزية)","bg":"#F8FAFC","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"C6","v":"المقاومة المسموحة (φ = 0.75)","bg":"#F8FAFC","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"E6","v":"الحد الآمن: Ratio ≤ 100%","bg":"#F8FAFC","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"G6","v":"سقوط Drop أو كانات قص","bg":"#E0F2FE","fg":"#475569","al":"center"}]},{"r":7,"h":14.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"أولاً: بيانات المشروع والمعايير الهندسية الحاكمة","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":40.0,"cells":[{"c":"A9","v":"م","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"البيان الهندسي / المعيار","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"الرمز الكودي","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"القيمة المدخلة","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"الوحدة","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"المعادلة / المرجع الكودي","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"ملاحظات الفحص والاعتماد","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":1,"bg":"#F1F5F9","al":"center"},{"c":"B10","v":"اسم المشروع الإنشائي","bg":"#F1F5F9","b":true},{"c":"C10","v":"Project","bg":"#F1F5F9","al":"center"},{"c":"D10","v":"برج الأفق السكني التجاري","bg":"#F1F5F9","b":true,"al":"center"},{"c":"E10","v":"-","bg":"#F1F5F9","al":"center"},{"c":"F10","v":"عقد المقاولة الرئيسي","bg":"#F1F5F9","al":"center"},{"c":"G10","v":"مبنى خرساني هيكلي بلاطات لاكمرية","bg":"#F1F5F9"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":2,"al":"center"},{"c":"B11","v":"كود التصميم الإنشائي المعتمد","b":true},{"c":"C11","v":"Code","al":"center"},{"c":"D11","v":"SBC 304 / ACI 318-19","b":true,"al":"center"},{"c":"E11","v":"-","al":"center"},{"c":"F11","v":"كود البناء السعودي للخرسانة","al":"center"},{"c":"G11","v":"معتمد لأعمال التحليل والتصميم"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":3,"bg":"#F1F5F9","al":"center"},{"c":"B12","v":"موقع البلاطة الإنشائية","bg":"#F1F5F9","b":true},{"c":"C12","v":"Floor","bg":"#F1F5F9","al":"center"},{"c":"D12","v":"سقف الطابق الأرضي (Ground Floor)","bg":"#F1F5F9","b":true,"al":"center"},{"c":"E12","v":"-","bg":"#F1F5F9","al":"center"},{"c":"F12","v":"المخططات الإنشائية المعتمدة","bg":"#F1F5F9","al":"center"},{"c":"G12","v":"بحور نموذجية 6.50 × 6.00 م","bg":"#F1F5F9"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":4,"al":"center"},{"c":"B13","v":"رقم العمود المفحوص","b":true},{"c":"C13","v":"Col ID","al":"center"},{"c":"D13","v":"عمود نموذجي C-14","b":true,"al":"center"},{"c":"E13","v":"-","al":"center"},{"c":"F13","v":"مخطط المحاور والأعمدة","al":"center"},{"c":"G13","v":"عمود داخلي محمل بأعلى رد فعل"}]},{"r":14,"h":38.0,"cells":[{"c":"A14","v":"ثانياً: خواص قطاع البلاطة والمواد الإنشائية (Slab & Material Properties)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":15,"h":40.0,"cells":[{"c":"A15","v":"م","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B15","v":"البيان الهندسي / المعيار","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C15","v":"الرمز الكودي","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D15","v":"القيمة المدخلة","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E15","v":"الوحدة","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F15","v":"المعادلة / المرجع الكودي","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G15","v":"ملاحظات الفحص والاعتماد","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":1,"bg":"#F1F5F9","al":"center"},{"c":"B16","v":"سمك البلاطة الكلي","bg":"#F1F5F9","b":true},{"c":"C16","v":"hs","bg":"#F1F5F9","al":"center"},{"c":"D16","v":250,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"E16","v":"مم","bg":"#F1F5F9","al":"center"},{"c":"F16","v":"المخطط الإنشائي","bg":"#F1F5F9","al":"center"},{"c":"G16","v":"سمك منتظم للبلاطة اللاكمرية","bg":"#F1F5F9"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":2,"al":"center"},{"c":"B17","v":"الغطاء الخرساني الصافي لحديد التسليح","b":true},{"c":"C17","v":"cc","al":"center"},{"c":"D17","v":25,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"E17","v":"مم","al":"center"},{"c":"F17","v":"SBC 304 Section 20.6.1","al":"center"},{"c":"G17","v":"خرسانة محمية داخل المبنى"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":3,"bg":"#F1F5F9","al":"center"},{"c":"B18","v":"متوسط قطر أسياخ حديد التسليح العلوي","bg":"#F1F5F9","b":true},{"c":"C18","v":"db","bg":"#F1F5F9","al":"center"},{"c":"D18","v":16,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"E18","v":"مم","bg":"#F1F5F9","al":"center"},{"c":"F18","v":"تسليح الشبكة العلوية الإضافية","bg":"#F1F5F9","al":"center"},{"c":"G18","v":"T16 @ 150 mm علوي","bg":"#F1F5F9"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":4,"al":"center"},{"c":"B19","v":"العمق الفعال المتوسط للبلاطة (d)","b":true},{"c":"C19","v":"d","al":"center"},{"c":"D19","v":209,"f":"=D16-D17-D18","b":true,"al":"center"},{"c":"E19","v":"مم","al":"center"},{"c":"F19","v":"hs - cc - db","al":"center"},{"c":"G19","v":"العمق الفعال لمقاومة القص الثاقب"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":5,"bg":"#F1F5F9","al":"center"},{"c":"B20","v":"رتبة الخرسانة المميزة للأسطوانة (28 يوم)","bg":"#F1F5F9","b":true},{"c":"C20","v":"f'c","bg":"#F1F5F9","al":"center"},{"c":"D20","v":30,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"E20","v":"ميجا باسكال","bg":"#F1F5F9","al":"center"},{"c":"F20","v":"ASTM C39 / SBC 304","bg":"#F1F5F9","al":"center"},{"c":"G20","v":"تعادل رتبة المكعب fcu = 37 MPa","bg":"#F1F5F9"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":6,"al":"center"},{"c":"B21","v":"معامل الخرسانة خفيفة الوزن","b":true},{"c":"C21","v":"λ","al":"center"},{"c":"D21","v":1,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"E21","v":"-","al":"center"},{"c":"F21","v":"SBC 304 Table 19.2.4.2","al":"center"},{"c":"G21","v":"1.0 للخرسانة عادية الوزن النورمال"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":7,"bg":"#F1F5F9","al":"center"},{"c":"B22","v":"معامل تخفيض المقاومة الكودي للقص","bg":"#F1F5F9","b":true},{"c":"C22","v":"φ","bg":"#F1F5F9","al":"center"},{"c":"D22","v":0.75,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"E22","v":"-","bg":"#F1F5F9","al":"center"},{"c":"F22","v":"SBC 304 Table 21.2.1","bg":"#F1F5F9","al":"center"},{"c":"G22","v":"معامل الأمان للقص والانفصال 0.75","bg":"#F1F5F9"}]},{"r":23,"h":38.0,"cells":[{"c":"A23","v":"ثالثاً: أبعاد العمود والأحمال التصميمية القصوى (Column Geometry & Ultimate Loads)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":24,"h":40.0,"cells":[{"c":"A24","v":"م","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B24","v":"البيان الهندسي / المعيار","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C24","v":"الرمز الكودي","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D24","v":"القيمة المدخلة","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E24","v":"الوحدة","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F24","v":"المعادلة / المرجع الكودي","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G24","v":"ملاحظات الفحص والاعتماد","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":1,"al":"center"},{"c":"B25","v":"بعد العمود الأول c1 (موازي لاتجاه العزم)","b":true},{"c":"C25","v":"c1","al":"center"},{"c":"D25","v":500,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"E25","v":"مم","al":"center"},{"c":"F25","v":"أبعاد العمود المعمارية","al":"center"},{"c":"G25","v":"مقطع خرساني مستطيل / مربع"}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":2,"bg":"#F1F5F9","al":"center"},{"c":"B26","v":"بعد العمود الثاني c2 (عمودي على العزم)","bg":"#F1F5F9","b":true},{"c":"C26","v":"c2","bg":"#F1F5F9","al":"center"},{"c":"D26","v":500,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"E26","v":"مم","bg":"#F1F5F9","al":"center"},{"c":"F26","v":"أبعاد العمود المعمارية","bg":"#F1F5F9","al":"center"},{"c":"G26","v":"مقطع خرساني مستطيل / مربع","bg":"#F1F5F9"}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":3,"al":"center"},{"c":"B27","v":"معامل موقع العمود الكودي (Interior / Edge / Corner)","b":true},{"c":"C27","v":"αs","al":"center"},{"c":"D27","v":40,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"E27","v":"-","al":"center"},{"c":"F27","v":"SBC 304 Section 22.6.5.3","al":"center"},{"c":"G27","v":"40 داخلي، 30 طرفي، 20 ركني"}]},{"r":28,"h":34.0,"cells":[{"c":"A28","v":4,"bg":"#F1F5F9","al":"center"},{"c":"B28","v":"نسبة استطالة العمود (الضلع الأكبر / الأصغر)","bg":"#F1F5F9","b":true},{"c":"C28","v":"β","bg":"#F1F5F9","al":"center"},{"c":"D28","v":1,"f":"=MAX(D25,D26)/MIN(D25,D26)","bg":"#F1F5F9","b":true,"al":"center"},{"c":"E28","v":"-","bg":"#F1F5F9","al":"center"},{"c":"F28","v":"c_max / c_min","bg":"#F1F5F9","al":"center"},{"c":"G28","v":"معامل يعكس تركيز الإجهادات بالعمود","bg":"#F1F5F9"}]},{"r":29,"h":34.0,"cells":[{"c":"A29","v":5,"al":"center"},{"c":"B29","v":"قوة القص الكلية القصوى المؤثرة من البلاطة","b":true},{"c":"C29","v":"Vu","al":"center"},{"c":"D29","v":640,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"E29","v":"كيلو نيوتن","al":"center"},{"c":"F29","v":"التحليل الإنشائي ثلاثي الأبعاد","al":"center"},{"c":"G29","v":"رد فعل العمود الأقصى Factored Load"}]},{"r":30,"h":34.0,"cells":[{"c":"A30","v":6,"bg":"#F1F5F9","al":"center"},{"c":"B30","v":"عزم الانحناء غير المتزن المنقول بالاتصال","bg":"#F1F5F9","b":true},{"c":"C30","v":"Mux","bg":"#F1F5F9","al":"center"},{"c":"D30","v":38,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"E30","v":"كيلو نيوتن.م","bg":"#F1F5F9","al":"center"},{"c":"F30","v":"التحليل الإنشائي للأحمال الحية والرياح","bg":"#F1F5F9","al":"center"},{"c":"G30","v":"عزم تصميمي منقول من البلاطة للعمود","bg":"#F1F5F9"}]},{"r":31,"h":38.0,"cells":[{"c":"A31","v":"رابعاً: هندسة القطاع الحرج وإجهادات القص المؤثرة (Critical Section & Factored Stresses)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":32,"h":40.0,"cells":[{"c":"A32","v":"م","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B32","v":"البيان الهندسي / المعيار","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C32","v":"الرمز الكودي","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D32","v":"القيمة المدخلة","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E32","v":"الوحدة","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F32","v":"المعادلة / المرجع الكودي","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G32","v":"ملاحظات الفحص والاعتماد","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":33,"h":34.0,"cells":[{"c":"A33","v":1,"al":"center"},{"c":"B33","v":"البعد الحرج الأول للمحيط على مسافة d/2","b":true},{"c":"C33","v":"b1","al":"center"},{"c":"D33","v":709,"f":"=D25+D19","b":true,"al":"center","nf":"0.000"},{"c":"E33","v":"مم","al":"center"},{"c":"F33","v":"c1 + d","al":"center"},{"c":"G33","v":"البعد الحرج الموازي لاتجاه العزم"}]},{"r":34,"h":34.0,"cells":[{"c":"A34","v":2,"bg":"#F1F5F9","al":"center"},{"c":"B34","v":"البعد الحرج الثاني للمحيط على مسافة d/2","bg":"#F1F5F9","b":true},{"c":"C34","v":"b2","bg":"#F1F5F9","al":"center"},{"c":"D34","v":709,"f":"=D26+D19","bg":"#F1F5F9","b":true,"al":"center","nf":"0.000"},{"c":"E34","v":"مم","bg":"#F1F5F9","al":"center"},{"c":"F34","v":"c2 + d","bg":"#F1F5F9","al":"center"},{"c":"G34","v":"البعد الحرج العمودي على العزم","bg":"#F1F5F9"}]},{"r":35,"h":34.0,"cells":[{"c":"A35","v":3,"al":"center"},{"c":"B35","v":"المحيط الحرج الكلي لمقاومة القص الثاقب","b":true},{"c":"C35","v":"b0","al":"center"},{"c":"D35","v":2836,"f":"=2*(D33+D34)","b":true,"al":"center","nf":"0.000"},{"c":"E35","v":"مم","al":"center"},{"c":"F35","v":"2 * (b1 + b2)","al":"center"},{"c":"G35","v":"محيط مسار انهيار القص الثاقب"}]},{"r":36,"h":34.0,"cells":[{"c":"A36","v":4,"bg":"#F1F5F9","al":"center"},{"c":"B36","v":"إجهاد القص المباشر الناتج عن الحمل الرأسي","bg":"#F1F5F9","b":true},{"c":"C36","v":"vu,direct","bg":"#F1F5F9","al":"center"},{"c":"D36","v":1.079761,"f":"=(D29*1000)/(D35*D19)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.000"},{"c":"E36","v":"ميجا باسكال","bg":"#F1F5F9","al":"center"},{"c":"F36","v":"Vu / (b0 * d)","bg":"#F1F5F9","al":"center"},{"c":"G36","v":"الإجهاد الموزع بانتظام على المحيط","bg":"#F1F5F9"}]},{"r":37,"h":34.0,"cells":[{"c":"A37","v":5,"al":"center"},{"c":"B37","v":"إجهاد القص الإضافي الناتج عن العزم غير المتزن","b":true},{"c":"C37","v":"vu,moment","al":"center"},{"c":"D37","v":0.239484,"f":"=D30*1000000*0.40*(D33/2)/(22500000000)","b":true,"al":"center","nf":"0.000"},{"c":"E37","v":"ميجا باسكال","al":"center"},{"c":"F37","v":"γv * Mux * c / Jc","al":"center"},{"c":"G37","v":"إجهاد اللامركزية الدوراني عند الأطراف"}]},{"r":38,"h":34.0,"cells":[{"c":"A38","v":6,"bg":"#F1F5F9","al":"center"},{"c":"B38","v":"إجهاد القص الأقصى الإجمالي المؤثر على القطاع","bg":"#F1F5F9","b":true},{"c":"C38","v":"vu","bg":"#F1F5F9","al":"center"},{"c":"D38","v":1.319245,"f":"=D36+D37","bg":"#F1F5F9","b":true,"al":"center","nf":"0.000"},{"c":"E38","v":"ميجا باسكال","bg":"#F1F5F9","al":"center"},{"c":"F38","v":"vu,direct + vu,moment","bg":"#F1F5F9","al":"center"},{"c":"G38","v":"أقصى إجهاد يقارن بمقاومة الخرسانة","bg":"#F1F5F9"}]},{"r":39,"h":38.0,"cells":[{"c":"A39","v":"خامساً: معادلات مقاومة الخرسانة الكودية والتقييم النهائي (Concrete Shear Capacity & Decision)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":40,"h":40.0,"cells":[{"c":"A40","v":"م","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B40","v":"البيان الهندسي / المعيار","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C40","v":"الرمز الكودي","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D40","v":"القيمة المدخلة","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E40","v":"الوحدة","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F40","v":"المعادلة / المرجع الكودي","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G40","v":"ملاحظات الفحص والاعتماد","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":41,"h":34.0,"cells":[{"c":"A41","v":1,"al":"center"},{"c":"B41","v":"مقاومة الخرسانة - المعادلة الكودية 1 (الأساسية)","b":true},{"c":"C41","v":"vc1","al":"center"},{"c":"D41","v":1.807484,"f":"=0.33*D21*SQRT(D20)","b":true,"al":"center","nf":"0.000"},{"c":"E41","v":"ميجا باسكال","al":"center"},{"c":"F41","v":"0.33 * λ * √f'c","al":"center"},{"c":"G41","v":"المعادلة العامة للبلاطات المتناظرة"}]},{"r":42,"h":34.0,"cells":[{"c":"A42","v":2,"bg":"#F1F5F9","al":"center"},{"c":"B42","v":"مقاومة الخرسانة - المعادلة الكودية 2 (نسبة الأبعاد)","bg":"#F1F5F9","b":true},{"c":"C42","v":"vc2","bg":"#F1F5F9","al":"center"},{"c":"D42","v":2.793385,"f":"=0.17*(1+(2/D28))*D21*SQRT(D20)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.000"},{"c":"E42","v":"ميجا باسكال","bg":"#F1F5F9","al":"center"},{"c":"F42","v":"0.17 * (1 + 2/β) * λ * √f'c","bg":"#F1F5F9","al":"center"},{"c":"G42","v":"تأثير استطالة مقطع العمود","bg":"#F1F5F9"}]},{"r":43,"h":34.0,"cells":[{"c":"A43","v":3,"al":"center"},{"c":"B43","v":"مقاومة الخرسانة - المعادلة الكودية 3 (موقع العمود)","b":true},{"c":"C43","v":"vc3","al":"center"},{"c":"D43","v":2.249324,"f":"=0.083*(2+(D27*D19/D35))*D21*SQRT(D20)","b":true,"al":"center","nf":"0.000"},{"c":"E43","v":"ميجا باسكال","al":"center"},{"c":"F43","v":"0.083 * (2 + αs*d/b0) * λ * √f'c","al":"center"},{"c":"G43","v":"تأثير نسبة العمق إلى المحيط الحرج"}]},{"r":44,"h":34.0,"cells":[{"c":"A44","v":4,"bg":"#F1F5F9","al":"center"},{"c":"B44","v":"المقاومة الاسمية للخرسانة (الأصغر من المعادلات)","bg":"#F1F5F9","b":true},{"c":"C44","v":"vc","bg":"#F1F5F9","al":"center"},{"c":"D44","v":1.807484,"f":"=MIN(D41:D43)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.000"},{"c":"E44","v":"ميجا باسكال","bg":"#F1F5F9","al":"center"},{"c":"F44","v":"MIN(vc1, vc2, vc3)","bg":"#F1F5F9","al":"center"},{"c":"G44","v":"القيمة الكودية الحاكمة لمقاومة الخرسانة","bg":"#F1F5F9"}]},{"r":45,"h":34.0,"cells":[{"c":"A45","v":5,"al":"center"},{"c":"B45","v":"مقاومة الخرسانة التصميمية المسموحة (معامل الأمان)","b":true},{"c":"C45","v":"φvc","al":"center"},{"c":"D45","v":1.355613,"f":"=D22*D44","b":true,"al":"center","nf":"0.000"},{"c":"E45","v":"ميجا باسكال","al":"center"},{"c":"F45","v":"φ * vc (φ = 0.75)","al":"center"},{"c":"G45","v":"أقصى إجهاد تتحمله الخرسانة وحدها"}]},{"r":46,"h":34.0,"cells":[{"c":"A46","v":6,"bg":"#F1F5F9","al":"center"},{"c":"B46","v":"نسبة الاستخدام والتحميل على القطاع الإنشائي","bg":"#F1F5F9","b":true},{"c":"C46","v":"Ratio","bg":"#F1F5F9","al":"center"},{"c":"D46","v":0.973172,"f":"=D38/D45","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"E46","v":"-","bg":"#F1F5F9","al":"center"},{"c":"F46","v":"vu / φvc","bg":"#F1F5F9","al":"center"},{"c":"G46","v":"يجب أن تكون Ratio ≤ 1.00 للأمان التام","bg":"#F1F5F9"}]},{"r":47,"h":44.0,"cells":[{"c":"A47","v":7,"bg":"#FEE2E2","fg":"#991B1B","b":true,"al":"center"},{"c":"B47","v":"حالة التحقق الكودية للقص الثاقب للبلاطة","bg":"#FEE2E2","fg":"#991B1B","b":true},{"c":"C47","v":"Status","bg":"#FEE2E2","fg":"#991B1B","b":true,"al":"center"},{"c":"D47","v":"آمن إنشائياً (Safe)","f":"=IF(D46<=1.0,\"آمن إنشائياً (Safe)\",\"حرج - غير آمن (Unsafe) يتطلب تدخلاً هندسياً\")","bg":"#FEE2E2","fg":"#991B1B","b":true,"al":"center"},{"c":"E47","v":"-","bg":"#FEE2E2","fg":"#991B1B","b":true,"al":"center"},{"c":"F47","v":"SBC 304 Chapter 22","bg":"#FEE2E2","fg":"#991B1B","b":true,"al":"center"},{"c":"G47","v":"مقارنة vu مع φvc","bg":"#FEE2E2","fg":"#991B1B","b":true}]},{"r":48,"h":44.0,"cells":[{"c":"A48","v":8,"bg":"#FEF3C7","fg":"#92400E","b":true,"al":"center"},{"c":"B48","v":"التوصية الهندسية والقرار التنفيذي المعتمد","bg":"#FEF3C7","fg":"#92400E","b":true},{"c":"C48","v":"Action","bg":"#FEF3C7","fg":"#92400E","b":true,"al":"center"},{"c":"D48","v":"القطاع آمن تماماً ولا يتطلب أي تعديل في السمك","f":"=IF(D46<=1.0,\"القطاع آمن تماماً ولا يتطلب أي تعديل في السمك\",\"يتطلب عمل سقوط للعمود Drop Panel (راجع Tab 2) أو كانات قص (Tab 3)\")","bg":"#FEF3C7","fg":"#92400E","b":true,"al":"center"},{"c":"E48","v":"-","bg":"#FEF3C7","fg":"#92400E","b":true,"al":"center"},{"c":"F48","v":"دليل المكتب الفني","bg":"#FEF3C7","fg":"#92400E","b":true,"al":"center"},{"c":"G48","v":"إجراء هندسي إلزامي قبل الصب","bg":"#FEF3C7","fg":"#92400E","b":true}]}]},{"name":"تصميم سقوط العمود Drop Panel","maxRow":46,"maxCol":7,"colWidths":[8.0,58.0,16.0,22.0,14.0,34.0,40.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"تصميم والتحقق من سقوط الأعمدة Drop Panel لمقاومة القص الثاقب وفق SBC 304 وACI 318","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"فحص القطاعين الحرجين (القطاع الداخلي عند العمود والقطاع الخارجي عند أطراف السقوط) وحساب الكميات","bg":"#0F172A","fg":"#E2E8F0","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":14.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"السمك الكلي عند السقوط (htotal)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"نسبة الإجهاد داخل السقوط (Ratio In)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"نسبة الإجهاد خارج السقوط (Ratio Out)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"G4","v":"قرار اعتماد السقوط","bg":"#DCFCE7","fg":"#1E293B","b":true,"al":"center"}]},{"r":5,"h":44.0,"cells":[{"c":"A5","v":350,"f":"=D17","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0\" mm\"","cs":2},{"skip":true},{"c":"C5","v":0.542969,"f":"=D27","bg":"#F8FAFC","b":true,"al":"center","nf":"0.0%","cs":2},{"skip":true},{"c":"E5","v":1.355613,"f":"=D37","bg":"#F8FAFC","b":true,"al":"center","nf":"0.0%","cs":2},{"skip":true},{"c":"G5","v":"يتطلب تكبير الأبعاد","f":"=IF(AND(C5<=1.0,E5<=1.0),\"آمن تماماً\",\"يتطلب تكبير الأبعاد\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"سمك البلاطة + سمك السقوط الإضافي","bg":"#F8FAFC","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"C6","v":"فحص العمود على مسافة d_tot/2","bg":"#F8FAFC","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"E6","v":"فحص محيط السقوط على مسافة d/2","bg":"#F8FAFC","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"G6","v":"مطابق لاشتراطات SBC 304","bg":"#DCFCE7","fg":"#475569","al":"center"}]},{"r":7,"h":14.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"أولاً: أبعاد سقوط العمود والاشتراطات الهندسية الكودية (Drop Panel Geometry & Code Limits)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":40.0,"cells":[{"c":"A9","v":"م","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"البيان الهندسي / المعيار","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"الرمز الكودي","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"القيمة المدخلة","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"الوحدة","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"المعادلة / المرجع الكودي","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"ملاحظات الفحص والاعتماد","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":1,"bg":"#F1F5F9","al":"center"},{"c":"B10","v":"بحر البلاطة الأكبر في الاتجاه الأول L1","bg":"#F1F5F9","b":true},{"c":"C10","v":"L1","bg":"#F1F5F9","al":"center"},{"c":"D10","v":6.5,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.00"},{"c":"E10","v":"متر","bg":"#F1F5F9","al":"center"},{"c":"F10","v":"المخطط المعماري والإنشائي","bg":"#F1F5F9","al":"center"},{"c":"G10","v":"المسافة بين محاور الأعمدة","bg":"#F1F5F9"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":2,"al":"center"},{"c":"B11","v":"بحر البلاطة الأكبر في الاتجاه الثاني L2","b":true},{"c":"C11","v":"L2","al":"center"},{"c":"D11","v":6,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E11","v":"متر","al":"center"},{"c":"F11","v":"المخطط المعماري والإنشائي","al":"center"},{"c":"G11","v":"المسافة بين محاور الأعمدة"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":3,"bg":"#F1F5F9","al":"center"},{"c":"B12","v":"الحد الأدنى لامتداد السقوط من كل جانب (L/6)","bg":"#F1F5F9","b":true},{"c":"C12","v":"Ext,min","bg":"#F1F5F9","al":"center"},{"c":"D12","v":1.083333,"f":"=MAX(D10,D11)/6","bg":"#F1F5F9","b":true,"al":"center"},{"c":"E12","v":"متر","bg":"#F1F5F9","al":"center"},{"c":"F12","v":"SBC 304 Section 8.2.4","bg":"#F1F5F9","al":"center"},{"c":"G12","v":"يجب أن يمتد السقوط ≥ سدس البحر","bg":"#F1F5F9"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":4,"al":"center"},{"c":"B13","v":"الطول المقترح لسقوط العمود بالاتجاه الأول","b":true},{"c":"C13","v":"L_drop","al":"center"},{"c":"D13","v":2500,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"E13","v":"مم","al":"center"},{"c":"F13","v":"2.50 م ≥ (c1 + 2*Ext,min)","al":"center"},{"c":"G13","v":"محقق للحد الأدنى الكودي"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":5,"bg":"#F1F5F9","al":"center"},{"c":"B14","v":"العرض المقترح لسقوط العمود بالاتجاه الثاني","bg":"#F1F5F9","b":true},{"c":"C14","v":"B_drop","bg":"#F1F5F9","al":"center"},{"c":"D14","v":2500,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"E14","v":"مم","bg":"#F1F5F9","al":"center"},{"c":"F14","v":"2.50 م ≥ (c2 + 2*Ext,min)","bg":"#F1F5F9","al":"center"},{"c":"G14","v":"محقق للحد الأدنى الكودي","bg":"#F1F5F9"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":6,"al":"center"},{"c":"B15","v":"سمك البلاطة الأساسية (من Tab 1)","b":true},{"c":"C15","v":"hs","al":"center"},{"c":"D15","v":250,"f":"='فحص القص الثاقب للبلاطة Flat'!D16","b":true,"al":"center"},{"c":"E15","v":"مم","al":"center"},{"c":"F15","v":"سمك البلاطة الأصلية","al":"center"},{"c":"G15","v":"250 مم"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":7,"bg":"#F1F5F9","al":"center"},{"c":"B16","v":"سمك السقوط الإضافي المقترح hd (≥ hs/4)","bg":"#F1F5F9","b":true},{"c":"C16","v":"hd","bg":"#F1F5F9","al":"center"},{"c":"D16","v":100,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"E16","v":"مم","bg":"#F1F5F9","al":"center"},{"c":"F16","v":"SBC 304 Section 8.2.4","bg":"#F1F5F9","al":"center"},{"c":"G16","v":"يجب أن يكون hd ≥ 250/4 = 62.5 مم","bg":"#F1F5F9"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":8,"al":"center"},{"c":"B17","v":"السمك الإجمالي للخرسانة عند السقوط","b":true},{"c":"C17","v":"htotal","al":"center"},{"c":"D17","v":350,"f":"=D15+D16","b":true,"al":"center"},{"c":"E17","v":"مم","al":"center"},{"c":"F17","v":"hs + hd","al":"center"},{"c":"G17","v":"السمك الكلي عند ركيزة العمود"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":9,"bg":"#F1F5F9","al":"center"},{"c":"B18","v":"العمق الفعال الكلي عند السقوط (d_total)","bg":"#F1F5F9","b":true},{"c":"C18","v":"d_total","bg":"#F1F5F9","al":"center"},{"c":"D18","v":309,"f":"=D17-25-16","bg":"#F1F5F9","b":true,"al":"center"},{"c":"E18","v":"مم","bg":"#F1F5F9","al":"center"},{"c":"F18","v":"htotal - cc - db","bg":"#F1F5F9","al":"center"},{"c":"G18","v":"العمق الفعال للقطاع الداخلي","bg":"#F1F5F9"}]},{"r":19,"h":38.0,"cells":[{"c":"A19","v":"ثانياً: فحص القطاع الحرج الأول (داخل السقوط عند محيط العمود على مسافة d_total/2)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":20,"h":40.0,"cells":[{"c":"A20","v":"م","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B20","v":"البيان الهندسي / المعيار","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C20","v":"الرمز الكودي","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D20","v":"القيمة المدخلة","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E20","v":"الوحدة","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F20","v":"المعادلة / المرجع الكودي","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G20","v":"ملاحظات الفحص والاعتماد","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":1,"al":"center"},{"c":"B21","v":"أبعاد العمود c1 × c2","b":true},{"c":"C21","v":"c1, c2","al":"center"},{"c":"D21","v":"500 × 500","b":true,"al":"center"},{"c":"E21","v":"مم","al":"center"},{"c":"F21","v":"أبعاد العمود الأصلية","al":"center"},{"c":"G21","v":"مقطع خرساني مربع"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":2,"bg":"#F1F5F9","al":"center"},{"c":"B22","v":"البعد الحرج الداخلي الأول (c1 + d_total)","bg":"#F1F5F9","b":true},{"c":"C22","v":"b1,in","bg":"#F1F5F9","al":"center"},{"c":"D22","v":809,"f":"=500+D18","bg":"#F1F5F9","b":true,"al":"center"},{"c":"E22","v":"مم","bg":"#F1F5F9","al":"center"},{"c":"F22","v":"c1 + d_total","bg":"#F1F5F9","al":"center"},{"c":"G22","v":"البعد الحرج الأول","bg":"#F1F5F9"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":3,"al":"center"},{"c":"B23","v":"البعد الحرج الداخلي الثاني (c2 + d_total)","b":true},{"c":"C23","v":"b2,in","al":"center"},{"c":"D23","v":809,"f":"=500+D18","b":true,"al":"center"},{"c":"E23","v":"مم","al":"center"},{"c":"F23","v":"c2 + d_total","al":"center"},{"c":"G23","v":"البعد الحرج الثاني"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":4,"bg":"#F1F5F9","al":"center"},{"c":"B24","v":"المحيط الحرج الداخلي الكلي (b0,in)","bg":"#F1F5F9","b":true},{"c":"C24","v":"b0,in","bg":"#F1F5F9","al":"center"},{"c":"D24","v":3236,"f":"=2*(D22+D23)","bg":"#F1F5F9","b":true,"al":"center"},{"c":"E24","v":"مم","bg":"#F1F5F9","al":"center"},{"c":"F24","v":"2 * (b1,in + b2,in)","bg":"#F1F5F9","al":"center"},{"c":"G24","v":"المحيط الحرج عند العمود","bg":"#F1F5F9"}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":5,"al":"center"},{"c":"B25","v":"إجهاد القص الأقصى المؤثر داخل السقوط","b":true},{"c":"C25","v":"vu,in","al":"center"},{"c":"D25","v":0.736056,"f":"=1.15*('فحص القص الثاقب للبلاطة Flat'!D29*1000)/(D24*D18)","b":true,"al":"center","nf":"0.000"},{"c":"E25","v":"ميجا باسكال","al":"center"},{"c":"F25","v":"1.15 * Vu / (b0,in * d_total)","al":"center"},{"c":"G25","v":"شامل تأثير اللامركزية 15%"}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":6,"bg":"#F1F5F9","al":"center"},{"c":"B26","v":"مقاومة الخرسانة التصميمية عند السقوط","bg":"#F1F5F9","b":true},{"c":"C26","v":"φvc,in","bg":"#F1F5F9","al":"center"},{"c":"D26","v":1.355613,"f":"=0.75*0.33*1.0*SQRT('فحص القص الثاقب للبلاطة Flat'!D20)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.000"},{"c":"E26","v":"ميجا باسكال","bg":"#F1F5F9","al":"center"},{"c":"F26","v":"φ * 0.33 * λ * √f'c","bg":"#F1F5F9","al":"center"},{"c":"G26","v":"مقاومة القطاع الخرساني المصمت","bg":"#F1F5F9"}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":7,"al":"center"},{"c":"B27","v":"نسبة الاستخدام والتحميل داخل السقوط","b":true},{"c":"C27","v":"Ratio,in","al":"center"},{"c":"D27","v":0.542969,"f":"=D25/D26","b":true,"al":"center","nf":"0.0%"},{"c":"E27","v":"-","al":"center"},{"c":"F27","v":"vu,in / φvc,in","al":"center"},{"c":"G27","v":"يجب أن تكون ≤ 1.00"}]},{"r":28,"h":40.0,"cells":[{"c":"A28","v":8,"bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"B28","v":"حالة التحقق الإنشائي داخل السقوط","bg":"#DCFCE7","fg":"#166534","b":true},{"c":"C28","v":"Status","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"D28","v":"آمن تماماً داخل السقوط (Safe)","f":"=IF(D27<=1.0,\"آمن تماماً داخل السقوط (Safe)\",\"غير آمن - يتطلب زيادة سمك السقوط hd\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"E28","v":"-","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"F28","v":"SBC 304 Section 22.6","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"G28","v":"نتيجة فحص القطاع الداخلي","bg":"#DCFCE7","fg":"#166534","b":true}]},{"r":29,"h":38.0,"cells":[{"c":"A29","v":"ثالثاً: فحص القطاع الحرج الثاني (خارج السقوط عند محيط أطراف السقوط على مسافة d/2 في البلاطة الأصلية)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":30,"h":40.0,"cells":[{"c":"A30","v":"م","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B30","v":"البيان الهندسي / المعيار","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C30","v":"الرمز الكودي","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D30","v":"القيمة المدخلة","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E30","v":"الوحدة","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F30","v":"المعادلة / المرجع الكودي","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G30","v":"ملاحظات الفحص والاعتماد","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":31,"h":34.0,"cells":[{"c":"A31","v":1,"al":"center"},{"c":"B31","v":"أبعاد سقوط العمود L_drop × B_drop","b":true},{"c":"C31","v":"L, B","al":"center"},{"c":"D31","v":"2500 × 2500","b":true,"al":"center"},{"c":"E31","v":"مم","al":"center"},{"c":"F31","v":"أبعاد السقوط المنفذ","al":"center"},{"c":"G31","v":"قاعدة السقوط الخرساني"}]},{"r":32,"h":34.0,"cells":[{"c":"A32","v":2,"bg":"#F1F5F9","al":"center"},{"c":"B32","v":"العمق الفعال للبلاطة خارج السقوط (d_slab)","bg":"#F1F5F9","b":true},{"c":"C32","v":"d_slab","bg":"#F1F5F9","al":"center"},{"c":"D32","v":209,"f":"='فحص القص الثاقب للبلاطة Flat'!D19","bg":"#F1F5F9","b":true,"al":"center"},{"c":"E32","v":"مم","bg":"#F1F5F9","al":"center"},{"c":"F32","v":"hs - cc - db","bg":"#F1F5F9","al":"center"},{"c":"G32","v":"العمق الفعال للبلاطة الأصلية 209 مم","bg":"#F1F5F9"}]},{"r":33,"h":34.0,"cells":[{"c":"A33","v":3,"al":"center"},{"c":"B33","v":"البعد الحرج الخارجي الأول (L_drop + d_slab)","b":true},{"c":"C33","v":"b1,out","al":"center"},{"c":"D33","v":2709,"f":"=D13+D32","b":true,"al":"center"},{"c":"E33","v":"مم","al":"center"},{"c":"F33","v":"L_drop + d_slab","al":"center"},{"c":"G33","v":"البعد الحرج خارج السقوط"}]},{"r":34,"h":34.0,"cells":[{"c":"A34","v":4,"bg":"#F1F5F9","al":"center"},{"c":"B34","v":"البعد الحرج الخارجي الثاني (B_drop + d_slab)","bg":"#F1F5F9","b":true},{"c":"C34","v":"b2,out","bg":"#F1F5F9","al":"center"},{"c":"D34","v":2709,"f":"=D14+D32","bg":"#F1F5F9","b":true,"al":"center"},{"c":"E34","v":"مم","bg":"#F1F5F9","al":"center"},{"c":"F34","v":"B_drop + d_slab","bg":"#F1F5F9","al":"center"},{"c":"G34","v":"البعد الحرج خارج السقوط","bg":"#F1F5F9"}]},{"r":35,"h":34.0,"cells":[{"c":"A35","v":5,"al":"center"},{"c":"B35","v":"المحيط الحرج الخارجي الكلي (b0,out)","b":true},{"c":"C35","v":"b0,out","al":"center"},{"c":"D35","v":10836,"f":"=2*(D33+D34)","b":true,"al":"center"},{"c":"E35","v":"مم","al":"center"},{"c":"F35","v":"2 * (b1,out + b2,out)","al":"center"},{"c":"G35","v":"محيط مسار القص خارج السقوط"}]},{"r":36,"h":34.0,"cells":[{"c":"A36","v":6,"bg":"#F1F5F9","al":"center"},{"c":"B36","v":"إجهاد القص الأقصى المؤثر خارج السقوط","bg":"#F1F5F9","b":true},{"c":"C36","v":"vu,out","bg":"#F1F5F9","al":"center"},{"c":"D36","v":0.296725,"f":"=1.05*('فحص القص الثاقب للبلاطة Flat'!D29*1000)/(D35*D32)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.000"},{"c":"E36","v":"ميجا باسكال","bg":"#F1F5F9","al":"center"},{"c":"F36","v":"1.05 * Vu / (b0,out * d_slab)","bg":"#F1F5F9","al":"center"},{"c":"G36","v":"تأثير اللامركزية يتلاشى مع اتساع المحيط","bg":"#F1F5F9"}]},{"r":37,"h":34.0,"cells":[{"c":"A37","v":7,"al":"center"},{"c":"B37","v":"مقاومة الخرسانة التصميمية للبلاطة الأصلية","b":true},{"c":"C37","v":"φvc,out","al":"center"},{"c":"D37","v":1.355613,"f":"='فحص القص الثاقب للبلاطة Flat'!D45","b":true,"al":"center","nf":"0.000"},{"c":"E37","v":"ميجا باسكال","al":"center"},{"c":"F37","v":"φ * 0.33 * λ * √f'c","al":"center"},{"c":"G37","v":"مقاومة البلاطة ذات السمك 250 مم"}]},{"r":38,"h":34.0,"cells":[{"c":"A38","v":8,"bg":"#F1F5F9","al":"center"},{"c":"B38","v":"نسبة الاستخدام والتحميل خارج السقوط","bg":"#F1F5F9","b":true},{"c":"C38","v":"Ratio,out","bg":"#F1F5F9","al":"center"},{"c":"D38","v":0.218886,"f":"=D36/D37","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"E38","v":"-","bg":"#F1F5F9","al":"center"},{"c":"F38","v":"vu,out / φvc,out","bg":"#F1F5F9","al":"center"},{"c":"G38","v":"يجب أن تكون ≤ 1.00","bg":"#F1F5F9"}]},{"r":39,"h":40.0,"cells":[{"c":"A39","v":9,"bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"B39","v":"حالة التحقق الإنشائي خارج السقوط","bg":"#DCFCE7","fg":"#166534","b":true},{"c":"C39","v":"Status","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"D39","v":"آمن تماماً خارج السقوط (Safe)","f":"=IF(D38<=1.0,\"آمن تماماً خارج السقوط (Safe)\",\"غير آمن - يتطلب زيادة أبعاد السقوط L_drop\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"E39","v":"-","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"F39","v":"SBC 304 Section 22.6","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"G39","v":"نتيجة فحص القطاع الخارجي","bg":"#DCFCE7","fg":"#166534","b":true}]},{"r":40,"h":28.0,"cells":[{"c":"A40","v":""},{"c":"B40","v":""},{"c":"C40","v":""},{"c":"D40","v":""},{"c":"E40","v":""},{"c":"F40","v":""},{"c":"G40","v":""}]},{"r":41,"h":38.0,"cells":[{"c":"A41","v":"رابعاً: حصر كميات الخرسانة والتسليح لسقوط الأعمدة (Drop Panel Material Takeoff)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":42,"h":40.0,"cells":[{"c":"A42","v":"م","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B42","v":"البيان الهندسي / المعيار","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C42","v":"الرمز الكودي","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D42","v":"القيمة المدخلة","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E42","v":"الوحدة","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F42","v":"المعادلة / المرجع الكودي","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G42","v":"ملاحظات الفحص والاعتماد","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":43,"h":34.0,"cells":[{"c":"A43","v":1,"al":"center"},{"c":"B43","v":"حجم الخرسانة المسلحة الإضافية لسقوط العمود الواحد","b":true},{"c":"C43","v":"V_drop","al":"center"},{"c":"D43","v":0.625,"f":"=(D13/1000)*(D14/1000)*(D16/1000)","b":true,"al":"center","nf":"#,##0.00"},{"c":"E43","v":"متر مكعب","al":"center"},{"c":"F43","v":"L_drop * B_drop * hd","al":"center"},{"c":"G43","v":"خرسانة إضافية تصب مع البلاطة"}]},{"r":44,"h":34.0,"cells":[{"c":"A44","v":2,"bg":"#F1F5F9","al":"center"},{"c":"B44","v":"إجمالي عدد الأعمدة التي تتطلب سقوط بالسقف","bg":"#F1F5F9","b":true},{"c":"C44","v":"No_drops","bg":"#F1F5F9","al":"center"},{"c":"D44","v":12,"in":true,"bg":"#F1F5F9","b":true,"al":"center"},{"c":"E44","v":"عمود","bg":"#F1F5F9","al":"center"},{"c":"F44","v":"حصر الأعمدة الحرجة إنشائياً","bg":"#F1F5F9","al":"center"},{"c":"G44","v":"أعمدة ذات بحور وأحمال عالية","bg":"#F1F5F9"}]},{"r":45,"h":34.0,"cells":[{"c":"A45","v":3,"al":"center"},{"c":"B45","v":"إجمالي حجم الخرسانة الإضافية لجميع السقوطات","b":true},{"c":"C45","v":"V_total","al":"center"},{"c":"D45","v":7.5,"f":"=D43*D44","b":true,"al":"center","nf":"#,##0.00"},{"c":"E45","v":"متر مكعب","al":"center"},{"c":"F45","v":"V_drop * No_drops","al":"center"},{"c":"G45","v":"إجمالي توريد خرسانة جاهزة"}]},{"r":46,"h":52.0,"cells":[{"c":"A46","v":4,"bg":"#F1F5F9","al":"center"},{"c":"B46","v":"تسليح السقوط السفلي الإضافي المقترح","bg":"#F1F5F9","b":true},{"c":"C46","v":"Rebar","bg":"#F1F5F9","al":"center"},{"c":"D46","v":"شبكة T12 @ 150 mm في الاتجاهين","bg":"#F1F5F9","b":true,"al":"center"},{"c":"E46","v":"-","bg":"#F1F5F9","al":"center"},{"c":"F46","v":"مخططات التسليح المعتمدة","bg":"#F1F5F9","al":"center"},{"c":"G46","v":"حديد تسليح إضافي سفلي","bg":"#F1F5F9"}]}]},{"name":"تصميم كانات وأشواك تسليح القص","maxRow":35,"maxCol":7,"colWidths":[8.0,58.0,16.0,22.0,14.0,34.0,40.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"تصميم كانات وأشواك تسليح القص الثاقب Two-Way Shear Reinforcement وفق SBC 304 وACI 318","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"حلول هندسية بديلة لسقوط الأعمدة: حساب مساحة الكانات Av، التباعد s، عدد الصفوف وامتداد المحيط الحرج","bg":"#0F172A","fg":"#E2E8F0","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":14.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"الحد الأقصى للقص مع تسليح (φvn,max)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"قوة القص التصميمية للكانات (Vs)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"مواصفة وتوزيع كانات القص","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"G4","v":"عدد صفوف الكانات","bg":"#DCFCE7","fg":"#1E293B","b":true,"al":"center"}]},{"r":5,"h":44.0,"cells":[{"c":"A5","v":2.05396,"f":"=D11","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00\" MPa\"","cs":2},{"skip":true},{"c":"C5","v":490.695454,"f":"=D16","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0\" kN\"","cs":2},{"skip":true},{"c":"E5","v":"T10 @ 100 mm","bg":"#F8FAFC","b":true,"al":"center","cs":2},{"skip":true},{"c":"G5","v":4,"f":"=D26","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"سقف المقاومة القصوى للخرسانة","bg":"#F8FAFC","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"C6","v":"القوة الفائضة عن قدرة الخرسانة","bg":"#F8FAFC","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"E6","v":"كانات مقفلة أو أشواك قص Studs","bg":"#F8FAFC","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"G6","v":"صفوف محيطة بالعمود","bg":"#DCFCE7","fg":"#475569","al":"center"}]},{"r":7,"h":14.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"أولاً: التحقق الكودي من إمكانية استخدام تسليح القص (Code Feasibility & Upper Stress Limits)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":40.0,"cells":[{"c":"A9","v":"م","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"البيان الهندسي / المعيار","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"الرمز الكودي","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"القيمة المدخلة","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"الوحدة","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"المعادلة / المرجع الكودي","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"ملاحظات الفحص والاعتماد","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":1,"bg":"#F1F5F9","al":"center"},{"c":"B10","v":"إجهاد القص الأقصى المؤثر على القطاع vu","bg":"#F1F5F9","b":true},{"c":"C10","v":"vu","bg":"#F1F5F9","al":"center"},{"c":"D10","v":1.319245,"f":"='فحص القص الثاقب للبلاطة Flat'!D38","bg":"#F1F5F9","b":true,"al":"center","nf":"0.000"},{"c":"E10","v":"ميجا باسكال","bg":"#F1F5F9","al":"center"},{"c":"F10","v":"من حسابات Tab 1","bg":"#F1F5F9","al":"center"},{"c":"G10","v":"إجهاد القص الكلي المؤثر","bg":"#F1F5F9"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":2,"al":"center"},{"c":"B11","v":"الحد الأقصى المطلق لإجهاد القص مع كانات φvn,max","b":true},{"c":"C11","v":"φvn,max","al":"center"},{"c":"D11","v":2.05396,"f":"=0.75*0.50*1.0*SQRT('فحص القص الثاقب للبلاطة Flat'!D20)","b":true,"al":"center","nf":"0.000"},{"c":"E11","v":"ميجا باسكال","al":"center"},{"c":"F11","v":"φ * 0.50 * λ * √f'c","al":"center"},{"c":"G11","v":"SBC 304 Section 22.6.6.2"}]},{"r":12,"h":40.0,"cells":[{"c":"A12","v":3,"bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"B12","v":"هل يسمح الكود باستخدام تسليح القص للبلاطة؟","bg":"#DCFCE7","fg":"#166534","b":true},{"c":"C12","v":"Check","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"D12","v":"نعم - مسموح كودياً باستخدام كانات أو أشواك قص","f":"=IF(D10<=D11,\"نعم - مسموح كودياً باستخدام كانات أو أشواك قص\",\"غير مسموح - يجب تكبير أبعاد العمود أو زيادة سمك البلاطة\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"E12","v":"-","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"F12","v":"مقارنة vu مع φvn,max","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"G12","v":"شرط أمان كودي ملزم","bg":"#DCFCE7","fg":"#166534","b":true}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":4,"al":"center"},{"c":"B13","v":"مقاومة الخرسانة للقص بوجود تسليح vc,reduced","b":true},{"c":"C13","v":"vc","al":"center"},{"c":"D13","v":0.931128,"f":"=0.17*1.0*SQRT('فحص القص الثاقب للبلاطة Flat'!D20)","b":true,"al":"center","nf":"0.000"},{"c":"E13","v":"ميجا باسكال","al":"center"},{"c":"F13","v":"0.17 * λ * √f'c","al":"center"},{"c":"G13","v":"تنخفض مساهمة الخرسانة إلى النصف"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":5,"bg":"#F1F5F9","al":"center"},{"c":"B14","v":"المقاومة التصميمية المخفضة للخرسانة φvc","bg":"#F1F5F9","b":true},{"c":"C14","v":"φvc","bg":"#F1F5F9","al":"center"},{"c":"D14","v":0.698346,"f":"=0.75*D13","bg":"#F1F5F9","b":true,"al":"center","nf":"0.000"},{"c":"E14","v":"ميجا باسكال","bg":"#F1F5F9","al":"center"},{"c":"F14","v":"φ * vc","bg":"#F1F5F9","al":"center"},{"c":"G14","v":"المقاومة التي تتحملها الخرسانة","bg":"#F1F5F9"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":6,"al":"center"},{"c":"B15","v":"إجهاد القص الفائض المطلوب حمله بحديد الكانات","b":true},{"c":"C15","v":"vs,req","al":"center"},{"c":"D15","v":0.827865,"f":"=(D10/0.75)-D13","b":true,"al":"center","nf":"0.000"},{"c":"E15","v":"ميجا باسكال","al":"center"},{"c":"F15","v":"(vu / φ) - vc","al":"center"},{"c":"G15","v":"إجهاد القص الذي يجب تغطيته بالكانات"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":7,"bg":"#F1F5F9","al":"center"},{"c":"B16","v":"قوة القص الكلية الفائضة المطلوب مقاومتها","bg":"#F1F5F9","b":true},{"c":"C16","v":"Vs","bg":"#F1F5F9","al":"center"},{"c":"D16","v":490.695454,"f":"=(D15*'فحص القص الثاقب للبلاطة Flat'!D35*'فحص القص الثاقب للبلاطة Flat'!D19)/1000","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"E16","v":"كيلو نيوتن","bg":"#F1F5F9","al":"center"},{"c":"F16","v":"vs * b0 * d / 1000","bg":"#F1F5F9","al":"center"},{"c":"G16","v":"إجمالي قوة القص على حديد الكانات","bg":"#F1F5F9"}]},{"r":17,"h":38.0,"cells":[{"c":"A17","v":"ثانياً: تصميم أبعاد وتوزيع كانات القص (Shear Links Sizing, Spacing & Detailing)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":18,"h":40.0,"cells":[{"c":"A18","v":"م","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B18","v":"البيان الهندسي / المعيار","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C18","v":"الرمز الكودي","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D18","v":"القيمة المدخلة","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E18","v":"الوحدة","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F18","v":"المعادلة / المرجع الكودي","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G18","v":"ملاحظات الفحص والاعتماد","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":1,"al":"center"},{"c":"B19","v":"إجهاد خضوع حديد تسليح الكانات fyt","b":true},{"c":"C19","v":"fyt","al":"center"},{"c":"D19","v":420,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"E19","v":"ميجا باسكال","al":"center"},{"c":"F19","v":"ASTM A615 Grade 60","al":"center"},{"c":"G19","v":"صلب عالي المقاومة"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":2,"bg":"#F1F5F9","al":"center"},{"c":"B20","v":"قطر سيخ الكانة المقترح db,tie","bg":"#F1F5F9","b":true},{"c":"C20","v":"db,tie","bg":"#F1F5F9","al":"center"},{"c":"D20","v":10,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"E20","v":"مم","bg":"#F1F5F9","al":"center"},{"c":"F20","v":"حديد تسليح أملس أو مشرشر","bg":"#F1F5F9","al":"center"},{"c":"G20","v":"T10 أو T12","bg":"#F1F5F9"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":3,"al":"center"},{"c":"B21","v":"مساحة مقطع الفرع الواحد للكانة Ab","b":true},{"c":"C21","v":"Ab","al":"center"},{"c":"D21","v":78.53975,"f":"=3.14159*(D20/2)^2","b":true,"al":"center","nf":"#,##0.0"},{"c":"E21","v":"مم²","al":"center"},{"c":"F21","v":"π * (db/2)^2","al":"center"},{"c":"G21","v":"78.5 مم² للفرع T10"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":4,"bg":"#F1F5F9","al":"center"},{"c":"B22","v":"عدد أفرع الكانات المحيطة في المحيط الواحد","bg":"#F1F5F9","b":true},{"c":"C22","v":"n_legs","bg":"#F1F5F9","al":"center"},{"c":"D22","v":8,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"E22","v":"فرع","bg":"#F1F5F9","al":"center"},{"c":"F22","v":"فرعان بكل وجه من أوجه العمود","bg":"#F1F5F9","al":"center"},{"c":"G22","v":"توزيع متناظر حول العمود","bg":"#F1F5F9"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":5,"al":"center"},{"c":"B23","v":"إجمالي مساحة مقطع الكانات في المحيط Av","b":true},{"c":"C23","v":"Av","al":"center"},{"c":"D23","v":628.318,"f":"=D21*D22","b":true,"al":"center","nf":"#,##0.0"},{"c":"E23","v":"مم²","al":"center"},{"c":"F23","v":"n_legs * Ab","al":"center"},{"c":"G23","v":"مساحة حديد القص في الصف الواحد"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":6,"bg":"#F1F5F9","al":"center"},{"c":"B24","v":"التباعد الأقصى المسموح به كودياً بين الصفوف","bg":"#F1F5F9","b":true},{"c":"C24","v":"s_max","bg":"#F1F5F9","al":"center"},{"c":"D24","v":104.5,"f":"='فحص القص الثاقب للبلاطة Flat'!D19/2","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"E24","v":"مم","bg":"#F1F5F9","al":"center"},{"c":"F24","v":"d / 2 (SBC 304 Section 8.7.6)","bg":"#F1F5F9","al":"center"},{"c":"G24","v":"أقصى مسافة بين أطواق الكانات","bg":"#F1F5F9"}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":7,"al":"center"},{"c":"B25","v":"التباعد المعتمد للتنفيذ بين صفوف الكانات","b":true},{"c":"C25","v":"s","al":"center"},{"c":"D25","v":100,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"E25","v":"مم","al":"center"},{"c":"F25","v":"s ≤ s_max","al":"center"},{"c":"G25","v":"تقريب عملي للتباعد بالموقع"}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":8,"bg":"#F1F5F9","al":"center"},{"c":"B26","v":"عدد صفوف الكانات المطلوبة حول العمود","bg":"#F1F5F9","b":true},{"c":"C26","v":"N_rows","bg":"#F1F5F9","al":"center"},{"c":"D26","v":4,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"E26","v":"صفوف","bg":"#F1F5F9","al":"center"},{"c":"F26","v":"حتى الوصول للمحيط الخارجي الآمن","bg":"#F1F5F9","al":"center"},{"c":"G26","v":"تبدأ أول كانة على d/2 = 100 مم","bg":"#F1F5F9"}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":9,"al":"center"},{"c":"B27","v":"المسافة الكلية لامتداد تسليح القص من وجه العمود","b":true},{"c":"C27","v":"L_reinf","al":"center"},{"c":"D27","v":400,"f":"=D25*D26","b":true,"al":"center","nf":"#,##0"},{"c":"E27","v":"مم","al":"center"},{"c":"F27","v":"N_rows * s","al":"center"},{"c":"G27","v":"يمتد التسليح 400 مم من وجه العمود"}]},{"r":28,"h":40.0,"cells":[{"c":"A28","v":10,"bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"B28","v":"التحقق من كفاءة تسليح القص المنفذ","bg":"#DCFCE7","fg":"#166534","b":true},{"c":"C28","v":"Status","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"D28","v":"غير آمن - زيادة قطر الكانة أو تقليل التباعد","f":"=IF((D24*D19*('فحص القص الثاقب للبلاطة Flat'!D19)/(D25*1000))>=D16,\"آمن تماماً - التسليح يغطي كامل قوى القص الفائضة\",\"غير آمن - زيادة قطر الكانة أو تقليل التباعد\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"E28","v":"-","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"F28","v":"Av * fyt * d / (s * 1000) ≥ Vs","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"G28","v":"اعتماد الحسابات الإنشائية","bg":"#DCFCE7","fg":"#166534","b":true}]},{"r":29,"h":28.0,"cells":[{"c":"A29","v":""},{"c":"B29","v":""},{"c":"C29","v":""},{"c":"D29","v":""},{"c":"E29","v":""},{"c":"F29","v":""},{"c":"G29","v":""}]},{"r":30,"h":38.0,"cells":[{"c":"A30","v":"ثالثاً: الاشتراطات الهندسية وملاحظات التنفيذ الميدانية (Site Execution & Detailing Notes)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":31,"h":40.0,"cells":[{"c":"A31","v":"م","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B31","v":"البيان الهندسي / المعيار","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C31","v":"الرمز الكودي","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D31","v":"القيمة المدخلة","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E31","v":"الوحدة","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F31","v":"المعادلة / المرجع الكودي","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G31","v":"ملاحظات الفحص والاعتماد","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":32,"h":52.0,"cells":[{"c":"A32","v":1,"bg":"#F1F5F9","al":"center"},{"c":"B32","v":"تثبيت الكانات مع حديد التسليح الطولي","bg":"#F1F5F9","b":true},{"c":"C32","v":"Anchorage","bg":"#F1F5F9","al":"center"},{"c":"D32","v":"تطويق كامل لأسياخ التسليح الطولية","bg":"#F1F5F9","b":true,"al":"center"},{"c":"E32","v":"-","bg":"#F1F5F9","al":"center"},{"c":"F32","v":"SBC 304 Section 25.7.1","bg":"#F1F5F9","al":"center"},{"c":"G32","v":"يجب أن تلف كانات القص حول الأسياخ العلوية والسفلية","bg":"#F1F5F9"}]},{"r":33,"h":34.0,"cells":[{"c":"A33","v":2,"al":"center"},{"c":"B33","v":"مسافة أول كانة من وجه العمود","b":true},{"c":"C33","v":"First Link","al":"center"},{"c":"D33","v":"لا تتجاوز d/2 (100 مم)","b":true,"al":"center"},{"c":"E33","v":"مم","al":"center"},{"c":"F33","v":"SBC 304 Section 8.7.6.2","al":"center"},{"c":"G33","v":"تبدأ أول كانة على مسافة بين d/4 و d/2"}]},{"r":34,"h":52.0,"cells":[{"c":"A34","v":3,"bg":"#F1F5F9","al":"center"},{"c":"B34","v":"تجنب التداخل مع مسارات مواسير الكهرباء","bg":"#F1F5F9","b":true},{"c":"C34","v":"MEP Pipes","bg":"#F1F5F9","al":"center"},{"c":"D34","v":"يمنع مرور أي مواسير ضمن نطاق القص","bg":"#F1F5F9","b":true,"al":"center"},{"c":"E34","v":"-","bg":"#F1F5F9","al":"center"},{"c":"F34","v":"الكود السعودي العام SBC 201","bg":"#F1F5F9","al":"center"},{"c":"G34","v":"يحظر تمديد مواسير PVC في نطاق d حول العمود","bg":"#F1F5F9"}]},{"r":35,"h":34.0,"cells":[{"c":"A35","v":4,"al":"center"},{"c":"B35","v":"بديل أشواك القص المسبقة الصنع (Shear Studs)","b":true},{"c":"C35","v":"Stud Rails","al":"center"},{"c":"D35","v":"تثبيت ألواح الصلب الملحومة برؤوس مطروقة","b":true,"al":"center"},{"c":"E35","v":"-","al":"center"},{"c":"F35","v":"ASTM A1044 / ACI 421.1R","al":"center"},{"c":"G35","v":"أسرع في التنفيذ وتوفر كفاءة تثبيت عالية جداً"}]}]}]}