{"slug":"footings-concrete-qto","sheets":[{"name":"خلاصة_حصر_الخرسانات_وطلب_المحطة","maxRow":24,"maxCol":11,"colWidths":[14.0,36.0,18.0,18.0,22.0,14.0,24.0,20.0,20.0,24.0,34.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"شيت حصر كميات خرسانة الأساسات والقواعد والسملات (FOOTINGS CONCRETE QTO)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"مشروع: إنشاء برج سكني وتجاري | عنصر الأساسات: القواعد المنفصلة والمشتركة والميد الخرسانية | كود SBC 304","bg":"#1E3A8A","fg":"#E2E8F0","al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":""},{"c":"B4","v":"إجمالي الخرسانة المسلحة (RC)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true},{"c":"D4","v":"إجمالي الخرسانة العادية (PC)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true},{"c":"F4","v":""},{"c":"G4","v":"إجمالي خرسانة الميد والشناجات","bg":"#065F46","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true},{"c":"I4","v":""},{"c":"J4","v":"إجمالي طلب المحطة شاملاً الهدر (3%)","bg":"#92400E","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true}]},{"r":5,"h":26.0,"cells":[{"c":"A5","v":""},{"c":"B5","v":114.58956,"f":"=J16","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.00 \"م³\"","rs":2,"cs":2},{"skip":true},{"c":"D5","v":2.912,"f":"=J17","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.00 \"م³\"","rs":2,"cs":2},{"skip":true},{"c":"F5","v":""},{"c":"G5","v":20.50112,"f":"=J18","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.00 \"م³\"","rs":2,"cs":2},{"skip":true},{"c":"I5","v":""},{"c":"J5","v":157.00618,"f":"=J20","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.00 \"م³\"","rs":2,"cs":2},{"skip":true}]},{"r":6,"h":26.0,"cells":[{"c":"A6","v":""},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F6","v":""},{"skip":true},{"skip":true},{"c":"I6","v":""},{"skip":true},{"skip":true}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""},{"c":"I7","v":""},{"c":"J7","v":""},{"c":"K7","v":""}]},{"r":8,"h":40.0,"cells":[{"c":"A8","v":"جدول خلاصة حصر كميات الخرسانة لجميع عناصر الأساسات والصب الموقعي","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"م","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"بيان العنصر الإنشائي","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"نوع الخرسانة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"رتبة الخرسانة (f'c)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"نوع الإسمنت المستخدم","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"عدد النماذج","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"الحجم الصافي الهندسي (م³)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H9","v":"نسبة الهدر الموقعي المعتمدة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I9","v":"كمية الهدر التقديرية (م³)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J9","v":"الحجم الفعلي لطلب الصب (م³)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K9","v":"ملاحظات واشتراطات الصب","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":1,"fg":"#1E293B","al":"center"},{"c":"B10","v":"الخرسانة المسلحة للقواعد المنفصلة (Isolated RC)","fg":"#1E293B"},{"c":"C10","v":"خرسانة مسلحة","fg":"#1E293B","al":"center"},{"c":"D10","v":"C35 (35 MPa)","fg":"#1E293B","al":"center"},{"c":"E10","v":"إسمنت مقاوم للأملاح SRC","fg":"#1E293B","al":"center"},{"c":"F10","v":18,"in":true,"fg":"#1E293B","al":"center"},{"c":"G10","v":67.572,"f":"=حصر_القواعد_المسلحة_والعادية!H15","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H10","v":0.03,"in":true,"fg":"#1E293B","al":"center","nf":"0.0%"},{"c":"I10","v":2.02716,"f":"=G10*H10","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J10","v":69.59916,"f":"=G10+I10","b":true,"al":"center","nf":"#,##0.00"},{"c":"K10","v":"صب مستمر مع هزازات ميكانيكية","fg":"#1E293B"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":2,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"B11","v":"الخرسانة المسلحة للقواعد المشتركة (Combined RC)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C11","v":"خرسانة مسلحة","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D11","v":"C35 (35 MPa)","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E11","v":"إسمنت مقاوم للأملاح SRC","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F11","v":4,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"G11","v":43.68,"f":"=حصر_القواعد_المسلحة_والعادية!H23","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H11","v":0.03,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0%"},{"c":"I11","v":1.3104,"f":"=G11*H11","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J11","v":44.9904,"f":"=G11+I11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"K11","v":"قواعد مشتركة تحت الأعمدة المتجاورة","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":3,"fg":"#1E293B","al":"center"},{"c":"B12","v":"خرسانة النظافة العادية أسفل القواعد (Blinding PC)","fg":"#1E293B"},{"c":"C12","v":"خرسانة عادية","fg":"#1E293B","al":"center"},{"c":"D12","v":"C20 (20 MPa)","fg":"#1E293B","al":"center"},{"c":"E12","v":"إسمنت مقاوم للأملاح SRC","fg":"#1E293B","al":"center"},{"c":"F12","v":22,"in":true,"fg":"#1E293B","al":"center"},{"c":"G12","v":2.8,"f":"=حصر_القواعد_المسلحة_والعادية!H32","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H12","v":0.04,"in":true,"fg":"#1E293B","al":"center","nf":"0.0%"},{"c":"I12","v":0.112,"f":"=G12*H12","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J12","v":2.912,"f":"=G12+I12","b":true,"al":"center","nf":"#,##0.00"},{"c":"K12","v":"فرشات نظافة سمك 10 سم مع رفرفة","fg":"#1E293B"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":4,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"B13","v":"الخرسانة المسلحة للميد والشناجات الأرضية (Tie Beams)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C13","v":"خرسانة مسلحة","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D13","v":"C35 (35 MPa)","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E13","v":"إسمنت مقاوم للأملاح SRC","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F13","v":16,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"G13","v":19.904,"f":"=حصر_الميد_والسملات_الأرضية!H18","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H13","v":0.03,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0%"},{"c":"I13","v":0.59712,"f":"=G13*H13","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J13","v":20.50112,"f":"=G13+I13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"K13","v":"ربط القواعد لمقاومة الهبوط غير المتكافئ","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":5,"fg":"#1E293B","al":"center"},{"c":"B14","v":"خرسانة رقاب الأعمدة حتى منسوب الميد (Column Necks)","fg":"#1E293B"},{"c":"C14","v":"خرسانة مسلحة","fg":"#1E293B","al":"center"},{"c":"D14","v":"C40 (40 MPa)","fg":"#1E293B","al":"center"},{"c":"E14","v":"إسمنت مقاوم للأملاح SRC","fg":"#1E293B","al":"center"},{"c":"F14","v":24,"in":true,"fg":"#1E293B","al":"center"},{"c":"G14","v":18.45,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H14","v":0.03,"in":true,"fg":"#1E293B","al":"center","nf":"0.0%"},{"c":"I14","v":0.5535,"f":"=G14*H14","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J14","v":19.0035,"f":"=G14+I14","b":true,"al":"center","nf":"#,##0.00"},{"c":"K14","v":"ارتفاع 1.20م مع مراعاة الأشاير الإنشائية","fg":"#1E293B"}]},{"r":15,"h":28.0,"cells":[{"c":"A15","v":""},{"c":"B15","v":""},{"c":"C15","v":""},{"c":"D15","v":""},{"c":"E15","v":""},{"c":"F15","v":""},{"c":"G15","v":""},{"c":"H15","v":""},{"c":"I15","v":""},{"c":"J15","v":""},{"c":"K15","v":""}]},{"r":16,"h":40.0,"cells":[{"c":"A16","v":"إجمالي خرسانة القواعد المسلحة فقط (RC FOOTINGS TOTAL)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G16","v":111.252,"f":"=G10+G11","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H16","v":"—","al":"center"},{"c":"I16","v":3.33756,"f":"=I10+I11","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"J16","v":114.58956,"f":"=J10+J11","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"K16","v":"الكمية الإجمالية للقواعد المسلحة"}]},{"r":17,"h":36.0,"cells":[{"c":"A17","v":"إجمالي خرسانة النظافة العادية (BLINDING PC TOTAL)","bg":"#F0F9FF","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G17","v":2.8,"f":"=G12","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H17","v":"—","al":"center"},{"c":"I17","v":0.112,"f":"=I12","bg":"#F0F9FF","al":"center","nf":"#,##0.00"},{"c":"J17","v":2.912,"f":"=J12","bg":"#F0F9FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"K17","v":"فرشات النظافة أسفل الأساسات"}]},{"r":18,"h":36.0,"cells":[{"c":"A18","v":"إجمالي خرسانة الميد والشناجات (TIE BEAMS TOTAL)","bg":"#ECFDF5","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G18","v":19.904,"f":"=G13","bg":"#ECFDF5","b":true,"al":"center","nf":"#,##0.00"},{"c":"H18","v":"—","al":"center"},{"c":"I18","v":0.59712,"f":"=I13","bg":"#ECFDF5","al":"center","nf":"#,##0.00"},{"c":"J18","v":20.50112,"f":"=J13","bg":"#ECFDF5","b":true,"al":"center","nf":"#,##0.00"},{"c":"K18","v":"الشناجات الرابطة للقواعد"}]},{"r":19,"h":28.0,"cells":[{"c":"A19","v":""},{"c":"B19","v":""},{"c":"C19","v":""},{"c":"D19","v":""},{"c":"E19","v":""},{"c":"F19","v":""},{"c":"G19","v":""},{"c":"H19","v":""},{"c":"I19","v":""},{"c":"J19","v":""},{"c":"K19","v":""}]},{"r":20,"h":44.0,"cells":[{"c":"A20","v":"الإجمالي الكلي لخرسانات الأساسات (GRAND TOTAL FOUNDATION CONCRETE)","bg":"#065F46","fg":"#FFFFFF","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G20","v":152.406,"f":"=SUM(G10:G14)","bg":"#065F46","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H20","v":"—","al":"center"},{"c":"I20","v":4.60018,"f":"=SUM(I10:I14)","bg":"#065F46","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"J20","v":157.00618,"f":"=SUM(J10:J14)","bg":"#065F46","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"K20","v":"الحجم المطلوب اعتماده مع محطة الخرسانة"}]},{"r":21,"h":28.0,"cells":[{"c":"A21","v":""},{"c":"B21","v":""},{"c":"C21","v":""},{"c":"D21","v":""},{"c":"E21","v":""},{"c":"F21","v":""},{"c":"G21","v":""},{"c":"H21","v":""},{"c":"I21","v":""},{"c":"J21","v":""},{"c":"K21","v":""}]},{"r":22,"h":38.0,"cells":[{"c":"A22","v":"حساب عدد سيارات الخلاطات الجاهزة وجدولة الصب (READY-MIX TRUCKLOAD DISPATCH)","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":23,"h":36.0,"cells":[{"c":"A23","v":"سعة سيارة الخلاطة الجاهزة","bg":"#F0F9FF","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"D23","v":"10.0 م³ / شاحنة","bg":"#F8FAFC","fg":"#1E293B","al":"center","cs":2},{"skip":true},{"c":"F23","v":"عدد الشاحنات المقدر لخرسانة القواعد المسلحة","bg":"#F0F9FF","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"I23","v":"12 شاحنة خرسانة","f":"=ROUNDUP(J16/10, 0) & \" شاحنة خرسانة\"","bg":"#ECFDF5","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":24,"h":36.0,"cells":[{"c":"A24","v":"معدل ضخ مضخة الخرسانة (Pump)","bg":"#F0F9FF","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"D24","v":"45-60 م³ / ساعة","bg":"#F8FAFC","fg":"#1E293B","al":"center","cs":2},{"skip":true},{"c":"F24","v":"الزمن التقديري لصب القواعد المسلحة بالكامل","bg":"#F0F9FF","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"I24","v":"2.3 ساعة صب متواصل","f":"=ROUND(J16/50, 1) & \" ساعة صب متواصل\"","bg":"#ECFDF5","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]}]},{"name":"حصر_القواعد_المسلحة_والعادية","maxRow":33,"maxCol":11,"colWidths":[12.0,16.0,32.0,14.0,14.0,16.0,14.0,24.0,22.0,16.0,30.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول الحصر الهندسي التفصيلي للقواعد الخرسانية المسلحة والعادية (ITEMIZED FOOTINGS TAKEOFF)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":28.0,"cells":[{"c":"A2","v":""},{"c":"B2","v":""},{"c":"C2","v":""},{"c":"D2","v":""},{"c":"E2","v":""},{"c":"F2","v":""},{"c":"G2","v":""},{"c":"H2","v":""},{"c":"I2","v":""},{"c":"J2","v":""},{"c":"K2","v":""}]},{"r":3,"h":52.0,"cells":[{"c":"A3","v":"م","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B3","v":"رمز نموذج القاعدة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C3","v":"موقع القاعدة والمحاور الإنشائية","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D3","v":"الطول (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E3","v":"العرض (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F3","v":"الارتفاع / السمك (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G3","v":"العدد المكرر","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H3","v":"حجم الخرسانة الإجمالي (م³)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I3","v":"مساحة الشدة الخشبية (م²)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J3","v":"نوع القاعدة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K3","v":"ملاحظات التسليح والصب","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"أولاً: حصر القواعد الخرسانية المسلحة المنفصلة (ISOLATED RC FOOTINGS)","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":36.0,"cells":[{"c":"A5","v":1,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"B5","v":"ق1 (RC-F1)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C5","v":"محاور A-1, A-4, D-1, D-4","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D5","v":1.8,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"E5","v":1.6,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"F5","v":0.6,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G5","v":4,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"H5","v":6.912,"f":"=D5*E5*F5*G5","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"I5","v":16.32,"f":"=2*(D5+E5)*F5*G5","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J5","v":"منفصلة","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K5","v":"قاعدة ركنية خفيفة","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":6,"h":36.0,"cells":[{"c":"A6","v":2,"fg":"#1E293B","al":"center"},{"c":"B6","v":"ق2 (RC-F2)","b":true,"al":"center"},{"c":"C6","v":"محاور B-1, C-1, B-4, C-4","fg":"#1E293B"},{"c":"D6","v":2.2,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"E6","v":1.9,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"F6","v":0.65,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G6","v":4,"in":true,"fg":"#1E293B","al":"center"},{"c":"H6","v":10.868,"f":"=D6*E6*F6*G6","b":true,"al":"center","nf":"#,##0.00"},{"c":"I6","v":21.32,"f":"=2*(D6+E6)*F6*G6","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J6","v":"منفصلة","fg":"#1E293B","al":"center"},{"c":"K6","v":"قواعد طرفية","fg":"#1E293B"}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":3,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"B7","v":"ق3 (RC-F3)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C7","v":"محاور A-2, A-3, D-2, D-3","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D7","v":2.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"E7","v":2.2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"F7","v":0.7,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G7","v":4,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"H7","v":15.4,"f":"=D7*E7*F7*G7","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"I7","v":26.32,"f":"=2*(D7+E7)*F7*G7","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J7","v":"منفصلة","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K7","v":"قواعد وسطية طرفية","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":8,"h":36.0,"cells":[{"c":"A8","v":4,"fg":"#1E293B","al":"center"},{"c":"B8","v":"ق4 (RC-F4)","b":true,"al":"center"},{"c":"C8","v":"محاور B-2, B-3, C-2, C-3","fg":"#1E293B"},{"c":"D8","v":2.8,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"E8","v":2.5,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"F8","v":0.75,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G8","v":4,"in":true,"fg":"#1E293B","al":"center"},{"c":"H8","v":21,"f":"=D8*E8*F8*G8","b":true,"al":"center","nf":"#,##0.00"},{"c":"I8","v":31.8,"f":"=2*(D8+E8)*F8*G8","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J8","v":"منفصلة","fg":"#1E293B","al":"center"},{"c":"K8","v":"قواعد قلب المبنى - أحمال عالية","fg":"#1E293B"}]},{"r":9,"h":36.0,"cells":[{"c":"A9","v":5,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"B9","v":"ق5 (RC-F5)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C9","v":"محور E-2, E-3 (ملحق المصعد)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D9","v":3.1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"E9","v":2.7,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"F9","v":0.8,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G9","v":2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"H9","v":13.392,"f":"=D9*E9*F9*G9","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"I9","v":18.56,"f":"=2*(D9+E9)*F9*G9","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J9","v":"منفصلة","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K9","v":"قواعد بئر المصعد والسلالم","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":10,"h":28.0,"cells":[{"c":"A10","v":""},{"c":"B10","v":""},{"c":"C10","v":""},{"c":"D10","v":""},{"c":"E10","v":""},{"c":"F10","v":""},{"c":"G10","v":""},{"c":"H10","v":""},{"c":"I10","v":""},{"c":"J10","v":""},{"c":"K10","v":""}]},{"r":11,"h":28.0,"cells":[{"c":"A11","v":""},{"c":"B11","v":""},{"c":"C11","v":""},{"c":"D11","v":""},{"c":"E11","v":""},{"c":"F11","v":""},{"c":"G11","v":""},{"c":"H11","v":""},{"c":"I11","v":""},{"c":"J11","v":""},{"c":"K11","v":""}]},{"r":12,"h":28.0,"cells":[{"c":"A12","v":""},{"c":"B12","v":""},{"c":"C12","v":""},{"c":"D12","v":""},{"c":"E12","v":""},{"c":"F12","v":""},{"c":"G12","v":""},{"c":"H12","v":""},{"c":"I12","v":""},{"c":"J12","v":""},{"c":"K12","v":""}]},{"r":13,"h":28.0,"cells":[{"c":"A13","v":""},{"c":"B13","v":""},{"c":"C13","v":""},{"c":"D13","v":""},{"c":"E13","v":""},{"c":"F13","v":""},{"c":"G13","v":""},{"c":"H13","v":""},{"c":"I13","v":""},{"c":"J13","v":""},{"c":"K13","v":""}]},{"r":14,"h":28.0,"cells":[{"c":"A14","v":""},{"c":"B14","v":""},{"c":"C14","v":""},{"c":"D14","v":""},{"c":"E14","v":""},{"c":"F14","v":""},{"c":"G14","v":""},{"c":"H14","v":""},{"c":"I14","v":""},{"c":"J14","v":""},{"c":"K14","v":""}]},{"r":15,"h":40.0,"cells":[{"c":"A15","v":"مجموع خرسانة القواعد المنفصلة (ISOLATED FOOTINGS SUBTOTAL)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H15","v":67.572,"f":"=SUM(H5:H9)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"I15","v":114.32,"f":"=SUM(I5:I9)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"J15","v":"إجمالي 18 قاعدة منفصلة","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true}]},{"r":16,"h":28.0,"cells":[{"c":"A16","v":""},{"c":"B16","v":""},{"c":"C16","v":""},{"c":"D16","v":""},{"c":"E16","v":""},{"c":"F16","v":""},{"c":"G16","v":""},{"c":"H16","v":""},{"c":"I16","v":""},{"c":"J16","v":""},{"c":"K16","v":""}]},{"r":17,"h":38.0,"cells":[{"c":"A17","v":"ثانياً: حصر القواعد الخرسانية المسلحة المشتركة (COMBINED RC FOOTINGS)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":18,"h":36.0,"cells":[{"c":"A18","v":1,"fg":"#1E293B","al":"center"},{"c":"B18","v":"قم1 (CF-1)","b":true,"al":"center"},{"c":"C18","v":"محور الجار A-B (عمود جار + عمود داخلي)","fg":"#1E293B"},{"c":"D18","v":5.2,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"E18","v":2.4,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"F18","v":0.85,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G18","v":2,"in":true,"fg":"#1E293B","al":"center"},{"c":"H18","v":21.216,"f":"=D18*E18*F18*G18","b":true,"al":"center","nf":"#,##0.00"},{"c":"I18","v":25.84,"f":"=2*(D18+E18)*F18*G18","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J18","v":"مشتركة جار","fg":"#1E293B","al":"center"},{"c":"K18","v":"قاعدة شريطية مشتركة مع شداد","fg":"#1E293B"}]},{"r":19,"h":36.0,"cells":[{"c":"A19","v":2,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"B19","v":"قم2 (CF-2)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C19","v":"محور المصاعد C-D (عمودي مصعد مزدوج)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D19","v":4.8,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"E19","v":2.6,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"F19","v":0.9,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G19","v":2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"H19","v":22.464,"f":"=D19*E19*F19*G19","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"I19","v":26.64,"f":"=2*(D19+E19)*F19*G19","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J19","v":"مشتركة داخلية","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K19","v":"أحمال مركزة عالية وبئر مصعد","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":20,"h":28.0,"cells":[{"c":"A20","v":""},{"c":"B20","v":""},{"c":"C20","v":""},{"c":"D20","v":""},{"c":"E20","v":""},{"c":"F20","v":""},{"c":"G20","v":""},{"c":"H20","v":""},{"c":"I20","v":""},{"c":"J20","v":""},{"c":"K20","v":""}]},{"r":21,"h":28.0,"cells":[{"c":"A21","v":""},{"c":"B21","v":""},{"c":"C21","v":""},{"c":"D21","v":""},{"c":"E21","v":""},{"c":"F21","v":""},{"c":"G21","v":""},{"c":"H21","v":""},{"c":"I21","v":""},{"c":"J21","v":""},{"c":"K21","v":""}]},{"r":22,"h":28.0,"cells":[{"c":"A22","v":""},{"c":"B22","v":""},{"c":"C22","v":""},{"c":"D22","v":""},{"c":"E22","v":""},{"c":"F22","v":""},{"c":"G22","v":""},{"c":"H22","v":""},{"c":"I22","v":""},{"c":"J22","v":""},{"c":"K22","v":""}]},{"r":23,"h":40.0,"cells":[{"c":"A23","v":"مجموع خرسانة القواعد المشتركة (COMBINED FOOTINGS SUBTOTAL)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H23","v":43.68,"f":"=SUM(H18:H19)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"I23","v":52.48,"f":"=SUM(I18:I19)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"J23","v":"إجمالي 4 قواعد مشتركة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true}]},{"r":24,"h":28.0,"cells":[{"c":"A24","v":""},{"c":"B24","v":""},{"c":"C24","v":""},{"c":"D24","v":""},{"c":"E24","v":""},{"c":"F24","v":""},{"c":"G24","v":""},{"c":"H24","v":""},{"c":"I24","v":""},{"c":"J24","v":""},{"c":"K24","v":""}]},{"r":25,"h":38.0,"cells":[{"c":"A25","v":"ثالثاً: حصر خرسانة النظافة العادية أسفل القواعد (PLAIN CONCRETE BLINDING PC)","bg":"#065F46","fg":"#FFFFFF","b":true,"cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":26,"h":36.0,"cells":[{"c":"A26","v":1,"fg":"#1E293B","al":"center"},{"c":"B26","v":"ع1 (PC-F1)","b":true,"al":"center"},{"c":"C26","v":"أسفل ق1 مع رفرفة 10 سم من كل جانب","fg":"#1E293B"},{"c":"D26","v":2,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"E26","v":1.8,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"F26","v":0.1,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G26","v":4,"in":true,"fg":"#1E293B","al":"center"},{"c":"H26","v":1.44,"f":"=D26*E26*F26*G26","b":true,"al":"center","nf":"#,##0.00"},{"c":"I26","v":3.04,"f":"=2*(D26+E26)*F26*G26","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J26","v":"نظافة","fg":"#1E293B","al":"center"},{"c":"K26","v":"سمك 10 سم رفرفة 10 سم","fg":"#1E293B"}]},{"r":27,"h":36.0,"cells":[{"c":"A27","v":2,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"B27","v":"ع2 (PC-F2)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C27","v":"أسفل ق2 مع رفرفة 10 سم من كل جانب","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D27","v":2.4,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"E27","v":2.1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"F27","v":0.1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G27","v":4,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"H27","v":2.016,"f":"=D27*E27*F27*G27","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"I27","v":3.6,"f":"=2*(D27+E27)*F27*G27","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J27","v":"نظافة","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K27","v":"سمك 10 سم رفرفة 10 سم","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":28,"h":36.0,"cells":[{"c":"A28","v":3,"fg":"#1E293B","al":"center"},{"c":"B28","v":"ع3 (PC-F3)","b":true,"al":"center"},{"c":"C28","v":"أسفل ق3 مع رفرفة 10 سم من كل جانب","fg":"#1E293B"},{"c":"D28","v":2.7,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"E28","v":2.4,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"F28","v":0.1,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G28","v":4,"in":true,"fg":"#1E293B","al":"center"},{"c":"H28","v":2.592,"f":"=D28*E28*F28*G28","b":true,"al":"center","nf":"#,##0.00"},{"c":"I28","v":4.08,"f":"=2*(D28+E28)*F28*G28","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J28","v":"نظافة","fg":"#1E293B","al":"center"},{"c":"K28","v":"سمك 10 سم رفرفة 10 سم","fg":"#1E293B"}]},{"r":29,"h":36.0,"cells":[{"c":"A29","v":4,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"B29","v":"ع4 (PC-F4)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C29","v":"أسفل ق4 مع رفرفة 10 سم من كل جانب","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D29","v":3,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"E29","v":2.7,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"F29","v":0.1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G29","v":4,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"H29","v":3.24,"f":"=D29*E29*F29*G29","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"I29","v":4.56,"f":"=2*(D29+E29)*F29*G29","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J29","v":"نظافة","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K29","v":"سمك 10 سم رفرفة 10 سم","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":30,"h":36.0,"cells":[{"c":"A30","v":5,"fg":"#1E293B","al":"center"},{"c":"B30","v":"ع5 (PC-F5)","b":true,"al":"center"},{"c":"C30","v":"أسفل ق5 مع رفرفة 10 سم من كل جانب","fg":"#1E293B"},{"c":"D30","v":3.3,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"E30","v":2.9,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"F30","v":0.1,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G30","v":2,"in":true,"fg":"#1E293B","al":"center"},{"c":"H30","v":1.914,"f":"=D30*E30*F30*G30","b":true,"al":"center","nf":"#,##0.00"},{"c":"I30","v":2.48,"f":"=2*(D30+E30)*F30*G30","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J30","v":"نظافة","fg":"#1E293B","al":"center"},{"c":"K30","v":"سمك 10 سم رفرفة 10 سم","fg":"#1E293B"}]},{"r":31,"h":36.0,"cells":[{"c":"A31","v":6,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"B31","v":"عم1 (PC-CF1)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C31","v":"أسفل قم1 المشتركة مع رفرفة 10 سم","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D31","v":5.4,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"E31","v":2.6,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"F31","v":0.1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G31","v":2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"H31","v":2.808,"f":"=D31*E31*F31*G31","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"I31","v":3.2,"f":"=2*(D31+E31)*F31*G31","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J31","v":"نظافة مشتركة","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K31","v":"سمك 10 سم رفرفة 10 سم","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":32,"h":36.0,"cells":[{"c":"A32","v":7,"fg":"#1E293B","al":"center"},{"c":"B32","v":"عم2 (PC-CF2)","b":true,"al":"center"},{"c":"C32","v":"أسفل قم2 المشتركة مع رفرفة 10 سم","fg":"#1E293B"},{"c":"D32","v":5,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"E32","v":2.8,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"F32","v":0.1,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G32","v":2,"in":true,"fg":"#1E293B","al":"center"},{"c":"H32","v":2.8,"f":"=D32*E32*F32*G32","b":true,"al":"center","nf":"#,##0.00"},{"c":"I32","v":3.12,"f":"=2*(D32+E32)*F32*G32","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J32","v":"نظافة مشتركة","fg":"#1E293B","al":"center"},{"c":"K32","v":"سمك 10 سم رفرفة 10 سم","fg":"#1E293B"}]},{"r":33,"h":40.0,"cells":[{"c":"A33","v":"مجموع خرسانة النظافة العادية (PC BLINDING SUBTOTAL)","bg":"#065F46","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H33","v":16.81,"f":"=SUM(H26:H32)","bg":"#065F46","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"I33","v":24.08,"f":"=SUM(I26:I32)","bg":"#065F46","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"J33","v":"إجمالي مسطحات النظافة","bg":"#065F46","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true}]}]},{"name":"حصر_الميد_والسملات_الأرضية","maxRow":18,"maxCol":11,"colWidths":[12.0,16.0,32.0,16.0,14.0,14.0,12.0,24.0,24.0,16.0,30.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول حصر خرسانة الميد والشناجات والسملات الأرضية (TIE & STRAP BEAMS QTO)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":28.0,"cells":[{"c":"A2","v":""},{"c":"B2","v":""},{"c":"C2","v":""},{"c":"D2","v":""},{"c":"E2","v":""},{"c":"F2","v":""},{"c":"G2","v":""},{"c":"H2","v":""},{"c":"I2","v":""},{"c":"J2","v":""},{"c":"K2","v":""}]},{"r":3,"h":52.0,"cells":[{"c":"A3","v":"م","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B3","v":"رمز نموذج الميدة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C3","v":"المحاور الرابطة بين القواعد","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D3","v":"الطول الصافي الحر (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E3","v":"عرض الميدة (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F3","v":"ارتفاع الميدة (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G3","v":"العدد المكرر","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H3","v":"حجم الخرسانة الصافي (م³)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I3","v":"مساحة الشدة الخشبية للجانبين (م²)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J3","v":"منسوب التأسيس","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K3","v":"ملاحظات التنفيذ والربط","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":1,"fg":"#1E293B","al":"center"},{"c":"B4","v":"م1 (TB-1)","b":true,"al":"center"},{"c":"C4","v":"ميد محيطية رابطة للقواعد الخارجية محاور A, D","fg":"#1E293B"},{"c":"D4","v":4.2,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"E4","v":0.3,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"F4","v":0.6,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G4","v":8,"in":true,"fg":"#1E293B","al":"center"},{"c":"H4","v":6.048,"f":"=D4*E4*F4*G4","b":true,"al":"center","nf":"#,##0.00"},{"c":"I4","v":40.32,"f":"=2*D4*F4*G4","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J4","v":"-1.50 م","fg":"#1E293B","al":"center"},{"c":"K4","v":"ربط القواعد الطرفية وحمل حوائط البلوك","fg":"#1E293B"}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":2,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"B5","v":"م2 (TB-2)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C5","v":"ميد داخلية رئيسية رابطة للقواعد محاور B, C","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D5","v":3.8,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"E5","v":0.4,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"F5","v":0.7,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G5","v":6,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"H5","v":6.384,"f":"=D5*E5*F5*G5","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"I5","v":31.92,"f":"=2*D5*F5*G5","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J5","v":"-1.50 م","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K5","v":"ربط القواعد الداخلية وأحمال مباني سمك 25 سم","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":3,"fg":"#1E293B","al":"center"},{"c":"B6","v":"م3 (TB-3)","b":true,"al":"center"},{"c":"C6","v":"سملات ربط القواعد المشتركة مع قواعد الجار","fg":"#1E293B"},{"c":"D6","v":3.5,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"E6","v":0.5,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"F6","v":0.8,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G6","v":4,"in":true,"fg":"#1E293B","al":"center"},{"c":"H6","v":5.6,"f":"=D6*E6*F6*G6","b":true,"al":"center","nf":"#,##0.00"},{"c":"I6","v":22.4,"f":"=2*D6*F6*G6","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J6","v":"-1.60 م","fg":"#1E293B","al":"center"},{"c":"K6","v":"سملات جسئة لمقاومة عزم الانقلاب بقواعد الجار","fg":"#1E293B"}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":4,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"B7","v":"م4 (TB-4)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C7","v":"ميد رابطة حول بئر المصعد والسلالم","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D7","v":2.6,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"E7","v":0.3,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"F7","v":0.6,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G7","v":4,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"H7","v":1.872,"f":"=D7*E7*F7*G7","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"I7","v":12.48,"f":"=2*D7*F7*G7","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J7","v":"-1.50 م","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K7","v":"تأطير بئر المصعد وغرفة المضخات","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":8,"h":28.0,"cells":[{"c":"A8","v":""},{"c":"B8","v":""},{"c":"C8","v":""},{"c":"D8","v":""},{"c":"E8","v":""},{"c":"F8","v":""},{"c":"G8","v":""},{"c":"H8","v":""},{"c":"I8","v":""},{"c":"J8","v":""},{"c":"K8","v":""}]},{"r":9,"h":28.0,"cells":[{"c":"A9","v":""},{"c":"B9","v":""},{"c":"C9","v":""},{"c":"D9","v":""},{"c":"E9","v":""},{"c":"F9","v":""},{"c":"G9","v":""},{"c":"H9","v":""},{"c":"I9","v":""},{"c":"J9","v":""},{"c":"K9","v":""}]},{"r":10,"h":28.0,"cells":[{"c":"A10","v":""},{"c":"B10","v":""},{"c":"C10","v":""},{"c":"D10","v":""},{"c":"E10","v":""},{"c":"F10","v":""},{"c":"G10","v":""},{"c":"H10","v":""},{"c":"I10","v":""},{"c":"J10","v":""},{"c":"K10","v":""}]},{"r":11,"h":28.0,"cells":[{"c":"A11","v":""},{"c":"B11","v":""},{"c":"C11","v":""},{"c":"D11","v":""},{"c":"E11","v":""},{"c":"F11","v":""},{"c":"G11","v":""},{"c":"H11","v":""},{"c":"I11","v":""},{"c":"J11","v":""},{"c":"K11","v":""}]},{"r":12,"h":28.0,"cells":[{"c":"A12","v":""},{"c":"B12","v":""},{"c":"C12","v":""},{"c":"D12","v":""},{"c":"E12","v":""},{"c":"F12","v":""},{"c":"G12","v":""},{"c":"H12","v":""},{"c":"I12","v":""},{"c":"J12","v":""},{"c":"K12","v":""}]},{"r":13,"h":28.0,"cells":[{"c":"A13","v":""},{"c":"B13","v":""},{"c":"C13","v":""},{"c":"D13","v":""},{"c":"E13","v":""},{"c":"F13","v":""},{"c":"G13","v":""},{"c":"H13","v":""},{"c":"I13","v":""},{"c":"J13","v":""},{"c":"K13","v":""}]},{"r":14,"h":28.0,"cells":[{"c":"A14","v":""},{"c":"B14","v":""},{"c":"C14","v":""},{"c":"D14","v":""},{"c":"E14","v":""},{"c":"F14","v":""},{"c":"G14","v":""},{"c":"H14","v":""},{"c":"I14","v":""},{"c":"J14","v":""},{"c":"K14","v":""}]},{"r":15,"h":28.0,"cells":[{"c":"A15","v":""},{"c":"B15","v":""},{"c":"C15","v":""},{"c":"D15","v":""},{"c":"E15","v":""},{"c":"F15","v":""},{"c":"G15","v":""},{"c":"H15","v":""},{"c":"I15","v":""},{"c":"J15","v":""},{"c":"K15","v":""}]},{"r":16,"h":28.0,"cells":[{"c":"A16","v":""},{"c":"B16","v":""},{"c":"C16","v":""},{"c":"D16","v":""},{"c":"E16","v":""},{"c":"F16","v":""},{"c":"G16","v":""},{"c":"H16","v":""},{"c":"I16","v":""},{"c":"J16","v":""},{"c":"K16","v":""}]},{"r":17,"h":28.0,"cells":[{"c":"A17","v":""},{"c":"B17","v":""},{"c":"C17","v":""},{"c":"D17","v":""},{"c":"E17","v":""},{"c":"F17","v":""},{"c":"G17","v":""},{"c":"H17","v":""},{"c":"I17","v":""},{"c":"J17","v":""},{"c":"K17","v":""}]},{"r":18,"h":42.0,"cells":[{"c":"A18","v":"إجمالي خرسانة الميد والشناجات الأرضية (TIE BEAMS TOTAL)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H18","v":19.904,"f":"=SUM(H4:H7)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"I18","v":107.12,"f":"=SUM(I4:I7)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"J18","v":"إجمالي 22 ميدة رابطة","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true}]}]}]}