{"slug":"footings-strap-bbs","sheets":[{"name":"لوحة المؤشرات وملخص التوريد","maxRow":28,"maxCol":10,"colWidths":[6.0,16.0,18.0,20.0,20.0,20.0,20.0,16.0,22.0,24.0],"rows":[{"r":1,"h":38.0,"cells":[{"c":"A1","v":"شيت تفريد وحصر حديد تسليح القواعد والشدادات (Bar Bending Schedule - BBS)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"المكتب الفني وإدارة التنفيذ | حصر تفصيلي للأطوال والأوزان ومذكرات التوريد بالأقطار والهالك","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"اسم المشروع:","b":true},{"c":"B4","v":"مشروع إنشاء مجمع الأبراج السكنية والتجارية","al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"F4","v":"تاريخ الحصر:","b":true},{"c":"G4","v":"2026-10-01","al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"استشاري المشروع:","b":true},{"c":"B5","v":"مكتب الاستشارات الهندسية المتكاملة","al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"F5","v":"رقم الإصدار:","b":true},{"c":"G5","v":"Rev 02 - معتمد للتنفيذ","al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":6,"h":72.0,"cells":[{"c":"A6","v":"المقاول العام:","b":true},{"c":"B6","v":"شركة المقاولات العامة والإنشاءات التخصصية","al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"F6","v":"الكود المعتمد:","b":true},{"c":"G6","v":"الكود المصري ECP 203 / الكود السعودي SBC 304","al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""},{"c":"I7","v":""},{"c":"J7","v":""}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"إجمالي حديد القواعد والشدادات","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C8","v":"الوزن الإجمالي شامل الهالك","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"E8","v":"إجمالي عدد الأسياخ (12م)","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H8","v":"التكلفة التقديرية للحديد","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":9,"h":28.0,"cells":[{"c":"A9","v":12.094599,"f":"=G23","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"0.000","cs":2},{"skip":true},{"c":"C9","v":12.595236,"f":"=I23","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"0.000","cs":2},{"skip":true},{"c":"E9","v":728,"f":"=J23","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0","cs":3},{"skip":true},{"skip":true},{"c":"H9","v":440833.26,"f":"=I23*35000","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0","cs":3},{"skip":true},{"skip":true}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":"طن متري صافي","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C10","v":"طن شامل هالك 4.5%","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"E10","v":"سيخ بطول 12 متر للتوريد","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H10","v":"تقديري (فئة 35,000)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":11,"h":28.0,"cells":[{"c":"A11","v":""},{"c":"B11","v":""},{"c":"C11","v":""},{"c":"D11","v":""},{"c":"E11","v":""},{"c":"F11","v":""},{"c":"G11","v":""},{"c":"H11","v":""},{"c":"I11","v":""},{"c":"J11","v":""}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":"📌 ملخص التوريد والكميات حسب أقطار حديد التسليح (Rebar Schedule by Diameter)","fg":"#1E293B","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":"م","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B13","v":"قطر السيخ (Φ ملم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C13","v":"وزن المتر الطولي (كجم/م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D13","v":"إجمالي الطول بالقواعد (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E13","v":"إجمالي الطول بالشدادات (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F13","v":"إجمالي الطول الكلي (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G13","v":"إجمالي الوزن الصافي (طن)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H13","v":"نسبة الهالك المقدرة (%)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I13","v":"إجمالي وزن الطلبية شامل الهالك (طن)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J13","v":"عدد الأسياخ القياسية (12 م) المطلوبة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":1,"al":"center"},{"c":"B14","v":"Φ 8","al":"center"},{"c":"C14","v":0.395,"f":"=ROUND((8^2)/162, 3)","al":"center","nf":"0.000"},{"c":"D14","v":0,"f":"=SUMIF('تفريد حديد القواعد المسلحة'!$I$6:$I$30, 8, 'تفريد حديد القواعد المسلحة'!$S$6:$S$30)","al":"center","nf":"#,##0.00"},{"c":"E14","v":1129.44,"f":"=SUMIF('تفريد حديد الشدادات والميد'!$H$6:$H$30, 8, 'تفريد حديد الشدادات والميد'!$M$6:$M$30)","al":"center","nf":"#,##0.00"},{"c":"F14","v":1129.44,"f":"=D14+E14","b":true,"al":"center","nf":"#,##0.00"},{"c":"G14","v":0.446129,"f":"=(F14*C14)/1000","b":true,"al":"center","nf":"0.000"},{"c":"H14","v":0.05,"in":true,"al":"center","nf":"0.0%"},{"c":"I14","v":0.468435,"f":"=G14*(1+H14)","fg":"#065F46","b":true,"al":"center","nf":"0.000"},{"c":"J14","v":99,"f":"=ROUNDUP((F14*(1+H14))/12, 0)","b":true,"al":"center","nf":"#,##0"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":2,"bg":"#F8FAFC","al":"center"},{"c":"B15","v":"Φ 10","bg":"#F8FAFC","al":"center"},{"c":"C15","v":0.617,"f":"=ROUND((10^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"D15","v":0,"f":"=SUMIF('تفريد حديد القواعد المسلحة'!$I$6:$I$30, 10, 'تفريد حديد القواعد المسلحة'!$S$6:$S$30)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E15","v":1382.5,"f":"=SUMIF('تفريد حديد الشدادات والميد'!$H$6:$H$30, 10, 'تفريد حديد الشدادات والميد'!$M$6:$M$30)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"F15","v":1382.5,"f":"=D15+E15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G15","v":0.853002,"f":"=(F15*C15)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"H15","v":0.05,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0%"},{"c":"I15","v":0.895652,"f":"=G15*(1+H15)","bg":"#F8FAFC","fg":"#065F46","b":true,"al":"center","nf":"0.000"},{"c":"J15","v":121,"f":"=ROUNDUP((F15*(1+H15))/12, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":3,"al":"center"},{"c":"B16","v":"Φ 12","al":"center"},{"c":"C16","v":0.889,"f":"=ROUND((12^2)/162, 3)","al":"center","nf":"0.000"},{"c":"D16","v":129.6,"f":"=SUMIF('تفريد حديد القواعد المسلحة'!$I$6:$I$30, 12, 'تفريد حديد القواعد المسلحة'!$S$6:$S$30)","al":"center","nf":"#,##0.00"},{"c":"E16","v":304.8,"f":"=SUMIF('تفريد حديد الشدادات والميد'!$H$6:$H$30, 12, 'تفريد حديد الشدادات والميد'!$M$6:$M$30)","al":"center","nf":"#,##0.00"},{"c":"F16","v":434.4,"f":"=D16+E16","b":true,"al":"center","nf":"#,##0.00"},{"c":"G16","v":0.386182,"f":"=(F16*C16)/1000","b":true,"al":"center","nf":"0.000"},{"c":"H16","v":0.05,"in":true,"al":"center","nf":"0.0%"},{"c":"I16","v":0.405491,"f":"=G16*(1+H16)","fg":"#065F46","b":true,"al":"center","nf":"0.000"},{"c":"J16","v":39,"f":"=ROUNDUP((F16*(1+H16))/12, 0)","b":true,"al":"center","nf":"#,##0"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":4,"bg":"#F8FAFC","al":"center"},{"c":"B17","v":"Φ 14","bg":"#F8FAFC","al":"center"},{"c":"C17","v":1.21,"f":"=ROUND((14^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"D17","v":0,"f":"=SUMIF('تفريد حديد القواعد المسلحة'!$I$6:$I$30, 14, 'تفريد حديد القواعد المسلحة'!$S$6:$S$30)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E17","v":0,"f":"=SUMIF('تفريد حديد الشدادات والميد'!$H$6:$H$30, 14, 'تفريد حديد الشدادات والميد'!$M$6:$M$30)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"F17","v":0,"f":"=D17+E17","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G17","v":0,"f":"=(F17*C17)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"H17","v":0.04,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0%"},{"c":"I17","v":0,"f":"=G17*(1+H17)","bg":"#F8FAFC","fg":"#065F46","b":true,"al":"center","nf":"0.000"},{"c":"J17","v":0,"f":"=ROUNDUP((F17*(1+H17))/12, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":5,"al":"center"},{"c":"B18","v":"Φ 16","al":"center"},{"c":"C18","v":1.58,"f":"=ROUND((16^2)/162, 3)","al":"center","nf":"0.000"},{"c":"D18","v":2155.2,"f":"=SUMIF('تفريد حديد القواعد المسلحة'!$I$6:$I$30, 16, 'تفريد حديد القواعد المسلحة'!$S$6:$S$30)","al":"center","nf":"#,##0.00"},{"c":"E18","v":1124.8,"f":"=SUMIF('تفريد حديد الشدادات والميد'!$H$6:$H$30, 16, 'تفريد حديد الشدادات والميد'!$M$6:$M$30)","al":"center","nf":"#,##0.00"},{"c":"F18","v":3280,"f":"=D18+E18","b":true,"al":"center","nf":"#,##0.00"},{"c":"G18","v":5.1824,"f":"=(F18*C18)/1000","b":true,"al":"center","nf":"0.000"},{"c":"H18","v":0.04,"in":true,"al":"center","nf":"0.0%"},{"c":"I18","v":5.389696,"f":"=G18*(1+H18)","fg":"#065F46","b":true,"al":"center","nf":"0.000"},{"c":"J18","v":285,"f":"=ROUNDUP((F18*(1+H18))/12, 0)","b":true,"al":"center","nf":"#,##0"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":6,"bg":"#F8FAFC","al":"center"},{"c":"B19","v":"Φ 18","bg":"#F8FAFC","al":"center"},{"c":"C19","v":2,"f":"=ROUND((18^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"D19","v":808.42,"f":"=SUMIF('تفريد حديد القواعد المسلحة'!$I$6:$I$30, 18, 'تفريد حديد القواعد المسلحة'!$S$6:$S$30)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E19","v":69.6,"f":"=SUMIF('تفريد حديد الشدادات والميد'!$H$6:$H$30, 18, 'تفريد حديد الشدادات والميد'!$M$6:$M$30)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"F19","v":878.02,"f":"=D19+E19","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G19","v":1.75604,"f":"=(F19*C19)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"H19","v":0.04,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0%"},{"c":"I19","v":1.826282,"f":"=G19*(1+H19)","bg":"#F8FAFC","fg":"#065F46","b":true,"al":"center","nf":"0.000"},{"c":"J19","v":77,"f":"=ROUNDUP((F19*(1+H19))/12, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":7,"al":"center"},{"c":"B20","v":"Φ 20","al":"center"},{"c":"C20","v":2.469,"f":"=ROUND((20^2)/162, 3)","al":"center","nf":"0.000"},{"c":"D20","v":681.6,"f":"=SUMIF('تفريد حديد القواعد المسلحة'!$I$6:$I$30, 20, 'تفريد حديد القواعد المسلحة'!$S$6:$S$30)","al":"center","nf":"#,##0.00"},{"c":"E20","v":0,"f":"=SUMIF('تفريد حديد الشدادات والميد'!$H$6:$H$30, 20, 'تفريد حديد الشدادات والميد'!$M$6:$M$30)","al":"center","nf":"#,##0.00"},{"c":"F20","v":681.6,"f":"=D20+E20","b":true,"al":"center","nf":"#,##0.00"},{"c":"G20","v":1.68287,"f":"=(F20*C20)/1000","b":true,"al":"center","nf":"0.000"},{"c":"H20","v":0.04,"in":true,"al":"center","nf":"0.0%"},{"c":"I20","v":1.750185,"f":"=G20*(1+H20)","fg":"#065F46","b":true,"al":"center","nf":"0.000"},{"c":"J20","v":60,"f":"=ROUNDUP((F20*(1+H20))/12, 0)","b":true,"al":"center","nf":"#,##0"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":8,"bg":"#F8FAFC","al":"center"},{"c":"B21","v":"Φ 22","bg":"#F8FAFC","al":"center"},{"c":"C21","v":2.988,"f":"=ROUND((22^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"D21","v":0,"f":"=SUMIF('تفريد حديد القواعد المسلحة'!$I$6:$I$30, 22, 'تفريد حديد القواعد المسلحة'!$S$6:$S$30)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E21","v":304,"f":"=SUMIF('تفريد حديد الشدادات والميد'!$H$6:$H$30, 22, 'تفريد حديد الشدادات والميد'!$M$6:$M$30)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"F21","v":304,"f":"=D21+E21","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G21","v":0.908352,"f":"=(F21*C21)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"H21","v":0.04,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0%"},{"c":"I21","v":0.944686,"f":"=G21*(1+H21)","bg":"#F8FAFC","fg":"#065F46","b":true,"al":"center","nf":"0.000"},{"c":"J21","v":27,"f":"=ROUNDUP((F21*(1+H21))/12, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":9,"al":"center"},{"c":"B22","v":"Φ 25","al":"center"},{"c":"C22","v":3.858,"f":"=ROUND((25^2)/162, 3)","al":"center","nf":"0.000"},{"c":"D22","v":0,"f":"=SUMIF('تفريد حديد القواعد المسلحة'!$I$6:$I$30, 25, 'تفريد حديد القواعد المسلحة'!$S$6:$S$30)","al":"center","nf":"#,##0.00"},{"c":"E22","v":228,"f":"=SUMIF('تفريد حديد الشدادات والميد'!$H$6:$H$30, 25, 'تفريد حديد الشدادات والميد'!$M$6:$M$30)","al":"center","nf":"#,##0.00"},{"c":"F22","v":228,"f":"=D22+E22","b":true,"al":"center","nf":"#,##0.00"},{"c":"G22","v":0.879624,"f":"=(F22*C22)/1000","b":true,"al":"center","nf":"0.000"},{"c":"H22","v":0.04,"in":true,"al":"center","nf":"0.0%"},{"c":"I22","v":0.914809,"f":"=G22*(1+H22)","fg":"#065F46","b":true,"al":"center","nf":"0.000"},{"c":"J22","v":20,"f":"=ROUNDUP((F22*(1+H22))/12, 0)","b":true,"al":"center","nf":"#,##0"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":"الإجمالي الكلي","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D23","v":3774.82,"f":"=SUM(D14:D22)","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0.00"},{"c":"E23","v":4543.14,"f":"=SUM(E14:E22)","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0.00"},{"c":"F23","v":8317.96,"f":"=SUM(F14:F22)","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0.00"},{"c":"G23","v":12.094599,"f":"=SUM(G14:G22)","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"0.000"},{"c":"H23","v":"-","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center"},{"c":"I23","v":12.595236,"f":"=SUM(I14:I22)","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"0.000"},{"c":"J23","v":728,"f":"=SUM(J14:J22)","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"}]},{"r":24,"h":28.0,"cells":[{"c":"A24","v":""},{"c":"B24","v":""},{"c":"C24","v":""},{"c":"D24","v":""},{"c":"E24","v":""},{"c":"F24","v":""},{"c":"G24","v":""},{"c":"H24","v":""},{"c":"I24","v":""},{"c":"J24","v":""}]},{"r":25,"h":28.0,"cells":[{"c":"A25","v":""},{"c":"B25","v":""},{"c":"C25","v":""},{"c":"D25","v":""},{"c":"E25","v":""},{"c":"F25","v":""},{"c":"G25","v":""},{"c":"H25","v":""},{"c":"I25","v":""},{"c":"J25","v":""}]},{"r":26,"h":128.0,"cells":[{"c":"A26","v":"مهندس المكتب الفني (إعداد وحصر):","b":true,"al":"center"},{"c":"B26","v":""},{"c":"C26","v":""},{"c":"D26","v":"مدير المشروع (مراجعة وتدقيق):","b":true,"al":"center"},{"c":"E26","v":""},{"c":"F26","v":""},{"c":"G26","v":""},{"c":"H26","v":"استشاري المشروع (اعتماد التنفيذ):","b":true,"al":"center"},{"c":"I26","v":""},{"c":"J26","v":""}]},{"r":27,"h":28.0,"cells":[{"c":"A27","v":""},{"c":"B27","v":""},{"c":"C27","v":""},{"c":"D27","v":""},{"c":"E27","v":""},{"c":"F27","v":""},{"c":"G27","v":""},{"c":"H27","v":""},{"c":"I27","v":""},{"c":"J27","v":""}]},{"r":28,"h":248.0,"cells":[{"c":"A28","v":"الاسم والتوقيع: .......................................","al":"center"},{"c":"B28","v":""},{"c":"C28","v":""},{"c":"D28","v":"الاسم والتوقيع: .......................................","al":"center"},{"c":"E28","v":""},{"c":"F28","v":""},{"c":"G28","v":""},{"c":"H28","v":"الختم والاعتماد: .......................................","al":"center"},{"c":"I28","v":""},{"c":"J28","v":""}]}]},{"name":"تفريد حديد القواعد المسلحة","maxRow":21,"maxCol":23,"colWidths":[5.0,12.0,10.0,9.0,9.0,9.0,10.0,15.0,10.0,9.0,12.0,12.0,13.0,10.0,12.0,10.0,11.0,13.0,15.0,13.0,15.0,14.0,20.0],"rows":[{"r":1,"h":36.0,"cells":[{"c":"A1","v":"جدول تفريد وتفصيل حديد تسليح القواعد المسلحة (Footings Bar Bending Schedule - BBS)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":23},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"حساب قطعيات الأسياخ (Cutting Length) وخصم الثنيات (Bend Deductions) والأوزان وفقاً للغطاء الخرساني والأبعاد","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center","cs":23},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""},{"c":"N3","v":""},{"c":"O3","v":""},{"c":"P3","v":""},{"c":"Q3","v":""},{"c":"R3","v":""},{"c":"S3","v":""},{"c":"T3","v":""},{"c":"U3","v":""},{"c":"V3","v":""},{"c":"W3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"م","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"B4","v":"نموذج القاعدة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"C4","v":"العدد المتكرر","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"D4","v":"أبعاد الخرسانة المسلحة (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G4","v":"الغطاء (سم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"H4","v":"موضع التسليح","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"I4","v":"القطر Φ (ملم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"J4","v":"العدد / م","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"K4","v":"الأسياخ / القاعدة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"L4","v":"إجمالي الأسياخ","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"M4","v":"شكل التفريد","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"N4","v":"أطوال أضلاع السيخ (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"Q4","v":"خصم الثنيات (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"R4","v":"طول القطعية (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"S4","v":"إجمالي الأطوال (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"T4","v":"وزن المتر (كجم/م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"U4","v":"الوزن الكلي (كجم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"V4","v":"الوزن الكلي (طن)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"W4","v":"ملاحظات وتفاصيل الرباط","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2}]},{"r":5,"h":34.0,"cells":[{"skip":true},{"skip":true},{"skip":true},{"c":"D5","v":"طول L","bg":"#E2E8F0","fg":"#334155","b":true,"al":"center"},{"c":"E5","v":"عرض B","bg":"#E2E8F0","fg":"#334155","b":true,"al":"center"},{"c":"F5","v":"سمك T","bg":"#E2E8F0","fg":"#334155","b":true,"al":"center"},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"N5","v":"رجل 1 (h1)","bg":"#E2E8F0","fg":"#334155","b":true,"al":"center"},{"c":"O5","v":"جزء أفقي (b)","bg":"#E2E8F0","fg":"#334155","b":true,"al":"center"},{"c":"P5","v":"رجل 2 (h2)","bg":"#E2E8F0","fg":"#334155","b":true,"al":"center"},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":1,"al":"center"},{"c":"B6","v":"ق1","b":true,"al":"center"},{"c":"C6","v":6,"in":true,"al":"center"},{"c":"D6","v":1.8,"in":true,"al":"center"},{"c":"E6","v":1.6,"in":true,"al":"center"},{"c":"F6","v":0.6,"in":true,"al":"center"},{"c":"G6","v":5,"in":true,"al":"center"},{"c":"H6","v":"فرش اتجاه الطول"},{"c":"I6","v":16,"in":true,"b":true,"al":"center"},{"c":"J6","v":6,"in":true,"al":"center"},{"c":"K6","v":11,"f":"=ROUNDUP(E6*J6, 0)+1","b":true,"al":"center"},{"c":"L6","v":66,"f":"=C6*K6","b":true,"al":"center"},{"c":"M6","v":"حرف U برجلين","al":"center"},{"c":"N6","v":0.5,"f":"=F6-(2*G6/100)","al":"center","nf":"0.00"},{"c":"O6","v":1.7,"f":"=D6-(2*G6/100)","al":"center","nf":"0.00"},{"c":"P6","v":0.5,"f":"=F6-(2*G6/100)","al":"center","nf":"0.00"},{"c":"Q6","v":0.064,"f":"=2*2*(I6/1000)","al":"center","nf":"0.00"},{"c":"R6","v":2.64,"f":"=ROUND(N6+O6+P6-Q6, 2)","b":true,"al":"center","nf":"0.00"},{"c":"S6","v":174.24,"f":"=L6*R6","b":true,"al":"center","nf":"#,##0.00"},{"c":"T6","v":1.58,"f":"=ROUND((I6^2)/162, 3)","al":"center","nf":"0.000"},{"c":"U6","v":275.2992,"f":"=S6*T6","al":"center","nf":"#,##0.0"},{"c":"V6","v":0.275299,"f":"=U6/1000","b":true,"al":"center","nf":"0.000"},{"c":"W6","v":"توضع الأرجل متبادلة"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":2,"bg":"#F8FAFC","al":"center"},{"c":"B7","v":"ق1","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C7","v":6,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"D7","v":1.8,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E7","v":1.6,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F7","v":0.6,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G7","v":5,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H7","v":"غطاء اتجاه العرض","bg":"#F8FAFC"},{"c":"I7","v":16,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"J7","v":6,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"K7","v":12,"f":"=ROUNDUP(D7*J7, 0)+1","bg":"#F8FAFC","b":true,"al":"center"},{"c":"L7","v":72,"f":"=C7*K7","bg":"#F8FAFC","b":true,"al":"center"},{"c":"M7","v":"حرف U برجلين","bg":"#F8FAFC","al":"center"},{"c":"N7","v":0.5,"f":"=F7-(2*G7/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"O7","v":1.5,"f":"=E7-(2*G7/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"P7","v":0.5,"f":"=F7-(2*G7/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"Q7","v":0.064,"f":"=2*2*(I7/1000)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"R7","v":2.44,"f":"=ROUND(N7+O7+P7-Q7, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"S7","v":175.68,"f":"=L7*R7","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"T7","v":1.58,"f":"=ROUND((I7^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"U7","v":277.5744,"f":"=S7*T7","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"V7","v":0.277574,"f":"=U7/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"W7","v":"توضع الأرجل متبادلة","bg":"#F8FAFC"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":3,"al":"center"},{"c":"B8","v":"ق2","b":true,"al":"center"},{"c":"C8","v":8,"in":true,"al":"center"},{"c":"D8","v":2.2,"in":true,"al":"center"},{"c":"E8","v":2,"in":true,"al":"center"},{"c":"F8","v":0.6,"in":true,"al":"center"},{"c":"G8","v":5,"in":true,"al":"center"},{"c":"H8","v":"فرش اتجاه الطول"},{"c":"I8","v":16,"in":true,"b":true,"al":"center"},{"c":"J8","v":7,"in":true,"al":"center"},{"c":"K8","v":15,"f":"=ROUNDUP(E8*J8, 0)+1","b":true,"al":"center"},{"c":"L8","v":120,"f":"=C8*K8","b":true,"al":"center"},{"c":"M8","v":"حرف U برجلين","al":"center"},{"c":"N8","v":0.5,"f":"=F8-(2*G8/100)","al":"center","nf":"0.00"},{"c":"O8","v":2.1,"f":"=D8-(2*G8/100)","al":"center","nf":"0.00"},{"c":"P8","v":0.5,"f":"=F8-(2*G8/100)","al":"center","nf":"0.00"},{"c":"Q8","v":0.064,"f":"=2*2*(I8/1000)","al":"center","nf":"0.00"},{"c":"R8","v":3.04,"f":"=ROUND(N8+O8+P8-Q8, 2)","b":true,"al":"center","nf":"0.00"},{"c":"S8","v":364.8,"f":"=L8*R8","b":true,"al":"center","nf":"#,##0.00"},{"c":"T8","v":1.58,"f":"=ROUND((I8^2)/162, 3)","al":"center","nf":"0.000"},{"c":"U8","v":576.384,"f":"=S8*T8","al":"center","nf":"#,##0.0"},{"c":"V8","v":0.576384,"f":"=U8/1000","b":true,"al":"center","nf":"0.000"},{"c":"W8","v":"توضع الأرجل متبادلة"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":4,"bg":"#F8FAFC","al":"center"},{"c":"B9","v":"ق2","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C9","v":8,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"D9","v":2.2,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E9","v":2,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F9","v":0.6,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G9","v":5,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H9","v":"غطاء اتجاه العرض","bg":"#F8FAFC"},{"c":"I9","v":16,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"J9","v":6,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"K9","v":15,"f":"=ROUNDUP(D9*J9, 0)+1","bg":"#F8FAFC","b":true,"al":"center"},{"c":"L9","v":120,"f":"=C9*K9","bg":"#F8FAFC","b":true,"al":"center"},{"c":"M9","v":"حرف U برجلين","bg":"#F8FAFC","al":"center"},{"c":"N9","v":0.5,"f":"=F9-(2*G9/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"O9","v":1.9,"f":"=E9-(2*G9/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"P9","v":0.5,"f":"=F9-(2*G9/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"Q9","v":0.064,"f":"=2*2*(I9/1000)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"R9","v":2.84,"f":"=ROUND(N9+O9+P9-Q9, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"S9","v":340.8,"f":"=L9*R9","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"T9","v":1.58,"f":"=ROUND((I9^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"U9","v":538.464,"f":"=S9*T9","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"V9","v":0.538464,"f":"=U9/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"W9","v":"توضع الأرجل متبادلة","bg":"#F8FAFC"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":5,"al":"center"},{"c":"B10","v":"ق3","b":true,"al":"center"},{"c":"C10","v":4,"in":true,"al":"center"},{"c":"D10","v":2.6,"in":true,"al":"center"},{"c":"E10","v":2.4,"in":true,"al":"center"},{"c":"F10","v":0.7,"in":true,"al":"center"},{"c":"G10","v":5,"in":true,"al":"center"},{"c":"H10","v":"فرش اتجاه الطول"},{"c":"I10","v":18,"in":true,"b":true,"al":"center"},{"c":"J10","v":7,"in":true,"al":"center"},{"c":"K10","v":18,"f":"=ROUNDUP(E10*J10, 0)+1","b":true,"al":"center"},{"c":"L10","v":72,"f":"=C10*K10","b":true,"al":"center"},{"c":"M10","v":"حرف U برجلين","al":"center"},{"c":"N10","v":0.6,"f":"=F10-(2*G10/100)","al":"center","nf":"0.00"},{"c":"O10","v":2.5,"f":"=D10-(2*G10/100)","al":"center","nf":"0.00"},{"c":"P10","v":0.6,"f":"=F10-(2*G10/100)","al":"center","nf":"0.00"},{"c":"Q10","v":0.072,"f":"=2*2*(I10/1000)","al":"center","nf":"0.00"},{"c":"R10","v":3.63,"f":"=ROUND(N10+O10+P10-Q10, 2)","b":true,"al":"center","nf":"0.00"},{"c":"S10","v":261.36,"f":"=L10*R10","b":true,"al":"center","nf":"#,##0.00"},{"c":"T10","v":2,"f":"=ROUND((I10^2)/162, 3)","al":"center","nf":"0.000"},{"c":"U10","v":522.72,"f":"=S10*T10","al":"center","nf":"#,##0.0"},{"c":"V10","v":0.52272,"f":"=U10/1000","b":true,"al":"center","nf":"0.000"},{"c":"W10","v":"تثبيت مع شداد الجار"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":6,"bg":"#F8FAFC","al":"center"},{"c":"B11","v":"ق3","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C11","v":4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"D11","v":2.6,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E11","v":2.4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F11","v":0.7,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G11","v":5,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H11","v":"غطاء اتجاه العرض","bg":"#F8FAFC"},{"c":"I11","v":16,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"J11","v":7,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"K11","v":20,"f":"=ROUNDUP(D11*J11, 0)+1","bg":"#F8FAFC","b":true,"al":"center"},{"c":"L11","v":80,"f":"=C11*K11","bg":"#F8FAFC","b":true,"al":"center"},{"c":"M11","v":"حرف U برجلين","bg":"#F8FAFC","al":"center"},{"c":"N11","v":0.6,"f":"=F11-(2*G11/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"O11","v":2.3,"f":"=E11-(2*G11/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"P11","v":0.6,"f":"=F11-(2*G11/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"Q11","v":0.064,"f":"=2*2*(I11/1000)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"R11","v":3.44,"f":"=ROUND(N11+O11+P11-Q11, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"S11","v":275.2,"f":"=L11*R11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"T11","v":1.58,"f":"=ROUND((I11^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"U11","v":434.816,"f":"=S11*T11","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"V11","v":0.434816,"f":"=U11/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"W11","v":"تثبيت مع شداد الجار","bg":"#F8FAFC"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":7,"al":"center"},{"c":"B12","v":"ق4","b":true,"al":"center"},{"c":"C12","v":2,"in":true,"al":"center"},{"c":"D12","v":3,"in":true,"al":"center"},{"c":"E12","v":2.8,"in":true,"al":"center"},{"c":"F12","v":0.8,"in":true,"al":"center"},{"c":"G12","v":5,"in":true,"al":"center"},{"c":"H12","v":"فرش اتجاه الطول"},{"c":"I12","v":18,"in":true,"b":true,"al":"center"},{"c":"J12","v":7,"in":true,"al":"center"},{"c":"K12","v":21,"f":"=ROUNDUP(E12*J12, 0)+1","b":true,"al":"center"},{"c":"L12","v":42,"f":"=C12*K12","b":true,"al":"center"},{"c":"M12","v":"حرف U برجلين","al":"center"},{"c":"N12","v":0.7,"f":"=F12-(2*G12/100)","al":"center","nf":"0.00"},{"c":"O12","v":2.9,"f":"=D12-(2*G12/100)","al":"center","nf":"0.00"},{"c":"P12","v":0.7,"f":"=F12-(2*G12/100)","al":"center","nf":"0.00"},{"c":"Q12","v":0.072,"f":"=2*2*(I12/1000)","al":"center","nf":"0.00"},{"c":"R12","v":4.23,"f":"=ROUND(N12+O12+P12-Q12, 2)","b":true,"al":"center","nf":"0.00"},{"c":"S12","v":177.66,"f":"=L12*R12","b":true,"al":"center","nf":"#,##0.00"},{"c":"T12","v":2,"f":"=ROUND((I12^2)/162, 3)","al":"center","nf":"0.000"},{"c":"U12","v":355.32,"f":"=S12*T12","al":"center","nf":"#,##0.0"},{"c":"V12","v":0.35532,"f":"=U12/1000","b":true,"al":"center","nf":"0.000"},{"c":"W12","v":"تثبيت مع شداد الجار"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":8,"bg":"#F8FAFC","al":"center"},{"c":"B13","v":"ق4","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C13","v":2,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"D13","v":3,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E13","v":2.8,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F13","v":0.8,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G13","v":5,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H13","v":"غطاء اتجاه العرض","bg":"#F8FAFC"},{"c":"I13","v":18,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"J13","v":7,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"K13","v":22,"f":"=ROUNDUP(D13*J13, 0)+1","bg":"#F8FAFC","b":true,"al":"center"},{"c":"L13","v":44,"f":"=C13*K13","bg":"#F8FAFC","b":true,"al":"center"},{"c":"M13","v":"حرف U برجلين","bg":"#F8FAFC","al":"center"},{"c":"N13","v":0.7,"f":"=F13-(2*G13/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"O13","v":2.7,"f":"=E13-(2*G13/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"P13","v":0.7,"f":"=F13-(2*G13/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"Q13","v":0.072,"f":"=2*2*(I13/1000)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"R13","v":4.03,"f":"=ROUND(N13+O13+P13-Q13, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"S13","v":177.32,"f":"=L13*R13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"T13","v":2,"f":"=ROUND((I13^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"U13","v":354.64,"f":"=S13*T13","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"V13","v":0.35464,"f":"=U13/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"W13","v":"تثبيت مع شداد الجار","bg":"#F8FAFC"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":9,"al":"center"},{"c":"B14","v":"ق4","b":true,"al":"center"},{"c":"C14","v":2,"in":true,"al":"center"},{"c":"D14","v":3,"in":true,"al":"center"},{"c":"E14","v":2.8,"in":true,"al":"center"},{"c":"F14","v":0.8,"in":true,"al":"center"},{"c":"G14","v":5,"in":true,"al":"center"},{"c":"H14","v":"شبكة علوية انكماش"},{"c":"I14","v":12,"in":true,"b":true,"al":"center"},{"c":"J14","v":5,"in":true,"al":"center"},{"c":"K14","v":16,"f":"=ROUNDUP(D14*J14, 0)+1","b":true,"al":"center"},{"c":"L14","v":32,"f":"=C14*K14","b":true,"al":"center"},{"c":"M14","v":"حرف U مقلوب","al":"center"},{"c":"N14","v":0.7,"f":"=F14-(2*G14/100)","al":"center","nf":"0.00"},{"c":"O14","v":2.7,"f":"=E14-(2*G14/100)","al":"center","nf":"0.00"},{"c":"P14","v":0.7,"f":"=F14-(2*G14/100)","al":"center","nf":"0.00"},{"c":"Q14","v":0.048,"f":"=2*2*(I14/1000)","al":"center","nf":"0.00"},{"c":"R14","v":4.05,"f":"=ROUND(N14+O14+P14-Q14, 2)","b":true,"al":"center","nf":"0.00"},{"c":"S14","v":129.6,"f":"=L14*R14","b":true,"al":"center","nf":"#,##0.00"},{"c":"T14","v":0.889,"f":"=ROUND((I14^2)/162, 3)","al":"center","nf":"0.000"},{"c":"U14","v":115.2144,"f":"=S14*T14","al":"center","nf":"#,##0.0"},{"c":"V14","v":0.115214,"f":"=U14/1000","b":true,"al":"center","nf":"0.000"},{"c":"W14","v":"يتم التثبيت على كراسي حديد Φ 16"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":10,"bg":"#F8FAFC","al":"center"},{"c":"B15","v":"ق.م 1","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C15","v":2,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"D15","v":5.8,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E15","v":2.8,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F15","v":0.9,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G15","v":7,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H15","v":"سفلي رئيسي طولي","bg":"#F8FAFC"},{"c":"I15","v":20,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"J15","v":8,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"K15","v":24,"f":"=ROUNDUP(E15*J15, 0)+1","bg":"#F8FAFC","b":true,"al":"center"},{"c":"L15","v":48,"f":"=C15*K15","bg":"#F8FAFC","b":true,"al":"center"},{"c":"M15","v":"حرف U برجلين","bg":"#F8FAFC","al":"center"},{"c":"N15","v":0.76,"f":"=F15-(2*G15/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"O15","v":5.66,"f":"=D15-(2*G15/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"P15","v":0.76,"f":"=F15-(2*G15/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"Q15","v":0.08,"f":"=2*2*(I15/1000)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"R15","v":7.1,"f":"=ROUND(N15+O15+P15-Q15, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"S15","v":340.8,"f":"=L15*R15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"T15","v":2.469,"f":"=ROUND((I15^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"U15","v":841.4352,"f":"=S15*T15","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"V15","v":0.841435,"f":"=U15/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"W15","v":"تثبيت مع شداد الجار","bg":"#F8FAFC"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":11,"al":"center"},{"c":"B16","v":"ق.م 1","b":true,"al":"center"},{"c":"C16","v":2,"in":true,"al":"center"},{"c":"D16","v":5.8,"in":true,"al":"center"},{"c":"E16","v":2.8,"in":true,"al":"center"},{"c":"F16","v":0.9,"in":true,"al":"center"},{"c":"G16","v":7,"in":true,"al":"center"},{"c":"H16","v":"سفلي عرضي (غطاء)"},{"c":"I16","v":16,"in":true,"b":true,"al":"center"},{"c":"J16","v":7,"in":true,"al":"center"},{"c":"K16","v":42,"f":"=ROUNDUP(D16*J16, 0)+1","b":true,"al":"center"},{"c":"L16","v":84,"f":"=C16*K16","b":true,"al":"center"},{"c":"M16","v":"حرف U برجلين","al":"center"},{"c":"N16","v":0.76,"f":"=F16-(2*G16/100)","al":"center","nf":"0.00"},{"c":"O16","v":2.66,"f":"=E16-(2*G16/100)","al":"center","nf":"0.00"},{"c":"P16","v":0.76,"f":"=F16-(2*G16/100)","al":"center","nf":"0.00"},{"c":"Q16","v":0.064,"f":"=2*2*(I16/1000)","al":"center","nf":"0.00"},{"c":"R16","v":4.12,"f":"=ROUND(N16+O16+P16-Q16, 2)","b":true,"al":"center","nf":"0.00"},{"c":"S16","v":346.08,"f":"=L16*R16","b":true,"al":"center","nf":"#,##0.00"},{"c":"T16","v":1.58,"f":"=ROUND((I16^2)/162, 3)","al":"center","nf":"0.000"},{"c":"U16","v":546.8064,"f":"=S16*T16","al":"center","nf":"#,##0.0"},{"c":"V16","v":0.546806,"f":"=U16/1000","b":true,"al":"center","nf":"0.000"},{"c":"W16","v":"تثبيت مع شداد الجار"}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":12,"bg":"#F8FAFC","al":"center"},{"c":"B17","v":"ق.م 1","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C17","v":2,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"D17","v":5.8,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E17","v":2.8,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F17","v":0.9,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G17","v":7,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H17","v":"علوي رئيسي طولي (شوك)","bg":"#F8FAFC"},{"c":"I17","v":20,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"J17","v":8,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"K17","v":24,"f":"=ROUNDUP(E17*J17, 0)+1","bg":"#F8FAFC","b":true,"al":"center"},{"c":"L17","v":48,"f":"=C17*K17","bg":"#F8FAFC","b":true,"al":"center"},{"c":"M17","v":"حرف U برجلين","bg":"#F8FAFC","al":"center"},{"c":"N17","v":0.76,"f":"=F17-(2*G17/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"O17","v":5.66,"f":"=D17-(2*G17/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"P17","v":0.76,"f":"=F17-(2*G17/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"Q17","v":0.08,"f":"=2*2*(I17/1000)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"R17","v":7.1,"f":"=ROUND(N17+O17+P17-Q17, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"S17","v":340.8,"f":"=L17*R17","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"T17","v":2.469,"f":"=ROUND((I17^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"U17","v":841.4352,"f":"=S17*T17","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"V17","v":0.841435,"f":"=U17/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"W17","v":"يتم التثبيت على كراسي حديد Φ 16","bg":"#F8FAFC"}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":13,"al":"center"},{"c":"B18","v":"ق.م 1","b":true,"al":"center"},{"c":"C18","v":2,"in":true,"al":"center"},{"c":"D18","v":5.8,"in":true,"al":"center"},{"c":"E18","v":2.8,"in":true,"al":"center"},{"c":"F18","v":0.9,"in":true,"al":"center"},{"c":"G18","v":7,"in":true,"al":"center"},{"c":"H18","v":"علوي عرضي"},{"c":"I18","v":16,"in":true,"b":true,"al":"center"},{"c":"J18","v":6,"in":true,"al":"center"},{"c":"K18","v":36,"f":"=ROUNDUP(D18*J18, 0)+1","b":true,"al":"center"},{"c":"L18","v":72,"f":"=C18*K18","b":true,"al":"center"},{"c":"M18","v":"حرف U برجلين","al":"center"},{"c":"N18","v":0.76,"f":"=F18-(2*G18/100)","al":"center","nf":"0.00"},{"c":"O18","v":2.66,"f":"=E18-(2*G18/100)","al":"center","nf":"0.00"},{"c":"P18","v":0.76,"f":"=F18-(2*G18/100)","al":"center","nf":"0.00"},{"c":"Q18","v":0.064,"f":"=2*2*(I18/1000)","al":"center","nf":"0.00"},{"c":"R18","v":4.12,"f":"=ROUND(N18+O18+P18-Q18, 2)","b":true,"al":"center","nf":"0.00"},{"c":"S18","v":296.64,"f":"=L18*R18","b":true,"al":"center","nf":"#,##0.00"},{"c":"T18","v":1.58,"f":"=ROUND((I18^2)/162, 3)","al":"center","nf":"0.000"},{"c":"U18","v":468.6912,"f":"=S18*T18","al":"center","nf":"#,##0.0"},{"c":"V18","v":0.468691,"f":"=U18/1000","b":true,"al":"center","nf":"0.000"},{"c":"W18","v":"يتم التثبيت على كراسي حديد Φ 16"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":14,"bg":"#F8FAFC","al":"center"},{"c":"B19","v":"ق.جار","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C19","v":4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"D19","v":2.4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E19","v":1.8,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F19","v":0.7,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G19","v":5,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H19","v":"فرش باتجاه الشداد","bg":"#F8FAFC"},{"c":"I19","v":18,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"J19","v":7,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"K19","v":14,"f":"=ROUNDUP(E19*J19, 0)+1","bg":"#F8FAFC","b":true,"al":"center"},{"c":"L19","v":56,"f":"=C19*K19","bg":"#F8FAFC","b":true,"al":"center"},{"c":"M19","v":"حرف U برجلين","bg":"#F8FAFC","al":"center"},{"c":"N19","v":0.6,"f":"=F19-(2*G19/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"O19","v":2.3,"f":"=D19-(2*G19/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"P19","v":0.6,"f":"=F19-(2*G19/100)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"Q19","v":0.072,"f":"=2*2*(I19/1000)","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"R19","v":3.43,"f":"=ROUND(N19+O19+P19-Q19, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"S19","v":192.08,"f":"=L19*R19","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"T19","v":2,"f":"=ROUND((I19^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"U19","v":384.16,"f":"=S19*T19","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"V19","v":0.38416,"f":"=U19/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"W19","v":"تثبيت مع شداد الجار","bg":"#F8FAFC"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":15,"al":"center"},{"c":"B20","v":"ق.جار","b":true,"al":"center"},{"c":"C20","v":4,"in":true,"al":"center"},{"c":"D20","v":2.4,"in":true,"al":"center"},{"c":"E20","v":1.8,"in":true,"al":"center"},{"c":"F20","v":0.7,"in":true,"al":"center"},{"c":"G20","v":5,"in":true,"al":"center"},{"c":"H20","v":"غطاء عرضي"},{"c":"I20","v":16,"in":true,"b":true,"al":"center"},{"c":"J20","v":6,"in":true,"al":"center"},{"c":"K20","v":16,"f":"=ROUNDUP(D20*J20, 0)+1","b":true,"al":"center"},{"c":"L20","v":64,"f":"=C20*K20","b":true,"al":"center"},{"c":"M20","v":"حرف U برجلين","al":"center"},{"c":"N20","v":0.6,"f":"=F20-(2*G20/100)","al":"center","nf":"0.00"},{"c":"O20","v":1.7,"f":"=E20-(2*G20/100)","al":"center","nf":"0.00"},{"c":"P20","v":0.6,"f":"=F20-(2*G20/100)","al":"center","nf":"0.00"},{"c":"Q20","v":0.064,"f":"=2*2*(I20/1000)","al":"center","nf":"0.00"},{"c":"R20","v":2.84,"f":"=ROUND(N20+O20+P20-Q20, 2)","b":true,"al":"center","nf":"0.00"},{"c":"S20","v":181.76,"f":"=L20*R20","b":true,"al":"center","nf":"#,##0.00"},{"c":"T20","v":1.58,"f":"=ROUND((I20^2)/162, 3)","al":"center","nf":"0.000"},{"c":"U20","v":287.1808,"f":"=S20*T20","al":"center","nf":"#,##0.0"},{"c":"V20","v":0.287181,"f":"=U20/1000","b":true,"al":"center","nf":"0.000"},{"c":"W20","v":"تثبيت مع شداد الجار"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":"الإجمالي الكلي لحديد القواعد المسلحة","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"L21","v":1020,"f":"=SUM(L6:L20)","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"M21","v":"","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center"},{"c":"N21","v":"","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center"},{"c":"O21","v":"","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center"},{"c":"P21","v":"","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center"},{"c":"Q21","v":"","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center"},{"c":"R21","v":"","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center"},{"c":"S21","v":3774.82,"f":"=SUM(S6:S20)","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0.00"},{"c":"T21","v":"","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center"},{"c":"U21","v":6820.1408,"f":"=SUM(U6:U20)","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0.0"},{"c":"V21","v":6.820139,"f":"=SUM(V6:V20)","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"0.000"},{"c":"W21","v":"","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center"}]}]},{"name":"تفريد حديد الشدادات والميد","maxRow":22,"maxCol":20,"colWidths":[5.0,14.0,10.0,9.0,9.0,9.0,10.0,10.0,18.0,12.0,12.0,13.0,15.0,13.0,15.0,14.0,9.0,9.0,12.0,22.0],"rows":[{"r":1,"h":36.0,"cells":[{"c":"A1","v":"جدول تفريد وحصر حديد الشدادات والسملات والميد (Strap & Tie Beams BBS)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":20},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"حساب تسليح العزوم العلوية للشدادات + حديد الميد السفلي والعلوي + الكانات المقفولة وبراندات الانكماش الجانبية","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center","cs":20},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""},{"c":"N3","v":""},{"c":"O3","v":""},{"c":"P3","v":""},{"c":"Q3","v":""},{"c":"R3","v":""},{"c":"S3","v":""},{"c":"T3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"م","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"B4","v":"كود الشداد / الميدة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"C4","v":"العدد المتكرر","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"D4","v":"أبعاد الشداد الخرسانية (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G4","v":"الغطاء (سم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"H4","v":"القطر Φ (ملم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"I4","v":"موضع وطبقة التسليح","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"J4","v":"الأسياخ بالمقطع","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"K4","v":"إجمالي الأسياخ","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"L4","v":"طول القطعية (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"M4","v":"إجمالي الأطوال (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"N4","v":"وزن المتر (كجم/م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"O4","v":"الوزن الكلي (كجم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"P4","v":"الوزن الكلي (طن)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2},{"c":"Q4","v":"تفاصيل الكانات وفروعها","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"T4","v":"الملاحظات وتفاصيل التماسك Ld","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","rs":2}]},{"r":5,"h":52.0,"cells":[{"skip":true},{"skip":true},{"skip":true},{"c":"D5","v":"طول Ln","bg":"#E2E8F0","fg":"#334155","b":true,"al":"center"},{"c":"E5","v":"عرض b","bg":"#E2E8F0","fg":"#334155","b":true,"al":"center"},{"c":"F5","v":"عمق t","bg":"#E2E8F0","fg":"#334155","b":true,"al":"center"},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"Q5","v":"عدد الفروع","bg":"#E2E8F0","fg":"#334155","b":true,"al":"center"},{"c":"R5","v":"الخطوة / م","bg":"#E2E8F0","fg":"#334155","b":true,"al":"center"},{"c":"S5","v":"محيط الكانة (م)","bg":"#E2E8F0","fg":"#334155","b":true,"al":"center"},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":1,"al":"center"},{"c":"B6","v":"شداد ش1","b":true,"al":"center"},{"c":"C6","v":4,"in":true,"al":"center"},{"c":"D6","v":6.5,"in":true,"al":"center"},{"c":"E6","v":0.4,"in":true,"al":"center"},{"c":"F6","v":1,"in":true,"al":"center"},{"c":"G6","v":5,"in":true,"al":"center"},{"c":"H6","v":22,"in":true,"b":true,"al":"center"},{"c":"I6","v":"علوي رئيسي (عزم شداد)"},{"c":"J6","v":8,"in":true,"al":"center"},{"c":"K6","v":32,"f":"=C6*J6","b":true,"al":"center"},{"c":"L6","v":9.5,"f":"=D6+2*(F6-0.10)+1.20","b":true,"al":"center","nf":"0.00"},{"c":"M6","v":304,"f":"=K6*L6","b":true,"al":"center","nf":"#,##0.00"},{"c":"N6","v":2.988,"f":"=ROUND((H6^2)/162, 3)","al":"center","nf":"0.000"},{"c":"O6","v":908.352,"f":"=M6*N6","al":"center","nf":"#,##0.0"},{"c":"P6","v":0.908352,"f":"=O6/1000","b":true,"al":"center","nf":"0.000"},{"c":"Q6","v":"-","al":"center"},{"c":"R6","v":"-","al":"center"},{"c":"S6","v":"-","al":"center"},{"c":"T6","v":"يمتد بكامل طول قاعدة الجار برجل قائمة"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":2,"bg":"#F8FAFC","al":"center"},{"c":"B7","v":"شداد ش1","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C7","v":4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"D7","v":6.5,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E7","v":0.4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F7","v":1,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G7","v":5,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H7","v":16,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"I7","v":"سفلي تعليق وتثبيت","bg":"#F8FAFC"},{"c":"J7","v":4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"K7","v":16,"f":"=C7*J7","bg":"#F8FAFC","b":true,"al":"center"},{"c":"L7","v":7.3,"f":"=D6+0.80","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"M7","v":116.8,"f":"=K7*L7","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"N7","v":1.58,"f":"=ROUND((H7^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"O7","v":184.544,"f":"=M7*N7","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"P7","v":0.184544,"f":"=O7/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"Q7","v":"-","bg":"#F8FAFC","al":"center"},{"c":"R7","v":"-","bg":"#F8FAFC","al":"center"},{"c":"S7","v":"-","bg":"#F8FAFC","al":"center"},{"c":"T7","v":"يمتد مسافة تماسك Ld داخل القواعد","bg":"#F8FAFC"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":3,"al":"center"},{"c":"B8","v":"شداد ش1","b":true,"al":"center"},{"c":"C8","v":4,"in":true,"al":"center"},{"c":"D8","v":6.5,"in":true,"al":"center"},{"c":"E8","v":0.4,"in":true,"al":"center"},{"c":"F8","v":1,"in":true,"al":"center"},{"c":"G8","v":5,"in":true,"al":"center"},{"c":"H8","v":12,"in":true,"b":true,"al":"center"},{"c":"I8","v":"براندات جانبية انكماش"},{"c":"J8","v":6,"in":true,"al":"center"},{"c":"K8","v":24,"f":"=C8*J8","b":true,"al":"center"},{"c":"L8","v":7.1,"f":"=D6+0.60","b":true,"al":"center","nf":"0.00"},{"c":"M8","v":170.4,"f":"=K8*L8","b":true,"al":"center","nf":"#,##0.00"},{"c":"N8","v":0.889,"f":"=ROUND((H8^2)/162, 3)","al":"center","nf":"0.000"},{"c":"O8","v":151.4856,"f":"=M8*N8","al":"center","nf":"#,##0.0"},{"c":"P8","v":0.151486,"f":"=O8/1000","b":true,"al":"center","nf":"0.000"},{"c":"Q8","v":"-","al":"center"},{"c":"R8","v":"-","al":"center"},{"c":"S8","v":"-","al":"center"},{"c":"T8","v":"توضع كل 30 سم على جانبي الشداد"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":4,"bg":"#F8FAFC","al":"center"},{"c":"B9","v":"شداد ش1","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C9","v":4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"D9","v":6.5,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E9","v":0.4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F9","v":1,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G9","v":5,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H9","v":10,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"I9","v":"كانات أوتوماتيك مقفولة","bg":"#F8FAFC"},{"c":"J9","v":54,"f":"=ROUNDUP(D6*8, 0)+2","bg":"#F8FAFC","al":"center"},{"c":"K9","v":216,"f":"=C9*J9","bg":"#F8FAFC","b":true,"al":"center"},{"c":"L9","v":2.6,"f":"=2*(E6-0.10)+2*(F6-0.10)+0.20","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"M9","v":561.6,"f":"=K9*L9","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"N9","v":0.617,"f":"=ROUND((H9^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"O9","v":346.5072,"f":"=M9*N9","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"P9","v":0.346507,"f":"=O9/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"Q9","v":4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"R9","v":"8 كانات / م","bg":"#F8FAFC","al":"center"},{"c":"S9","v":2.6,"f":"=2*(E6-0.10)+2*(F6-0.10)+0.20","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"T9","v":"تكثيف الكانات بالكامل وقفل 10Φ تبادلي","bg":"#F8FAFC"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":5,"al":"center"},{"c":"B10","v":"شداد ش2","b":true,"al":"center"},{"c":"C10","v":2,"in":true,"al":"center"},{"c":"D10","v":7.8,"in":true,"al":"center"},{"c":"E10","v":0.5,"in":true,"al":"center"},{"c":"F10","v":1.2,"in":true,"al":"center"},{"c":"G10","v":5,"in":true,"al":"center"},{"c":"H10","v":25,"in":true,"b":true,"al":"center"},{"c":"I10","v":"علوي رئيسي (عزم شداد)"},{"c":"J10","v":10,"in":true,"al":"center"},{"c":"K10","v":20,"f":"=C10*J10","b":true,"al":"center"},{"c":"L10","v":11.4,"f":"=D10+2*(F10-0.10)+1.40","b":true,"al":"center","nf":"0.00"},{"c":"M10","v":228,"f":"=K10*L10","b":true,"al":"center","nf":"#,##0.00"},{"c":"N10","v":3.858,"f":"=ROUND((H10^2)/162, 3)","al":"center","nf":"0.000"},{"c":"O10","v":879.624,"f":"=M10*N10","al":"center","nf":"#,##0.0"},{"c":"P10","v":0.879624,"f":"=O10/1000","b":true,"al":"center","nf":"0.000"},{"c":"Q10","v":"-","al":"center"},{"c":"R10","v":"-","al":"center"},{"c":"S10","v":"-","al":"center"},{"c":"T10","v":"تسليح رئيسي لتحمل عزم فرق الهبوط"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":6,"bg":"#F8FAFC","al":"center"},{"c":"B11","v":"شداد ش2","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C11","v":2,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"D11","v":7.8,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E11","v":0.5,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F11","v":1.2,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G11","v":5,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H11","v":18,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"I11","v":"سفلي إضافي","bg":"#F8FAFC"},{"c":"J11","v":4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"K11","v":8,"f":"=C11*J11","bg":"#F8FAFC","b":true,"al":"center"},{"c":"L11","v":8.7,"f":"=D10+0.90","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"M11","v":69.6,"f":"=K11*L11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"N11","v":2,"f":"=ROUND((H11^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"O11","v":139.2,"f":"=M11*N11","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"P11","v":0.1392,"f":"=O11/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"Q11","v":"-","bg":"#F8FAFC","al":"center"},{"c":"R11","v":"-","bg":"#F8FAFC","al":"center"},{"c":"S11","v":"-","bg":"#F8FAFC","al":"center"},{"c":"T11","v":"يمتد Ld كاملة داخل القاعدة الداخلية","bg":"#F8FAFC"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":7,"al":"center"},{"c":"B12","v":"شداد ش2","b":true,"al":"center"},{"c":"C12","v":2,"in":true,"al":"center"},{"c":"D12","v":7.8,"in":true,"al":"center"},{"c":"E12","v":0.5,"in":true,"al":"center"},{"c":"F12","v":1.2,"in":true,"al":"center"},{"c":"G12","v":5,"in":true,"al":"center"},{"c":"H12","v":12,"in":true,"b":true,"al":"center"},{"c":"I12","v":"براندات جانبية انكماش"},{"c":"J12","v":8,"in":true,"al":"center"},{"c":"K12","v":16,"f":"=C12*J12","b":true,"al":"center"},{"c":"L12","v":8.4,"f":"=D10+0.60","b":true,"al":"center","nf":"0.00"},{"c":"M12","v":134.4,"f":"=K12*L12","b":true,"al":"center","nf":"#,##0.00"},{"c":"N12","v":0.889,"f":"=ROUND((H12^2)/162, 3)","al":"center","nf":"0.000"},{"c":"O12","v":119.4816,"f":"=M12*N12","al":"center","nf":"#,##0.0"},{"c":"P12","v":0.119482,"f":"=O12/1000","b":true,"al":"center","nf":"0.000"},{"c":"Q12","v":"-","al":"center"},{"c":"R12","v":"-","al":"center"},{"c":"S12","v":"-","al":"center"},{"c":"T12","v":"براندات كل 25 سم لعمق 1.20 م"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":8,"bg":"#F8FAFC","al":"center"},{"c":"B13","v":"شداد ش2","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C13","v":2,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"D13","v":7.8,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E13","v":0.5,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F13","v":1.2,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G13","v":5,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H13","v":10,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"I13","v":"كانات 4 فروع مقفولة","bg":"#F8FAFC"},{"c":"J13","v":73,"f":"=ROUNDUP(D10*9, 0)+2","bg":"#F8FAFC","al":"center"},{"c":"K13","v":146,"f":"=C13*J13","bg":"#F8FAFC","b":true,"al":"center"},{"c":"L13","v":3.25,"f":"=2*(E10-0.10)+2*(F10-0.10)+0.25","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"M13","v":474.5,"f":"=K13*L13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"N13","v":0.617,"f":"=ROUND((H13^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"O13","v":292.7665,"f":"=M13*N13","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"P13","v":0.292766,"f":"=O13/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"Q13","v":4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"R13","v":"9 كانات / م","bg":"#F8FAFC","al":"center"},{"c":"S13","v":3.25,"f":"=2*(E10-0.10)+2*(F10-0.10)+0.25","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"T13","v":"كانة 4 فروع صندوق + حباية","bg":"#F8FAFC"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":9,"al":"center"},{"c":"B14","v":"ميدة م1","b":true,"al":"center"},{"c":"C14","v":12,"in":true,"al":"center"},{"c":"D14","v":5,"in":true,"al":"center"},{"c":"E14","v":0.3,"in":true,"al":"center"},{"c":"F14","v":0.6,"in":true,"al":"center"},{"c":"G14","v":5,"in":true,"al":"center"},{"c":"H14","v":16,"in":true,"b":true,"al":"center"},{"c":"I14","v":"سفلي رئيسي مستمر"},{"c":"J14","v":4,"in":true,"al":"center"},{"c":"K14","v":48,"f":"=C14*J14","b":true,"al":"center"},{"c":"L14","v":5.8,"f":"=D14+0.80","b":true,"al":"center","nf":"0.00"},{"c":"M14","v":278.4,"f":"=K14*L14","b":true,"al":"center","nf":"#,##0.00"},{"c":"N14","v":1.58,"f":"=ROUND((H14^2)/162, 3)","al":"center","nf":"0.000"},{"c":"O14","v":439.872,"f":"=M14*N14","al":"center","nf":"#,##0.0"},{"c":"P14","v":0.439872,"f":"=O14/1000","b":true,"al":"center","nf":"0.000"},{"c":"Q14","v":"-","al":"center"},{"c":"R14","v":"-","al":"center"},{"c":"S14","v":"-","al":"center"},{"c":"T14","v":"ربط القواعد المنفصلة ومقاومة الهبوط"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":10,"bg":"#F8FAFC","al":"center"},{"c":"B15","v":"ميدة م1","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C15","v":12,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"D15","v":5,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E15","v":0.3,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F15","v":0.6,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G15","v":5,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H15","v":16,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"I15","v":"علوي رئيسي","bg":"#F8FAFC"},{"c":"J15","v":4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"K15","v":48,"f":"=C15*J15","bg":"#F8FAFC","b":true,"al":"center"},{"c":"L15","v":5.8,"f":"=D14+0.80","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"M15","v":278.4,"f":"=K15*L15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"N15","v":1.58,"f":"=ROUND((H15^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"O15","v":439.872,"f":"=M15*N15","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"P15","v":0.439872,"f":"=O15/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"Q15","v":"-","bg":"#F8FAFC","al":"center"},{"c":"R15","v":"-","bg":"#F8FAFC","al":"center"},{"c":"S15","v":"-","bg":"#F8FAFC","al":"center"},{"c":"T15","v":"أرجل قائمة داخل القواعد","bg":"#F8FAFC"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":11,"al":"center"},{"c":"B16","v":"ميدة م1","b":true,"al":"center"},{"c":"C16","v":12,"in":true,"al":"center"},{"c":"D16","v":5,"in":true,"al":"center"},{"c":"E16","v":0.3,"in":true,"al":"center"},{"c":"F16","v":0.6,"in":true,"al":"center"},{"c":"G16","v":5,"in":true,"al":"center"},{"c":"H16","v":10,"in":true,"b":true,"al":"center"},{"c":"I16","v":"براندات انكماش"},{"c":"J16","v":2,"in":true,"al":"center"},{"c":"K16","v":24,"f":"=C16*J16","b":true,"al":"center"},{"c":"L16","v":5.5,"f":"=D14+0.50","b":true,"al":"center","nf":"0.00"},{"c":"M16","v":132,"f":"=K16*L16","b":true,"al":"center","nf":"#,##0.00"},{"c":"N16","v":0.617,"f":"=ROUND((H16^2)/162, 3)","al":"center","nf":"0.000"},{"c":"O16","v":81.444,"f":"=M16*N16","al":"center","nf":"#,##0.0"},{"c":"P16","v":0.081444,"f":"=O16/1000","b":true,"al":"center","nf":"0.000"},{"c":"Q16","v":"-","al":"center"},{"c":"R16","v":"-","al":"center"},{"c":"S16","v":"-","al":"center"},{"c":"T16","v":"براندة واحدة بكل جهة"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":12,"bg":"#F8FAFC","al":"center"},{"c":"B17","v":"ميدة م1","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C17","v":12,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"D17","v":5,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E17","v":0.3,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F17","v":0.6,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G17","v":5,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H17","v":8,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"I17","v":"كانات صندوقية 2 فرع","bg":"#F8FAFC"},{"c":"J17","v":31,"f":"=ROUNDUP(D14*6, 0)+1","bg":"#F8FAFC","al":"center"},{"c":"K17","v":372,"f":"=C17*J17","bg":"#F8FAFC","b":true,"al":"center"},{"c":"L17","v":1.56,"f":"=2*(E14-0.10)+2*(F14-0.10)+0.16","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"M17","v":580.32,"f":"=K17*L17","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"N17","v":0.395,"f":"=ROUND((H17^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"O17","v":229.2264,"f":"=M17*N17","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"P17","v":0.229226,"f":"=O17/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"Q17","v":2,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"R17","v":"6 كانات / م","bg":"#F8FAFC","al":"center"},{"c":"S17","v":1.56,"f":"=2*(E14-0.10)+2*(F14-0.10)+0.16","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"T17","v":"كانة مغلقة بقفل 135 درجة","bg":"#F8FAFC"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":13,"al":"center"},{"c":"B18","v":"ميدة م2","b":true,"al":"center"},{"c":"C18","v":8,"in":true,"al":"center"},{"c":"D18","v":6.2,"in":true,"al":"center"},{"c":"E18","v":0.3,"in":true,"al":"center"},{"c":"F18","v":0.7,"in":true,"al":"center"},{"c":"G18","v":5,"in":true,"al":"center"},{"c":"H18","v":16,"in":true,"b":true,"al":"center"},{"c":"I18","v":"سفلي رئيسي"},{"c":"J18","v":4,"in":true,"al":"center"},{"c":"K18","v":32,"f":"=C18*J18","b":true,"al":"center"},{"c":"L18","v":7.05,"f":"=D18+0.85","b":true,"al":"center","nf":"0.00"},{"c":"M18","v":225.6,"f":"=K18*L18","b":true,"al":"center","nf":"#,##0.00"},{"c":"N18","v":1.58,"f":"=ROUND((H18^2)/162, 3)","al":"center","nf":"0.000"},{"c":"O18","v":356.448,"f":"=M18*N18","al":"center","nf":"#,##0.0"},{"c":"P18","v":0.356448,"f":"=O18/1000","b":true,"al":"center","nf":"0.000"},{"c":"Q18","v":"-","al":"center"},{"c":"R18","v":"-","al":"center"},{"c":"S18","v":"-","al":"center"},{"c":"T18","v":"ميدة سملات تحت حوائط الدور الأرضي"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":14,"bg":"#F8FAFC","al":"center"},{"c":"B19","v":"ميدة م2","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C19","v":8,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"D19","v":6.2,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E19","v":0.3,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F19","v":0.7,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G19","v":5,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H19","v":16,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"I19","v":"علوي رئيسي","bg":"#F8FAFC"},{"c":"J19","v":4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"K19","v":32,"f":"=C19*J19","bg":"#F8FAFC","b":true,"al":"center"},{"c":"L19","v":7.05,"f":"=D18+0.85","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"M19","v":225.6,"f":"=K19*L19","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"N19","v":1.58,"f":"=ROUND((H19^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"O19","v":356.448,"f":"=M19*N19","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"P19","v":0.356448,"f":"=O19/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"Q19","v":"-","bg":"#F8FAFC","al":"center"},{"c":"R19","v":"-","bg":"#F8FAFC","al":"center"},{"c":"S19","v":"-","bg":"#F8FAFC","al":"center"},{"c":"T19","v":"تمديد الأرجل داخل القواعد 60Φ","bg":"#F8FAFC"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":15,"al":"center"},{"c":"B20","v":"ميدة م2","b":true,"al":"center"},{"c":"C20","v":8,"in":true,"al":"center"},{"c":"D20","v":6.2,"in":true,"al":"center"},{"c":"E20","v":0.3,"in":true,"al":"center"},{"c":"F20","v":0.7,"in":true,"al":"center"},{"c":"G20","v":5,"in":true,"al":"center"},{"c":"H20","v":10,"in":true,"b":true,"al":"center"},{"c":"I20","v":"براندات انكماش"},{"c":"J20","v":4,"in":true,"al":"center"},{"c":"K20","v":32,"f":"=C20*J20","b":true,"al":"center"},{"c":"L20","v":6.7,"f":"=D18+0.50","b":true,"al":"center","nf":"0.00"},{"c":"M20","v":214.4,"f":"=K20*L20","b":true,"al":"center","nf":"#,##0.00"},{"c":"N20","v":0.617,"f":"=ROUND((H20^2)/162, 3)","al":"center","nf":"0.000"},{"c":"O20","v":132.2848,"f":"=M20*N20","al":"center","nf":"#,##0.0"},{"c":"P20","v":0.132285,"f":"=O20/1000","b":true,"al":"center","nf":"0.000"},{"c":"Q20","v":"-","al":"center"},{"c":"R20","v":"-","al":"center"},{"c":"S20","v":"-","al":"center"},{"c":"T20","v":"براندتين بكل جهة"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":16,"bg":"#F8FAFC","al":"center"},{"c":"B21","v":"ميدة م2","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C21","v":8,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"D21","v":6.2,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E21","v":0.3,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F21","v":0.7,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G21","v":5,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H21","v":8,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"I21","v":"كانات صندوقية 2 فرع","bg":"#F8FAFC"},{"c":"J21","v":39,"f":"=ROUNDUP(D18*6, 0)+1","bg":"#F8FAFC","al":"center"},{"c":"K21","v":312,"f":"=C21*J21","bg":"#F8FAFC","b":true,"al":"center"},{"c":"L21","v":1.76,"f":"=2*(E18-0.10)+2*(F18-0.10)+0.16","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"M21","v":549.12,"f":"=K21*L21","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"N21","v":0.395,"f":"=ROUND((H21^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"O21","v":216.9024,"f":"=M21*N21","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"P21","v":0.216902,"f":"=O21/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"Q21","v":2,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"R21","v":"6 كانات / م","bg":"#F8FAFC","al":"center"},{"c":"S21","v":1.76,"f":"=2*(E18-0.10)+2*(F18-0.10)+0.16","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"T21","v":"توزيع منتظم","bg":"#F8FAFC"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":"الإجمالي الكلي لحديد الشدادات والميد","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"K22","v":1378,"f":"=SUM(K6:K21)","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"L22","v":"","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center"},{"c":"M22","v":4543.14,"f":"=SUM(M6:M21)","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0.00"},{"c":"N22","v":"","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center"},{"c":"O22","v":5274.4585,"f":"=SUM(O6:O21)","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0.0"},{"c":"P22","v":5.274458,"f":"=SUM(P6:P21)","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"0.000"},{"c":"Q22","v":"","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center"},{"c":"R22","v":"","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center"},{"c":"S22","v":"","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center"},{"c":"T22","v":"","bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center"}]}]},{"name":"الأكواد والثوابت الهندسية","maxRow":23,"maxCol":8,"colWidths":[22.0,22.0,22.0,22.0,22.0,22.0,22.0,22.0],"rows":[{"r":1,"h":36.0,"cells":[{"c":"A1","v":"المرجع الفني والمعادلات الحسابية لتفريد وحصر حديد التسليح وفق الأكواد المعتمدة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":28.0,"cells":[{"c":"A2","v":""},{"c":"B2","v":""},{"c":"C2","v":""},{"c":"D2","v":""},{"c":"E2","v":""},{"c":"F2","v":""},{"c":"G2","v":""},{"c":"H2","v":""}]},{"r":3,"h":104.0,"cells":[{"c":"A3","v":"1. جدول الخصائص القياسية لأقطار حديد التسليح (Standard Rebar Properties):","fg":"#1E293B","b":true,"al":"center"},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"القطر الاسمي (Φ ملم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"مساحة المقطع (سم²)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"وزن المتر الطولي النظري (كجم/م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"عدد الأسياخ القياسية (12م) في الطن","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"طول التماسك بالشد (Ld = 50Φ)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"طول التماسك بالضغط (Ld = 40Φ)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"طول الوصلة المتراكبة (Lap = 60Φ)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"أقل طول لقفل الكانة الزلزالية (10Φ)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"Φ 8","b":true,"al":"center"},{"c":"B5","v":0.503,"in":true,"al":"center","nf":"0.000"},{"c":"C5","v":0.395,"f":"=ROUND((8^2)/162, 3)","al":"center","nf":"0.000"},{"c":"D5","v":211,"f":"=ROUND(1000/(C5*12), 1)","al":"center","nf":"0.0"},{"c":"E5","v":"0.40 م","al":"center"},{"c":"F5","v":"0.32 م","al":"center"},{"c":"G5","v":"0.48 م","al":"center"},{"c":"H5","v":"8.0 سم","al":"center"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"Φ 10","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B6","v":0.785,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"C6","v":0.617,"f":"=ROUND((10^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"D6","v":135.1,"f":"=ROUND(1000/(C6*12), 1)","bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"E6","v":"0.50 م","bg":"#F8FAFC","al":"center"},{"c":"F6","v":"0.40 م","bg":"#F8FAFC","al":"center"},{"c":"G6","v":"0.60 م","bg":"#F8FAFC","al":"center"},{"c":"H6","v":"10.0 سم","bg":"#F8FAFC","al":"center"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"Φ 12","b":true,"al":"center"},{"c":"B7","v":1.131,"in":true,"al":"center","nf":"0.000"},{"c":"C7","v":0.889,"f":"=ROUND((12^2)/162, 3)","al":"center","nf":"0.000"},{"c":"D7","v":93.7,"f":"=ROUND(1000/(C7*12), 1)","al":"center","nf":"0.0"},{"c":"E7","v":"0.60 م","al":"center"},{"c":"F7","v":"0.48 م","al":"center"},{"c":"G7","v":"0.72 م","al":"center"},{"c":"H7","v":"12.0 سم","al":"center"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"Φ 14","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B8","v":1.539,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"C8","v":1.21,"f":"=ROUND((14^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"D8","v":68.9,"f":"=ROUND(1000/(C8*12), 1)","bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"E8","v":"0.70 م","bg":"#F8FAFC","al":"center"},{"c":"F8","v":"0.56 م","bg":"#F8FAFC","al":"center"},{"c":"G8","v":"0.84 م","bg":"#F8FAFC","al":"center"},{"c":"H8","v":"14.0 سم","bg":"#F8FAFC","al":"center"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"Φ 16","b":true,"al":"center"},{"c":"B9","v":2.011,"in":true,"al":"center","nf":"0.000"},{"c":"C9","v":1.58,"f":"=ROUND((16^2)/162, 3)","al":"center","nf":"0.000"},{"c":"D9","v":52.7,"f":"=ROUND(1000/(C9*12), 1)","al":"center","nf":"0.0"},{"c":"E9","v":"0.80 م","al":"center"},{"c":"F9","v":"0.64 م","al":"center"},{"c":"G9","v":"0.96 م","al":"center"},{"c":"H9","v":"16.0 سم","al":"center"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":"Φ 18","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B10","v":2.545,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"C10","v":2,"f":"=ROUND((18^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"D10","v":41.7,"f":"=ROUND(1000/(C10*12), 1)","bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"E10","v":"0.90 م","bg":"#F8FAFC","al":"center"},{"c":"F10","v":"0.72 م","bg":"#F8FAFC","al":"center"},{"c":"G10","v":"1.08 م","bg":"#F8FAFC","al":"center"},{"c":"H10","v":"18.0 سم","bg":"#F8FAFC","al":"center"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":"Φ 20","b":true,"al":"center"},{"c":"B11","v":3.142,"in":true,"al":"center","nf":"0.000"},{"c":"C11","v":2.469,"f":"=ROUND((20^2)/162, 3)","al":"center","nf":"0.000"},{"c":"D11","v":33.8,"f":"=ROUND(1000/(C11*12), 1)","al":"center","nf":"0.0"},{"c":"E11","v":"1.00 م","al":"center"},{"c":"F11","v":"0.80 م","al":"center"},{"c":"G11","v":"1.20 م","al":"center"},{"c":"H11","v":"20.0 سم","al":"center"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":"Φ 22","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B12","v":3.801,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"C12","v":2.988,"f":"=ROUND((22^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"D12","v":27.9,"f":"=ROUND(1000/(C12*12), 1)","bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"E12","v":"1.10 م","bg":"#F8FAFC","al":"center"},{"c":"F12","v":"0.88 م","bg":"#F8FAFC","al":"center"},{"c":"G12","v":"1.32 م","bg":"#F8FAFC","al":"center"},{"c":"H12","v":"22.0 سم","bg":"#F8FAFC","al":"center"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":"Φ 25","b":true,"al":"center"},{"c":"B13","v":4.909,"in":true,"al":"center","nf":"0.000"},{"c":"C13","v":3.858,"f":"=ROUND((25^2)/162, 3)","al":"center","nf":"0.000"},{"c":"D13","v":21.6,"f":"=ROUND(1000/(C13*12), 1)","al":"center","nf":"0.0"},{"c":"E13","v":"1.25 م","al":"center"},{"c":"F13","v":"1.00 م","al":"center"},{"c":"G13","v":"1.50 م","al":"center"},{"c":"H13","v":"25.0 سم","al":"center"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":"Φ 28","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B14","v":6.158,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"C14","v":4.84,"f":"=ROUND((28^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"D14","v":17.2,"f":"=ROUND(1000/(C14*12), 1)","bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"E14","v":"1.40 م","bg":"#F8FAFC","al":"center"},{"c":"F14","v":"1.12 م","bg":"#F8FAFC","al":"center"},{"c":"G14","v":"1.68 م","bg":"#F8FAFC","al":"center"},{"c":"H14","v":"28.0 سم","bg":"#F8FAFC","al":"center"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":"Φ 32","b":true,"al":"center"},{"c":"B15","v":8.042,"in":true,"al":"center","nf":"0.000"},{"c":"C15","v":6.321,"f":"=ROUND((32^2)/162, 3)","al":"center","nf":"0.000"},{"c":"D15","v":13.2,"f":"=ROUND(1000/(C15*12), 1)","al":"center","nf":"0.0"},{"c":"E15","v":"1.60 م","al":"center"},{"c":"F15","v":"1.28 م","al":"center"},{"c":"G15","v":"1.92 م","al":"center"},{"c":"H15","v":"32.0 سم","al":"center"}]},{"r":16,"h":28.0,"cells":[{"c":"A16","v":""},{"c":"B16","v":""},{"c":"C16","v":""},{"c":"D16","v":""},{"c":"E16","v":""},{"c":"F16","v":""},{"c":"G16","v":""},{"c":"H16","v":""}]},{"r":17,"h":28.0,"cells":[{"c":"A17","v":""},{"c":"B17","v":""},{"c":"C17","v":""},{"c":"D17","v":""},{"c":"E17","v":""},{"c":"F17","v":""},{"c":"G17","v":""},{"c":"H17","v":""}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":"2. القوانين والمعادلات الهندسية المبرمجة بالشيت:","fg":"#1E293B","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":"معادلة وزن المتر الطولي للحديد:","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"C19","v":"W = D² / 162.2 (كجم/م)","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true},{"c":"E19","v":"حيث D هو قطر السيخ بالملليمتر وتنتج من كثافة الصلب (7850 كجم/م3) مقسومة على مساحة المقطع.","bg":"#F8FAFC","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":"معادلة خصم ثنيات التشكيل (Bend Deduction):","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"C20","v":"خصم 2D لكل ثنية 90 درجة، و 1D لكل ثنية 45 درجة","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true},{"c":"E20","v":"تخصم لتعويض استطالة الألياف الخارجية للسيخ أثناء الثني على البنك لضبط أبعاد القواعد بدقة.","bg":"#F8FAFC","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":21,"h":52.0,"cells":[{"c":"A21","v":"معادلة طول قطع السيخ للقاعدة (حرف U):","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"C21","v":"Cutting Length = (H - 2*Cover) + (L - 2*Cover) + (H - 2*Cover) - خصم الثنيات","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true},{"c":"E21","v":"تضمن بقاء الغطاء الخرساني (5 سم إلى 7 سم للقواعد) ثابتاً من جميع الجهات.","bg":"#F8FAFC","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":"معادلة حساب هالك الحديد التقديري (Scrap %):","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"C22","v":"وزن التوريد = الوزن النظري الصافي × (1 + نسبة الهالك)","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true},{"c":"E22","v":"تتراوح نسبة الهالك في القواعد والميد بين 3% إلى 5% وتصل إلى 7% في المنشآت غير المنتظمة.","bg":"#F8FAFC","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":23,"h":52.0,"cells":[{"c":"A23","v":"معادلة كانات الشدادات والميد:","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"C23","v":"طول الكانة = 2 × (العرض الصافي + العمق الصافي) + 2 × طول قفل الكانة الزلزالية (10Φ)","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true},{"c":"E23","v":"مع تفريغ قفل الكانات بزاوية 135 درجة وتبادل مواضع الأقفال.","bg":"#F8FAFC","cs":4},{"skip":true},{"skip":true},{"skip":true}]}]}]}