{"slug":"gravity-sewer-network-hydraulic-pipe-sizing-and-slope-sheet","sheets":[{"name":"الهيدروليكا وحسابات مانينغ","maxRow":20,"maxCol":20,"colWidths":[14.0,14.0,14.0,14.0,16.0,18.0,20.0,16.0,20.0,20.0,16.0,16.0,24.0,20.0,24.0,22.0,20.0,22.0,22.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"شيت تصميم وحسابات شبكات الصرف الصحي بالانحدار ومعادلة مانينغ","bg":"#0F2744","fg":"#FFFFFF","b":true,"al":"center","cs":19},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"T1","v":""}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"حساب أقطار المواسير، الميول، سرعات الجريان الذاتي V ≥ 0.6 m/s والتصرف الهيدروليكي وفق كود SBC 701 واشتراطات MOMRAH و ECP 102","bg":"#0F2744","fg":"#CFD8DC","al":"center","cs":19},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"T2","v":""}]},{"r":3,"h":104.0,"cells":[{"c":"A3","v":"مشروع الإنشاء:","fg":"#1F2937","b":true,"al":"center"},{"c":"B3","v":""},{"c":"C3","v":"شبكة الصرف الصحي لمخطط الفرسان السكني - الرياض","fg":"#1F2937","al":"center"},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":"المقاول المنفذ:","fg":"#1F2937","b":true,"al":"center"},{"c":"H3","v":""},{"c":"I3","v":"شركة أفق البنية التحتية للمقاولات العامة","fg":"#1F2937","al":"center"},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":"تاريخ الحساب:","fg":"#1F2937","b":true,"al":"center"},{"c":"N3","v":""},{"c":"O3","v":"2026-10-11","fg":"#1F2937","al":"center"},{"c":"P3","v":""},{"c":"Q3","v":""},{"c":"R3","v":""},{"c":"S3","v":""},{"c":"T3","v":""}]},{"r":4,"h":104.0,"cells":[{"c":"A4","v":"الاستشاري المشرف:","fg":"#1F2937","b":true,"al":"center"},{"c":"B4","v":""},{"c":"C4","v":"دار الرؤية للاستشارات الهندسية وفحص المشاريع","fg":"#1F2937","al":"center"},{"c":"D4","v":""},{"c":"E4","v":""},{"c":"F4","v":""},{"c":"G4","v":"الكود المرجعي:","fg":"#1F2937","b":true,"al":"center"},{"c":"H4","v":""},{"c":"I4","v":"كود SBC 701 واشتراطات شركة المياه الوطنية NWC","fg":"#1F2937","al":"center"},{"c":"J4","v":""},{"c":"K4","v":""},{"c":"L4","v":""},{"c":"M4","v":"معامل الأمان:","fg":"#1F2937","b":true,"al":"center"},{"c":"N4","v":""},{"c":"O4","v":"أقصى تدفق بالساعة Peak Factor = 2.50","fg":"#1F2937","al":"center"},{"c":"P4","v":""},{"c":"Q4","v":""},{"c":"R4","v":""},{"c":"S4","v":""},{"c":"T4","v":""}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"إجمالي أطوال خطوط الشبكة","bg":"#EAEEF3","fg":"#1F2937","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D5","v":"أقصى تدفق تصميمي Peak Flow","bg":"#EAEEF3","fg":"#1F2937","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"H5","v":"متوسط سرعة الجريان الفعلي","bg":"#EAEEF3","fg":"#1F2937","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"L5","v":"الامتثال لسرعة التنظيف الذاتي","bg":"#EAEEF3","fg":"#1F2937","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"P5","v":"حالة المطابقة الهيدروليكية","bg":"#EAEEF3","fg":"#1F2937","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"T5","v":""}]},{"r":6,"h":54.0,"cells":[{"c":"A6","v":525,"f":"=SUM(E9:E16)","bg":"#F8FAFC","fg":"#0F2744","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D6","v":95,"f":"=MAX(O9:O16)","bg":"#F8FAFC","fg":"#0F2744","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"H6","v":1.035,"f":"=AVERAGE(Q9:Q16)","bg":"#F8FAFC","fg":"#0F2744","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"L6","v":1,"f":"=COUNTIF(R9:R16, \"محقق وآمن\") / COUNTA(R9:R16)","bg":"#F8FAFC","fg":"#0F2744","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"P6","v":"كافة الخطوط مطابقة","f":"=IF(COUNTIF(T9:T16, \"مطابق للمواصفات\")=COUNTA(T9:T16), \"كافة الخطوط مطابقة\", \"توجد خطوط تحتاج مراجعة\")","bg":"#F8FAFC","fg":"#0F2744","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"T6","v":""}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""},{"c":"I7","v":""},{"c":"J7","v":""},{"c":"K7","v":""},{"c":"L7","v":""},{"c":"M7","v":""},{"c":"N7","v":""},{"c":"O7","v":""},{"c":"P7","v":""},{"c":"Q7","v":""},{"c":"R7","v":""},{"c":"S7","v":""},{"c":"T7","v":""}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"م","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B8","v":"كود الخط","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C8","v":"من منهل","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D8","v":"إلى منهل","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E8","v":"طول الخط (م)","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F8","v":"القطر الاسمي D (مم)","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G8","v":"نوع الماسورة","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H8","v":"معامل مانينغ n","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I8","v":"منسوب قاع بداية IL (م)","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J8","v":"منسوب قاع نهاية IL (م)","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K8","v":"ميل الخط (‰)","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L8","v":"ميل الخط S (م/م)","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M8","v":"التصرف الكلي ممتلئة Q_full (L/s)","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"N8","v":"السرعة ممتلئة V_full (m/s)","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"O8","v":"التصرف التصميمي Q_design (L/s)","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"P8","v":"نسبة الامتلاء التصميمية d/D","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"Q8","v":"السرعة الفعلية V_act (m/s)","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"R8","v":"فحص التنظيف الذاتي (≥0.6)","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"S8","v":"فحص سرعة النحر (≤3.0)","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"T8","v":"الحالة الهيدروليكية للخط","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":9,"h":36.0,"cells":[{"c":"A9","v":1,"fg":"#1F2937","al":"center"},{"c":"B9","v":"L-01","fg":"#1F2937","al":"center"},{"c":"C9","v":"MH-01","fg":"#1F2937","al":"center"},{"c":"D9","v":"MH-02","fg":"#1F2937","al":"center"},{"c":"E9","v":52,"in":true,"fg":"#1F2937","al":"center","nf":"0.00"},{"c":"F9","v":200,"in":true,"fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"G9","v":"uPVC Class 4","fg":"#1F2937","al":"center"},{"c":"H9","v":0.01,"in":true,"fg":"#1F2937","al":"center","nf":"0.000"},{"c":"I9","v":624.5,"in":true,"fg":"#1F2937","al":"center","nf":"0.00"},{"c":"J9","v":624.21,"in":true,"fg":"#1F2937","al":"center","nf":"0.00"},{"c":"K9","v":5.58,"f":"=ROUND((I9-J9)/E9*1000, 2)","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"L9","v":0.00558,"f":"=K9/1000","fg":"#1F2937","al":"center","nf":"0.0000"},{"c":"M9","v":31.85,"f":"=ROUND((1/H9)*(PI()*(F9/1000)^2/4)*((F9/1000)/4)^(2/3)*(L9^0.5)*1000, 2)","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"N9","v":1.01,"f":"=ROUND((1/H9)*((F9/1000)/4)^(2/3)*(L9^0.5), 2)","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"O9","v":15.2,"in":true,"fg":"#1F2937","al":"center","nf":"0.00"},{"c":"P9","v":0.55,"in":true,"fg":"#1F2937","al":"center","nf":"0.00"},{"c":"Q9","v":0.79,"f":"=ROUND(N9*(P9^0.42), 2)","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"R9","v":"محقق وآمن","f":"=IF(Q9>=0.6, \"محقق وآمن\", \"سرعة بطيئة - ترسبات\")","bg":"#E8F8F2","fg":"#0E6251","b":true,"al":"center"},{"c":"S9","v":"محقق وآمن","f":"=IF(Q9<=3.0, \"محقق وآمن\", \"سرعة عالية - نحر\")","bg":"#E8F8F2","fg":"#0E6251","b":true,"al":"center"},{"c":"T9","v":"مطابق للمواصفات","f":"=IF(AND(R9=\"محقق وآمن\", S9=\"محقق وآمن\"), \"مطابق للمواصفات\", \"يتطلب تعديل الميل/القطر\")","bg":"#E8F8F2","fg":"#1F2937","b":true,"al":"center"}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":2,"bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"B10","v":"L-02","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"C10","v":"MH-02","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"D10","v":"MH-03","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"E10","v":48,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"F10","v":200,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"G10","v":"uPVC Class 4","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"H10","v":0.01,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.000"},{"c":"I10","v":624.21,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"J10","v":623.95,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"K10","v":5.42,"f":"=ROUND((I10-J10)/E10*1000, 2)","bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"L10","v":0.00542,"f":"=K10/1000","bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.0000"},{"c":"M10","v":31.39,"f":"=ROUND((1/H10)*(PI()*(F10/1000)^2/4)*((F10/1000)/4)^(2/3)*(L10^0.5)*1000, 2)","bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"N10","v":1,"f":"=ROUND((1/H10)*((F10/1000)/4)^(2/3)*(L10^0.5), 2)","bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"O10","v":18.5,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"P10","v":0.6,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"Q10","v":0.81,"f":"=ROUND(N10*(P10^0.42), 2)","bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"R10","v":"محقق وآمن","f":"=IF(Q10>=0.6, \"محقق وآمن\", \"سرعة بطيئة - ترسبات\")","bg":"#E8F8F2","fg":"#0E6251","b":true,"al":"center"},{"c":"S10","v":"محقق وآمن","f":"=IF(Q10<=3.0, \"محقق وآمن\", \"سرعة عالية - نحر\")","bg":"#E8F8F2","fg":"#0E6251","b":true,"al":"center"},{"c":"T10","v":"مطابق للمواصفات","f":"=IF(AND(R10=\"محقق وآمن\", S10=\"محقق وآمن\"), \"مطابق للمواصفات\", \"يتطلب تعديل الميل/القطر\")","bg":"#E8F8F2","fg":"#1F2937","b":true,"al":"center"}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":3,"fg":"#1F2937","al":"center"},{"c":"B11","v":"L-03","fg":"#1F2937","al":"center"},{"c":"C11","v":"MH-03","fg":"#1F2937","al":"center"},{"c":"D11","v":"MH-04","fg":"#1F2937","al":"center"},{"c":"E11","v":60,"in":true,"fg":"#1F2937","al":"center","nf":"0.00"},{"c":"F11","v":250,"in":true,"fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"G11","v":"uPVC Class 4","fg":"#1F2937","al":"center"},{"c":"H11","v":0.01,"in":true,"fg":"#1F2937","al":"center","nf":"0.000"},{"c":"I11","v":623.95,"in":true,"fg":"#1F2937","al":"center","nf":"0.00"},{"c":"J11","v":623.62,"in":true,"fg":"#1F2937","al":"center","nf":"0.00"},{"c":"K11","v":5.5,"f":"=ROUND((I11-J11)/E11*1000, 2)","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"L11","v":0.0055,"f":"=K11/1000","fg":"#1F2937","al":"center","nf":"0.0000"},{"c":"M11","v":57.33,"f":"=ROUND((1/H11)*(PI()*(F11/1000)^2/4)*((F11/1000)/4)^(2/3)*(L11^0.5)*1000, 2)","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"N11","v":1.17,"f":"=ROUND((1/H11)*((F11/1000)/4)^(2/3)*(L11^0.5), 2)","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"O11","v":28.4,"in":true,"fg":"#1F2937","al":"center","nf":"0.00"},{"c":"P11","v":0.58,"in":true,"fg":"#1F2937","al":"center","nf":"0.00"},{"c":"Q11","v":0.93,"f":"=ROUND(N11*(P11^0.42), 2)","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"R11","v":"محقق وآمن","f":"=IF(Q11>=0.6, \"محقق وآمن\", \"سرعة بطيئة - ترسبات\")","bg":"#E8F8F2","fg":"#0E6251","b":true,"al":"center"},{"c":"S11","v":"محقق وآمن","f":"=IF(Q11<=3.0, \"محقق وآمن\", \"سرعة عالية - نحر\")","bg":"#E8F8F2","fg":"#0E6251","b":true,"al":"center"},{"c":"T11","v":"مطابق للمواصفات","f":"=IF(AND(R11=\"محقق وآمن\", S11=\"محقق وآمن\"), \"مطابق للمواصفات\", \"يتطلب تعديل الميل/القطر\")","bg":"#E8F8F2","fg":"#1F2937","b":true,"al":"center"}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":4,"bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"B12","v":"L-04","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"C12","v":"MH-04","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"D12","v":"MH-05","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"E12","v":55,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"F12","v":250,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"G12","v":"uPVC Class 4","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"H12","v":0.01,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.000"},{"c":"I12","v":623.62,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"J12","v":623.32,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"K12","v":5.45,"f":"=ROUND((I12-J12)/E12*1000, 2)","bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"L12","v":0.00545,"f":"=K12/1000","bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.0000"},{"c":"M12","v":57.07,"f":"=ROUND((1/H12)*(PI()*(F12/1000)^2/4)*((F12/1000)/4)^(2/3)*(L12^0.5)*1000, 2)","bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"N12","v":1.16,"f":"=ROUND((1/H12)*((F12/1000)/4)^(2/3)*(L12^0.5), 2)","bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"O12","v":34,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"P12","v":0.62,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"Q12","v":0.95,"f":"=ROUND(N12*(P12^0.42), 2)","bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"R12","v":"محقق وآمن","f":"=IF(Q12>=0.6, \"محقق وآمن\", \"سرعة بطيئة - ترسبات\")","bg":"#E8F8F2","fg":"#0E6251","b":true,"al":"center"},{"c":"S12","v":"محقق وآمن","f":"=IF(Q12<=3.0, \"محقق وآمن\", \"سرعة عالية - نحر\")","bg":"#E8F8F2","fg":"#0E6251","b":true,"al":"center"},{"c":"T12","v":"مطابق للمواصفات","f":"=IF(AND(R12=\"محقق وآمن\", S12=\"محقق وآمن\"), \"مطابق للمواصفات\", \"يتطلب تعديل الميل/القطر\")","bg":"#E8F8F2","fg":"#1F2937","b":true,"al":"center"}]},{"r":13,"h":36.0,"cells":[{"c":"A13","v":5,"fg":"#1F2937","al":"center"},{"c":"B13","v":"L-05","fg":"#1F2937","al":"center"},{"c":"C13","v":"MH-05","fg":"#1F2937","al":"center"},{"c":"D13","v":"MH-06","fg":"#1F2937","al":"center"},{"c":"E13","v":65,"in":true,"fg":"#1F2937","al":"center","nf":"0.00"},{"c":"F13","v":315,"in":true,"fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"G13","v":"uPVC Class 4","fg":"#1F2937","al":"center"},{"c":"H13","v":0.01,"in":true,"fg":"#1F2937","al":"center","nf":"0.000"},{"c":"I13","v":623.32,"in":true,"fg":"#1F2937","al":"center","nf":"0.00"},{"c":"J13","v":622.96,"in":true,"fg":"#1F2937","al":"center","nf":"0.00"},{"c":"K13","v":5.54,"f":"=ROUND((I13-J13)/E13*1000, 2)","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"L13","v":0.00554,"f":"=K13/1000","fg":"#1F2937","al":"center","nf":"0.0000"},{"c":"M13","v":106.57,"f":"=ROUND((1/H13)*(PI()*(F13/1000)^2/4)*((F13/1000)/4)^(2/3)*(L13^0.5)*1000, 2)","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"N13","v":1.37,"f":"=ROUND((1/H13)*((F13/1000)/4)^(2/3)*(L13^0.5), 2)","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"O13","v":48.6,"in":true,"fg":"#1F2937","al":"center","nf":"0.00"},{"c":"P13","v":0.65,"in":true,"fg":"#1F2937","al":"center","nf":"0.00"},{"c":"Q13","v":1.14,"f":"=ROUND(N13*(P13^0.42), 2)","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"R13","v":"محقق وآمن","f":"=IF(Q13>=0.6, \"محقق وآمن\", \"سرعة بطيئة - ترسبات\")","bg":"#E8F8F2","fg":"#0E6251","b":true,"al":"center"},{"c":"S13","v":"محقق وآمن","f":"=IF(Q13<=3.0, \"محقق وآمن\", \"سرعة عالية - نحر\")","bg":"#E8F8F2","fg":"#0E6251","b":true,"al":"center"},{"c":"T13","v":"مطابق للمواصفات","f":"=IF(AND(R13=\"محقق وآمن\", S13=\"محقق وآمن\"), \"مطابق للمواصفات\", \"يتطلب تعديل الميل/القطر\")","bg":"#E8F8F2","fg":"#1F2937","b":true,"al":"center"}]},{"r":14,"h":36.0,"cells":[{"c":"A14","v":6,"bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"B14","v":"L-06","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"C14","v":"MH-06","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"D14","v":"MH-07","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"E14","v":70,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"F14","v":315,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"G14","v":"uPVC Class 4","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"H14","v":0.01,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.000"},{"c":"I14","v":622.96,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"J14","v":622.58,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"K14","v":5.43,"f":"=ROUND((I14-J14)/E14*1000, 2)","bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"L14","v":0.00543,"f":"=K14/1000","bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.0000"},{"c":"M14","v":105.51,"f":"=ROUND((1/H14)*(PI()*(F14/1000)^2/4)*((F14/1000)/4)^(2/3)*(L14^0.5)*1000, 2)","bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"N14","v":1.35,"f":"=ROUND((1/H14)*((F14/1000)/4)^(2/3)*(L14^0.5), 2)","bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"O14","v":56.2,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"P14","v":0.68,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"Q14","v":1.15,"f":"=ROUND(N14*(P14^0.42), 2)","bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"R14","v":"محقق وآمن","f":"=IF(Q14>=0.6, \"محقق وآمن\", \"سرعة بطيئة - ترسبات\")","bg":"#E8F8F2","fg":"#0E6251","b":true,"al":"center"},{"c":"S14","v":"محقق وآمن","f":"=IF(Q14<=3.0, \"محقق وآمن\", \"سرعة عالية - نحر\")","bg":"#E8F8F2","fg":"#0E6251","b":true,"al":"center"},{"c":"T14","v":"مطابق للمواصفات","f":"=IF(AND(R14=\"محقق وآمن\", S14=\"محقق وآمن\"), \"مطابق للمواصفات\", \"يتطلب تعديل الميل/القطر\")","bg":"#E8F8F2","fg":"#1F2937","b":true,"al":"center"}]},{"r":15,"h":36.0,"cells":[{"c":"A15","v":7,"fg":"#1F2937","al":"center"},{"c":"B15","v":"L-07","fg":"#1F2937","al":"center"},{"c":"C15","v":"MH-07","fg":"#1F2937","al":"center"},{"c":"D15","v":"MH-08","fg":"#1F2937","al":"center"},{"c":"E15","v":85,"in":true,"fg":"#1F2937","al":"center","nf":"0.00"},{"c":"F15","v":400,"in":true,"fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"G15","v":"GRP SN5000","fg":"#1F2937","al":"center"},{"c":"H15","v":0.011,"in":true,"fg":"#1F2937","al":"center","nf":"0.000"},{"c":"I15","v":622.58,"in":true,"fg":"#1F2937","al":"center","nf":"0.00"},{"c":"J15","v":622.11,"in":true,"fg":"#1F2937","al":"center","nf":"0.00"},{"c":"K15","v":5.53,"f":"=ROUND((I15-J15)/E15*1000, 2)","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"L15","v":0.00553,"f":"=K15/1000","fg":"#1F2937","al":"center","nf":"0.0000"},{"c":"M15","v":183.03,"f":"=ROUND((1/H15)*(PI()*(F15/1000)^2/4)*((F15/1000)/4)^(2/3)*(L15^0.5)*1000, 2)","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"N15","v":1.46,"f":"=ROUND((1/H15)*((F15/1000)/4)^(2/3)*(L15^0.5), 2)","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"O15","v":82.5,"in":true,"fg":"#1F2937","al":"center","nf":"0.00"},{"c":"P15","v":0.7,"in":true,"fg":"#1F2937","al":"center","nf":"0.00"},{"c":"Q15","v":1.26,"f":"=ROUND(N15*(P15^0.42), 2)","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"R15","v":"محقق وآمن","f":"=IF(Q15>=0.6, \"محقق وآمن\", \"سرعة بطيئة - ترسبات\")","bg":"#E8F8F2","fg":"#0E6251","b":true,"al":"center"},{"c":"S15","v":"محقق وآمن","f":"=IF(Q15<=3.0, \"محقق وآمن\", \"سرعة عالية - نحر\")","bg":"#E8F8F2","fg":"#0E6251","b":true,"al":"center"},{"c":"T15","v":"مطابق للمواصفات","f":"=IF(AND(R15=\"محقق وآمن\", S15=\"محقق وآمن\"), \"مطابق للمواصفات\", \"يتطلب تعديل الميل/القطر\")","bg":"#E8F8F2","fg":"#1F2937","b":true,"al":"center"}]},{"r":16,"h":36.0,"cells":[{"c":"A16","v":8,"bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"B16","v":"L-08","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"C16","v":"MH-08","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"D16","v":"MH-09","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"E16","v":90,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"F16","v":400,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"#,##0"},{"c":"G16","v":"GRP SN5000","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"H16","v":0.011,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.000"},{"c":"I16","v":622.11,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"J16","v":621.62,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"K16","v":5.44,"f":"=ROUND((I16-J16)/E16*1000, 2)","bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"L16","v":0.00544,"f":"=K16/1000","bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.0000"},{"c":"M16","v":181.53,"f":"=ROUND((1/H16)*(PI()*(F16/1000)^2/4)*((F16/1000)/4)^(2/3)*(L16^0.5)*1000, 2)","bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"N16","v":1.44,"f":"=ROUND((1/H16)*((F16/1000)/4)^(2/3)*(L16^0.5), 2)","bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"O16","v":95,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"P16","v":0.72,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"Q16","v":1.25,"f":"=ROUND(N16*(P16^0.42), 2)","bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"R16","v":"محقق وآمن","f":"=IF(Q16>=0.6, \"محقق وآمن\", \"سرعة بطيئة - ترسبات\")","bg":"#E8F8F2","fg":"#0E6251","b":true,"al":"center"},{"c":"S16","v":"محقق وآمن","f":"=IF(Q16<=3.0, \"محقق وآمن\", \"سرعة عالية - نحر\")","bg":"#E8F8F2","fg":"#0E6251","b":true,"al":"center"},{"c":"T16","v":"مطابق للمواصفات","f":"=IF(AND(R16=\"محقق وآمن\", S16=\"محقق وآمن\"), \"مطابق للمواصفات\", \"يتطلب تعديل الميل/القطر\")","bg":"#E8F8F2","fg":"#1F2937","b":true,"al":"center"}]},{"r":17,"h":40.0,"cells":[{"c":"A17","v":"الإجمالي العام والمتوسطات الهيدروليكية","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"E17","v":525,"f":"=SUM(E9:E16)","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F17","v":"متوسط ميل الخطوط والتصرفات","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"K17","v":5.48625,"f":"=AVERAGE(K9:K16)","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center","nf":"0.00"},{"c":"L17","v":0.005486,"f":"=AVERAGE(L9:L16)","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center","nf":"0.0000"},{"c":"M17","v":754.28,"f":"=SUM(M9:M16)","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"N17","v":1.245,"f":"=AVERAGE(N9:N16)","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center","nf":"0.00"},{"c":"O17","v":378.4,"f":"=SUM(O9:O16)","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"P17","v":0.6375,"f":"=AVERAGE(P9:P16)","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center","nf":"0.00"},{"c":"Q17","v":1.035,"f":"=AVERAGE(Q9:Q16)","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center","nf":"0.00"},{"c":"R17","v":"كافة الاختبارات ناجحة ومحققة","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":18,"h":28.0,"cells":[{"c":"A18","v":""},{"c":"B18","v":""},{"c":"C18","v":""},{"c":"D18","v":""},{"c":"E18","v":""},{"c":"F18","v":""},{"c":"G18","v":""},{"c":"H18","v":""},{"c":"I18","v":""},{"c":"J18","v":""},{"c":"K18","v":""},{"c":"L18","v":""},{"c":"M18","v":""},{"c":"N18","v":""},{"c":"O18","v":""},{"c":"P18","v":""},{"c":"Q18","v":""},{"c":"R18","v":""},{"c":"S18","v":""},{"c":"T18","v":""}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":"ملاحظات واشتراطات الكود الهندسي لشبكات الصرف الصحي بالانحدار:","fg":"#1F2937","b":true,"cs":20},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":20,"h":72.0,"cells":[{"c":"A20","v":"1. الحد الأدنى لسرعة الجريان (Self-Cleansing Velocity) هو 0.60 م/ث عند أدنى تصرف يومي لمنع ترسب المواد العالقة والرمال وفق SBC 701.\n2. الحد الأقصى لسرعة الجريان (Scouring Velocity) هو 3.00 م/ث لمنع تآكل ونحر جدران المواسير ووصلات الجوانات المطاطية.\n3. أقصى نسبة امتلاء مسموحة للقطاع المائي (d/D) هي 0.75 للأقطار حتى 315 مم و0.80 للأقطار الأكبر لتوفير حيز لتهوية غاز كبريتيد الهيدروجين H2S.","fg":"#1F2937","cs":20},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]}]},{"name":"بيانات المناهل وغرف التفتيش","maxRow":14,"maxCol":13,"colWidths":[14.0,14.0,18.0,22.0,22.0,22.0,18.0,20.0,22.0,24.0,22.0,24.0,20.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول حصر وتوصيف مناهل وغرف تفتيش الصرف الصحي (Manhole Schedule)","bg":"#0F2744","fg":"#FFFFFF","b":true,"al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"تحديد مناسيب الأغطية والقيعان، أعماق الحفر، اشتراطات هدارات السقوط وفئات التحمل للأغطية D400 وفق اشتراطات MOMRAH","bg":"#0F2744","fg":"#CFD8DC","al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"م","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"كود المنهل","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"الموقع / الستيشن","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"منسوب الغطاء الأرضي GL (م)","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"منسوب قاع الداخل IL In (م)","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"منسوب قاع الخارج IL Out (م)","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"فرق الهبوط الداخلي (م)","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"العمق الإجمالي للمنهل (م)","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"تصنيف قطر المنهل النموذجي","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J4","v":"اشتراطات هدارة السقوط Backdrop","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K4","v":"طريقة التنفيذ والتوريد","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L4","v":"متطلبات العزل والتبطين","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M4","v":"فئة تحمل الغطاء (Class)","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":1,"fg":"#1F2937","al":"center"},{"c":"B5","v":"MH-01","fg":"#1F2937","al":"center"},{"c":"C5","v":"Sta. 0+000 - بداية المخطط","fg":"#1F2937","al":"center"},{"c":"D5","v":627,"in":true,"fg":"#1F2937","al":"center","nf":"0.00"},{"c":"E5","v":624.5,"in":true,"fg":"#1F2937","al":"center","nf":"0.00"},{"c":"F5","v":624.5,"in":true,"fg":"#1F2937","al":"center","nf":"0.00"},{"c":"G5","v":0,"f":"=ROUND(E5-F5, 2)","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"H5","v":2.5,"f":"=ROUND(D5-F5, 2)","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"I5","v":"منهل قياسي 1200 مم","f":"=IF(H5<1.5, \"منهل سطحي 1000 مم\", IF(H5<=3.0, \"منهل قياسي 1200 مم\", \"منهل عميق 1500 مم\"))","fg":"#1F2937","al":"center"},{"c":"J5","v":"انحدار مباشر بصينية المنهل Direct Bench","f":"=IF(G5>=0.6, \"يلزم هدارة سقوط Drop Backdrop\", \"انحدار مباشر بصينية المنهل Direct Bench\")","bg":"#FDF6E2","fg":"#7D3C98","b":true,"al":"center"},{"c":"K5","v":"خرسانة مسلحة مسبقة الصنع Precast","fg":"#1F2937","al":"center"},{"c":"L5","v":"تبطين داخلي HDPE Liner","fg":"#1F2937","al":"center"},{"c":"M5","v":"حديد زهر مرن فئة D400","fg":"#1F2937","al":"center"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":2,"bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"B6","v":"MH-02","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"C6","v":"Sta. 0+052 - تقاطع شارع 15","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"D6","v":626.85,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"E6","v":624.21,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"F6","v":624.21,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"G6","v":0,"f":"=ROUND(E6-F6, 2)","bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"H6","v":2.64,"f":"=ROUND(D6-F6, 2)","bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"I6","v":"منهل قياسي 1200 مم","f":"=IF(H6<1.5, \"منهل سطحي 1000 مم\", IF(H6<=3.0, \"منهل قياسي 1200 مم\", \"منهل عميق 1500 مم\"))","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"J6","v":"انحدار مباشر بصينية المنهل Direct Bench","f":"=IF(G6>=0.6, \"يلزم هدارة سقوط Drop Backdrop\", \"انحدار مباشر بصينية المنهل Direct Bench\")","bg":"#FDF6E2","fg":"#7D3C98","b":true,"al":"center"},{"c":"K6","v":"خرسانة مسلحة مسبقة الصنع Precast","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"L6","v":"تبطين داخلي HDPE Liner","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"M6","v":"حديد زهر مرن فئة D400","bg":"#F0F4F8","fg":"#1F2937","al":"center"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":3,"fg":"#1F2937","al":"center"},{"c":"B7","v":"MH-03","fg":"#1F2937","al":"center"},{"c":"C7","v":"Sta. 0+100 - تقاطع رئيسي","fg":"#1F2937","al":"center"},{"c":"D7","v":626.7,"in":true,"fg":"#1F2937","al":"center","nf":"0.00"},{"c":"E7","v":623.95,"in":true,"fg":"#1F2937","al":"center","nf":"0.00"},{"c":"F7","v":623.95,"in":true,"fg":"#1F2937","al":"center","nf":"0.00"},{"c":"G7","v":0,"f":"=ROUND(E7-F7, 2)","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"H7","v":2.75,"f":"=ROUND(D7-F7, 2)","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"I7","v":"منهل قياسي 1200 مم","f":"=IF(H7<1.5, \"منهل سطحي 1000 مم\", IF(H7<=3.0, \"منهل قياسي 1200 مم\", \"منهل عميق 1500 مم\"))","fg":"#1F2937","al":"center"},{"c":"J7","v":"انحدار مباشر بصينية المنهل Direct Bench","f":"=IF(G7>=0.6, \"يلزم هدارة سقوط Drop Backdrop\", \"انحدار مباشر بصينية المنهل Direct Bench\")","bg":"#FDF6E2","fg":"#7D3C98","b":true,"al":"center"},{"c":"K7","v":"خرسانة مسلحة مسبقة الصنع Precast","fg":"#1F2937","al":"center"},{"c":"L7","v":"تبطين داخلي HDPE Liner","fg":"#1F2937","al":"center"},{"c":"M7","v":"حديد زهر مرن فئة D400","fg":"#1F2937","al":"center"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":4,"bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"B8","v":"MH-04","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"C8","v":"Sta. 0+160 - شارع 20 تجاري","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"D8","v":626.5,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"E8","v":623.62,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"F8","v":623.62,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"G8","v":0,"f":"=ROUND(E8-F8, 2)","bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"H8","v":2.88,"f":"=ROUND(D8-F8, 2)","bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"I8","v":"منهل قياسي 1200 مم","f":"=IF(H8<1.5, \"منهل سطحي 1000 مم\", IF(H8<=3.0, \"منهل قياسي 1200 مم\", \"منهل عميق 1500 مم\"))","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"J8","v":"انحدار مباشر بصينية المنهل Direct Bench","f":"=IF(G8>=0.6, \"يلزم هدارة سقوط Drop Backdrop\", \"انحدار مباشر بصينية المنهل Direct Bench\")","bg":"#FDF6E2","fg":"#7D3C98","b":true,"al":"center"},{"c":"K8","v":"خرسانة مسلحة مسبقة الصنع Precast","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"L8","v":"تبطين داخلي HDPE Liner","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"M8","v":"حديد زهر مرن فئة D400","bg":"#F0F4F8","fg":"#1F2937","al":"center"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":5,"fg":"#1F2937","al":"center"},{"c":"B9","v":"MH-05","fg":"#1F2937","al":"center"},{"c":"C9","v":"Sta. 0+215 - ميدان الحي","fg":"#1F2937","al":"center"},{"c":"D9","v":626.4,"in":true,"fg":"#1F2937","al":"center","nf":"0.00"},{"c":"E9","v":624.1,"in":true,"fg":"#1F2937","al":"center","nf":"0.00"},{"c":"F9","v":623.32,"in":true,"fg":"#1F2937","al":"center","nf":"0.00"},{"c":"G9","v":0.78,"f":"=ROUND(E9-F9, 2)","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"H9","v":3.08,"f":"=ROUND(D9-F9, 2)","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"I9","v":"منهل عميق 1500 مم","f":"=IF(H9<1.5, \"منهل سطحي 1000 مم\", IF(H9<=3.0, \"منهل قياسي 1200 مم\", \"منهل عميق 1500 مم\"))","fg":"#1F2937","al":"center"},{"c":"J9","v":"يلزم هدارة سقوط Drop Backdrop","f":"=IF(G9>=0.6, \"يلزم هدارة سقوط Drop Backdrop\", \"انحدار مباشر بصينية المنهل Direct Bench\")","bg":"#FDF6E2","fg":"#7D3C98","b":true,"al":"center"},{"c":"K9","v":"خرسانة مسلحة مسبقة الصنع Precast","fg":"#1F2937","al":"center"},{"c":"L9","v":"تبطين داخلي HDPE Liner","fg":"#1F2937","al":"center"},{"c":"M9","v":"حديد زهر مرن فئة D400","fg":"#1F2937","al":"center"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":6,"bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"B10","v":"MH-06","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"C10","v":"Sta. 0+280 - شارع 30","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"D10","v":626.2,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"E10","v":622.96,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"F10","v":622.96,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"G10","v":0,"f":"=ROUND(E10-F10, 2)","bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"H10","v":3.24,"f":"=ROUND(D10-F10, 2)","bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"I10","v":"منهل عميق 1500 مم","f":"=IF(H10<1.5, \"منهل سطحي 1000 مم\", IF(H10<=3.0, \"منهل قياسي 1200 مم\", \"منهل عميق 1500 مم\"))","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"J10","v":"انحدار مباشر بصينية المنهل Direct Bench","f":"=IF(G10>=0.6, \"يلزم هدارة سقوط Drop Backdrop\", \"انحدار مباشر بصينية المنهل Direct Bench\")","bg":"#FDF6E2","fg":"#7D3C98","b":true,"al":"center"},{"c":"K10","v":"خرسانة مسلحة مسبقة الصنع Precast","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"L10","v":"تبطين داخلي HDPE Liner","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"M10","v":"حديد زهر مرن فئة D400","bg":"#F0F4F8","fg":"#1F2937","al":"center"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":7,"fg":"#1F2937","al":"center"},{"c":"B11","v":"MH-07","fg":"#1F2937","al":"center"},{"c":"C11","v":"Sta. 0+350 - تقاطع مجمع تجاري","fg":"#1F2937","al":"center"},{"c":"D11","v":626,"in":true,"fg":"#1F2937","al":"center","nf":"0.00"},{"c":"E11","v":622.58,"in":true,"fg":"#1F2937","al":"center","nf":"0.00"},{"c":"F11","v":622.58,"in":true,"fg":"#1F2937","al":"center","nf":"0.00"},{"c":"G11","v":0,"f":"=ROUND(E11-F11, 2)","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"H11","v":3.42,"f":"=ROUND(D11-F11, 2)","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"I11","v":"منهل عميق 1500 مم","f":"=IF(H11<1.5, \"منهل سطحي 1000 مم\", IF(H11<=3.0, \"منهل قياسي 1200 مم\", \"منهل عميق 1500 مم\"))","fg":"#1F2937","al":"center"},{"c":"J11","v":"انحدار مباشر بصينية المنهل Direct Bench","f":"=IF(G11>=0.6, \"يلزم هدارة سقوط Drop Backdrop\", \"انحدار مباشر بصينية المنهل Direct Bench\")","bg":"#FDF6E2","fg":"#7D3C98","b":true,"al":"center"},{"c":"K11","v":"خرسانة مسلحة مسبقة الصنع Precast","fg":"#1F2937","al":"center"},{"c":"L11","v":"تبطين داخلي HDPE Liner","fg":"#1F2937","al":"center"},{"c":"M11","v":"حديد زهر مرن فئة D400","fg":"#1F2937","al":"center"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":8,"bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"B12","v":"MH-08","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"C12","v":"Sta. 0+435 - خط التجميع","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"D12","v":625.8,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"E12","v":622.11,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"F12","v":622.11,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"G12","v":0,"f":"=ROUND(E12-F12, 2)","bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"H12","v":3.69,"f":"=ROUND(D12-F12, 2)","bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"I12","v":"منهل عميق 1500 مم","f":"=IF(H12<1.5, \"منهل سطحي 1000 مم\", IF(H12<=3.0, \"منهل قياسي 1200 مم\", \"منهل عميق 1500 مم\"))","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"J12","v":"انحدار مباشر بصينية المنهل Direct Bench","f":"=IF(G12>=0.6, \"يلزم هدارة سقوط Drop Backdrop\", \"انحدار مباشر بصينية المنهل Direct Bench\")","bg":"#FDF6E2","fg":"#7D3C98","b":true,"al":"center"},{"c":"K12","v":"خرسانة مسلحة مسبقة الصنع Precast","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"L12","v":"تبطين داخلي HDPE Liner","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"M12","v":"حديد زهر مرن فئة D400","bg":"#F0F4F8","fg":"#1F2937","al":"center"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":9,"fg":"#1F2937","al":"center"},{"c":"B13","v":"MH-09","fg":"#1F2937","al":"center"},{"c":"C13","v":"Sta. 0+525 - نقطة الربط العمومية","fg":"#1F2937","al":"center"},{"c":"D13","v":625.5,"in":true,"fg":"#1F2937","al":"center","nf":"0.00"},{"c":"E13","v":621.62,"in":true,"fg":"#1F2937","al":"center","nf":"0.00"},{"c":"F13","v":621.62,"in":true,"fg":"#1F2937","al":"center","nf":"0.00"},{"c":"G13","v":0,"f":"=ROUND(E13-F13, 2)","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"H13","v":3.88,"f":"=ROUND(D13-F13, 2)","fg":"#1F2937","al":"center","nf":"0.00"},{"c":"I13","v":"منهل عميق 1500 مم","f":"=IF(H13<1.5, \"منهل سطحي 1000 مم\", IF(H13<=3.0, \"منهل قياسي 1200 مم\", \"منهل عميق 1500 مم\"))","fg":"#1F2937","al":"center"},{"c":"J13","v":"انحدار مباشر بصينية المنهل Direct Bench","f":"=IF(G13>=0.6, \"يلزم هدارة سقوط Drop Backdrop\", \"انحدار مباشر بصينية المنهل Direct Bench\")","bg":"#FDF6E2","fg":"#7D3C98","b":true,"al":"center"},{"c":"K13","v":"صب في الموقع Cast-in-situ","fg":"#1F2937","al":"center"},{"c":"L13","v":"تبطين إيبوكسي قطران فحم كول تار","fg":"#1F2937","al":"center"},{"c":"M13","v":"حديد زهر مرن فئة D400","fg":"#1F2937","al":"center"}]},{"r":14,"h":40.0,"cells":[{"c":"A14","v":"متوسط وإجمالي أعماق المناهل","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D14","v":626.327778,"f":"=AVERAGE(D5:D13)","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center","nf":"0.00"},{"c":"E14","v":"متوسط فرق الهبوط الداخلي","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H14","v":3.12,"f":"=AVERAGE(H5:H13)","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center","nf":"0.00"},{"c":"I14","v":"إجمالي عدد المناهل المحصورة: 9 مناهل","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]}]},{"name":"حصر كميات خطوط الصرف والحفر","maxRow":19,"maxCol":9,"colWidths":[12.0,14.0,64.0,12.0,16.0,16.0,20.0,20.0,36.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول حصر الكميات والمقايسة التقديرية لشبكة الصرف الصحي وحفر الخنادق","bg":"#0F2744","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"حصر بنود الحفر، سند الجوانب، طبقات التأسيس، مد واختبار المواسير، غرف التفتيش، والردم وفق معايير MOMRAH","bg":"#0F2744","fg":"#CFD8DC","al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""}]},{"r":4,"h":42.0,"cells":[{"c":"A4","v":"بند","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"كود البند","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"بيان الأعمال وتوصيف البند الهندسي لشبكة الصرف الصحي","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"الوحدة","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"الكمية","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"الفئة (ر.س)","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"الإجمالي (ر.س)","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"المعيار المرجعي","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"ملاحظات التنفيذ وضبط الجودة الحقلية","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":104.0,"cells":[{"c":"A5","v":1,"fg":"#1F2937","al":"center"},{"c":"B5","v":"SEW-01","fg":"#1F2937","al":"center"},{"c":"C5","v":"أعمال حفر خنادق المواسير في جميع أنواع التربة (عادية وصخرية) للوصول إلى مناسيب التأسيس المحددة بالمخططات شاملة سند جوانب الحفر ونزح المياه الجوفية إن وجدت ونقل نواتج الحفر الزائدة للمقالب العمومية.","fg":"#1F2937"},{"c":"D5","v":"م3","fg":"#1F2937","al":"center"},{"c":"E5","v":1950,"in":true,"fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"F5","v":45,"in":true,"fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"G5","v":87750,"f":"=ROUND(E5*F5, 2)","fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"H5","v":"SBC 303 / MOMRAH","fg":"#1F2937","al":"center"},{"c":"I5","v":"القياس هندسي للخنادق حسب العمق وعرض القاع القياسي","fg":"#1F2937"}]},{"r":6,"h":72.0,"cells":[{"c":"A6","v":2,"bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"B6","v":"SEW-02","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"C6","v":"توريد وفرش ودك طبقة أساس حزام التأسيس (Pipe Bedding) من الرمل الخشن النظيف المتدرج أو الركام الناعم بسمك لا يقل عن 15 سم أسفل الماسورة مع التسوية التامة لضبط المناسيب.","bg":"#F0F4F8","fg":"#1F2937"},{"c":"D6","v":"م3","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"E6","v":240,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"F6","v":85,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"G6","v":20400,"f":"=ROUND(E6*F6, 2)","bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"H6","v":"ASTM D2321 / NWC","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"I6","v":"الدمك حتى 95% وفق اختبار بروكتور المعدل","bg":"#F0F4F8","fg":"#1F2937"}]},{"r":7,"h":72.0,"cells":[{"c":"A7","v":3,"fg":"#1F2937","al":"center"},{"c":"B7","v":"SEW-03","fg":"#1F2937","al":"center"},{"c":"C7","v":"توريد وتركيب وتنزيل واختبار مواسير بلاستيك غير ملدن uPVC قطر خارجي 200 مم ضغط Class 4 (SDR 34 / SN 4) شاملة الجوانات المطاطية التوسعية المشحمة وقطع التوصيل.","fg":"#1F2937"},{"c":"D7","v":"م.ط","fg":"#1F2937","al":"center"},{"c":"E7","v":100,"in":true,"fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"F7","v":140,"in":true,"fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"G7","v":14000,"f":"=ROUND(E7*F7, 2)","fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"H7","v":"ASTM D3034 / EN 1401","fg":"#1F2937","al":"center"},{"c":"I7","v":"الربط بين MH-01 إلى MH-03 وفق الميول التصميمية","fg":"#1F2937"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":4,"bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"B8","v":"SEW-04","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"C8","v":"توريد وتركيب وتنزيل واختبار مواسير بلاستيك غير ملدن uPVC قطر خارجي 250 مم ضغط Class 4 شاملة حلقات الوصل المطاطية وجميع المستلزمات.","bg":"#F0F4F8","fg":"#1F2937"},{"c":"D8","v":"م.ط","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"E8","v":115,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"F8","v":185,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"G8","v":21275,"f":"=ROUND(E8*F8, 2)","bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"H8","v":"ASTM D3034 / EN 1401","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"I8","v":"الربط بين MH-03 إلى MH-05 مع اختبار استقامة الخطوط","bg":"#F0F4F8","fg":"#1F2937"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":5,"fg":"#1F2937","al":"center"},{"c":"B9","v":"SEW-05","fg":"#1F2937","al":"center"},{"c":"C9","v":"توريد وتركيب وتنزيل واختبار مواسير بلاستيك غير ملدن uPVC قطر خارجي 315 مم ضغط Class 4 مع الوصلات المرنة وغرف التفتيش.","fg":"#1F2937"},{"c":"D9","v":"م.ط","fg":"#1F2937","al":"center"},{"c":"E9","v":135,"in":true,"fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"F9","v":240,"in":true,"fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"G9","v":32400,"f":"=ROUND(E9*F9, 2)","fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"H9","v":"ASTM D3034 / EN 1401","fg":"#1F2937","al":"center"},{"c":"I9","v":"الربط بين MH-05 إلى MH-07 وضبط المناسيب بميزان القامة","fg":"#1F2937"}]},{"r":10,"h":72.0,"cells":[{"c":"A10","v":6,"bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"B10","v":"SEW-06","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"C10","v":"توريد وتركيب واختبار مواسير ألياف زجاجية مقواة بوليستر GRP قطر اسمي 400 مم فئة صلابة SN 5000 N/m2 لخطوط التجميع الرئيسية والانحدار العام.","bg":"#F0F4F8","fg":"#1F2937"},{"c":"D10","v":"م.ط","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"E10","v":175,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"F10","v":420,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"G10","v":73500,"f":"=ROUND(E10*F10, 2)","bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"H10","v":"ASTM D3262 / AWWA C950","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"I10","v":"الربط بين MH-07 إلى MH-09 شاملة فحص التحدب البيضاوي","bg":"#F0F4F8","fg":"#1F2937"}]},{"r":11,"h":72.0,"cells":[{"c":"A11","v":7,"fg":"#1F2937","al":"center"},{"c":"B11","v":"SEW-07","fg":"#1F2937","al":"center"},{"c":"C11","v":"صب خرسانة عادية C20 لتغليف وحماية المواسير (Concrete Encasement) بسمك 15 سم حول الماسورة عند التقاطعات أو حيث يقل الغطاء الترابي عن 1.20 م.","fg":"#1F2937"},{"c":"D11","v":"م3","fg":"#1F2937","al":"center"},{"c":"E11","v":65,"in":true,"fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"F11","v":310,"in":true,"fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"G11","v":20150,"f":"=ROUND(E11*F11, 2)","fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"H11","v":"SBC 701 / MOMRAH","fg":"#1F2937","al":"center"},{"c":"I11","v":"تطبيق التغليف الخرساني لمنع كسر المواسير تحت أحمال المرور","fg":"#1F2937"}]},{"r":12,"h":72.0,"cells":[{"c":"A12","v":8,"bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"B12","v":"SEW-08","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"C12","v":"توريد وتركيب مناهل دائرية خرسانية مسلحة مسبقة الصنع (Precast) قطر داخلي 1200 مم شاملة القاعدة والصينية ومقاطع الحلقات وغطاء التحويل المخروطي والتبطين الداخلي المقاوم لكبريتيد الهيدروجين.","bg":"#F0F4F8","fg":"#1F2937"},{"c":"D12","v":"عدد","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"E12","v":8,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"F12","v":6500,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"G12","v":52000,"f":"=ROUND(E12*F12, 2)","bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"H12","v":"ASTM C478 / NWC","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"I12","v":"مناهل من MH-01 إلى MH-08 مع عزل خارجي بالبيتومين","bg":"#F0F4F8","fg":"#1F2937"}]},{"r":13,"h":72.0,"cells":[{"c":"A13","v":9,"fg":"#1F2937","al":"center"},{"c":"B13","v":"SEW-09","fg":"#1F2937","al":"center"},{"c":"C13","v":"تنفيذ غرفة تفتيش ومصب نهائي خرسانة مسلحة صب موقع C35/SRC مقاوم للكبريتات شاملة حديد التسليح والتبطين الإيبوكسي العازل للأحماض والمواد الكيميائية.","fg":"#1F2937"},{"c":"D13","v":"عدد","fg":"#1F2937","al":"center"},{"c":"E13","v":1,"in":true,"fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"F13","v":18500,"in":true,"fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"G13","v":18500,"f":"=ROUND(E13*F13, 2)","fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"H13","v":"SBC 304 / ECP 102","fg":"#1F2937","al":"center"},{"c":"I13","v":"منهل المصب النهائي MH-09 عند نقطة الربط العمومية","fg":"#1F2937"}]},{"r":14,"h":72.0,"cells":[{"c":"A14","v":10,"bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"B14","v":"SEW-10","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"C14","v":"توريد وتركيب أغطية وإطارات مناهل حديد زهر مرن (Ductile Iron) فئة تحمل D400 حمولة 40 طن مقاس 600 مم مانعة لانبعاث الروائح ومحكمة الإغلاق ومقاومة للاهتزاز.","bg":"#F0F4F8","fg":"#1F2937"},{"c":"D14","v":"عدد","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"E14","v":9,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"F14","v":1450,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"G14","v":13050,"f":"=ROUND(E14*F14, 2)","bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"H14","v":"EN 124 / SASO","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"I14","v":"مطابقة لمواصفات الهيئة السعودية للمواصفات والمقاييس","bg":"#F0F4F8","fg":"#1F2937"}]},{"r":15,"h":72.0,"cells":[{"c":"A15","v":11,"fg":"#1F2937","al":"center"},{"c":"B15","v":"SEW-11","fg":"#1F2937","al":"center"},{"c":"C15","v":"أعمال الردم حول وأعلى المواسير على طبقات لا تتجاوز سماكتها 20 سم بمواد صالحة ومختارة مع الرش بالمياه والدمك حتى 95% مع اختبار الكثافة الحقلية بمخروط الرمل.","fg":"#1F2937"},{"c":"D15","v":"م3","fg":"#1F2937","al":"center"},{"c":"E15","v":1680,"in":true,"fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"F15","v":35,"in":true,"fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"G15","v":58800,"f":"=ROUND(E15*F15, 2)","fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"H15","v":"SBC 303 / ASTM D1556","fg":"#1F2937","al":"center"},{"c":"I15","v":"الردم اليدوي الحذر حتى 30 سم فوق تاج الماسورة","fg":"#1F2937"}]},{"r":16,"h":72.0,"cells":[{"c":"A16","v":12,"bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"B16","v":"SEW-12","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"C16","v":"إجراء اختبارات الاستلام الهيدروليكية لخطوط الصرف بالهواء المضغوط أو ضغط الماء وفق معايير EN 1610 مع الفحص التلفزيوني بكاميرا CCTV وتقديم التقرير النهائي.","bg":"#F0F4F8","fg":"#1F2937"},{"c":"D16","v":"م.ط","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"E16","v":525,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"F16","v":25,"in":true,"bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"G16","v":13125,"f":"=ROUND(E16*F16, 2)","bg":"#F0F4F8","fg":"#1F2937","al":"center","nf":"#,##0.00"},{"c":"H16","v":"EN 1610 / ASTM C924","bg":"#F0F4F8","fg":"#1F2937","al":"center"},{"c":"I16","v":"فحص كامل طول الشبكة وتقديم تسجيلات الفيديو المعتمدة","bg":"#F0F4F8","fg":"#1F2937"}]},{"r":17,"h":40.0,"cells":[{"c":"A17","v":"إجمالي الأعمال قبل ضريبة القيمة المضافة (Subtotal)","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"left","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G17","v":424950,"f":"=SUM(G5:G16)","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H17","v":"قيمة التكلفة المباشرة للأعمال","bg":"#1E3D59","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true}]},{"r":18,"h":36.0,"cells":[{"c":"A18","v":"ضريبة القيمة المضافة (VAT 15%) وفق النظام الضريبي السعودي","bg":"#EAEEF3","fg":"#1F2937","b":true,"al":"left","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G18","v":63742.5,"f":"=ROUND(G17*0.15, 2)","bg":"#EAEEF3","fg":"#1F2937","b":true,"al":"center","nf":"#,##0.00"},{"c":"H18","v":"هيئة الزكاة والضريبة والجمارك ZATCA","bg":"#EAEEF3","fg":"#1F2937","al":"center","cs":2},{"skip":true}]},{"r":19,"h":46.0,"cells":[{"c":"A19","v":"القيمة الإجمالية النهائية لشبكة الصرف شاملة الضريبة (Grand Total SAR)","bg":"#0F2744","fg":"#FFFFFF","b":true,"al":"left","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G19","v":488692.5,"f":"=ROUND(G17+G18, 2)","bg":"#0F2744","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H19","v":"جاهز للتسعير والتقديم المالي والتعاقدي","bg":"#0F2744","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true}]}]}]}