{"slug":"gypsum-board-and-suspended-ceiling-metal-furring-qto-boq-sheet","sheets":[{"name":"إعدادات_الجبس_والملخص","maxRow":24,"maxCol":7,"colWidths":[14.0,62.0,16.0,18.0,13.0,13.0,20.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"شيت حصر وتفريد أعمال الجبس بورد والأسقف المعلقة وقطاعات الصاج والأوميجا والزوايا","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"نموذج عملي للمكتب الفني ومهندسي الديكور والتشطيبات لحصر الأسقف المعلقة وبيوت النور وحساب الألواح والقطاعات المعدنية والإكسسوارات","bg":"#EEF2FF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":40.0,"cells":[{"c":"A3","v":"أولاً: ثوابت المشروع وأبعاد الألواح والقطاعات ونسب الهالك (الخلايا الصفراء قابلة للتعديل)","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":1,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B4","v":"اسم المشروع ونوع الوحدات","bg":"#F8FAFC","b":true},{"c":"C4","v":"مشروع تشطيب طابقين إداري وسكني (مسطح 1,150 م²) — الرياض / القاهرة","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"نسبة ضريبة القيمة المضافة (VAT %)","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"G4","v":0.15,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":2,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B5","v":"مقاول الجبس بورد والديكور","bg":"#F8FAFC","b":true},{"c":"C5","v":"شركة الإبداع للأسقف المعلقة وأنظمة الجبس بورد (Knauf / Gyproc)","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","cs":2},{"skip":true},{"c":"E5","v":"نسبة استقطاع ضمان حسن التنفيذ (%)","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"G5","v":0.1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":3,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B6","v":"مساحة لوح الجبس بورد القياسي","bg":"#F8FAFC","b":true},{"c":"C6","v":"لوح قياسي 1.20 × 2.50 م = 3.00 م² (وطول عود الصاج 3.00 م.ط)","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","cs":2},{"skip":true},{"c":"E6","v":"نسبة هالك قص الألواح وقطاعات الصاج (%)","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"G6","v":0.08,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":4,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B7","v":"تاريخ الحصر والمراجعة","bg":"#F8FAFC","b":true},{"c":"C7","v":"2026-11-02 | الكود المرجعي: BOQ-FIN-073","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","cs":2},{"skip":true},{"c":"E7","v":"مساحة اللوح الواحد بالمعادلات (م²)","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"G7","v":3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":8,"h":40.0,"cells":[{"c":"A8","v":"ثانياً: جدول فئات الأسعار المرجعية لبنود الأسقف المعلقة وبيوت النور والقواطع الجبسية","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":42.0,"cells":[{"c":"A9","v":"كود البند","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"توصيف بند الجبس بورد / السقف المستعار والمواصفة الفنية","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"الوحدة","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"سعر الخامات","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"سعر المصنعية والمعجون","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"إجمالي سعر الوحدة","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"المرجع الكودي","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":"GYP-CLG-01","b":true,"al":"center"},{"c":"B10","v":"سقف جبس بورد مستعار فلات سادة (ألواح أبيض 12.5 مم على شاسيه صاج مجلفن 0.55 مم شامل المعجون)"},{"c":"C10","v":"م²","b":true,"al":"center"},{"c":"D10","v":36,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E10","v":29,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F10","v":65,"f":"=D10+E10","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G10","v":"ASTM C754 / C840","al":"center"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"GYP-CLG-02","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":"سقف جبس بورد أخضر مقاوم للرطوبة (MR Board 12.5mm) للحمامات والمطابخ شامل الشاسيه والمعجون","bg":"#F8FAFC"},{"c":"C11","v":"م²","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D11","v":42,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E11","v":33,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F11","v":75,"f":"=D11+E11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G11","v":"ASTM C1396 / SBC 201","bg":"#F8FAFC","al":"center"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":"GYP-CLG-03","b":true,"al":"center"},{"c":"B12","v":"سقف جبس بورد أحمر مقاوم للحريق (FR Board 15mm) للممرات وغرف الخدمات وفق كود الحريق"},{"c":"C12","v":"م²","b":true,"al":"center"},{"c":"D12","v":48,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E12","v":37,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F12","v":85,"f":"=D12+E12","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G12","v":"SBC 801 / ASTM C1396","al":"center"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":"GYP-COV-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":"بيت نور مخفي (Hidden Light Cove) وبوكسات ستائر ودروبات جانبية بارتفاع حتى 25 سم بالمتر الطولي","bg":"#F8FAFC"},{"c":"C13","v":"م.ط","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D13","v":28,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E13","v":27,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F13","v":55,"f":"=D13+E13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G13","v":"أصول الصنعة / ديكور","bg":"#F8FAFC","al":"center"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"GYP-SHD-01","b":true,"al":"center"},{"c":"B14","v":"توريد وتركيب زاوية ظل محيطية (Shadow Gap Profile 20×20mm) بين الحائط والسقف الجبسي"},{"c":"C14","v":"م.ط","b":true,"al":"center"},{"c":"D14","v":14,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E14","v":11,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F14","v":25,"f":"=D14+E14","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G14","v":"تشطيب معماري حديث","al":"center"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"GYP-ARM-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B15","v":"سقف مستعار بلاطات أرمسترونج ألياف معدنية / معدن (60×60 سم) شامل شبكة T-Grid","bg":"#F8FAFC"},{"c":"C15","v":"م²","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D15","v":46,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E15","v":24,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F15","v":70,"f":"=D15+E15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G15","v":"ASTM C635 / C636","bg":"#F8FAFC","al":"center"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":"GYP-PRT-01","b":true,"al":"center"},{"c":"B16","v":"قواطع حوائط جبس بورد مزدوجة الوجهين (قطاعات C-Stud 70mm + عزل صوف صخري كثافة 50 كجم/م³)"},{"c":"C16","v":"م²","b":true,"al":"center"},{"c":"D16","v":68,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E16","v":42,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F16","v":110,"f":"=D16+E16","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G16","v":"ASTM C754 / عزل صوتي","al":"center"}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":"GYP-ACC-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B17","v":"فتحة صيانة ألومنيوم مخفية بغطاء جبس بورد (Access Panel 60×60 cm) لتكييف الكونسيلد","bg":"#F8FAFC"},{"c":"C17","v":"عدد","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D17","v":95,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E17","v":45,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F17","v":140,"f":"=D17+E17","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G17","v":"ضبط جودة MEP","bg":"#F8FAFC","al":"center"}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":"GYP-TRK-01","b":true,"al":"center"},{"c":"B18","v":"تأسيس وتفريز مجرى إضاءة ماجنتيك تراك لايت غاطس بالسقف الجبسي (Magnetic Track Profile)"},{"c":"C18","v":"م.ط","b":true,"al":"center"},{"c":"D18","v":45,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E18","v":25,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F18","v":70,"f":"=D18+E18","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G18","v":"تنسيق الإضاءة المعمارية","al":"center"}]},{"r":19,"h":40.0,"cells":[{"c":"A19","v":"ثالثاً: الملخص المالي التنفيذي لمقايسة الأسقف المعلقة وبيوت النور وطلبيات المواد الخام","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":"م","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B20","v":"بيان قسم الأعمال (مرتبط تلقائياً بأوراق حصر الفراغات والمواد)","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C20","v":"إجمالي المسطح / الطول","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D20","v":"الوحدة","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E20","v":"التكلفة قبل الضريبة","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F20","v":"ضريبة القيمة المضافة 15%","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G20","v":"الإجمالي شامل الضريبة","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":21,"h":52.0,"cells":[{"c":"A21","v":1,"b":true,"al":"center"},{"c":"B21","v":"إجمالي أعمال الأسقف الجبسية المستعارة الفلات والأرمسترونج والقواطع (بالمتر المربع)","b":true},{"c":"C21","v":1211.72,"f":"=حصر_الأسقف_وبيوت_النور!G19","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D21","v":"م² صافي","al":"center"},{"c":"E21","v":87143.8,"f":"=حصر_الأسقف_وبيوت_النور!K19","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F21","v":0,"f":"=ROUND(E21*$G$4,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G21","v":87143.8,"f":"=E21+F21","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":22,"h":52.0,"cells":[{"c":"A22","v":2,"b":true,"al":"center"},{"c":"B22","v":"إجمالي أعمال بيوت النور المخفية وبوكسات الستائر وزوايا الظل وفتحات الصيانة (بالمتر الطولي والعدد)","b":true},{"c":"C22","v":510.4,"f":"=حصر_الأسقف_وبيوت_النور!I19","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D22","v":"م.ط / عدد","al":"center"},{"c":"E22","v":26096,"f":"=حصر_الأسقف_وبيوت_النور!L19","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F22","v":0,"f":"=ROUND(E22*$G$4,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G22","v":26096,"f":"=E22+F22","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":23,"h":44.0,"cells":[{"c":"A23","v":"الإجمالي الكلي لمقايسة أعمال الجبس بورد والأسقف المعلقة (شاملاً الضريبة)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true},{"c":"C23","v":1722.12,"f":"=SUM(C21:C22)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D23","v":"إجمالي المشروع","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E23","v":113239.8,"f":"=SUM(E21:E22)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F23","v":0,"f":"=SUM(F21:F22)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G23","v":113239.8,"f":"=SUM(G21:G22)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":24,"h":40.0,"cells":[{"c":"A24","v":"صافي المستحق للصرف بعد خصم استقطاع ضمان حسن التنفيذ (10% من القيمة قبل الضريبة)","bg":"#E0E7FF","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"E24","v":0,"f":"=ROUND(E23*$G$5,2)","bg":"#E0E7FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F24","v":"صافي الصرف:","bg":"#E0E7FF","b":true,"al":"center"},{"c":"G24","v":113239.8,"f":"=G23-E24","bg":"#E0E7FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]}]},{"name":"حصر_الأسقف_وبيوت_النور","maxRow":19,"maxCol":13,"colWidths":[13.0,58.0,16.0,13.0,14.0,13.0,15.0,13.0,16.0,15.0,16.0,13.0,18.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول الحصر الهندسي للأسقف المستعارة الفلات والأرمسترونج وبيوت النور المخفية وزوايا الظل","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"يحسب المسطح الأفقي بالمتر المربع، المحيط الهندسي، أطوال بيوت النور وبوكسات الستائر بالمتر الطولي، والتكلفة الإجمالية لكل فراغ","bg":"#EEF2FF","b":true,"al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":40.0,"cells":[{"c":"A3","v":"جدول حصر مسطحات الأسقف المعلقة وأطوال بيوت النور والدروبات الجانبية حسب الغرف والفراغات","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"كود الفراغ","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"توصيف الغرفة / الفراغ المعماري ونظام السقف المستعار","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"نوع اللوح / النظام","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"العدد المكرر","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"طول الغرفة (م)","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"عرض الغرفة (م)","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"مسطح السقف الفلات (م²)","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"محيط الزوايا (م.ط)","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"طول بيت النور والستائر (م.ط)","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J4","v":"سعر المتر المربع (ر.س)","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K4","v":"تكلفة المسطح الفلات (ر.س)","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L4","v":"تكلفة بيوت النور والإضافات","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M4","v":"إجمالي تكلفة البند (ر.س)","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"CLG-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B5","v":"صالات الاستقبال والمجالس الرئيسية (جبس بورد أبيض فلات + بيت نور محيطي وبوكس ستارة)","bg":"#F8FAFC"},{"c":"C5","v":"جبس أبيض 12.5مم","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D5","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E5","v":8.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F5","v":5.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G5","v":176.8,"f":"=ROUND(D5*E5*F5,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H5","v":109.6,"f":"=ROUND(IF(E5>0,D5*2*(E5+F5),0),2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I5","v":96,"f":"=ROUND(D5*24,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J5","v":65,"f":"=إعدادات_الجبس_والملخص!$F$10","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K5","v":11492,"f":"=ROUND(G5*J5,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L5","v":5280,"f":"=ROUND(I5*إعدادات_الجبس_والملخص!$F$13,2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M5","v":16772,"f":"=K5+L5","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"CLG-02","b":true,"al":"center"},{"c":"B6","v":"صالات المعيشة العائلية وغرف الطعام (جبس بورد أبيض فلات + بيت نور مخفي للسبوتات)"},{"c":"C6","v":"جبس أبيض 12.5مم","b":true,"al":"center"},{"c":"D6","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E6","v":6.4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F6","v":4.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G6","v":115.2,"f":"=ROUND(D6*E6*F6,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H6","v":87.2,"f":"=ROUND(IF(E6>0,D6*2*(E6+F6),0),2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I6","v":72,"f":"=ROUND(D6*18,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J6","v":65,"f":"=إعدادات_الجبس_والملخص!$F$10","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K6","v":7488,"f":"=ROUND(G6*J6,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L6","v":3960,"f":"=ROUND(I6*إعدادات_الجبس_والملخص!$F$13,2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M6","v":11448,"f":"=K6+L6","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"CLG-03","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B7","v":"غرف النوم الرئيسية Master Bedrooms (جبس بورد أبيض + دروب بيت نور فوق السرير والستارة)","bg":"#F8FAFC"},{"c":"C7","v":"جبس أبيض 12.5مم","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D7","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E7","v":5.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F7","v":4.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G7","v":87.36,"f":"=ROUND(D7*E7*F7,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H7","v":75.2,"f":"=ROUND(IF(E7>0,D7*2*(E7+F7),0),2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I7","v":56,"f":"=ROUND(D7*14,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J7","v":65,"f":"=إعدادات_الجبس_والملخص!$F$10","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K7","v":5678.4,"f":"=ROUND(G7*J7,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L7","v":3080,"f":"=ROUND(I7*إعدادات_الجبس_والملخص!$F$13,2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M7","v":8758.4,"f":"=K7+L7","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":8,"h":50.0,"cells":[{"c":"A8","v":"CLG-04","b":true,"al":"center"},{"c":"B8","v":"غرف النوم الفرعية للأبناء والضيوف (جبس بورد أبيض فلات + بوكس ستارة مخفي)"},{"c":"C8","v":"جبس أبيض 12.5مم","b":true,"al":"center"},{"c":"D8","v":8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E8","v":4.4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F8","v":3.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G8","v":133.76,"f":"=ROUND(D8*E8*F8,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H8","v":131.2,"f":"=ROUND(IF(E8>0,D8*2*(E8+F8),0),2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I8","v":35.2,"f":"=ROUND(D8*4.4,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J8","v":65,"f":"=إعدادات_الجبس_والملخص!$F$10","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K8","v":8694.4,"f":"=ROUND(G8*J8,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L8","v":1936,"f":"=ROUND(I8*إعدادات_الجبس_والملخص!$F$13,2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M8","v":10630.4,"f":"=K8+L8","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"CLG-05","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B9","v":"الممرات الداخلية وموزعات الشقق والمداخل (جبس بورد أحمر مقاوم للحريق + زوايا ظل محيطية)","bg":"#F8FAFC"},{"c":"C9","v":"جبس أحمر FR 15مم","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D9","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E9","v":9.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F9","v":1.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G9","v":68.4,"f":"=ROUND(D9*E9*F9,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H9","v":90.4,"f":"=ROUND(IF(E9>0,D9*2*(E9+F9),0),2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I9","v":76,"f":"=ROUND(D9*19,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J9","v":85,"f":"=إعدادات_الجبس_والملخص!$F$12","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K9","v":5814,"f":"=ROUND(G9*J9,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L9","v":1900,"f":"=ROUND(I9*إعدادات_الجبس_والملخص!$F$14,2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M9","v":7714,"f":"=K9+L9","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":"CLG-06","b":true,"al":"center"},{"c":"B10","v":"المطابخ الرئيسية والأوفيس (جبس بورد أخضر مقاوم للرطوبة والحرارة MR Board 12.5mm)"},{"c":"C10","v":"جبس أخضر MR","b":true,"al":"center"},{"c":"D10","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E10","v":4.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F10","v":3.6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G10","v":64.8,"f":"=ROUND(D10*E10*F10,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H10","v":64.8,"f":"=ROUND(IF(E10>0,D10*2*(E10+F10),0),2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I10","v":18,"f":"=ROUND(D10*4.5,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J10","v":75,"f":"=إعدادات_الجبس_والملخص!$F$11","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K10","v":4860,"f":"=ROUND(G10*J10,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L10","v":450,"f":"=ROUND(I10*إعدادات_الجبس_والملخص!$F$14,2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M10","v":5310,"f":"=K10+L10","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"CLG-07","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":"الحمامات الرئيسية وحمامات الضيوف (جبس بورد أخضر مقاوم للرطوبة MR + زاوية ظل)","bg":"#F8FAFC"},{"c":"C11","v":"جبس أخضر MR","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D11","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E11","v":2.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F11","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G11","v":67.2,"f":"=ROUND(D11*E11*F11,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H11","v":115.2,"f":"=ROUND(IF(E11>0,D11*2*(E11+F11),0),2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I11","v":67.2,"f":"=ROUND(D11*5.6,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J11","v":75,"f":"=إعدادات_الجبس_والملخص!$F$11","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K11","v":5040,"f":"=ROUND(G11*J11,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L11","v":1680,"f":"=ROUND(I11*إعدادات_الجبس_والملخص!$F$14,2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M11","v":6720,"f":"=K11+L11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":"CLG-08","b":true,"al":"center"},{"c":"B12","v":"المكاتب الإدارية المفتوحة بالدور الأول (بلاطات أرمسترونج 60×60 سم عازلة للصوت)"},{"c":"C12","v":"بلاطات أرمسترونج","b":true,"al":"center"},{"c":"D12","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E12","v":14,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F12","v":8.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G12","v":238,"f":"=ROUND(D12*E12*F12,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H12","v":90,"f":"=ROUND(IF(E12>0,D12*2*(E12+F12),0),2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I12","v":0,"f":"=ROUND(D12*0,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J12","v":70,"f":"=إعدادات_الجبس_والملخص!$F$15","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K12","v":16660,"f":"=ROUND(G12*J12,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L12","v":0,"f":"=ROUND(I12*إعدادات_الجبس_والملخص!$F$13,2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M12","v":16660,"f":"=K12+L12","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":"CLG-09","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":"قاعة الاجتماعات الرئيسية ومكتب المدير التنفيذي (جبس بورد فلات + تراك لايت مغناطيسي)","bg":"#F8FAFC"},{"c":"C13","v":"جبس أبيض 12.5مم","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D13","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E13","v":7.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F13","v":5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G13","v":75,"f":"=ROUND(D13*E13*F13,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H13","v":50,"f":"=ROUND(IF(E13>0,D13*2*(E13+F13),0),2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I13","v":32,"f":"=ROUND(D13*16,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J13","v":65,"f":"=إعدادات_الجبس_والملخص!$F$10","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K13","v":4875,"f":"=ROUND(G13*J13,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L13","v":2240,"f":"=ROUND(I13*إعدادات_الجبس_والملخص!$F$18,2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M13","v":7115,"f":"=K13+L13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"CLG-10","b":true,"al":"center"},{"c":"B14","v":"بهو المدخل الرئيسي والاستقبال الأرضي (جبس بورد دبل هايت + بيت نور محيطي مزدوج)"},{"c":"C14","v":"جبس أبيض 12.5مم","b":true,"al":"center"},{"c":"D14","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E14","v":9,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F14","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G14","v":54,"f":"=ROUND(D14*E14*F14,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H14","v":30,"f":"=ROUND(IF(E14>0,D14*2*(E14+F14),0),2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I14","v":30,"f":"=ROUND(D14*30,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J14","v":65,"f":"=إعدادات_الجبس_والملخص!$F$10","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K14","v":3510,"f":"=ROUND(G14*J14,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L14","v":1650,"f":"=ROUND(I14*إعدادات_الجبس_والملخص!$F$13,2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M14","v":5160,"f":"=K14+L14","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"CLG-11","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B15","v":"غرف الكهرباء والتحكم والميكانيكا (جبس بورد أحمر مقاوم للحريق لمدة ساعتين FR)","bg":"#F8FAFC"},{"c":"C15","v":"جبس أحمر FR 15مم","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D15","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E15","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F15","v":3.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G15","v":28,"f":"=ROUND(D15*E15*F15,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H15","v":30,"f":"=ROUND(IF(E15>0,D15*2*(E15+F15),0),2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I15","v":0,"f":"=ROUND(D15*0,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J15","v":85,"f":"=إعدادات_الجبس_والملخص!$F$12","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K15","v":2380,"f":"=ROUND(G15*J15,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L15","v":0,"f":"=ROUND(I15*إعدادات_الجبس_والملخص!$F$13,2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M15","v":2380,"f":"=K15+L15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":"CLG-12","b":true,"al":"center"},{"c":"B16","v":"قواطع حوائط جبس بورد مزدوجة الوجهين بعزل صوف صخري لتقسيم المكاتب الإدارية"},{"c":"C16","v":"قواطع جبسية","b":true,"al":"center"},{"c":"D16","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E16","v":6.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F16","v":3.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G16","v":83.2,"f":"=ROUND(D16*E16*F16,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H16","v":77.6,"f":"=ROUND(IF(E16>0,D16*2*(E16+F16),0),2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I16","v":0,"f":"=ROUND(D16*0,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J16","v":110,"f":"=إعدادات_الجبس_والملخص!$F$16","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K16","v":9152,"f":"=ROUND(G16*J16,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L16","v":0,"f":"=ROUND(I16*إعدادات_الجبس_والملخص!$F$13,2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M16","v":9152,"f":"=K16+L16","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":"CLG-13","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B17","v":"فتحات صيانة ألومنيوم مخفية (Access Panels 60×60 cm) لوحدات التكييف الكونسيلد والحمامات","bg":"#F8FAFC"},{"c":"C17","v":"فتحات صيانة","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D17","v":28,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E17","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F17","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G17","v":0,"f":"=ROUND(D17*E17*F17,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H17","v":0,"f":"=ROUND(IF(E17>0,D17*2*(E17+F17),0),2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I17","v":28,"f":"=ROUND(D17*1,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J17","v":140,"f":"=إعدادات_الجبس_والملخص!$F$17","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K17","v":0,"f":"=ROUND(G17*J17,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L17","v":3920,"f":"=ROUND(I17*إعدادات_الجبس_والملخص!$F$17,2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M17","v":3920,"f":"=K17+L17","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":18,"h":50.0,"cells":[{"c":"A18","v":"CLG-14","b":true,"al":"center"},{"c":"B18","v":"مناطق غرف الغسيل والتخزين والخدمات (جبس بورد أخضر مقاوم للرطوبة MR)"},{"c":"C18","v":"جبس أخضر MR","b":true,"al":"center"},{"c":"D18","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E18","v":2.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F18","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G18","v":20,"f":"=ROUND(D18*E18*F18,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H18","v":36,"f":"=ROUND(IF(E18>0,D18*2*(E18+F18),0),2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I18","v":0,"f":"=ROUND(D18*0,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J18","v":75,"f":"=إعدادات_الجبس_والملخص!$F$11","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K18","v":1500,"f":"=ROUND(G18*J18,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L18","v":0,"f":"=ROUND(I18*إعدادات_الجبس_والملخص!$F$13,2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M18","v":1500,"f":"=K18+L18","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":19,"h":44.0,"cells":[{"c":"A19","v":"إجمالي مسطحات الأسقف المعلقة وأطوال بيوت النور والتكلفة الكلية","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D19","v":83,"f":"=SUM(D5:D18)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E19","v":6.06,"f":"=ROUND(AVERAGE(E5:E18),2)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F19","v":3.81,"f":"=ROUND(AVERAGE(F5:F18),2)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G19","v":1211.72,"f":"=SUM(G5:G18)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H19","v":987.2,"f":"=SUM(H5:H18)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I19","v":510.4,"f":"=SUM(I5:I18)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J19","v":78.93,"f":"=ROUND(AVERAGE(J5:J18),2)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K19","v":87143.8,"f":"=SUM(K5:K18)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L19","v":26096,"f":"=SUM(L5:L18)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M19","v":113239.8,"f":"=SUM(M5:M18)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]}]},{"name":"حاسبة_الألواح_والصاج_والزوايا","maxRow":16,"maxCol":8,"colWidths":[14.0,62.0,18.0,16.0,13.0,13.0,18.0,13.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"حاسبة تفريد المواد الخام والإكسسوارات (عدد ألواح الجبس بورد، أعواد الصاج الأوميجا والسي، والزوايا)","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"تحسب تلقائياً عدد الألواح (1.2×2.5م)، أعواد الأوميجا والسي والزاوية (طول 3م)، التيش، المسامير، والمعجون وفق معدلات كناوف القياسية","bg":"#EEF2FF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":40.0,"cells":[{"c":"A3","v":"جدول حساب كميات التوريد للموقع (Material Take-Off: الألواح + الصاج المجلفن + الإكسسوارات)","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"كود المادة","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"توصيف المواد الخام والقطاعات المعدنية الموردة للموقع","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"المسطح / الطول المرتبط (م²)","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"معدل الاستهلاك القياسي للمتر","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"وحدة التوريد","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"الكمية الصافية","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"الكمية بالهالك 8% (طلبية)","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"التكلفة التقديرية للمواد (ر.س)","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"MTO-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B5","v":"ألواح جبس بورد أبيض عادي سماكة 12.5 مم (مقاس اللوح 1.20×2.50 م = 3.00 م²) للصالات والغرف والقواطع","bg":"#F8FAFC"},{"c":"C5","v":1012.68,"f":"=SUM(حصر_الأسقف_وبيوت_النور!G5:G8)+حصر_الأسقف_وبيوت_النور!G13+حصر_الأسقف_وبيوت_النور!G14+(حصر_الأسقف_وبيوت_النور!G16*2)+(حصر_الأسقف_وبيوت_النور!I19*0.4)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D5","v":0.3333,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E5","v":"لوح 3.0 م²","bg":"#F8FAFC","b":true,"al":"center"},{"c":"F5","v":337.5,"f":"=ROUND(C5*D5,1)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G5","v":365,"f":"=ROUNDUP(F5*(1+إعدادات_الجبس_والملخص!$G$6),0)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H5","v":12410,"f":"=ROUND(G5*34,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"MTO-02","b":true,"al":"center"},{"c":"B6","v":"ألواح جبس بورد أخضر مقاوم للرطوبة (MR 12.5mm — لوح 3.00 م²) للحمامات والمطابخ والغسيل"},{"c":"C6","v":152,"f":"=حصر_الأسقف_وبيوت_النور!G10+حصر_الأسقف_وبيوت_النور!G11+حصر_الأسقف_وبيوت_النور!G18","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D6","v":0.3333,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E6","v":"لوح أخضر MR","b":true,"al":"center"},{"c":"F6","v":50.7,"f":"=ROUND(C6*D6,1)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G6","v":55,"f":"=ROUNDUP(F6*(1+إعدادات_الجبس_والملخص!$G$6),0)","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H6","v":2420,"f":"=ROUND(G6*44,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"MTO-03","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B7","v":"ألواح جبس بورد أحمر مقاوم للحريق (FR 15mm — لوح 3.00 م²) للممرات وغرف الكهرباء والخدمات","bg":"#F8FAFC"},{"c":"C7","v":96.4,"f":"=حصر_الأسقف_وبيوت_النور!G9+حصر_الأسقف_وبيوت_النور!G15","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D7","v":0.3333,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E7","v":"لوح أحمر FR","bg":"#F8FAFC","b":true,"al":"center"},{"c":"F7","v":32.1,"f":"=ROUND(C7*D7,1)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G7","v":35,"f":"=ROUNDUP(F7*(1+إعدادات_الجبس_والملخص!$G$6),0)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H7","v":1820,"f":"=ROUND(G7*52,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"MTO-04","b":true,"al":"center"},{"c":"B8","v":"قطاعات صاج أوميجا فرعية مجلفنة سماكة 0.55 مم (Furring Omega — طول العود 3.00 م — تقسيط كل 50–60 سم)"},{"c":"C8","v":1284.12,"f":"=SUM(حصر_الأسقف_وبيوت_النور!G5:G11)+حصر_الأسقف_وبيوت_النور!G13+حصر_الأسقف_وبيوت_النور!G14+حصر_الأسقف_وبيوت_النور!G18+(حصر_الأسقف_وبيوت_النور!G16*2)+(حصر_الأسقف_وبيوت_النور!I19*0.5)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D8","v":0.62,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E8","v":"عود صاج 3 م.ط","b":true,"al":"center"},{"c":"F8","v":796.2,"f":"=ROUND(C8*D8,1)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G8","v":860,"f":"=ROUNDUP(F8*(1+إعدادات_الجبس_والملخص!$G$6),0)","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H8","v":12470,"f":"=ROUND(G8*14.5,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"MTO-05","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B9","v":"قطاعات صاج سي رئيسية حاملة مجلفنة سماكة 0.60 مم (Main C-Channel — طول العود 3.00 م — تقسيط كل 90 سم)","bg":"#F8FAFC"},{"c":"C9","v":1284.12,"f":"=SUM(حصر_الأسقف_وبيوت_النور!G5:G11)+حصر_الأسقف_وبيوت_النور!G13+حصر_الأسقف_وبيوت_النور!G14+حصر_الأسقف_وبيوت_النور!G18+(حصر_الأسقف_وبيوت_النور!G16*2)+(حصر_الأسقف_وبيوت_النور!I19*0.5)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D9","v":0.32,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E9","v":"عود صاج 3 م.ط","bg":"#F8FAFC","b":true,"al":"center"},{"c":"F9","v":410.9,"f":"=ROUND(C9*D9,1)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G9","v":444,"f":"=ROUNDUP(F9*(1+إعدادات_الجبس_والملخص!$G$6),0)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H9","v":7326,"f":"=ROUND(G9*16.5,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":"MTO-06","b":true,"al":"center"},{"c":"B10","v":"زوايا صاج محيطية على الحوائط مجلفنة (Wall L-Angle — طول العود 3.00 م) لتثبيت حواف الأسقف وبيوت النور"},{"c":"C10","v":1497.6,"f":"=حصر_الأسقف_وبيوت_النور!H19+حصر_الأسقف_وبيوت_النور!I19","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D10","v":0.34,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E10","v":"عود زاوية 3 م.ط","b":true,"al":"center"},{"c":"F10","v":509.2,"f":"=ROUND(C10*D10,1)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G10","v":550,"f":"=ROUNDUP(F10*(1+إعدادات_الجبس_والملخص!$G$6),0)","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H10","v":6050,"f":"=ROUND(G10*11,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"MTO-07","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":"أطقم تعليق السقف بالخرسانة (سيخ تيش مجلفن M6 + عصفورة تعليق + خابور صلب أكمون — بمعدل 0.90 طقم/م²)","bg":"#F8FAFC"},{"c":"C11","v":1284.12,"f":"=SUM(حصر_الأسقف_وبيوت_النور!G5:G11)+حصر_الأسقف_وبيوت_النور!G13+حصر_الأسقف_وبيوت_النور!G14+حصر_الأسقف_وبيوت_النور!G18+(حصر_الأسقف_وبيوت_النور!G16*2)+(حصر_الأسقف_وبيوت_النور!I19*0.5)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D11","v":0.9,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E11","v":"طقم تعليق كامل","bg":"#F8FAFC","b":true,"al":"center"},{"c":"F11","v":1155.7,"f":"=ROUND(C11*D11,1)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G11","v":1249,"f":"=ROUNDUP(F11*(1+إعدادات_الجبس_والملخص!$G$6),0)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H11","v":8118.5,"f":"=ROUND(G11*6.5,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":"MTO-08","b":true,"al":"center"},{"c":"B12","v":"علب مسامير جبس بورد فوسفاتية سوداء 25 مم ومسامير تك للربط المعدني (علبة 1000 مسمار لكل 60 م²)"},{"c":"C12","v":1284.12,"f":"=SUM(حصر_الأسقف_وبيوت_النور!G5:G11)+حصر_الأسقف_وبيوت_النور!G13+حصر_الأسقف_وبيوت_النور!G14+حصر_الأسقف_وبيوت_النور!G18+(حصر_الأسقف_وبيوت_النور!G16*2)+(حصر_الأسقف_وبيوت_النور!I19*0.5)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D12","v":0.017,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E12","v":"علبة 1000 مسمار","b":true,"al":"center"},{"c":"F12","v":21.8,"f":"=ROUND(C12*D12,1)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G12","v":24,"f":"=ROUNDUP(F12*(1+إعدادات_الجبس_والملخص!$G$6),0)","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H12","v":912,"f":"=ROUND(G12*38,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":"MTO-09","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":"بستلات معجون فواصل الجبس بورد الجاهز (Joint Compound 25 kg — بمعدل 0.45 كجم/م² أي بستلة لكل 55 م²)","bg":"#F8FAFC"},{"c":"C13","v":1284.12,"f":"=SUM(حصر_الأسقف_وبيوت_النور!G5:G11)+حصر_الأسقف_وبيوت_النور!G13+حصر_الأسقف_وبيوت_النور!G14+حصر_الأسقف_وبيوت_النور!G18+(حصر_الأسقف_وبيوت_النور!G16*2)+(حصر_الأسقف_وبيوت_النور!I19*0.5)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D13","v":0.018,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E13","v":"بستلة 25 كجم","bg":"#F8FAFC","b":true,"al":"center"},{"c":"F13","v":23.1,"f":"=ROUND(C13*D13,1)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G13","v":25,"f":"=ROUNDUP(F13*(1+إعدادات_الجبس_والملخص!$G$6),0)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H13","v":1625,"f":"=ROUND(G13*65,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"MTO-10","b":true,"al":"center"},{"c":"B14","v":"بكر شريط فايبر لاصق لتسليح الفواصل وزوايا ميتال تيب (بكرة 90 م.ط تغطي حوالي 55 م² أسقف)"},{"c":"C14","v":1284.12,"f":"=SUM(حصر_الأسقف_وبيوت_النور!G5:G11)+حصر_الأسقف_وبيوت_النور!G13+حصر_الأسقف_وبيوت_النور!G14+حصر_الأسقف_وبيوت_النور!G18+(حصر_الأسقف_وبيوت_النور!G16*2)+(حصر_الأسقف_وبيوت_النور!I19*0.5)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D14","v":0.018,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E14","v":"بكرة 90 م.ط","b":true,"al":"center"},{"c":"F14","v":23.1,"f":"=ROUND(C14*D14,1)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G14","v":25,"f":"=ROUNDUP(F14*(1+إعدادات_الجبس_والملخص!$G$6),0)","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H14","v":600,"f":"=ROUND(G14*24,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"MTO-11","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B15","v":"بلاطات أرمسترونج 60×60 سم شاملة زوايا وقطاعات Main Tee & Cross Tee (بالمتر المربع المتكامل)","bg":"#F8FAFC"},{"c":"C15","v":238,"f":"=حصر_الأسقف_وبيوت_النور!G12","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D15","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E15","v":"م² متكامل","bg":"#F8FAFC","b":true,"al":"center"},{"c":"F15","v":238,"f":"=ROUND(C15*D15,1)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G15","v":258,"f":"=ROUNDUP(F15*(1+إعدادات_الجبس_والملخص!$G$6),0)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H15","v":11868,"f":"=ROUND(G15*46,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":16,"h":44.0,"cells":[{"c":"A16","v":"إجمالي طلبيات وتكلفة توريد الألواح وقطاعات الصاج والإكسسوارات للموقع","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F16","v":3598.3,"f":"=SUM(F5:F15)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G16","v":3890,"f":"=SUM(G5:G15)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H16","v":65619.5,"f":"=SUM(H5:H15)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]}]},{"name":"فحص_واستلام_الجبس_بورد_RFI","maxRow":17,"maxCol":9,"colWidths":[8.0,58.0,16.0,13.0,13.0,13.0,15.0,20.0,26.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"سجل الفحص الميداني واستلام الشاسيه المعدني وألواح الجبس بورد (RFI / ASTM C754 & C840)","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"يدقق تلقائياً سماكة الصاج المجلفن، مسافات تقسيط الأوميجا والسي والتيش والمسامير، وأفقية السقف بميزان الليزر","bg":"#EEF2FF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":40.0,"cells":[{"c":"A3","v":"قائمة الفحص والقياسات الميدانية لاستلام أعمال الأسقف المعلقة الجبس بورد (12 معياراً هندسياً)","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"م","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"بند الفحص الهندسي ومعيار الاستلام الميداني للجبس بورد والشاسيه","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"المرجع الكودي","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"القيمة المعيارية","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"الحد الأقصى للتفاوت","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"القراءة الفعلية بالموقع","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"الانحراف المحسوب","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"حكم المطابقة التلقائي","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"ملاحظات مهندس الجودة QA/QC","bg":"#4338CA","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":1,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B5","v":"سماكة قطاعات الصاج المجلفن (الأوميجا والسي والزوايا) المقاسة بالقدمة ذات الورنية (مم)","bg":"#F8FAFC"},{"c":"C5","v":"ASTM C645","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D5","v":0.55,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E5","v":0.05,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F5","v":0.56,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G5","v":0.01,"f":"=ABS(F5-D5)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H5","v":"مطابق للمواصفات","f":"=IF(G5<=E5,\"مطابق للمواصفات\",\"مرفوض - يلزم تعديل\")","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"I5","v":"صاج مجلفن ثقيل مقاوم للصدأ","bg":"#F8FAFC"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":2,"b":true,"al":"center"},{"c":"B6","v":"المسافة بين أسياخ تيش التعليق الرأسية المثبتة في السقف الخرساني بمسامير أكمون صلب (سم)"},{"c":"C6","v":"ASTM C754","b":true,"al":"center"},{"c":"D6","v":90,"in":true,"b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E6","v":10,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F6","v":90,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G6","v":0,"f":"=ABS(F6-D6)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H6","v":"مطابق للمواصفات","f":"=IF(G6<=E6,\"مطابق للمواصفات\",\"مرفوض - يلزم تعديل\")","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"I6","v":"ممنوع استخدام الفيشرات البلاستيك"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":3,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B7","v":"المسافة بين الجسور الحاملة الرئيسية (Main C-Channel) في الاتجاه الطولي (سم)","bg":"#F8FAFC"},{"c":"C7","v":"ASTM C754","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D7","v":90,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E7","v":10,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F7","v":85,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G7","v":5,"f":"=ABS(F7-D7)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H7","v":"مطابق للمواصفات","f":"=IF(G7<=E7,\"مطابق للمواصفات\",\"مرفوض - يلزم تعديل\")","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"I7","v":"مربوطة بالأوميجا بكلبسات ربط","bg":"#F8FAFC"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":4,"b":true,"al":"center"},{"c":"B8","v":"المسافة المحورية بين قطاعات الأوميجا الفرعية (Furring Omega) في الصالات والغرف الجافة (سم)"},{"c":"C8","v":"ASTM C754","b":true,"al":"center"},{"c":"D8","v":50,"in":true,"b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E8","v":10,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F8","v":50,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G8","v":0,"f":"=ABS(F8-D8)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H8","v":"مطابق للمواصفات","f":"=IF(G8<=E8,\"مطابق للمواصفات\",\"مرفوض - يلزم تعديل\")","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"I8","v":"تقسيط منتظم 50 سم من المحور"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":5,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B9","v":"المسافة المحورية بين قطاعات الأوميجا في الحمامات والمطابخ (الألواح الخضراء MR - سم)","bg":"#F8FAFC"},{"c":"C9","v":"ASTM C840","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D9","v":40,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E9","v":5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F9","v":40,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G9","v":0,"f":"=ABS(F9-D9)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H9","v":"مطابق للمواصفات","f":"=IF(G9<=E9,\"مطابق للمواصفات\",\"مرفوض - يلزم تعديل\")","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"I9","v":"تكثيف الأوميجا لمنع الترخيم","bg":"#F8FAFC"}]},{"r":10,"h":48.0,"cells":[{"c":"A10","v":6,"b":true,"al":"center"},{"c":"B10","v":"سماكة ألواح الجبس بورد الموردة للموقع للأسقف القياسية والحمامات (مم)"},{"c":"C10","v":"ASTM C1396","b":true,"al":"center"},{"c":"D10","v":12.5,"in":true,"b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E10","v":0.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F10","v":12.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G10","v":0,"f":"=ABS(F10-D10)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H10","v":"مطابق للمواصفات","f":"=IF(G10<=E10,\"مطابق للمواصفات\",\"مرفوض - يلزم تعديل\")","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"I10","v":"مطابق لاعتماد المواد MIR"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":7,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":"المسافة بين مسامير تثبيت الجبس بورد الفوسفاتية السوداء عند أطراف وحواف اللوح (سم)","bg":"#F8FAFC"},{"c":"C11","v":"ASTM C840","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D11","v":15,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E11","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F11","v":15,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G11","v":0,"f":"=ABS(F11-D11)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H11","v":"مطابق للمواصفات","f":"=IF(G11<=E11,\"مطابق للمواصفات\",\"مرفوض - يلزم تعديل\")","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"I11","v":"عمق غطس رأس المسمار 1 مم","bg":"#F8FAFC"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":8,"b":true,"al":"center"},{"c":"B12","v":"المسافة بين مسامير تثبيت الجبس بورد في وسط اللوح على قطاعات الأوميجا (سم)"},{"c":"C12","v":"ASTM C840","b":true,"al":"center"},{"c":"D12","v":20,"in":true,"b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E12","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F12","v":20,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G12","v":0,"f":"=ABS(F12-D12)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H12","v":"مطابق للمواصفات","f":"=IF(G12<=E12,\"مطابق للمواصفات\",\"مرفوض - يلزم تعديل\")","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"I12","v":"تثبيت كامل دون تمزيق الورق"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":9,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":"عمق شطف حواف ألواح الجبس غير المفرزة بزاوية 45 درجة لملء معجون الفواصل (مم)","bg":"#F8FAFC"},{"c":"C13","v":"أصول الصنعة","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D13","v":4,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E13","v":1.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F13","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G13","v":0,"f":"=ABS(F13-D13)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H13","v":"مطابق للمواصفات","f":"=IF(G13<=E13,\"مطابق للمواصفات\",\"مرفوض - يلزم تعديل\")","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"I13","v":"مع تسليح الفواصل بشريط الفايبر","bg":"#F8FAFC"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":10,"b":true,"al":"center"},{"c":"B14","v":"أفقية واستواء منسوب السقف المستعار المقاس بجهاز الليزر والقدة الألومنيوم بطول 2 م (مم)"},{"c":"C14","v":"SBC 201 / AWI","b":true,"al":"center"},{"c":"D14","v":0,"in":true,"b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E14","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F14","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G14","v":1,"f":"=ABS(F14-D14)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H14","v":"مطابق للمواصفات","f":"=IF(G14<=E14,\"مطابق للمواصفات\",\"مرفوض - يلزم تعديل\")","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"I14","v":"أفقية ممتازة دون تموجات"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":11,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B15","v":"المسافة القصوى لعمل فاصل تمدد وحركة (Control Joint) في الأسقف المستمرة الكبيرة (م)","bg":"#F8FAFC"},{"c":"C15","v":"ASTM C840","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D15","v":12,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E15","v":3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F15","v":11.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G15","v":0.5,"f":"=ABS(F15-D15)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H15","v":"مطابق للمواصفات","f":"=IF(G15<=E15,\"مطابق للمواصفات\",\"مرفوض - يلزم تعديل\")","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"I15","v":"فاصل تمدد في الممرات الطويلة","bg":"#F8FAFC"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":12,"b":true,"al":"center"},{"c":"B16","v":"خلوص زاوية الظل المحيطية (Shadow Gap) عند التقاء السقف الجبسي بالحوائط (مم)"},{"c":"C16","v":"المخطط التنفيذي","b":true,"al":"center"},{"c":"D16","v":20,"in":true,"b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E16","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F16","v":20,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G16","v":0,"f":"=ABS(F16-D16)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H16","v":"مطابق للمواصفات","f":"=IF(G16<=E16,\"مطابق للمواصفات\",\"مرفوض - يلزم تعديل\")","bg":"#D1FAE5","fg":"#065F46","b":true,"al":"center"},{"c":"I16","v":"خط ظل مستقيم ومنتظم العرض"}]},{"r":17,"h":44.0,"cells":[{"c":"A17","v":"نتيجة الفحص الميداني الشامل لأعمال الشاسيه المعدني والجبس بورد (نسبة المطابقة)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G17","v":12,"f":"=COUNTIF(H5:H16,\"مطابق للمواصفات\")","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H17","v":1,"f":"=G17/12","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"0.0%"},{"c":"I17","v":"مقبول للبدء في المعجون والدهان (Code A)","f":"=IF(G17=12,\"مقبول للبدء في المعجون والدهان (Code A)\",\"توجد ملاحظات يلزم تلافيها\")","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"}]}]}]}