{"slug":"hvac-cooling-load-duct-sizing","sheets":[{"name":"لوحة التحكم وملخص الأحمال","maxRow":31,"maxCol":10,"colWidths":[14.0,34.0,16.0,22.0,18.0,18.0,28.0,22.0,18.0,28.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"شيت حساب أحمال التكييف وتصميم مجاري الهواء الدكت وحصر الصاج","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"قالب هندسي تشغيلي متكامل لحساب الأحمال الحرارية ومقاسات مجاري الهواء وحصر الصاج والعزل وفق كود البناء السعودي SBC 501 ومعايير ASHRAE و SMACNA","bg":"#1E293B","fg":"#FFFFFF","al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"  بيانات المشروع والظروف التصميمية للموقع (Project Design Conditions)","bg":"#0284C7","fg":"#FFFFFF","b":true,"cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":36.0,"cells":[{"c":"A5","v":"اسم المشروع:","bg":"#F8FAFC","fg":"#475569","b":true,"cs":2},{"skip":true},{"c":"C5","v":"مشروع إنشاء فيلا سكنية فاخرة (دورين + ملحق)","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"F5","v":"المدينة وكود التصميم:","bg":"#F8FAFC","fg":"#475569","b":true,"cs":2},{"skip":true},{"c":"H5","v":"الرياض - كود SBC 501 / ASHRAE 2021","b":true,"cs":3},{"skip":true},{"skip":true}]},{"r":6,"h":36.0,"cells":[{"c":"A6","v":"المالك / المطور:","bg":"#F8FAFC","fg":"#475569","b":true,"cs":2},{"skip":true},{"c":"C6","v":"شركة إعمار للتطوير العقاري","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"F6","v":"الحرارة الخارجية التصميمية:","bg":"#F8FAFC","fg":"#475569","b":true,"cs":2},{"skip":true},{"c":"H6","v":"46 °C Dry Bulb / 24 °C Wet Bulb","bg":"#E0F2FE","fg":"#0284C7","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":"مهندس التصميم MEP:","bg":"#F8FAFC","fg":"#475569","b":true,"cs":2},{"skip":true},{"c":"C7","v":"مكتب الاستشارات الهندسية المتخصص","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"F7","v":"الحرارة والرطوبة الداخلية:","bg":"#F8FAFC","fg":"#475569","b":true,"cs":2},{"skip":true},{"c":"H7","v":"23 °C ± 1°C / 50% RH (Comfort)","bg":"#E0F2FE","fg":"#0284C7","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":8,"h":36.0,"cells":[{"c":"A8","v":"تاريخ الإعداد والاعتماد:","bg":"#F8FAFC","fg":"#475569","b":true,"cs":2},{"skip":true},{"c":"C8","v":"2026-10-07","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"F8","v":"نظام التكييف المعتمد:","bg":"#F8FAFC","fg":"#475569","b":true,"cs":2},{"skip":true},{"c":"H8","v":"كونسيلد مخفي + سبليت ديكوري مع مجاري دكت","b":true,"cs":3},{"skip":true},{"skip":true}]},{"r":9,"h":28.0,"cells":[{"c":"A9","v":""},{"c":"B9","v":""},{"c":"C9","v":""},{"c":"D9","v":""},{"c":"E9","v":""},{"c":"F9","v":""},{"c":"G9","v":""},{"c":"H9","v":""},{"c":"I9","v":""},{"c":"J9","v":""}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":"إجمالي قدرة التبريد الكلية (TR)","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C10","v":"إجمالي الحمل الحراري (BTU/hr)","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"E10","v":"إجمالي تدفق الهواء المطلوب (CFM)","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"G10","v":"إجمالي مسطحات الصاج (م²)","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"I10","v":"إجمالي وزن الصاج التقديري (كجم)","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true}]},{"r":11,"h":46.0,"cells":[{"c":"A11","v":26.25,"f":"='حساب أحمال الغرف'!L23","fg":"#0284C7","b":true,"al":"center","nf":"#,##0.00","cs":2},{"skip":true},{"c":"C11","v":299300,"f":"='حساب أحمال الغرف'!K23","b":true,"al":"center","nf":"#,##0","cs":2},{"skip":true},{"c":"E11","v":10500,"f":"='حساب أحمال الغرف'!M23","fg":"#0284C7","b":true,"al":"center","nf":"#,##0","cs":2},{"skip":true},{"c":"G11","v":85.25,"f":"='حصر الصاج والعزل'!G18","b":true,"al":"center","nf":"#,##0.0","cs":2},{"skip":true},{"c":"I11","v":617.1,"f":"='حصر الصاج والعزل'!J18","fg":"#166534","b":true,"al":"center","nf":"#,##0","cs":2},{"skip":true}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":"طن تبريد (Total Capacity)","bg":"#F1F5F9","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"C12","v":"وحدة حرارية بريطانية / ساعة","bg":"#F1F5F9","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"E12","v":"قدم مكعب / دقيقة (Airflow)","bg":"#F1F5F9","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"G12","v":"م² صاج مجلفن للدكت","bg":"#F1F5F9","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"I12","v":"كجم صاج مجلفن (G90)","bg":"#F1F5F9","fg":"#475569","al":"center","cs":2},{"skip":true}]},{"r":13,"h":28.0,"cells":[{"c":"A13","v":""},{"c":"B13","v":""},{"c":"C13","v":""},{"c":"D13","v":""},{"c":"E13","v":""},{"c":"F13","v":""},{"c":"G13","v":""},{"c":"H13","v":""},{"c":"I13","v":""},{"c":"J13","v":""}]},{"r":14,"h":38.0,"cells":[{"c":"A14","v":"  جدول ملخص الفراغات واختيار وحدات التكييف المقترحة (Space-by-Space Equipment Selection)","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"كود الفراغ","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B15","v":"اسم الفراغ والوظيفة المعمارية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C15","v":"المساحة (م²)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D15","v":"الحمل المحسوب (BTU/hr)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E15","v":"الحمل التصميمي (TR)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F15","v":"تدفق الهواء (CFM)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G15","v":"نوع وحدة التكييف المقترحة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H15","v":"السعة التجارية المختارة (TR)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I15","v":"ضغط المروحة (ESP - Pa)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J15","v":"حالة التوزيع ونظام الهواء","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":16,"h":36.0,"cells":[{"c":"A16","v":"Z-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B16","v":"المجلس الرئيسي للرجال (Main Majlis)","f":"='حساب أحمال الغرف'!B10","bg":"#F8FAFC"},{"c":"C16","v":48,"f":"='حساب أحمال الغرف'!C10","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"D16","v":41200,"f":"='حساب أحمال الغرف'!K10","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"E16","v":3.61,"f":"='حساب أحمال الغرف'!L10","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"F16","v":1444,"f":"='حساب أحمال الغرف'!M10","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"G16","v":"كونسيلد مخفي (Concealed FCU)","bg":"#F8FAFC","al":"center"},{"c":"H16","v":4,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"I16","v":75,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"J16","v":"مجاري هواء صاج + مخارج طولية Slot","bg":"#F8FAFC"}]},{"r":17,"h":36.0,"cells":[{"c":"A17","v":"Z-02","b":true,"al":"center"},{"c":"B17","v":"صالة الاستقبال وتناول الطعام (Dining & Reception)","f":"='حساب أحمال الغرف'!B11"},{"c":"C17","v":56,"f":"='حساب أحمال الغرف'!C11","al":"center","nf":"#,##0.0"},{"c":"D17","v":48300,"f":"='حساب أحمال الغرف'!K11","al":"center","nf":"#,##0"},{"c":"E17","v":4.23,"f":"='حساب أحمال الغرف'!L11","b":true,"al":"center","nf":"#,##0.00"},{"c":"F17","v":1692,"f":"='حساب أحمال الغرف'!M11","al":"center","nf":"#,##0"},{"c":"G17","v":"كونسيلد مخفي (Concealed FCU)","al":"center"},{"c":"H17","v":4.5,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"I17","v":75,"in":true,"al":"center"},{"c":"J17","v":"مجاري هواء صاج + مخارج طولية Slot"}]},{"r":18,"h":36.0,"cells":[{"c":"A18","v":"Z-03","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B18","v":"صالة المعيشة العائلية (Family Living Room)","f":"='حساب أحمال الغرف'!B12","bg":"#F8FAFC"},{"c":"C18","v":40,"f":"='حساب أحمال الغرف'!C12","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"D18","v":32600,"f":"='حساب أحمال الغرف'!K12","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"E18","v":2.86,"f":"='حساب أحمال الغرف'!L12","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"F18","v":1144,"f":"='حساب أحمال الغرف'!M12","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"G18","v":"كونسيلد مخفي (Concealed FCU)","bg":"#F8FAFC","al":"center"},{"c":"H18","v":3,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"I18","v":60,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"J18","v":"مجاري هواء صاج + جريلات جانبية","bg":"#F8FAFC"}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":"Z-04","b":true,"al":"center"},{"c":"B19","v":"جناح النوم الرئيسي (Master Bedroom Suite)","f":"='حساب أحمال الغرف'!B13"},{"c":"C19","v":36,"f":"='حساب أحمال الغرف'!C13","al":"center","nf":"#,##0.0"},{"c":"D19","v":24700,"f":"='حساب أحمال الغرف'!K13","al":"center","nf":"#,##0"},{"c":"E19","v":2.17,"f":"='حساب أحمال الغرف'!L13","b":true,"al":"center","nf":"#,##0.00"},{"c":"F19","v":868,"f":"='حساب أحمال الغرف'!M13","al":"center","nf":"#,##0"},{"c":"G19","v":"كونسيلد مخفي (Concealed FCU)","al":"center"},{"c":"H19","v":2.5,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"I19","v":50,"in":true,"al":"center"},{"c":"J19","v":"مجاري هواء صاج + مخارج هواء هادئة NC25"}]},{"r":20,"h":36.0,"cells":[{"c":"A20","v":"Z-05","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B20","v":"غرفة نوم الأولاد 1 (Bedroom 1)","f":"='حساب أحمال الغرف'!B14","bg":"#F8FAFC"},{"c":"C20","v":24,"f":"='حساب أحمال الغرف'!C14","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"D20","v":16600,"f":"='حساب أحمال الغرف'!K14","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"E20","v":1.46,"f":"='حساب أحمال الغرف'!L14","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"F20","v":584,"f":"='حساب أحمال الغرف'!M14","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"G20","v":"سبليت جداري (Decorative Split)","bg":"#F8FAFC","al":"center"},{"c":"H20","v":2,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"I20","v":0,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"J20","v":"مباشر بدون دكت (Direct Expansion)","bg":"#F8FAFC"}]},{"r":21,"h":36.0,"cells":[{"c":"A21","v":"Z-06","b":true,"al":"center"},{"c":"B21","v":"غرفة نوم البنات 2 (Bedroom 2)","f":"='حساب أحمال الغرف'!B15"},{"c":"C21","v":24,"f":"='حساب أحمال الغرف'!C15","al":"center","nf":"#,##0.0"},{"c":"D21","v":17200,"f":"='حساب أحمال الغرف'!K15","al":"center","nf":"#,##0"},{"c":"E21","v":1.51,"f":"='حساب أحمال الغرف'!L15","b":true,"al":"center","nf":"#,##0.00"},{"c":"F21","v":604,"f":"='حساب أحمال الغرف'!M15","al":"center","nf":"#,##0"},{"c":"G21","v":"سبليت جداري (Decorative Split)","al":"center"},{"c":"H21","v":2,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"I21","v":0,"in":true,"al":"center"},{"c":"J21","v":"مباشر بدون دكت (Direct Expansion)"}]},{"r":22,"h":36.0,"cells":[{"c":"A22","v":"Z-07","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B22","v":"غرفة نوم الضيوف 3 (Guest Bedroom)","f":"='حساب أحمال الغرف'!B16","bg":"#F8FAFC"},{"c":"C22","v":20,"f":"='حساب أحمال الغرف'!C16","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"D22","v":14500,"f":"='حساب أحمال الغرف'!K16","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"E22","v":1.27,"f":"='حساب أحمال الغرف'!L16","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"F22","v":508,"f":"='حساب أحمال الغرف'!M16","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"G22","v":"سبليت جداري (Decorative Split)","bg":"#F8FAFC","al":"center"},{"c":"H22","v":1.5,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"I22","v":0,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"J22","v":"مباشر بدون دكت (Direct Expansion)","bg":"#F8FAFC"}]},{"r":23,"h":36.0,"cells":[{"c":"A23","v":"Z-08","b":true,"al":"center"},{"c":"B23","v":"المطبخ الرئيسي المفتوح (Main Kitchen)","f":"='حساب أحمال الغرف'!B17"},{"c":"C23","v":22,"f":"='حساب أحمال الغرف'!C17","al":"center","nf":"#,##0.0"},{"c":"D23","v":20700,"f":"='حساب أحمال الغرف'!K17","al":"center","nf":"#,##0"},{"c":"E23","v":1.82,"f":"='حساب أحمال الغرف'!L17","b":true,"al":"center","nf":"#,##0.00"},{"c":"F23","v":728,"f":"='حساب أحمال الغرف'!M17","al":"center","nf":"#,##0"},{"c":"G23","v":"كاسيت سقفي (Cassette 4-Way)","al":"center"},{"c":"H23","v":2,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"I23","v":0,"in":true,"al":"center"},{"c":"J23","v":"تغذية هواء نقي + شفاط طرد مستقل"}]},{"r":24,"h":36.0,"cells":[{"c":"A24","v":"Z-09","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B24","v":"المكتب المنزلي والمكتبة (Home Office)","f":"='حساب أحمال الغرف'!B18","bg":"#F8FAFC"},{"c":"C24","v":18,"f":"='حساب أحمال الغرف'!C18","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"D24","v":14400,"f":"='حساب أحمال الغرف'!K18","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"E24","v":1.26,"f":"='حساب أحمال الغرف'!L18","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"F24","v":504,"f":"='حساب أحمال الغرف'!M18","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"G24","v":"سبليت جداري (Decorative Split)","bg":"#F8FAFC","al":"center"},{"c":"H24","v":1.5,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"I24","v":0,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"J24","v":"مباشر بدون دكت مع فلتر تنقية","bg":"#F8FAFC"}]},{"r":25,"h":36.0,"cells":[{"c":"A25","v":"Z-10","b":true,"al":"center"},{"c":"B25","v":"صالة الرياضة والألعاب (Gym & Fitness)","f":"='حساب أحمال الغرف'!B19"},{"c":"C25","v":30,"f":"='حساب أحمال الغرف'!C19","al":"center","nf":"#,##0.0"},{"c":"D25","v":27000,"f":"='حساب أحمال الغرف'!K19","al":"center","nf":"#,##0"},{"c":"E25","v":2.37,"f":"='حساب أحمال الغرف'!L19","b":true,"al":"center","nf":"#,##0.00"},{"c":"F25","v":948,"f":"='حساب أحمال الغرف'!M19","al":"center","nf":"#,##0"},{"c":"G25","v":"كونسيلد مخفي (Concealed FCU)","al":"center"},{"c":"H25","v":2.5,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"I25","v":60,"in":true,"al":"center"},{"c":"J25","v":"مجاري هواء صاج + مخارج دائرية"}]},{"r":26,"h":36.0,"cells":[{"c":"A26","v":"Z-11","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B26","v":"ملحق السطح والجلسة العلوية (Roof Lounge)","f":"='حساب أحمال الغرف'!B20","bg":"#F8FAFC"},{"c":"C26","v":32,"f":"='حساب أحمال الغرف'!C20","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"D26","v":29800,"f":"='حساب أحمال الغرف'!K20","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"E26","v":2.61,"f":"='حساب أحمال الغرف'!L20","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"F26","v":1044,"f":"='حساب أحمال الغرف'!M20","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"G26","v":"سبليت جداري (Decorative Split)","bg":"#F8FAFC","al":"center"},{"c":"H26","v":2.5,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"I26","v":0,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"J26","v":"مباشر بدون دكت - عزل إضافي","bg":"#F8FAFC"}]},{"r":27,"h":36.0,"cells":[{"c":"A27","v":"Z-12","b":true,"al":"center"},{"c":"B27","v":"غرفة السائق والخدمات (Driver & Service)","f":"='حساب أحمال الغرف'!B21"},{"c":"C27","v":16,"f":"='حساب أحمال الغرف'!C21","al":"center","nf":"#,##0.0"},{"c":"D27","v":12300,"f":"='حساب أحمال الغرف'!K21","al":"center","nf":"#,##0"},{"c":"E27","v":1.08,"f":"='حساب أحمال الغرف'!L21","b":true,"al":"center","nf":"#,##0.00"},{"c":"F27","v":432,"f":"='حساب أحمال الغرف'!M21","al":"center","nf":"#,##0"},{"c":"G27","v":"سبليت جداري (Decorative Split)","al":"center"},{"c":"H27","v":1.5,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"I27","v":0,"in":true,"al":"center"},{"c":"J27","v":"مباشر بدون دكت"}]},{"r":28,"h":46.0,"cells":[{"c":"A28","v":"الإجمالي الكلي للمشروع (Grand Total)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true},{"c":"C28","v":366,"f":"=SUM(C16:C27)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.0"},{"c":"D28","v":299300,"f":"=SUM(D16:D27)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"E28","v":26.25,"f":"=SUM(E16:E27)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F28","v":10500,"f":"=SUM(F16:F27)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"G28","v":"—","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H28","v":29.5,"f":"=SUM(H16:H27)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"I28","v":"—","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J28","v":"12 وحدة تكييف إجمالية","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":29,"h":28.0,"cells":[{"c":"A29","v":""},{"c":"B29","v":""},{"c":"C29","v":""},{"c":"D29","v":""},{"c":"E29","v":""},{"c":"F29","v":""},{"c":"G29","v":""},{"c":"H29","v":""},{"c":"I29","v":""},{"c":"J29","v":""}]},{"r":30,"h":34.0,"cells":[{"c":"A30","v":"مهندس التكييف والميكانيكا المصمم (MEP Engineer)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D30","v":"المهندس المراجع / مدير المكتب الفني (Technical Manager)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"H30","v":"الاستشاري الهندسي المشرف (Supervising Consultant)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":31,"h":75.0,"cells":[{"c":"A31","v":"الاسم: م. أحمد عبد العزيز\nالتوقيع: ........................\nالتاريخ: 2026-10-07","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D31","v":"الاسم: م. فهد الشمري\nالتوقيع: ........................\nالتاريخ: 2026-10-07","al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"H31","v":"المكتب: دار الرؤية للاستشارات\nالتوقيع والختم: ........................\nالتاريخ: 2026-10-07","al":"center","cs":3},{"skip":true},{"skip":true}]}]},{"name":"حساب أحمال الغرف","maxRow":23,"maxCol":15,"colWidths":[10.0,44.0,15.0,13.0,15.0,22.0,22.0,22.0,22.0,22.0,22.0,18.0,18.0,18.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول حساب الأحمال الحرارية التبريدية التفصيلية للفراغات (Cooling Load Calculations)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":15},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":40.0,"cells":[{"c":"A2","v":"حساب أحمال التوصيل والحرارة المحسوسة والكامنة (Envelope, Solar Glass, Occupants, Lights & Infiltration) وفق معادلات ASHRAE و SBC 501","bg":"#1E293B","fg":"#FFFFFF","al":"center","cs":15},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""},{"c":"N3","v":""},{"c":"O3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"تعريف الفراغ والموقع","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"الأبعاد الهندسية والحجم","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"F4","v":"تفصيل مكونات الحمل الحراري التبريدي (BTU/hr Components)","bg":"#0369A1","fg":"#FFFFFF","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"K4","v":"النتائج الإجمالية وقدرة التكييف المطلوبة","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"O4","v":"ملاحظات التوجيه","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":42.0,"cells":[{"c":"A5","v":"الكود","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"اسم الفراغ والوظيفة المعمارية","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"المساحة (م²)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"الارتفاع (م)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"الحجم (م³)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"حمل الجدران والأسقف (BTU)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"حمل الزجاج والواجهات (BTU)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"حمل الأشخاص والإشغال (BTU)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I5","v":"حمل الإنارة والأجهزة (BTU)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J5","v":"حمل التهوية والتخلخل (BTU)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K5","v":"إجمالي الحمل (BTU/hr)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L5","v":"قدرة التبريد (TR)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M5","v":"تدفق الهواء (CFM)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"N5","v":"معدل التبريد (م²/TR)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"O5","v":"توجيه الواجهة الرئيسية","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":28.0,"cells":[{"c":"A6","v":""},{"c":"B6","v":""},{"c":"C6","v":""},{"c":"D6","v":""},{"c":"E6","v":""},{"c":"F6","v":""},{"c":"G6","v":""},{"c":"H6","v":""},{"c":"I6","v":""},{"c":"J6","v":""},{"c":"K6","v":""},{"c":"L6","v":""},{"c":"M6","v":""},{"c":"N6","v":""},{"c":"O6","v":""}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""},{"c":"I7","v":""},{"c":"J7","v":""},{"c":"K7","v":""},{"c":"L7","v":""},{"c":"M7","v":""},{"c":"N7","v":""},{"c":"O7","v":""}]},{"r":8,"h":28.0,"cells":[{"c":"A8","v":""},{"c":"B8","v":""},{"c":"C8","v":""},{"c":"D8","v":""},{"c":"E8","v":""},{"c":"F8","v":""},{"c":"G8","v":""},{"c":"H8","v":""},{"c":"I8","v":""},{"c":"J8","v":""},{"c":"K8","v":""},{"c":"L8","v":""},{"c":"M8","v":""},{"c":"N8","v":""},{"c":"O8","v":""}]},{"r":9,"h":28.0,"cells":[{"c":"A9","v":""},{"c":"B9","v":""},{"c":"C9","v":""},{"c":"D9","v":""},{"c":"E9","v":""},{"c":"F9","v":""},{"c":"G9","v":""},{"c":"H9","v":""},{"c":"I9","v":""},{"c":"J9","v":""},{"c":"K9","v":""},{"c":"L9","v":""},{"c":"M9","v":""},{"c":"N9","v":""},{"c":"O9","v":""}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":"RM-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B10","v":"المجلس الرئيسي للرجال (Main Majlis)","bg":"#F8FAFC"},{"c":"C10","v":48,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"D10","v":3.8,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"E10","v":182.4,"f":"=C10*D10","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"F10","v":11500,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"G10","v":10200,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"H10","v":6800,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"I10","v":4900,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"J10","v":7800,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"K10","v":41200,"f":"=SUM(F10:J10)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L10","v":3.61,"f":"=ROUNDUP(K10/12000*1.05, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M10","v":1444,"f":"=ROUNDUP(L10*400, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"N10","v":13.3,"f":"=ROUND(C10/L10, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"O10","v":"واجهة جنوبية غربية - واجهات زجاجية مزدوجة","bg":"#F8FAFC"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"RM-02","b":true,"al":"center"},{"c":"B11","v":"صالة الاستقبال وتناول الطعام (Dining & Reception)"},{"c":"C11","v":56,"in":true,"al":"center","nf":"#,##0.0"},{"c":"D11","v":3.8,"in":true,"al":"center","nf":"#,##0.0"},{"c":"E11","v":212.8,"f":"=C11*D11","al":"center","nf":"#,##0.0"},{"c":"F11","v":13200,"in":true,"al":"center","nf":"#,##0"},{"c":"G11","v":11800,"in":true,"al":"center","nf":"#,##0"},{"c":"H11","v":8500,"in":true,"al":"center","nf":"#,##0"},{"c":"I11","v":5600,"in":true,"al":"center","nf":"#,##0"},{"c":"J11","v":9200,"in":true,"al":"center","nf":"#,##0"},{"c":"K11","v":48300,"f":"=SUM(F11:J11)","b":true,"al":"center","nf":"#,##0"},{"c":"L11","v":4.23,"f":"=ROUNDUP(K11/12000*1.05, 2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"M11","v":1692,"f":"=ROUNDUP(L11*400, 0)","b":true,"al":"center","nf":"#,##0"},{"c":"N11","v":13.2,"f":"=ROUND(C11/L11, 1)","al":"center","nf":"#,##0.0"},{"c":"O11","v":"واجهة شرقية - نافذة بانورامية كبيرة"}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":"RM-03","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B12","v":"صالة المعيشة العائلية (Family Living Room)","bg":"#F8FAFC"},{"c":"C12","v":40,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"D12","v":3.4,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"E12","v":136,"f":"=C12*D12","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"F12","v":8900,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"G12","v":7200,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"H12","v":5200,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"I12","v":4800,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"J12","v":6500,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"K12","v":32600,"f":"=SUM(F12:J12)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L12","v":2.86,"f":"=ROUNDUP(K12/12000*1.05, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M12","v":1144,"f":"=ROUNDUP(L12*400, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"N12","v":14,"f":"=ROUND(C12/L12, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"O12","v":"واجهة شمالية مظللة جزئياً","bg":"#F8FAFC"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":"RM-04","b":true,"al":"center"},{"c":"B13","v":"جناح النوم الرئيسي (Master Bedroom Suite)"},{"c":"C13","v":36,"in":true,"al":"center","nf":"#,##0.0"},{"c":"D13","v":3.4,"in":true,"al":"center","nf":"#,##0.0"},{"c":"E13","v":122.4,"f":"=C13*D13","al":"center","nf":"#,##0.0"},{"c":"F13","v":7600,"in":true,"al":"center","nf":"#,##0"},{"c":"G13","v":6100,"in":true,"al":"center","nf":"#,##0"},{"c":"H13","v":2400,"in":true,"al":"center","nf":"#,##0"},{"c":"I13","v":3200,"in":true,"al":"center","nf":"#,##0"},{"c":"J13","v":5400,"in":true,"al":"center","nf":"#,##0"},{"c":"K13","v":24700,"f":"=SUM(F13:J13)","b":true,"al":"center","nf":"#,##0"},{"c":"L13","v":2.17,"f":"=ROUNDUP(K13/12000*1.05, 2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"M13","v":868,"f":"=ROUNDUP(L13*400, 0)","b":true,"al":"center","nf":"#,##0"},{"c":"N13","v":16.6,"f":"=ROUND(C13/L13, 1)","al":"center","nf":"#,##0.0"},{"c":"O13","v":"واجهة شرقية جنوبية مع جلسة خاصة"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"RM-05","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B14","v":"غرفة نوم الأولاد 1 (Bedroom 1)","bg":"#F8FAFC"},{"c":"C14","v":24,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"D14","v":3.2,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"E14","v":76.8,"f":"=C14*D14","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"F14","v":5100,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"G14","v":4200,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"H14","v":1600,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"I14","v":2100,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"J14","v":3600,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"K14","v":16600,"f":"=SUM(F14:J14)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L14","v":1.46,"f":"=ROUNDUP(K14/12000*1.05, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M14","v":584,"f":"=ROUNDUP(L14*400, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"N14","v":16.4,"f":"=ROUND(C14/L14, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"O14","v":"واجهة شمالية - نافذة ستاندرد معزولة","bg":"#F8FAFC"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"RM-06","b":true,"al":"center"},{"c":"B15","v":"غرفة نوم البنات 2 (Bedroom 2)"},{"c":"C15","v":24,"in":true,"al":"center","nf":"#,##0.0"},{"c":"D15","v":3.2,"in":true,"al":"center","nf":"#,##0.0"},{"c":"E15","v":76.8,"f":"=C15*D15","al":"center","nf":"#,##0.0"},{"c":"F15","v":5300,"in":true,"al":"center","nf":"#,##0"},{"c":"G15","v":4500,"in":true,"al":"center","nf":"#,##0"},{"c":"H15","v":1600,"in":true,"al":"center","nf":"#,##0"},{"c":"I15","v":2100,"in":true,"al":"center","nf":"#,##0"},{"c":"J15","v":3700,"in":true,"al":"center","nf":"#,##0"},{"c":"K15","v":17200,"f":"=SUM(F15:J15)","b":true,"al":"center","nf":"#,##0"},{"c":"L15","v":1.51,"f":"=ROUNDUP(K15/12000*1.05, 2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"M15","v":604,"f":"=ROUNDUP(L15*400, 0)","b":true,"al":"center","nf":"#,##0"},{"c":"N15","v":15.9,"f":"=ROUND(C15/L15, 1)","al":"center","nf":"#,##0.0"},{"c":"O15","v":"واجهة غربية مع شتر ألومنيوم خارجي"}]},{"r":16,"h":36.0,"cells":[{"c":"A16","v":"RM-07","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B16","v":"غرفة نوم الضيوف 3 (Guest Bedroom)","bg":"#F8FAFC"},{"c":"C16","v":20,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"D16","v":3.2,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"E16","v":64,"f":"=C16*D16","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"F16","v":4400,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"G16","v":3600,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"H16","v":1600,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"I16","v":1800,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"J16","v":3100,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"K16","v":14500,"f":"=SUM(F16:J16)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L16","v":1.27,"f":"=ROUNDUP(K16/12000*1.05, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M16","v":508,"f":"=ROUNDUP(L16*400, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"N16","v":15.7,"f":"=ROUND(C16/L16, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"O16","v":"واجهة شمالية - إشغال متقطع","bg":"#F8FAFC"}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":"RM-08","b":true,"al":"center"},{"c":"B17","v":"المطبخ الرئيسي المفتوح (Main Kitchen)"},{"c":"C17","v":22,"in":true,"al":"center","nf":"#,##0.0"},{"c":"D17","v":3.2,"in":true,"al":"center","nf":"#,##0.0"},{"c":"E17","v":70.4,"f":"=C17*D17","al":"center","nf":"#,##0.0"},{"c":"F17","v":4200,"in":true,"al":"center","nf":"#,##0"},{"c":"G17","v":2800,"in":true,"al":"center","nf":"#,##0"},{"c":"H17","v":2000,"in":true,"al":"center","nf":"#,##0"},{"c":"I17","v":7200,"in":true,"al":"center","nf":"#,##0"},{"c":"J17","v":4500,"in":true,"al":"center","nf":"#,##0"},{"c":"K17","v":20700,"f":"=SUM(F17:J17)","b":true,"al":"center","nf":"#,##0"},{"c":"L17","v":1.82,"f":"=ROUNDUP(K17/12000*1.05, 2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"M17","v":728,"f":"=ROUNDUP(L17*400, 0)","b":true,"al":"center","nf":"#,##0"},{"c":"N17","v":12.1,"f":"=ROUND(C17/L17, 1)","al":"center","nf":"#,##0.0"},{"c":"O17","v":"أجهزة طهي وفرن - تبريد تعويضي مستقل"}]},{"r":18,"h":36.0,"cells":[{"c":"A18","v":"RM-09","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B18","v":"المكتب المنزلي والمكتبة (Home Office)","bg":"#F8FAFC"},{"c":"C18","v":18,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"D18","v":3.2,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"E18","v":57.6,"f":"=C18*D18","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"F18","v":3800,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"G18","v":3200,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"H18","v":1200,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"I18","v":3400,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"J18","v":2800,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"K18","v":14400,"f":"=SUM(F18:J18)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L18","v":1.26,"f":"=ROUNDUP(K18/12000*1.05, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M18","v":504,"f":"=ROUNDUP(L18*400, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"N18","v":14.3,"f":"=ROUND(C18/L18, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"O18","v":"أجهزة كمبيوتر وشاشات وطابعات","bg":"#F8FAFC"}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":"RM-10","b":true,"al":"center"},{"c":"B19","v":"صالة الرياضة والألعاب (Gym & Fitness)"},{"c":"C19","v":30,"in":true,"al":"center","nf":"#,##0.0"},{"c":"D19","v":3.4,"in":true,"al":"center","nf":"#,##0.0"},{"c":"E19","v":102,"f":"=C19*D19","al":"center","nf":"#,##0.0"},{"c":"F19","v":6800,"in":true,"al":"center","nf":"#,##0"},{"c":"G19","v":5400,"in":true,"al":"center","nf":"#,##0"},{"c":"H19","v":4500,"in":true,"al":"center","nf":"#,##0"},{"c":"I19","v":3100,"in":true,"al":"center","nf":"#,##0"},{"c":"J19","v":7200,"in":true,"al":"center","nf":"#,##0"},{"c":"K19","v":27000,"f":"=SUM(F19:J19)","b":true,"al":"center","nf":"#,##0"},{"c":"L19","v":2.37,"f":"=ROUNDUP(K19/12000*1.05, 2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"M19","v":948,"f":"=ROUNDUP(L19*400, 0)","b":true,"al":"center","nf":"#,##0"},{"c":"N19","v":12.7,"f":"=ROUND(C19/L19, 1)","al":"center","nf":"#,##0.0"},{"c":"O19","v":"معدل نشاط بدني مرتفع وهواء نقي إضافي"}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":"RM-11","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B20","v":"ملحق السطح والجلسة العلوية (Roof Lounge)","bg":"#F8FAFC"},{"c":"C20","v":32,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"D20","v":3.2,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"E20","v":102.4,"f":"=C20*D20","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"F20","v":9200,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"G20","v":7800,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"H20","v":3200,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"I20","v":3500,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"J20","v":6100,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"K20","v":29800,"f":"=SUM(F20:J20)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L20","v":2.61,"f":"=ROUNDUP(K20/12000*1.05, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M20","v":1044,"f":"=ROUNDUP(L20*400, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"N20","v":12.3,"f":"=ROUND(C20/L20, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"O20","v":"معرض للشمس والرياح - سقف معرض كلياً","bg":"#F8FAFC"}]},{"r":21,"h":36.0,"cells":[{"c":"A21","v":"RM-12","b":true,"al":"center"},{"c":"B21","v":"غرفة السائق والخدمات (Driver & Service)"},{"c":"C21","v":16,"in":true,"al":"center","nf":"#,##0.0"},{"c":"D21","v":3,"in":true,"al":"center","nf":"#,##0.0"},{"c":"E21","v":48,"f":"=C21*D21","al":"center","nf":"#,##0.0"},{"c":"F21","v":3900,"in":true,"al":"center","nf":"#,##0"},{"c":"G21","v":2800,"in":true,"al":"center","nf":"#,##0"},{"c":"H21","v":1400,"in":true,"al":"center","nf":"#,##0"},{"c":"I21","v":1600,"in":true,"al":"center","nf":"#,##0"},{"c":"J21","v":2600,"in":true,"al":"center","nf":"#,##0"},{"c":"K21","v":12300,"f":"=SUM(F21:J21)","b":true,"al":"center","nf":"#,##0"},{"c":"L21","v":1.08,"f":"=ROUNDUP(K21/12000*1.05, 2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"M21","v":432,"f":"=ROUNDUP(L21*400, 0)","b":true,"al":"center","nf":"#,##0"},{"c":"N21","v":14.8,"f":"=ROUND(C21/L21, 1)","al":"center","nf":"#,##0.0"},{"c":"O21","v":"واجهة غربية - تبريد اقتصادي"}]},{"r":22,"h":28.0,"cells":[{"c":"A22","v":""},{"c":"B22","v":""},{"c":"C22","v":""},{"c":"D22","v":""},{"c":"E22","v":""},{"c":"F22","v":""},{"c":"G22","v":""},{"c":"H22","v":""},{"c":"I22","v":""},{"c":"J22","v":""},{"c":"K22","v":""},{"c":"L22","v":""},{"c":"M22","v":""},{"c":"N22","v":""},{"c":"O22","v":""}]},{"r":23,"h":52.0,"cells":[{"c":"A23","v":"الإجمالي الكلي لأحمال المبنى (Total Building Loads)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true},{"c":"C23","v":366,"f":"=SUM(C10:C21)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.0"},{"c":"D23","v":"—","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E23","v":1251.6,"f":"=SUM(E10:E21)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.0"},{"c":"F23","v":83900,"f":"=SUM(F10:F21)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"G23","v":69600,"f":"=SUM(G10:G21)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"H23","v":40000,"f":"=SUM(H10:H21)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"I23","v":43300,"f":"=SUM(I10:I21)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"J23","v":62500,"f":"=SUM(J10:J21)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"K23","v":299300,"f":"=SUM(K10:K21)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"L23","v":26.25,"f":"=SUM(L10:L21)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"M23","v":10500,"f":"=SUM(M10:M21)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"N23","v":13.9,"f":"=ROUND(C23/L23, 1)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.0"},{"c":"O23","v":"متوسط التبريد: 1 طن لكل 11.5 م²","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"}]}]},{"name":"تصميم مجاري الهواء الدكت","maxRow":17,"maxCol":14,"colWidths":[12.0,46.0,18.0,22.0,20.0,20.0,20.0,20.0,22.0,22.0,20.0,16.0,18.0,26.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول تصميم وحساب مقاسات مجاري الهواء الدكت بطريقة الاحتكاك المتساوي (Equal Friction Method)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":14},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":40.0,"cells":[{"c":"A2","v":"تحديد أبعاد الدكت (W × H بالبوصة) والقطر المكافئ وسرعة الهواء والنسبة الباعية وفق معايير ASHRAE و SMACNA مع الالتزام بحدود الضوضاء السكنية","bg":"#1E293B","fg":"#FFFFFF","al":"center","cs":14},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""},{"c":"N3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"كود المقطع","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"وصف مسار الدكت والمخرج المخدوم","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"تدفق الهواء (CFM)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"معدل الاحتكاك (in.wg/100ft)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"السرعة المستهدفة (fpm)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"القطر المكافئ (De - inch)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"الارتفاع المتاح (H - inch)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"العرض المحسوب (W - inch)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"العرض المنفذ المعتمد (inch)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J4","v":"النسبة الباعية (Aspect Ratio W/H)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K4","v":"السرعة الفعلية (fpm)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L4","v":"طول المقطع (م)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M4","v":"هبوط الضغط (in.wg)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"N4","v":"حالة المطابقة ومعايير الضوضاء","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":36.0,"cells":[{"c":"A5","v":"D-01","b":true,"al":"center"},{"c":"B5","v":"المجلس: مخرج الماكينة الرئيسي (Main Trunk)"},{"c":"C5","v":1600,"in":true,"al":"center","nf":"#,##0"},{"c":"D5","v":0.08,"in":true,"al":"center","nf":"0.00"},{"c":"E5","v":1000,"in":true,"al":"center","nf":"#,##0"},{"c":"F5","v":16.8,"in":true,"al":"center","nf":"#,##0.0"},{"c":"G5","v":12,"in":true,"al":"center","nf":"#,##0.0"},{"c":"H5","v":23.8,"f":"=ROUNDUP((1.30*(F5^1.25))/(G5^0.25), 1)","al":"center","nf":"#,##0.0"},{"c":"I5","v":18,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"J5","v":1.5,"f":"=ROUND(I5/G5, 2)","b":true,"al":"center","nf":"0.00"},{"c":"K5","v":1067,"f":"=ROUND(C5*144/(I5*G5), 0)","b":true,"al":"center","nf":"#,##0"},{"c":"L5","v":5.5,"in":true,"al":"center","nf":"#,##0.0"},{"c":"M5","v":0.014,"f":"=ROUND(D5*(L5/0.3048)/100, 3)","al":"center","nf":"0.000"},{"c":"N5","v":"آمن ومطابق NC 30"}]},{"r":6,"h":36.0,"cells":[{"c":"A6","v":"D-02","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B6","v":"المجلس: فرع التغذية الشرقي (Branch East)","bg":"#F8FAFC"},{"c":"C6","v":800,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"D6","v":0.08,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"E6","v":800,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"F6","v":12.6,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"G6","v":10,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"H6","v":17.4,"f":"=ROUNDUP((1.30*(F6^1.25))/(G6^0.25), 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"I6","v":14,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"J6","v":1.4,"f":"=ROUND(I6/G6, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"K6","v":823,"f":"=ROUND(C6*144/(I6*G6), 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L6","v":4.2,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"M6","v":0.011,"f":"=ROUND(D6*(L6/0.3048)/100, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"N6","v":"آمن ومطابق NC 25","bg":"#F8FAFC"}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":"D-03","b":true,"al":"center"},{"c":"B7","v":"المجلس: فرع التغذية الغربي (Branch West)"},{"c":"C7","v":800,"in":true,"al":"center","nf":"#,##0"},{"c":"D7","v":0.08,"in":true,"al":"center","nf":"0.00"},{"c":"E7","v":800,"in":true,"al":"center","nf":"#,##0"},{"c":"F7","v":12.6,"in":true,"al":"center","nf":"#,##0.0"},{"c":"G7","v":10,"in":true,"al":"center","nf":"#,##0.0"},{"c":"H7","v":17.4,"f":"=ROUNDUP((1.30*(F7^1.25))/(G7^0.25), 1)","al":"center","nf":"#,##0.0"},{"c":"I7","v":14,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"J7","v":1.4,"f":"=ROUND(I7/G7, 2)","b":true,"al":"center","nf":"0.00"},{"c":"K7","v":823,"f":"=ROUND(C7*144/(I7*G7), 0)","b":true,"al":"center","nf":"#,##0"},{"c":"L7","v":4,"in":true,"al":"center","nf":"#,##0.0"},{"c":"M7","v":0.01,"f":"=ROUND(D7*(L7/0.3048)/100, 3)","al":"center","nf":"0.000"},{"c":"N7","v":"آمن ومطابق NC 25"}]},{"r":8,"h":36.0,"cells":[{"c":"A8","v":"D-04","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B8","v":"الاستقبال: مخرج الماكينة الرئيسي (Main Trunk)","bg":"#F8FAFC"},{"c":"C8","v":1800,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"D8","v":0.08,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"E8","v":1050,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"F8","v":17.6,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"G8","v":12,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"H8","v":25.2,"f":"=ROUNDUP((1.30*(F8^1.25))/(G8^0.25), 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"I8","v":22,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"J8","v":1.83,"f":"=ROUND(I8/G8, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"K8","v":982,"f":"=ROUND(C8*144/(I8*G8), 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L8","v":6,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"M8","v":0.016,"f":"=ROUND(D8*(L8/0.3048)/100, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"N8","v":"آمن ومطابق NC 30","bg":"#F8FAFC"}]},{"r":9,"h":36.0,"cells":[{"c":"A9","v":"D-05","b":true,"al":"center"},{"c":"B9","v":"الاستقبال: فرع صالة الطعام (Dining Branch)"},{"c":"C9","v":900,"in":true,"al":"center","nf":"#,##0"},{"c":"D9","v":0.08,"in":true,"al":"center","nf":"0.00"},{"c":"E9","v":850,"in":true,"al":"center","nf":"#,##0"},{"c":"F9","v":13.2,"in":true,"al":"center","nf":"#,##0.0"},{"c":"G9","v":10,"in":true,"al":"center","nf":"#,##0.0"},{"c":"H9","v":18.4,"f":"=ROUNDUP((1.30*(F9^1.25))/(G9^0.25), 1)","al":"center","nf":"#,##0.0"},{"c":"I9","v":16,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"J9","v":1.6,"f":"=ROUND(I9/G9, 2)","b":true,"al":"center","nf":"0.00"},{"c":"K9","v":810,"f":"=ROUND(C9*144/(I9*G9), 0)","b":true,"al":"center","nf":"#,##0"},{"c":"L9","v":5,"in":true,"al":"center","nf":"#,##0.0"},{"c":"M9","v":0.013,"f":"=ROUND(D9*(L9/0.3048)/100, 3)","al":"center","nf":"0.000"},{"c":"N9","v":"آمن ومطابق NC 25"}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":"D-06","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B10","v":"الاستقبال: فرع الصالة الرئيسية (Lounge Branch)","bg":"#F8FAFC"},{"c":"C10","v":900,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"D10","v":0.08,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"E10","v":850,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"F10","v":13.2,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"G10","v":10,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"H10","v":18.4,"f":"=ROUNDUP((1.30*(F10^1.25))/(G10^0.25), 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"I10","v":16,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"J10","v":1.6,"f":"=ROUND(I10/G10, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"K10","v":810,"f":"=ROUND(C10*144/(I10*G10), 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L10","v":4.8,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"M10","v":0.013,"f":"=ROUND(D10*(L10/0.3048)/100, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"N10","v":"آمن ومطابق NC 25","bg":"#F8FAFC"}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":"D-07","b":true,"al":"center"},{"c":"B11","v":"صالة المعيشة: مخرج الماكينة الرئيسي (Main Trunk)"},{"c":"C11","v":1200,"in":true,"al":"center","nf":"#,##0"},{"c":"D11","v":0.08,"in":true,"al":"center","nf":"0.00"},{"c":"E11","v":950,"in":true,"al":"center","nf":"#,##0"},{"c":"F11","v":15,"in":true,"al":"center","nf":"#,##0.0"},{"c":"G11","v":10,"in":true,"al":"center","nf":"#,##0.0"},{"c":"H11","v":21.6,"f":"=ROUNDUP((1.30*(F11^1.25))/(G11^0.25), 1)","al":"center","nf":"#,##0.0"},{"c":"I11","v":20,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"J11","v":2,"f":"=ROUND(I11/G11, 2)","b":true,"al":"center","nf":"0.00"},{"c":"K11","v":864,"f":"=ROUND(C11*144/(I11*G11), 0)","b":true,"al":"center","nf":"#,##0"},{"c":"L11","v":5.2,"in":true,"al":"center","nf":"#,##0.0"},{"c":"M11","v":0.014,"f":"=ROUND(D11*(L11/0.3048)/100, 3)","al":"center","nf":"0.000"},{"c":"N11","v":"آمن ومطابق NC 30"}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":"D-08","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B12","v":"صالة المعيشة: فرع التوزيع الشمالي (North Branch)","bg":"#F8FAFC"},{"c":"C12","v":600,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"D12","v":0.08,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"E12","v":750,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"F12","v":11.2,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"G12","v":8,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"H12","v":15.9,"f":"=ROUNDUP((1.30*(F12^1.25))/(G12^0.25), 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"I12","v":14,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"J12","v":1.75,"f":"=ROUND(I12/G12, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"K12","v":771,"f":"=ROUND(C12*144/(I12*G12), 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L12","v":3.8,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"M12","v":0.01,"f":"=ROUND(D12*(L12/0.3048)/100, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"N12","v":"آمن ومطابق NC 25","bg":"#F8FAFC"}]},{"r":13,"h":36.0,"cells":[{"c":"A13","v":"D-09","b":true,"al":"center"},{"c":"B13","v":"صالة المعيشة: فرع التوزيع الجنوبي (South Branch)"},{"c":"C13","v":600,"in":true,"al":"center","nf":"#,##0"},{"c":"D13","v":0.08,"in":true,"al":"center","nf":"0.00"},{"c":"E13","v":750,"in":true,"al":"center","nf":"#,##0"},{"c":"F13","v":11.2,"in":true,"al":"center","nf":"#,##0.0"},{"c":"G13","v":8,"in":true,"al":"center","nf":"#,##0.0"},{"c":"H13","v":15.9,"f":"=ROUNDUP((1.30*(F13^1.25))/(G13^0.25), 1)","al":"center","nf":"#,##0.0"},{"c":"I13","v":14,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"J13","v":1.75,"f":"=ROUND(I13/G13, 2)","b":true,"al":"center","nf":"0.00"},{"c":"K13","v":771,"f":"=ROUND(C13*144/(I13*G13), 0)","b":true,"al":"center","nf":"#,##0"},{"c":"L13","v":3.6,"in":true,"al":"center","nf":"#,##0.0"},{"c":"M13","v":0.009,"f":"=ROUND(D13*(L13/0.3048)/100, 3)","al":"center","nf":"0.000"},{"c":"N13","v":"آمن ومطابق NC 25"}]},{"r":14,"h":36.0,"cells":[{"c":"A14","v":"D-10","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B14","v":"جناح النوم الرئيسي: مخرج رئيسي هادئ (Master Trunk)","bg":"#F8FAFC"},{"c":"C14","v":1000,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"D14","v":0.06,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"E14","v":750,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"F14","v":14.5,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"G14","v":10,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"H14","v":20.7,"f":"=ROUNDUP((1.30*(F14^1.25))/(G14^0.25), 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"I14","v":18,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"J14","v":1.8,"f":"=ROUND(I14/G14, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"K14","v":800,"f":"=ROUND(C14*144/(I14*G14), 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L14","v":4.5,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"M14","v":0.009,"f":"=ROUND(D14*(L14/0.3048)/100, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"N14","v":"فائق الهدوء NC 20","bg":"#F8FAFC"}]},{"r":15,"h":36.0,"cells":[{"c":"A15","v":"D-11","b":true,"al":"center"},{"c":"B15","v":"جناح النوم الرئيسي: فرع غرفة النوم (Bedroom Branch)"},{"c":"C15","v":600,"in":true,"al":"center","nf":"#,##0"},{"c":"D15","v":0.06,"in":true,"al":"center","nf":"0.00"},{"c":"E15","v":650,"in":true,"al":"center","nf":"#,##0"},{"c":"F15","v":11.8,"in":true,"al":"center","nf":"#,##0.0"},{"c":"G15","v":8,"in":true,"al":"center","nf":"#,##0.0"},{"c":"H15","v":17,"f":"=ROUNDUP((1.30*(F15^1.25))/(G15^0.25), 1)","al":"center","nf":"#,##0.0"},{"c":"I15","v":14,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"J15","v":1.75,"f":"=ROUND(I15/G15, 2)","b":true,"al":"center","nf":"0.00"},{"c":"K15","v":771,"f":"=ROUND(C15*144/(I15*G15), 0)","b":true,"al":"center","nf":"#,##0"},{"c":"L15","v":3.5,"in":true,"al":"center","nf":"#,##0.0"},{"c":"M15","v":0.007,"f":"=ROUND(D15*(L15/0.3048)/100, 3)","al":"center","nf":"0.000"},{"c":"N15","v":"فائق الهدوء NC 20"}]},{"r":16,"h":36.0,"cells":[{"c":"A16","v":"D-12","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B16","v":"صالة الألعاب الرياضية: مخرج الماكينة (Gym Trunk)","bg":"#F8FAFC"},{"c":"C16","v":1000,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"D16","v":0.08,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"E16","v":900,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"F16","v":14,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"G16","v":10,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"H16","v":19.8,"f":"=ROUNDUP((1.30*(F16^1.25))/(G16^0.25), 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"I16","v":16,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"J16","v":1.6,"f":"=ROUND(I16/G16, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.00"},{"c":"K16","v":900,"f":"=ROUND(C16*144/(I16*G16), 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L16","v":4.5,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"M16","v":0.012,"f":"=ROUND(D16*(L16/0.3048)/100, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"N16","v":"آمن ومطابق NC 32","bg":"#F8FAFC"}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":"إجمالي شبكة مجاري الهواء المصممة (Total Duct Network)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true},{"c":"C17","v":11800,"f":"=SUM(C5:C16)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"D17","v":"—","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E17","v":"—","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F17","v":"—","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G17","v":"—","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H17","v":"—","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I17","v":"—","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J17","v":1.67,"f":"=ROUND(AVERAGE(J5:J16), 2)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"0.00"},{"c":"K17","v":849,"f":"=ROUND(AVERAGE(K5:K16), 0)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"L17","v":54.6,"f":"=SUM(L5:L16)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.0"},{"c":"M17","v":0.016,"f":"=ROUND(MAX(M5:M16), 3)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"0.000"},{"c":"N17","v":"جميع المقاطع ضمن الحدود الآمنة للضوضاء","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"}]}]},{"name":"حصر الصاج والعزل","maxRow":31,"maxCol":10,"colWidths":[12.0,36.0,16.0,16.0,18.0,18.0,20.0,22.0,18.0,22.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول حصر كميات ومسطحات صاج الدكت والعزل ومخارج الهواء (Sheet Metal & Air Outlets BOQ)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":40.0,"cells":[{"c":"A2","v":"حصر مساحات وأوزان الصاج المجلفن (G90) وسماكات Gauge وفق معايير SMACNA وعزل الفيبر جلاس ومخمدات الحريق","bg":"#1E293B","fg":"#FFFFFF","al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"  أولاً: حصر مسطحات وأوزان الصاج المجلفن للدكت (Galvanized Sheet Metal BOQ - SMACNA Standards)","bg":"#0284C7","fg":"#FFFFFF","b":true,"cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"كود المقطع","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"مقاس الدكت المنفذ (W × H inch)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"محيط المقطع (م)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"طول المقطع (م)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"المساحة الصافية (م²)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"معامل الهالك والتفصيلات","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"إجمالي مساحة الصاج (م²)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"سمك الصاج القياسي (Gauge)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I5","v":"وزن المتر المربع (كجم/م²)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J5","v":"إجمالي وزن الصاج (كجم)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":36.0,"cells":[{"c":"A6","v":"D-01","f":"='تصميم مجاري الهواء الدكت'!A5","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B6","v":"18 × 12 in","f":"='تصميم مجاري الهواء الدكت'!I5&\" × \"&'تصميم مجاري الهواء الدكت'!G5&\" in\"","bg":"#F8FAFC","al":"center"},{"c":"C6","v":1.524,"f":"=ROUND(2*('تصميم مجاري الهواء الدكت'!I5+'تصميم مجاري الهواء الدكت'!G5)*0.0254, 3)","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"D6","v":5.5,"f":"='تصميم مجاري الهواء الدكت'!L5","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"E6","v":8.38,"f":"=ROUND(C6*D6, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"F6","v":1.15,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"G6","v":9.64,"f":"=ROUND(E6*F6, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"H6","v":"Gauge 24 (0.70 mm)","f":"=IF(MAX('تصميم مجاري الهواء الدكت'!I5, 'تصميم مجاري الهواء الدكت'!G5)>30, \"Gauge 22 (0.85 mm)\", IF(MAX('تصميم مجاري الهواء الدكت'!I5, 'تصميم مجاري الهواء الدكت'!G5)>12, \"Gauge 24 (0.70 mm)\", \"Gauge 26 (0.55 mm)\"))","bg":"#F8FAFC","al":"center"},{"c":"I6","v":7.24,"f":"=IF(ISNUMBER(SEARCH(\"22\", H6)), 7.24, IF(ISNUMBER(SEARCH(\"24\", H6)), 6.06, 4.88))","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"J6","v":69.8,"f":"=ROUND(G6*I6, 1)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":"D-02","f":"='تصميم مجاري الهواء الدكت'!A6","b":true,"al":"center"},{"c":"B7","v":"14 × 10 in","f":"='تصميم مجاري الهواء الدكت'!I6&\" × \"&'تصميم مجاري الهواء الدكت'!G6&\" in\"","al":"center"},{"c":"C7","v":1.219,"f":"=ROUND(2*('تصميم مجاري الهواء الدكت'!I6+'تصميم مجاري الهواء الدكت'!G6)*0.0254, 3)","al":"center","nf":"#,##0.0"},{"c":"D7","v":4.2,"f":"='تصميم مجاري الهواء الدكت'!L6","al":"center","nf":"#,##0.0"},{"c":"E7","v":5.12,"f":"=ROUND(C7*D7, 2)","al":"center","nf":"#,##0.0"},{"c":"F7","v":1.15,"in":true,"al":"center","nf":"0.00"},{"c":"G7","v":5.89,"f":"=ROUND(E7*F7, 2)","b":true,"al":"center","nf":"#,##0.0"},{"c":"H7","v":"Gauge 24 (0.70 mm)","f":"=IF(MAX('تصميم مجاري الهواء الدكت'!I6, 'تصميم مجاري الهواء الدكت'!G6)>30, \"Gauge 22 (0.85 mm)\", IF(MAX('تصميم مجاري الهواء الدكت'!I6, 'تصميم مجاري الهواء الدكت'!G6)>12, \"Gauge 24 (0.70 mm)\", \"Gauge 26 (0.55 mm)\"))","al":"center"},{"c":"I7","v":7.24,"f":"=IF(ISNUMBER(SEARCH(\"22\", H7)), 7.24, IF(ISNUMBER(SEARCH(\"24\", H7)), 6.06, 4.88))","al":"center","nf":"#,##0.0"},{"c":"J7","v":42.6,"f":"=ROUND(G7*I7, 1)","b":true,"al":"center","nf":"#,##0.0"}]},{"r":8,"h":36.0,"cells":[{"c":"A8","v":"D-03","f":"='تصميم مجاري الهواء الدكت'!A7","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B8","v":"14 × 10 in","f":"='تصميم مجاري الهواء الدكت'!I7&\" × \"&'تصميم مجاري الهواء الدكت'!G7&\" in\"","bg":"#F8FAFC","al":"center"},{"c":"C8","v":1.219,"f":"=ROUND(2*('تصميم مجاري الهواء الدكت'!I7+'تصميم مجاري الهواء الدكت'!G7)*0.0254, 3)","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"D8","v":4,"f":"='تصميم مجاري الهواء الدكت'!L7","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"E8","v":4.88,"f":"=ROUND(C8*D8, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"F8","v":1.15,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"G8","v":5.61,"f":"=ROUND(E8*F8, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"H8","v":"Gauge 24 (0.70 mm)","f":"=IF(MAX('تصميم مجاري الهواء الدكت'!I7, 'تصميم مجاري الهواء الدكت'!G7)>30, \"Gauge 22 (0.85 mm)\", IF(MAX('تصميم مجاري الهواء الدكت'!I7, 'تصميم مجاري الهواء الدكت'!G7)>12, \"Gauge 24 (0.70 mm)\", \"Gauge 26 (0.55 mm)\"))","bg":"#F8FAFC","al":"center"},{"c":"I8","v":7.24,"f":"=IF(ISNUMBER(SEARCH(\"22\", H8)), 7.24, IF(ISNUMBER(SEARCH(\"24\", H8)), 6.06, 4.88))","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"J8","v":40.6,"f":"=ROUND(G8*I8, 1)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"}]},{"r":9,"h":36.0,"cells":[{"c":"A9","v":"D-04","f":"='تصميم مجاري الهواء الدكت'!A8","b":true,"al":"center"},{"c":"B9","v":"22 × 12 in","f":"='تصميم مجاري الهواء الدكت'!I8&\" × \"&'تصميم مجاري الهواء الدكت'!G8&\" in\"","al":"center"},{"c":"C9","v":1.727,"f":"=ROUND(2*('تصميم مجاري الهواء الدكت'!I8+'تصميم مجاري الهواء الدكت'!G8)*0.0254, 3)","al":"center","nf":"#,##0.0"},{"c":"D9","v":6,"f":"='تصميم مجاري الهواء الدكت'!L8","al":"center","nf":"#,##0.0"},{"c":"E9","v":10.36,"f":"=ROUND(C9*D9, 2)","al":"center","nf":"#,##0.0"},{"c":"F9","v":1.15,"in":true,"al":"center","nf":"0.00"},{"c":"G9","v":11.91,"f":"=ROUND(E9*F9, 2)","b":true,"al":"center","nf":"#,##0.0"},{"c":"H9","v":"Gauge 24 (0.70 mm)","f":"=IF(MAX('تصميم مجاري الهواء الدكت'!I8, 'تصميم مجاري الهواء الدكت'!G8)>30, \"Gauge 22 (0.85 mm)\", IF(MAX('تصميم مجاري الهواء الدكت'!I8, 'تصميم مجاري الهواء الدكت'!G8)>12, \"Gauge 24 (0.70 mm)\", \"Gauge 26 (0.55 mm)\"))","al":"center"},{"c":"I9","v":7.24,"f":"=IF(ISNUMBER(SEARCH(\"22\", H9)), 7.24, IF(ISNUMBER(SEARCH(\"24\", H9)), 6.06, 4.88))","al":"center","nf":"#,##0.0"},{"c":"J9","v":86.2,"f":"=ROUND(G9*I9, 1)","b":true,"al":"center","nf":"#,##0.0"}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":"D-05","f":"='تصميم مجاري الهواء الدكت'!A9","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B10","v":"16 × 10 in","f":"='تصميم مجاري الهواء الدكت'!I9&\" × \"&'تصميم مجاري الهواء الدكت'!G9&\" in\"","bg":"#F8FAFC","al":"center"},{"c":"C10","v":1.321,"f":"=ROUND(2*('تصميم مجاري الهواء الدكت'!I9+'تصميم مجاري الهواء الدكت'!G9)*0.0254, 3)","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"D10","v":5,"f":"='تصميم مجاري الهواء الدكت'!L9","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"E10","v":6.61,"f":"=ROUND(C10*D10, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"F10","v":1.15,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"G10","v":7.6,"f":"=ROUND(E10*F10, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"H10","v":"Gauge 24 (0.70 mm)","f":"=IF(MAX('تصميم مجاري الهواء الدكت'!I9, 'تصميم مجاري الهواء الدكت'!G9)>30, \"Gauge 22 (0.85 mm)\", IF(MAX('تصميم مجاري الهواء الدكت'!I9, 'تصميم مجاري الهواء الدكت'!G9)>12, \"Gauge 24 (0.70 mm)\", \"Gauge 26 (0.55 mm)\"))","bg":"#F8FAFC","al":"center"},{"c":"I10","v":7.24,"f":"=IF(ISNUMBER(SEARCH(\"22\", H10)), 7.24, IF(ISNUMBER(SEARCH(\"24\", H10)), 6.06, 4.88))","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"J10","v":55,"f":"=ROUND(G10*I10, 1)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":"D-06","f":"='تصميم مجاري الهواء الدكت'!A10","b":true,"al":"center"},{"c":"B11","v":"16 × 10 in","f":"='تصميم مجاري الهواء الدكت'!I10&\" × \"&'تصميم مجاري الهواء الدكت'!G10&\" in\"","al":"center"},{"c":"C11","v":1.321,"f":"=ROUND(2*('تصميم مجاري الهواء الدكت'!I10+'تصميم مجاري الهواء الدكت'!G10)*0.0254, 3)","al":"center","nf":"#,##0.0"},{"c":"D11","v":4.8,"f":"='تصميم مجاري الهواء الدكت'!L10","al":"center","nf":"#,##0.0"},{"c":"E11","v":6.34,"f":"=ROUND(C11*D11, 2)","al":"center","nf":"#,##0.0"},{"c":"F11","v":1.15,"in":true,"al":"center","nf":"0.00"},{"c":"G11","v":7.29,"f":"=ROUND(E11*F11, 2)","b":true,"al":"center","nf":"#,##0.0"},{"c":"H11","v":"Gauge 24 (0.70 mm)","f":"=IF(MAX('تصميم مجاري الهواء الدكت'!I10, 'تصميم مجاري الهواء الدكت'!G10)>30, \"Gauge 22 (0.85 mm)\", IF(MAX('تصميم مجاري الهواء الدكت'!I10, 'تصميم مجاري الهواء الدكت'!G10)>12, \"Gauge 24 (0.70 mm)\", \"Gauge 26 (0.55 mm)\"))","al":"center"},{"c":"I11","v":7.24,"f":"=IF(ISNUMBER(SEARCH(\"22\", H11)), 7.24, IF(ISNUMBER(SEARCH(\"24\", H11)), 6.06, 4.88))","al":"center","nf":"#,##0.0"},{"c":"J11","v":52.8,"f":"=ROUND(G11*I11, 1)","b":true,"al":"center","nf":"#,##0.0"}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":"D-07","f":"='تصميم مجاري الهواء الدكت'!A11","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B12","v":"20 × 10 in","f":"='تصميم مجاري الهواء الدكت'!I11&\" × \"&'تصميم مجاري الهواء الدكت'!G11&\" in\"","bg":"#F8FAFC","al":"center"},{"c":"C12","v":1.524,"f":"=ROUND(2*('تصميم مجاري الهواء الدكت'!I11+'تصميم مجاري الهواء الدكت'!G11)*0.0254, 3)","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"D12","v":5.2,"f":"='تصميم مجاري الهواء الدكت'!L11","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"E12","v":7.92,"f":"=ROUND(C12*D12, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"F12","v":1.15,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"G12","v":9.11,"f":"=ROUND(E12*F12, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"H12","v":"Gauge 24 (0.70 mm)","f":"=IF(MAX('تصميم مجاري الهواء الدكت'!I11, 'تصميم مجاري الهواء الدكت'!G11)>30, \"Gauge 22 (0.85 mm)\", IF(MAX('تصميم مجاري الهواء الدكت'!I11, 'تصميم مجاري الهواء الدكت'!G11)>12, \"Gauge 24 (0.70 mm)\", \"Gauge 26 (0.55 mm)\"))","bg":"#F8FAFC","al":"center"},{"c":"I12","v":7.24,"f":"=IF(ISNUMBER(SEARCH(\"22\", H12)), 7.24, IF(ISNUMBER(SEARCH(\"24\", H12)), 6.06, 4.88))","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"J12","v":66,"f":"=ROUND(G12*I12, 1)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"}]},{"r":13,"h":36.0,"cells":[{"c":"A13","v":"D-08","f":"='تصميم مجاري الهواء الدكت'!A12","b":true,"al":"center"},{"c":"B13","v":"14 × 8 in","f":"='تصميم مجاري الهواء الدكت'!I12&\" × \"&'تصميم مجاري الهواء الدكت'!G12&\" in\"","al":"center"},{"c":"C13","v":1.118,"f":"=ROUND(2*('تصميم مجاري الهواء الدكت'!I12+'تصميم مجاري الهواء الدكت'!G12)*0.0254, 3)","al":"center","nf":"#,##0.0"},{"c":"D13","v":3.8,"f":"='تصميم مجاري الهواء الدكت'!L12","al":"center","nf":"#,##0.0"},{"c":"E13","v":4.25,"f":"=ROUND(C13*D13, 2)","al":"center","nf":"#,##0.0"},{"c":"F13","v":1.15,"in":true,"al":"center","nf":"0.00"},{"c":"G13","v":4.89,"f":"=ROUND(E13*F13, 2)","b":true,"al":"center","nf":"#,##0.0"},{"c":"H13","v":"Gauge 24 (0.70 mm)","f":"=IF(MAX('تصميم مجاري الهواء الدكت'!I12, 'تصميم مجاري الهواء الدكت'!G12)>30, \"Gauge 22 (0.85 mm)\", IF(MAX('تصميم مجاري الهواء الدكت'!I12, 'تصميم مجاري الهواء الدكت'!G12)>12, \"Gauge 24 (0.70 mm)\", \"Gauge 26 (0.55 mm)\"))","al":"center"},{"c":"I13","v":7.24,"f":"=IF(ISNUMBER(SEARCH(\"22\", H13)), 7.24, IF(ISNUMBER(SEARCH(\"24\", H13)), 6.06, 4.88))","al":"center","nf":"#,##0.0"},{"c":"J13","v":35.4,"f":"=ROUND(G13*I13, 1)","b":true,"al":"center","nf":"#,##0.0"}]},{"r":14,"h":36.0,"cells":[{"c":"A14","v":"D-09","f":"='تصميم مجاري الهواء الدكت'!A13","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B14","v":"14 × 8 in","f":"='تصميم مجاري الهواء الدكت'!I13&\" × \"&'تصميم مجاري الهواء الدكت'!G13&\" in\"","bg":"#F8FAFC","al":"center"},{"c":"C14","v":1.118,"f":"=ROUND(2*('تصميم مجاري الهواء الدكت'!I13+'تصميم مجاري الهواء الدكت'!G13)*0.0254, 3)","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"D14","v":3.6,"f":"='تصميم مجاري الهواء الدكت'!L13","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"E14","v":4.02,"f":"=ROUND(C14*D14, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"F14","v":1.15,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"G14","v":4.62,"f":"=ROUND(E14*F14, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"H14","v":"Gauge 24 (0.70 mm)","f":"=IF(MAX('تصميم مجاري الهواء الدكت'!I13, 'تصميم مجاري الهواء الدكت'!G13)>30, \"Gauge 22 (0.85 mm)\", IF(MAX('تصميم مجاري الهواء الدكت'!I13, 'تصميم مجاري الهواء الدكت'!G13)>12, \"Gauge 24 (0.70 mm)\", \"Gauge 26 (0.55 mm)\"))","bg":"#F8FAFC","al":"center"},{"c":"I14","v":7.24,"f":"=IF(ISNUMBER(SEARCH(\"22\", H14)), 7.24, IF(ISNUMBER(SEARCH(\"24\", H14)), 6.06, 4.88))","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"J14","v":33.4,"f":"=ROUND(G14*I14, 1)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"}]},{"r":15,"h":36.0,"cells":[{"c":"A15","v":"D-10","f":"='تصميم مجاري الهواء الدكت'!A14","b":true,"al":"center"},{"c":"B15","v":"18 × 10 in","f":"='تصميم مجاري الهواء الدكت'!I14&\" × \"&'تصميم مجاري الهواء الدكت'!G14&\" in\"","al":"center"},{"c":"C15","v":1.422,"f":"=ROUND(2*('تصميم مجاري الهواء الدكت'!I14+'تصميم مجاري الهواء الدكت'!G14)*0.0254, 3)","al":"center","nf":"#,##0.0"},{"c":"D15","v":4.5,"f":"='تصميم مجاري الهواء الدكت'!L14","al":"center","nf":"#,##0.0"},{"c":"E15","v":6.4,"f":"=ROUND(C15*D15, 2)","al":"center","nf":"#,##0.0"},{"c":"F15","v":1.15,"in":true,"al":"center","nf":"0.00"},{"c":"G15","v":7.36,"f":"=ROUND(E15*F15, 2)","b":true,"al":"center","nf":"#,##0.0"},{"c":"H15","v":"Gauge 24 (0.70 mm)","f":"=IF(MAX('تصميم مجاري الهواء الدكت'!I14, 'تصميم مجاري الهواء الدكت'!G14)>30, \"Gauge 22 (0.85 mm)\", IF(MAX('تصميم مجاري الهواء الدكت'!I14, 'تصميم مجاري الهواء الدكت'!G14)>12, \"Gauge 24 (0.70 mm)\", \"Gauge 26 (0.55 mm)\"))","al":"center"},{"c":"I15","v":7.24,"f":"=IF(ISNUMBER(SEARCH(\"22\", H15)), 7.24, IF(ISNUMBER(SEARCH(\"24\", H15)), 6.06, 4.88))","al":"center","nf":"#,##0.0"},{"c":"J15","v":53.3,"f":"=ROUND(G15*I15, 1)","b":true,"al":"center","nf":"#,##0.0"}]},{"r":16,"h":36.0,"cells":[{"c":"A16","v":"D-11","f":"='تصميم مجاري الهواء الدكت'!A15","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B16","v":"14 × 8 in","f":"='تصميم مجاري الهواء الدكت'!I15&\" × \"&'تصميم مجاري الهواء الدكت'!G15&\" in\"","bg":"#F8FAFC","al":"center"},{"c":"C16","v":1.118,"f":"=ROUND(2*('تصميم مجاري الهواء الدكت'!I15+'تصميم مجاري الهواء الدكت'!G15)*0.0254, 3)","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"D16","v":3.5,"f":"='تصميم مجاري الهواء الدكت'!L15","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"E16","v":3.91,"f":"=ROUND(C16*D16, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"F16","v":1.15,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"G16","v":4.5,"f":"=ROUND(E16*F16, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"H16","v":"Gauge 24 (0.70 mm)","f":"=IF(MAX('تصميم مجاري الهواء الدكت'!I15, 'تصميم مجاري الهواء الدكت'!G15)>30, \"Gauge 22 (0.85 mm)\", IF(MAX('تصميم مجاري الهواء الدكت'!I15, 'تصميم مجاري الهواء الدكت'!G15)>12, \"Gauge 24 (0.70 mm)\", \"Gauge 26 (0.55 mm)\"))","bg":"#F8FAFC","al":"center"},{"c":"I16","v":7.24,"f":"=IF(ISNUMBER(SEARCH(\"22\", H16)), 7.24, IF(ISNUMBER(SEARCH(\"24\", H16)), 6.06, 4.88))","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"J16","v":32.6,"f":"=ROUND(G16*I16, 1)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"}]},{"r":17,"h":36.0,"cells":[{"c":"A17","v":"D-12","f":"='تصميم مجاري الهواء الدكت'!A16","b":true,"al":"center"},{"c":"B17","v":"16 × 10 in","f":"='تصميم مجاري الهواء الدكت'!I16&\" × \"&'تصميم مجاري الهواء الدكت'!G16&\" in\"","al":"center"},{"c":"C17","v":1.321,"f":"=ROUND(2*('تصميم مجاري الهواء الدكت'!I16+'تصميم مجاري الهواء الدكت'!G16)*0.0254, 3)","al":"center","nf":"#,##0.0"},{"c":"D17","v":4.5,"f":"='تصميم مجاري الهواء الدكت'!L16","al":"center","nf":"#,##0.0"},{"c":"E17","v":5.94,"f":"=ROUND(C17*D17, 2)","al":"center","nf":"#,##0.0"},{"c":"F17","v":1.15,"in":true,"al":"center","nf":"0.00"},{"c":"G17","v":6.83,"f":"=ROUND(E17*F17, 2)","b":true,"al":"center","nf":"#,##0.0"},{"c":"H17","v":"Gauge 24 (0.70 mm)","f":"=IF(MAX('تصميم مجاري الهواء الدكت'!I16, 'تصميم مجاري الهواء الدكت'!G16)>30, \"Gauge 22 (0.85 mm)\", IF(MAX('تصميم مجاري الهواء الدكت'!I16, 'تصميم مجاري الهواء الدكت'!G16)>12, \"Gauge 24 (0.70 mm)\", \"Gauge 26 (0.55 mm)\"))","al":"center"},{"c":"I17","v":7.24,"f":"=IF(ISNUMBER(SEARCH(\"22\", H17)), 7.24, IF(ISNUMBER(SEARCH(\"24\", H17)), 6.06, 4.88))","al":"center","nf":"#,##0.0"},{"c":"J17","v":49.4,"f":"=ROUND(G17*I17, 1)","b":true,"al":"center","nf":"#,##0.0"}]},{"r":18,"h":46.0,"cells":[{"c":"A18","v":"إجمالي كميات صاج الدكت (Total Sheet Metal)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true},{"c":"C18","v":"—","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D18","v":54.6,"f":"=SUM(D6:D17)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.0"},{"c":"E18","v":74.13,"f":"=SUM(E6:E17)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.0"},{"c":"F18","v":"—","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G18","v":85.25,"f":"=SUM(G6:G17)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.0"},{"c":"H18","v":"—","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I18","v":7.24,"f":"=ROUND(AVERAGE(I6:I17), 2)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"J18","v":617.1,"f":"=SUM(J6:J17)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.0"}]},{"r":19,"h":28.0,"cells":[{"c":"A19","v":""},{"c":"B19","v":""},{"c":"C19","v":""},{"c":"D19","v":""},{"c":"E19","v":""},{"c":"F19","v":""},{"c":"G19","v":""},{"c":"H19","v":""},{"c":"I19","v":""},{"c":"J19","v":""}]},{"r":20,"h":28.0,"cells":[{"c":"A20","v":""},{"c":"B20","v":""},{"c":"C20","v":""},{"c":"D20","v":""},{"c":"E20","v":""},{"c":"F20","v":""},{"c":"G20","v":""},{"c":"H20","v":""},{"c":"I20","v":""},{"c":"J20","v":""}]},{"r":21,"h":38.0,"cells":[{"c":"A21","v":"  ثانياً: حصر بنود العزل الحراري والصوتي ومخارج الهواء والملحقات (Insulation, Diffusers & Accessories)","bg":"#0284C7","fg":"#FFFFFF","b":true,"cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":22,"h":52.0,"cells":[{"c":"A22","v":"م","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B22","v":"توصيف البند والمواصفات الفنية المعتمدة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C22","v":"الوحدة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D22","v":"الكمية المحصورة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E22","v":"سعر الوحدة التقديري (ر.س)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F22","v":"إجمالي التكلفة التقديرية (ر.س)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G22","v":"المعيار والكود المرجعي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H22","v":"ملاحظات التنفيذ واشتراطات الكود","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":23,"h":72.0,"cells":[{"c":"A23","v":1,"b":true,"al":"center"},{"c":"B23","v":"عزل حراري خارجي لمجاري الهواء (صوف زجاجي كثافة 24 كجم/م³ سمك 50 مم مع تغليف رقائق ألومنيوم FSK مقوى)"},{"c":"C23","v":"م²","al":"center"},{"c":"D23","v":85.2,"f":"=ROUND(G18, 1)","al":"center","nf":"#,##0.00"},{"c":"E23","v":38,"in":true,"al":"center","nf":"#,##0.00"},{"c":"F23","v":3237.6,"f":"=ROUND(D23*E23, 2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"G23","v":"SBC 501 / ASTM C1290","al":"center"},{"c":"H23","v":"تثبيت بالدبابيس الحرارية وشريط ألومنيوم لاصق مع تداخل 50 مم","fg":"#475569","cs":3},{"skip":true},{"skip":true}]},{"r":24,"h":104.0,"cells":[{"c":"A24","v":2,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B24","v":"عزل صوتي داخلي لمجاري الهواء (بطانة داخلية كثافة 32 كجم/م³ سمك 25 مم مغلفة بمادة النيوبرين المانعة لتطاير الألياف)","bg":"#F8FAFC"},{"c":"C24","v":"م²","bg":"#F8FAFC","al":"center"},{"c":"D24","v":29.8,"f":"=ROUND(G18*0.35, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E24","v":52,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"F24","v":1549.6,"f":"=ROUND(D24*E24, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G24","v":"ASTM C1071 / SMACNA","bg":"#F8FAFC","al":"center"},{"c":"H24","v":"يركب لمسافة 3 إلى 5 أمتار من مخرج الماكينة لامتصاص الضوضاء","bg":"#F8FAFC","fg":"#475569","cs":3},{"skip":true},{"skip":true}]},{"r":25,"h":72.0,"cells":[{"c":"A25","v":3,"b":true,"al":"center"},{"c":"B25","v":"مخارج هواء طولية خطية (Linear Slot Diffuser 2-Slot) مع صندوق توزيع هواء معزول (Plenum Box)"},{"c":"C25","v":"م.ط","al":"center"},{"c":"D25","v":38,"in":true,"al":"center","nf":"#,##0.00"},{"c":"E25","v":145,"in":true,"al":"center","nf":"#,##0.00"},{"c":"F25","v":5510,"f":"=ROUND(D25*E25, 2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"G25","v":"ASHRAE Standard 70","al":"center"},{"c":"H25","v":"ألومنيوم مدهون إلكتروستاتيك مع دمبر توجيه حجم الهواء","fg":"#475569","cs":3},{"skip":true},{"skip":true}]},{"r":26,"h":72.0,"cells":[{"c":"A26","v":4,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B26","v":"مخارج هواء سقفية مربعة 4 اتجاهات (Square Ceiling Diffusers 60×60 cm) للألمنيوم","bg":"#F8FAFC"},{"c":"C26","v":"عدد","bg":"#F8FAFC","al":"center"},{"c":"D26","v":8,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E26","v":110,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"F26","v":880,"f":"=ROUND(D26*E26, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G26","v":"SMACNA / ADC 1062","bg":"#F8FAFC","al":"center"},{"c":"H26","v":"شفرات منحرفة لتوزيع الهواء بزوايا 360 درجة","bg":"#F8FAFC","fg":"#475569","cs":3},{"skip":true},{"skip":true}]},{"r":27,"h":52.0,"cells":[{"c":"A27","v":5,"b":true,"al":"center"},{"c":"B27","v":"جريلات سحب الهواء الراجع (Return Air Grilles) مع فلتر ألومنيوم قابل للغسيل"},{"c":"C27","v":"عدد","al":"center"},{"c":"D27","v":6,"in":true,"al":"center","nf":"#,##0.00"},{"c":"E27","v":125,"in":true,"al":"center","nf":"#,##0.00"},{"c":"F27","v":750,"f":"=ROUND(D27*E27, 2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"G27","v":"ASHRAE Standard 62.1","al":"center"},{"c":"H27","v":"تركب في الأسقف المستعارة أو الجدران لضمان كفاءة التدوير","fg":"#475569","cs":3},{"skip":true},{"skip":true}]},{"r":28,"h":52.0,"cells":[{"c":"A28","v":6,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B28","v":"مخمدات ضبط حجم الهواء اليدوية (Manual Volume Control Dampers - VCD)","bg":"#F8FAFC"},{"c":"C28","v":"عدد","bg":"#F8FAFC","al":"center"},{"c":"D28","v":8,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E28","v":95,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"F28","v":760,"f":"=ROUND(D28*E28, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G28","v":"SMACNA Duct Design","bg":"#F8FAFC","al":"center"},{"c":"H28","v":"شفرات متقابلة Opposed Blade لتعديل وموازنة الهواء TAB","bg":"#F8FAFC","fg":"#475569","cs":3},{"skip":true},{"skip":true}]},{"r":29,"h":52.0,"cells":[{"c":"A29","v":7,"b":true,"al":"center"},{"c":"B29","v":"مخمدات حريق آلية مع فيوز حراري 72°C (Motorized / Gravity Fire Dampers)"},{"c":"C29","v":"عدد","al":"center"},{"c":"D29","v":4,"in":true,"al":"center","nf":"#,##0.00"},{"c":"E29","v":320,"in":true,"al":"center","nf":"#,##0.00"},{"c":"F29","v":1280,"f":"=ROUND(D29*E29, 2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"G29","v":"UL 555 / NFPA 90A","al":"center"},{"c":"H29","v":"تركب عند اختراق الدكت للجدران المقاومة للحريق لضمان السلامة","fg":"#475569","cs":3},{"skip":true},{"skip":true}]},{"r":30,"h":52.0,"cells":[{"c":"A30","v":8,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B30","v":"وصلات قماشية مرنة مقاومة للحريق (Canvas Flexible Duct Connectors)","bg":"#F8FAFC"},{"c":"C30","v":"م.ط","bg":"#F8FAFC","al":"center"},{"c":"D30","v":14,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E30","v":65,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"F30","v":910,"f":"=ROUND(D30*E30, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G30","v":"NFPA 90A Compliance","bg":"#F8FAFC","al":"center"},{"c":"H30","v":"تمنع انتقال الاهتزازات الميكانيكية من الماكينة إلى الدكت","bg":"#F8FAFC","fg":"#475569","cs":3},{"skip":true},{"skip":true}]},{"r":31,"h":46.0,"cells":[{"c":"A31","v":"إجمالي التكلفة التقديرية لبنود العزل والمخارج (ر.س)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D31","v":14877.2,"f":"=SUM(F23:F30)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00","cs":3},{"skip":true},{"skip":true},{"c":"G31","v":"الأسعار استرشادية لمتوسط سوق المقاولات السعودي لعام 2026","bg":"#1E293B","fg":"#FFFFFF","al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true}]}]},{"name":"ثوابت التصميم والمناخ","maxRow":31,"maxCol":8,"colWidths":[20.0,16.0,26.0,26.0,22.0,22.0,20.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"البيانات المناخية التصميمية وثوابت كود التكييف وكود الطاقة (HVAC Design Criteria)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":40.0,"cells":[{"c":"A2","v":"الظروف الخارجية لمدن المملكة ومصر ومعاملات العزل الحراري U-Values واشتراطات SMACNA لمقاسات وسماكات الصاج","bg":"#1E293B","fg":"#FFFFFF","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"  جدول 1: درجات الحرارة والرطوبة التصميمية الخارجية (SBC 501 / ASHRAE Climatic Design Conditions)","bg":"#0284C7","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"المدينة / المنطقة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"الدولة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"درجة الحرارة الجافة الصيفية (°C)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"درجة الحرارة الرطبة المتزامنة (°C)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"المدى الحراري اليومي (°C)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"الرطوبة النسبية التصميمية (%)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"كود المنطقة المناخية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"المعيار المرجعي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"الرياض","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B6","v":"المملكة العربية السعودية","bg":"#F8FAFC","al":"center"},{"c":"C6","v":46,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"D6","v":24,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"E6","v":14.5,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"F6","v":"18%","bg":"#F8FAFC","al":"center"},{"c":"G6","v":"Zone 1 (Extreme Hot Dry)","bg":"#F8FAFC","al":"center"},{"c":"H6","v":"SBC 501 / SBC 601","bg":"#F8FAFC","al":"center"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"جدة","b":true,"al":"center"},{"c":"B7","v":"المملكة العربية السعودية","al":"center"},{"c":"C7","v":42,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"D7","v":28.5,"in":true,"al":"center","nf":"#,##0.0"},{"c":"E7","v":10,"in":true,"al":"center","nf":"#,##0.0"},{"c":"F7","v":"52%","al":"center"},{"c":"G7","v":"Zone 1 (Hot Humid Coastal)","al":"center"},{"c":"H7","v":"SBC 501 / SBC 601","al":"center"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"الدمام / الخبر","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B8","v":"المملكة العربية السعودية","bg":"#F8FAFC","al":"center"},{"c":"C8","v":46,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"D8","v":28,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"E8","v":12,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"F8","v":"48%","bg":"#F8FAFC","al":"center"},{"c":"G8","v":"Zone 1 (Hot Humid Coastal)","bg":"#F8FAFC","al":"center"},{"c":"H8","v":"SBC 501 / SBC 601","bg":"#F8FAFC","al":"center"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"مكة المكرمة","b":true,"al":"center"},{"c":"B9","v":"المملكة العربية السعودية","al":"center"},{"c":"C9","v":45,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"D9","v":26,"in":true,"al":"center","nf":"#,##0.0"},{"c":"E9","v":13,"in":true,"al":"center","nf":"#,##0.0"},{"c":"F9","v":"25%","al":"center"},{"c":"G9","v":"Zone 1 (Extreme Hot Dry)","al":"center"},{"c":"H9","v":"SBC 501 / SBC 601","al":"center"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":"المدينة المنورة","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B10","v":"المملكة العربية السعودية","bg":"#F8FAFC","al":"center"},{"c":"C10","v":44,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"D10","v":22,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"E10","v":14,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"F10","v":"16%","bg":"#F8FAFC","al":"center"},{"c":"G10","v":"Zone 1 (Hot Dry)","bg":"#F8FAFC","al":"center"},{"c":"H10","v":"SBC 501 / SBC 601","bg":"#F8FAFC","al":"center"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"دبي / أبوظبي","b":true,"al":"center"},{"c":"B11","v":"الإمارات العربية المتحدة","al":"center"},{"c":"C11","v":44,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"D11","v":29,"in":true,"al":"center","nf":"#,##0.0"},{"c":"E11","v":10.5,"in":true,"al":"center","nf":"#,##0.0"},{"c":"F11","v":"55%","al":"center"},{"c":"G11","v":"Hot Humid","al":"center"},{"c":"H11","v":"ASHRAE Weather Data","al":"center"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":"الكويت","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B12","v":"دولة الكويت","bg":"#F8FAFC","al":"center"},{"c":"C12","v":48,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"D12","v":25,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"E12","v":15,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"F12","v":"20%","bg":"#F8FAFC","al":"center"},{"c":"G12","v":"Extreme Hot","bg":"#F8FAFC","al":"center"},{"c":"H12","v":"MEW Kuwait Standards","bg":"#F8FAFC","al":"center"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":"القاهرة","b":true,"al":"center"},{"c":"B13","v":"جمهورية مصر العربية","al":"center"},{"c":"C13","v":37,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"D13","v":24,"in":true,"al":"center","nf":"#,##0.0"},{"c":"E13","v":12,"in":true,"al":"center","nf":"#,##0.0"},{"c":"F13","v":"40%","al":"center"},{"c":"G13","v":"Zone 2 (Moderate Hot)","al":"center"},{"c":"H13","v":"الكود المصري للتكييف","al":"center"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":"الإسكندرية","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B14","v":"جمهورية مصر العربية","bg":"#F8FAFC","al":"center"},{"c":"C14","v":33,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"D14","v":25,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"E14","v":8.5,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"F14","v":"62%","bg":"#F8FAFC","al":"center"},{"c":"G14","v":"Coastal Humid","bg":"#F8FAFC","al":"center"},{"c":"H14","v":"الكود المصري للتكييف","bg":"#F8FAFC","al":"center"}]},{"r":15,"h":28.0,"cells":[{"c":"A15","v":""},{"c":"B15","v":""},{"c":"C15","v":""},{"c":"D15","v":""},{"c":"E15","v":""},{"c":"F15","v":""},{"c":"G15","v":""},{"c":"H15","v":""}]},{"r":16,"h":28.0,"cells":[{"c":"A16","v":""},{"c":"B16","v":""},{"c":"C16","v":""},{"c":"D16","v":""},{"c":"E16","v":""},{"c":"F16","v":""},{"c":"G16","v":""},{"c":"H16","v":""}]},{"r":17,"h":38.0,"cells":[{"c":"A17","v":"  جدول 2: المعاملات الحرارية القصوى المسموح بها لعناصر المبنى (SBC 601 / 602 Maximum U-Values)","bg":"#0284C7","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":"عنصر الغلاف الإنشائي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B18","v":"الحد الأقصى U-Value (W/m²·K)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C18","v":"المكافئ بالنظام الإنجليزي (BTU/hr·ft²·°F)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D18","v":"سماكة ونوع العزل الموصى به","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E18","v":"معامل الظل الشمسي (SHGC)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F18","v":"كود البناء المرجعي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G18","v":"حالة المطابقة النظامية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H18","v":"ملاحظات الكفاءة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":"الجدران الخارجية المعزولة (External Walls)","b":true,"al":"center"},{"c":"B19","v":0.342,"in":true,"b":true,"al":"center","nf":"0.000"},{"c":"C19","v":0.06,"in":true,"al":"center","nf":"0.000"},{"c":"D19","v":"ألواح صوف صخري أو بوليستيرين 50-70 مم","al":"center"},{"c":"E19","v":"—","al":"center"},{"c":"F19","v":"SBC 601 (Sec. 5)","al":"center"},{"c":"G19","v":"إلزامي للمباني السكنية","al":"center"},{"c":"H19","v":"يقلل الحمل الحراري بنسبة 45%","al":"center"}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":"الأسقف العلوية المعرضة للشمس (Roofs)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B20","v":0.202,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"C20","v":0.035,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"D20","v":"بوليوريثان فوم أو فوم بوليستيرين 80-100 مم","bg":"#F8FAFC","al":"center"},{"c":"E20","v":"—","bg":"#F8FAFC","al":"center"},{"c":"F20","v":"SBC 601 (Sec. 5)","bg":"#F8FAFC","al":"center"},{"c":"G20","v":"إلزامي للمباني السكنية","bg":"#F8FAFC","al":"center"},{"c":"H20","v":"أعلى مصدر لاكتساب الحرارة صيفاً","bg":"#F8FAFC","al":"center"}]},{"r":21,"h":52.0,"cells":[{"c":"A21","v":"الواجهات الزجاجية المزدوجة (Double Glazing)","b":true,"al":"center"},{"c":"B21","v":1.9,"in":true,"b":true,"al":"center","nf":"0.000"},{"c":"C21","v":0.334,"in":true,"al":"center","nf":"0.000"},{"c":"D21","v":"زجاج مزدوج 6 مم + 12 مم فراغ أرجون + 6 مم","al":"center"},{"c":"E21","v":"≤ 0.25","al":"center"},{"c":"F21","v":"SBC 602 (Commercial/Res)","al":"center"},{"c":"G21","v":"معتمد ومطابق","al":"center"},{"c":"H21","v":"طبقة طلاء منخفضة الانبعاثية Low-E","al":"center"}]},{"r":22,"h":72.0,"cells":[{"c":"A22","v":"الأرضيات المعرضة للهواء الخارجي (Cantilevers)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B22","v":0.28,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"C22","v":0.049,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"D22","v":"عزل حراري سفلي مثبت ميكانيكياً 50 مم","bg":"#F8FAFC","al":"center"},{"c":"E22","v":"—","bg":"#F8FAFC","al":"center"},{"c":"F22","v":"SBC 601","bg":"#F8FAFC","al":"center"},{"c":"G22","v":"مطابق للاشتراطات","bg":"#F8FAFC","al":"center"},{"c":"H22","v":"للبروزات والكبائن المعلقة","bg":"#F8FAFC","al":"center"}]},{"r":23,"h":28.0,"cells":[{"c":"A23","v":""},{"c":"B23","v":""},{"c":"C23","v":""},{"c":"D23","v":""},{"c":"E23","v":""},{"c":"F23","v":""},{"c":"G23","v":""},{"c":"H23","v":""}]},{"r":24,"h":28.0,"cells":[{"c":"A24","v":""},{"c":"B24","v":""},{"c":"C24","v":""},{"c":"D24","v":""},{"c":"E24","v":""},{"c":"F24","v":""},{"c":"G24","v":""},{"c":"H24","v":""}]},{"r":25,"h":38.0,"cells":[{"c":"A25","v":"  جدول 3: مواصفات وسماكات الصاج المجلفن للدكت وفق أبعاد المقطع (SMACNA HVAC Duct Standards)","bg":"#0284C7","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":26,"h":52.0,"cells":[{"c":"A26","v":"الحد الأقصى لبعد الدكت (بوصة / مم)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B26","v":"رقم المقياس القياسي (Gauge)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C26","v":"السمك الاسمي للصاج (مم)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D26","v":"السمك الاسمي (بوصة)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E26","v":"وزن المتر المربع (كجم/م²)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F26","v":"نوع التوصيل والفواصل الموصى به","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G26","v":"فئة الضغط الاستاتيكي (in.wg)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H26","v":"مستوى الجودة والتجلفن","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":27,"h":52.0,"cells":[{"c":"A27","v":"حتى 12 بوصة (≤ 300 مم)","b":true,"al":"center"},{"c":"B27","v":"Gauge 26","b":true,"al":"center"},{"c":"C27","v":0.55,"in":true,"al":"center","nf":"#,##0.00"},{"c":"D27","v":0.0217,"in":true,"al":"center","nf":"0.0000"},{"c":"E27","v":4.88,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F27","v":"S & Drive Cleats (وصلات سحاب)","al":"center"},{"c":"G27","v":"حتى 2.0 in.wg","al":"center"},{"c":"H27","v":"صاج مجلفن G90 بالغمس الساخن","al":"center"}]},{"r":28,"h":52.0,"cells":[{"c":"A28","v":"من 13 إلى 30 بوصة (325 - 750 مم)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B28","v":"Gauge 24","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C28","v":0.7,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"D28","v":0.0276,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0000"},{"c":"E28","v":6.06,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"F28","v":"TDC / TDF Flange أو Standing S","bg":"#F8FAFC","al":"center"},{"c":"G28","v":"حتى 2.0 in.wg","bg":"#F8FAFC","al":"center"},{"c":"H28","v":"صاج مجلفن G90 بالغمس الساخن","bg":"#F8FAFC","al":"center"}]},{"r":29,"h":52.0,"cells":[{"c":"A29","v":"من 31 إلى 54 بوصة (775 - 1350 مم)","b":true,"al":"center"},{"c":"B29","v":"Gauge 22","b":true,"al":"center"},{"c":"C29","v":0.85,"in":true,"al":"center","nf":"#,##0.00"},{"c":"D29","v":0.0335,"in":true,"al":"center","nf":"0.0000"},{"c":"E29","v":7.24,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F29","v":"TDF Flange مع تدعيم حديد زاوية","al":"center"},{"c":"G29","v":"حتى 4.0 in.wg","al":"center"},{"c":"H29","v":"صاج مجلفن G90 بالغمس الساخن","al":"center"}]},{"r":30,"h":52.0,"cells":[{"c":"A30","v":"من 55 إلى 84 بوصة (1400 - 2100 مم)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B30","v":"Gauge 20","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C30","v":1,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"D30","v":0.0396,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0000"},{"c":"E30","v":8.42,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"F30","v":"TDF Flange 35 مم مع تدعيم وسطي","bg":"#F8FAFC","al":"center"},{"c":"G30","v":"حتى 4.0 in.wg","bg":"#F8FAFC","al":"center"},{"c":"H30","v":"صاج مجلفن G90 بالغمس الساخن","bg":"#F8FAFC","al":"center"}]},{"r":31,"h":52.0,"cells":[{"c":"A31","v":"أكثر من 84 بوصة (> 2100 مم)","b":true,"al":"center"},{"c":"B31","v":"Gauge 18","b":true,"al":"center"},{"c":"C31","v":1.25,"in":true,"al":"center","nf":"#,##0.00"},{"c":"D31","v":0.0478,"in":true,"al":"center","nf":"0.0000"},{"c":"E31","v":10.4,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F31","v":"شفرات تدعيم خارجية ملحومة","al":"center"},{"c":"G31","v":"حتى 6.0 in.wg","al":"center"},{"c":"H31","v":"صاج مجلفن G90 عالي المتانة","al":"center"}]}]}]}