{"slug":"hvac-duct-sizing-and-external-static-pressure-esp-calculation-sheet","sheets":[{"name":"حساب الضغط الإستاتيكي والدكت","maxRow":38,"maxCol":8,"colWidths":[38.0,36.0,26.0,22.0,22.0,22.0,24.0,36.0],"rows":[{"r":1,"h":34.0,"cells":[{"c":"A1","v":"نموذج وحاسبة مقاسات مجاري الهواء وهبوط الضغط الإستاتيكي ESP (ASHRAE / SMACNA / SBC 501)","bg":"#0F3642","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"حساب مقاسات الصاج بطريقة هبوط الاحتكاك الثابت (Equal Friction)، هبوط ضغط المسار الحرج، واختيار مروحة التغذية","bg":"#134E5E","fg":"#FFFFFF","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"إجمالي تدفق الهواء التصميمي (CFM)","bg":"#CFFAFE","fg":"#0F3642","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"الضغط الإستاتيكي الخارجي ESP (in.wg)","bg":"#FEF3C7","fg":"#0F3642","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"أقصى سرعة هواء بالدكت (Velocity)","bg":"#F0F9FF","fg":"#0F3642","b":true,"al":"center","cs":2},{"skip":true},{"c":"G4","v":"قدرة محرك المروحة التصميمية (Motor)","bg":"#DCFCE7","fg":"#0F3642","b":true,"al":"center","cs":2},{"skip":true}]},{"r":5,"h":28.0,"cells":[{"c":"A5","v":"6,500 CFM","f":"=TEXT(C10,\"#,##0\") & \" CFM\"","bg":"#CFFAFE","fg":"#134E5E","b":true,"al":"center","cs":2},{"skip":true},{"c":"C5","v":"0.25 in.wg","f":"=TEXT(D34,\"0.000\") & \" in.wg\"","bg":"#FEF3C7","fg":"#B45309","b":true,"al":"center","cs":2},{"skip":true},{"c":"E5","v":"1,300 FPM","f":"=TEXT(MAX(G19:G26),\"#,##0\") & \" FPM\"","bg":"#F0F9FF","fg":"#134E5E","b":true,"al":"center","cs":2},{"skip":true},{"c":"G5","v":"0.00 حصان BHP","f":"=TEXT(G36,\"0.00\") & \" حصان BHP\"","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center","cs":2},{"skip":true}]},{"r":6,"h":28.0,"cells":[{"c":"A6","v":"حمل التبريد: 0.1 طن تبريد (TR)","f":"=\"حمل التبريد: \" & TEXT(C11,\"0.0\") & \" طن تبريد (TR)\"","bg":"#CFFAFE","fg":"#0F3642","al":"center","cs":2},{"skip":true},{"c":"C6","v":"يعادل: 62 باسكال (Pa)","f":"=\"يعادل: \" & TEXT(D34*249.08,\"#,##0\") & \" باسكال (Pa)\"","bg":"#FEF3C7","fg":"#15803D","b":true,"al":"center","cs":2},{"skip":true},{"c":"E6","v":"سرعة منخفضة هادئة (Low Noise)","f":"=IF(MAX(G19:G26)<=1500,\"سرعة منخفضة هادئة (Low Noise)\",\"سرعة مرتفعة - تتطلب عازل صوتي\")","bg":"#F0F9FF","fg":"#15803D","b":true,"al":"center","cs":2},{"skip":true},{"c":"G6","v":"قدرة كهربائية: 0.00 كيلوواط kW","f":"=\"قدرة كهربائية: \" & TEXT(G36*0.746,\"0.00\") & \" كيلوواط kW\"","bg":"#DCFCE7","fg":"#15803D","al":"center","cs":2},{"skip":true}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"أولاً: البيانات التصميمية لوحدة التكييف ومحددات مجرى الهواء (HVAC Unit & Design Criteria)","bg":"#1E3A4B","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"رمز ورقم وحدة التكييف (Equipment Tag)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C9","v":"AHU-L02-01 (وحدة مناولة هواء الدور الثاني)","fg":"#1E293B","al":"center"},{"c":"D9","v":"نظام توزيع الهواء الميكانيكي","fg":"#1E293B","al":"center"},{"c":"E9","v":"حجم هواء متغير VAV مع مجاري صاج مجلفن","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"G9","v":"","fg":"#1E293B","al":"center"},{"c":"H9","v":"","fg":"#1E293B","al":"center"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":"إجمالي تدفق الهواء التصميمي (Total Airflow)","bg":"#F8FAFC","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C10","v":6500,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D10","v":"CFM (قدم مكعب/دقيقة)","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E10","v":"سعة التبريد الكلية التقديرية","bg":"#F8FAFC","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"G10","v":16.25,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"H10","v":"طن تبريد (TR)","bg":"#F8FAFC","fg":"#1E293B","al":"center"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":"معدل هبوط الاحتكاك التصميمي (Friction Rate)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C11","v":0.08,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D11","v":"in.wg / 100 ft","fg":"#1E293B","al":"center"},{"c":"E11","v":"الحد الأقصى للسرعة في المجرى الرئيسي","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"G11","v":1400,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"H11","v":"FPM (قدم/دقيقة)","fg":"#1E293B","al":"center"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":"درجة حرارة هواء التغذية (Supply Air Temp)","bg":"#F8FAFC","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C12","v":55,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"D12","v":"°F (12.8 °C)","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E12","v":"درجة حرارة هواء الغرفة التصميمية","bg":"#F8FAFC","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"G12","v":75,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"H12","v":"°F (23.9 °C)","bg":"#F8FAFC","fg":"#1E293B","al":"center"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":"مادة تصنيع مجاري الهواء (Duct Material)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C13","v":"صاج حديد مجلفن ASTM A653","fg":"#1E293B","al":"center"},{"c":"D13","v":"فئة الضغط الإستاتيكي للدكت (SMACNA)","fg":"#1E293B","al":"center"},{"c":"E13","v":"+2.0 in.wg (500 Pa)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"G13","v":"","fg":"#1E293B","al":"center"},{"c":"H13","v":"","fg":"#1E293B","al":"center"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":"كفاءة مروحة التغذية الإستاتيكية (Fan Efficiency)","bg":"#F8FAFC","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C14","v":0.65,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D14","v":"نسبة مئوية (65%)","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E14","v":"كفاءة المحرك الكهربائي ونظام النقل","bg":"#F8FAFC","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"G14","v":0.88,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H14","v":"نسبة مئوية (88%)","bg":"#F8FAFC","fg":"#1E293B","al":"center"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"معامل الأمان الإضافي لضغط المروحة (Safety Factor)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C15","v":1.15,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D15","v":"15% هامش أمان إضافي","fg":"#1E293B","al":"center"},{"c":"E15","v":"طريقة حساب وتوزيع المقاسات","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"G15","v":"طريقة الاحتكاك المتساوي (Equal Friction)","fg":"#1E293B","al":"center"},{"c":"H15","v":"","fg":"#1E293B","al":"center"}]},{"r":16,"h":28.0,"cells":[{"c":"A16","v":""},{"c":"B16","v":""},{"c":"C16","v":""},{"c":"D16","v":""},{"c":"E16","v":""},{"c":"F16","v":""},{"c":"G16","v":""},{"c":"H16","v":""}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":"ثانياً: جدول أبعاد وسرعات وهبوط ضغط مجاري الهواء على أطول مسار حرج (Critical Duct Run Calculation)","bg":"#D97706","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":"مقطع المجرى والوصف","bg":"#134E5E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B18","v":"تدفق الهواء Q (CFM)","bg":"#134E5E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C18","v":"العرض × الارتفاع W×H (بوصة)","bg":"#134E5E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D18","v":"المقاس بالملم (W × H mm)","bg":"#134E5E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E18","v":"نسبة الاستطالة (Aspect Ratio)","bg":"#134E5E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F18","v":"طول المقطع L (قدم)","bg":"#134E5E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G18","v":"سرعة الهواء V (FPM)","bg":"#134E5E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H18","v":"هبوط ضغط المقطع (in.wg)","bg":"#134E5E","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":"مخرج المروحة والمجرى الرئيسي الأول (S01)","bg":"#F8FAFC","fg":"#1E293B","b":true},{"c":"B19","v":6500,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"C19","v":"36 × 20","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center"},{"c":"D19","v":"914 × 508","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E19","v":1.8,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"F19","v":35,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"G19","v":1300,"f":"=(B19*144)/(36.0*20.0)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0"},{"c":"H19","v":0.159702,"f":"=(0.08*(F19/100)) + (1.25 * ((G19/4005)^2))","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"0.000"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":"المجرى الرئيسي قبل التفرع الأول (S02)","fg":"#1E293B","b":true},{"c":"B20","v":5200,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"C20","v":"32 × 18","fg":"#1E293B","b":true,"al":"center"},{"c":"D20","v":"812 × 457","fg":"#1E293B","al":"center"},{"c":"E20","v":1.78,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"F20","v":40,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"G20","v":1300,"f":"=(B20*144)/(32.0*18.0)","fg":"#1E293B","b":true,"al":"center","nf":"#,##0"},{"c":"H20","v":0.132093,"f":"=(0.08*(F20/100)) + (0.95 * ((G20/4005)^2))","fg":"#1E293B","b":true,"al":"center","nf":"0.000"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":"مجرى التوزيع بالدور والممر الرئيسي (S03)","bg":"#F8FAFC","fg":"#1E293B","b":true},{"c":"B21","v":4000,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"C21","v":"28 × 16","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center"},{"c":"D21","v":"711 × 406","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E21","v":1.75,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"F21","v":45,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"G21","v":1285.714286,"f":"=(B21*144)/(28.0*16.0)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0"},{"c":"H21","v":0.118447,"f":"=(0.08*(F21/100)) + (0.8 * ((G21/4005)^2))","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"0.000"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":"مجرى الجناح الشرقي قبل صناديق VAV (S04)","fg":"#1E293B","b":true},{"c":"B22","v":2800,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"C22","v":"24 × 14","fg":"#1E293B","b":true,"al":"center"},{"c":"D22","v":"609 × 355","fg":"#1E293B","al":"center"},{"c":"E22","v":1.71,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"F22","v":35,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"G22","v":1200,"f":"=(B22*144)/(24.0*14.0)","fg":"#1E293B","b":true,"al":"center","nf":"#,##0"},{"c":"H22","v":0.090843,"f":"=(0.08*(F22/100)) + (0.7 * ((G22/4005)^2))","fg":"#1E293B","b":true,"al":"center","nf":"0.000"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":"مجرى التغذية لصناديق الحجم المتغير (S05)","bg":"#F8FAFC","fg":"#1E293B","b":true},{"c":"B23","v":1800,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"C23","v":"18 × 12","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center"},{"c":"D23","v":"457 × 304","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E23","v":1.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"F23","v":30,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"G23","v":1200,"f":"=(B23*144)/(18.0*12.0)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0"},{"c":"H23","v":0.073376,"f":"=(0.08*(F23/100)) + (0.55 * ((G23/4005)^2))","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"0.000"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":"المجرى الفرعي بعد صندوق VAV (S06)","fg":"#1E293B","b":true},{"c":"B24","v":1000,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"C24","v":"14 × 10","fg":"#1E293B","b":true,"al":"center"},{"c":"D24","v":"355 × 254","fg":"#1E293B","al":"center"},{"c":"E24","v":1.4,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"F24","v":25,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"G24","v":1028.571429,"f":"=(B24*144)/(14.0*10.0)","fg":"#1E293B","b":true,"al":"center","nf":"#,##0"},{"c":"H24","v":0.046383,"f":"=(0.08*(F24/100)) + (0.4 * ((G24/4005)^2))","fg":"#1E293B","b":true,"al":"center","nf":"0.000"}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":"المجرى المتجه لمخارج الهواء (S07)","bg":"#F8FAFC","fg":"#1E293B","b":true},{"c":"B25","v":500,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"C25","v":"10 × 8","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center"},{"c":"D25","v":"254 × 203","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E25","v":1.25,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"F25","v":20,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"G25","v":900,"f":"=(B25*144)/(10.0*8.0)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0"},{"c":"H25","v":0.03115,"f":"=(0.08*(F25/100)) + (0.3 * ((G25/4005)^2))","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"0.000"}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":"وصلة الدكت المرن لآخر ناشر هواء (S08)","fg":"#1E293B","b":true},{"c":"B26","v":250,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"C26","v":"8 × 8","fg":"#1E293B","b":true,"al":"center"},{"c":"D26","v":"203 × 203","fg":"#1E293B","al":"center"},{"c":"E26","v":1,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"F26","v":10,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"G26","v":562.5,"f":"=(B26*144)/(8.0*8.0)","fg":"#1E293B","b":true,"al":"center","nf":"#,##0"},{"c":"H26","v":0.010959,"f":"=(0.08*(F26/100)) + (0.15 * ((G26/4005)^2))","fg":"#1E293B","b":true,"al":"center","nf":"0.000"}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":"إجمالي هبوط ضغط مجاري الهواء المستقيمة والوصلات للمسار الحرج (Duct & Fittings Loss)","bg":"#ECFEFF","fg":"#0F3642","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H27","v":0.662953,"f":"=SUM(H19:H26)","bg":"#ECFEFF","fg":"#0F3642","b":true,"al":"center","nf":"0.000"}]},{"r":28,"h":34.0,"cells":[{"c":"A28","v":"ثالثاً: هبوط الضغط الإستاتيكي في ملحقات وتجهيزات المسار (In-Line HVAC Components & Terminal Devices)","bg":"#1E3A4B","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":29,"h":52.0,"cells":[{"c":"A29","v":"عنصر التجهيزات الميكانيكية","bg":"#134E5E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B29","v":"مواصفات ونوع الملحق الميكانيكي","bg":"#134E5E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C29","v":"المعيار / الكتالوج الفني المحدد","bg":"#134E5E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D29","v":"هبوط الضغط التصميمي (in.wg)","bg":"#134E5E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E29","v":"هبوط الضغط بالباسكال (Pa)","bg":"#134E5E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F29","v":"موقع التركيب في الشبكة","bg":"#134E5E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G29","v":"حالة الفحص","bg":"#134E5E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H29","v":"ملاحظات الصيانة والتشغيل","bg":"#134E5E","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":30,"h":52.0,"cells":[{"c":"A30","v":"فلتر هواء ابتدائي (Pre-Filter MERV 8)","fg":"#1E293B","b":true},{"c":"B30","v":"فلتر طيات ألياف زجاجية سماكة 2 بوصة قابل للاستبدال","fg":"#1E293B"},{"c":"C30","v":"ASHRAE 52.2","fg":"#1E293B","al":"center"},{"c":"D30","v":0.25,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"0.000"},{"c":"E30","v":62.27,"f":"=D30*249.08","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"F30","v":"مدخل وحدة المناولة AHU","fg":"#1E293B","al":"center"},{"c":"G30","v":"محقق","fg":"#15803D","b":true,"al":"center"},{"c":"H30","v":"ضغط الفلتر في حالة الاتساخ المتوسط","fg":"#1E293B"}]},{"r":31,"h":34.0,"cells":[{"c":"A31","v":"فلتر هواء نهائي عالي الكفاءة (Bag Filter)","bg":"#F8FAFC","fg":"#1E293B","b":true},{"c":"B31","v":"فلتر أكياس MERV 13 كفاءة ترشيح 90%","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C31","v":"ASHRAE 52.2","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D31","v":0.4,"in":true,"bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"0.000"},{"c":"E31","v":99.632,"f":"=D31*249.08","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"F31","v":"داخل وحدة المناولة AHU","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"G31","v":"محقق","bg":"#F8FAFC","fg":"#15803D","b":true,"al":"center"},{"c":"H31","v":"مخصص لتنقية الهواء الداخلي المريح","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":32,"h":52.0,"cells":[{"c":"A32","v":"كويل التبريد بالماء المثلج (Chilled Water Coil)","fg":"#1E293B","b":true},{"c":"B32","v":"كويل نحاس مع زعانف ألمنيوم 6 صفوف 10 زعانف/بوصة","fg":"#1E293B"},{"c":"C32","v":"AHRI 410","fg":"#1E293B","al":"center"},{"c":"D32","v":0.55,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"0.000"},{"c":"E32","v":136.994,"f":"=D32*249.08","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"F32","v":"داخل وحدة المناولة AHU","fg":"#1E293B","al":"center"},{"c":"G32","v":"محقق","fg":"#15803D","b":true,"al":"center"},{"c":"H32","v":"سطح مبلل في أقصى حمل تبريد","fg":"#1E293B"}]},{"r":33,"h":34.0,"cells":[{"c":"A33","v":"كاتم صوت مجرى الهواء (Sound Attenuator)","bg":"#F8FAFC","fg":"#1E293B","b":true},{"c":"B33","v":"كاتم صوت مستطيل طول 1.5 م مع حشوات صوف صخري","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C33","v":"ASTM E477","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D33","v":0.15,"in":true,"bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"0.000"},{"c":"E33","v":37.362,"f":"=D33*249.08","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"F33","v":"مخرج وحدة المناولة الرئيسي","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"G33","v":"محقق","bg":"#F8FAFC","fg":"#15803D","b":true,"al":"center"},{"c":"H33","v":"خفض مستوى الضوضاء إلى NC-35","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":34,"h":52.0,"cells":[{"c":"A34","v":"صندوق حجم الهواء المتغير (VAV Terminal Box)","fg":"#1E293B","b":true},{"c":"B34","v":"صندوق VAV مع صمام تحكم بمحرك ومجس ضغط","fg":"#1E293B"},{"c":"C34","v":"AHRI 880","fg":"#1E293B","al":"center"},{"c":"D34","v":0.25,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"0.000"},{"c":"E34","v":62.27,"f":"=D34*249.08","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"F34","v":"قبل التفرعات الفرعية للأجنحة","fg":"#1E293B","al":"center"},{"c":"G34","v":"محقق","fg":"#15803D","b":true,"al":"center"},{"c":"H34","v":"ضغط التشغيل الأدنى للصندوق","fg":"#1E293B"}]},{"r":35,"h":52.0,"cells":[{"c":"A35","v":"مخارج وناشرات الهواء (Supply Air Diffusers)","bg":"#F8FAFC","fg":"#1E293B","b":true},{"c":"B35","v":"ناشرات هواء مربعة 60×60 سم مع دمبر تحكم OBD","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C35","v":"ADC / ASHRAE 70","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D35","v":0.12,"in":true,"bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"0.000"},{"c":"E35","v":29.8896,"f":"=D35*249.08","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"F35","v":"نهاية المسار الحرج بالسقف المستعار","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"G35","v":"محقق","bg":"#F8FAFC","fg":"#15803D","b":true,"al":"center"},{"c":"H35","v":"أقصى تدفق 400 CFM للناشر","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":36,"h":34.0,"cells":[{"c":"A36","v":"إجمالي الضغط الإستاتيكي الخارجي النهائي شامل هامش الأمان (Total Final Design ESP)","bg":"#ECFEFF","fg":"#0F3642","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"D36","v":2.740396,"f":"=(H27 + SUM(D30:D35)) * C15","bg":"#ECFEFF","fg":"#0F3642","b":true,"al":"center","nf":"0.000"},{"c":"E36","v":682.577836,"f":"=D36*249.08","bg":"#ECFEFF","fg":"#0F3642","b":true,"al":"center","nf":"#,##0.0"},{"c":"F36","v":"قدرة محرك المروحة التصميمية: 4.31 حصان BHP","f":"=\"قدرة محرك المروحة التصميمية: \" & TEXT((C10*D36)/(6356*C14),\"0.00\") & \" حصان BHP\"","bg":"#ECFEFF","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":37,"h":28.0,"cells":[{"c":"A37","v":""},{"c":"B37","v":""},{"c":"C37","v":""},{"c":"D37","v":""},{"c":"E37","v":""},{"c":"F37","v":""},{"c":"G37","v":""},{"c":"H37","v":""}]},{"r":38,"h":52.0,"cells":[{"c":"A38","v":"مهندس تصميم ميكانيكي (HVAC):\nإعداد مقاسات الدكت وحسابات الضغط","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"C38","v":"مهندس فحص وتوازن الهواء (TAB Specialist):\nمعايرة وضبط تدفقات ومخارج الهواء","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"F38","v":"استشاري الأعمال الكهروميكانيكية (MEP):\nالمطابقة والترخيص بتصنيع وتركيب الصاج","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]}]},{"name":"سماكات صاج الدكت SMACNA","maxRow":11,"maxCol":8,"colWidths":[30.0,26.0,30.0,24.0,34.0,26.0,28.0,38.0],"rows":[{"r":1,"h":34.0,"cells":[{"c":"A1","v":"جدول سماكات وأوزان صاج مجاري الهواء وفق معايير SMACNA لمشاريع التكييف","bg":"#0F3642","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"تحديد عيار وسماكة الصاج (Gauge)، نوع الفلانجة والوصلات (TDF/TDC)، ومساحة عزل الصوف الزجاجي والمطاطي","bg":"#134E5E","fg":"#FFFFFF","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"البعد الأكبر لمجرى الهواء (بوصة)","bg":"#134E5E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"البعد الأكبر بالمليمتر (مم)","bg":"#134E5E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"رقم عيار الصاج SMACNA (Gauge)","bg":"#134E5E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"سماكة الصاج الاسمية (ملم)","bg":"#134E5E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"نوع الوصلات المشتركة القياسية","bg":"#134E5E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"أقصى مسافة لتدعيم الصاج (م)","bg":"#134E5E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"وزن المتر المربع للصاج (كجم/م²)","bg":"#134E5E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"الاستخدام الهندسي النموذجي","bg":"#134E5E","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"حتى 12 بوصة","fg":"#1E293B","b":true,"al":"center"},{"c":"B5","v":"حتى 300 ملم","fg":"#1E293B","al":"center"},{"c":"C5","v":26,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0"},{"c":"D5","v":0.55,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"E5","v":"S-Cleat & Drive Slip (وصلات شطف)","fg":"#1E293B"},{"c":"F5","v":1.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G5","v":4.8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H5","v":"مجاري الفروع ومخارج الهواء الصغيرة","fg":"#1E293B"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"من 13 إلى 18 بوصة","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center"},{"c":"B6","v":"325 إلى 450 ملم","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"C6","v":24,"in":true,"bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0"},{"c":"D6","v":0.7,"in":true,"bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"E6","v":"Standing S-Slip / TDF فلنجة","bg":"#F8FAFC","fg":"#1E293B"},{"c":"F6","v":1.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G6","v":5.95,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H6","v":"مجاري الفروع الفرعية وتفرعات المكاتب","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"من 19 إلى 30 بوصة","fg":"#1E293B","b":true,"al":"center"},{"c":"B7","v":"475 إلى 750 ملم","fg":"#1E293B","al":"center"},{"c":"C7","v":24,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0"},{"c":"D7","v":0.7,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"E7","v":"TDF / TDC فلانجة مدمجة 35 ملم","fg":"#1E293B"},{"c":"F7","v":1.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G7","v":5.95,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H7","v":"مجاري التوزيع بالدور والممرات","fg":"#1E293B"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"من 31 إلى 42 بوصة","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center"},{"c":"B8","v":"775 إلى 1050 ملم","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"C8","v":22,"in":true,"bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0"},{"c":"D8","v":0.85,"in":true,"bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"E8","v":"TDF / TDC مع زوايا تدعيم 4 براغي","bg":"#F8FAFC","fg":"#1E293B"},{"c":"F8","v":1.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G8","v":7.2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H8","v":"المجاري الرئيسية لوحدات المناولة AHU","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"من 43 إلى 54 بوصة","fg":"#1E293B","b":true,"al":"center"},{"c":"B9","v":"1100 إلى 1350 ملم","fg":"#1E293B","al":"center"},{"c":"C9","v":20,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0"},{"c":"D9","v":1,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"E9","v":"TDC Flange مع جسور حديد زاوية","fg":"#1E293B"},{"c":"F9","v":1.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G9","v":8.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H9","v":"مجاري الهواء الرئيسية في غرف الميكانيكا","fg":"#1E293B"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":"من 55 إلى 84 بوصة","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center"},{"c":"B10","v":"1400 إلى 2100 ملم","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"C10","v":18,"in":true,"bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0"},{"c":"D10","v":1.25,"in":true,"bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"E10","v":"Companion Angle Flange 40×40×4","bg":"#F8FAFC","fg":"#1E293B"},{"c":"F10","v":1.2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G10","v":10.6,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H10","v":"مجاري الهواء الضخمة ومخارج مراوح الدخان","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":"أكثر من 84 بوصة","fg":"#1E293B","b":true,"al":"center"},{"c":"B11","v":"أكثر من 2150 ملم","fg":"#1E293B","al":"center"},{"c":"C11","v":16,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0"},{"c":"D11","v":1.5,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"E11","v":"Heavy Angle Flange 50×50×5 ملم","fg":"#1E293B"},{"c":"F11","v":1,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G11","v":12.75,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H11","v":"مجاري هواء سحب وضغط الدخان ومحطات المترو","fg":"#1E293B"}]}]},{"name":"معاملات هبوط الضغط ASHRAE","maxRow":13,"maxCol":7,"colWidths":[36.0,42.0,26.0,24.0,28.0,24.0,38.0],"rows":[{"r":1,"h":34.0,"cells":[{"c":"A1","v":"معاملات فقد الضغط الديناميكي لوصلات مجاري الهواء وفق دليل ASHRAE Fundamentals","bg":"#0F3642","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"معاملات الفقد الموضعي (Loss Coefficient Co) للأكواع، التفرعات، التوسعات والانكماش، ومخمدات الحريق","bg":"#134E5E","fg":"#FFFFFF","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"نوع الوصلة أو الملحق الميكانيكي","bg":"#134E5E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"الوصف الهندسي وتفاصيل التشكيل","bg":"#134E5E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"معامل الفقد الديناميكي (Co)","bg":"#134E5E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"معادلة هبوط الضغط ΔP","bg":"#134E5E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"أثر التصميم على مستوى الضوضاء","bg":"#134E5E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"معيار الكود ASHRAE","bg":"#134E5E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"التوصية الهندسية للمشروع","bg":"#134E5E","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"كوع 90 درجة نصف قطري ناعم (Smooth Radius)","fg":"#1E293B","b":true},{"c":"B5","v":"كوع بنصف قطر R/W = 1.5 بدون ريش توجيه","fg":"#1E293B","al":"center"},{"c":"C5","v":0.15,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"0.00"},{"c":"D5","v":"Co × (V/4005)²","fg":"#1E293B","al":"center"},{"c":"E5","v":"منخفض جداً وهادئ NC-25","fg":"#1E293B","al":"center"},{"c":"F5","v":"ASHRAE Table CD3-1","fg":"#1E293B","al":"center"},{"c":"G5","v":"الخيار الأفضل لكفاءة الطاقة وتوفير الضغط","fg":"#1E293B","al":"center"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"كوع 90 درجة حاد مع ريش توجيه (Vanes)","bg":"#F8FAFC","fg":"#1E293B","b":true},{"c":"B6","v":"كوع قائم زاوية 90° مع ريش توجيه هوائية Turning Vanes","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"C6","v":0.28,"in":true,"bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"0.00"},{"c":"D6","v":"Co × (V/4005)²","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E6","v":"منخفض ومقبول NC-32","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F6","v":"ASHRAE Table CD3-5","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"G6","v":"يستخدم عند ضيق المساحات المعمارية بالسقف","bg":"#F8FAFC","fg":"#1E293B","al":"center"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"كوع 90 درجة حاد بدون ريش (Mitered Elbow)","fg":"#1E293B","b":true},{"c":"B7","v":"كوع قائم حاد بدون أي ريش توجيه داخلية","fg":"#1E293B","al":"center"},{"c":"C7","v":1.25,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"0.00"},{"c":"D7","v":"Co × (V/4005)²","fg":"#1E293B","al":"center"},{"c":"E7","v":"مرتفع ومزعج NC-45","fg":"#1E293B","al":"center"},{"c":"F7","v":"ASHRAE Table CD3-6","fg":"#1E293B","al":"center"},{"c":"G7","v":"ممنوع في مسارات التغذية الرئيسية","fg":"#1E293B","al":"center"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"تفرع مستقيم 45 درجة (45° Wye Takeoff)","bg":"#F8FAFC","fg":"#1E293B","b":true},{"c":"B8","v":"تفرع انسيابي بزاوية 45 درجة مع انتقال انسيابي","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"C8","v":0.22,"in":true,"bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"0.00"},{"c":"D8","v":"Co × (V/4005)²","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E8","v":"انسيابي ومثالي","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F8","v":"ASHRAE Table CD5-1","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"G8","v":"ممتاز لتفرعات الهواء الرئيسية","bg":"#F8FAFC","fg":"#1E293B","al":"center"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"تفرع تسعين درجة كروي (Shoe Tap 90°)","fg":"#1E293B","b":true},{"c":"B9","v":"وصلة تفرع قائمة مع نعل انسيابي Shoe Tap","fg":"#1E293B","al":"center"},{"c":"C9","v":0.45,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"0.00"},{"c":"D9","v":"Co × (V/4005)²","fg":"#1E293B","al":"center"},{"c":"E9","v":"متوسط ومقبول","fg":"#1E293B","al":"center"},{"c":"F9","v":"ASHRAE Table CD5-9","fg":"#1E293B","al":"center"},{"c":"G9","v":"الخيار الأكثر شيوعاً في الممرات","fg":"#1E293B","al":"center"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":"توسع تدريجي في المجرى (Expansion)","bg":"#F8FAFC","fg":"#1E293B","b":true},{"c":"B10","v":"مسلوب توسيع بزاوية ميل لا تتجاوز 15 درجة","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"C10","v":0.18,"in":true,"bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"0.00"},{"c":"D10","v":"Co × (V/4005)²","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E10","v":"هادئ وبدون اضطراب","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F10","v":"ASHRAE Table CD2-1","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"G10","v":"ضروري لمنع انفصال تيار الهواء والتكثيف","bg":"#F8FAFC","fg":"#1E293B","al":"center"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":"انكماش تدريجي في المجرى (Contraction)","fg":"#1E293B","b":true},{"c":"B11","v":"مسلوب تضييق تدريجي بزاوية ميل 30 درجة","fg":"#1E293B","al":"center"},{"c":"C11","v":0.08,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"0.00"},{"c":"D11","v":"Co × (V/4005)²","fg":"#1E293B","al":"center"},{"c":"E11","v":"ممتاز وبدون فواقد","fg":"#1E293B","al":"center"},{"c":"F11","v":"ASHRAE Table CD2-3","fg":"#1E293B","al":"center"},{"c":"G11","v":"يستخدم بعد خروج التفرعات لضبط السرعة","fg":"#1E293B","al":"center"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":"مخمد تحكم في الحجم (Volume Damper)","bg":"#F8FAFC","fg":"#1E293B","b":true},{"c":"B12","v":"دمبر بشفرات متقابلة Opposed Blades مفتوح بالكامل","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"C12","v":0.2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"0.00"},{"c":"D12","v":"Co × (V/4005)²","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E12","v":"هادئ NC-30","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F12","v":"SMACNA / AMCA 500","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"G12","v":"لمعايرة تدفق الهواء في فروع المكاتب","bg":"#F8FAFC","fg":"#1E293B","al":"center"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":"مخمد حريق ودخان (Fire Smoke Damper)","fg":"#1E293B","b":true},{"c":"B13","v":"دمبر حريق بشفرات إيروفويل هوائية True Airfoil","fg":"#1E293B","al":"center"},{"c":"C13","v":0.18,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"0.00"},{"c":"D13","v":"Co × (V/4005)²","fg":"#1E293B","al":"center"},{"c":"E13","v":"انسيابي","fg":"#1E293B","al":"center"},{"c":"F13","v":"UL 555S / NFPA 90A","fg":"#1E293B","al":"center"},{"c":"G13","v":"إلزامي عند اختراق جدران الحريق المعزولة","fg":"#1E293B","al":"center"}]}]}]}