{"slug":"hvac-ductwork-sheet-metal-qto","sheets":[{"name":"لوحة_المؤشرات_والمواصفات","maxRow":13,"maxCol":7,"colWidths":[12.0,58.0,24.0,16.0,18.0,22.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"شيت حصر مسطحات وأوزان صاج مجاري الهواء (الدكت) والعزل ومخارج الهواء","bg":"#0E7490","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"حساب كميات الصاج بالكيلوجرام والمتر المربع وفق اشتراطات الكود الميكانيكي السعودي SBC 501 ومعايير SMACNA","bg":"#1E3A8A","fg":"#E2E8F0","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":""},{"c":"B4","v":"إجمالي وزن صاج الدكت المجلفن","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"D4","v":""},{"c":"E4","v":"إجمالي مسطح العزل الحراري الخارجي","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"G4","v":""}]},{"r":5,"h":28.0,"cells":[{"c":"A5","v":""},{"c":"B5","v":86.6,"f":"=D13","bg":"#F8FAFC","fg":"#0E7490","b":true,"al":"center","nf":"#,##0 \"كجم\"","cs":2},{"skip":true},{"c":"D5","v":""},{"c":"E5","v":914.4,"f":"=E13","bg":"#F8FAFC","fg":"#15803D","b":true,"al":"center","nf":"#,##0.0 \"م²\"","cs":2},{"skip":true},{"c":"G5","v":""}]},{"r":6,"h":28.0,"cells":[{"c":"A6","v":""},{"c":"B6","v":""},{"c":"C6","v":""},{"c":"D6","v":""},{"c":"E6","v":""},{"c":"F6","v":""},{"c":"G6","v":""}]},{"r":7,"h":38.0,"cells":[{"c":"A7","v":"خلاصة توزيع أوزان ومسطحات الصاج حسب السماكة القياسية (SMACNA Gauge Summary)","fg":"#0E7490","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"السمك القياسي (Gauge)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B8","v":"السماكة الاسمية (مم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C8","v":"البعد الأكبر لمقطع الدكت","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D8","v":"الوزن الإجمالي (كجم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E8","v":"المسطح الإجمالي (م²)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F8","v":"نسبة الوزن %","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G8","v":"سعر التوريد والتركيب (ر.س)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":9,"h":36.0,"cells":[{"c":"A9","v":"Gauge 26","fg":"#1E293B","al":"center"},{"c":"B9","v":"0.55 مم","fg":"#1E293B","al":"center"},{"c":"C9","v":"حتى 300 مم (12 بوصة)","fg":"#1E293B","al":"center"},{"c":"D9","v":9,"f":"=SUMIF(حصر_دكت_التغذية_والراجع!E4:E25, \"26\", حصر_دكت_التغذية_والراجع!I4:I25)","fg":"#1E293B","al":"left","nf":"#,##0.0"},{"c":"E9","v":127.7,"f":"=SUMIF(حصر_دكت_التغذية_والراجع!E4:E25, \"26\", حصر_دكت_التغذية_والراجع!H4:H25)","fg":"#1E293B","al":"left","nf":"#,##0.0"},{"c":"F9","v":0,"f":"=D9/$D$13","fg":"#1E293B","al":"center","nf":"0.0%"},{"c":"G9","v":24,"in":true,"fg":"#1E293B","al":"left","nf":"#,##0.00"}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":"Gauge 24","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"B10","v":"0.70 مم","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"C10","v":"من 301 إلى 750 مم (30 بوصة)","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D10","v":33.6,"f":"=SUMIF(حصر_دكت_التغذية_والراجع!E4:E25, \"24\", حصر_دكت_التغذية_والراجع!I4:I25)","bg":"#F8FAFC","fg":"#1E293B","al":"left","nf":"#,##0.0"},{"c":"E10","v":347,"f":"=SUMIF(حصر_دكت_التغذية_والراجع!E4:E25, \"24\", حصر_دكت_التغذية_والراجع!H4:H25)","bg":"#F8FAFC","fg":"#1E293B","al":"left","nf":"#,##0.0"},{"c":"F10","v":0,"f":"=D10/$D$13","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0%"},{"c":"G10","v":25.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"left","nf":"#,##0.00"}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":"Gauge 22","fg":"#1E293B","al":"center"},{"c":"B11","v":"0.85 مم","fg":"#1E293B","al":"center"},{"c":"C11","v":"من 751 إلى 1350 مم (54 بوصة)","fg":"#1E293B","al":"center"},{"c":"D11","v":27.6,"f":"=SUMIF(حصر_دكت_التغذية_والراجع!E4:E25, \"22\", حصر_دكت_التغذية_والراجع!I4:I25)","fg":"#1E293B","al":"left","nf":"#,##0.0"},{"c":"E11","v":254.9,"f":"=SUMIF(حصر_دكت_التغذية_والراجع!E4:E25, \"22\", حصر_دكت_التغذية_والراجع!H4:H25)","fg":"#1E293B","al":"left","nf":"#,##0.0"},{"c":"F11","v":0,"f":"=D11/$D$13","fg":"#1E293B","al":"center","nf":"0.0%"},{"c":"G11","v":27,"in":true,"fg":"#1E293B","al":"left","nf":"#,##0.00"}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":"Gauge 20","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"B12","v":"1.00 مم","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"C12","v":"أكبر من 1350 مم ومجاري الدخان","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D12","v":16.4,"f":"=SUMIF(حصر_دكت_التغذية_والراجع!E4:E25, \"20\", حصر_دكت_التغذية_والراجع!I4:I25)","bg":"#F8FAFC","fg":"#1E293B","al":"left","nf":"#,##0.0"},{"c":"E12","v":184.8,"f":"=SUMIF(حصر_دكت_التغذية_والراجع!E4:E25, \"20\", حصر_دكت_التغذية_والراجع!H4:H25)","bg":"#F8FAFC","fg":"#1E293B","al":"left","nf":"#,##0.0"},{"c":"F12","v":0,"f":"=D12/$D$13","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0%"},{"c":"G12","v":29.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"left","nf":"#,##0.00"}]},{"r":13,"h":42.0,"cells":[{"c":"A13","v":"إجمالي أعمال تصنيع وتركيب الصاج (Total)","bg":"#DCFCE7","fg":"#15803D","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"D13","v":86.6,"f":"=SUM(D9:D12)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"left","nf":"#,##0.0"},{"c":"E13","v":914.4,"f":"=SUM(E9:E12)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"left","nf":"#,##0.0"},{"c":"F13","v":"100.0%","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"G13","v":2301.8,"f":"=SUMPRODUCT(D9:D12, G9:G12)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"left","nf":"#,##0.00"}]}]},{"name":"حصر_دكت_التغذية_والراجع","maxRow":18,"maxCol":10,"colWidths":[10.0,45.0,14.0,14.0,14.0,16.0,14.0,18.0,18.0,18.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول حصر أبعاد ومسطحات وأوزان مجاري الهواء المستطيلة (Supply & Return Ducts)","bg":"#0E7490","fg":"#FFFFFF","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":28.0,"cells":[{"c":"A2","v":""},{"c":"B2","v":""},{"c":"C2","v":""},{"c":"D2","v":""},{"c":"E2","v":""},{"c":"F2","v":""},{"c":"G2","v":""},{"c":"H2","v":""},{"c":"I2","v":""},{"c":"J2","v":""}]},{"r":3,"h":40.0,"cells":[{"c":"A3","v":"رقم الخط","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B3","v":"المسار / النظام","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C3","v":"العرض W (مم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D3","v":"الارتفاع H (مم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E3","v":"السماكة Gauge","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F3","v":"محيط المقطع (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G3","v":"الطول L (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H3","v":"المسطح الخارجي (م²)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I3","v":"الوزن النوعي (كجم/م²)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J3","v":"الوزن الكلي (كجم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":4,"h":36.0,"cells":[{"c":"A4","v":"L-01","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"B4","v":"خط التغذية الرئيسي - مخرج الماكينة AHU-01","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C4","v":1200,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D4","v":600,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E4","v":"22","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F4","v":3.6,"f":"=2*(C4+D4)/1000","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G4","v":18.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"H4","v":66.6,"f":"=F4*G4","bg":"#F8FAFC","fg":"#1E293B","al":"left","nf":"#,##0.0"},{"c":"I4","v":6.9,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"J4","v":459.54,"f":"=H4*I4","bg":"#F8FAFC","fg":"#1E293B","al":"left","nf":"#,##0.0"}]},{"r":5,"h":36.0,"cells":[{"c":"A5","v":"L-02","fg":"#1E293B","al":"center"},{"c":"B5","v":"خط التغذية الفرعي - الجناح الشرقي","fg":"#1E293B"},{"c":"C5","v":900,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D5","v":500,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E5","v":"22","fg":"#1E293B","al":"center"},{"c":"F5","v":2.8,"f":"=2*(C5+D5)/1000","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G5","v":24,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"H5","v":67.2,"f":"=F5*G5","fg":"#1E293B","al":"left","nf":"#,##0.0"},{"c":"I5","v":6.9,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"J5","v":463.68,"f":"=H5*I5","fg":"#1E293B","al":"left","nf":"#,##0.0"}]},{"r":6,"h":36.0,"cells":[{"c":"A6","v":"L-03","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"B6","v":"خط التغذية الفرعي - الجناح الغربي","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C6","v":800,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D6","v":450,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E6","v":"24","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F6","v":2.5,"f":"=2*(C6+D6)/1000","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G6","v":22,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"H6","v":55,"f":"=F6*G6","bg":"#F8FAFC","fg":"#1E293B","al":"left","nf":"#,##0.0"},{"c":"I6","v":5.6,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"J6","v":308,"f":"=H6*I6","bg":"#F8FAFC","fg":"#1E293B","al":"left","nf":"#,##0.0"}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":"L-04","fg":"#1E293B","al":"center"},{"c":"B7","v":"تفرعات مكاتب الإدارة - الدور الأرضي","fg":"#1E293B"},{"c":"C7","v":600,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D7","v":350,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E7","v":"24","fg":"#1E293B","al":"center"},{"c":"F7","v":1.9,"f":"=2*(C7+D7)/1000","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G7","v":36,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"H7","v":68.4,"f":"=F7*G7","fg":"#1E293B","al":"left","nf":"#,##0.0"},{"c":"I7","v":5.6,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"J7","v":383.04,"f":"=H7*I7","fg":"#1E293B","al":"left","nf":"#,##0.0"}]},{"r":8,"h":36.0,"cells":[{"c":"A8","v":"L-05","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"B8","v":"تفرعات مكاتب الإدارة - الدور الأول","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C8","v":500,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D8","v":300,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E8","v":"24","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F8","v":1.6,"f":"=2*(C8+D8)/1000","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G8","v":42,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"H8","v":67.2,"f":"=F8*G8","bg":"#F8FAFC","fg":"#1E293B","al":"left","nf":"#,##0.0"},{"c":"I8","v":5.6,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"J8","v":376.32,"f":"=H8*I8","bg":"#F8FAFC","fg":"#1E293B","al":"left","nf":"#,##0.0"}]},{"r":9,"h":36.0,"cells":[{"c":"A9","v":"L-06","fg":"#1E293B","al":"center"},{"c":"B9","v":"مخارج التغذية النهائية للناشرات السقفية","fg":"#1E293B"},{"c":"C9","v":300,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D9","v":250,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E9","v":"26","fg":"#1E293B","al":"center"},{"c":"F9","v":1.1,"f":"=2*(C9+D9)/1000","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G9","v":55,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"H9","v":60.5,"f":"=F9*G9","fg":"#1E293B","al":"left","nf":"#,##0.0"},{"c":"I9","v":4.5,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"J9","v":272.25,"f":"=H9*I9","fg":"#1E293B","al":"left","nf":"#,##0.0"}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":"L-07","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"B10","v":"تغذية صالة الاجتماعات الرئيسية","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C10","v":700,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D10","v":400,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E10","v":"24","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F10","v":2.2,"f":"=2*(C10+D10)/1000","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G10","v":16,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"H10","v":35.2,"f":"=F10*G10","bg":"#F8FAFC","fg":"#1E293B","al":"left","nf":"#,##0.0"},{"c":"I10","v":5.6,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"J10","v":197.12,"f":"=H10*I10","bg":"#F8FAFC","fg":"#1E293B","al":"left","nf":"#,##0.0"}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":"L-08","fg":"#1E293B","al":"center"},{"c":"B11","v":"خط الراجع الرئيسي - الدور الأرضي","fg":"#1E293B"},{"c":"C11","v":1000,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D11","v":550,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E11","v":"22","fg":"#1E293B","al":"center"},{"c":"F11","v":3.1,"f":"=2*(C11+D11)/1000","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G11","v":26,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"H11","v":80.6,"f":"=F11*G11","fg":"#1E293B","al":"left","nf":"#,##0.0"},{"c":"I11","v":6.9,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"J11","v":556.14,"f":"=H11*I11","fg":"#1E293B","al":"left","nf":"#,##0.0"}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":"L-09","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"B12","v":"خط الراجع الفرعي - الدور الأول","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C12","v":750,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D12","v":400,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E12","v":"24","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F12","v":2.3,"f":"=2*(C12+D12)/1000","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G12","v":32,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"H12","v":73.6,"f":"=F12*G12","bg":"#F8FAFC","fg":"#1E293B","al":"left","nf":"#,##0.0"},{"c":"I12","v":5.6,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"J12","v":412.16,"f":"=H12*I12","bg":"#F8FAFC","fg":"#1E293B","al":"left","nf":"#,##0.0"}]},{"r":13,"h":36.0,"cells":[{"c":"A13","v":"L-10","fg":"#1E293B","al":"center"},{"c":"B13","v":"تفرعات الراجع للقاعات والممرات","fg":"#1E293B"},{"c":"C13","v":400,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D13","v":300,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E13","v":"26","fg":"#1E293B","al":"center"},{"c":"F13","v":1.4,"f":"=2*(C13+D13)/1000","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G13","v":48,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"H13","v":67.2,"f":"=F13*G13","fg":"#1E293B","al":"left","nf":"#,##0.0"},{"c":"I13","v":4.5,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"J13","v":302.4,"f":"=H13*I13","fg":"#1E293B","al":"left","nf":"#,##0.0"}]},{"r":14,"h":36.0,"cells":[{"c":"A14","v":"L-11","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"B14","v":"خط الهواء النقي الخارجي FAHU","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C14","v":850,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D14","v":500,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E14","v":"22","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F14","v":2.7,"f":"=2*(C14+D14)/1000","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G14","v":15,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"H14","v":40.5,"f":"=F14*G14","bg":"#F8FAFC","fg":"#1E293B","al":"left","nf":"#,##0.0"},{"c":"I14","v":6.9,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"J14","v":279.45,"f":"=H14*I14","bg":"#F8FAFC","fg":"#1E293B","al":"left","nf":"#,##0.0"}]},{"r":15,"h":36.0,"cells":[{"c":"A15","v":"L-12","fg":"#1E293B","al":"center"},{"c":"B15","v":"خط سحب الهواء العادم دورات المياه","fg":"#1E293B"},{"c":"C15","v":500,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D15","v":350,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E15","v":"24","fg":"#1E293B","al":"center"},{"c":"F15","v":1.7,"f":"=2*(C15+D15)/1000","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G15","v":28,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"H15","v":47.6,"f":"=F15*G15","fg":"#1E293B","al":"left","nf":"#,##0.0"},{"c":"I15","v":5.6,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"J15","v":266.56,"f":"=H15*I15","fg":"#1E293B","al":"left","nf":"#,##0.0"}]},{"r":16,"h":36.0,"cells":[{"c":"A16","v":"L-13","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"B16","v":"خط طرد عوادم المطابخ المركزية","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C16","v":650,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D16","v":400,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E16","v":"20","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F16","v":2.1,"f":"=2*(C16+D16)/1000","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G16","v":20,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"H16","v":42,"f":"=F16*G16","bg":"#F8FAFC","fg":"#1E293B","al":"left","nf":"#,##0.0"},{"c":"I16","v":8.2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0"},{"c":"J16","v":344.4,"f":"=H16*I16","bg":"#F8FAFC","fg":"#1E293B","al":"left","nf":"#,##0.0"}]},{"r":17,"h":36.0,"cells":[{"c":"A17","v":"L-14","fg":"#1E293B","al":"center"},{"c":"B17","v":"خط سحب الدخان الرئيسي - القبو","fg":"#1E293B"},{"c":"C17","v":1400,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D17","v":700,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E17","v":"20","fg":"#1E293B","al":"center"},{"c":"F17","v":4.2,"f":"=2*(C17+D17)/1000","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G17","v":34,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"H17","v":142.8,"f":"=F17*G17","fg":"#1E293B","al":"left","nf":"#,##0.0"},{"c":"I17","v":8.2,"in":true,"fg":"#1E293B","al":"center","nf":"0.0"},{"c":"J17","v":1170.96,"f":"=H17*I17","fg":"#1E293B","al":"left","nf":"#,##0.0"}]},{"r":18,"h":42.0,"cells":[{"c":"A18","v":"المجموع الإجمالي لمجاري الهواء (Rectangular Ducts Total)","bg":"#DCFCE7","fg":"#15803D","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G18","v":416.5,"f":"=SUM(G4:G17)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center","nf":"#,##0.0 \"م\""},{"c":"H18","v":914.4,"f":"=SUM(H4:H17)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"left","nf":"#,##0.0 \"م²\""},{"c":"I18","v":"-","bg":"#DCFCE7","al":"center"},{"c":"J18","v":5792.02,"f":"=SUM(J4:J17)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"left","nf":"#,##0.0 \"كجم\""}]}]},{"name":"حصر_القطع_الخاصة_والملحقات","maxRow":10,"maxCol":7,"colWidths":[12.0,58.0,24.0,16.0,18.0,22.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول حصر كميات القطع الخاصة والتحويلات وصناديق التجميع (Fittings & Plenums QTO)","bg":"#0E7490","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":28.0,"cells":[{"c":"A2","v":""},{"c":"B2","v":""},{"c":"C2","v":""},{"c":"D2","v":""},{"c":"E2","v":""},{"c":"F2","v":""},{"c":"G2","v":""}]},{"r":3,"h":40.0,"cells":[{"c":"A3","v":"م","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B3","v":"بيان القطعة الخاصة الميكانيكية","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C3","v":"المقاس النموذجي (مم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D3","v":"الوحدة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E3","v":"العدد المحصور","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F3","v":"متوسط المسطح المكافئ (م²)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G3","v":"إجمالي المسطح (م²)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":4,"h":36.0,"cells":[{"c":"A4","v":"1","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"B4","v":"أكواع دكت 90 درجة مع ريش توجيه هوائية داخلية (Turning Vanes)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C4","v":"مقاسات متنوعة 600 إلى 1200 مم","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D4","v":"عدد","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E4","v":48,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"F4","v":2.2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G4","v":105.6,"f":"=E4*F4","bg":"#F8FAFC","fg":"#1E293B","al":"left","nf":"#,##0.0"}]},{"r":5,"h":36.0,"cells":[{"c":"A5","v":"2","fg":"#1E293B","al":"center"},{"c":"B5","v":"أكواع دكت 45 درجة لتفادي العوائق والكمرات الإنشائية","fg":"#1E293B"},{"c":"C5","v":"مقاسات متنوعة 400 إلى 800 مم","fg":"#1E293B","al":"center"},{"c":"D5","v":"عدد","fg":"#1E293B","al":"center"},{"c":"E5","v":36,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"F5","v":1.4,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G5","v":50.4,"f":"=E5*F5","fg":"#1E293B","al":"left","nf":"#,##0.0"}]},{"r":6,"h":36.0,"cells":[{"c":"A6","v":"3","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"B6","v":"تحويلات مقطع مسلوبة (Transitions / Reducers)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C6","v":"تخفيض مقطع من 900 إلى 600 مم","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D6","v":"عدد","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E6","v":52,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"F6","v":1.8,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G6","v":93.6,"f":"=E6*F6","bg":"#F8FAFC","fg":"#1E293B","al":"left","nf":"#,##0.0"}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":"4","fg":"#1E293B","al":"center"},{"c":"B7","v":"تفريعات جانبية مسحوبة (Tee / Take-offs with Damper)","fg":"#1E293B"},{"c":"C7","v":"تفريعات الصالات والمكاتب","fg":"#1E293B","al":"center"},{"c":"D7","v":"عدد","fg":"#1E293B","al":"center"},{"c":"E7","v":64,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"F7","v":1.5,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G7","v":96,"f":"=E7*F7","fg":"#1E293B","al":"left","nf":"#,##0.0"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"5","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"B8","v":"صناديق تجميع الهواء العازلة (Plenum Boxes) للوحدات المخفية","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C8","v":"مقاسات تناسب ماكينات 2 إلى 4 طن","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D8","v":"عدد","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E8","v":45,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"F8","v":3.2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G8","v":144,"f":"=E8*F8","bg":"#F8FAFC","fg":"#1E293B","al":"left","nf":"#,##0.0"}]},{"r":9,"h":36.0,"cells":[{"c":"A9","v":"6","fg":"#1E293B","al":"center"},{"c":"B9","v":"صناديق مخارج الهواء (Diffuser Boot Boxes) المعزولة داخلياً","fg":"#1E293B"},{"c":"C9","v":"مقاس 60×60 سم مع مدخل دائري","fg":"#1E293B","al":"center"},{"c":"D9","v":"عدد","fg":"#1E293B","al":"center"},{"c":"E9","v":185,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"F9","v":0.85,"in":true,"fg":"#1E293B","al":"center","nf":"0.00"},{"c":"G9","v":157.25,"f":"=E9*F9","fg":"#1E293B","al":"left","nf":"#,##0.0"}]},{"r":10,"h":42.0,"cells":[{"c":"A10","v":"إجمالي مسطحات القطع الخاصة وصناديق البلينيوم (م²)","bg":"#DCFCE7","fg":"#15803D","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G10","v":646.85,"f":"=SUM(G4:G9)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"left","nf":"#,##0.0 \"م²\""}]}]},{"name":"حصر_العوازل_ومخارج_الهواء","maxRow":11,"maxCol":7,"colWidths":[12.0,58.0,24.0,16.0,18.0,22.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول حصر أعمال العزل الحراري والصوتي للدكت ومخارج الهواء (Insulation & Outlets)","bg":"#0E7490","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":28.0,"cells":[{"c":"A2","v":""},{"c":"B2","v":""},{"c":"C2","v":""},{"c":"D2","v":""},{"c":"E2","v":""},{"c":"F2","v":""},{"c":"G2","v":""}]},{"r":3,"h":40.0,"cells":[{"c":"A3","v":"م","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B3","v":"بيان بند العزل / مخرج الهواء","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C3","v":"المواصفة الفنية والنوع","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D3","v":"الوحدة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E3","v":"الكمية المحصورة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F3","v":"سعر الوحدة (ريال)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G3","v":"إجمالي القيمة (ريال)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"1","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"B4","v":"عزل حراري خارجي من الصوف الزجاجي (Fiberglass) سماكة 50 مم بكثافة 24 كجم/م³ مع طبقة FSK مقاومة للرطوبة","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C4","v":"Fiberglass Wrap 50mm","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D4","v":"م²","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E4","v":3850,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"F4","v":26.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"left","nf":"#,##0.00"},{"c":"G4","v":102025,"f":"=E4*F4","bg":"#F8FAFC","fg":"#1E293B","al":"left","nf":"#,##0.00"}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"2","fg":"#1E293B","al":"center"},{"c":"B5","v":"عزل صوتي داخلي (Acoustic Lining) سماكة 25 مم بكثافة 32 كجم/م³ مطلي بطبقة حماية من الاحتكاك","fg":"#1E293B"},{"c":"C5","v":"Acoustic Lining 25mm","fg":"#1E293B","al":"center"},{"c":"D5","v":"م²","fg":"#1E293B","al":"center"},{"c":"E5","v":680,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"F5","v":44,"in":true,"fg":"#1E293B","al":"left","nf":"#,##0.00"},{"c":"G5","v":29920,"f":"=E5*F5","fg":"#1E293B","al":"left","nf":"#,##0.00"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"3","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"B6","v":"عزل حراري للدكت المكشوف فوق السطح بالصوف الصخري 50 مم مع التغليف بألواح الألمنيوم Cladding","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C6","v":"Rockwool + 0.8mm Al Cladding","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D6","v":"م²","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E6","v":420,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"F6","v":95,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"left","nf":"#,##0.00"},{"c":"G6","v":39900,"f":"=E6*F6","bg":"#F8FAFC","fg":"#1E293B","al":"left","nf":"#,##0.00"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"4","fg":"#1E293B","al":"center"},{"c":"B7","v":"ناشرات هواء سقفية مربعة 4 اتجاهات (Square Diffusers) ألمنيوم مقاس 60×60 سم مع الدامبر","fg":"#1E293B"},{"c":"C7","v":"Supply Diffusers 60x60","fg":"#1E293B","al":"center"},{"c":"D7","v":"عدد","fg":"#1E293B","al":"center"},{"c":"E7","v":185,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"F7","v":155,"in":true,"fg":"#1E293B","al":"left","nf":"#,##0.00"},{"c":"G7","v":28675,"f":"=E7*F7","fg":"#1E293B","al":"left","nf":"#,##0.00"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"5","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"B8","v":"جريلات هواء طولية خطية (Linear Slot Diffusers) ألمنيوم 2 فتحة بطول 1.2 متر","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C8","v":"Linear Slot 2-Slot 1.2m","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D8","v":"عدد","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E8","v":96,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"F8","v":185,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"left","nf":"#,##0.00"},{"c":"G8","v":17760,"f":"=E8*F8","bg":"#F8FAFC","fg":"#1E293B","al":"left","nf":"#,##0.00"}]},{"r":9,"h":36.0,"cells":[{"c":"A9","v":"6","fg":"#1E293B","al":"center"},{"c":"B9","v":"مخمدات معايرة حجمية يدوية (Manual Volume Control Dampers - VCD)","fg":"#1E293B"},{"c":"C9","v":"Opposed Blade VCD","fg":"#1E293B","al":"center"},{"c":"D9","v":"عدد","fg":"#1E293B","al":"center"},{"c":"E9","v":42,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"F9","v":280,"in":true,"fg":"#1E293B","al":"left","nf":"#,##0.00"},{"c":"G9","v":11760,"f":"=E9*F9","fg":"#1E293B","al":"left","nf":"#,##0.00"}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":"7","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"B10","v":"مخمدات حريق أوتوماتيكية مع فيوز انصهار 72°C (Fusible Link Fire Dampers)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C10","v":"UL Listed Fire Damper 1.5hr","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D10","v":"عدد","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E10","v":24,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"F10","v":750,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"left","nf":"#,##0.00"},{"c":"G10","v":18000,"f":"=E10*F10","bg":"#F8FAFC","fg":"#1E293B","al":"left","nf":"#,##0.00"}]},{"r":11,"h":42.0,"cells":[{"c":"A11","v":"إجمالي حزمة العوازل ومخارج الهواء والدامبرز (ريال)","bg":"#DCFCE7","fg":"#15803D","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G11","v":248040,"f":"=SUM(G4:G10)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"left","nf":"#,##0.00"}]}]}]}