{"slug":"inspection-and-test-plan-itp","sheets":[{"name":"لوحة_المعلومات_والمؤشرات","maxRow":17,"maxCol":8,"colWidths":[8.0,44.0,16.0,16.0,16.0,16.0,26.0,44.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"خطة الفحص والاختبار الشاملة للمشروع (Inspection and Test Plan - ITP)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"مصفوفة توكيد وضبط الجودة (QA/QC Matrix)، تحديد نقاط التوقف (H) والمعاينة (W) والمراجعة (S) وفق ISO 9001 و SBC","bg":"#1E293B","fg":"#E2E8F0","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"اسم المشروع:","b":true,"al":"center"},{"c":"B4","v":"مشروع إنشاء وتشييد المجمع السكني والتجاري المتكامل","fg":"#1E293B","al":"center"},{"c":"C4","v":""},{"c":"D4","v":""},{"c":"E4","v":"المالك / المطور:","b":true,"al":"center"},{"c":"F4","v":"شركة التطوير العقاري المتقدمة","fg":"#1E293B","al":"center"},{"c":"G4","v":""},{"c":"H4","v":""}]},{"r":5,"h":72.0,"cells":[{"c":"A5","v":"المقاول العام:","b":true,"al":"center"},{"c":"B5","v":"شركة الإنشاءات والمقاولات العامة","fg":"#1E293B","al":"center"},{"c":"C5","v":""},{"c":"D5","v":""},{"c":"E5","v":"استشاري ضبط وتوكيد الجودة:","b":true,"al":"center"},{"c":"F5","v":"المكتب الاستشاري للإشراف وضبط الجودة","fg":"#1E293B","al":"center"},{"c":"G5","v":""},{"c":"H5","v":""}]},{"r":6,"h":104.0,"cells":[{"c":"A6","v":"إصدار الخطة:","b":true,"al":"center"},{"c":"B6","v":"الإصدار المعتمد Rev-0 (أكتوبر 2026م)","fg":"#1E293B","al":"center"},{"c":"C6","v":""},{"c":"D6","v":""},{"c":"E6","v":"معايير الجودة المرجعية:","b":true,"al":"center"},{"c":"F6","v":"كود البناء السعودي SBC / مواصفات ASTM و ACI / نظام ISO 9001","fg":"#1E293B","al":"center"},{"c":"G6","v":""},{"c":"H6","v":""}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"إجمالي نقاط الفحص والاختبار","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C8","v":"نقاط التوقف الإلزامية (Hold Points)","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"E8","v":"نقاط المعاينة والشهود (Witness)","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"G8","v":"نقاط المراجعة والتدقيق (Review)","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true}]},{"r":9,"h":30.0,"cells":[{"c":"A9","v":22,"f":"=COUNT(خطة_الفحص_للأعمال_المدنية!A5:A12)+COUNT(خطة_الفحص_للتشطيبات_المعمارية!A5:A11)+COUNT(فحص_الأعمال_الكهروميكانيكية!A5:A11)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0","rs":2,"cs":2},{"skip":true},{"c":"C9","v":13,"f":"=COUNTIF(خطة_الفحص_للأعمال_المدنية!H5:H12, \"H\")+COUNTIF(خطة_الفحص_للتشطيبات_المعمارية!H5:H11, \"H\")+COUNTIF(فحص_الأعمال_الكهروميكانيكية!H5:H11, \"H\")","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0","rs":2,"cs":2},{"skip":true},{"c":"E9","v":9,"f":"=COUNTIF(خطة_الفحص_للأعمال_المدنية!H5:H12, \"W\")+COUNTIF(خطة_الفحص_للتشطيبات_المعمارية!H5:H11, \"W\")+COUNTIF(فحص_الأعمال_الكهروميكانيكية!H5:H11, \"W\")","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0","rs":2,"cs":2},{"skip":true},{"c":"G9","v":0,"f":"=COUNTIF(خطة_الفحص_للأعمال_المدنية!H5:H12, \"S\")+COUNTIF(خطة_الفحص_للتشطيبات_المعمارية!H5:H11, \"S\")+COUNTIF(فحص_الأعمال_الكهروميكانيكية!H5:H11, \"S\")","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0","rs":2,"cs":2},{"skip":true}]},{"r":10,"h":30.0,"cells":[{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":"نقطة فحص جودة تغطي دورة المشروع","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C11","v":"تتطلب توقيع وموافقة رسمية للمتابعة","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"E11","v":"معاينة مشتركة مع الاستشاري","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"G11","v":"مراجعة تقارير الاختبارات وسجلات الفحص","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true}]},{"r":12,"h":28.0,"cells":[{"c":"A12","v":""},{"c":"B12","v":""},{"c":"C12","v":""},{"c":"D12","v":""},{"c":"E12","v":""},{"c":"F12","v":""},{"c":"G12","v":""},{"c":"H12","v":""}]},{"r":13,"h":38.0,"cells":[{"c":"A13","v":"توزيع نقاط الفحص والاختبار حسب التخصص ونوع نقطة التحكم","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":14,"h":40.0,"cells":[{"c":"A14","v":"م","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B14","v":"القسم التخصصي","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C14","v":"إجمالي النقاط","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D14","v":"نقاط توقف (H)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E14","v":"نقاط معاينة (W)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F14","v":"نقاط مراجعة (S)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G14","v":"الجهة المعتمدة","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H14","v":"سجلات التحقق الرئيسية","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":15,"h":36.0,"cells":[{"c":"A15","v":"1","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"B15","v":"الأعمال المدنية والإنشائية (Civil & Structural)","fg":"#1E293B"},{"c":"C15","v":8,"f":"=COUNT(خطة_الفحص_للأعمال_المدنية!A5:A12)","b":true,"al":"center","nf":"#,##0"},{"c":"D15","v":5,"f":"=COUNTIF(خطة_الفحص_للأعمال_المدنية!H5:H12, \"H\")","b":true,"al":"center","nf":"#,##0"},{"c":"E15","v":3,"f":"=COUNTIF(خطة_الفحص_للأعمال_المدنية!H5:H12, \"W\")","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"F15","v":0,"f":"=COUNTIF(خطة_الفحص_للأعمال_المدنية!H5:H12, \"S\")","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"G15","v":"الاستشاري + مختبر معتمد","fg":"#1E293B","al":"center"},{"c":"H15","v":"محاضر صب RFI، كسر مكعبات، دمك تربة","fg":"#1E293B"}]},{"r":16,"h":36.0,"cells":[{"c":"A16","v":"2","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"B16","v":"أعمال التشطيبات المعمارية (Architectural Finishes)","fg":"#1E293B"},{"c":"C16","v":7,"f":"=COUNT(خطة_الفحص_للتشطيبات_المعمارية!A5:A11)","b":true,"al":"center","nf":"#,##0"},{"c":"D16","v":3,"f":"=COUNTIF(خطة_الفحص_للتشطيبات_المعمارية!H5:H11, \"H\")","b":true,"al":"center","nf":"#,##0"},{"c":"E16","v":4,"f":"=COUNTIF(خطة_الفحص_للتشطيبات_المعمارية!H5:H11, \"W\")","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"F16","v":0,"f":"=COUNTIF(خطة_الفحص_للتشطيبات_المعمارية!H5:H11, \"S\")","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"G16","v":"الاستشاري المعماري","fg":"#1E293B","al":"center"},{"c":"H16","v":"اختبارات غمر عزل، استلام بؤج وأوتار، دهانات","fg":"#1E293B"}]},{"r":17,"h":36.0,"cells":[{"c":"A17","v":"3","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"B17","v":"الأعمال الكهروميكانيكية (MEP Systems)","fg":"#1E293B"},{"c":"C17","v":7,"f":"=COUNT(فحص_الأعمال_الكهروميكانيكية!A5:A11)","b":true,"al":"center","nf":"#,##0"},{"c":"D17","v":5,"f":"=COUNTIF(فحص_الأعمال_الكهروميكانيكية!H5:H11, \"H\")","b":true,"al":"center","nf":"#,##0"},{"c":"E17","v":2,"f":"=COUNTIF(فحص_الأعمال_الكهروميكانيكية!H5:H11, \"W\")","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"F17","v":0,"f":"=COUNTIF(فحص_الأعمال_الكهروميكانيكية!H5:H11, \"S\")","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"G17","v":"الاستشاري الكهروميكانيكي","fg":"#1E293B","al":"center"},{"c":"H17","v":"اختبار ضغط مياه، ميجر عزل كابلات، تسريب دكت","fg":"#1E293B"}]}]},{"name":"خطة_الفحص_للأعمال_المدنية","maxRow":12,"maxCol":11,"colWidths":[8.0,38.0,28.0,44.0,30.0,18.0,22.0,16.0,28.0,26.0,36.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"خطة الفحص والاختبار للأعمال المدنية والإنشائية (Civil & Structural ITP)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"نقاط التحكم ومعايير القبول والتكرار للأعمال الترابية والأساسات والخرسانات المسلحة وفق SBC 304","bg":"#1E293B","fg":"#E2E8F0","al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"بند","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"النشاط الإنشائي / مرحلة العمل","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"المواصفة والكود المرجعي","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"معايير القبول والحدود المسموحة","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"معدل وتكرار الفحص","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"مسؤولية المقاول QC","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"مسؤولية الاستشاري QA","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"نقطة التحكم الإلزامية","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"سجل ومستند الفحص والتحقق","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J4","v":"الجهة المنفذة للاختبار","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K4","v":"ملاحظات واشتراطات","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"1","fg":"#1E293B","al":"center"},{"c":"B5","v":"فحص قاع الحفر ومناسيب التأسيس","fg":"#1E293B"},{"c":"C5","v":"SBC 301 / تقرير التربة","fg":"#1E293B"},{"c":"D5","v":"الوصول للمنسوب التصميمي والتأكد من خلو التربة من أي ردميات","fg":"#1E293B"},{"c":"E5","v":"100% من مسطح القواعد","fg":"#1E293B"},{"c":"F5","v":"100%","fg":"#1E293B","al":"center"},{"c":"G5","v":"معاينة واعتماد","fg":"#1E293B","al":"center"},{"c":"H5","v":"H","bg":"#FEE2E2","b":true,"al":"center"},{"c":"I5","v":"تقرير مساحي + RFI","fg":"#1E293B"},{"c":"J5","v":"المقاول + مساح الاستشاري","fg":"#1E293B"},{"c":"K5","v":"حظر الصب قبل اعتماد المنسوب","fg":"#1E293B"}]},{"r":6,"h":36.0,"cells":[{"c":"A6","v":"2","fg":"#1E293B","al":"center"},{"c":"B6","v":"دمك طبقات الإحلال والردميات (Compaction Test)","fg":"#1E293B"},{"c":"C6","v":"ASTM D1557 (Modified Proctor)","fg":"#1E293B"},{"c":"D6","v":"نسبة الدمك لا تقل عن 95% من أقصى كثافة جافة معملية","fg":"#1E293B"},{"c":"E6","v":"اختبار لكل 300 م² لكل طبقة 25 سم","fg":"#1E293B"},{"c":"F6","v":"100%","fg":"#1E293B","al":"center"},{"c":"G6","v":"مراجعة تقرير المختبر","fg":"#1E293B","al":"center"},{"c":"H6","v":"H","bg":"#FEE2E2","b":true,"al":"center"},{"c":"I6","v":"شهادة اختبار مختبر معتمد","fg":"#1E293B"},{"c":"J6","v":"مختبر مواد مستقل مرخص","fg":"#1E293B"},{"c":"K6","v":"سمك الطبقة لا يتجاوز 25-30 سم","fg":"#1E293B"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"3","fg":"#1E293B","al":"center"},{"c":"B7","v":"صب خرسانة النظافة العادية (Blinding Concrete)","fg":"#1E293B"},{"c":"C7","v":"SBC 304 / ACI 301","fg":"#1E293B"},{"c":"D7","v":"سمك لا يقل عن 10 سم ومقاومة ضغط لا تقل عن 15 ميجاباسكال","fg":"#1E293B"},{"c":"E7","v":"لكل صبة خرسانية","fg":"#1E293B"},{"c":"F7","v":"100%","fg":"#1E293B","al":"center"},{"c":"G7","v":"معاينة واعتماد","fg":"#1E293B","al":"center"},{"c":"H7","v":"W","bg":"#FEF3C7","b":true,"al":"center"},{"c":"I7","v":"نموذج استلام أعمال RFI","fg":"#1E293B"},{"c":"J7","v":"فريق المقاول والاستشاري","fg":"#1E293B"},{"c":"K7","v":"ضبط الاستواء ورش الماء 7 أيام","fg":"#1E293B"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"4","fg":"#1E293B","al":"center"},{"c":"B8","v":"عزل القواعد والميد الخرسانية (Bitumen Coating)","fg":"#1E293B"},{"c":"C8","v":"SBC 501 / ASTM D41","fg":"#1E293B"},{"c":"D8","v":"دهان وجهين متقاطعين بسمك متجانس وخالي من الفقاعات وثقوب الهواء","fg":"#1E293B"},{"c":"E8","v":"100% من المسطحات الملامسة للتربة","fg":"#1E293B"},{"c":"F8","v":"100%","fg":"#1E293B","al":"center"},{"c":"G8","v":"فحص عيني وسماكة","fg":"#1E293B","al":"center"},{"c":"H8","v":"W","bg":"#FEF3C7","b":true,"al":"center"},{"c":"I8","v":"سجل فحص العزل + RFI","fg":"#1E293B"},{"c":"J8","v":"مهندس الجودة والاستشاري","fg":"#1E293B"},{"c":"K8","v":"حظر الردم قبل جفاف العزل وألواح الحماية","fg":"#1E293B"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"5","fg":"#1E293B","al":"center"},{"c":"B9","v":"حدادة ونجارة القواعد المسلحة والشدادات","fg":"#1E293B"},{"c":"C9","v":"SBC 304 / المخططات المعتمدة","fg":"#1E293B"},{"c":"D9","v":"مطابقة الأقطار والعدد والمسافات والغطاء الخرساني 50-75 مم","fg":"#1E293B"},{"c":"E9","v":"لكل قاعدة وميد خرسانية","fg":"#1E293B"},{"c":"F9","v":"100%","fg":"#1E293B","al":"center"},{"c":"G9","v":"استلام شامل وتوقيع","fg":"#1E293B","al":"center"},{"c":"H9","v":"H","bg":"#FEE2E2","b":true,"al":"center"},{"c":"I9","v":"طلب استلام حدادة ونجارة RFI","fg":"#1E293B"},{"c":"J9","v":"مهندس الموقع والاستشاري","fg":"#1E293B"},{"c":"K9","v":"نقطة توقف: حظر الصب نهائياً بدون تصريح","fg":"#1E293B"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":"6","fg":"#1E293B","al":"center"},{"c":"B10","v":"فحص الخرسانة الجاهزة واختبار الهبوط Slump","fg":"#1E293B"},{"c":"C10","v":"ASTM C143 / SBC 304","fg":"#1E293B"},{"c":"D10","v":"قيمة الهبوط 100-140 مم حسب تصميم الخلطة ودرجة الحرارة < 32°م","fg":"#1E293B"},{"c":"E10","v":"لكل خلاطة خرسانية بالموقع","fg":"#1E293B"},{"c":"F10","v":"100%","fg":"#1E293B","al":"center"},{"c":"G10","v":"مراقبة واختبار فوري","fg":"#1E293B","al":"center"},{"c":"H10","v":"W","bg":"#FEF3C7","b":true,"al":"center"},{"c":"I10","v":"سجل فحص الهبوط وتذكرة الخرسانة","fg":"#1E293B"},{"c":"J10","v":"فني مختبر المقاول والاستشاري","fg":"#1E293B"},{"c":"K10","v":"رفض أي خلاطة تتجاوز 90 دقيقة من الخلط","fg":"#1E293B"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"7","fg":"#1E293B","al":"center"},{"c":"B11","v":"أخذ مكعبات اختبار كسر الخرسانة (Compressive Strength)","fg":"#1E293B"},{"c":"C11","v":"ASTM C39 / ACI 318","fg":"#1E293B"},{"c":"D11","v":"6 مكعبات لكل 50-100 م³ (3 كسر 7 أيام و3 كسر 28 يوماً)","fg":"#1E293B"},{"c":"E11","v":"لكل 100 م³ خرسانة مصبوبة","fg":"#1E293B"},{"c":"F11","v":"100%","fg":"#1E293B","al":"center"},{"c":"G11","v":"شاهد على أخذ العينات والكسر","fg":"#1E293B","al":"center"},{"c":"H11","v":"H","bg":"#FEE2E2","b":true,"al":"center"},{"c":"I11","v":"شهادة كسر مكعبات معتمدة","fg":"#1E293B"},{"c":"J11","v":"مختبر فحص مواد معتمد","fg":"#1E293B"},{"c":"K11","v":"تحقيق مقاومة 28 يوماً التصميمية بالكامل","fg":"#1E293B"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":"8","fg":"#1E293B","al":"center"},{"c":"B12","v":"حدادة ونجارة الأعمدة والأسقف الخرسانية","fg":"#1E293B"},{"c":"C12","v":"SBC 304 / المخططات الإنشائية","fg":"#1E293B"},{"c":"D12","v":"شاقولية الأعمدة والكمرات وسمك البلاطات وتوزيع كانات التكثيف","fg":"#1E293B"},{"c":"E12","v":"لكل عنصر إنشائي قبل الصب","fg":"#1E293B"},{"c":"F12","v":"100%","fg":"#1E293B","al":"center"},{"c":"G12","v":"فحص تفصيلي معتمد","fg":"#1E293B","al":"center"},{"c":"H12","v":"H","bg":"#FEE2E2","b":true,"al":"center"},{"c":"I12","v":"تصريح صب خرسانة رسمي RFI","fg":"#1E293B"},{"c":"J12","v":"استشاري الإشراف الإنشائي","fg":"#1E293B"},{"c":"K12","v":"نقطة توقف إلزامية (Hold Point)","fg":"#1E293B"}]}]},{"name":"خطة_الفحص_للتشطيبات_المعمارية","maxRow":11,"maxCol":11,"colWidths":[8.0,38.0,28.0,44.0,30.0,18.0,22.0,16.0,28.0,26.0,36.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"خطة الفحص والاختبار لأعمال التشطيبات المعمارية (Architectural Finishes ITP)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"معايير استلام المباني والمحارة والعوازل والسيراميك والدهانات والألوميتال وفق SBC 201 و SBC 501","bg":"#1E293B","fg":"#E2E8F0","al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"بند","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"النشاط الإنشائي / مرحلة العمل","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"المواصفة والكود المرجعي","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"معايير القبول والحدود المسموحة","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"معدل وتكرار الفحص","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"مسؤولية المقاول QC","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"مسؤولية الاستشاري QA","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"نقطة التحكم الإلزامية","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"سجل ومستند الفحص والتحقق","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J4","v":"الجهة المنفذة للاختبار","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K4","v":"ملاحظات واشتراطات","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"1","fg":"#1E293B","al":"center"},{"c":"B5","v":"أعمال بناء البلوك والقواطع الإسمنتية","fg":"#1E293B"},{"c":"C5","v":"SBC 201 / المواصفات المعمارية","fg":"#1E293B"},{"c":"D5","v":"استقامة الجدران والشاقولية (تفاوت < 3 مم/2م) وربط كانات الأعمدة","fg":"#1E293B"},{"c":"E5","v":"لكل دور وفراغ معماري","fg":"#1E293B"},{"c":"F5","v":"100%","fg":"#1E293B","al":"center"},{"c":"G5","v":"معاينة واعتماد","fg":"#1E293B","al":"center"},{"c":"H5","v":"W","bg":"#FEF3C7","b":true,"al":"center"},{"c":"I5","v":"طلب استلام مباني RFI","fg":"#1E293B"},{"c":"J5","v":"مهندس الجودة والاستشاري","fg":"#1E293B"},{"c":"K5","v":"استلام المدماك الأول والشاحط","fg":"#1E293B"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"2","fg":"#1E293B","al":"center"},{"c":"B6","v":"أعمال بياض المحارة واللياسة (بؤج وأوتار)","fg":"#1E293B"},{"c":"C6","v":"SBC 501 / ASTM C926","fg":"#1E293B"},{"c":"D6","v":"استواء تام بالقاطوع والقامات الألمنيوم وزوايا قائمة 90 درجة","fg":"#1E293B"},{"c":"E6","v":"لكل غرفة وصالة","fg":"#1E293B"},{"c":"F6","v":"100%","fg":"#1E293B","al":"center"},{"c":"G6","v":"استلام البؤج والأوتار","fg":"#1E293B","al":"center"},{"c":"H6","v":"H","bg":"#FEE2E2","b":true,"al":"center"},{"c":"I6","v":"طلب استلام أوتار ولياسة RFI","fg":"#1E293B"},{"c":"J6","v":"استشاري التشطيبات المعماري","fg":"#1E293B"},{"c":"K6","v":"حظر اللياسة قبل استلام البؤج والشباك","fg":"#1E293B"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"3","fg":"#1E293B","al":"center"},{"c":"B7","v":"العزل المائي للأسطح واختبار الغمر بالمياه","fg":"#1E293B"},{"c":"C7","v":"SBC 501 / ASTM D5147","fg":"#1E293B"},{"c":"D7","v":"عدم وجود أي ترشيح أو تسريب بعد ملء السطح بارتفاع 15 سم لمدة 72 ساعة","fg":"#1E293B"},{"c":"E7","v":"100% من مسطح الأسطح والحمامات","fg":"#1E293B"},{"c":"F7","v":"100%","fg":"#1E293B","al":"center"},{"c":"G7","v":"معاينة الغمر وتوقيع المحضر","fg":"#1E293B","al":"center"},{"c":"H7","v":"H","bg":"#FEE2E2","b":true,"al":"center"},{"c":"I7","v":"محضر اختبار الغمر المائي الرسمي","fg":"#1E293B"},{"c":"J7","v":"الاستشاري ومقاول العزل","fg":"#1E293B"},{"c":"K7","v":"نقطة توقف: حظر الدفان قبل توقيع المحضر","fg":"#1E293B"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"4","fg":"#1E293B","al":"center"},{"c":"B8","v":"تركيب ألواح العزل الحراري XPS للأسطح","fg":"#1E293B"},{"c":"C8","v":"SBC 601 / ASTM C578","fg":"#1E293B"},{"c":"D8","v":"تراصف الألواح المتداخلة L-Edge بدون فواصل وتركيب طبقة الجيوتكستايل","fg":"#1E293B"},{"c":"E8","v":"100% من مسطح الأسطح","fg":"#1E293B"},{"c":"F8","v":"100%","fg":"#1E293B","al":"center"},{"c":"G8","v":"معاينة واعتماد","fg":"#1E293B","al":"center"},{"c":"H8","v":"W","bg":"#FEF3C7","b":true,"al":"center"},{"c":"I8","v":"سجل استلام العزل الحراري","fg":"#1E293B"},{"c":"J8","v":"مهندس الجودة والاستشاري","fg":"#1E293B"},{"c":"K8","v":"مطابقة الكثافة 35 كجم/م³ والسمك 5 سم","fg":"#1E293B"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"5","fg":"#1E293B","al":"center"},{"c":"B9","v":"تركيب السيراميك والبورسلين والرخام","fg":"#1E293B"},{"c":"C9","v":"SBC 501 / ANSI A108","fg":"#1E293B"},{"c":"D9","v":"خلو تام من التطبيل واستواء الفواصل بميزان الماء وتوزيع روبة الفواصل","fg":"#1E293B"},{"c":"E9","v":"لكل وحدة سكنية","fg":"#1E293B"},{"c":"F9","v":"100%","fg":"#1E293B","al":"center"},{"c":"G9","v":"فحص الاستواء والتطبيل","fg":"#1E293B","al":"center"},{"c":"H9","v":"W","bg":"#FEF3C7","b":true,"al":"center"},{"c":"I9","v":"طلب استلام أعمال بلاط RFI","fg":"#1E293B"},{"c":"J9","v":"استشاري التشطيبات المعماري","fg":"#1E293B"},{"c":"K9","v":"التأكد من استخدام الغراء المخصص للبورسلين","fg":"#1E293B"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":"6","fg":"#1E293B","al":"center"},{"c":"B10","v":"شاسيه وألواح الأسقف المعلقة الجبس بورد","fg":"#1E293B"},{"c":"C10","v":"ASTM C840 / SBC 501","fg":"#1E293B"},{"c":"D10","v":"أبعاد تباعد الأوميجا < 60 سم، قطاعات صاج مجلفن معتمدة، وتثبيت سليم","fg":"#1E293B"},{"c":"E10","v":"لكل سقف معلق","fg":"#1E293B"},{"c":"F10","v":"100%","fg":"#1E293B","al":"center"},{"c":"G10","v":"فحص الشاسيه قبل الإغلاق","fg":"#1E293B","al":"center"},{"c":"H10","v":"H","bg":"#FEE2E2","b":true,"al":"center"},{"c":"I10","v":"طلب استلام شاسيه جبس RFI","fg":"#1E293B"},{"c":"J10","v":"استشاري الديكور والمعماري","fg":"#1E293B"},{"c":"K10","v":"استلام الشاسيه قبل تركيب الألواح","fg":"#1E293B"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"7","fg":"#1E293B","al":"center"},{"c":"B11","v":"أعمال الدهانات الداخلية وأوجه التشطيب","fg":"#1E293B"},{"c":"C11","v":"SBC 501 / مواصفات المشروع","fg":"#1E293B"},{"c":"D11","v":"تطبيق برايمر + 3 سكاكين معجون + وجهين دهان بدون تموجات أو سيلان","fg":"#1E293B"},{"c":"E11","v":"لكل فراغ معماري","fg":"#1E293B"},{"c":"F11","v":"100%","fg":"#1E293B","al":"center"},{"c":"G11","v":"فحص نهائي تحت الإضاءة","fg":"#1E293B","al":"center"},{"c":"H11","v":"W","bg":"#FEF3C7","b":true,"al":"center"},{"c":"I11","v":"طلب استلام دهانات نهائي RFI","fg":"#1E293B"},{"c":"J11","v":"الاستشاري المشرف","fg":"#1E293B"},{"c":"K11","v":"التأكد من جفاف كل طبقة تماماً","fg":"#1E293B"}]}]},{"name":"فحص_الأعمال_الكهروميكانيكية","maxRow":11,"maxCol":11,"colWidths":[8.0,38.0,28.0,44.0,30.0,18.0,22.0,16.0,28.0,26.0,36.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"خطة الفحص والاختبار للأعمال الكهروميكانيكية (MEP Systems ITP)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"اختبارات ضغط شبكات السباكة والتغذية، عزل الكابلات والميجر، تسريب الدكت، واختبارات مكافحة الحريق","bg":"#1E293B","fg":"#E2E8F0","al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"بند","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"النشاط الإنشائي / مرحلة العمل","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"المواصفة والكود المرجعي","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"معايير القبول والحدود المسموحة","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"معدل وتكرار الفحص","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"مسؤولية المقاول QC","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"مسؤولية الاستشاري QA","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"نقطة التحكم الإلزامية","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"سجل ومستند الفحص والتحقق","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J4","v":"الجهة المنفذة للاختبار","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K4","v":"ملاحظات واشتراطات","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"1","fg":"#1E293B","al":"center"},{"c":"B5","v":"اختبار ضغط شبكات تغذية المياه (Pressure Hydrotest)","fg":"#1E293B"},{"c":"C5","v":"SBC 701 / كود السباكة السعودي","fg":"#1E293B"},{"c":"D5","v":"ضغط الشبكة على 10-15 بار لمدة 24 ساعة بدون أي هبوط في عداد الضغط","fg":"#1E293B"},{"c":"E5","v":"لكل شبكة ووحدة سكنية","fg":"#1E293B"},{"c":"F5","v":"100%","fg":"#1E293B","al":"center"},{"c":"G5","v":"شاهد على الضغط والتوقيع","fg":"#1E293B","al":"center"},{"c":"H5","v":"H","bg":"#FEE2E2","b":true,"al":"center"},{"c":"I5","v":"محضر اختبار ضغط معتمد RFI","fg":"#1E293B"},{"c":"J5","v":"استشاري الميكانيكا والمقاول","fg":"#1E293B"},{"c":"K5","v":"نقطة توقف: حظر إغلاق الجدران قبل الاختبار","fg":"#1E293B"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"2","fg":"#1E293B","al":"center"},{"c":"B6","v":"اختبار ميول وانسياب شبكات الصرف الصحي (Gravity Test)","fg":"#1E293B"},{"c":"C6","v":"SBC 702 / UPC Standards","fg":"#1E293B"},{"c":"D6","v":"ميول منتظمة 1% إلى 2% والتأكد من انسياب المياه بدون أي تراكم أو انسداد","fg":"#1E293B"},{"c":"E6","v":"لكل خط صرف رئيسي وفرعي","fg":"#1E293B"},{"c":"F6","v":"100%","fg":"#1E293B","al":"center"},{"c":"G6","v":"معاينة واختبار غمر الخطوط","fg":"#1E293B","al":"center"},{"c":"H6","v":"W","bg":"#FEF3C7","b":true,"al":"center"},{"c":"I6","v":"سجل فحص خطوط الصرف RFI","fg":"#1E293B"},{"c":"J6","v":"مهندس الجودة والاستشاري","fg":"#1E293B"},{"c":"K6","v":"استخدام ميزان ماء واختبار الدخان","fg":"#1E293B"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"3","fg":"#1E293B","al":"center"},{"c":"B7","v":"اختبار عزل الكابلات الكهربائية بالميجر (Megger Test)","fg":"#1E293B"},{"c":"C7","v":"SBC 401 / IEEE Standards","fg":"#1E293B"},{"c":"D7","v":"مقاومة العزل لا تقل عن 1000 ميجا أوم عند اختبار جهد 1000 فولت تيار مستمر","fg":"#1E293B"},{"c":"E7","v":"لكل كابل صاعد ورئيسي","fg":"#1E293B"},{"c":"F7","v":"100%","fg":"#1E293B","al":"center"},{"c":"G7","v":"شاهد على قراءات الميجر","fg":"#1E293B","al":"center"},{"c":"H7","v":"H","bg":"#FEE2E2","b":true,"al":"center"},{"c":"I7","v":"شهادة اختبار عزل الكابلات","fg":"#1E293B"},{"c":"J7","v":"استشاري الكهرباء وفني المختبر","fg":"#1E293B"},{"c":"K7","v":"نقطة توقف قبل إطلاق التيار الكهربائي","fg":"#1E293B"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"4","fg":"#1E293B","al":"center"},{"c":"B8","v":"اتزان الأحمال وتأريض اللوحات (Earthing & Balancing)","fg":"#1E293B"},{"c":"C8","v":"SBC 401 / SEC Specifications","fg":"#1E293B"},{"c":"D8","v":"مقاومة بئر التأريض أقل من 5 أوم، وتفاوت الأحمال بين الفازات < 10%","fg":"#1E293B"},{"c":"E8","v":"لكل لوحة توزيع رئيسية وفرعية","fg":"#1E293B"},{"c":"F8","v":"100%","fg":"#1E293B","al":"center"},{"c":"G8","v":"فحص القياس ومحضر الاعتماد","fg":"#1E293B","al":"center"},{"c":"H8","v":"H","bg":"#FEE2E2","b":true,"al":"center"},{"c":"I8","v":"محضر اختبار التأريض والاتزان","fg":"#1E293B"},{"c":"J8","v":"استشاري الكهرباء وشركة الكهرباء","fg":"#1E293B"},{"c":"K8","v":"إلزامي لإطلاق التيار الدائم من الشركة","fg":"#1E293B"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"5","fg":"#1E293B","al":"center"},{"c":"B9","v":"اختبار تسريب مجاري الهواء الدكت (Duct Leakage Test)","fg":"#1E293B"},{"c":"C9","v":"SMACNA HVAC Leakage Standards","fg":"#1E293B"},{"c":"D9","v":"نسبة التسريب أقل من الفئة المعتمدة (Class 3/6) عند الضغط التصميمي","fg":"#1E293B"},{"c":"E9","v":"عينات عشوائية بنسبة 25% من الخطوط","fg":"#1E293B"},{"c":"F9","v":"100%","fg":"#1E293B","al":"center"},{"c":"G9","v":"شاهد على جهاز قياس التسريب","fg":"#1E293B","al":"center"},{"c":"H9","v":"W","bg":"#FEF3C7","b":true,"al":"center"},{"c":"I9","v":"شهادة اختبار تسريب الدكت","fg":"#1E293B"},{"c":"J9","v":"استشاري الميكانيكا ومقاول التكييف","fg":"#1E293B"},{"c":"K9","v":"إجراء الاختبار قبل تركيب العزل الصوتي والحراري","fg":"#1E293B"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":"6","fg":"#1E293B","al":"center"},{"c":"B10","v":"اختبار شبكة مكافحة الحريق والرشاشات (Hydrostatic Test)","fg":"#1E293B"},{"c":"C10","v":"NFPA 13 / SBC 801","fg":"#1E293B"},{"c":"D10","v":"ضغط الشبكة على 200 psi (14 بار) لمدة ساعتين متواصلتين بدون هبوط","fg":"#1E293B"},{"c":"E10","v":"100% من شبكة إطفاء الحريق","fg":"#1E293B"},{"c":"F10","v":"100%","fg":"#1E293B","al":"center"},{"c":"G10","v":"شاهد معتمد وتوقيع المحضر","fg":"#1E293B","al":"center"},{"c":"H10","v":"H","bg":"#FEE2E2","b":true,"al":"center"},{"c":"I10","v":"محضر اختبار شبكة الإطفاء","fg":"#1E293B"},{"c":"J10","v":"استشاري السلامة والدفاع المدني","fg":"#1E293B"},{"c":"K10","v":"نقطة توقف إلزامية للحصول على رخصة إشغال","fg":"#1E293B"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"7","fg":"#1E293B","al":"center"},{"c":"B11","v":"التشغيل التجريبي والتوازن لأنظمة المبنى (TAB Testing)","fg":"#1E293B"},{"c":"C11","v":"NEBB / AASHRAE Standards","fg":"#1E293B"},{"c":"D11","v":"ضبط معدلات تدفق الهواء وموازنة المياه المبردة وفق الجداول التصميمية","fg":"#1E293B"},{"c":"E11","v":"لكل نظام ومعدة ميكانيكية","fg":"#1E293B"},{"c":"F11","v":"100%","fg":"#1E293B","al":"center"},{"c":"G11","v":"مراجعة تقرير TAB الشامل","fg":"#1E293B","al":"center"},{"c":"H11","v":"H","bg":"#FEE2E2","b":true,"al":"center"},{"c":"I11","v":"تقرير التوازن الميكانيكي المعتمد","fg":"#1E293B"},{"c":"J11","v":"شركة متخصصة في اختبارات TAB","fg":"#1E293B"},{"c":"K11","v":"مستند إلزامي للاستلام الابتدائي للمبنى","fg":"#1E293B"}]}]}]}