{"slug":"internal-and-external-architectural-painting-putty-and-textured-coatings-boq-sheet","sheets":[{"name":"1_مقايسة_أعمال_الدهانات_BOQ","maxRow":22,"maxCol":10,"colWidths":[14.0,62.0,13.0,15.0,16.0,15.0,17.0,18.0,19.0,15.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"شيت حصر وتسعير أعمال الدهانات الداخلية والخارجية والمعجون والسيلر والواجهات الجرافيتو (BOQ-FIN-222)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":54.0,"cells":[{"c":"A2","v":"المرجع الكودي القياسي: المواصفات الأمريكية ASTM D3273 & D6695 | المواصفة الأوروبية ISO 12944 & EN 1062 | الكود المصري والسعودي SBC — الخلايا الصفراء قابلة للتعديل","bg":"#9A3412","fg":"#FFFFFF","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":18.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"تكلفة الدهانات الداخلية والأسقف والديكور","bg":"#FFF7ED","fg":"#9A3412","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D4","v":"تكلفة الواجهات الخارجية والجرافيتو والإيبوكسي","bg":"#FFF7ED","fg":"#9A3412","b":true,"al":"center","cs":2},{"skip":true},{"c":"F4","v":"إجمالي أعمال الدهانات والنقاشة قبل الضريبة","bg":"#FFF7ED","fg":"#9A3412","b":true,"al":"center","cs":2},{"skip":true},{"c":"H4","v":"الإجمالي التعاقدي للدهانات شاملاً الضريبة","bg":"#FFF7ED","fg":"#9A3412","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":5,"h":46.0,"cells":[{"c":"A5","v":217226.25,"f":"=SUM(I9:I12)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\"","cs":3},{"skip":true},{"skip":true},{"c":"D5","v":221045.25,"f":"=SUM(I13:I18)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\"","cs":2},{"skip":true},{"c":"F5","v":453611,"f":"=I19+I20","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\"","cs":2},{"skip":true},{"c":"H5","v":521652.65,"f":"=I22","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\"","cs":3},{"skip":true},{"skip":true}]},{"r":6,"h":18.0,"cells":[{"c":"A6","v":""},{"c":"B6","v":""},{"c":"C6","v":""},{"c":"D6","v":""},{"c":"E6","v":""},{"c":"F6","v":""},{"c":"G6","v":""},{"c":"H6","v":""},{"c":"I6","v":""},{"c":"J6","v":""}]},{"r":7,"h":38.0,"cells":[{"c":"A7","v":"أولاً: جدول حصر وتسعير الدهانات المعمارية الداخلية والخارجية، المعجون والسيلر، واجهات الجرافيتو، والدهانات الإيبوكسية","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"كود البند","bg":"#7C2D12","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B8","v":"توصيف بند الدهانات الداخلية والخارجية والمعجون والجرافيتو والمواصفة الفنية","bg":"#7C2D12","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C8","v":"الوحدة","bg":"#7C2D12","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D8","v":"عدد الأدوار / المناطق","bg":"#7C2D12","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E8","v":"صافي المسطح لكل دور/منطقة","bg":"#7C2D12","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F8","v":"نسبة الهالك والتداخل %","bg":"#7C2D12","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G8","v":"إجمالي الكمية الهندسية","bg":"#7C2D12","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H8","v":"فئة الوحدة (خامات ومصنعية)","bg":"#7C2D12","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I8","v":"إجمالي قيمة البند","bg":"#7C2D12","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J8","v":"الوزن المالي %","bg":"#7C2D12","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":9,"h":72.0,"cells":[{"c":"A9","v":"PNT-01","b":true,"al":"center"},{"c":"B9","v":"توريد وتنفيذ دهان بلاستيك مائي أكريليك داخلي قابل للغسيل للحوائط (Washable Acrylic Emulsion — نصف لمعة/مط) شاملاً الصنفرة، وجه سيلر مائي، 3 سكاكين معجون أكريليك، ووجهي تشطيب"},{"c":"C9","v":"م2","b":true,"al":"center"},{"c":"D9","v":5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E9","v":920,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F9","v":0.04,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G9","v":4784,"f":"=ROUND(D9*E9*(1+F9), 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H9","v":28,"f":"='3_إعدادات_الأسعار_ومعدلات_الفرد'!$F$9","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I9","v":133952,"f":"=ROUND(G9*H9, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J9","v":0,"f":"=IF($I$19>0, I9/$I$19, 0)","al":"center","nf":"0.0%"}]},{"r":10,"h":72.0,"cells":[{"c":"A10","v":"PNT-02","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B10","v":"توريد وتنفيذ دهان بلاستيك مائي ناصع البياض للأسقف الخرسانية والجبس بورد (Ceiling Flat Matt Emulsion) شاملاً معالجة الفواصل، وجه سيلر، سكينتي معجون، ووجهي تشطيب","bg":"#F8FAFC"},{"c":"C10","v":"م2","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D10","v":5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E10","v":380,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F10","v":0.04,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G10","v":1976,"f":"=ROUND(D10*E10*(1+F10), 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H10","v":23,"f":"='3_إعدادات_الأسعار_ومعدلات_الفرد'!$F$10","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I10","v":45448,"f":"=ROUND(G10*H10, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J10","v":0,"f":"=IF($I$19>0, I10/$I$19, 0)","bg":"#F8FAFC","al":"center","nf":"0.0%"}]},{"r":11,"h":72.0,"cells":[{"c":"A11","v":"PNT-03","b":true,"al":"center"},{"c":"B11","v":"توريد وتنفيذ دهان أكريليك مقاوم للرطوبة والبكتيريا والعفن للحمامات والمطابخ (Anti-Fungal & Moisture-Resistant Paint ASTM D3273) شاملاً البرايمر ومعجون الرطوبة"},{"c":"C11","v":"م2","b":true,"al":"center"},{"c":"D11","v":5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E11","v":110,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F11","v":0.05,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G11","v":577.5,"f":"=ROUND(D11*E11*(1+F11), 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H11","v":33,"f":"='3_إعدادات_الأسعار_ومعدلات_الفرد'!$F$11","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I11","v":19057.5,"f":"=ROUND(G11*H11, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J11","v":0,"f":"=IF($I$19>0, I11/$I$19, 0)","al":"center","nf":"0.0%"}]},{"r":12,"h":72.0,"cells":[{"c":"A12","v":"PNT-04","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B12","v":"توريد وتنفيذ دهانات ديكورية داخلية (قطيفة / ستوكو أنتيك / لؤلؤي — Decorative Velvet & Stucco Feature Walls) للحوائط المميزة بالمداخل والقاعات شاملة التأسيس الكامل","bg":"#F8FAFC"},{"c":"C12","v":"م2","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D12","v":5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E12","v":65,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F12","v":0.05,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G12","v":341.25,"f":"=ROUND(D12*E12*(1+F12), 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H12","v":55,"f":"='3_إعدادات_الأسعار_ومعدلات_الفرد'!$F$12","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I12","v":18768.75,"f":"=ROUND(G12*H12, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J12","v":0,"f":"=IF($I$19>0, I12/$I$19, 0)","bg":"#F8FAFC","al":"center","nf":"0.0%"}]},{"r":13,"h":72.0,"cells":[{"c":"A13","v":"PNT-05","b":true,"al":"center"},{"c":"B13","v":"توريد وتنفيذ دهان واجهات خارجية أكريليك مرن مقاوم للأشعة فوق البنفسجية والأمطار (Exterior Weather-Shield Elastomeric Coating EN 1062) شاملاً السيلر الحراري ومعجون الواجهات"},{"c":"C13","v":"م2","b":true,"al":"center"},{"c":"D13","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E13","v":1850,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F13","v":0.05,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G13","v":1942.5,"f":"=ROUND(D13*E13*(1+F13), 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H13","v":35,"f":"='3_إعدادات_الأسعار_ومعدلات_الفرد'!$F$13","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I13","v":67987.5,"f":"=ROUND(G13*H13, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J13","v":0,"f":"=IF($I$19>0, I13/$I$19, 0)","al":"center","nf":"0.0%"}]},{"r":14,"h":72.0,"cells":[{"c":"A14","v":"PNT-06","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B14","v":"توريد وتنفيذ كسوة واجهات خارجية معجونة بارزة جرافيتو / بروفايل أكريليك حبيبات كوارتز (Textured Graffiato / Profile Coating 2.5mm) شاملاً البرايمر الملون وطبقة الحماية السيلر","bg":"#F8FAFC"},{"c":"C14","v":"م2","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D14","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E14","v":1200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F14","v":0.06,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G14","v":1272,"f":"=ROUND(D14*E14*(1+F14), 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H14","v":48,"f":"='3_إعدادات_الأسعار_ومعدلات_الفرد'!$F$14","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I14","v":61056,"f":"=ROUND(G14*H14, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J14","v":0,"f":"=IF($I$19>0, I14/$I$19, 0)","bg":"#F8FAFC","al":"center","nf":"0.0%"}]},{"r":15,"h":72.0,"cells":[{"c":"A15","v":"PNT-07","b":true,"al":"center"},{"c":"B15","v":"توريد وتنفيذ دهان إيبوكسي خالي من المذيبات لأرضيات وحوائط البدروم وغرف الخدمات (Two-Component Epoxy Coating 400 Microns) شاملاً الصنفرة الماسية والبرايمر الإيبوكسي"},{"c":"C15","v":"م2","b":true,"al":"center"},{"c":"D15","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E15","v":950,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F15","v":0.05,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G15","v":997.5,"f":"=ROUND(D15*E15*(1+F15), 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H15","v":60,"f":"='3_إعدادات_الأسعار_ومعدلات_الفرد'!$F$15","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I15","v":59850,"f":"=ROUND(G15*H15, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J15","v":0,"f":"=IF($I$19>0, I15/$I$19, 0)","al":"center","nf":"0.0%"}]},{"r":16,"h":72.0,"cells":[{"c":"A16","v":"PNT-08","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B16","v":"توريد وتنفيذ دهان بولي يوريثان / لاكيه للأبواب والهاندريل والمشغولات المعدنية والخشبية (Alkyd / PU Enamel Coating ISO 12944) شاملاً البرايمر المانع للصدأ والمعجون","bg":"#F8FAFC"},{"c":"C16","v":"م2","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D16","v":5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E16","v":55,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F16","v":0.05,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G16","v":288.75,"f":"=ROUND(D16*E16*(1+F16), 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H16","v":45,"f":"='3_إعدادات_الأسعار_ومعدلات_الفرد'!$F$16","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I16","v":12993.75,"f":"=ROUND(G16*H16, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J16","v":0,"f":"=IF($I$19>0, I16/$I$19, 0)","bg":"#F8FAFC","al":"center","nf":"0.0%"}]},{"r":17,"h":72.0,"cells":[{"c":"A17","v":"PNT-09","b":true,"al":"center"},{"c":"B17","v":"توريد وتنفيذ دهان تخطيط أرضيات مواقف السيارات والأسهم الإرشادية والبردورات (Reflective Traffic & Car Park Line Marking Paint) بعرض 10-15 سم شاملاً الحبيبات العاكسة"},{"c":"C17","v":"م.ط","b":true,"al":"center"},{"c":"D17","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E17","v":640,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F17","v":0.03,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G17","v":659.2,"f":"=ROUND(D17*E17*(1+F17), 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H17","v":15,"f":"='3_إعدادات_الأسعار_ومعدلات_الفرد'!$F$17","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I17","v":9888,"f":"=ROUND(G17*H17, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J17","v":0,"f":"=IF($I$19>0, I17/$I$19, 0)","al":"center","nf":"0.0%"}]},{"r":18,"h":72.0,"cells":[{"c":"A18","v":"PNT-10","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B18","v":"توريد وتنفيذ معالجة الشروخ الشعرية وفواصل التقاء الخرسانة بالمباني بمعجون مرن مسلح بشريط فايبر (Elastomeric Crack Filler & Mesh Tape) قبل البدء في سحب المعجون","bg":"#F8FAFC"},{"c":"C18","v":"م.ط","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D18","v":5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E18","v":120,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F18","v":0.03,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G18","v":618,"f":"=ROUND(D18*E18*(1+F18), 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H18","v":15,"f":"='3_إعدادات_الأسعار_ومعدلات_الفرد'!$F$18","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I18","v":9270,"f":"=ROUND(G18*H18, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J18","v":0,"f":"=IF($I$19>0, I18/$I$19, 0)","bg":"#F8FAFC","al":"center","nf":"0.0%"}]},{"r":19,"h":42.0,"cells":[{"c":"A19","v":"إجمالي التكلفة المباشرة لأعمال الدهانات الداخلية والخارجية والجرافيتو والإيبوكسي (Subtotal Architectural Painting)","bg":"#E2E8F0","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"I19","v":438271.5,"f":"=SUM(I9:I18)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J19","v":0,"f":"=SUM(J9:J18)","bg":"#E2E8F0","b":true,"al":"center","nf":"0.0%"}]},{"r":20,"h":42.0,"cells":[{"c":"A20","v":"مخصص السقالات الخارجية للواجهات ومشمعات حماية الأرضيات والألمنيوم (Scaffolding & Surface Protection 3.5%)","bg":"#E2E8F0","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"I20","v":15339.5,"f":"=ROUND(I19*'3_إعدادات_الأسعار_ومعدلات_الفرد'!$D$5, 2)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J20","v":"","bg":"#E2E8F0","b":true,"al":"center"}]},{"r":21,"h":42.0,"cells":[{"c":"A21","v":"قيمة ضريبة القيمة المضافة المقررة (VAT 15.0%)","bg":"#E2E8F0","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"I21","v":68041.65,"f":"=ROUND((I19+I20)*'3_إعدادات_الأسعار_ومعدلات_الفرد'!$D$4, 2)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J21","v":"","bg":"#E2E8F0","b":true,"al":"center"}]},{"r":22,"h":46.0,"cells":[{"c":"A22","v":"الإجمالي العام التعاقدي لمقايسة أعمال الدهانات والنقاشة شاملاً الضريبة","bg":"#DCFCE7","fg":"#065F46","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"I22","v":521652.65,"f":"=I19+I20+I21","bg":"#DCFCE7","fg":"#065F46","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J22","v":"","bg":"#DCFCE7","fg":"#065F46","b":true,"al":"center"}]}]},{"name":"2_حصر_المسطحات_واستهلاك_الدهان","maxRow":11,"maxCol":9,"colWidths":[14.0,54.0,15.0,16.0,13.0,13.0,13.0,17.0,13.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"حاسبة تفريد خامات النقاشة وطلبيات البستلات (سيلر 18 لتر، معجون 20 كجم، دهان بلاستيك وواجهات، وجرافيتو)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":54.0,"cells":[{"c":"A2","v":"يسحب المسطحات من التبويب الأول لحساب أعداد بستلات السيلر والمعجون ودهان التشطيب وفق معدلات الفرد القياسية","bg":"#9A3412","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":18.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"ثانياً: جدول حصر عبوات وبستلات الدهانات المطلوبة للتوريد للموقع (Material Take-Off: Sealer, Putty & Topcoat Pails)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"كود النظام","bg":"#7C2D12","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"بيان نظام الدهانات ومعدل التغطية القياسي للبستلة","bg":"#7C2D12","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"إجمالي المسطح (م2)","bg":"#7C2D12","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"تغطية بستلة السيلر (م2)","bg":"#7C2D12","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"بستلات السيلر (18 لتر)","bg":"#7C2D12","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"تغطية بستلة المعجون (م2)","bg":"#7C2D12","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"بستلات المعجون (20 كجم)","bg":"#7C2D12","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"تغطية بستلة الدهان (م2)","bg":"#7C2D12","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I5","v":"بستلات التشطيب (18 لتر/25كجم)","bg":"#7C2D12","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"MAT-INT","b":true,"al":"center"},{"c":"B6","v":"دهان حوائط داخلية وديكور (سيلر 140 م2/بستلة + 3 سكاكين معجون 28 م2/بستلة + وجهين دهان 110 م2/بستلة)"},{"c":"C6","v":5125.25,"f":"='1_مقايسة_أعمال_الدهانات_BOQ'!G9+'1_مقايسة_أعمال_الدهانات_BOQ'!G12","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D6","v":140,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E6","v":37,"f":"=ROUNDUP(C6/D6, 0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F6","v":28,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G6","v":184,"f":"=ROUNDUP(C6/F6, 0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H6","v":110,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I6","v":47,"f":"=ROUNDUP(C6/H6, 0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"MAT-CEIL","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B7","v":"دهان أسقف خرسانية وجبس بورد وحمامات (سيلر 145 م2/بستلة + سكينتان معجون 38 م2/بستلة + وجهين 115 م2)","bg":"#F8FAFC"},{"c":"C7","v":2553.5,"f":"='1_مقايسة_أعمال_الدهانات_BOQ'!G10+'1_مقايسة_أعمال_الدهانات_BOQ'!G11","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D7","v":145,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E7","v":18,"f":"=ROUNDUP(C7/D7, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F7","v":38,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G7","v":68,"f":"=ROUNDUP(C7/F7, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H7","v":115,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I7","v":23,"f":"=ROUNDUP(C7/H7, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"MAT-EXT","b":true,"al":"center"},{"c":"B8","v":"دهان واجهات خارجية مقاوم للعوامل الجوية (سيلر خارجي 130 م2/بستلة + معجون أسمنتي 32 م2 + دهان 95 م2)"},{"c":"C8","v":1942.5,"f":"='1_مقايسة_أعمال_الدهانات_BOQ'!G13","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D8","v":130,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E8","v":15,"f":"=ROUNDUP(C8/D8, 0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F8","v":32,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G8","v":61,"f":"=ROUNDUP(C8/F8, 0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H8","v":95,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I8","v":21,"f":"=ROUNDUP(C8/H8, 0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"MAT-GRF","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B9","v":"كسوة واجهات جرافيتو وبروفايل 2.5 مم (برايمر ملون 120 م2/بستلة + معجون تسوية 50 م2 + جرافيتو 8.5 م2/بستلة 25 كجم)","bg":"#F8FAFC"},{"c":"C9","v":1272,"f":"='1_مقايسة_أعمال_الدهانات_BOQ'!G14","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D9","v":120,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E9","v":11,"f":"=ROUNDUP(C9/D9, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F9","v":50,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G9","v":26,"f":"=ROUNDUP(C9/F9, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H9","v":8.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I9","v":150,"f":"=ROUNDUP(C9/H9, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":"MAT-EPX","b":true,"al":"center"},{"c":"B10","v":"دهانات إيبوكسي للأرضيات ولاكيه للمشغولات (برايمر إيبوكسي 90 م2/عبوة + معجون إيبوكسي 60 م2 + وجهين 65 م2/مجموعة)"},{"c":"C10","v":1286.25,"f":"='1_مقايسة_أعمال_الدهانات_BOQ'!G15+'1_مقايسة_أعمال_الدهانات_BOQ'!G16","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D10","v":90,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E10","v":15,"f":"=ROUNDUP(C10/D10, 0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F10","v":60,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G10","v":22,"f":"=ROUNDUP(C10/F10, 0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H10","v":65,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I10","v":20,"f":"=ROUNDUP(C10/H10, 0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""}]},{"r":11,"h":46.0,"cells":[{"c":"A11","v":"إجمالي المسطحات وطلبيات بستلات السيلر والمعجون ودهانات التشطيب للمشروع","bg":"#DCFCE7","fg":"#065F46","b":true,"cs":2},{"skip":true},{"c":"C11","v":12179.5,"f":"=SUM(C6:C10)","bg":"#DCFCE7","fg":"#065F46","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D11","v":125,"f":"=AVERAGE(D6:D10)","bg":"#DCFCE7","fg":"#065F46","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E11","v":96,"f":"=SUM(E6:E10)","bg":"#DCFCE7","fg":"#065F46","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F11","v":41.6,"f":"=AVERAGE(F6:F10)","bg":"#DCFCE7","fg":"#065F46","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G11","v":361,"f":"=SUM(G6:G10)","bg":"#DCFCE7","fg":"#065F46","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H11","v":78.7,"f":"=AVERAGE(H6:H10)","bg":"#DCFCE7","fg":"#065F46","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I11","v":261,"f":"=SUM(I6:I10)","bg":"#DCFCE7","fg":"#065F46","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""}]}]},{"name":"3_إعدادات_الأسعار_ومعدلات_الفرد","maxRow":18,"maxCol":7,"colWidths":[16.0,58.0,16.0,18.0,13.0,20.0,22.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"إعدادات فئات أسعار بنود الدهانات والنقاشة (خامات ومصنعية) ومعدلات الفرد القياسية","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":54.0,"cells":[{"c":"A2","v":"عدّل أسعار الخامات والمصنعية في الخلايا الصفراء لتحديث جدول المقايسة تلقائياً","bg":"#9A3412","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":36.0,"cells":[{"c":"A3","v":"عملة التسعير القياسية للمشروع","bg":"#F8FAFC","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"D3","v":"SAR (ريال سعودي)","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"E3","v":"معامل ديناميكي مرتبط بجدول المقايسة وتفريد الخامات","cs":3},{"skip":true},{"skip":true}]},{"r":4,"h":36.0,"cells":[{"c":"A4","v":"نسبة ضريبة القيمة المضافة (VAT %)","bg":"#F8FAFC","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"D4","v":0.15,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"E4","v":"معامل ديناميكي مرتبط بجدول المقايسة وتفريد الخامات","cs":3},{"skip":true},{"skip":true}]},{"r":5,"h":36.0,"cells":[{"c":"A5","v":"نسبة السقالات الخارجية وحماية الأرضيات والألمنيوم (Scaffolding & Masking %)","bg":"#F8FAFC","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"D5","v":0.035,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"E5","v":"معامل ديناميكي مرتبط بجدول المقايسة وتفريد الخامات","cs":3},{"skip":true},{"skip":true}]},{"r":6,"h":36.0,"cells":[{"c":"A6","v":"سعة بستلة الدهان القياسية باللتر (Standard Paint Pail Volume L)","bg":"#F8FAFC","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"D6","v":18,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E6","v":"معامل ديناميكي مرتبط بجدول المقايسة وتفريد الخامات","cs":3},{"skip":true},{"skip":true}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":"الحد الأدنى لمساحة الفتحة التي تُخصم هندسياً بالمتر المربع (Opening Deduction Threshold m2)","bg":"#F8FAFC","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"D7","v":0.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E7","v":"معامل ديناميكي مرتبط بجدول المقايسة وتفريد الخامات","cs":3},{"skip":true},{"skip":true}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"كود البند","bg":"#7C2D12","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B8","v":"بيان بند الدهانات والنقاشة والواجهات والإيبوكسي","bg":"#7C2D12","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C8","v":"الوحدة","bg":"#7C2D12","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D8","v":"تكلفة السيلر والمعجون والدهان","bg":"#7C2D12","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E8","v":"مصنعية النقاشة والصنفرة","bg":"#7C2D12","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F8","v":"إجمالي فئة البند","bg":"#7C2D12","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G8","v":"المرجع الكودي القياسي","bg":"#7C2D12","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":9,"h":38.0,"cells":[{"c":"A9","v":"PNT-01","b":true,"al":"center"},{"c":"B9","v":"دهان بلاستيك أكريليك داخلي للحوائط (سيلر + 3 سكاكين معجون + وجهين)"},{"c":"C9","v":"م2","b":true,"al":"center"},{"c":"D9","v":14,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E9","v":14,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F9","v":28,"f":"=ROUND(D9+E9, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G9","v":"ASTM D3273 / ECP 204","al":"center"}]},{"r":10,"h":38.0,"cells":[{"c":"A10","v":"PNT-02","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B10","v":"دهان بلاستيك مط ناصع البياض للأسقف الخرسانية والجبس بورد","bg":"#F8FAFC"},{"c":"C10","v":"م2","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D10","v":11,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E10","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F10","v":23,"f":"=ROUND(D10+E10, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G10","v":"ASTM D3273 / SBC","bg":"#F8FAFC","al":"center"}]},{"r":11,"h":38.0,"cells":[{"c":"A11","v":"PNT-03","b":true,"al":"center"},{"c":"B11","v":"دهان أكريليك مقاوم للرطوبة والعفن للحمامات والمطابخ"},{"c":"C11","v":"م2","b":true,"al":"center"},{"c":"D11","v":18,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E11","v":15,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F11","v":33,"f":"=ROUND(D11+E11, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G11","v":"ASTM D3273 / Hygiene Std","al":"center"}]},{"r":12,"h":38.0,"cells":[{"c":"A12","v":"PNT-04","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B12","v":"دهانات ديكورية داخلية قطيفة / ستوكو أنتيك للحوائط المميزة","bg":"#F8FAFC"},{"c":"C12","v":"م2","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D12","v":28,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E12","v":27,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F12","v":55,"f":"=ROUND(D12+E12, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G12","v":"Decorative Spec","bg":"#F8FAFC","al":"center"}]},{"r":13,"h":38.0,"cells":[{"c":"A13","v":"PNT-05","b":true,"al":"center"},{"c":"B13","v":"دهان واجهات خارجية أكريليك مرن مقاوم للأشعة UV والعوامل الجوية"},{"c":"C13","v":"م2","b":true,"al":"center"},{"c":"D13","v":19,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E13","v":16,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F13","v":35,"f":"=ROUND(D13+E13, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G13","v":"EN 1062-1 / ASTM D6695","al":"center"}]},{"r":14,"h":38.0,"cells":[{"c":"A14","v":"PNT-06","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B14","v":"كسوة واجهات خارجية جرافيتو / بروفايل أكريليك 2.5 مم بالبرايمر","bg":"#F8FAFC"},{"c":"C14","v":"م2","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D14","v":26,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E14","v":22,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F14","v":48,"f":"=ROUND(D14+E14, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G14","v":"EN 15824 / Facade Spec","bg":"#F8FAFC","al":"center"}]},{"r":15,"h":38.0,"cells":[{"c":"A15","v":"PNT-07","b":true,"al":"center"},{"c":"B15","v":"دهان إيبوكسي للأرضيات وحوائط البدروم (400 ميكرون) بالبرايمر"},{"c":"C15","v":"م2","b":true,"al":"center"},{"c":"D15","v":38,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E15","v":22,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F15","v":60,"f":"=ROUND(D15+E15, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G15","v":"ASTM D4541 / BS 8204-6","al":"center"}]},{"r":16,"h":38.0,"cells":[{"c":"A16","v":"PNT-08","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B16","v":"دهان بولي يوريثان / لاكيه للأبواب والهاندريل والمشغولات المعدنية","bg":"#F8FAFC"},{"c":"C16","v":"م2","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D16","v":24,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E16","v":21,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F16","v":45,"f":"=ROUND(D16+E16, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G16","v":"ISO 12944 / Steel Spec","bg":"#F8FAFC","al":"center"}]},{"r":17,"h":38.0,"cells":[{"c":"A17","v":"PNT-09","b":true,"al":"center"},{"c":"B17","v":"دهان تخطيط مواقف السيارات والخطوط المرورية العاكسة (عرض 10-15 سم)"},{"c":"C17","v":"م.ط","b":true,"al":"center"},{"c":"D17","v":9,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E17","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F17","v":15,"f":"=ROUND(D17+E17, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G17","v":"AASHTO M248 / Traffic","al":"center"}]},{"r":18,"h":38.0,"cells":[{"c":"A18","v":"PNT-10","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B18","v":"معالجة الشروخ الشعرية والفواصل بمعجون مرن وشريط فايبر","bg":"#F8FAFC"},{"c":"C18","v":"م.ط","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D18","v":7,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E18","v":8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F18","v":15,"f":"=ROUND(D18+E18, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G18","v":"ASTM C920 / Prep Spec","bg":"#F8FAFC","al":"center"}]}]}]}