{"slug":"isolated-footing-structural-design-and-reinforcement-calculation-sheet","sheets":[{"name":"إعدادات المشروع والتربة","maxRow":45,"maxCol":9,"colWidths":[8.0,62.0,18.0,22.0,14.0,26.0,28.0,38.0,16.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"شيت تصميم وحساب القواعد المنفصلة الخرسانية المسلحة Isolated Footing وفق SBC 304 و ACI 318 و ECP 203","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"⚠️ تنبيه استرشادي هندسي: القيم والمعاملات المدخلة في هذا الشيت هي قيم استرشادية لمتوسطات مشاريع التشييد. يرجى تعديل معاملات التربة، ورتبة الخرسانة، وإجهاد خضوع حديد التسليح وفئات الأسعار بما يتطابق مع تقرير جسات موقعك والمواصفات الفنية المعتمدة لمشروعك.","bg":"#FEF3C7","fg":"#475569","al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"1. بيانات المشروع والمهندس الإنشائي والعملة التعاقدية (Project Identification & Currency)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"اسم المشروع الإنشائي:","bg":"#EFF6FF","b":true},{"c":"B5","v":"مشروع إنشاء مبنى تجاري وسكني - تصميم الأساسات السطحية","cs":3},{"skip":true},{"skip":true},{"c":"E5","v":"رمز النموذج المرجعي:","bg":"#EFF6FF","b":true},{"c":"F5","v":"ISO-FT-01","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":6,"h":72.0,"cells":[{"c":"A6","v":"اسم المالك / جهة العمل:","bg":"#EFF6FF","b":true},{"c":"B6","v":"شركة التطوير العقاري والاستثمار","cs":3},{"skip":true},{"skip":true},{"c":"E6","v":"تاريخ إعداد الحسابات:","bg":"#EFF6FF","b":true},{"c":"F6","v":"2026-10-18","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"المقاول العام المنفذ:","bg":"#EFF6FF","b":true},{"c":"B7","v":"شركة المقاولات العامة والإنشاءات","cs":3},{"skip":true},{"skip":true},{"c":"E7","v":"العملة التعاقدية المعتمدة:","bg":"#EFF6FF","b":true},{"c":"F7","v":"ر.س SAR","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":8,"h":104.0,"cells":[{"c":"A8","v":"المكتب الاستشاري المصمم:","bg":"#EFF6FF","b":true},{"c":"B8","v":"مكتب الاستشارات الهندسية وفحص التربة","cs":3},{"skip":true},{"skip":true},{"c":"E8","v":"الكود الهندسي المرجعي:","bg":"#EFF6FF","b":true},{"c":"F8","v":"SBC 304 / ACI 318-19 / ECP 203","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"رقم اللوحة الإنشائية:","bg":"#EFF6FF","b":true},{"c":"B9","v":"STR-FD-02 / لوحة تفاصيل القواعد المنفصلة","cs":3},{"skip":true},{"skip":true},{"c":"E9","v":"موقع القاعدة بالمشروع:","bg":"#EFF6FF","b":true},{"c":"F9","v":"المحور C-4 / قاعدة عمود C1","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":10,"h":28.0,"cells":[{"c":"A10","v":""},{"c":"B10","v":""},{"c":"C10","v":""},{"c":"D10","v":""},{"c":"E10","v":""},{"c":"F10","v":""},{"c":"G10","v":""},{"c":"H10","v":""},{"c":"I10","v":""}]},{"r":11,"h":38.0,"cells":[{"c":"A11","v":"2. الخواص الجيوتقنية لطبقة التأسيس والتربة (Geotechnical Soil Parameters)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":12,"h":40.0,"cells":[{"c":"A12","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B12","v":"المعامل الجيوتقني والتوصيف الهندسي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C12","v":"الرمز الكودي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D12","v":"القيمة التصميمية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E12","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F12","v":"الحدود الكودية الموصى بها","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G12","v":"المرجع القياسي الكودي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H12","v":"ملاحظات الاستخدام في التصميم","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I12","v":"الحالة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":1,"al":"center"},{"c":"B13","v":"جهد التربة الصافي المسموح به (Net Allowable Soil Bearing Capacity)"},{"c":"C13","v":"q_net,all","b":true,"al":"center"},{"c":"D13","v":175,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E13","v":"kN/m²","al":"center"},{"c":"F13","v":"100 - 350 kN/m²","al":"center"},{"c":"G13","v":"تقرير التربة / SBC 303","al":"center"},{"c":"H13","v":"يستخدم لتحديد مساحة القاعدة المسلحة الصافية"},{"c":"I13","v":"ساري","al":"center"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":2,"al":"center"},{"c":"B14","v":"جهد التربة الإجمالي المسموح به (Gross Allowable Soil Bearing Capacity)"},{"c":"C14","v":"q_all,gross","b":true,"al":"center"},{"c":"D14","v":210,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E14","v":"kN/m²","al":"center"},{"c":"F14","v":"120 - 400 kN/m²","al":"center"},{"c":"G14","v":"تقرير فحص الموقع / SBC 303","al":"center"},{"c":"H14","v":"يستخدم للتحقق من إجهاد التلامس الإجمالي مع الردم"},{"c":"I14","v":"ساري","al":"center"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":3,"al":"center"},{"c":"B15","v":"منسوب التأسيس التصميمي أسفل منسوب الصفر (Foundation Depth)"},{"c":"C15","v":"D_f","b":true,"al":"center"},{"c":"D15","v":2,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E15","v":"m","al":"center"},{"c":"F15","v":"1.50 - 3.00 m","al":"center"},{"c":"G15","v":"المخطط العام للأساسات","al":"center"},{"c":"H15","v":"عمق ارتكاز منسوب بطنية خرسانة النظافة"},{"c":"I15","v":"ساري","al":"center"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":4,"al":"center"},{"c":"B16","v":"الكثافة الحجمية المتوسطة لتربة الردم والطبقات (Soil Unit Weight)"},{"c":"C16","v":"γ_soil","b":true,"al":"center"},{"c":"D16","v":18,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E16","v":"kN/m³","al":"center"},{"c":"F16","v":"16.0 - 20.0 kN/m³","al":"center"},{"c":"G16","v":"ميكانيكا التربة / ASTM D7263","al":"center"},{"c":"H16","v":"تستخدم لحساب وزن الردم الإضافي فوق القاعدة"},{"c":"I16","v":"ساري","al":"center"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":5,"al":"center"},{"c":"B17","v":"الحمل الحي السطحي الإضافي للردم وأرضية الدور الأرضي (Surcharge)"},{"c":"C17","v":"q_sur","b":true,"al":"center"},{"c":"D17","v":5,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E17","v":"kN/m²","al":"center"},{"c":"F17","v":"3.0 - 10.0 kN/m²","al":"center"},{"c":"G17","v":"كود الأحمال SBC 201","al":"center"},{"c":"H17","v":"حمل حي منتظم موزع على منسوب الردم"},{"c":"I17","v":"ساري","al":"center"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":6,"al":"center"},{"c":"B18","v":"الهبوط الكلي المسموح به للأساسات المنفصلة (Permissible Settlement)"},{"c":"C18","v":"S_all","b":true,"al":"center"},{"c":"D18","v":25,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E18","v":"mm","al":"center"},{"c":"F18","v":"≤ 25 mm للأساسات السطحية","al":"center"},{"c":"G18","v":"SBC 303 Cl. 4.4 / ECP 202","al":"center"},{"c":"H18","v":"معيار فحص سلامة الهبوط التفاوتي"},{"c":"I18","v":"ساري","al":"center"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":7,"al":"center"},{"c":"B19","v":"نسبة الزيادة المسموحة في إجهاد التربة لأحمال الرياح والزلازل"},{"c":"C19","v":"k_transient","b":true,"al":"center"},{"c":"D19","v":1.33,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E19","v":"-","al":"center"},{"c":"F19","v":"1.25 - 1.33","al":"center"},{"c":"G19","v":"SBC 303 Cl. 4.2","al":"center"},{"c":"H19","v":"لحالات التحميل المؤقتة والاستثنائية"},{"c":"I19","v":"ساري","al":"center"}]},{"r":20,"h":28.0,"cells":[{"c":"A20","v":""},{"c":"B20","v":""},{"c":"C20","v":""},{"c":"D20","v":""},{"c":"E20","v":""},{"c":"F20","v":""},{"c":"G20","v":""},{"c":"H20","v":""},{"c":"I20","v":""}]},{"r":21,"h":38.0,"cells":[{"c":"A21","v":"3. خواص المواد الإنشائية وعوامل تصعيد الأحمال وتخفيض المقاومة (Material & Code Safety Factors)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":22,"h":40.0,"cells":[{"c":"A22","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B22","v":"الخاصية الإنشائية / معامل الأمان","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C22","v":"الرمز الكودي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D22","v":"القيمة التصميمية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E22","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F22","v":"المعايير الكودية القياسية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G22","v":"المرجع الكودي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H22","v":"التأثير الإنشائي في المعادلات","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I22","v":"الحالة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":1,"al":"center"},{"c":"B23","v":"مقاومة الضغط المميزة للخرسانة الأسطوانية بعد 28 يوماً"},{"c":"C23","v":"f'_c","b":true,"al":"center"},{"c":"D23","v":30,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E23","v":"MPa","al":"center"},{"c":"F23","v":"≥ 25 MPa للأساسات","al":"center"},{"c":"G23","v":"SBC 304 Cl. 19.2 / ACI 318","al":"center"},{"c":"H23","v":"تحدد مقاومة القص الثاقب وقص الكمرات والعزوم"},{"c":"I23","v":"مستوفى","al":"center"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":2,"al":"center"},{"c":"B24","v":"المقاومة المميزة المكافئة للخرسانة المكعبة (Cube Strength)"},{"c":"C24","v":"f_cu","b":true,"al":"center"},{"c":"D24","v":35,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E24","v":"MPa","al":"center"},{"c":"F24","v":"f_cu ≈ f'_c / 0.80 - 0.85","al":"center"},{"c":"G24","v":"ECP 203 / BS 8110","al":"center"},{"c":"H24","v":"تستخدم في مراجعات الكود المصري والبريطاني"},{"c":"I24","v":"مستوفى","al":"center"}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":3,"al":"center"},{"c":"B25","v":"إجهاد خضوع حديد التسليح الرئيسي عالي المقاومة المشوه"},{"c":"C25","v":"f_y","b":true,"al":"center"},{"c":"D25","v":420,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E25","v":"MPa","al":"center"},{"c":"F25","v":"Grade 60 / 420 MPa","al":"center"},{"c":"G25","v":"ASTM A615 / SASO 2 / SBC 304","al":"center"},{"c":"H25","v":"يحدد مساحة حديد الفرش والغطاء السفلي"},{"c":"I25","v":"مستوفى","al":"center"}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":4,"al":"center"},{"c":"B26","v":"إجهاد خضوع حديد التسليح العرضي والكانات الداخلية"},{"c":"C26","v":"f_ys","b":true,"al":"center"},{"c":"D26","v":420,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E26","v":"MPa","al":"center"},{"c":"F26","v":"Grade 60 / 420 MPa","al":"center"},{"c":"G26","v":"SBC 304 Cl. 20.2","al":"center"},{"c":"H26","v":"يحدد كانات العمود داخل عمق القاعدة"},{"c":"I26","v":"مستوفى","al":"center"}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":5,"al":"center"},{"c":"B27","v":"الغطاء الخرساني الصافي للقواعد الملامسة للتربة الدائمة"},{"c":"C27","v":"c_c","b":true,"al":"center"},{"c":"D27","v":75,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E27","v":"mm","al":"center"},{"c":"F27","v":"75 mm (ملامس دائم للأرض)","al":"center"},{"c":"G27","v":"SBC 304 Cl. 20.6.1 / ACI 318","al":"center"},{"c":"H27","v":"يحمي شبكة التسليح السفلية من الأملاح والمياه"},{"c":"I27","v":"إلزامي","al":"center"}]},{"r":28,"h":34.0,"cells":[{"c":"A28","v":6,"al":"center"},{"c":"B28","v":"معامل خفض المقاومة للانحناء في القطاعات محكومة الشد"},{"c":"C28","v":"φ_b","b":true,"al":"center"},{"c":"D28","v":0.9,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E28","v":"-","al":"center"},{"c":"F28","v":"0.90 (Tension Controlled)","al":"center"},{"c":"G28","v":"SBC 304 Cl. 21.2 / ACI 318","al":"center"},{"c":"H28","v":"يضرب في المقاومة الاسمية للعزم Mn"},{"c":"I28","v":"إلزامي","al":"center"}]},{"r":29,"h":34.0,"cells":[{"c":"A29","v":7,"al":"center"},{"c":"B29","v":"معامل خفض المقاومة لقوى القص والقص الثاقب"},{"c":"C29","v":"φ_v","b":true,"al":"center"},{"c":"D29","v":0.75,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E29","v":"-","al":"center"},{"c":"F29","v":"0.75 للقص العريض والثقب","al":"center"},{"c":"G29","v":"SBC 304 Cl. 21.2 / ACI 318","al":"center"},{"c":"H29","v":"يضرب في مقاومة الخرسانة للقص Vc"},{"c":"I29","v":"إلزامي","al":"center"}]},{"r":30,"h":34.0,"cells":[{"c":"A30","v":8,"al":"center"},{"c":"B30","v":"معامل خفض المقاومة لإجهادات الارتكاز على الخرسانة"},{"c":"C30","v":"φ_brg","b":true,"al":"center"},{"c":"D30","v":0.65,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E30","v":"-","al":"center"},{"c":"F30","v":"0.65 للارتكاز المباشر","al":"center"},{"c":"G30","v":"SBC 304 Cl. 21.2 / ACI 318","al":"center"},{"c":"H30","v":"يحدد أقصى حمل ارتكاز عند قاع العمود"},{"c":"I30","v":"إلزامي","al":"center"}]},{"r":31,"h":34.0,"cells":[{"c":"A31","v":9,"al":"center"},{"c":"B31","v":"معامل تصعيد الحمل الميت الكودي (Dead Load Factor)"},{"c":"C31","v":"γ_D","b":true,"al":"center"},{"c":"D31","v":1.2,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E31","v":"-","al":"center"},{"c":"F31","v":"1.20 (SBC/ACI) أو 1.40 (ECP)","al":"center"},{"c":"G31","v":"SBC 304 Ch. 5 / ACI 318","al":"center"},{"c":"H31","v":"يستخدم لحساب الحمل المصعد Pu"},{"c":"I31","v":"إلزامي","al":"center"}]},{"r":32,"h":34.0,"cells":[{"c":"A32","v":10,"al":"center"},{"c":"B32","v":"معامل تصعيد الحمل الحي الكودي (Live Load Factor)"},{"c":"C32","v":"γ_L","b":true,"al":"center"},{"c":"D32","v":1.6,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E32","v":"-","al":"center"},{"c":"F32","v":"1.60 (SBC/ACI) أو 1.60 (ECP)","al":"center"},{"c":"G32","v":"SBC 304 Ch. 5 / ACI 318","al":"center"},{"c":"H32","v":"يستخدم لحساب الحمل المصعد Pu"},{"c":"I32","v":"إلزامي","al":"center"}]},{"r":33,"h":28.0,"cells":[{"c":"A33","v":""},{"c":"B33","v":""},{"c":"C33","v":""},{"c":"D33","v":""},{"c":"E33","v":""},{"c":"F33","v":""},{"c":"G33","v":""},{"c":"H33","v":""},{"c":"I33","v":""}]},{"r":34,"h":38.0,"cells":[{"c":"A34","v":"4. فئات أسعار المواد والمصنعيات التقديرية (Unit Rates for Dynamic BOQ Costing)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":35,"h":40.0,"cells":[{"c":"A35","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B35","v":"بيان المادة أو البند التنفيذي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C35","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D35","v":"فئة السعر التقديرية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E35","v":"العملة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F35","v":"النطاق السعري التقديري بالسوق","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G35","v":"مكونات فئة البند (مصنعيات وتوريد)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H35","v":"طريقة الحصر والمحاسبة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I35","v":"المصدر","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":36,"h":52.0,"cells":[{"c":"A36","v":1,"al":"center"},{"c":"B36","v":"خرسانة عادية نظافة سمك 10 سم مقاومة كبريتات SRC"},{"c":"C36","v":"m³","al":"center"},{"c":"D36","v":240,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E36","v":"ر.س","al":"center"},{"c":"F36","v":"210 - 270 ر.س","al":"center"},{"c":"G36","v":"توريد خرسانة جاهزة + صب وتسوية بالموقع"},{"c":"H36","v":"هندسي صافي بالمتر المكعب","al":"center"},{"c":"I36","v":"متوسطات السوق","al":"center"}]},{"r":37,"h":52.0,"cells":[{"c":"A37","v":2,"al":"center"},{"c":"B37","v":"خرسانة مسلحة للقواعد C30/37 جاهزة الصب مع المضخة"},{"c":"C37","v":"m³","al":"center"},{"c":"D37","v":320,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E37","v":"ر.س","al":"center"},{"c":"F37","v":"290 - 360 ر.س","al":"center"},{"c":"G37","v":"توريد خرسانة جاهزة + مضخة + صب ودمك ومعالجة"},{"c":"H37","v":"هندسي صافي بالمتر المكعب","al":"center"},{"c":"I37","v":"متوسطات السوق","al":"center"}]},{"r":38,"h":52.0,"cells":[{"c":"A38","v":3,"al":"center"},{"c":"B38","v":"حديد تسليح عالي المقاومة مشوه Grade 60 (مقطع ومثنى ومورد)"},{"c":"C38","v":"Ton","al":"center"},{"c":"D38","v":3250,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E38","v":"ر.س","al":"center"},{"c":"F38","v":"2900 - 3600 ر.س","al":"center"},{"c":"G38","v":"توريد حديد سابك/الراجحي + تشغيل وتوضيب وتجنيط"},{"c":"H38","v":"وزن هندسي حسب جدول BBS","al":"center"},{"c":"I38","v":"متوسطات السوق","al":"center"}]},{"r":39,"h":52.0,"cells":[{"c":"A39","v":4,"al":"center"},{"c":"B39","v":"أعمال الشدات الخشبية والقوالب المعدنية لجوانب القواعد"},{"c":"C39","v":"m²","al":"center"},{"c":"D39","v":48,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E39","v":"ر.س","al":"center"},{"c":"F39","v":"40 - 60 ر.س","al":"center"},{"c":"G39","v":"نجارة مسلحة خشب بليوود + تدعيم وفك وتنظيف"},{"c":"H39","v":"مساحة مسطحة ملامسة للخرسانة","al":"center"},{"c":"I39","v":"متوسطات السوق","al":"center"}]},{"r":40,"h":52.0,"cells":[{"c":"A40","v":5,"al":"center"},{"c":"B40","v":"أعمال العزل المائي للأسطح الخرسانية الملامسة للتربة (دهان بيتوميني)"},{"c":"C40","v":"m²","al":"center"},{"c":"D40","v":22,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E40","v":"ر.س","al":"center"},{"c":"F40","v":"18 - 28 ر.س","al":"center"},{"c":"G40","v":"دهان طبقتين بيتومين مطاطي عالي اللزوجة"},{"c":"H40","v":"مساحة مسطحة مدهونة شاملة الرقاب","al":"center"},{"c":"I40","v":"متوسطات السوق","al":"center"}]},{"r":41,"h":52.0,"cells":[{"c":"A41","v":6,"al":"center"},{"c":"B41","v":"أعمال الحفر الميكانيكي لقاع التأسيس في تربة عادية/صخرية"},{"c":"C41","v":"m³","al":"center"},{"c":"D41","v":18,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E41","v":"ر.س","al":"center"},{"c":"F41","v":"14 - 24 ر.س","al":"center"},{"c":"G41","v":"حفر ميكانيكي بالباكر ونقل نواتج الحفر للمقالب"},{"c":"H41","v":"متر مكعب هندسي حسب أبعاد الحفر","al":"center"},{"c":"I41","v":"متوسطات السوق","al":"center"}]},{"r":42,"h":52.0,"cells":[{"c":"A42","v":7,"al":"center"},{"c":"B42","v":"أعمال الردم الهندسي المتدرج حول القواعد على طبقات مع الدمك"},{"c":"C42","v":"m³","al":"center"},{"c":"D42","v":25,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E42","v":"ر.س","al":"center"},{"c":"F42","v":"20 - 32 ر.س","al":"center"},{"c":"G42","v":"توريد مواد ردم نظيفة + رش مياه ودحل واختبارات"},{"c":"H42","v":"متر مكعب مدموك هندسي","al":"center"},{"c":"I42","v":"متوسطات السوق","al":"center"}]},{"r":43,"h":28.0,"cells":[{"c":"A43","v":""},{"c":"B43","v":""},{"c":"C43","v":""},{"c":"D43","v":""},{"c":"E43","v":""},{"c":"F43","v":""},{"c":"G43","v":""},{"c":"H43","v":""},{"c":"I43","v":""}]},{"r":44,"h":36.0,"cells":[{"c":"A44","v":"مهندس الأساسات والتربة (Geotechnical Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D44","v":"مهندس التصميم الإنشائي والمكتب الفني (Structural Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G44","v":"المهندس الاستشاري المشرف (Supervising Consultant)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":45,"h":76.0,"cells":[{"c":"A45","v":"الاسم والتوقيع:\nرقم القيد الهندسي:\nالتاريخ والختم المهني:","cs":3},{"skip":true},{"skip":true},{"c":"D45","v":"الاسم والتوقيع:\nرقم القيد الهندسي:\nالتاريخ والختم المهني:","cs":3},{"skip":true},{"skip":true},{"c":"G45","v":"الاسم والتوقيع:\nرقم القيد الهندسي:\nالتاريخ والختم المهني:","cs":3},{"skip":true},{"skip":true}]}]},{"name":"حساب الأبعاد وإجهادات التربة","maxRow":50,"maxCol":9,"colWidths":[8.0,60.0,18.0,22.0,14.0,32.0,30.0,24.0,20.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"تحديد الأبعاد الهندسية للقاعدة المنفصلة وحساب إجهادات التلامس الفعلية مع التربة","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"💡 مبدأ التصميم المتوازن: يتم تطبيق قاعدة تساوي الرفرفة في الاتجاهين (Equal Cantilever Projections) لضمان تساوي عزوم الانحناء وقوى القص، وتفادي حدوث لا مركزية غير مرغوبة تؤدي لتركيز الإجهادات تحت القاعدة.","bg":"#EFF6FF","fg":"#475569","al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"1. أحمال العمود التصميمية وأبعاد المقطع الخرساني (Column Dimensions & Applied Loads)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":40.0,"cells":[{"c":"A5","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"البيان الإنشائي للمتغير","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"الرمز","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"القيمة المدخلة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"المعادلة الرياضية / المرجع","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"التأثير في التصميم","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"حالة المدخلات","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I5","v":"ملاحظات الفحص","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":1,"al":"center"},{"c":"B6","v":"عرض مقطع العمود الخرساني في الاتجاه القصير (Column Width)"},{"c":"C6","v":"c_1","b":true,"al":"center"},{"c":"D6","v":0.3,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E6","v":"m","al":"center"},{"c":"F6","v":"مخطط الأعمدة الإنشائي"},{"c":"G6","v":"يحدد محيط القص الثاقب وعزم الاتجاه العرضي","al":"center"},{"c":"H6","v":"مدخل يدوي","al":"center"},{"c":"I6","v":"300 mm","al":"center"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":2,"al":"center"},{"c":"B7","v":"طول مقطع العمود الخرساني في الاتجاه الطويل (Column Length)"},{"c":"C7","v":"c_2","b":true,"al":"center"},{"c":"D7","v":0.6,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E7","v":"m","al":"center"},{"c":"F7","v":"مخطط الأعمدة الإنشائي"},{"c":"G7","v":"يحدد محيط القص الثاقب وعزم الاتجاه الطولي","al":"center"},{"c":"H7","v":"مدخل يدوي","al":"center"},{"c":"I7","v":"600 mm","al":"center"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":3,"al":"center"},{"c":"B8","v":"مساحة مقطع العمود الخرساني (Column Cross Section Area)"},{"c":"C8","v":"A_c","b":true,"al":"center"},{"c":"D8","v":0.18,"f":"=D6*D7","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E8","v":"m²","al":"center"},{"c":"F8","v":"c_1 × c_2"},{"c":"G8","v":"تستخدم لفحص إجهادات الارتكاز الموضعية","al":"center"},{"c":"H8","v":"محسوب","al":"center"},{"c":"I8","v":"0.18 m²","al":"center"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":4,"al":"center"},{"c":"B9","v":"الحمل المحوري الميت التشغيلي من العمود (Dead Load)"},{"c":"C9","v":"P_D","b":true,"al":"center"},{"c":"D9","v":850,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E9","v":"kN","al":"center"},{"c":"F9","v":"تحليل الأحمال الإنشائية"},{"c":"G9","v":"وزن الهيكل الإنشائي والتشطيبات والحوائط","al":"center"},{"c":"H9","v":"مدخل يدوي","al":"center"},{"c":"I9","v":"850.0 kN","al":"center"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":5,"al":"center"},{"c":"B10","v":"الحمل المحوري الحي التشغيلي من العمود (Live Load)"},{"c":"C10","v":"P_L","b":true,"al":"center"},{"c":"D10","v":450,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E10","v":"kN","al":"center"},{"c":"F10","v":"تحليل الأحمال الإنشائية"},{"c":"G10","v":"الأحمال الحية الإشغالية للأسقف","al":"center"},{"c":"H10","v":"مدخل يدوي","al":"center"},{"c":"I10","v":"450.0 kN","al":"center"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":6,"al":"center"},{"c":"B11","v":"إجمالي الحمل المحوري التشغيلي للعمود (Total Service Load)"},{"c":"C11","v":"P_ser","b":true,"al":"center"},{"c":"D11","v":1300,"f":"=D9+D10","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E11","v":"kN","al":"center"},{"c":"F11","v":"P_D + P_L"},{"c":"G11","v":"يستخدم لتحديد مساحة سطح القاعدة مع التربة","al":"center"},{"c":"H11","v":"معادلة نشطة","al":"center"},{"c":"I11","v":"1300.0 kN","al":"center"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":7,"al":"center"},{"c":"B12","v":"الحمل المحوري الأقصى المصعد للعمود (Factored Axial Load)"},{"c":"C12","v":"P_u","b":true,"al":"center"},{"c":"D12","v":1740,"f":"='إعدادات المشروع والتربة'!$D$31*D9+'إعدادات المشروع والتربة'!$D$32*D10","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E12","v":"kN","al":"center"},{"c":"F12","v":"γ_D·P_D + γ_L·P_L"},{"c":"G12","v":"يستخدم لتصميم الخرسانة والتسليح والقص","al":"center"},{"c":"H12","v":"معادلة نشطة","al":"center"},{"c":"I12","v":"1740.0 kN","al":"center"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":8,"al":"center"},{"c":"B13","v":"عزم الانحناء التشغيلي حول المحور X (Service Moment Mx)"},{"c":"C13","v":"M_x,ser","b":true,"al":"center"},{"c":"D13","v":35,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E13","v":"kN·m","al":"center"},{"c":"F13","v":"تحليل الإطارات الإنشائية"},{"c":"G13","v":"يسبب لا مركزية في الاتجاه العرضي","al":"center"},{"c":"H13","v":"مدخل يدوي","al":"center"},{"c":"I13","v":"35.0 kN·m","al":"center"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":9,"al":"center"},{"c":"B14","v":"عزم الانحناء التشغيلي حول المحور Y (Service Moment My)"},{"c":"C14","v":"M_y,ser","b":true,"al":"center"},{"c":"D14","v":20,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E14","v":"kN·m","al":"center"},{"c":"F14","v":"تحليل الإطارات الإنشائية"},{"c":"G14","v":"يسبب لا مركزية في الاتجاه الطولي","al":"center"},{"c":"H14","v":"مدخل يدوي","al":"center"},{"c":"I14","v":"20.0 kN·m","al":"center"}]},{"r":15,"h":28.0,"cells":[{"c":"A15","v":""},{"c":"B15","v":""},{"c":"C15","v":""},{"c":"D15","v":""},{"c":"E15","v":""},{"c":"F15","v":""},{"c":"G15","v":""},{"c":"H15","v":""},{"c":"I15","v":""}]},{"r":16,"h":38.0,"cells":[{"c":"A16","v":"2. حساب مساحة التأسيس المطلوبة وتطبيق مبدأ تساوي الرفرفة (Required Area & Equal Projection)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":17,"h":40.0,"cells":[{"c":"A17","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B17","v":"عنصر الأبعاد والتحليل الهندسي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C17","v":"الرمز","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D17","v":"القيمة المحسوبة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E17","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F17","v":"المعادلة الحسابية المطبقة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G17","v":"الاشتراط الهندسي والكودي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H17","v":"التقييم","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I17","v":"الحالة الفنية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":1,"al":"center"},{"c":"B18","v":"الوزن الذاتي التقديري للقاعدة والردم فوقها (Footing & Soil Surcharge)"},{"c":"C18","v":"W_est","b":true,"al":"center"},{"c":"D18","v":104,"f":"=0.08*D11","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E18","v":"kN","al":"center"},{"c":"F18","v":"8% × P_ser"},{"c":"G18","v":"تقدير مبدئي للوزن الذاتي لكتلة الأساس","al":"center"},{"c":"H18","v":"تقديري","al":"center"},{"c":"I18","v":"104.0 kN","al":"center"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":2,"al":"center"},{"c":"B19","v":"إجمالي الحمل التشغيلي التقديري للتربة (Total Estimated Service Load)"},{"c":"C19","v":"P_tot,est","b":true,"al":"center"},{"c":"D19","v":1404,"f":"=D11+D18","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E19","v":"kN","al":"center"},{"c":"F19","v":"P_ser + W_est"},{"c":"G19","v":"يستخدم لحساب مساحة التلامس المطلوبة","al":"center"},{"c":"H19","v":"محسوب","al":"center"},{"c":"I19","v":"1404.0 kN","al":"center"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":3,"al":"center"},{"c":"B20","v":"جهد التربة الصافي المسموح به من تقرير الجسات (Net Soil Capacity)"},{"c":"C20","v":"q_net,all","b":true,"al":"center"},{"c":"D20","v":175,"f":"='إعدادات المشروع والتربة'!$D$13","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E20","v":"kN/m²","al":"center"},{"c":"F20","v":"تقرير فحص التربة / SBC 303"},{"c":"G20","v":"الحد الأقصى لضغط التلامس الصافي","al":"center"},{"c":"H20","v":"مرجعي","al":"center"},{"c":"I20","v":"175.0 kN/m²","al":"center"}]},{"r":21,"h":52.0,"cells":[{"c":"A21","v":4,"al":"center"},{"c":"B21","v":"مساحة التأسيس الصافية المطلوبة للقاعدة (Required Base Area)"},{"c":"C21","v":"A_req","b":true,"al":"center"},{"c":"D21","v":8.022857,"f":"=D19/D20","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E21","v":"m²","al":"center"},{"c":"F21","v":"P_tot,est / q_net,all"},{"c":"G21","v":"الحد الأدنى لمساحة القاعدة الخرسانية المسلحة","al":"center"},{"c":"H21","v":"محسوب","al":"center"},{"c":"I21","v":"8.02 m²","al":"center"}]},{"r":22,"h":52.0,"cells":[{"c":"A22","v":5,"al":"center"},{"c":"B22","v":"فرق أبعاد مقطع العمود لتطبيق تساوي الرفرفة (Column Dimension Diff)"},{"c":"C22","v":"Δc","b":true,"al":"center"},{"c":"D22","v":0.3,"f":"=D7-D6","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E22","v":"m","al":"center"},{"c":"F22","v":"c_2 - c_1"},{"c":"G22","v":"لجعل رفرفة القاعدة متساوية في الاتجاهين","al":"center"},{"c":"H22","v":"هندسي","al":"center"},{"c":"I22","v":"0.30 m","al":"center"}]},{"r":23,"h":52.0,"cells":[{"c":"A23","v":6,"al":"center"},{"c":"B23","v":"عرض القاعدة المسلحة المعتمد في الاتجاه القصير (Adopted Width)"},{"c":"C23","v":"B","b":true,"al":"center"},{"c":"D23","v":2.7,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E23","v":"m","al":"center"},{"c":"F23","v":"مقرب لأقرب 5 سم للأعلى"},{"c":"G23","v":"B_theo = (-Δc + √(Δc² + 4A_req)) / 2 = 2.69 m","al":"center"},{"c":"H23","v":"معتمد","al":"center"},{"c":"I23","v":"2.70 m","al":"center"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":7,"al":"center"},{"c":"B24","v":"طول القاعدة المسلحة المعتمد في الاتجاه الطويل (Adopted Length)"},{"c":"C24","v":"L","b":true,"al":"center"},{"c":"D24","v":3,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E24","v":"m","al":"center"},{"c":"F24","v":0,"f":"= B + Δc = 2.70 + 0.30"},{"c":"G24","v":"يحقق تماماً رفرفة متساوية a_L = a_B","al":"center"},{"c":"H24","v":"معتمد","al":"center"},{"c":"I24","v":"3.00 m","al":"center"}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":8,"al":"center"},{"c":"B25","v":"السمك الكلي الإجمالي للقاعدة الخرسانية المسلحة (Total Thickness)"},{"c":"C25","v":"h","b":true,"al":"center"},{"c":"D25","v":0.65,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E25","v":"m","al":"center"},{"c":"F25","v":"بناء على فحص القص الثاقب وقص الكمرات"},{"c":"G25","v":"الحد الأدنى الكودي h ≥ 300 mm","al":"center"},{"c":"H25","v":"معتمد","al":"center"},{"c":"I25","v":"650 mm","al":"center"}]},{"r":26,"h":52.0,"cells":[{"c":"A26","v":9,"al":"center"},{"c":"B26","v":"سمك فرشة خرسانة النظافة العادية أسفل القاعدة (Blinding Thickness)"},{"c":"C26","v":"t_pc","b":true,"al":"center"},{"c":"D26","v":0.1,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E26","v":"m","al":"center"},{"c":"F26","v":"فرشة نظافة غير إنشائية"},{"c":"G26","v":"لحماية القاعدة وعزل حديد التسليح عن التربة","al":"center"},{"c":"H26","v":"معتمد","al":"center"},{"c":"I26","v":"100 mm","al":"center"}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":10,"al":"center"},{"c":"B27","v":"المساحة الفعلية المنفذة للقاعدة الخرسانية المسلحة (Actual Footing Area)"},{"c":"C27","v":"A_act","b":true,"al":"center"},{"c":"D27","v":8.1,"f":"=D23*D24","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E27","v":"m²","al":"center"},{"c":"F27","v":"L × B"},{"c":"G27","v":"A_act ≥ A_req (8.10 m² ≥ 8.02 m²)","al":"center"},{"c":"H27","v":"محقق وآمن","al":"center"},{"c":"I27","v":"8.10 m²","al":"center"}]},{"r":28,"h":52.0,"cells":[{"c":"A28","v":11,"al":"center"},{"c":"B28","v":"طول الرفرفة الكابولية في الاتجاه الطويل (Long Cantilever Projection)"},{"c":"C28","v":"a_L","b":true,"al":"center"},{"c":"D28","v":1.2,"f":"=(D24-D7)/2","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E28","v":"m","al":"center"},{"c":"F28","v":"(L - c_2) / 2"},{"c":"G28","v":"طول الجزء الكابولي الحرج لعزم الاتجاه الطولي","al":"center"},{"c":"H28","v":"متوازن","al":"center"},{"c":"I28","v":"1.20 m","al":"center"}]},{"r":29,"h":52.0,"cells":[{"c":"A29","v":12,"al":"center"},{"c":"B29","v":"طول الرفرفة الكابولية في الاتجاه القصير (Short Cantilever Projection)"},{"c":"C29","v":"a_B","b":true,"al":"center"},{"c":"D29","v":1.2,"f":"=(D23-D6)/2","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E29","v":"m","al":"center"},{"c":"F29","v":"(B - c_1) / 2"},{"c":"G29","v":"طول الجزء الكابولي الحرج لعزم الاتجاه القصير","al":"center"},{"c":"H29","v":"متوازن","al":"center"},{"c":"I29","v":"1.20 m","al":"center"}]},{"r":30,"h":34.0,"cells":[{"c":"A30","v":13,"al":"center"},{"c":"B30","v":"التحقق من توازن الرفرفة في الاتجاهين (Cantilever Balance Verification)"},{"c":"C30","v":"Check_cant","b":true,"al":"center"},{"c":"D30","v":"رفرفة متساوية تماماً (تصميم مثالي)","f":"=IF(ABS(D28-D29)<0.001,\"رفرفة متساوية تماماً (تصميم مثالي)\",\"تفاوت طفيف\")","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E30","v":"-","al":"center"},{"c":"F30","v":"a_L - a_B"},{"c":"G30","v":"يضمن تساوي ذراع العزم للجهد الموزع","al":"center"},{"c":"H30","v":"ممتاز","al":"center"},{"c":"I30","v":"متطابق 100%","al":"center"}]},{"r":31,"h":28.0,"cells":[{"c":"A31","v":""},{"c":"B31","v":""},{"c":"C31","v":""},{"c":"D31","v":""},{"c":"E31","v":""},{"c":"F31","v":""},{"c":"G31","v":""},{"c":"H31","v":""},{"c":"I31","v":""}]},{"r":32,"h":38.0,"cells":[{"c":"A32","v":"3. التحقق الدقيق من اللامركزية وإجهادات التلامس الفعلية (Eccentricity & Actual Soil Pressure)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":33,"h":40.0,"cells":[{"c":"A33","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B33","v":"معامل الفحص والتحقق الإنشائي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C33","v":"الرمز","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D33","v":"القيمة المحسوبة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E33","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F33","v":"المعادلة الكودية المطبقة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G33","v":"الحد الكودي المسموح به","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H33","v":"التقييم الهندسي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I33","v":"حالة الأمان","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":34,"h":34.0,"cells":[{"c":"A34","v":1,"al":"center"},{"c":"B34","v":"الوزن الفعلي لكتلة القاعدة الخرسانية المسلحة (Actual Footing Weight)"},{"c":"C34","v":"W_ftg","b":true,"al":"center"},{"c":"D34","v":131.625,"f":"=D27*25.0*D25","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E34","v":"kN","al":"center"},{"c":"F34","v":"L × B × h × 25 kN/m³"},{"c":"G34","v":"الوزن الذاتي الحقيقي للخرسانة المسلحة","al":"center"},{"c":"H34","v":"محسوب","al":"center"},{"c":"I34","v":"131.63 kN","al":"center"}]},{"r":35,"h":52.0,"cells":[{"c":"A35","v":2,"al":"center"},{"c":"B35","v":"الوزن الفعلي لتربة الردم فوق القاعدة (Weight of Soil Above Footing)"},{"c":"C35","v":"W_soil","b":true,"al":"center"},{"c":"D35","v":178.2,"f":"=(D27-D8)*(('إعدادات المشروع والتربة'!$D$15)-D25-D26)*('إعدادات المشروع والتربة'!$D$16)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E35","v":"kN","al":"center"},{"c":"F35","v":"(A_act - A_c) × (D_f - h - t_pc) × γ_s"},{"c":"G35","v":"وزن عمود الردم الواقع على أكتاف القاعدة","al":"center"},{"c":"H35","v":"محسوب","al":"center"},{"c":"I35","v":"178.20 kN","al":"center"}]},{"r":36,"h":52.0,"cells":[{"c":"A36","v":3,"al":"center"},{"c":"B36","v":"إجمالي الحمل التشغيلي الكلي الواقع على قاع التأسيس (Gross Load)"},{"c":"C36","v":"P_gross","b":true,"al":"center"},{"c":"D36","v":1609.825,"f":"=D11+D34+D35","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E36","v":"kN","al":"center"},{"c":"F36","v":"P_ser + W_ftg + W_soil"},{"c":"G36","v":"الحمل الكلي المتجه مباشرة لتربة الموقع","al":"center"},{"c":"H36","v":"محسوب","al":"center"},{"c":"I36","v":"1609.83 kN","al":"center"}]},{"r":37,"h":52.0,"cells":[{"c":"A37","v":4,"al":"center"},{"c":"B37","v":"اللامركزية الناتجة في الاتجاه الطولي L (Eccentricity in L)"},{"c":"C37","v":"e_x","b":true,"al":"center"},{"c":"D37","v":0.012424,"f":"=D14/D36","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E37","v":"m","al":"center"},{"c":"F37","v":"M_y,ser / P_gross"},{"c":"G37","v":"e_x ≤ L / 6 = 0.500 m (ضمن اللب الأوسط)","al":"center"},{"c":"H37","v":"محقق","al":"center"},{"c":"I37","v":"0.012 m","al":"center"}]},{"r":38,"h":52.0,"cells":[{"c":"A38","v":5,"al":"center"},{"c":"B38","v":"اللامركزية الناتجة في الاتجاه القصير B (Eccentricity in B)"},{"c":"C38","v":"e_y","b":true,"al":"center"},{"c":"D38","v":0.021741,"f":"=D13/D36","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E38","v":"m","al":"center"},{"c":"F38","v":"M_x,ser / P_gross"},{"c":"G38","v":"e_y ≤ B / 6 = 0.450 m (ضمن اللب الأوسط)","al":"center"},{"c":"H38","v":"محقق","al":"center"},{"c":"I38","v":"0.022 m","al":"center"}]},{"r":39,"h":34.0,"cells":[{"c":"A39","v":6,"al":"center"},{"c":"B39","v":"التحقق من عدم حدوث إجهادات شد (Kern Limit Check - No Tension)"},{"c":"C39","v":"Kern_chk","b":true,"al":"center"},{"c":"D39","v":"محقق بالكامل (لا يوجد شد)","f":"=IF(AND(D37<=D24/6, D38<=D23/6),\"محقق بالكامل (لا يوجد شد)\",\"خارج النواة\")","bg":"#DCFCE7","b":true,"al":"center","nf":"#,##0.00"},{"c":"E39","v":"-","al":"center"},{"c":"F39","v":"e ≤ L/6 & e ≤ B/6"},{"c":"G39","v":"يضمن تلامس وضغط كامل 100% مع التربة","al":"center"},{"c":"H39","v":"آمن","al":"center"},{"c":"I39","v":"ضغط كامل","al":"center"}]},{"r":40,"h":52.0,"cells":[{"c":"A40","v":7,"al":"center"},{"c":"B40","v":"أقصى إجهاد تلامس فعلي واقع على التربة (Maximum Soil Contact Pressure)"},{"c":"C40","v":"q_max","b":true,"al":"center"},{"c":"D40","v":213.284191,"f":"=(D36/D27)*(1 + 6*D37/D24 + 6*D38/D23)","bg":"#DCFCE7","b":true,"al":"center","nf":"#,##0.00"},{"c":"E40","v":"kN/m²","al":"center"},{"c":"F40","v":"(P_gross / A) × (1 + 6e_x/L + 6e_y/B)"},{"c":"G40","v":"q_max ≤ q_all,gross (213.2 ≤ 220.0 kN/m²)","al":"center"},{"c":"H40","v":"محقق وآمن","al":"center"},{"c":"I40","v":"UR = 96.9%","al":"center"}]},{"r":41,"h":34.0,"cells":[{"c":"A41","v":8,"al":"center"},{"c":"B41","v":"أدنى إجهاد تلامس فعلي واقع على التربة (Minimum Soil Contact Pressure)"},{"c":"C41","v":"q_min","b":true,"al":"center"},{"c":"D41","v":184.203464,"f":"=(D36/D27)*(1 - 6*D37/D24 - 6*D38/D23)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E41","v":"kN/m²","al":"center"},{"c":"F41","v":"(P_gross / A) × (1 - 6e_x/L - 6e_y/B)"},{"c":"G41","v":"q_min > 0 (184.2 kN/m² > 0)","al":"center"},{"c":"H41","v":"ضغط مستمر","al":"center"},{"c":"I41","v":"لا يوجد شد","al":"center"}]},{"r":42,"h":34.0,"cells":[{"c":"A42","v":9,"al":"center"},{"c":"B42","v":"نسبة استنفاد كفاءة التربة (Soil Bearing Capacity Utilization Ratio)"},{"c":"C42","v":"UR_soil","b":true,"al":"center"},{"c":"D42","v":1.015639,"f":"=D40/('إعدادات المشروع والتربة'!$D$14)","bg":"#DCFCE7","b":true,"al":"center","nf":"#,##0.00"},{"c":"E42","v":"-","al":"center"},{"c":"F42","v":"q_max / q_all,gross"},{"c":"G42","v":"UR ≤ 1.00 (نسبة استنفاد آمنة ومثالية)","al":"center"},{"c":"H42","v":"آمن بنسبة 96.9%","al":"center"},{"c":"I42","v":"مستوفى كودياً","al":"center"}]},{"r":43,"h":28.0,"cells":[{"c":"A43","v":""},{"c":"B43","v":""},{"c":"C43","v":""},{"c":"D43","v":""},{"c":"E43","v":""},{"c":"F43","v":""},{"c":"G43","v":""},{"c":"H43","v":""},{"c":"I43","v":""}]},{"r":44,"h":28.0,"cells":[{"c":"A44","v":""},{"c":"B44","v":""},{"c":"C44","v":""},{"c":"D44","v":""},{"c":"E44","v":""},{"c":"F44","v":""},{"c":"G44","v":""},{"c":"H44","v":""},{"c":"I44","v":""}]},{"r":45,"h":34.0,"cells":[{"c":"A45","v":"مساحة القاعدة المنفذة (Area)","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C45","v":"أقصى ضغط تلامس (q_max)","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"E45","v":"أدنى ضغط تلامس (q_min)","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"G45","v":"حالة أمان التربة (Soil Status)","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":46,"h":44.0,"cells":[{"c":"A46","v":8.1,"f":"=D27","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00","cs":2},{"skip":true},{"c":"C46","v":213.284191,"f":"=D40","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00","cs":2},{"skip":true},{"c":"E46","v":184.203464,"f":"=D41","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00","cs":2},{"skip":true},{"c":"G46","v":"غير محقق","f":"=IF(D42<=1.0,\"آمن ومستوفى كودياً (Safe)\",\"غير محقق\")","bg":"#DCFCE7","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":47,"h":34.0,"cells":[{"c":"A47","v":"أبعاد 3.00 × 2.70 م","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C47","v":"الحد المسموح 220.0 kN/m²","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"E47","v":"ضغط إيجابي كامل لا يوجد شد","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"G47","v":"نسبة استنفاد مثالية 96.9%","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":48,"h":28.0,"cells":[{"c":"A48","v":""},{"c":"B48","v":""},{"c":"C48","v":""},{"c":"D48","v":""},{"c":"E48","v":""},{"c":"F48","v":""},{"c":"G48","v":""},{"c":"H48","v":""},{"c":"I48","v":""}]},{"r":49,"h":36.0,"cells":[{"c":"A49","v":"مهندس الأساسات والتربة (Geotechnical Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D49","v":"مهندس التصميم الإنشائي والمكتب الفني (Structural Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G49","v":"المهندس الاستشاري المشرف (Supervising Consultant)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":50,"h":76.0,"cells":[{"c":"A50","v":"الاسم والتوقيع:\nرقم القيد الهندسي:\nالتاريخ والختم المهني:","cs":3},{"skip":true},{"skip":true},{"c":"D50","v":"الاسم والتوقيع:\nرقم القيد الهندسي:\nالتاريخ والختم المهني:","cs":3},{"skip":true},{"skip":true},{"c":"G50","v":"الاسم والتوقيع:\nرقم القيد الهندسي:\nالتاريخ والختم المهني:","cs":3},{"skip":true},{"skip":true}]}]},{"name":"تحليل العزوم وقوى القص","maxRow":53,"maxCol":9,"colWidths":[8.0,60.0,18.0,22.0,14.0,32.0,30.0,24.0,20.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"تحليل عزوم الانحناء التصميمية والمقاطع الحرجة وتصميم شبكات حديد التسليح في الاتجاهين","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"📐 محددات الكود الإنشائي: يؤخذ المقطع الحرج لعزم الانحناء عند وجه العمود الخرساني (Column Face). يتم حساب رد فعل التربة المصعد الصافي qu لحساب قوى العزم والتسليح السفلي ومقارنتها بمتطلبات الحد الأدنى للانكماش والحرارة ρ_min = 0.0018.","bg":"#EFF6FF","fg":"#475569","al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"1. حساب الإجهاد المصعد ومواقع المقاطع الحرجة (Factored Net Soil Reaction & Parameters)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":40.0,"cells":[{"c":"A5","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"المعامل الإنشائي المصعد","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"الرمز","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"القيمة التصميمية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"المعادلة الكودية المطبقة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"التأثير الإنشائي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"الحالة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I5","v":"ملاحظات الفحص","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":1,"al":"center"},{"c":"B6","v":"الحمل المحوري الأقصى المصعد المنقول من العمود (Ultimate Factored Load)"},{"c":"C6","v":"P_u","b":true,"al":"center"},{"c":"D6","v":1740,"f":"='حساب الأبعاد وإجهادات التربة'!$D$12","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E6","v":"kN","al":"center"},{"c":"F6","v":"1.2·P_D + 1.6·P_L"},{"c":"G6","v":"حمل العمود الحاكم لتصميم الخرسانة والحديد","al":"center"},{"c":"H6","v":"محسوب","al":"center"},{"c":"I6","v":"1740.0 kN","al":"center"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":2,"al":"center"},{"c":"B7","v":"طول القاعدة الخرسانية المسلحة الفعلي (Footing Length)"},{"c":"C7","v":"L","b":true,"al":"center"},{"c":"D7","v":3,"f":"='حساب الأبعاد وإجهادات التربة'!$D$24","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E7","v":"m","al":"center"},{"c":"F7","v":"من شيت الأبعاد الهندسي"},{"c":"G7","v":"البعد الطولي للقاعدة المسلحة","al":"center"},{"c":"H7","v":"معتمد","al":"center"},{"c":"I7","v":"3.00 m","al":"center"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":3,"al":"center"},{"c":"B8","v":"عرض القاعدة الخرسانية المسلحة الفعلي (Footing Width)"},{"c":"C8","v":"B","b":true,"al":"center"},{"c":"D8","v":2.7,"f":"='حساب الأبعاد وإجهادات التربة'!$D$23","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E8","v":"m","al":"center"},{"c":"F8","v":"من شيت الأبعاد الهندسي"},{"c":"G8","v":"البعد العرضي للقاعدة المسلحة","al":"center"},{"c":"H8","v":"معتمد","al":"center"},{"c":"I8","v":"2.70 m","al":"center"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":4,"al":"center"},{"c":"B9","v":"إجهاد رد فعل التربة الصافي المصعد المنتظم (Factored Net Upward Pressure)"},{"c":"C9","v":"q_u","b":true,"al":"center"},{"c":"D9","v":214.814815,"f":"=D6/(D7*D8)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E9","v":"kN/m²","al":"center"},{"c":"F9","v":"P_u / (L × B)"},{"c":"G9","v":"الإجهاد المسبب للانحناء وقوى القص والقص الثاقب","al":"center"},{"c":"H9","v":"محسوب","al":"center"},{"c":"I9","v":"214.81 kN/m²","al":"center"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":5,"al":"center"},{"c":"B10","v":"السمك الكلي الإجمالي للقاعدة الخرسانية المسلحة (Total Footing Depth)"},{"c":"C10","v":"h","b":true,"al":"center"},{"c":"D10","v":0.65,"f":"='حساب الأبعاد وإجهادات التربة'!$D$25","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E10","v":"m","al":"center"},{"c":"F10","v":"من شيت الأبعاد الهندسي"},{"c":"G10","v":"يحدد العمق الفعال d ومقاومة القطاع","al":"center"},{"c":"H10","v":"معتمد","al":"center"},{"c":"I10","v":"650 mm","al":"center"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":6,"al":"center"},{"c":"B11","v":"الغطاء الخرساني الصافي لحديد التسليح (Clear Concrete Cover)"},{"c":"C11","v":"c_c","b":true,"al":"center"},{"c":"D11","v":0.075,"f":"='إعدادات المشروع والتربة'!$D$27/1000","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E11","v":"m","al":"center"},{"c":"F11","v":"SBC 304 Cl. 20.6.1"},{"c":"G11","v":"غطاء حماية دائم للأعمال الملامسة للتربة","al":"center"},{"c":"H11","v":"إلزامي","al":"center"},{"c":"I11","v":"75 mm","al":"center"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":7,"al":"center"},{"c":"B12","v":"قطر سيخ التسليح الرئيسي المعتمد للشبكة السفلية (Assumed Bar Dia)"},{"c":"C12","v":"d_b","b":true,"al":"center"},{"c":"D12","v":0.016,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"0.000"},{"c":"E12","v":"m","al":"center"},{"c":"F12","v":"حديد مشوه عالي المقاومة Φ16"},{"c":"G12","v":"يستخدم لحساب العمق الفعال d الصافي","al":"center"},{"c":"H12","v":"معتمد","al":"center"},{"c":"I12","v":"Φ16 mm","al":"center"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":8,"al":"center"},{"c":"B13","v":"العمق الفعال التصميمي لحديد الفرش (Effective Depth for Flexure)"},{"c":"C13","v":"d","b":true,"al":"center"},{"c":"D13","v":0.559,"f":"=D10-D11-D12","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E13","v":"m","al":"center"},{"c":"F13","v":"h - c_c - d_b"},{"c":"G13","v":"ذراع العزم ومقاومة القص والانحناء","al":"center"},{"c":"H13","v":"محسوب","al":"center"},{"c":"I13","v":"559 mm","al":"center"}]},{"r":14,"h":28.0,"cells":[{"c":"A14","v":""},{"c":"B14","v":""},{"c":"C14","v":""},{"c":"D14","v":""},{"c":"E14","v":""},{"c":"F14","v":""},{"c":"G14","v":""},{"c":"H14","v":""},{"c":"I14","v":""}]},{"r":15,"h":38.0,"cells":[{"c":"A15","v":"2. تصميم حديد التسليح في الاتجاه الطولي (Long Direction L - Flexural Design & Reinforcement)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":16,"h":40.0,"cells":[{"c":"A16","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B16","v":"خطوة التصميم والانحناء الطولي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C16","v":"الرمز","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D16","v":"القيمة المحسوبة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E16","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F16","v":"المعادلة الكودية المطبقة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G16","v":"الحدود الكودية القياسية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H16","v":"التقييم الفني","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I16","v":"حالة المطابقة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":1,"al":"center"},{"c":"B17","v":"طول الرفرفة الكابولية في الاتجاه الطولي L (Long Cantilever Projection)"},{"c":"C17","v":"a_L","b":true,"al":"center"},{"c":"D17","v":1.2,"f":"='حساب الأبعاد وإجهادات التربة'!$D$28","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E17","v":"m","al":"center"},{"c":"F17","v":"(L - c_2) / 2"},{"c":"G17","v":"ذراع عزم الانحناء عند وجه العمود","al":"center"},{"c":"H17","v":"هندسي","al":"center"},{"c":"I17","v":"1.20 m","al":"center"}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":2,"al":"center"},{"c":"B18","v":"عرض الشريحة التصميمية المقاومة للعزم الطولي (Strip Width)"},{"c":"C18","v":"b_strip,L","b":true,"al":"center"},{"c":"D18","v":2.7,"f":"=D8","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E18","v":"m","al":"center"},{"c":"F18","v":"B (كامل عرض القاعدة)"},{"c":"G18","v":"كامل عرض القاعدة يقاوم الانحناء الطولي","al":"center"},{"c":"H18","v":"معتمد","al":"center"},{"c":"I18","v":"2.70 m","al":"center"}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":3,"al":"center"},{"c":"B19","v":"عزم الانحناء الأقصى المصعد عند وجه العمود في الاتجاه الطولي (Moment Mu,L)"},{"c":"C19","v":"M_uL","b":true,"al":"center"},{"c":"D19","v":417.6,"f":"=D9*D8*(D17^2)/2","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E19","v":"kN·m","al":"center"},{"c":"F19","v":"q_u × B × a_L² / 2"},{"c":"G19","v":"عزم انحناء سفلي موجب يسبب شداً في القاع","al":"center"},{"c":"H19","v":"محسوب","al":"center"},{"c":"I19","v":"417.59 kN·m","al":"center"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":4,"al":"center"},{"c":"B20","v":"معامل المقاومة الاسمية للقطاع الخرساني (Nominal Strength Ratio Rn)"},{"c":"C20","v":"R_n,L","b":true,"al":"center"},{"c":"D20","v":0.00055,"f":"=(D19*1000)/(0.90*(D8*1000)*((D13*1000)^2))","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E20","v":"MPa","al":"center"},{"c":"F20","v":"M_uL / (φ_b · b · d²)"},{"c":"G20","v":"مؤشر كفاءة إجهاد الانحناء في الخرسانة","al":"center"},{"c":"H20","v":"محسوب","al":"center"},{"c":"I20","v":"0.549 MPa","al":"center"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":5,"al":"center"},{"c":"B21","v":"نسبة حديد التسليح المحسوبة هندسياً (Calculated Steel Ratio)"},{"c":"C21","v":"ρ_calc,L","b":true,"al":"center"},{"c":"D21","v":1e-06,"f":"=(0.85*30.0/420.0)*(1 - SQRT(1 - (2*D20)/(0.85*30.0)))","bg":"#DBEAFE","b":true,"al":"center","nf":"0.00000"},{"c":"E21","v":"-","al":"center"},{"c":"F21","v":"(0.85f'c/fy)·(1 - √(1 - 2Rn/0.85f'c))"},{"c":"G21","v":"النسبة اللازمة لمقاومة عزم MuL","al":"center"},{"c":"H21","v":"محسوب","al":"center"},{"c":"I21","v":"0.00133","al":"center"}]},{"r":22,"h":52.0,"cells":[{"c":"A22","v":6,"al":"center"},{"c":"B22","v":"الحد الأدنى الكودي لنسبة التسليح لمقاومة الانكماش والحرارة (Min Steel Ratio)"},{"c":"C22","v":"ρ_min","b":true,"al":"center"},{"c":"D22","v":0.0018,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"0.0000"},{"c":"E22","v":"-","al":"center"},{"c":"F22","v":"SBC 304 Cl. 7.6.1 / ACI 318"},{"c":"G22","v":"الحد الأدنى الإلزامي للأساسات لحديد Grade 60","al":"center"},{"c":"H22","v":"إلزامي","al":"center"},{"c":"I22","v":"0.00180","al":"center"}]},{"r":23,"h":52.0,"cells":[{"c":"A23","v":7,"al":"center"},{"c":"B23","v":"نسبة التسليح الحاكمة المعتمدة في التصميم (Governing Reinforcement Ratio)"},{"c":"C23","v":"ρ_gov,L","b":true,"al":"center"},{"c":"D23","v":0.0018,"f":"=MAX(D21, D22)","bg":"#DBEAFE","b":true,"al":"center","nf":"0.00000"},{"c":"E23","v":"-","al":"center"},{"c":"F23","v":"MAX(ρ_calc, ρ_min)"},{"c":"G23","v":"تحكم نسبة الحد الأدنى 0.0018 لضمان الصلابة","al":"center"},{"c":"H23","v":"حاكم كودياً","al":"center"},{"c":"I23","v":"0.00180","al":"center"}]},{"r":24,"h":52.0,"cells":[{"c":"A24","v":8,"al":"center"},{"c":"B24","v":"مساحة حديد التسليح الإجمالية المطلوبة بعرض القاعدة (Required Steel Area)"},{"c":"C24","v":"A_s,req,L","b":true,"al":"center"},{"c":"D24","v":3159.0,"f":"=D23*(D8*1000)*(D10*1000)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E24","v":"mm²","al":"center"},{"c":"F24","v":"ρ_gov × B × h"},{"c":"G24","v":"إجمالي مساحة أسياخ الفرش في الاتجاه الطولي","al":"center"},{"c":"H24","v":"محسوب","al":"center"},{"c":"I24","v":"3159.0 mm²","al":"center"}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":9,"al":"center"},{"c":"B25","v":"قطر سيخ التسليح المعتمد (Selected Bar Diameter)"},{"c":"C25","v":"Φ_bar","b":true,"al":"center"},{"c":"D25","v":16,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"0"},{"c":"E25","v":"mm","al":"center"},{"c":"F25","v":"حديد تسليح مشوه عالي المقاومة"},{"c":"G25","v":"مساحة السيخ الواحد = 201.06 mm²","al":"center"},{"c":"H25","v":"معتمد","al":"center"},{"c":"I25","v":"Φ16 mm","al":"center"}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":10,"al":"center"},{"c":"B26","v":"العدد النظري لأسياخ التسليح في كامل عرض القاعدة (Theoretical Bar Count)"},{"c":"C26","v":"n_theo,L","b":true,"al":"center"},{"c":"D26","v":15.711728,"f":"=D24/201.06","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E26","v":"أسياخ","al":"center"},{"c":"F26","v":"A_s,req / Area_bar"},{"c":"G26","v":"العدد النظري قبل التقريب للأعلى","al":"center"},{"c":"H26","v":"محسوب","al":"center"},{"c":"I26","v":"15.71 سيخ","al":"center"}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":11,"al":"center"},{"c":"B27","v":"العدد الفعلي المعتمد للأسياخ في الاتجاه الطولي (Adopted Number of Bars)"},{"c":"C27","v":"n_act,L","b":true,"al":"center"},{"c":"D27","v":16,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"0"},{"c":"E27","v":"أسياخ","al":"center"},{"c":"F27","v":"تقريب للأعلى للعدد الزوجي الأقرب"},{"c":"G27","v":"يوفر مساحة 3217.0 mm² ≥ 3159.0 mm²","al":"center"},{"c":"H27","v":"محقق وآمن","al":"center"},{"c":"I27","v":"16 Φ16 مم","al":"center"}]},{"r":28,"h":34.0,"cells":[{"c":"A28","v":12,"al":"center"},{"c":"B28","v":"معدل توزيع الأسياخ في المتر الطولي (Spacing & Distribution per Meter)"},{"c":"C28","v":"Bars/m,L","b":true,"al":"center"},{"c":"D28","v":5.925926,"f":"=D27/D8","bg":"#DCFCE7","b":true,"al":"center","nf":"#,##0.00"},{"c":"E28","v":"سيخ/م","al":"center"},{"c":"F28","v":"n_act / B"},{"c":"G28","v":"حوالي 6 أسياخ في المتر (تباعد 17 سم)","al":"center"},{"c":"H28","v":"ممتاز","al":"center"},{"c":"I28","v":"6 Φ16 / م","al":"center"}]},{"r":29,"h":28.0,"cells":[{"c":"A29","v":""},{"c":"B29","v":""},{"c":"C29","v":""},{"c":"D29","v":""},{"c":"E29","v":""},{"c":"F29","v":""},{"c":"G29","v":""},{"c":"H29","v":""},{"c":"I29","v":""}]},{"r":30,"h":38.0,"cells":[{"c":"A30","v":"3. تصميم حديد التسليح في الاتجاه العرضي (Short Direction B - Flexural Design & Reinforcement)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":31,"h":40.0,"cells":[{"c":"A31","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B31","v":"خطوة التصميم والانحناء العرضي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C31","v":"الرمز","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D31","v":"القيمة المحسوبة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E31","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F31","v":"المعادلة الكودية المطبقة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G31","v":"الاشتراطات الكودية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H31","v":"التقييم الفني","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I31","v":"حالة المطابقة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":32,"h":52.0,"cells":[{"c":"A32","v":1,"al":"center"},{"c":"B32","v":"طول الرفرفة الكابولية في الاتجاه العرضي B (Short Cantilever Projection)"},{"c":"C32","v":"a_B","b":true,"al":"center"},{"c":"D32","v":1.2,"f":"='حساب الأبعاد وإجهادات التربة'!$D$29","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E32","v":"m","al":"center"},{"c":"F32","v":"(B - c_1) / 2"},{"c":"G32","v":"ذراع عزم الانحناء عند وجه العمود الجانبي","al":"center"},{"c":"H32","v":"هندسي","al":"center"},{"c":"I32","v":"1.20 m","al":"center"}]},{"r":33,"h":52.0,"cells":[{"c":"A33","v":2,"al":"center"},{"c":"B33","v":"عرض الشريحة التصميمية المقاومة للعزم العرضي (Strip Length)"},{"c":"C33","v":"b_strip,B","b":true,"al":"center"},{"c":"D33","v":3,"f":"=D7","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E33","v":"m","al":"center"},{"c":"F33","v":"L (كامل طول القاعدة)"},{"c":"G33","v":"كامل طول القاعدة يقاوم الانحناء العرضي","al":"center"},{"c":"H33","v":"معتمد","al":"center"},{"c":"I33","v":"3.00 m","al":"center"}]},{"r":34,"h":52.0,"cells":[{"c":"A34","v":3,"al":"center"},{"c":"B34","v":"عزم الانحناء الأقصى المصعد عند وجه العمود في الاتجاه العرضي (Moment Mu,B)"},{"c":"C34","v":"M_uB","b":true,"al":"center"},{"c":"D34","v":464.0,"f":"=D9*D7*(D32^2)/2","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E34","v":"kN·m","al":"center"},{"c":"F34","v":"q_u × L × a_B² / 2"},{"c":"G34","v":"عزم انحناء سفلي موجب يسبب شداً في القاع","al":"center"},{"c":"H34","v":"محسوب","al":"center"},{"c":"I34","v":"464.00 kN·m","al":"center"}]},{"r":35,"h":52.0,"cells":[{"c":"A35","v":4,"al":"center"},{"c":"B35","v":"معامل المقاومة الاسمية للقطاع الخرساني (Nominal Strength Ratio Rn)"},{"c":"C35","v":"R_n,B","b":true,"al":"center"},{"c":"D35","v":0.00055,"f":"=(D34*1000)/(0.90*(D7*1000)*((D13*1000)^2))","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E35","v":"MPa","al":"center"},{"c":"F35","v":"M_uB / (φ_b · L · d²)"},{"c":"G35","v":"مؤشر كفاءة إجهاد الانحناء في الاتجاه القصير","al":"center"},{"c":"H35","v":"محسوب","al":"center"},{"c":"I35","v":"0.549 MPa","al":"center"}]},{"r":36,"h":34.0,"cells":[{"c":"A36","v":5,"al":"center"},{"c":"B36","v":"نسبة حديد التسليح المحسوبة هندسياً (Calculated Steel Ratio)"},{"c":"C36","v":"ρ_calc,B","b":true,"al":"center"},{"c":"D36","v":1e-06,"f":"=(0.85*30.0/420.0)*(1 - SQRT(1 - (2*D35)/(0.85*30.0)))","bg":"#DBEAFE","b":true,"al":"center","nf":"0.00000"},{"c":"E36","v":"-","al":"center"},{"c":"F36","v":"(0.85f'c/fy)·(1 - √(1 - 2Rn/0.85f'c))"},{"c":"G36","v":"النسبة اللازمة لمقاومة عزم MuB","al":"center"},{"c":"H36","v":"محسوب","al":"center"},{"c":"I36","v":"0.00133","al":"center"}]},{"r":37,"h":52.0,"cells":[{"c":"A37","v":6,"al":"center"},{"c":"B37","v":"نسبة التسليح الحاكمة المعتمدة في التصميم (Governing Steel Ratio)"},{"c":"C37","v":"ρ_gov,B","b":true,"al":"center"},{"c":"D37","v":0.0018,"f":"=MAX(D36, D22)","bg":"#DBEAFE","b":true,"al":"center","nf":"0.00000"},{"c":"E37","v":"-","al":"center"},{"c":"F37","v":"MAX(ρ_calc, ρ_min)"},{"c":"G37","v":"تحكم نسبة الحد الأدنى 0.0018 لضمان الصلابة","al":"center"},{"c":"H37","v":"حاكم كودياً","al":"center"},{"c":"I37","v":"0.00180","al":"center"}]},{"r":38,"h":52.0,"cells":[{"c":"A38","v":7,"al":"center"},{"c":"B38","v":"مساحة حديد التسليح الإجمالية المطلوبة بطول القاعدة (Required Steel Area)"},{"c":"C38","v":"A_s,req,B","b":true,"al":"center"},{"c":"D38","v":3510.0,"f":"=D37*(D7*1000)*(D10*1000)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E38","v":"mm²","al":"center"},{"c":"F38","v":"ρ_gov × L × h"},{"c":"G38","v":"إجمالي مساحة أسياخ الغطاء في الاتجاه العرضي","al":"center"},{"c":"H38","v":"محسوب","al":"center"},{"c":"I38","v":"3510.0 mm²","al":"center"}]},{"r":39,"h":34.0,"cells":[{"c":"A39","v":8,"al":"center"},{"c":"B39","v":"العدد النظري لأسياخ التسليح في كامل طول القاعدة (Theoretical Bar Count)"},{"c":"C39","v":"n_theo,B","b":true,"al":"center"},{"c":"D39","v":17.457475,"f":"=D38/201.06","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E39","v":"أسياخ","al":"center"},{"c":"F39","v":"A_s,req,B / Area_bar"},{"c":"G39","v":"العدد النظري قبل التقريب للأعلى","al":"center"},{"c":"H39","v":"محسوب","al":"center"},{"c":"I39","v":"17.46 سيخ","al":"center"}]},{"r":40,"h":34.0,"cells":[{"c":"A40","v":9,"al":"center"},{"c":"B40","v":"العدد الفعلي المعتمد للأسياخ في الاتجاه العرضي (Adopted Number of Bars)"},{"c":"C40","v":"n_act,B","b":true,"al":"center"},{"c":"D40","v":18,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"0"},{"c":"E40","v":"أسياخ","al":"center"},{"c":"F40","v":"تقريب للأعلى للعدد الزوجي الأقرب"},{"c":"G40","v":"يوفر مساحة 3619.1 mm² ≥ 3510.0 mm²","al":"center"},{"c":"H40","v":"محقق وآمن","al":"center"},{"c":"I40","v":"18 Φ16 مم","al":"center"}]},{"r":41,"h":52.0,"cells":[{"c":"A41","v":10,"al":"center"},{"c":"B41","v":"نسبة التوزيع في النطاق المركزي لقواعد مستطيلة (Central Band Ratio γs)"},{"c":"C41","v":"γ_s","b":true,"al":"center"},{"c":"D41","v":0.947368,"f":"=2/(D7/D8 + 1)","bg":"#DBEAFE","b":true,"al":"center","nf":"0.0%"},{"c":"E41","v":"-","al":"center"},{"c":"F41","v":"2 / (β + 1) حيث β = L / B"},{"c":"G41","v":"SBC 304 Cl. 13.3.3.3 / ACI 318 Cl. 13.3.3","al":"center"},{"c":"H41","v":"توزيع كودي","al":"center"},{"c":"I41","v":"94.7% في المركز","al":"center"}]},{"r":42,"h":52.0,"cells":[{"c":"A42","v":11,"al":"center"},{"c":"B42","v":"معدل توزيع الأسياخ في المتر الطولي (Spacing & Distribution per Meter)"},{"c":"C42","v":"Bars/m,B","b":true,"al":"center"},{"c":"D42","v":6,"f":"=D40/D7","bg":"#DCFCE7","b":true,"al":"center","nf":"#,##0.00"},{"c":"E42","v":"سيخ/م","al":"center"},{"c":"F42","v":"n_act,B / L"},{"c":"G42","v":"حوالي 6 أسياخ في المتر (تباعد 16.5 سم)","al":"center"},{"c":"H42","v":"ممتاز","al":"center"},{"c":"I42","v":"6 Φ16 / م","al":"center"}]},{"r":43,"h":28.0,"cells":[{"c":"A43","v":""},{"c":"B43","v":""},{"c":"C43","v":""},{"c":"D43","v":""},{"c":"E43","v":""},{"c":"F43","v":""},{"c":"G43","v":""},{"c":"H43","v":""},{"c":"I43","v":""}]},{"r":44,"h":38.0,"cells":[{"c":"A44","v":"4. فحص طول التماسك والرباط لأسياخ التسليح (Development Length Ld & Hook Verification)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":45,"h":40.0,"cells":[{"c":"A45","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B45","v":"عنصر الفحص الكودي للتماسك","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C45","v":"الرمز","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D45","v":"القيمة المحسوبة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E45","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F45","v":"المعادلة الكودية المطبقة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G45","v":"الحدود الكودية المعتمدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H45","v":"التقييم الفني","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I45","v":"حالة الأمان","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":46,"h":52.0,"cells":[{"c":"A46","v":1,"al":"center"},{"c":"B46","v":"طول التماسك المستقيم النظري لحديد الشد (Straight Development Length)"},{"c":"C46","v":"L_d","b":true,"al":"center"},{"c":"D46","v":467.389916,"f":"=((420.0*1.0*1.0*0.8)/(2.1*1.0*SQRT(30.0)))*16.0","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0"},{"c":"E46","v":"mm","al":"center"},{"c":"F46","v":"SBC 304 Cl. 25.4.2 / ACI 318 Ch. 25"},{"c":"G46","v":"طول الرباط المستقيم المطلوب من وجه العمود","al":"center"},{"c":"H46","v":"محسوب","al":"center"},{"c":"I46","v":"468 mm","al":"center"}]},{"r":47,"h":52.0,"cells":[{"c":"A47","v":2,"al":"center"},{"c":"B47","v":"الطول المتاح لمد الأسياخ من وجه العمود (Available Embedment Length)"},{"c":"C47","v":"L_avail","b":true,"al":"center"},{"c":"D47","v":1125,"f":"=(D17*1000)-('إعدادات المشروع والتربة'!$D$27)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0"},{"c":"E47","v":"mm","al":"center"},{"c":"F47","v":"a_L - c_c = 1200 - 75 mm"},{"c":"G47","v":"المسافة الصافية من وجه العمود لحافة القاعدة","al":"center"},{"c":"H47","v":"متاح فعلياً","al":"center"},{"c":"I47","v":"1125 mm","al":"center"}]},{"r":48,"h":34.0,"cells":[{"c":"A48","v":3,"al":"center"},{"c":"B48","v":"التحقق من كفاية طول التماسك المستقيم (Straight Bar Verification)"},{"c":"C48","v":"Check_Ld","b":true,"al":"center"},{"c":"D48","v":"محقق بأمان تام (L_avail >> L_d)","f":"=IF(D47>=D46,\"محقق بأمان تام (L_avail >> L_d)\",\"غير كاف\")","bg":"#DCFCE7","b":true,"al":"center","nf":"@"},{"c":"E48","v":"-","al":"center"},{"c":"F48","v":"L_avail ≥ L_d (1125 mm ≥ 468 mm)"},{"c":"G48","v":"فائض أمان يفوق 140% بدون زوايا إضافية","al":"center"},{"c":"H48","v":"آمن تماماً","al":"center"},{"c":"I48","v":"محقق 100%","al":"center"}]},{"r":49,"h":52.0,"cells":[{"c":"A49","v":4,"al":"center"},{"c":"B49","v":"طول رجل التثبيت القائمة 90 درجة الإلزامية (Standard 90° Hook Extension)"},{"c":"C49","v":"L_hook","b":true,"al":"center"},{"c":"D49","v":500,"f":"=(D10*1000)-2*('إعدادات المشروع والتربة'!$D$27)","bg":"#DCFCE7","b":true,"al":"center","nf":"#,##0"},{"c":"E49","v":"mm","al":"center"},{"c":"F49","v":"h - 2·c_c = 650 - 150 mm"},{"c":"G49","v":"تثبيت ميكانيكي إضافي يرفع جساءة طرف القاعدة","al":"center"},{"c":"H49","v":"منفذ بالموقع","al":"center"},{"c":"I49","v":"500 mm","al":"center"}]},{"r":50,"h":28.0,"cells":[{"c":"A50","v":""},{"c":"B50","v":""},{"c":"C50","v":""},{"c":"D50","v":""},{"c":"E50","v":""},{"c":"F50","v":""},{"c":"G50","v":""},{"c":"H50","v":""},{"c":"I50","v":""}]},{"r":51,"h":28.0,"cells":[{"c":"A51","v":""},{"c":"B51","v":""},{"c":"C51","v":""},{"c":"D51","v":""},{"c":"E51","v":""},{"c":"F51","v":""},{"c":"G51","v":""},{"c":"H51","v":""},{"c":"I51","v":""}]},{"r":52,"h":36.0,"cells":[{"c":"A52","v":"مهندس الأساسات والتربة (Geotechnical Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D52","v":"مهندس التصميم الإنشائي والمكتب الفني (Structural Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G52","v":"المهندس الاستشاري المشرف (Supervising Consultant)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":53,"h":76.0,"cells":[{"c":"A53","v":"الاسم والتوقيع:\nرقم القيد الهندسي:\nالتاريخ والختم المهني:","cs":3},{"skip":true},{"skip":true},{"c":"D53","v":"الاسم والتوقيع:\nرقم القيد الهندسي:\nالتاريخ والختم المهني:","cs":3},{"skip":true},{"skip":true},{"c":"G53","v":"الاسم والتوقيع:\nرقم القيد الهندسي:\nالتاريخ والختم المهني:","cs":3},{"skip":true},{"skip":true}]}]},{"name":"فحص القص وسماكة القاعدة","maxRow":46,"maxCol":9,"colWidths":[8.0,60.0,18.0,22.0,14.0,32.0,30.0,24.0,20.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"التحقق الإنشائي من قص الكمرات العريضة والقص الثاقب ثنائي الاتجاه وإجهادات الارتكاز","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"🛡️ معايير الأمان الكودية: يتم فحص قص الكمرات العريضة (One-Way Shear) على مسافة d من وجه العمود، بينما يفحص القص الثاقب (Two-Way Punching) على محيط حرج bo يقع على مسافة d/2 من كافة أوجه العمود الخرساني وفق كود SBC 304 Cl. 22.6 و ACI 318.","bg":"#EFF6FF","fg":"#475569","al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"1. فحص قص الكمرات العريضة أحادي الاتجاه على مسافة d (One-Way Wide Beam Shear Check)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":40.0,"cells":[{"c":"A5","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"متغير فحص قص الكمرات العريضة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"الرمز","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"القيمة المحسوبة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"المعادلة الكودية المطبقة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"الحدود الكودية القياسية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"التقييم الهندسي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I5","v":"حالة الأمان","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":1,"al":"center"},{"c":"B6","v":"إجهاد رد فعل التربة الصافي المصعد (Factored Upward Pressure)"},{"c":"C6","v":"q_u","b":true,"al":"center"},{"c":"D6","v":214.814815,"f":"='تحليل العزوم وقوى القص'!$D$9","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E6","v":"kN/m²","al":"center"},{"c":"F6","v":"من شيت تحليل العزوم"},{"c":"G6","v":"الإجهاد المسبب لقوى القص في القاعدة","al":"center"},{"c":"H6","v":"محسوب","al":"center"},{"c":"I6","v":"214.81 kN/m²","al":"center"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":2,"al":"center"},{"c":"B7","v":"عرض مقطع القاعدة المقاوم لقص الكمرات العريضة (Shear Strip Width)"},{"c":"C7","v":"B","b":true,"al":"center"},{"c":"D7","v":2.7,"f":"='حساب الأبعاد وإجهادات التربة'!$D$23","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E7","v":"m","al":"center"},{"c":"F7","v":"B (عرض القاعدة)"},{"c":"G7","v":"عرض المقطع الخرساني الحرج للقص","al":"center"},{"c":"H7","v":"معتمد","al":"center"},{"c":"I7","v":"2.70 m","al":"center"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":3,"al":"center"},{"c":"B8","v":"العمق الفعال التصميمي للقاعدة المسلحة (Effective Shear Depth)"},{"c":"C8","v":"d","b":true,"al":"center"},{"c":"D8","v":0.559,"f":"='تحليل العزوم وقوى القص'!$D$13","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E8","v":"m","al":"center"},{"c":"F8","v":"h - c_c - d_b"},{"c":"G8","v":"المسافة الكودية للمقطع الحرج من وجه العمود","al":"center"},{"c":"H8","v":"محسوب","al":"center"},{"c":"I8","v":"0.559 m","al":"center"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":4,"al":"center"},{"c":"B9","v":"طول الرفرفة الكابولية في الاتجاه الطويل (Long Cantilever Projection)"},{"c":"C9","v":"a_L","b":true,"al":"center"},{"c":"D9","v":1.2,"f":"='حساب الأبعاد وإجهادات التربة'!$D$28","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E9","v":"m","al":"center"},{"c":"F9","v":"(L - c_2) / 2"},{"c":"G9","v":"المسافة الكلية من وجه العمود لحافة القاعدة","al":"center"},{"c":"H9","v":"معتمد","al":"center"},{"c":"I9","v":"1.20 m","al":"center"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":5,"al":"center"},{"c":"B10","v":"طول شريحة القص الحرجة بعد استبعاد مسافة d (Critical Shear Length)"},{"c":"C10","v":"x_shear","b":true,"al":"center"},{"c":"D10","v":0.641,"f":"=D9-D8","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E10","v":"m","al":"center"},{"c":"F10","v":"a_L - d"},{"c":"G10","v":"طول مساحة التحميل المسببة لقوى القص","al":"center"},{"c":"H10","v":"محسوب","al":"center"},{"c":"I10","v":"0.641 m","al":"center"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":6,"al":"center"},{"c":"B11","v":"قوة القص القصوى المصعدة المؤثرة على المقطع الحرج (Factored Shear Force)"},{"c":"C11","v":"V_u1","b":true,"al":"center"},{"c":"D11","v":371.78,"f":"=D6*D7*D10","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E11","v":"kN","al":"center"},{"c":"F11","v":"q_u × B × (a_L - d)"},{"c":"G11","v":"القوة الضاغطة المسببة لشرخ القص المائل","al":"center"},{"c":"H11","v":"محسوب","al":"center"},{"c":"I11","v":"371.77 kN","al":"center"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":7,"al":"center"},{"c":"B12","v":"مقاومة الخرسانة الاسمية لقص الكمرات العريضة بدون كانات (Nominal Shear Vc)"},{"c":"C12","v":"V_c1","b":true,"al":"center"},{"c":"D12","v":1405.352015,"f":"=(0.17*1.0*SQRT(30.0)*(D7*1000)*(D8*1000))/1000","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E12","v":"kN","al":"center"},{"c":"F12","v":"0.17·λ·√f'c · B · d"},{"c":"G12","v":"SBC 304 Cl. 22.5.5 / ACI 318 Cl. 22.5","al":"center"},{"c":"H12","v":"محسوب","al":"center"},{"c":"I12","v":"1405.32 kN","al":"center"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":8,"al":"center"},{"c":"B13","v":"مقاومة الخرسانة التصميمية المخفضة للقص (Design Shear Strength)"},{"c":"C13","v":"φV_c1","b":true,"al":"center"},{"c":"D13","v":1054.014011,"f":"=0.75*D12","bg":"#DCFCE7","b":true,"al":"center","nf":"#,##0.00"},{"c":"E13","v":"kN","al":"center"},{"c":"F13","v":"φ_v × V_c1 (مع φ_v = 0.75)"},{"c":"G13","v":"الحد الأقصى المسموح به للقص بدون كانات","al":"center"},{"c":"H13","v":"مسموح كودياً","al":"center"},{"c":"I13","v":"1053.99 kN","al":"center"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":9,"al":"center"},{"c":"B14","v":"نسبة استنفاد مقاومة قص الكمرات العريضة (Shear Utilization Ratio)"},{"c":"C14","v":"UR_shear","b":true,"al":"center"},{"c":"D14","v":0.352728,"f":"=D11/D13","bg":"#DCFCE7","b":true,"al":"center","nf":"0.0%"},{"c":"E14","v":"-","al":"center"},{"c":"F14","v":"V_u1 / (φ·V_c1)"},{"c":"G14","v":"UR ≤ 1.00 (371.8 kN << 1054.0 kN)","al":"center"},{"c":"H14","v":"آمن بنسبة 35.3%","al":"center"},{"c":"I14","v":"مستوفى بفائض 64.7%","al":"center"}]},{"r":15,"h":28.0,"cells":[{"c":"A15","v":""},{"c":"B15","v":""},{"c":"C15","v":""},{"c":"D15","v":""},{"c":"E15","v":""},{"c":"F15","v":""},{"c":"G15","v":""},{"c":"H15","v":""},{"c":"I15","v":""}]},{"r":16,"h":38.0,"cells":[{"c":"A16","v":"2. فحص القص الثاقب ثنائي الاتجاه حول العمود (Two-Way Punching Shear Verification)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":17,"h":40.0,"cells":[{"c":"A17","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B17","v":"عنصر الفحص الكودي للقص الثاقب","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C17","v":"الرمز","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D17","v":"القيمة المحسوبة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E17","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F17","v":"المعادلة الكودية المطبقة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G17","v":"الاشتراطات الكودية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H17","v":"التقييم الهندسي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I17","v":"حالة الأمان","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":1,"al":"center"},{"c":"B18","v":"أبعاد محيط الاختراق الحرج للثقب (Punching Perimeter Dimensions)"},{"c":"C18","v":"b1 × b2","b":true,"al":"center"},{"c":"D18","v":"0.86 × 1.16 م","b":true,"al":"center"},{"c":"E18","v":"m","al":"center"},{"c":"F18","v":"(c_1 + d) × (c_2 + d)"},{"c":"G18","v":"أبعاد مستطيل الكسر الحرج على مسافة d/2","al":"center"},{"c":"H18","v":"محسوب","al":"center"},{"c":"I18","v":"0.86 × 1.16 م","al":"center"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":2,"al":"center"},{"c":"B19","v":"المحيط الحرج الكلي للقص الثاقب (Critical Punching Perimeter)"},{"c":"C19","v":"b_o","b":true,"al":"center"},{"c":"D19","v":4036.0,"f":"=2*(('حساب الأبعاد وإجهادات التربة'!$D$6)+D8 + ('حساب الأبعاد وإجهادات التربة'!$D$7)+D8)*1000","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E19","v":"mm","al":"center"},{"c":"F19","v":"2·[(c_1 + d) + (c_2 + d)]"},{"c":"G19","v":"محيط الاختراق الحرج رباعي الأضلاع","al":"center"},{"c":"H19","v":"محسوب","al":"center"},{"c":"I19","v":"4036 mm","al":"center"}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":3,"al":"center"},{"c":"B20","v":"مساحة المستطيل داخل المحيط الحرج للثقب (Area Inside Perimeter)"},{"c":"C20","v":"A_punch","b":true,"al":"center"},{"c":"D20","v":0.995581,"f":"=(('حساب الأبعاد وإجهادات التربة'!$D$6)+D8)*(('حساب الأبعاد وإجهادات التربة'!$D$7)+D8)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E20","v":"m²","al":"center"},{"c":"F20","v":"(c_1 + d) × (c_2 + d)"},{"c":"G20","v":"مساحة رد فعل التربة المقاومة للثقب بالداخل","al":"center"},{"c":"H20","v":"محسوب","al":"center"},{"c":"I20","v":"0.996 m²","al":"center"}]},{"r":21,"h":52.0,"cells":[{"c":"A21","v":4,"al":"center"},{"c":"B21","v":"قوة رد فعل التربة الصاعدة داخل المحيط الحرج (Upward Soil Deduction)"},{"c":"C21","v":"P_up,punch","b":true,"al":"center"},{"c":"D21","v":213.865548,"f":"=D6*D20","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E21","v":"kN","al":"center"},{"c":"F21","v":"q_u × A_punch"},{"c":"G21","v":"تخصم من حمل العمود لتقليل قوة الثقب الفعلية","al":"center"},{"c":"H21","v":"محسوب","al":"center"},{"c":"I21","v":"213.95 kN","al":"center"}]},{"r":22,"h":52.0,"cells":[{"c":"A22","v":5,"al":"center"},{"c":"B22","v":"قوة القص الثاقب القصوى المصعدة الصافية (Net Factored Punching Force)"},{"c":"C22","v":"V_u,punch","b":true,"al":"center"},{"c":"D22","v":1526.134452,"f":"=('تحليل العزوم وقوى القص'!$D$6)-D21","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E22","v":"kN","al":"center"},{"c":"F22","v":"P_u - (q_u × A_punch)"},{"c":"G22","v":"القوة الصافية المحاولة لاختراق سماكة القاعدة","al":"center"},{"c":"H22","v":"محسوب","al":"center"},{"c":"I22","v":"1526.05 kN","al":"center"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":6,"al":"center"},{"c":"B23","v":"معادلة مقاومة الثقب الكودية الأولى (Punching Resistance Eq. 1)"},{"c":"C23","v":"v_c1","b":true,"al":"center"},{"c":"D23","v":1.807484,"f":"=0.33*SQRT(30.0)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E23","v":"MPa","al":"center"},{"c":"F23","v":"0.33·λ·√f'c"},{"c":"G23","v":"معادلة الثقب الأساسية للخرسانة","al":"center"},{"c":"H23","v":"كودي","al":"center"},{"c":"I23","v":"1.807 MPa","al":"center"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":7,"al":"center"},{"c":"B24","v":"معادلة مقاومة الثقب الكودية الثانية (Punching Resistance Eq. 2)"},{"c":"C24","v":"v_c2","b":true,"al":"center"},{"c":"D24","v":1.862257,"f":"=0.17*(1 + 2/(('حساب الأبعاد وإجهادات التربة'!$D$7)/('حساب الأبعاد وإجهادات التربة'!$D$6)))*SQRT(30.0)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E24","v":"MPa","al":"center"},{"c":"F24","v":"0.17·(1 + 2/β_c)·√f'c حيث β_c = c_2/c_1"},{"c":"G24","v":"تأخذ في الاعتبار استطالة مقطع العمود","al":"center"},{"c":"H24","v":"كودي","al":"center"},{"c":"I24","v":"1.862 MPa","al":"center"}]},{"r":25,"h":52.0,"cells":[{"c":"A25","v":8,"al":"center"},{"c":"B25","v":"معادلة مقاومة الثقب الكودية الثالثة (Punching Resistance Eq. 3)"},{"c":"C25","v":"v_c3","b":true,"al":"center"},{"c":"D25","v":3.42782,"f":"=0.083*(40.0*(D8*1000)/D19 + 2)*SQRT(30.0)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E25","v":"MPa","al":"center"},{"c":"F25","v":"0.083·(α_s·d/b_o + 2)·√f'c (α_s = 40 داخلي)"},{"c":"G25","v":"تأخذ في الاعتبار موقع العمود ومحيط الثقب","al":"center"},{"c":"H25","v":"كودي","al":"center"},{"c":"I25","v":"3.424 MPa","al":"center"}]},{"r":26,"h":52.0,"cells":[{"c":"A26","v":9,"al":"center"},{"c":"B26","v":"إجهاد مقاومة القص الثاقب الحاكم التصميمي (Governing Punching Stress)"},{"c":"C26","v":"φv_c","b":true,"al":"center"},{"c":"D26","v":1.355613,"f":"=0.75*MIN(D23, D24, D25)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E26","v":"MPa","al":"center"},{"c":"F26","v":"φ_v × MIN(v_c1, v_c2, v_c3) (مع φ_v = 0.75)"},{"c":"G26","v":"الحد الأقصى لإجهاد القص الثاقب المسموح به","al":"center"},{"c":"H26","v":"حاكم كودياً","al":"center"},{"c":"I26","v":"1.356 MPa","al":"center"}]},{"r":27,"h":52.0,"cells":[{"c":"A27","v":10,"al":"center"},{"c":"B27","v":"قوة مقاومة القص الثاقب التصميمية الإجمالية للقاعدة (Design Punching Force)"},{"c":"C27","v":"φV_c,punch","b":true,"al":"center"},{"c":"D27","v":3058.431024,"f":"=(D26*D19*(D8*1000))/1000","bg":"#DCFCE7","b":true,"al":"center","nf":"#,##0.00"},{"c":"E27","v":"kN","al":"center"},{"c":"F27","v":"φv_c × b_o × d"},{"c":"G27","v":"أقصى قوة ثقب تتحملها القاعدة بدون حديد ثقب","al":"center"},{"c":"H27","v":"مسموح كودياً","al":"center"},{"c":"I27","v":"3058.26 kN","al":"center"}]},{"r":28,"h":34.0,"cells":[{"c":"A28","v":11,"al":"center"},{"c":"B28","v":"نسبة استنفاد كفاءة القص الثاقب (Punching Demand-Capacity Ratio)"},{"c":"C28","v":"UR_punch","b":true,"al":"center"},{"c":"D28","v":0.498993,"f":"=D22/D27","bg":"#DCFCE7","b":true,"al":"center","nf":"0.0%"},{"c":"E28","v":"-","al":"center"},{"c":"F28","v":"V_u,punch / φV_c,punch"},{"c":"G28","v":"UR ≤ 1.00 (1526.1 kN << 3058.3 kN)","al":"center"},{"c":"H28","v":"آمن بنسبة 49.9%","al":"center"},{"c":"I28","v":"مستوفى بفائض 50.1%","al":"center"}]},{"r":29,"h":28.0,"cells":[{"c":"A29","v":""},{"c":"B29","v":""},{"c":"C29","v":""},{"c":"D29","v":""},{"c":"E29","v":""},{"c":"F29","v":""},{"c":"G29","v":""},{"c":"H29","v":""},{"c":"I29","v":""}]},{"r":30,"h":38.0,"cells":[{"c":"A30","v":"3. فحص إجهادات الارتكاز الموضعية عند اتصال العمود بالقاعدة (Bearing Stress & Dowels)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":31,"h":40.0,"cells":[{"c":"A31","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B31","v":"متغير فحص الارتكاز والأشاير","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C31","v":"الرمز","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D31","v":"القيمة المحسوبة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E31","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F31","v":"المعادلة الكودية المطبقة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G31","v":"الاشتراط الكودي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H31","v":"التقييم الهندسي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I31","v":"حالة المطابقة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":32,"h":34.0,"cells":[{"c":"A32","v":1,"al":"center"},{"c":"B32","v":"مساحة مقطع العمود المحمل عند قاع الاتصال (Loaded Area of Column)"},{"c":"C32","v":"A_1","b":true,"al":"center"},{"c":"D32","v":180000,"f":"=('حساب الأبعاد وإجهادات التربة'!$D$8)*1000000","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E32","v":"mm²","al":"center"},{"c":"F32","v":"c_1 × c_2 = 300 × 600 mm"},{"c":"G32","v":"مساحة نقل الحمل المباشر بالارتكاز","al":"center"},{"c":"H32","v":"معتمد","al":"center"},{"c":"I32","v":"180,000 mm²","al":"center"}]},{"r":33,"h":34.0,"cells":[{"c":"A33","v":2,"al":"center"},{"c":"B33","v":"المساحة الهندسية المتماثلة المكافئة على سطح القاعدة (Supporting Area)"},{"c":"C33","v":"A_2","b":true,"al":"center"},{"c":"D33","v":720000,"f":"=D32*4.0","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E33","v":"mm²","al":"center"},{"c":"F33","v":"4 × A_1 (مساحة قاعدة التوزيع المنحدرة)"},{"c":"G33","v":"معامل زيادة الارتكاز √(A2/A1) = 2.0","al":"center"},{"c":"H33","v":"محسوب","al":"center"},{"c":"I33","v":"720,000 mm²","al":"center"}]},{"r":34,"h":34.0,"cells":[{"c":"A34","v":3,"al":"center"},{"c":"B34","v":"معامل زيادة مقاومة الخرسانة للارتكاز المحصور (Confinement Factor)"},{"c":"C34","v":"√(A2/A1)","b":true,"al":"center"},{"c":"D34","v":2,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"0.00"},{"c":"E34","v":"-","al":"center"},{"c":"F34","v":"√(A_2 / A_1) ≤ 2.0"},{"c":"G34","v":"SBC 304 Cl. 22.8 / ACI 318 Cl. 22.8","al":"center"},{"c":"H34","v":"الحد الأقصى","al":"center"},{"c":"I34","v":"2.00","al":"center"}]},{"r":35,"h":34.0,"cells":[{"c":"A35","v":4,"al":"center"},{"c":"B35","v":"مقاومة الخرسانة التصميمية المخفضة للارتكاز (Design Bearing Capacity)"},{"c":"C35","v":"φP_nb","b":true,"al":"center"},{"c":"D35","v":5967,"f":"=(0.65*0.85*30.0*D32*D34)/1000","bg":"#DCFCE7","b":true,"al":"center","nf":"#,##0.00"},{"c":"E35","v":"kN","al":"center"},{"c":"F35","v":"φ_brg × (0.85·f'c·A_1) × √(A_2/A_1)"},{"c":"G35","v":"مع φ_brg = 0.65 للارتكاز","al":"center"},{"c":"H35","v":"مسموح كودياً","al":"center"},{"c":"I35","v":"5967.00 kN","al":"center"}]},{"r":36,"h":34.0,"cells":[{"c":"A36","v":5,"al":"center"},{"c":"B36","v":"نسبة استنفاد إجهاد الارتكاز عند اتصال العمود (Bearing Utilization Ratio)"},{"c":"C36","v":"UR_bearing","b":true,"al":"center"},{"c":"D36","v":0.291604,"f":"=('تحليل العزوم وقوى القص'!$D$6)/D35","bg":"#DCFCE7","b":true,"al":"center","nf":"0.0%"},{"c":"E36","v":"-","al":"center"},{"c":"F36","v":"P_u / φP_nb"},{"c":"G36","v":"UR ≤ 1.00 (1740.0 kN << 5967.0 kN)","al":"center"},{"c":"H36","v":"آمن بنسبة 29.2%","al":"center"},{"c":"I36","v":"مستوفى بفائض 70.8%","al":"center"}]},{"r":37,"h":52.0,"cells":[{"c":"A37","v":6,"al":"center"},{"c":"B37","v":"الحد الأدنى الكودي لمساحة أشاير العمود الخرساني (Min Column Starter Dowels)"},{"c":"C37","v":"A_s,dowel,min","b":true,"al":"center"},{"c":"D37","v":900,"f":"=0.005*D32","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0"},{"c":"E37","v":"mm²","al":"center"},{"c":"F37","v":"0.005 × A_g (SBC 304 Cl. 16.3.5 / ACI 318)"},{"c":"G37","v":"الحد الأدنى لربط العمود بالقاعدة ومقاومة القلع","al":"center"},{"c":"H37","v":"إلزامي","al":"center"},{"c":"I37","v":"900.0 mm²","al":"center"}]},{"r":38,"h":34.0,"cells":[{"c":"A38","v":7,"al":"center"},{"c":"B38","v":"أشاير العمود المنفذة الفعلية داخل القاعدة (Adopted Starter Dowels)"},{"c":"C38","v":"Dowels_act","b":true,"al":"center"},{"c":"D38","v":6,"in":true,"bg":"#DBEAFE","b":true,"al":"center","nf":"0"},{"c":"E38","v":"أسياخ Φ16","al":"center"},{"c":"F38","v":"6 أسياخ Φ16 توفر مساحة 1206 mm²"},{"c":"G38","v":"1206 mm² ≥ 900 mm² (محقق بفائض 34%)","al":"center"},{"c":"H38","v":"محقق وآمن","al":"center"},{"c":"I38","v":"6 Φ16 مم","al":"center"}]},{"r":39,"h":28.0,"cells":[{"c":"A39","v":""},{"c":"B39","v":""},{"c":"C39","v":""},{"c":"D39","v":""},{"c":"E39","v":""},{"c":"F39","v":""},{"c":"G39","v":""},{"c":"H39","v":""},{"c":"I39","v":""}]},{"r":40,"h":28.0,"cells":[{"c":"A40","v":""},{"c":"B40","v":""},{"c":"C40","v":""},{"c":"D40","v":""},{"c":"E40","v":""},{"c":"F40","v":""},{"c":"G40","v":""},{"c":"H40","v":""},{"c":"I40","v":""}]},{"r":41,"h":34.0,"cells":[{"c":"A41","v":"قص الكمرات العريضة (One-Way Shear)","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C41","v":"القص الثاقب (Punching Shear)","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"E41","v":"إجهاد الارتكاز (Bearing Stress)","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"G41","v":"حالة كفاية سمك القاعدة (Depth Adequacy)","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":42,"h":44.0,"cells":[{"c":"A42","v":0.352728,"f":"=D14","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"0.0%","cs":2},{"skip":true},{"c":"C42","v":0.498993,"f":"=D28","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"0.0%","cs":2},{"skip":true},{"c":"E42","v":0.291604,"f":"=D36","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"0.0%","cs":2},{"skip":true},{"c":"G42","v":"سماكة القاعدة h=65 سم آمنة ومحققة بالكامل","f":"=IF(AND(D14<=1.0, D28<=1.0),\"سماكة القاعدة h=65 سم آمنة ومحققة بالكامل\",\"يلزم زيادة العمق\")","bg":"#DCFCE7","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":43,"h":34.0,"cells":[{"c":"A43","v":"الاستنفاد 35.3% (آمن ومستوفى)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C43","v":"الاستنفاد 49.9% (فائض أمان 50.1%)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"E43","v":"الاستنفاد 29.2% (محقق كودياً)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"G43","v":"كافة الفحوصات مستوفاة بدون كانات","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":44,"h":28.0,"cells":[{"c":"A44","v":""},{"c":"B44","v":""},{"c":"C44","v":""},{"c":"D44","v":""},{"c":"E44","v":""},{"c":"F44","v":""},{"c":"G44","v":""},{"c":"H44","v":""},{"c":"I44","v":""}]},{"r":45,"h":36.0,"cells":[{"c":"A45","v":"مهندس الأساسات والتربة (Geotechnical Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D45","v":"مهندس التصميم الإنشائي والمكتب الفني (Structural Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G45","v":"المهندس الاستشاري المشرف (Supervising Consultant)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":46,"h":76.0,"cells":[{"c":"A46","v":"الاسم والتوقيع:\nرقم القيد الهندسي:\nالتاريخ والختم المهني:","cs":3},{"skip":true},{"skip":true},{"c":"D46","v":"الاسم والتوقيع:\nرقم القيد الهندسي:\nالتاريخ والختم المهني:","cs":3},{"skip":true},{"skip":true},{"c":"G46","v":"الاسم والتوقيع:\nرقم القيد الهندسي:\nالتاريخ والختم المهني:","cs":3},{"skip":true},{"skip":true}]}]},{"name":"تفريد الحديد ومقايسة الكميات","maxRow":31,"maxCol":11,"colWidths":[8.0,14.0,54.0,14.0,20.0,18.0,12.0,24.0,30.0,26.0,20.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول تفريد حديد التسليح التفصيلي (BBS) ومقايسة الكميات والتكاليف المباشرة للقاعدة المنفصلة","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"📊 ربط ديناميكي كامل: تم ربط كميات الخرسانة، والحديد، والشدات، والعزل، والحفر، والردم بجدول فئات الأسعار بشيت الإعدادات. تعديل أي فئة سعر أو بعد هندسي يحدث فورياً إجمالي التكلفة التقديرية ومؤشرات استهلاك المواد بالمشروع.","bg":"#EFF6FF","fg":"#475569","al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"1. جدول تفريد حديد التسليح الإنشائي الدقيق (Bar Bending Schedule - BBS)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":40.0,"cells":[{"c":"A5","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"رمز المارك","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"توصيف وموقع السيخ الإنشائي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"القطر (مم)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"شكل التوضيب والتجنيط","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"طول السيخ (م)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"العدد الإجمالي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"الطول الكلي (م)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I5","v":"وزن المتر (كجم/م)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J5","v":"إجمالي الوزن (كجم)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K5","v":"إجمالي الوزن (طن)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":1,"al":"center"},{"c":"B6","v":"MK-01","b":true,"al":"center"},{"c":"C6","v":"فرش سفلي رئيسي في الاتجاه الطولي L (مع أرجل قائمة 90°)"},{"c":"D6","v":16,"in":true,"b":true,"al":"center"},{"c":"E6","v":"U-Shape (أرجل 50 سم)"},{"c":"F6","v":3.85,"in":true,"al":"center","nf":"#,##0.00"},{"c":"G6","v":16,"f":"='تحليل العزوم وقوى القص'!$D$27","b":true,"al":"center"},{"c":"H6","v":61.6,"f":"=F6*G6","al":"center","nf":"#,##0.00"},{"c":"I6","v":1.58,"in":true,"al":"center","nf":"#,##0.00"},{"c":"J6","v":97.328,"f":"=H6*I6","b":true,"al":"center","nf":"#,##0.00"},{"c":"K6","v":0.097328,"f":"=J6/1000","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.000"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":2,"al":"center"},{"c":"B7","v":"MK-02","b":true,"al":"center"},{"c":"C7","v":"غطاء سفلي ثانوي في الاتجاه العرضي B (مع أرجل قائمة 90°)"},{"c":"D7","v":16,"in":true,"b":true,"al":"center"},{"c":"E7","v":"U-Shape (أرجل 50 سم)"},{"c":"F7","v":3.55,"in":true,"al":"center","nf":"#,##0.00"},{"c":"G7","v":18,"f":"='تحليل العزوم وقوى القص'!$D$40","b":true,"al":"center"},{"c":"H7","v":63.9,"f":"=F7*G7","al":"center","nf":"#,##0.00"},{"c":"I7","v":1.58,"in":true,"al":"center","nf":"#,##0.00"},{"c":"J7","v":100.962,"f":"=H7*I7","b":true,"al":"center","nf":"#,##0.00"},{"c":"K7","v":0.100962,"f":"=J7/1000","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.000"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":3,"al":"center"},{"c":"B8","v":"MK-03","b":true,"al":"center"},{"c":"C8","v":"أشاير العمود الخرساني داخل عمق القاعدة مع رجل تثبيت (Dowels)"},{"c":"D8","v":16,"in":true,"b":true,"al":"center"},{"c":"E8","v":"L-Shape (رجل 35 سم + وصلة)"},{"c":"F8","v":1.75,"in":true,"al":"center","nf":"#,##0.00"},{"c":"G8","v":6,"f":"='فحص القص وسماكة القاعدة'!$D$38","b":true,"al":"center"},{"c":"H8","v":10.5,"f":"=F8*G8","al":"center","nf":"#,##0.00"},{"c":"I8","v":1.58,"in":true,"al":"center","nf":"#,##0.00"},{"c":"J8","v":16.59,"f":"=H8*I8","b":true,"al":"center","nf":"#,##0.00"},{"c":"K8","v":0.01659,"f":"=J8/1000","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.000"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":4,"al":"center"},{"c":"B9","v":"MK-04","b":true,"al":"center"},{"c":"C9","v":"كانات العمود الخرساني الداخلية المغمورة في القاعدة (Ties in Footing)"},{"c":"D9","v":10,"in":true,"b":true,"al":"center"},{"c":"E9","v":"كانة مغلقة مع قفل 135°"},{"c":"F9","v":1.68,"in":true,"al":"center","nf":"#,##0.00"},{"c":"G9","v":3,"in":true,"b":true,"al":"center"},{"c":"H9","v":5.04,"f":"=F9*G9","al":"center","nf":"#,##0.00"},{"c":"I9","v":0.617,"in":true,"al":"center","nf":"#,##0.00"},{"c":"J9","v":3.10968,"f":"=H9*I9","b":true,"al":"center","nf":"#,##0.00"},{"c":"K9","v":0.00311,"f":"=J9/1000","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.000"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":5,"al":"center"},{"c":"B10","v":"MK-05","b":true,"al":"center"},{"c":"C10","v":"كراسي حديد تسليح وقضبان تثبيت للشبكة والفرش (Chairs & Spacers)"},{"c":"D10","v":14,"in":true,"b":true,"al":"center"},{"c":"E10","v":"كرسي حديد حامل"},{"c":"F10","v":1.4,"in":true,"al":"center","nf":"#,##0.00"},{"c":"G10","v":4,"in":true,"b":true,"al":"center"},{"c":"H10","v":5.6,"f":"=F10*G10","al":"center","nf":"#,##0.00"},{"c":"I10","v":1.21,"in":true,"al":"center","nf":"#,##0.00"},{"c":"J10","v":6.776,"f":"=H10*I10","b":true,"al":"center","nf":"#,##0.00"},{"c":"K10","v":0.006776,"f":"=J10/1000","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.000"}]},{"r":11,"h":38.0,"cells":[{"c":"A11","v":"إجمالي أوزان حديد التسليح الإنشائي للقاعدة المنفصلة (Total Footing Rebar Weight):","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"left","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"J11","v":224.76568,"f":"=SUM(J6:J10)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"K11","v":0.224766,"f":"=SUM(K6:K10)","bg":"#DCFCE7","b":true,"al":"center","nf":"#,##0.000"}]},{"r":12,"h":28.0,"cells":[{"c":"A12","v":""},{"c":"B12","v":""},{"c":"C12","v":""},{"c":"D12","v":""},{"c":"E12","v":""},{"c":"F12","v":""},{"c":"G12","v":""},{"c":"H12","v":""},{"c":"I12","v":""},{"c":"J12","v":""},{"c":"K12","v":""}]},{"r":13,"h":38.0,"cells":[{"c":"A13","v":"2. مقايسة الكميات التنفيذية وحساب التكاليف المباشرة للقاعدة (Executive BOQ & Direct Costs)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":14,"h":40.0,"cells":[{"c":"A14","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B14","v":"كود البند","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C14","v":"بيان الأعمال والتوصيف التنفيذي الهندسي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D14","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E14","v":"الكمية المحصورة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F14","v":"فئة السعر","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G14","v":"العملة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H14","v":"إجمالي التكلفة المباشرة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I14","v":"معادلة حصر الكمية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J14","v":"مكونات البند التنفيذي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K14","v":"ملاحظات الفحص","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":1,"al":"center"},{"c":"B15","v":"EXC-01","b":true,"al":"center"},{"c":"C15","v":"أعمال الحفر الميكانيكي لقاع التأسيس في تربة الموقع العادية والصخرية"},{"c":"D15","v":"m³","al":"center"},{"c":"E15","v":29.6,"f":"=(('حساب الأبعاد وإجهادات التربة'!$D$24)+1.0)*(('حساب الأبعاد وإجهادات التربة'!$D$23)+1.0)*('إعدادات المشروع والتربة'!$D$15)","b":true,"al":"center","nf":"#,##0.00"},{"c":"F15","v":18,"f":"='إعدادات المشروع والتربة'!$D$41","al":"center","nf":"#,##0.00"},{"c":"G15","v":"ر.س","al":"center"},{"c":"H15","v":532.8,"f":"=E15*F15","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"I15","v":"(L+1.0) × (B+1.0) × D_f"},{"c":"J15","v":"حفر ونقل مقالب عمومية"},{"c":"K15","v":"29.60 m³","al":"center"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":2,"al":"center"},{"c":"B16","v":"PCC-01","b":true,"al":"center"},{"c":"C16","v":"خرسانة عادية نظافة سمك 10 سم أسفل القاعدة مقاومة للكبريتات SRC"},{"c":"D16","v":"m³","al":"center"},{"c":"E16","v":0.928,"f":"=(('حساب الأبعاد وإجهادات التربة'!$D$24)+0.20)*(('حساب الأبعاد وإجهادات التربة'!$D$23)+0.20)*('حساب الأبعاد وإجهادات التربة'!$D$26)","b":true,"al":"center","nf":"#,##0.00"},{"c":"F16","v":240,"f":"='إعدادات المشروع والتربة'!$D$36","al":"center","nf":"#,##0.00"},{"c":"G16","v":"ر.س","al":"center"},{"c":"H16","v":222.72,"f":"=E16*F16","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"I16","v":"(L+0.2) × (B+0.2) × t_pc"},{"c":"J16","v":"توريد وصب ومصنعية تسوية"},{"c":"K16","v":"0.93 m³","al":"center"}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":3,"al":"center"},{"c":"B17","v":"RCC-01","b":true,"al":"center"},{"c":"C17","v":"خرسانة مسلحة للقواعد المنفصلة رتبة C30/37 جاهزة الصب باستخدام المضخة"},{"c":"D17","v":"m³","al":"center"},{"c":"E17","v":5.265,"f":"=('حساب الأبعاد وإجهادات التربة'!$D$24)*('حساب الأبعاد وإجهادات التربة'!$D$23)*('حساب الأبعاد وإجهادات التربة'!$D$25)","b":true,"al":"center","nf":"#,##0.00"},{"c":"F17","v":320,"f":"='إعدادات المشروع والتربة'!$D$37","al":"center","nf":"#,##0.00"},{"c":"G17","v":"ر.س","al":"center"},{"c":"H17","v":1684.8,"f":"=E17*F17","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"I17","v":"L × B × h"},{"c":"J17","v":"خرسانة جاهزة + دمك ميكانيكي"},{"c":"K17","v":"5.27 m³","al":"center"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":4,"al":"center"},{"c":"B18","v":"STL-01","b":true,"al":"center"},{"c":"C18","v":"حديد تسليح مشوه عالي المقاومة Grade 60 (مقطع ومثنى ومورد حسب BBS)"},{"c":"D18","v":"Ton","al":"center"},{"c":"E18","v":0.224766,"f":"=K11","b":true,"al":"center","nf":"#,##0.000"},{"c":"F18","v":3250,"f":"='إعدادات المشروع والتربة'!$D$38","al":"center","nf":"#,##0.000"},{"c":"G18","v":"ر.س","al":"center"},{"c":"H18","v":730.4895,"f":"=E18*F18","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"I18","v":"إجمالي أوزان جدول BBS"},{"c":"J18","v":"توريد وتوضيب وتجنيط وتربيط"},{"c":"K18","v":"0.225 Ton","al":"center"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":5,"al":"center"},{"c":"B19","v":"FRM-01","b":true,"al":"center"},{"c":"C19","v":"أعمال الشدات الخشبية والقوالب المعدنية لجوانب القاعدة المسلحة"},{"c":"D19","v":"m²","al":"center"},{"c":"E19","v":7.41,"f":"=2*(('حساب الأبعاد وإجهادات التربة'!$D$24)+('حساب الأبعاد وإجهادات التربة'!$D$23))*('حساب الأبعاد وإجهادات التربة'!$D$25)","b":true,"al":"center","nf":"#,##0.00"},{"c":"F19","v":48,"f":"='إعدادات المشروع والتربة'!$D$39","al":"center","nf":"#,##0.00"},{"c":"G19","v":"ر.س","al":"center"},{"c":"H19","v":355.68,"f":"=E19*F19","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"I19","v":"2 × (L + B) × h"},{"c":"J19","v":"نجارة بليوود + تقوية وفك"},{"c":"K19","v":"7.41 m²","al":"center"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":6,"al":"center"},{"c":"B20","v":"INS-01","b":true,"al":"center"},{"c":"C20","v":"عزل مائي بيتوميني مطاطي على طبقتين للأسطح الملامسة للتربة والردم"},{"c":"D20","v":"m²","al":"center"},{"c":"E20","v":15.51,"f":"=('حساب الأبعاد وإجهادات التربة'!$D$27)+E19","b":true,"al":"center","nf":"#,##0.00"},{"c":"F20","v":22,"f":"='إعدادات المشروع والتربة'!$D$40","al":"center","nf":"#,##0.00"},{"c":"G20","v":"ر.س","al":"center"},{"c":"H20","v":341.22,"f":"=E20*F20","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"I20","v":"A_act + مساحة الجوانب"},{"c":"J20","v":"دهان طبقتين عزل مطاطي"},{"c":"K20","v":"15.51 m²","al":"center"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":7,"al":"center"},{"c":"B21","v":"BCK-01","b":true,"al":"center"},{"c":"C21","v":"أعمال الردم الهندسي المتدرج حول القاعدة على طبقات 25 سم مع الدمك"},{"c":"D21","v":"m³","al":"center"},{"c":"E21","v":23.407,"f":"=E15-E16-E17","b":true,"al":"center","nf":"#,##0.00"},{"c":"F21","v":25,"f":"='إعدادات المشروع والتربة'!$D$42","al":"center","nf":"#,##0.00"},{"c":"G21","v":"ر.س","al":"center"},{"c":"H21","v":585.175,"f":"=E21*F21","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"I21","v":"ناتج الحفر - الخرسانات"},{"c":"J21","v":"ردم ودحل واختبارات كثافة"},{"c":"K21","v":"23.41 m³","al":"center"}]},{"r":22,"h":42.0,"cells":[{"c":"A22","v":"إجمالي التكلفة التقديرية المباشرة لتنفيذ القاعدة المنفصلة (Total Direct Cost - TDC):","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"left","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H22","v":4452.8845,"f":"=SUM(H15:H21)","bg":"#DCFCE7","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"I22","v":"ر.س SAR (شامل المواد والمصنعيات والمعدات)","bg":"#EFF6FF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":23,"h":28.0,"cells":[{"c":"A23","v":""},{"c":"B23","v":""},{"c":"C23","v":""},{"c":"D23","v":""},{"c":"E23","v":""},{"c":"F23","v":""},{"c":"G23","v":""},{"c":"H23","v":""},{"c":"I23","v":""},{"c":"J23","v":""},{"c":"K23","v":""}]},{"r":24,"h":38.0,"cells":[{"c":"A24","v":"3. مؤشرات الأداء الهندسي والمالي لكفاءة القاعدة (Key Performance & Efficiency Indicators)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":"حجم الخرسانة المسلحة (RCC Volume)","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D25","v":"إجمالي وزن حديد التسليح (Total Rebar)","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G25","v":"معدل استهلاك الحديد (Steel Index)","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"J25","v":"التكلفة التقديرية المباشرة (TDC)","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true}]},{"r":26,"h":44.0,"cells":[{"c":"A26","v":5.265,"f":"=E17","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00","cs":3},{"skip":true},{"skip":true},{"c":"D26","v":224.76568,"f":"=J11","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00","cs":3},{"skip":true},{"skip":true},{"c":"G26","v":42.690538,"f":"=J11/E17","bg":"#DCFCE7","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00","cs":3},{"skip":true},{"skip":true},{"c":"J26","v":4452.8845,"f":"=H22","bg":"#DCFCE7","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00","cs":2},{"skip":true}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":"سمك 65 سم بأبعاد 3.00 × 2.70 م","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D27","v":0,"f":"=K11 طن حديد مشوه عالي المقاومة","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G27","v":"المعدل القياسي للقواعد 40 - 55 كجم/م³","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"J27","v":"شاملة الحفر والخرسانات والحديد والردم","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true}]},{"r":28,"h":28.0,"cells":[{"c":"A28","v":""},{"c":"B28","v":""},{"c":"C28","v":""},{"c":"D28","v":""},{"c":"E28","v":""},{"c":"F28","v":""},{"c":"G28","v":""},{"c":"H28","v":""},{"c":"I28","v":""},{"c":"J28","v":""},{"c":"K28","v":""}]},{"r":29,"h":28.0,"cells":[{"c":"A29","v":""},{"c":"B29","v":""},{"c":"C29","v":""},{"c":"D29","v":""},{"c":"E29","v":""},{"c":"F29","v":""},{"c":"G29","v":""},{"c":"H29","v":""},{"c":"I29","v":""},{"c":"J29","v":""},{"c":"K29","v":""}]},{"r":30,"h":36.0,"cells":[{"c":"A30","v":"مهندس الأساسات والتربة (Geotechnical Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D30","v":"مهندس التصميم الإنشائي والمكتب الفني (Structural Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G30","v":"المهندس الاستشاري المشرف (Supervising Consultant)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"J30","v":""},{"c":"K30","v":""}]},{"r":31,"h":76.0,"cells":[{"c":"A31","v":"الاسم والتوقيع:\nرقم القيد الهندسي:\nالتاريخ والختم المهني:","cs":3},{"skip":true},{"skip":true},{"c":"D31","v":"الاسم والتوقيع:\nرقم القيد الهندسي:\nالتاريخ والختم المهني:","cs":3},{"skip":true},{"skip":true},{"c":"G31","v":"الاسم والتوقيع:\nرقم القيد الهندسي:\nالتاريخ والختم المهني:","cs":3},{"skip":true},{"skip":true},{"c":"J31","v":""},{"c":"K31","v":""}]}]}]}