{"slug":"isolated-footings-raft-foundation-and-tie-beams-rebar-bbs-sheet","sheets":[{"name":"1_تفريد_القواعد_والأشاير","maxRow":17,"maxCol":14,"colWidths":[16.0,60.0,17.0,13.0,13.0,13.0,13.0,13.0,13.0,13.0,13.0,13.0,13.0,13.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"شيت تفريد وحصر حديد تسليح القواعد المنفصلة والمشتركة وأشاير رقاب الأعمدة (Footings BBS — BOQ-ENG-195)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":14},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":52.0,"cells":[{"c":"A2","v":"حساب أطوال الأسياخ برجل زاوية (L-Shape) وبطن القاعدة والغطاء الخرساني (7.5 سم) وأوزان الأقطار وفق معادلة D²/162 واشتراطات SBC 304 و ECP 203","bg":"#1E293B","fg":"#E2E8F0","b":true,"al":"center","cs":14},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":38.0,"cells":[{"c":"A3","v":"اسم المشروع واللوحة الإنشائية:","bg":"#E2E8F0","b":true,"cs":2},{"skip":true},{"c":"C3","v":"الأساسات المسلحة للمبنى السكني الإداري — لوحة S-FDN-01","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"G3","v":"الغطاء الخرساني للأساسات c (م):","bg":"#E2E8F0","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"J3","v":0.075,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.000"},{"c":"K3","v":"معامل طول التماسك والأشاير (Ld = N × Φ):","bg":"#E2E8F0","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"N3","v":60,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"جدول تفريد حديد القواعد المنفصلة والمشتركة وأشاير رقاب الأعمدة (الخلايا الصفراء مدخلات أبعاد القاعدة والتسليح)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":14},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":151.9,"cells":[{"c":"A5","v":"كود العنصر","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"بيان القاعدة المسلحة واتجاه التسليح (فرش / غطاء / علوي / أشاير)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"عدد النماذج","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"طول القاعدة L (م)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"عرض القاعدة B (م)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"سمك القاعدة H (م)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"القطر Φ (مم)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"العدد في المتر","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I5","v":"مسافة التوزيع (م)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J5","v":"إجمالي عدد الأسياخ","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K5","v":"طول السيخ الإفرادي (م)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L5","v":"وزن المتر (كجم/م)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M5","v":"إجمالي الأطوال (م.ط)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"N5","v":"الوزن الصافي (كجم)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":128.0,"cells":[{"c":"A6","v":"F1-X","b":true,"al":"center"},{"c":"B6","v":"قاعدة منفصلة نموذج (F1) — تسليح سفلي فرش (الاتجاه الطويل برجلين L)"},{"c":"C6","v":8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"D6","v":2.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E6","v":1.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F6","v":0.6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G6","v":16,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"H6","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"I6","v":0,"f":"=MAX(0,E6-2*$J$3)","al":"center","nf":"#,##0.00"},{"c":"J6","v":8,"f":"=C6*(ROUNDUP(I6*H6,0)+1)","al":"center","nf":"#,##0"},{"c":"K6","v":0,"f":"=ROUND((D6-2*$J$3)+2*(F6-2*$J$3),2)","al":"center","nf":"#,##0.00"},{"c":"L6","v":1.58,"f":"=ROUND((G6^2)/162,3)","al":"center","nf":"0.000"},{"c":"M6","v":0,"f":"=ROUND(J6*K6,2)","al":"center","nf":"#,##0.00"},{"c":"N6","v":0,"f":"=ROUND(M6*L6,2)","b":true,"al":"center","nf":"#,##0.00"}]},{"r":7,"h":128.0,"cells":[{"c":"A7","v":"F1-Y","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B7","v":"قاعدة منفصلة نموذج (F1) — تسليح سفلي غطاء (الاتجاه القصير برجلين L)","bg":"#F8FAFC"},{"c":"C7","v":8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"D7","v":2.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E7","v":1.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F7","v":0.6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G7","v":16,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"H7","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"I7","v":0,"f":"=MAX(0,D7-2*$J$3)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"J7","v":8,"f":"=C7*(ROUNDUP(I7*H7,0)+1)","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"K7","v":0,"f":"=ROUND((E7-2*$J$3)+2*(F7-2*$J$3),2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"L7","v":1.58,"f":"=ROUND((G7^2)/162,3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"M7","v":0,"f":"=ROUND(J7*K7,2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"N7","v":0,"f":"=ROUND(M7*L7,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"}]},{"r":8,"h":128.0,"cells":[{"c":"A8","v":"F2-X","b":true,"al":"center"},{"c":"B8","v":"قاعدة منفصلة نموذج (F2) — تسليح سفلي فرش (الاتجاه الطويل برجلين L)"},{"c":"C8","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"D8","v":2.6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E8","v":2.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F8","v":0.7,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G8","v":16,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"H8","v":7,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"I8","v":0,"f":"=MAX(0,E8-2*$J$3)","al":"center","nf":"#,##0.00"},{"c":"J8","v":12,"f":"=C8*(ROUNDUP(I8*H8,0)+1)","al":"center","nf":"#,##0"},{"c":"K8","v":0,"f":"=ROUND((D8-2*$J$3)+2*(F8-2*$J$3),2)","al":"center","nf":"#,##0.00"},{"c":"L8","v":1.58,"f":"=ROUND((G8^2)/162,3)","al":"center","nf":"0.000"},{"c":"M8","v":0,"f":"=ROUND(J8*K8,2)","al":"center","nf":"#,##0.00"},{"c":"N8","v":0,"f":"=ROUND(M8*L8,2)","b":true,"al":"center","nf":"#,##0.00"}]},{"r":9,"h":128.0,"cells":[{"c":"A9","v":"F2-Y","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B9","v":"قاعدة منفصلة نموذج (F2) — تسليح سفلي غطاء (الاتجاه القصير برجلين L)","bg":"#F8FAFC"},{"c":"C9","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"D9","v":2.6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E9","v":2.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F9","v":0.7,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G9","v":16,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"H9","v":7,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"I9","v":0,"f":"=MAX(0,D9-2*$J$3)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"J9","v":12,"f":"=C9*(ROUNDUP(I9*H9,0)+1)","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"K9","v":0,"f":"=ROUND((E9-2*$J$3)+2*(F9-2*$J$3),2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"L9","v":1.58,"f":"=ROUND((G9^2)/162,3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"M9","v":0,"f":"=ROUND(J9*K9,2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"N9","v":0,"f":"=ROUND(M9*L9,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"}]},{"r":10,"h":128.0,"cells":[{"c":"A10","v":"F3-X","b":true,"al":"center"},{"c":"B10","v":"قاعدة منفصلة نموذج (F3) — تسليح سفلي فرش (الاتجاه الطويل برجلين L)"},{"c":"C10","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"D10","v":3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E10","v":2.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F10","v":0.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G10","v":18,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"H10","v":7,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"I10","v":0,"f":"=MAX(0,E10-2*$J$3)","al":"center","nf":"#,##0.00"},{"c":"J10","v":6,"f":"=C10*(ROUNDUP(I10*H10,0)+1)","al":"center","nf":"#,##0"},{"c":"K10","v":0,"f":"=ROUND((D10-2*$J$3)+2*(F10-2*$J$3),2)","al":"center","nf":"#,##0.00"},{"c":"L10","v":2,"f":"=ROUND((G10^2)/162,3)","al":"center","nf":"0.000"},{"c":"M10","v":0,"f":"=ROUND(J10*K10,2)","al":"center","nf":"#,##0.00"},{"c":"N10","v":0,"f":"=ROUND(M10*L10,2)","b":true,"al":"center","nf":"#,##0.00"}]},{"r":11,"h":128.0,"cells":[{"c":"A11","v":"F3-Y","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":"قاعدة منفصلة نموذج (F3) — تسليح سفلي غطاء (الاتجاه القصير برجلين L)","bg":"#F8FAFC"},{"c":"C11","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"D11","v":3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E11","v":2.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F11","v":0.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G11","v":18,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"H11","v":7,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"I11","v":0,"f":"=MAX(0,D11-2*$J$3)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"J11","v":6,"f":"=C11*(ROUNDUP(I11*H11,0)+1)","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"K11","v":0,"f":"=ROUND((E11-2*$J$3)+2*(F11-2*$J$3),2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"L11","v":2,"f":"=ROUND((G11^2)/162,3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"M11","v":0,"f":"=ROUND(J11*K11,2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"N11","v":0,"f":"=ROUND(M11*L11,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"}]},{"r":12,"h":104.0,"cells":[{"c":"A12","v":"CF1-BX","b":true,"al":"center"},{"c":"B12","v":"قاعدة مشتركة نموذج (CF1) — رقة سفلية فرش طولي مستمر برجلين"},{"c":"C12","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"D12","v":4.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E12","v":2.4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F12","v":0.85,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G12","v":18,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"H12","v":7,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"I12","v":0,"f":"=MAX(0,E12-2*$J$3)","al":"center","nf":"#,##0.00"},{"c":"J12","v":4,"f":"=C12*(ROUNDUP(I12*H12,0)+1)","al":"center","nf":"#,##0"},{"c":"K12","v":0,"f":"=ROUND((D12-2*$J$3)+2*(F12-2*$J$3),2)","al":"center","nf":"#,##0.00"},{"c":"L12","v":2,"f":"=ROUND((G12^2)/162,3)","al":"center","nf":"0.000"},{"c":"M12","v":0,"f":"=ROUND(J12*K12,2)","al":"center","nf":"#,##0.00"},{"c":"N12","v":0,"f":"=ROUND(M12*L12,2)","b":true,"al":"center","nf":"#,##0.00"}]},{"r":13,"h":128.0,"cells":[{"c":"A13","v":"CF1-BY","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":"قاعدة مشتركة نموذج (CF1) — رقة سفلية غطاء عرضي برجلين","bg":"#F8FAFC"},{"c":"C13","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"D13","v":4.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E13","v":2.4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F13","v":0.85,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G13","v":16,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"H13","v":7,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"I13","v":0,"f":"=MAX(0,D13-2*$J$3)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"J13","v":4,"f":"=C13*(ROUNDUP(I13*H13,0)+1)","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"K13","v":0,"f":"=ROUND((E13-2*$J$3)+2*(F13-2*$J$3),2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"L13","v":1.58,"f":"=ROUND((G13^2)/162,3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"M13","v":0,"f":"=ROUND(J13*K13,2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"N13","v":0,"f":"=ROUND(M13*L13,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"}]},{"r":14,"h":151.9,"cells":[{"c":"A14","v":"CF1-TX","b":true,"al":"center"},{"c":"B14","v":"قاعدة مشتركة نموذج (CF1) — رقة علوية فرش لمقاومة العزوم السالبة"},{"c":"C14","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"D14","v":4.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E14","v":2.4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F14","v":0.85,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G14","v":18,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"H14","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"I14","v":0,"f":"=MAX(0,E14-2*$J$3)","al":"center","nf":"#,##0.00"},{"c":"J14","v":4,"f":"=C14*(ROUNDUP(I14*H14,0)+1)","al":"center","nf":"#,##0"},{"c":"K14","v":0,"f":"=ROUND((D14-2*$J$3)+2*(F14-2*$J$3),2)","al":"center","nf":"#,##0.00"},{"c":"L14","v":2,"f":"=ROUND((G14^2)/162,3)","al":"center","nf":"0.000"},{"c":"M14","v":0,"f":"=ROUND(J14*K14,2)","al":"center","nf":"#,##0.00"},{"c":"N14","v":0,"f":"=ROUND(M14*L14,2)","b":true,"al":"center","nf":"#,##0.00"}]},{"r":15,"h":72.0,"cells":[{"c":"A15","v":"CF1-TY","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B15","v":"قاعدة مشتركة نموذج (CF1) — رقة علوية غطاء عرضي","bg":"#F8FAFC"},{"c":"C15","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"D15","v":4.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E15","v":2.4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F15","v":0.85,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G15","v":16,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"H15","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"I15","v":0,"f":"=MAX(0,D15-2*$J$3)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"J15","v":4,"f":"=C15*(ROUNDUP(I15*H15,0)+1)","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"K15","v":0,"f":"=ROUND((E15-2*$J$3)+2*(F15-2*$J$3),2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"L15","v":1.58,"f":"=ROUND((G15^2)/162,3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"M15","v":0,"f":"=ROUND(J15*K15,2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"N15","v":0,"f":"=ROUND(M15*L15,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"}]},{"r":16,"h":151.9,"cells":[{"c":"A16","v":"DWL-C1","b":true,"al":"center"},{"c":"B16","v":"أشاير رقاب الأعمدة المتمركزة داخل القواعد (رجل 30 سم + رقبة 1.20م + إشارة 60Φ)"},{"c":"C16","v":30,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"D16","v":1.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E16","v":0.3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F16","v":0.7,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G16","v":18,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"H16","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"I16","v":1,"in":true,"al":"center","nf":"#,##0.00"},{"c":"J16","v":360,"f":"=C16*H16","al":"center","nf":"#,##0"},{"c":"K16","v":0,"f":"=ROUND(D16+E16+(F16-$J$3)+($N$3*G16/1000),2)","al":"center","nf":"#,##0.00"},{"c":"L16","v":2,"f":"=ROUND((G16^2)/162,3)","al":"center","nf":"0.000"},{"c":"M16","v":0,"f":"=ROUND(J16*K16,2)","al":"center","nf":"#,##0.00"},{"c":"N16","v":0,"f":"=ROUND(M16*L16,2)","b":true,"al":"center","nf":"#,##0.00"}]},{"r":17,"h":44.0,"cells":[{"c":"A17","v":"إجمالي تفريد حديد تسليح القواعد المنفصلة والمشتركة والأشاير","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"J17","v":428,"f":"=SUM(J6:J16)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"K17","v":"-","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L17","v":"-","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M17","v":0,"f":"=SUM(M6:M16)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"N17","v":0,"f":"=SUM(N6:N16)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"}]}]},{"name":"2_تفريد_اللبشة_والكراسي","maxRow":15,"maxCol":13,"colWidths":[16.0,60.0,17.0,13.0,13.0,13.0,13.0,13.0,13.0,13.0,13.0,13.0,13.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"شيت تفريد وحصر حديد اللبشة المسلحة (الرقة السفلية والعلوية، الوصلات، الكراسي، والأوتار)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":52.0,"cells":[{"c":"A2","v":"حساب أطوال أسياخ اللبشة المسلحة شاملة وصلات التراكب (60Φ) لكل 12 متر، وحساب ارتفاع وعدد الكراسي الحديدية والأوتار الحاملة للرقة العلوية","bg":"#1E293B","fg":"#E2E8F0","b":true,"al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":52.0,"cells":[{"c":"A3","v":"أبعاد اللبشة المسلحة (الطول × العرض × السمك):","bg":"#E2E8F0","b":true,"cs":2},{"skip":true},{"c":"C3","v":28,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"D3","v":22,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E3","v":1.1,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F3","v":"طول السيخ التجاري بالموقع (م):","bg":"#E2E8F0","b":true,"cs":2},{"skip":true},{"c":"H3","v":12,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"I3","v":"ارتفاع الكرسي الحديدي المحسوب (م):","bg":"#E2E8F0","b":true,"cs":2},{"skip":true},{"c":"K3","v":0.862,"f":"=ROUND(E3-0.15-0.088,3)","bg":"#E2E8F0","b":true,"al":"center","nf":"0.000"},{"c":"L3","v":"صافي ارتفاع الكرسي بين الرقتين","bg":"#E2E8F0","al":"center","cs":2},{"skip":true}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"جدول تفريد الرقة السفلية والعلوية للبشة المسلحة والكراسي الحديدية والأوتار والفواتير الإضافية","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":128.0,"cells":[{"c":"A5","v":"كود البند","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"بيان عنصر تسليح اللبشة المسلحة (فرش / غطاء / كراسي / أوتار / إضافي)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"القطر Φ (مم)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"العدد في المتر","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"مسافة التوزيع (م)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"إجمالي عدد الخطوط/القطع","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"طول الشريحة أو العنصر (م)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"طول الرجلين الزاوية (م)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I5","v":"عدد وصلات التراكب للخط","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J5","v":"إجمالي طول الوصلات (60Φ) (م)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K5","v":"الطول الكلي للخط/القطعة (م)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L5","v":"وزن المتر (كجم/م)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M5","v":"الوزن الصافي (كجم)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":151.9,"cells":[{"c":"A6","v":"RFT-BX","b":true,"al":"center"},{"c":"B6","v":"الرقة السفلية — فرش اللبشة بالاتجاه الطولي (28.0 م) شامل رجلين ووصلات التراكب"},{"c":"C6","v":22,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"D6","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"E6","v":21.85,"f":"=D3-0.15","al":"center","nf":"#,##0.00"},{"c":"F6","v":133,"f":"=ROUNDUP(E6*D6,0)+1","al":"center","nf":"#,##0"},{"c":"G6","v":27.85,"f":"=C3-0.15","al":"center","nf":"#,##0.00"},{"c":"H6","v":1.9,"f":"=2*(E3-0.15)","al":"center","nf":"#,##0.00"},{"c":"I6","v":0,"f":"=INT(G6/$H$3)","al":"center","nf":"#,##0"},{"c":"J6","v":0,"f":"=ROUND(I6*60*(C6/1000),2)","al":"center","nf":"#,##0.00"},{"c":"K6","v":29.75,"f":"=ROUND(G6+H6+J6,2)","al":"center","nf":"#,##0.00"},{"c":"L6","v":2.988,"f":"=ROUND((C6^2)/162,3)","al":"center","nf":"0.000"},{"c":"M6","v":11822.77,"f":"=ROUND(F6*K6*L6,2)","b":true,"al":"center","nf":"#,##0.00"}]},{"r":7,"h":151.9,"cells":[{"c":"A7","v":"RFT-BY","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B7","v":"الرقة السفلية — غطاء اللبشة بالاتجاه العرضي (22.0 م) شامل رجلين ووصلات التراكب","bg":"#F8FAFC"},{"c":"C7","v":22,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"D7","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"E7","v":27.85,"f":"=C3-0.15","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"F7","v":169,"f":"=ROUNDUP(E7*D7,0)+1","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"G7","v":21.85,"f":"=D3-0.15","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"H7","v":1.9,"f":"=2*(E3-0.15)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"I7","v":0,"f":"=INT(G7/$H$3)","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"J7","v":0,"f":"=ROUND(I7*60*(C7/1000),2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"K7","v":23.75,"f":"=ROUND(G7+H7+J7,2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"L7","v":2.988,"f":"=ROUND((C7^2)/162,3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"M7","v":11993.08,"f":"=ROUND(F7*K7*L7,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"}]},{"r":8,"h":128.0,"cells":[{"c":"A8","v":"RFT-TX","b":true,"al":"center"},{"c":"B8","v":"الرقة العلوية — فرش علوي بالاتجاه الطولي (28.0 م) بوصلات تراكب متبادلة"},{"c":"C8","v":20,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"D8","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"E8","v":21.85,"f":"=D3-0.15","al":"center","nf":"#,##0.00"},{"c":"F8","v":133,"f":"=ROUNDUP(E8*D8,0)+1","al":"center","nf":"#,##0"},{"c":"G8","v":27.85,"f":"=C3-0.15","al":"center","nf":"#,##0.00"},{"c":"H8","v":1.9,"f":"=2*(E3-0.15)","al":"center","nf":"#,##0.00"},{"c":"I8","v":0,"f":"=INT(G8/$H$3)","al":"center","nf":"#,##0"},{"c":"J8","v":0,"f":"=ROUND(I8*60*(C8/1000),2)","al":"center","nf":"#,##0.00"},{"c":"K8","v":29.75,"f":"=ROUND(G8+H8+J8,2)","al":"center","nf":"#,##0.00"},{"c":"L8","v":2.469,"f":"=ROUND((C8^2)/162,3)","al":"center","nf":"0.000"},{"c":"M8","v":9769.22,"f":"=ROUND(F8*K8*L8,2)","b":true,"al":"center","nf":"#,##0.00"}]},{"r":9,"h":175.9,"cells":[{"c":"A9","v":"RFT-TY","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B9","v":"الرقة العلوية — غطاء علوي بالاتجاه العرضي (22.0 م) بوصلات تراكب متبادلة","bg":"#F8FAFC"},{"c":"C9","v":20,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"D9","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"E9","v":27.85,"f":"=C3-0.15","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"F9","v":169,"f":"=ROUNDUP(E9*D9,0)+1","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"G9","v":21.85,"f":"=D3-0.15","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"H9","v":1.9,"f":"=2*(E3-0.15)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"I9","v":0,"f":"=INT(G9/$H$3)","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"J9","v":0,"f":"=ROUND(I9*60*(C9/1000),2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"K9","v":23.75,"f":"=ROUND(G9+H9+J9,2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"L9","v":2.469,"f":"=ROUND((C9^2)/162,3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"M9","v":9909.95,"f":"=ROUND(F9*K9*L9,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"}]},{"r":10,"h":151.9,"cells":[{"c":"A10","v":"RFT-CH","b":true,"al":"center"},{"c":"B10","v":"الكراسي الحديدية الحاملة للرقة العلوية (كرسي كل 1.0 م2 بعرض مسند 1.0م ورجلين)"},{"c":"C10","v":16,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"D10","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"E10","v":616,"f":"=C3*D3","al":"center","nf":"#,##0.00"},{"c":"F10","v":586,"f":"=ROUNDUP(E10*0.95,0)","al":"center","nf":"#,##0"},{"c":"G10","v":1,"in":true,"al":"center","nf":"#,##0.00"},{"c":"H10","v":0,"f":"=2*($K$3+0.4)","al":"center","nf":"#,##0.00"},{"c":"I10","v":0,"in":true,"al":"center","nf":"#,##0"},{"c":"J10","v":0,"f":"=ROUND(I10*60*(C10/1000),2)","al":"center","nf":"#,##0.00"},{"c":"K10","v":1,"f":"=ROUND(G10+H10+J10,2)","al":"center","nf":"#,##0.00"},{"c":"L10","v":1.58,"f":"=ROUND((C10^2)/162,3)","al":"center","nf":"0.000"},{"c":"M10","v":925.88,"f":"=ROUND(F10*K10*L10,2)","b":true,"al":"center","nf":"#,##0.00"}]},{"r":11,"h":199.9,"cells":[{"c":"A11","v":"RFT-WT","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":"الأوتار الحديدية الحاملة لفرش الرقة العلوية فوق الكراسي (كل 1.0 م في الاتجاه العرضي)","bg":"#F8FAFC"},{"c":"C11","v":18,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"D11","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"E11","v":27.85,"f":"=C3-0.15","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"F11","v":29,"f":"=ROUNDUP(E11*D11,0)+1","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"G11","v":21.85,"f":"=D3-0.15","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"H11","v":0,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"I11","v":0,"f":"=INT(G11/$H$3)","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"J11","v":0,"f":"=ROUND(I11*60*(C11/1000),2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"K11","v":21.85,"f":"=ROUND(G11+H11+J11,2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"L11","v":2,"f":"=ROUND((C11^2)/162,3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"M11","v":1267.3,"f":"=ROUND(F11*K11*L11,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"}]},{"r":12,"h":128.0,"cells":[{"c":"A12","v":"RFT-AD1","b":true,"al":"center"},{"c":"B12","v":"حديد إضافي سفلي أسفل مناطق ارتكاز الأعمدة والكور (فواتير بطول 4.50 م)"},{"c":"C12","v":22,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"D12","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"E12","v":36,"in":true,"al":"center","nf":"#,##0.00"},{"c":"F12","v":216,"f":"=ROUNDUP(E12*D12,0)","al":"center","nf":"#,##0"},{"c":"G12","v":4.5,"in":true,"al":"center","nf":"#,##0.00"},{"c":"H12","v":0,"in":true,"al":"center","nf":"#,##0.00"},{"c":"I12","v":0,"in":true,"al":"center","nf":"#,##0"},{"c":"J12","v":0,"f":"=ROUND(I12*60*(C12/1000),2)","al":"center","nf":"#,##0.00"},{"c":"K12","v":4.5,"f":"=ROUND(G12+H12+J12,2)","al":"center","nf":"#,##0.00"},{"c":"L12","v":2.988,"f":"=ROUND((C12^2)/162,3)","al":"center","nf":"0.000"},{"c":"M12","v":2904.34,"f":"=ROUND(F12*K12*L12,2)","b":true,"al":"center","nf":"#,##0.00"}]},{"r":13,"h":128.0,"cells":[{"c":"A13","v":"RFT-AD2","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":"حديد إضافي علوي بمنتصف البحور لمقاومة العزوم السالبة (بطول 5.00 م)","bg":"#F8FAFC"},{"c":"C13","v":20,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"D13","v":5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"E13","v":32,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"F13","v":160,"f":"=ROUNDUP(E13*D13,0)","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"G13","v":5,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"H13","v":0,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"I13","v":0,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"J13","v":0,"f":"=ROUND(I13*60*(C13/1000),2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"K13","v":5,"f":"=ROUND(G13+H13+J13,2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"L13","v":2.469,"f":"=ROUND((C13^2)/162,3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"M13","v":1975.2,"f":"=ROUND(F13*K13*L13,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"}]},{"r":14,"h":151.9,"cells":[{"c":"A14","v":"RFT-EDG","b":true,"al":"center"},{"c":"B14","v":"كمر حزام تقوية محيط داير اللبشة (كليبسات محيطية U-Bars كل 20 سم)"},{"c":"C14","v":16,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"D14","v":5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"E14","v":100,"f":"=2*(C3+D3)","al":"center","nf":"#,##0.00"},{"c":"F14","v":500,"f":"=ROUNDUP(E14*D14,0)","al":"center","nf":"#,##0"},{"c":"G14","v":0.95,"f":"=E3-0.15","al":"center","nf":"#,##0.00"},{"c":"H14","v":1.6,"in":true,"al":"center","nf":"#,##0.00"},{"c":"I14","v":0,"in":true,"al":"center","nf":"#,##0"},{"c":"J14","v":0,"f":"=ROUND(I14*60*(C14/1000),2)","al":"center","nf":"#,##0.00"},{"c":"K14","v":2.55,"f":"=ROUND(G14+H14+J14,2)","al":"center","nf":"#,##0.00"},{"c":"L14","v":1.58,"f":"=ROUND((C14^2)/162,3)","al":"center","nf":"0.000"},{"c":"M14","v":2014.5,"f":"=ROUND(F14*K14*L14,2)","b":true,"al":"center","nf":"#,##0.00"}]},{"r":15,"h":44.0,"cells":[{"c":"A15","v":"إجمالي تفريد حديد تسليح اللبشة المسلحة والكراسي والأوتار","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F15","v":2095,"f":"=SUM(F6:F14)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"G15","v":"-","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H15","v":"-","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I15","v":"-","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J15","v":"-","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K15","v":"-","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L15","v":"-","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M15","v":52582.24,"f":"=SUM(M6:M14)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"}]}]},{"name":"3_تفريد_الميدات_وملخص_الأقطار","maxRow":20,"maxCol":12,"colWidths":[16.0,60.0,18.0,13.0,13.0,13.0,13.0,13.0,13.0,13.0,13.0,13.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"تفريد حديد الميدات والشدادات الأرضية والكانات وملخص تجميعي لأوزان الأقطار بالطن","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":12},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":52.0,"cells":[{"c":"A2","v":"تفريد التسليح الطولي والكانات للميدات والشدادات الأرضية، مع جدول تجميعي آلي (SUMIF) لأوزان كل قطر بالطن وعدد الأسياخ التجارية (12 م)","bg":"#1E293B","fg":"#E2E8F0","b":true,"al":"center","cs":12},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":38.0,"cells":[{"c":"A3","v":"أولاً: جدول تفريد حديد الميدات الأرضية (Tie Beams) والشدادات والكانات الصندوقية","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":12},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":4,"h":175.9,"cells":[{"c":"A4","v":"كود البند","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"بيان الميدة / الشداد الأرضي ونوع التسليح (سفلي / علوي / برندات / كانات)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"عدد الباكيات","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"طول الباكية / البحر (م)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"عرض الميدة b (م)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"عمق الميدة t (م)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"القطر Φ (مم)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"العدد بالقطاع / بالمتر","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"إجمالي عدد الأسياخ/الكانات","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J4","v":"طول السيخ / الكانة (م)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K4","v":"وزن المتر (كجم/م)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L4","v":"الوزن الصافي (كجم)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":128.0,"cells":[{"c":"A5","v":"TB1-BOT","b":true,"al":"center"},{"c":"B5","v":"ميدة أرضية نموذج (م1 — 30×60 سم) — تسليح سفلي ممتد برباط داخل الأعمدة"},{"c":"C5","v":18,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"D5","v":5.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E5","v":0.3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F5","v":0.6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G5","v":16,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"H5","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"I5","v":72,"f":"=C5*H5","al":"center","nf":"#,##0"},{"c":"J5","v":6.4,"f":"=ROUND(D5+2*0.6,2)","al":"center","nf":"#,##0.00"},{"c":"K5","v":1.58,"f":"=ROUND((G5^2)/162,3)","al":"center","nf":"0.000"},{"c":"L5","v":728.06,"f":"=ROUND(I5*J5*K5,2)","b":true,"al":"center","nf":"#,##0.00"}]},{"r":6,"h":175.9,"cells":[{"c":"A6","v":"TB1-TOP","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B6","v":"ميدة أرضية نموذج (م1 — 30×60 سم) — تسليح علوي ممتد برجل زاوية عند الأطراف","bg":"#F8FAFC"},{"c":"C6","v":18,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"D6","v":5.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E6","v":0.3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F6","v":0.6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G6","v":16,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"H6","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"I6","v":72,"f":"=C6*H6","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"J6","v":6.4,"f":"=ROUND(D6+2*0.6,2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"K6","v":1.58,"f":"=ROUND((G6^2)/162,3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"L6","v":728.06,"f":"=ROUND(I6*J6*K6,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"}]},{"r":7,"h":128.0,"cells":[{"c":"A7","v":"TB1-SHR","b":true,"al":"center"},{"c":"B7","v":"ميدة أرضية نموذج (م1 — 30×60 سم) — حديد انكماش جانبي (برندات 2Φ12)"},{"c":"C7","v":18,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"D7","v":5.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E7","v":0.3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F7","v":0.6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G7","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"H7","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"I7","v":36,"f":"=C7*H7","al":"center","nf":"#,##0"},{"c":"J7","v":5.6,"f":"=ROUND(D7+0.4,2)","al":"center","nf":"#,##0.00"},{"c":"K7","v":0.889,"f":"=ROUND((G7^2)/162,3)","al":"center","nf":"0.000"},{"c":"L7","v":179.22,"f":"=ROUND(I7*J7*K7,2)","b":true,"al":"center","nf":"#,##0.00"}]},{"r":8,"h":175.9,"cells":[{"c":"A8","v":"TB1-STR","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B8","v":"ميدة أرضية نموذج (م1 — 30×60 سم) — كانات صندوقية (7Φ10/م) شاملة قفل الكانة","bg":"#F8FAFC"},{"c":"C8","v":18,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"D8","v":5.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E8","v":0.3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F8","v":0.6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G8","v":10,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"H8","v":7,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"I8","v":684,"f":"=C8*(ROUNDUP(D8*H8,0)+1)","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"J8","v":1.64,"f":"=ROUND(2*((E8-0.08)+(F8-0.08))+0.16,2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"K8","v":0.617,"f":"=ROUND((G8^2)/162,3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"L8","v":692.13,"f":"=ROUND(I8*J8*K8,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"}]},{"r":9,"h":175.9,"cells":[{"c":"A9","v":"SB1-MAIN","b":true,"al":"center"},{"c":"B9","v":"شداد مسلح نموذج (ش1 — 40×80 سم) — تسليح رئيسي علوي وسفلي لمقاومة العزوم"},{"c":"C9","v":8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"D9","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E9","v":0.4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F9","v":0.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G9","v":20,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"H9","v":10,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"I9","v":80,"f":"=C9*H9","al":"center","nf":"#,##0"},{"c":"J9","v":7.6,"f":"=ROUND(D9+2*0.8,2)","al":"center","nf":"#,##0.00"},{"c":"K9","v":2.469,"f":"=ROUND((G9^2)/162,3)","al":"center","nf":"0.000"},{"c":"L9","v":1501.15,"f":"=ROUND(I9*J9*K9,2)","b":true,"al":"center","nf":"#,##0.00"}]},{"r":10,"h":151.9,"cells":[{"c":"A10","v":"SB1-STR","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B10","v":"شداد مسلح نموذج (ش1 — 40×80 سم) — كانات أوتوماتيك 4 فروع (8Φ10/م)","bg":"#F8FAFC"},{"c":"C10","v":8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"D10","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E10","v":0.4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F10","v":0.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G10","v":10,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"H10","v":8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"I10","v":392,"f":"=C10*(ROUNDUP(D10*H10,0)+1)","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"J10","v":3.76,"f":"=ROUND(2*((E10-0.08)+(F10-0.08))+2*(F10-0.08)+0.24,2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"K10","v":0.617,"f":"=ROUND((G10^2)/162,3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"L10","v":909.41,"f":"=ROUND(I10*J10*K10,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"}]},{"r":11,"h":42.0,"cells":[{"c":"A11","v":"إجمالي أوزان حديد تسليح الميدات والشدادات الأرضية (كجم)","bg":"#E2E8F0","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"I11","v":1336,"f":"=SUM(I5:I10)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0"},{"c":"J11","v":"-","bg":"#E2E8F0","b":true,"al":"center"},{"c":"K11","v":"-","bg":"#E2E8F0","b":true,"al":"center"},{"c":"L11","v":4738.03,"f":"=SUM(L5:L10)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00"}]},{"r":12,"h":38.0,"cells":[{"c":"A12","v":"ثانياً: الملخص التجميعي لطلبيات حديد تسليح الأساسات حسب القطر (مربوط تلقائياً بجميع الشيتات عبر دالة SUMIF)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":12},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":13,"h":128.0,"cells":[{"c":"A13","v":"كود القطر","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B13","v":"بيان قطر حديد التسليح واستخدامه الرئيسي في الأساسات","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C13","v":"القطر Φ (مم)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D13","v":"وزن المتر (كجم/م)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E13","v":"وزن القواعد والأشاير (كجم)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F13","v":"وزن اللبشة والكراسي (كجم)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G13","v":"وزن الميدات والشدادات (كجم)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H13","v":"إجمالي الوزن الصافي (كجم)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I13","v":"نسبة هالك التقطيع (%)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J13","v":"إجمالي وزن الطلبية بالهالك (كجم)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K13","v":"إجمالي الطلبية بالطن (Ton)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L13","v":"عدد الأسياخ التجارية (طول 12م)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":14,"h":151.9,"cells":[{"c":"A14","v":"DIA-10","b":true,"al":"center"},{"c":"B14","v":"حديد تسليح قطر 10 مم — كانات الميدات والشدادات ورقاب الأعمدة"},{"c":"C14","v":10,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"D14","v":0.617,"f":"=ROUND((C14^2)/162,3)","al":"center","nf":"0.000"},{"c":"E14","v":0,"f":"=SUMIF('1_تفريد_القواعد_والأشاير'!$G$6:$G$16,C14,'1_تفريد_القواعد_والأشاير'!$N$6:$N$16)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00"},{"c":"F14","v":0,"f":"=SUMIF('2_تفريد_اللبشة_والكراسي'!$C$6:$C$14,C14,'2_تفريد_اللبشة_والكراسي'!$M$6:$M$14)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00"},{"c":"G14","v":1601.54,"f":"=SUMIF($G$5:$G$10,C14,$L$5:$L$10)","al":"center","nf":"#,##0.00"},{"c":"H14","v":1601.54,"f":"=ROUND(E14+F14+G14,2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"I14","v":0.03,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"J14","v":1649.59,"f":"=ROUND(H14*(1+I14),2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"K14","v":1.65,"f":"=ROUND(J14/1000,3)","b":true,"al":"center","nf":"#,##0.000"},{"c":"L14","v":223,"f":"=ROUNDUP(J14/(12*D14),0)","b":true,"al":"center","nf":"#,##0"}]},{"r":15,"h":128.0,"cells":[{"c":"A15","v":"DIA-12","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B15","v":"حديد تسليح قطر 12 مم — حديد انكماش جانبي (برندات الميدات والشدادات)","bg":"#F8FAFC"},{"c":"C15","v":12,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"D15","v":0.889,"f":"=ROUND((C15^2)/162,3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"E15","v":0,"f":"=SUMIF('1_تفريد_القواعد_والأشاير'!$G$6:$G$16,C15,'1_تفريد_القواعد_والأشاير'!$N$6:$N$16)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00"},{"c":"F15","v":0,"f":"=SUMIF('2_تفريد_اللبشة_والكراسي'!$C$6:$C$14,C15,'2_تفريد_اللبشة_والكراسي'!$M$6:$M$14)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00"},{"c":"G15","v":179.22,"f":"=SUMIF($G$5:$G$10,C15,$L$5:$L$10)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"H15","v":179.22,"f":"=ROUND(E15+F15+G15,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"I15","v":0.03,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"J15","v":184.6,"f":"=ROUND(H15*(1+I15),2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"K15","v":0.185,"f":"=ROUND(J15/1000,3)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"L15","v":18,"f":"=ROUNDUP(J15/(12*D15),0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"}]},{"r":16,"h":175.9,"cells":[{"c":"A16","v":"DIA-16","b":true,"al":"center"},{"c":"B16","v":"حديد تسليح قطر 16 مم — تسليح القواعد المنفصلة والميدات والكراسي الحديدية"},{"c":"C16","v":16,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"D16","v":1.58,"f":"=ROUND((C16^2)/162,3)","al":"center","nf":"0.000"},{"c":"E16","v":0,"f":"=SUMIF('1_تفريد_القواعد_والأشاير'!$G$6:$G$16,C16,'1_تفريد_القواعد_والأشاير'!$N$6:$N$16)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00"},{"c":"F16","v":2940.38,"f":"=SUMIF('2_تفريد_اللبشة_والكراسي'!$C$6:$C$14,C16,'2_تفريد_اللبشة_والكراسي'!$M$6:$M$14)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00"},{"c":"G16","v":1456.12,"f":"=SUMIF($G$5:$G$10,C16,$L$5:$L$10)","al":"center","nf":"#,##0.00"},{"c":"H16","v":4396.5,"f":"=ROUND(E16+F16+G16,2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"I16","v":0.035,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"J16","v":4550.38,"f":"=ROUND(H16*(1+I16),2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"K16","v":4.55,"f":"=ROUND(J16/1000,3)","b":true,"al":"center","nf":"#,##0.000"},{"c":"L16","v":240,"f":"=ROUNDUP(J16/(12*D16),0)","b":true,"al":"center","nf":"#,##0"}]},{"r":17,"h":128.0,"cells":[{"c":"A17","v":"DIA-18","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B17","v":"حديد تسليح قطر 18 مم — تسليح القواعد المشتركة وأشاير الأعمدة والأوتار","bg":"#F8FAFC"},{"c":"C17","v":18,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"D17","v":2,"f":"=ROUND((C17^2)/162,3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"E17","v":0,"f":"=SUMIF('1_تفريد_القواعد_والأشاير'!$G$6:$G$16,C17,'1_تفريد_القواعد_والأشاير'!$N$6:$N$16)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00"},{"c":"F17","v":1267.3,"f":"=SUMIF('2_تفريد_اللبشة_والكراسي'!$C$6:$C$14,C17,'2_تفريد_اللبشة_والكراسي'!$M$6:$M$14)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00"},{"c":"G17","v":0,"f":"=SUMIF($G$5:$G$10,C17,$L$5:$L$10)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"H17","v":1267.3,"f":"=ROUND(E17+F17+G17,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"I17","v":0.04,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"J17","v":1317.99,"f":"=ROUND(H17*(1+I17),2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"K17","v":1.318,"f":"=ROUND(J17/1000,3)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"L17","v":55,"f":"=ROUNDUP(J17/(12*D17),0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"}]},{"r":18,"h":128.0,"cells":[{"c":"A18","v":"DIA-20","b":true,"al":"center"},{"c":"B18","v":"حديد تسليح قطر 20 مم — الرقة العلوية للبشة المسلحة وتسليح الشدادات"},{"c":"C18","v":20,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"D18","v":2.469,"f":"=ROUND((C18^2)/162,3)","al":"center","nf":"0.000"},{"c":"E18","v":0,"f":"=SUMIF('1_تفريد_القواعد_والأشاير'!$G$6:$G$16,C18,'1_تفريد_القواعد_والأشاير'!$N$6:$N$16)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00"},{"c":"F18","v":21654.37,"f":"=SUMIF('2_تفريد_اللبشة_والكراسي'!$C$6:$C$14,C18,'2_تفريد_اللبشة_والكراسي'!$M$6:$M$14)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00"},{"c":"G18","v":1501.15,"f":"=SUMIF($G$5:$G$10,C18,$L$5:$L$10)","al":"center","nf":"#,##0.00"},{"c":"H18","v":23155.52,"f":"=ROUND(E18+F18+G18,2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"I18","v":0.045,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"J18","v":24197.52,"f":"=ROUND(H18*(1+I18),2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"K18","v":24.198,"f":"=ROUND(J18/1000,3)","b":true,"al":"center","nf":"#,##0.000"},{"c":"L18","v":817,"f":"=ROUNDUP(J18/(12*D18),0)","b":true,"al":"center","nf":"#,##0"}]},{"r":19,"h":128.0,"cells":[{"c":"A19","v":"DIA-22","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B19","v":"حديد تسليح قطر 22 مم — الرقة السفلية والفواتير الإضافية للبشة المسلحة","bg":"#F8FAFC"},{"c":"C19","v":22,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"D19","v":2.988,"f":"=ROUND((C19^2)/162,3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"E19","v":0,"f":"=SUMIF('1_تفريد_القواعد_والأشاير'!$G$6:$G$16,C19,'1_تفريد_القواعد_والأشاير'!$N$6:$N$16)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00"},{"c":"F19","v":26720.19,"f":"=SUMIF('2_تفريد_اللبشة_والكراسي'!$C$6:$C$14,C19,'2_تفريد_اللبشة_والكراسي'!$M$6:$M$14)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00"},{"c":"G19","v":0,"f":"=SUMIF($G$5:$G$10,C19,$L$5:$L$10)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"H19","v":26720.19,"f":"=ROUND(E19+F19+G19,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"I19","v":0.05,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"J19","v":28056.2,"f":"=ROUND(H19*(1+I19),2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"K19","v":28.056,"f":"=ROUND(J19/1000,3)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"L19","v":783,"f":"=ROUNDUP(J19/(12*D19),0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"}]},{"r":20,"h":46.0,"cells":[{"c":"A20","v":"الإجمالي العام لحصر وطلب حديد تسليح الأساسات المسلحة","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"E20","v":0,"f":"=SUM(E14:E19)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F20","v":52582.24,"f":"=SUM(F14:F19)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G20","v":4738.03,"f":"=SUM(G14:G19)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H20","v":57320.27,"f":"=SUM(H14:H19)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"I20","v":"-","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J20","v":59956.28,"f":"=SUM(J14:J19)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"K20","v":59.957,"f":"=SUM(K14:K19)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.000"},{"c":"L20","v":2136,"f":"=SUM(L14:L19)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"}]}]}]}