{"slug":"marble-and-granite-stairs-flooring-and-mechanical-facade-qto-sheet","sheets":[{"name":"إعدادات_الرخام_والملخص","maxRow":24,"maxCol":8,"colWidths":[9.0,54.0,15.0,13.0,13.0,16.0,13.0,20.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"شيت حصر وتفريد وتسعير أعمال الرخام والجرانيت للأرضيات والدرج والواجهات الميكانيكية (BOQ-FIN-079)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"الخلايا بالخط الأزرق والخلفية الصفراء هي مدخلات ديناميكية (السماكات، الكثافة، الهالك، والأسعار) وتُحدث الجداول تلقائياً — المرجع: ASTM C503 & C615","bg":"#F8FAFC","fg":"#334155","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":39.0,"cells":[{"c":"A3","v":"أولاً: الثوابت الهندسية لسماكات وأوزان الرخام والجرانيت ومعدلات التركيب الميكانيكي (Stone Engineering Constants)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":4,"h":41.0,"cells":[{"c":"A4","v":"م","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"المعامل الهندسي لأعمال الرخام والجرانيت والتركيب","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"القيمة التصميمية","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"الوحدة","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"المرجع الكودي","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"النطاق القياسي","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"المكافئ الهندسي","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"ملاحظات الورشة والموقع","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":1,"al":"center"},{"c":"B5","v":"الكثافة النوعية للرخام والجرانيت الطبيعي (Stone Bulk Density)"},{"c":"C5","v":2.7,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D5","v":"طن / م³","al":"center"},{"c":"E5","v":"ASTM C503 / C615","al":"center"},{"c":"F5","v":"2.65 - 2.80 طن/م³","al":"center"},{"c":"G5","v":"2,700 كجم/م³","al":"center"},{"c":"H5","v":"لحساب أوزان الطاولات وحمولة الأوناش"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":2,"bg":"#F8FAFC","al":"center"},{"c":"B6","v":"سماكة ألواح ترابيع الأرضيات ونائم الدرج والكاونترات (Heavy Slab)","bg":"#F8FAFC"},{"c":"C6","v":0.03,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D6","v":"متر (3.0 سم)","bg":"#F8FAFC","al":"center"},{"c":"E6","v":"EN 12058 / SBC","bg":"#F8FAFC","al":"center"},{"c":"F6","v":"0.02 - 0.04 م","bg":"#F8FAFC","al":"center"},{"c":"G6","v":"81.0 كجم/م²","bg":"#F8FAFC","al":"center"},{"c":"H6","v":"تتحمل الأحمال الحية والصدمات بالمداخل","bg":"#F8FAFC"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":3,"al":"center"},{"c":"B7","v":"سماكة ألواح الواجهات وقائم الدرج والوزرات والتلابيس (Standard Slab)"},{"c":"C7","v":0.02,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D7","v":"متر (2.0 سم)","al":"center"},{"c":"E7","v":"EN 1469 / SBC","al":"center"},{"c":"F7","v":"0.02 م (20 مم)","al":"center"},{"c":"G7","v":"54.0 كجم/م²","al":"center"},{"c":"H7","v":"تُركب ميكانيكياً بالواجهات أو بالمونة"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":4,"bg":"#F8FAFC","al":"center"},{"c":"B8","v":"نسبة هالك تقطيع وتفصيل طاولات الرخام والجرانيت بالورشة (Cutting Waste %)","bg":"#F8FAFC"},{"c":"C8","v":0.12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"D8","v":"نسبة مئوية","bg":"#F8FAFC","al":"center"},{"c":"E8","v":"عرف ورش الرخام","bg":"#F8FAFC","al":"center"},{"c":"F8","v":"10.0% - 15.0%","bg":"#F8FAFC","al":"center"},{"c":"G8","v":"+12.0% هالك قص","bg":"#F8FAFC","al":"center"},{"c":"H8","v":"لتعويض أطراف الطاولات ومضاهاة العروق","bg":"#F8FAFC"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":5,"al":"center"},{"c":"B9","v":"معدل زوايا وكانات الإستانلس ستيل (SS 304) للواجهات الميكانيكية"},{"c":"C9","v":4.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D9","v":"زاوية / م²","al":"center"},{"c":"E9","v":"ASTM C1242","al":"center"},{"c":"F9","v":"4.0 - 5.0 زاوية/م²","al":"center"},{"c":"G9","v":"4 زوايا لكل لوح","al":"center"},{"c":"H9","v":"شامل مسامير التمدد والبنز والإيبوكسي"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":6,"bg":"#F8FAFC","al":"center"},{"c":"B10","v":"عرض بروز أنف الدرجة والحلية الأمامية (Stair Nosing Overhang)","bg":"#F8FAFC"},{"c":"C10","v":0.03,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D10","v":"متر (3.0 سم)","bg":"#F8FAFC","al":"center"},{"c":"E10","v":"كود السلالم SBC","bg":"#F8FAFC","al":"center"},{"c":"F10","v":"0.02 - 0.03 م","bg":"#F8FAFC","al":"center"},{"c":"G10","v":"أنف ملفوف/مشطوف","bg":"#F8FAFC","al":"center"},{"c":"H10","v":"يُضاف لعرض النائم الفعلي عند القص","bg":"#F8FAFC"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":7,"al":"center"},{"c":"B11","v":"سمك مونة فرشة التركيب الأسمنتية تحت ترابيع الأرضيات والدرج"},{"c":"C11","v":0.04,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D11","v":"متر (4.0 سم)","al":"center"},{"c":"E11","v":"أصول الصنعة","al":"center"},{"c":"F11","v":"0.03 - 0.05 م","al":"center"},{"c":"G11","v":"300 كجم أسمنت/م³","al":"center"},{"c":"H11","v":"تُخلط بأسمنت أبيض للرخام الفاتح"}]},{"r":12,"h":28.0,"cells":[{"c":"A12","v":""},{"c":"B12","v":""},{"c":"C12","v":""},{"c":"D12","v":""},{"c":"E12","v":""},{"c":"F12","v":""},{"c":"G12","v":""},{"c":"H12","v":""}]},{"r":13,"h":39.0,"cells":[{"c":"A13","v":"ثانياً: جدول فئات أسعار بنود الرخام والجرانيت بالمقايسة والملخص المالي التلقائي (BOQ Summary)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"كود البند","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B14","v":"بيان بند أعمال الرخام والجرانيت (توريد وتركيب وجلي وتلميع)","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C14","v":"وحدة المقايسة","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D14","v":"فئة الوحدة (ر.س)","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E14","v":"الكمية التعاقدية بالمقايسة","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F14","v":"صافي مسطح الألواح (م²)","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G14","v":"إجمالي الطاولات +12% (م²)","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H14","v":"إجمالي قيمة البند (ر.س)","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"MRB-01","b":true,"al":"center"},{"c":"B15","v":"توريد وتركيب وجلي ترابيع رخام/جرانيت للأرضيات والمداخل والصدفات (سمك 3 سم)"},{"c":"C15","v":"م²","b":true,"al":"center"},{"c":"D15","v":380,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E15","v":385.36,"f":"=SUMIFS(تفريد_وحصر_الرخام_والدرج!$J$5:$J$18,تفريد_وحصر_الرخام_والدرج!$C$5:$C$18,A15)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F15","v":385.36,"f":"=SUMIFS(تفريد_وحصر_الرخام_والدرج!$K$5:$K$18,تفريد_وحصر_الرخام_والدرج!$C$5:$C$18,A15)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G15","v":431.6,"f":"=SUMIFS(تفريد_وحصر_الرخام_والدرج!$L$5:$L$18,تفريد_وحصر_الرخام_والدرج!$C$5:$C$18,A15)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H15","v":146436.8,"f":"=ROUND(D15*E15,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":"MRB-02","b":true,"al":"center"},{"c":"B16","v":"توريد وتركيب درج سلم رخام/جرانيت نائم 3 سم وقائم 2 سم شامل الحلية والفرزات"},{"c":"C16","v":"م.ط","b":true,"al":"center"},{"c":"D16","v":260,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E16","v":136.2,"f":"=SUMIFS(تفريد_وحصر_الرخام_والدرج!$J$5:$J$18,تفريد_وحصر_الرخام_والدرج!$C$5:$C$18,A16)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F16","v":66.05,"f":"=SUMIFS(تفريد_وحصر_الرخام_والدرج!$K$5:$K$18,تفريد_وحصر_الرخام_والدرج!$C$5:$C$18,A16)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G16","v":73.98,"f":"=SUMIFS(تفريد_وحصر_الرخام_والدرج!$L$5:$L$18,تفريد_وحصر_الرخام_والدرج!$C$5:$C$18,A16)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H16","v":35412,"f":"=ROUND(D16*E16,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":"MRB-03","b":true,"al":"center"},{"c":"B17","v":"توريد وتركيب تكسيات واجهات وحوائط رخام/جرانيت بالطريقة الميكانيكية (SS 304)"},{"c":"C17","v":"م²","b":true,"al":"center"},{"c":"D17","v":520,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E17","v":208,"f":"=SUMIFS(تفريد_وحصر_الرخام_والدرج!$J$5:$J$18,تفريد_وحصر_الرخام_والدرج!$C$5:$C$18,A17)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F17","v":208,"f":"=SUMIFS(تفريد_وحصر_الرخام_والدرج!$K$5:$K$18,تفريد_وحصر_الرخام_والدرج!$C$5:$C$18,A17)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G17","v":232.96,"f":"=SUMIFS(تفريد_وحصر_الرخام_والدرج!$L$5:$L$18,تفريد_وحصر_الرخام_والدرج!$C$5:$C$18,A17)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H17","v":108160,"f":"=ROUND(D17*E17,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":"MRB-04","b":true,"al":"center"},{"c":"B18","v":"توريد وتركيب وزرات وتلابيس سلم ومعابر أبواب رخام/جرانيت (سمك 2 سم مشطوف)"},{"c":"C18","v":"م.ط","b":true,"al":"center"},{"c":"D18","v":85,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E18","v":247,"f":"=SUMIFS(تفريد_وحصر_الرخام_والدرج!$J$5:$J$18,تفريد_وحصر_الرخام_والدرج!$C$5:$C$18,A18)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F18","v":32.7,"f":"=SUMIFS(تفريد_وحصر_الرخام_والدرج!$K$5:$K$18,تفريد_وحصر_الرخام_والدرج!$C$5:$C$18,A18)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G18","v":36.62,"f":"=SUMIFS(تفريد_وحصر_الرخام_والدرج!$L$5:$L$18,تفريد_وحصر_الرخام_والدرج!$C$5:$C$18,A18)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H18","v":20995,"f":"=ROUND(D18*E18,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":"MRB-05","b":true,"al":"center"},{"c":"B19","v":"توريد وتركيب أسطح كاونترات مغاسل ومطابخ وجلسات شبابيك جرانيت (سمك 3 سم)"},{"c":"C19","v":"م.ط","b":true,"al":"center"},{"c":"D19","v":420,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E19","v":43.2,"f":"=SUMIFS(تفريد_وحصر_الرخام_والدرج!$J$5:$J$18,تفريد_وحصر_الرخام_والدرج!$C$5:$C$18,A19)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F19","v":22.08,"f":"=SUMIFS(تفريد_وحصر_الرخام_والدرج!$K$5:$K$18,تفريد_وحصر_الرخام_والدرج!$C$5:$C$18,A19)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G19","v":24.73,"f":"=SUMIFS(تفريد_وحصر_الرخام_والدرج!$L$5:$L$18,تفريد_وحصر_الرخام_والدرج!$C$5:$C$18,A19)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H19","v":18144,"f":"=ROUND(D19*E19,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":20,"h":40.0,"cells":[{"c":"A20","v":"إجمالي مسطحات الألواح وقيمة مقايسة أعمال الرخام والجرانيت قبل الضريبة (Subtotal)","bg":"#E2E8F0","b":true,"cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"E20","v":1019.76,"f":"=SUM(E15:E19)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F20","v":714.19,"f":"=SUM(F15:F19)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G20","v":799.89,"f":"=SUM(G15:G19)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H20","v":329147.8,"f":"=SUM(H15:H19)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":21,"h":36.0,"cells":[{"c":"A21","v":"ضريبة القيمة المضافة المقررة (VAT % — قابلة للتعديل في الخلية الصفراء)","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G21","v":0.15,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"H21","v":49372.17,"f":"=ROUND(H20*G21,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":22,"h":44.0,"cells":[{"c":"A22","v":"الإجمالي العام لمقايسة أعمال الرخام والجرانيت شامل الضريبة (Grand Total Incl. VAT)","bg":"#E0E7FF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H22","v":378519.97,"f":"=ROUND(H20+H21,2)","bg":"#E0E7FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":23,"h":36.0,"cells":[{"c":"A23","v":"استقطاع ضمان حسن التنفيذ الابتدائي (Retention % من القيمة قبل الضريبة)","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G23","v":0.1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"H23","v":32914.78,"f":"=ROUND(H20*G23,2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":24,"h":42.0,"cells":[{"c":"A24","v":"صافي المستحق للصرف بعد استقطاع ضمان حسن التنفيذ (Net Payable Amount)","bg":"#E2E8F0","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H24","v":345605.19,"f":"=ROUND(H22-H23,2)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]}]},{"name":"تفريد_وحصر_الرخام_والدرج","maxRow":19,"maxCol":15,"colWidths":[6.0,42.0,10.0,9.0,13.0,11.0,13.0,13.0,10.0,13.0,13.0,14.0,12.0,13.0,15.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول تفريد وحصر أعمال الرخام والجرانيت للأرضيات والدرج والواجهات (Marble & Granite Cutting List & QTO)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":15},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"يحول الشيت تلقائياً البنود الطولية (الدرج والوزرات والكاونترات) إلى مسطح ألواح رخام مكافئ (م²) شامل الهالك والوزن بالطن","bg":"#F8FAFC","fg":"#334155","al":"center","cs":15},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":39.0,"cells":[{"c":"A3","v":"جدول تفريد المقاسات وحصر الكميات التعاقدية ومسطحات الطاولات وأوزان الرخام والجرانيت","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":15},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"م","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"بيان موقع ونوع الرخام / الجرانيت (الأرضيات / الدرج / الواجهات)","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"كود البند","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"الوحدة","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"العدد","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"الطول (م)","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"العرض / النائم (م)","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"القائم / الارتفاع (م)","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"السمك (م)","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J4","v":"كمية المقايسة","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K4","v":"صافي مسطح اللوح (م²)","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L4","v":"إجمالي الطاولات +12% (م²)","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M4","v":"الوزن الكلي (طن)","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"N4","v":"فئة البند (ر.س)","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"O4","v":"إجمالي التكلفة (ر.س)","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":1,"al":"center"},{"c":"B5","v":"رخام كريما مارفيل إسباني لأرضيات بهو المدخل الرئيسي (أوبن بوك)"},{"c":"C5","v":"MRB-01","b":true,"al":"center"},{"c":"D5","v":"م²","b":true,"al":"center"},{"c":"E5","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F5","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G5","v":8.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H5","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I5","v":0.03,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J5","v":102,"f":"=IF(D5=\"م²\",ROUND(E5*F5*(G5+H5),2),ROUND(E5*F5,2))","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K5","v":102,"f":"=ROUND(E5*F5*(G5+H5),2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L5","v":114.24,"f":"=ROUND(K5*(1+إعدادات_الرخام_والملخص!$C$8),2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M5","v":9.25,"f":"=ROUND(L5*I5*إعدادات_الرخام_والملخص!$C$5,2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N5","v":380,"f":"=INDEX(إعدادات_الرخام_والملخص!$D$15:$D$19,MATCH(C5,إعدادات_الرخام_والملخص!$A$15:$A$19,0))","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O5","v":38760,"f":"=ROUND(J5*N5,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":6,"h":38.0,"cells":[{"c":"A6","v":2,"bg":"#F8FAFC","al":"center"},{"c":"B6","v":"رخام بوتشينو كلاسيك لأرضيات صالة الاستقبال والمجالس","bg":"#F8FAFC"},{"c":"C6","v":"MRB-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D6","v":"م²","bg":"#F8FAFC","b":true,"al":"center"},{"c":"E6","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F6","v":16,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G6","v":9.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H6","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I6","v":0.03,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J6","v":152,"f":"=IF(D6=\"م²\",ROUND(E6*F6*(G6+H6),2),ROUND(E6*F6,2))","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K6","v":152,"f":"=ROUND(E6*F6*(G6+H6),2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L6","v":170.24,"f":"=ROUND(K6*(1+إعدادات_الرخام_والملخص!$C$8),2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M6","v":13.79,"f":"=ROUND(L6*I6*إعدادات_الرخام_والملخص!$C$5,2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N6","v":380,"f":"=INDEX(إعدادات_الرخام_والملخص!$D$15:$D$19,MATCH(C6,إعدادات_الرخام_والملخص!$A$15:$A$19,0))","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O6","v":57760,"f":"=ROUND(J6*N6,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":3,"al":"center"},{"c":"B7","v":"جرانيت نجران / جندولا لبسطات وصدفات السلم الرئيسي (8 صدفات)"},{"c":"C7","v":"MRB-01","b":true,"al":"center"},{"c":"D7","v":"م²","b":true,"al":"center"},{"c":"E7","v":8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F7","v":2.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G7","v":1.4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H7","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I7","v":0.03,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J7","v":31.36,"f":"=IF(D7=\"م²\",ROUND(E7*F7*(G7+H7),2),ROUND(E7*F7,2))","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K7","v":31.36,"f":"=ROUND(E7*F7*(G7+H7),2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L7","v":35.12,"f":"=ROUND(K7*(1+إعدادات_الرخام_والملخص!$C$8),2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M7","v":2.84,"f":"=ROUND(L7*I7*إعدادات_الرخام_والملخص!$C$5,2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N7","v":380,"f":"=INDEX(إعدادات_الرخام_والملخص!$D$15:$D$19,MATCH(C7,إعدادات_الرخام_والملخص!$A$15:$A$19,0))","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O7","v":11916.8,"f":"=ROUND(J7*N7,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":4,"bg":"#F8FAFC","al":"center"},{"c":"B8","v":"جرانيت محروق مانع للانزلاق لمدخل السيارات والممرات الخارجية","bg":"#F8FAFC"},{"c":"C8","v":"MRB-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D8","v":"م²","bg":"#F8FAFC","b":true,"al":"center"},{"c":"E8","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F8","v":25,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G8","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H8","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I8","v":0.03,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J8","v":100,"f":"=IF(D8=\"م²\",ROUND(E8*F8*(G8+H8),2),ROUND(E8*F8,2))","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K8","v":100,"f":"=ROUND(E8*F8*(G8+H8),2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L8","v":112,"f":"=ROUND(K8*(1+إعدادات_الرخام_والملخص!$C$8),2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M8","v":9.07,"f":"=ROUND(L8*I8*إعدادات_الرخام_والملخص!$C$5,2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N8","v":380,"f":"=INDEX(إعدادات_الرخام_والملخص!$D$15:$D$19,MATCH(C8,إعدادات_الرخام_والملخص!$A$15:$A$19,0))","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O8","v":38000,"f":"=ROUND(J8*N8,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":5,"al":"center"},{"c":"B9","v":"درج السلم الرئيسي الداخلي (جرانيت نائم 3سم بعرض 33سم + قائم 2سم بارتفاع 15سم)"},{"c":"C9","v":"MRB-02","b":true,"al":"center"},{"c":"D9","v":"م.ط","b":true,"al":"center"},{"c":"E9","v":60,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F9","v":1.35,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G9","v":0.33,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H9","v":0.15,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I9","v":0.03,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J9","v":81,"f":"=IF(D9=\"م²\",ROUND(E9*F9*(G9+H9),2),ROUND(E9*F9,2))","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K9","v":38.88,"f":"=ROUND(E9*F9*(G9+H9),2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L9","v":43.55,"f":"=ROUND(K9*(1+إعدادات_الرخام_والملخص!$C$8),2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M9","v":3.53,"f":"=ROUND(L9*I9*إعدادات_الرخام_والملخص!$C$5,2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N9","v":260,"f":"=INDEX(إعدادات_الرخام_والملخص!$D$15:$D$19,MATCH(C9,إعدادات_الرخام_والملخص!$A$15:$A$19,0))","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O9","v":21060,"f":"=ROUND(J9*N9,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":6,"bg":"#F8FAFC","al":"center"},{"c":"B10","v":"درج سلم المدخل الخارجي العريض (جرانيت نائم 35سم + قائم 15سم)","bg":"#F8FAFC"},{"c":"C10","v":"MRB-02","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D10","v":"م.ط","bg":"#F8FAFC","b":true,"al":"center"},{"c":"E10","v":8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F10","v":4.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G10","v":0.35,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H10","v":0.15,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I10","v":0.03,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J10","v":33.6,"f":"=IF(D10=\"م²\",ROUND(E10*F10*(G10+H10),2),ROUND(E10*F10,2))","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K10","v":16.8,"f":"=ROUND(E10*F10*(G10+H10),2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L10","v":18.82,"f":"=ROUND(K10*(1+إعدادات_الرخام_والملخص!$C$8),2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M10","v":1.52,"f":"=ROUND(L10*I10*إعدادات_الرخام_والملخص!$C$5,2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N10","v":260,"f":"=INDEX(إعدادات_الرخام_والملخص!$D$15:$D$19,MATCH(C10,إعدادات_الرخام_والملخص!$A$15:$A$19,0))","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O10","v":8736,"f":"=ROUND(J10*N10,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":7,"al":"center"},{"c":"B11","v":"درج سلم الفيللا الداخلي الديكوري (رخام إمبرادور نائم 33سم + قائم 15سم)"},{"c":"C11","v":"MRB-02","b":true,"al":"center"},{"c":"D11","v":"م.ط","b":true,"al":"center"},{"c":"E11","v":18,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F11","v":1.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G11","v":0.33,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H11","v":0.15,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I11","v":0.03,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J11","v":21.6,"f":"=IF(D11=\"م²\",ROUND(E11*F11*(G11+H11),2),ROUND(E11*F11,2))","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K11","v":10.37,"f":"=ROUND(E11*F11*(G11+H11),2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L11","v":11.61,"f":"=ROUND(K11*(1+إعدادات_الرخام_والملخص!$C$8),2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M11","v":0.94,"f":"=ROUND(L11*I11*إعدادات_الرخام_والملخص!$C$5,2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N11","v":260,"f":"=INDEX(إعدادات_الرخام_والملخص!$D$15:$D$19,MATCH(C11,إعدادات_الرخام_والملخص!$A$15:$A$19,0))","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O11","v":5616,"f":"=ROUND(J11*N11,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":12,"h":38.0,"cells":[{"c":"A12","v":8,"bg":"#F8FAFC","al":"center"},{"c":"B12","v":"تكسية الواجهة المعمارية الرئيسية بالجرانيت والحجر الميكانيكي (زوايا SS304)","bg":"#F8FAFC"},{"c":"C12","v":"MRB-03","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D12","v":"م²","bg":"#F8FAFC","b":true,"al":"center"},{"c":"E12","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F12","v":18,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G12","v":8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H12","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I12","v":0.02,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J12","v":144,"f":"=IF(D12=\"م²\",ROUND(E12*F12*(G12+H12),2),ROUND(E12*F12,2))","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K12","v":144,"f":"=ROUND(E12*F12*(G12+H12),2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L12","v":161.28,"f":"=ROUND(K12*(1+إعدادات_الرخام_والملخص!$C$8),2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M12","v":8.71,"f":"=ROUND(L12*I12*إعدادات_الرخام_والملخص!$C$5,2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N12","v":520,"f":"=INDEX(إعدادات_الرخام_والملخص!$D$15:$D$19,MATCH(C12,إعدادات_الرخام_والملخص!$A$15:$A$19,0))","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O12","v":74880,"f":"=ROUND(J12*N12,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":9,"al":"center"},{"c":"B13","v":"تكسية حوائط بهو المصاعد والمدخل الرئيسي بالرخام الميكانيكي"},{"c":"C13","v":"MRB-03","b":true,"al":"center"},{"c":"D13","v":"م²","b":true,"al":"center"},{"c":"E13","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F13","v":5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G13","v":3.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H13","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I13","v":0.02,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J13","v":64,"f":"=IF(D13=\"م²\",ROUND(E13*F13*(G13+H13),2),ROUND(E13*F13,2))","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K13","v":64,"f":"=ROUND(E13*F13*(G13+H13),2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L13","v":71.68,"f":"=ROUND(K13*(1+إعدادات_الرخام_والملخص!$C$8),2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M13","v":3.87,"f":"=ROUND(L13*I13*إعدادات_الرخام_والملخص!$C$5,2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N13","v":520,"f":"=INDEX(إعدادات_الرخام_والملخص!$D$15:$D$19,MATCH(C13,إعدادات_الرخام_والملخص!$A$15:$A$19,0))","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O13","v":33280,"f":"=ROUND(J13*N13,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":10,"bg":"#F8FAFC","al":"center"},{"c":"B14","v":"وزرات رخام مشطوفة لصالات الاستقبال والمداخل والممرات (ارتفاع 12 سم)","bg":"#F8FAFC"},{"c":"C14","v":"MRB-04","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D14","v":"م.ط","bg":"#F8FAFC","b":true,"al":"center"},{"c":"E14","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F14","v":145,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G14","v":0.12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H14","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I14","v":0.02,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J14","v":145,"f":"=IF(D14=\"م²\",ROUND(E14*F14*(G14+H14),2),ROUND(E14*F14,2))","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K14","v":17.4,"f":"=ROUND(E14*F14*(G14+H14),2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L14","v":19.49,"f":"=ROUND(K14*(1+إعدادات_الرخام_والملخص!$C$8),2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M14","v":1.05,"f":"=ROUND(L14*I14*إعدادات_الرخام_والملخص!$C$5,2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N14","v":85,"f":"=INDEX(إعدادات_الرخام_والملخص!$D$15:$D$19,MATCH(C14,إعدادات_الرخام_والملخص!$A$15:$A$19,0))","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O14","v":12325,"f":"=ROUND(J14*N14,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":11,"al":"center"},{"c":"B15","v":"تلابيس وزرات مائلة لدرج السلم الرئيسي والداخلي (ارتفاع 15 سم)"},{"c":"C15","v":"MRB-04","b":true,"al":"center"},{"c":"D15","v":"م.ط","b":true,"al":"center"},{"c":"E15","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F15","v":64,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G15","v":0.15,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H15","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I15","v":0.02,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J15","v":64,"f":"=IF(D15=\"م²\",ROUND(E15*F15*(G15+H15),2),ROUND(E15*F15,2))","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K15","v":9.6,"f":"=ROUND(E15*F15*(G15+H15),2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L15","v":10.75,"f":"=ROUND(K15*(1+إعدادات_الرخام_والملخص!$C$8),2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M15","v":0.58,"f":"=ROUND(L15*I15*إعدادات_الرخام_والملخص!$C$5,2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N15","v":85,"f":"=INDEX(إعدادات_الرخام_والملخص!$D$15:$D$19,MATCH(C15,إعدادات_الرخام_والملخص!$A$15:$A$19,0))","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O15","v":5440,"f":"=ROUND(J15*N15,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":12,"bg":"#F8FAFC","al":"center"},{"c":"B16","v":"معابر أبواب الغرف والحمامات من الرخام المشطوف (عرض 15 سم)","bg":"#F8FAFC"},{"c":"C16","v":"MRB-04","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D16","v":"م.ط","bg":"#F8FAFC","b":true,"al":"center"},{"c":"E16","v":38,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F16","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G16","v":0.15,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H16","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I16","v":0.02,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J16","v":38,"f":"=IF(D16=\"م²\",ROUND(E16*F16*(G16+H16),2),ROUND(E16*F16,2))","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K16","v":5.7,"f":"=ROUND(E16*F16*(G16+H16),2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L16","v":6.38,"f":"=ROUND(K16*(1+إعدادات_الرخام_والملخص!$C$8),2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M16","v":0.34,"f":"=ROUND(L16*I16*إعدادات_الرخام_والملخص!$C$5,2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N16","v":85,"f":"=INDEX(إعدادات_الرخام_والملخص!$D$15:$D$19,MATCH(C16,إعدادات_الرخام_والملخص!$A$15:$A$19,0))","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O16","v":3230,"f":"=ROUND(J16*N16,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":13,"al":"center"},{"c":"B17","v":"كاونترات وأسطح مغاسل الحمامات والمطابخ من الجرانيت الأسود الجلاكسي (عرض 65 سم)"},{"c":"C17","v":"MRB-05","b":true,"al":"center"},{"c":"D17","v":"م.ط","b":true,"al":"center"},{"c":"E17","v":8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F17","v":2.4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G17","v":0.65,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H17","v":0.15,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I17","v":0.03,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J17","v":19.2,"f":"=IF(D17=\"م²\",ROUND(E17*F17*(G17+H17),2),ROUND(E17*F17,2))","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K17","v":15.36,"f":"=ROUND(E17*F17*(G17+H17),2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L17","v":17.2,"f":"=ROUND(K17*(1+إعدادات_الرخام_والملخص!$C$8),2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M17","v":1.39,"f":"=ROUND(L17*I17*إعدادات_الرخام_والملخص!$C$5,2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N17","v":420,"f":"=INDEX(إعدادات_الرخام_والملخص!$D$15:$D$19,MATCH(C17,إعدادات_الرخام_والملخص!$A$15:$A$19,0))","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O17","v":8064,"f":"=ROUND(J17*N17,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":14,"bg":"#F8FAFC","al":"center"},{"c":"B18","v":"جلسات الشبابيك والدروة من الرخام والجرانيت مع فرزة مياه (عرض 28 سم)","bg":"#F8FAFC"},{"c":"C18","v":"MRB-05","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D18","v":"م.ط","bg":"#F8FAFC","b":true,"al":"center"},{"c":"E18","v":16,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F18","v":1.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G18","v":0.28,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H18","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I18","v":0.03,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J18","v":24,"f":"=IF(D18=\"م²\",ROUND(E18*F18*(G18+H18),2),ROUND(E18*F18,2))","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K18","v":6.72,"f":"=ROUND(E18*F18*(G18+H18),2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L18","v":7.53,"f":"=ROUND(K18*(1+إعدادات_الرخام_والملخص!$C$8),2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M18","v":0.61,"f":"=ROUND(L18*I18*إعدادات_الرخام_والملخص!$C$5,2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N18","v":420,"f":"=INDEX(إعدادات_الرخام_والملخص!$D$15:$D$19,MATCH(C18,إعدادات_الرخام_والملخص!$A$15:$A$19,0))","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O18","v":10080,"f":"=ROUND(J18*N18,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":19,"h":42.0,"cells":[{"c":"A19","v":"إجمالي حصر وتفريد مسطحات طاولات الرخام والجرانيت والأوزان والتكلفة","bg":"#E0E7FF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"J19","v":1019.76,"f":"=SUM(J5:J18)","bg":"#E0E7FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K19","v":714.19,"f":"=SUM(K5:K18)","bg":"#E0E7FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L19","v":799.89,"f":"=SUM(L5:L18)","bg":"#E0E7FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M19","v":57.49,"f":"=SUM(M5:M18)","bg":"#E0E7FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N19","v":316.785714,"f":"=AVERAGE(N5:N18)","bg":"#E0E7FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O19","v":329147.8,"f":"=SUM(O5:O18)","bg":"#E0E7FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]}]},{"name":"حاسبة_الزوايا_والمون_والجلي","maxRow":15,"maxCol":9,"colWidths":[7.0,56.0,15.0,16.0,13.0,14.0,16.0,15.0,18.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"حاسبة خامات طاولات الرخام وزوايا الإستانلس ستيل (SS 304) والكلة الإيبوكسي والمون والجلي (Marble MTO)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"تستخرج هذه الورقة المسطحات المكافئة من جدول التفريد لحساب طلبيات الطاولات، زوايا الواجهات، اللواصق، ومواد الجلي","bg":"#F8FAFC","fg":"#334155","al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":39.0,"cells":[{"c":"A3","v":"جدول حصر طلبيات طاولات الرخام وإكسسوارات التركيب الميكانيكي والمون (Material Take-Off Schedule)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"م","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"بيان الخامة / طاولات الرخام / إكسسوارات التركيب الميكانيكي والمون","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"وحدة التوريد","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"الكمية المرجعية","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"معدل الاستهلاك","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"معامل الإضافة","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"الكمية المطلوبة للتوريد","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"سعر الوحدة (ر.س)","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"إجمالي التكلفة (ر.س)","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":1,"al":"center"},{"c":"B5","v":"طاولات وألواح رخام وجرانيت سمك 3.0 سم للأرضيات والدرج والكاونترات (شامل الهالك)"},{"c":"C5","v":"م² ألواح 3سم","al":"center"},{"c":"D5","v":530.31,"f":"=SUMIFS(تفريد_وحصر_الرخام_والدرج!$L$5:$L$18,تفريد_وحصر_الرخام_والدرج!$I$5:$I$18,0.03)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E5","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F5","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G5","v":530.3,"f":"=ROUND(D5*E5*F5,1)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H5","v":240,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I5","v":127272,"f":"=ROUND(G5*H5,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":2,"bg":"#F8FAFC","al":"center"},{"c":"B6","v":"طاولات وألواح رخام وجرانيت سمك 2.0 سم للواجهات والوزرات والتلابيس (شامل الهالك)","bg":"#F8FAFC"},{"c":"C6","v":"م² ألواح 2سم","bg":"#F8FAFC","al":"center"},{"c":"D6","v":269.58,"f":"=SUMIFS(تفريد_وحصر_الرخام_والدرج!$L$5:$L$18,تفريد_وحصر_الرخام_والدرج!$I$5:$I$18,0.02)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E6","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F6","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G6","v":269.6,"f":"=ROUND(D6*E6*F6,1)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H6","v":190,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I6","v":51224,"f":"=ROUND(G6*H6,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":3,"al":"center"},{"c":"B7","v":"أطقم زوايا وكانات تثبيت ميكانيكي ستانلس ستيل (SS 304) مع البنز ومسمار التمدد"},{"c":"C7","v":"طقم زاوية SS304","al":"center"},{"c":"D7","v":208,"f":"=إعدادات_الرخام_والملخص!F17","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E7","v":4.5,"f":"=إعدادات_الرخام_والملخص!C9","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F7","v":1.05,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G7","v":983,"f":"=ROUNDUP(D7*E7*F7,0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H7","v":16,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I7","v":15728,"f":"=ROUND(G7*H7,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":4,"bg":"#F8FAFC","al":"center"},{"c":"B8","v":"غراء كلة رخام وإيبوكسي ثنائي المركب لتثبيت البنوز وتجميع الأنف والسوك","bg":"#F8FAFC"},{"c":"C8","v":"عبوة 1.5 كجم","bg":"#F8FAFC","al":"center"},{"c":"D8","v":714.19,"f":"=إعدادات_الرخام_والملخص!F20","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E8","v":0.08,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F8","v":1.05,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G8","v":60,"f":"=ROUNDUP(D8*E8*F8,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H8","v":65,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I8","v":3900,"f":"=ROUND(G8*H8,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":5,"al":"center"},{"c":"B9","v":"غراء لاصق رخام أبيض مرن (White C2TE Adhesive) لمنع التبقيع خلف الرخام الفاتح"},{"c":"C9","v":"شكارة 25 كجم","al":"center"},{"c":"D9","v":714.19,"f":"=إعدادات_الرخام_والملخص!F20","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E9","v":0.12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F9","v":1.05,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G9","v":90,"f":"=ROUNDUP(D9*E9*F9,0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H9","v":42,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I9","v":3780,"f":"=ROUND(G9*H9,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":10,"h":38.0,"cells":[{"c":"A10","v":6,"bg":"#F8FAFC","al":"center"},{"c":"B10","v":"أسمنت أبيض وبورتلاندي لمونة فرشة تركيب الأرضيات والدرج (سمك 4 سم)","bg":"#F8FAFC"},{"c":"C10","v":"شكارة 50 كجم","bg":"#F8FAFC","al":"center"},{"c":"D10","v":451.41,"f":"=إعدادات_الرخام_والملخص!F15+إعدادات_الرخام_والملخص!F16","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E10","v":0.3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F10","v":1.08,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G10","v":147,"f":"=ROUNDUP(D10*E10*F10,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H10","v":32,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I10","v":4704,"f":"=ROUND(G10*H10,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":11,"h":38.0,"cells":[{"c":"A11","v":7,"al":"center"},{"c":"B11","v":"رمل حرش مغسول ومنخول لفرشة مونة تركيب أرضيات ودرج الرخام والجرانيت"},{"c":"C11","v":"م³ رمل","al":"center"},{"c":"D11","v":451.41,"f":"=إعدادات_الرخام_والملخص!F15+إعدادات_الرخام_والملخص!F16","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E11","v":0.05,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F11","v":1.08,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G11","v":24.4,"f":"=ROUND(D11*E11*F11,1)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H11","v":65,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I11","v":1586,"f":"=ROUND(G11*H11,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":8,"bg":"#F8FAFC","al":"center"},{"c":"B12","v":"أطقم أقراص جلي وتلميع ألماسية متدرجة وبودرة كريستال (أكساليك) لتلميع الرخام","bg":"#F8FAFC"},{"c":"C12","v":"طقم جلي كامل","bg":"#F8FAFC","al":"center"},{"c":"D12","v":451.41,"f":"=إعدادات_الرخام_والملخص!F15+إعدادات_الرخام_والملخص!F16","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E12","v":0.025,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.000"},{"c":"F12","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G12","v":12,"f":"=ROUNDUP(D12*E12*F12,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H12","v":380,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I12","v":4560,"f":"=ROUND(G12*H12,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":13,"h":38.0,"cells":[{"c":"A13","v":9,"al":"center"},{"c":"B13","v":"مادة سيلر عازل وحامٍ للرخام والجرانيت ضد امتصاص الزيوت والمياه والبقع"},{"c":"C13","v":"عبوة 5 لتر","al":"center"},{"c":"D13","v":714.19,"f":"=إعدادات_الرخام_والملخص!F20","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E13","v":0.014,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.000"},{"c":"F13","v":1.05,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G13","v":11,"f":"=ROUNDUP(D13*E13*F13,0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H13","v":220,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I13","v":2420,"f":"=ROUND(G13*H13,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":10,"bg":"#F8FAFC","al":"center"},{"c":"B14","v":"شرائح كاربوراندوم / فرزات مانعة للانزلاق لأنف درجات السلم (Anti-Slip Strips)","bg":"#F8FAFC"},{"c":"C14","v":"متر طولي","bg":"#F8FAFC","al":"center"},{"c":"D14","v":136.2,"f":"=إعدادات_الرخام_والملخص!E16","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E14","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F14","v":1.05,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G14","v":144,"f":"=ROUNDUP(D14*E14*F14,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H14","v":18,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I14","v":2592,"f":"=ROUND(G14*H14,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":15,"h":42.0,"cells":[{"c":"A15","v":"إجمالي التكلفة التقديرية لتوريد طاولات الرخام والزوايا الميكانيكية والمون والجلي","bg":"#E0E7FF","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G15","v":799.9,"f":"=SUM(G5:G6)","bg":"#E0E7FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H15","v":"م² إجمالي الألواح","bg":"#E0E7FF","b":true,"al":"center"},{"c":"I15","v":217766,"f":"=SUM(I5:I14)","bg":"#E0E7FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]}]},{"name":"أصول_القياس_وفحص_الرخام","maxRow":23,"maxCol":8,"colWidths":[7.0,48.0,13.0,14.0,15.0,13.0,13.0,18.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول أوزان ومعدلات ألواح الرخام والجرانيت وقائمة الفحص والاستلام الميداني (Marble Weights & QC)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"مرجع هندسي لحساب وزن المتر المربع والمتر الطولي وحمولة الطاولات + سجل استلام الأرضيات والدرج والواجهات (ASTM C503)","bg":"#F8FAFC","fg":"#334155","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":39.0,"cells":[{"c":"A3","v":"أولاً: الجدول المرجعي لأوزان ألواح الرخام والجرانيت وقدرة التحميل حسب السماكة (Stone Weight Matrix)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"م","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"نوع وسماكة لوح الرخام / الجرانيت وتطبيقه المعماري","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"السمك (سم)","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"الكثافة (طن/م³)","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"وزن 1 م² (كجم)","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"وزن 100 م² (طن)","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"مساحة حمولة 24 طن (م²)","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"طريقة التثبيت القياسية","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":1,"al":"center"},{"c":"B5","v":"ألواح رخام/جرانيت رقيقة للتكسيات الداخلية والوزرات (سمك 1.5 سم)"},{"c":"C5","v":1.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D5","v":2.7,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E5","v":40.5,"f":"=ROUND((C5/100)*D5*1000,1)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F5","v":4.05,"f":"=ROUND((E5*100)/1000,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G5","v":592.6,"f":"=ROUND(24000/E5,1)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H5","v":"غراء لاصق مرن C2TE","al":"center"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":2,"bg":"#F8FAFC","al":"center"},{"c":"B6","v":"ألواح رخام/جرانيت قياسية للواجهات الميكانيكية وقائم الدرج (سمك 2.0 سم)","bg":"#F8FAFC"},{"c":"C6","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D6","v":2.7,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E6","v":54,"f":"=ROUND((C6/100)*D6*1000,1)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F6","v":5.4,"f":"=ROUND((E6*100)/1000,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G6","v":444.4,"f":"=ROUND(24000/E6,1)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H6","v":"ميكانيكي زوايا SS 304","bg":"#F8FAFC","al":"center"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":3,"al":"center"},{"c":"B7","v":"ألواح رخام/جرانيت محملة للأرضيات الداخلية والمداخل (سمك 3.0 سم)"},{"c":"C7","v":3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D7","v":2.75,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E7","v":82.5,"f":"=ROUND((C7/100)*D7*1000,1)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F7","v":8.25,"f":"=ROUND((E7*100)/1000,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G7","v":290.9,"f":"=ROUND(24000/E7,1)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H7","v":"مونة أسمنتية / غراء","al":"center"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":4,"bg":"#F8FAFC","al":"center"},{"c":"B8","v":"ألواح جرانيت ثقيلة للمداخل الخارجية ونائم السلالم الكبرى (سمك 4.0 سم)","bg":"#F8FAFC"},{"c":"C8","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D8","v":2.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E8","v":112,"f":"=ROUND((C8/100)*D8*1000,1)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F8","v":11.2,"f":"=ROUND((E8*100)/1000,2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G8","v":214.3,"f":"=ROUND(24000/E8,1)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H8","v":"مونة ذاتية التسوية","bg":"#F8FAFC","al":"center"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":5,"al":"center"},{"c":"B9","v":"بردورات ومكعبات جرانيت للممرات واللاندسكيب الخارجي (سمك 6.0 سم)"},{"c":"C9","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D9","v":2.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E9","v":168,"f":"=ROUND((C9/100)*D9*1000,1)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F9","v":16.8,"f":"=ROUND((E9*100)/1000,2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G9","v":142.9,"f":"=ROUND(24000/E9,1)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H9","v":"فرشة خرسانية ومونة","al":"center"}]},{"r":10,"h":28.0,"cells":[{"c":"A10","v":""},{"c":"B10","v":""},{"c":"C10","v":""},{"c":"D10","v":""},{"c":"E10","v":""},{"c":"F10","v":""},{"c":"G10","v":""},{"c":"H10","v":""}]},{"r":11,"h":39.0,"cells":[{"c":"A11","v":"ثانياً: سجل الفحص والاستلام الميداني لأعمال الرخام والجرانيت والواجهات الميكانيكية (Site QC Checklist)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":"م","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B12","v":"معيار الفحص الهندسي لأعمال الرخام والجرانيت (الأرضيات، الدرج، والواجهات)","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C12","v":"الحد المسموح / المعيار","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D12","v":"القراءة الفعلية بالموقع","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E12","v":"الوحدة","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F12","v":"وزن الفحص","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G12","v":"الدرجة المحققة","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H12","v":"حالة المطابقة","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":1,"al":"center"},{"c":"B13","v":"التفاوت في سماكة ألواح الرخام والجرانيت الموردة بالقدمة ذات الورنية"},{"c":"C13","v":1.5,"in":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D13","v":0.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E13","v":"مم (±)","al":"center"},{"c":"F13","v":10,"in":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G13","v":10,"f":"=IF(D13<=C13,F13,0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H13","v":"مطابق للكود","f":"=IF(D13<=C13,\"مطابق للكود\",\"غير مطابق\")","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":2,"bg":"#F8FAFC","al":"center"},{"c":"B14","v":"مطابقة رتبة زوايا وبنوز التركيب الميكانيكي للإستانلس ستيل (SS 304 / 316)","bg":"#F8FAFC"},{"c":"C14","v":304,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D14","v":304,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E14","v":"رتبة SS","bg":"#F8FAFC","al":"center"},{"c":"F14","v":15,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G14","v":15,"f":"=IF(D14>=C14,F14,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H14","v":"مطابق للكود","f":"=IF(D14>=C14,\"مطابق للكود\",\"غير مطابق\")","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":3,"al":"center"},{"c":"B15","v":"الحد الأدنى لعدد زوايا التثبيت الميكانيكي لكل متر مربع من الواجهات"},{"c":"C15","v":4,"in":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D15","v":4.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E15","v":"زاوية/م²","al":"center"},{"c":"F15","v":10,"in":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G15","v":10,"f":"=IF(D15>=C15,F15,0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H15","v":"مطابق للكود","f":"=IF(D15>=C15,\"مطابق للكود\",\"غير مطابق\")","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":4,"bg":"#F8FAFC","al":"center"},{"c":"B16","v":"عمق تخريم ثقب البنز الإستانلس وحقنه بغراء الإيبوكسي ثنائي المركب","bg":"#F8FAFC"},{"c":"C16","v":25,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D16","v":30,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E16","v":"مم","bg":"#F8FAFC","al":"center"},{"c":"F16","v":10,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G16","v":10,"f":"=IF(D16>=C16,F16,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H16","v":"مطابق للكود","f":"=IF(D16>=C16,\"مطابق للكود\",\"غير مطابق\")","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":5,"al":"center"},{"c":"B17","v":"أقصى فرق منسوب مسموح بين لوحين متجاورين بعد الجلي (Lippage Tolerance)"},{"c":"C17","v":0.5,"in":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D17","v":0.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E17","v":"مم","al":"center"},{"c":"F17","v":15,"in":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G17","v":15,"f":"=IF(D17<=C17,F17,0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H17","v":"مطابق للكود","f":"=IF(D17<=C17,\"مطابق للكود\",\"غير مطابق\")","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":6,"bg":"#F8FAFC","al":"center"},{"c":"B18","v":"التفاوت في استواء أرضيات وحوائط الرخام تحت القدة الألومنيوم (طول 2 م)","bg":"#F8FAFC"},{"c":"C18","v":1.5,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D18","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E18","v":"مم","bg":"#F8FAFC","al":"center"},{"c":"F18","v":10,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G18","v":10,"f":"=IF(D18<=C18,F18,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H18","v":"مطابق للكود","f":"=IF(D18<=C18,\"مطابق للكود\",\"غير مطابق\")","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":7,"al":"center"},{"c":"B19","v":"أقصى فرق مسموح في ارتفاع القائم أو عرض النائم بين درجتي سلم متتاليتين"},{"c":"C19","v":2,"in":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D19","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E19","v":"مم","al":"center"},{"c":"F19","v":10,"in":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G19","v":10,"f":"=IF(D19<=C19,F19,0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H19","v":"مطابق للكود","f":"=IF(D19<=C19,\"مطابق للكود\",\"غير مطابق\")","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":8,"bg":"#F8FAFC","al":"center"},{"c":"B20","v":"نسبة التطبيل أو الفراغات الصوتية أسفل ترابيع الأرضيات ونائم الدرج","bg":"#F8FAFC"},{"c":"C20","v":0,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D20","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E20","v":"% تطبيل","bg":"#F8FAFC","al":"center"},{"c":"F20","v":10,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G20","v":10,"f":"=IF(D20<=C20,F20,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H20","v":"مطابق للكود","f":"=IF(D20<=C20,\"مطابق للكود\",\"غير مطابق\")","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":21,"h":52.0,"cells":[{"c":"A21","v":9,"al":"center"},{"c":"B21","v":"درجة اللمعان السطحي بعد الجلي الكريستالي ومعالجة الرخام بالسيلر العازل"},{"c":"C21","v":85,"in":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D21","v":92,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E21","v":"وحدة لمعان GU","al":"center"},{"c":"F21","v":5,"in":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G21","v":5,"f":"=IF(D21>=C21,F21,0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H21","v":"مطابق للكود","f":"=IF(D21>=C21,\"مطابق للكود\",\"غير مطابق\")","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":22,"h":52.0,"cells":[{"c":"A22","v":10,"bg":"#F8FAFC","al":"center"},{"c":"B22","v":"تغطية وحماية أرضيات ودرج الرخام بعد الجلي مباشرة حتى تسليم المشروع","bg":"#F8FAFC"},{"c":"C22","v":100,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D22","v":100,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E22","v":"% تغطية","bg":"#F8FAFC","al":"center"},{"c":"F22","v":5,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G22","v":5,"f":"=IF(D22>=C22,F22,0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H22","v":"مطابق للكود","f":"=IF(D22>=C22,\"مطابق للكود\",\"غير مطابق\")","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":23,"h":42.0,"cells":[{"c":"A23","v":"إجمالي تقييم مطابقة وجودة أعمال الرخام والجرانيت للاستلام الهندسي","bg":"#E0E7FF","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F23","v":100,"f":"=SUM(F13:F22)","bg":"#E0E7FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G23","v":100,"f":"=SUM(G13:G22)","bg":"#E0E7FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H23","v":"مقبول للاستلام (Code A)","f":"=IF(G23>=90,\"مقبول للاستلام (Code A)\",\"يتطلب إعادة جلي/ضبط (Code B)\")","bg":"#E0E7FF","b":true,"al":"center"}]}]}]}