{"slug":"material-submittal-log-mir","sheets":[{"name":"لوحة_المعلومات_والمؤشرات","maxRow":18,"maxCol":8,"colWidths":[8.0,48.0,16.0,16.0,18.0,16.0,16.0,20.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"لوحة متابعة اعتماد وفحص المواد الموقعية (Material Submittal & Inspection Log)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"متابعة طلبات اعتماد المواد (MS) وفحص التوريدات الموقعية (MIR) وإغلاق ملاحظات الاستشاري وفق ISO 9001 و SBC","bg":"#1E293B","fg":"#E2E8F0","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"اسم المشروع:","b":true,"al":"center"},{"c":"B4","v":"مشروع إنشاء مجمع الأعمال والأبراج المكتبية المتعددة","fg":"#1E293B","al":"center"},{"c":"C4","v":""},{"c":"D4","v":""},{"c":"E4","v":"المالك / جهة التطوير:","b":true,"al":"center"},{"c":"F4","v":"شركة التطوير العقاري الكبرى","fg":"#1E293B","al":"center"},{"c":"G4","v":""},{"c":"H4","v":""}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"المقاول الرئيسي:","b":true,"al":"center"},{"c":"B5","v":"تحالف المقاولات العامة والإنشاءات","fg":"#1E293B","al":"center"},{"c":"C5","v":""},{"c":"D5","v":""},{"c":"E5","v":"استشاري الإشراف وضبط الجودة:","b":true,"al":"center"},{"c":"F5","v":"المكتب الاستشاري الهندسي العام","fg":"#1E293B","al":"center"},{"c":"G5","v":""},{"c":"H5","v":""}]},{"r":6,"h":104.0,"cells":[{"c":"A6","v":"تاريخ التحديث:","b":true,"al":"center"},{"c":"B6","v":"أكتوبر 2026م","fg":"#1E293B","al":"center"},{"c":"C6","v":""},{"c":"D6","v":""},{"c":"E6","v":"نظام الجودة المعتمد:","b":true,"al":"center"},{"c":"F6","v":"خطة ضبط الجودة PQP / معيار ISO 9001:2015 / كود SBC","fg":"#1E293B","al":"center"},{"c":"G6","v":""},{"c":"H6","v":""}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"إجمالي طلبات الاعتماد المقدمة","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C8","v":"المواد المعتمدة كود A و B","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"E8","v":"طلبات تحت المراجعة / معلقة","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"G8","v":"نسبة نجاح الاعتماد الكلية","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true}]},{"r":9,"h":30.0,"cells":[{"c":"A9","v":0,"f":"=COUNT(سجل_اعتماد_المواد_الرئيسي!A5:A16)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0","rs":2,"cs":2},{"skip":true},{"c":"C9","v":11,"f":"=COUNTIF(سجل_اعتماد_المواد_الرئيسي!H5:H16, \"A\") + COUNTIF(سجل_اعتماد_المواد_الرئيسي!H5:H16, \"B\")","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0","rs":2,"cs":2},{"skip":true},{"c":"E9","v":0,"f":"=COUNTIF(سجل_اعتماد_المواد_الرئيسي!H5:H16, \"قيد المراجعة\")","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0","rs":2,"cs":2},{"skip":true},{"c":"G9","v":0,"f":"=(COUNTIF(سجل_اعتماد_المواد_الرئيسي!H5:H16, \"A\") + COUNTIF(سجل_اعتماد_المواد_الرئيسي!H5:H16, \"B\")) / COUNT(سجل_اعتماد_المواد_الرئيسي!A5:A16)","fg":"#1E3A8A","b":true,"al":"center","nf":"0.0%","rs":2,"cs":2},{"skip":true}]},{"r":10,"h":30.0,"cells":[{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":"طلب اعتماد مادة وعينة (MS)","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C11","v":"مادة معتمدة ومصرح بتوريدها","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"E11","v":"طلب بانتظار رد الاستشاري","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"G11","v":"معدل القبول الهندسي للمواد","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true}]},{"r":12,"h":28.0,"cells":[{"c":"A12","v":""},{"c":"B12","v":""},{"c":"C12","v":""},{"c":"D12","v":""},{"c":"E12","v":""},{"c":"F12","v":""},{"c":"G12","v":""},{"c":"H12","v":""}]},{"r":13,"h":38.0,"cells":[{"c":"A13","v":"توزيع طلبات اعتماد المواد حسب التخصص الهندسي وكود الاعتماد","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":14,"h":40.0,"cells":[{"c":"A14","v":"م","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B14","v":"التخصص الهندسي","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C14","v":"إجمالي الطلبات","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D14","v":"معتمد كود A","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E14","v":"معتمد بملاحظات B","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F14","v":"إعادة تقديم C","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G14","v":"مرفوض كود D","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H14","v":"نسبة الإنجاز","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":15,"h":36.0,"cells":[{"c":"A15","v":"1","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"B15","v":"الأعمال المدنية والإنشائية (Civil / Structural)","fg":"#1E293B"},{"c":"C15","v":3,"f":"=COUNTIFS(سجل_اعتماد_المواد_الرئيسي!C5:C16, \"مدني\")","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D15","v":2,"f":"=COUNTIFS(سجل_اعتماد_المواد_الرئيسي!C5:C16, \"مدني\", سجل_اعتماد_المواد_الرئيسي!H5:H16, \"A\")","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E15","v":1,"f":"=COUNTIFS(سجل_اعتماد_المواد_الرئيسي!C5:C16, \"مدني\", سجل_اعتماد_المواد_الرئيسي!H5:H16, \"B\")","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"F15","v":0,"f":"=COUNTIFS(سجل_اعتماد_المواد_الرئيسي!C5:C16, \"مدني\", سجل_اعتماد_المواد_الرئيسي!H5:H16, \"C\")","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"G15","v":0,"f":"=COUNTIFS(سجل_اعتماد_المواد_الرئيسي!C5:C16, \"مدني\", سجل_اعتماد_المواد_الرئيسي!H5:H16, \"D\")","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"H15","v":1,"f":"=(D15+E15)/C15","b":true,"al":"center","nf":"0.0%"}]},{"r":16,"h":36.0,"cells":[{"c":"A16","v":"2","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"B16","v":"الأعمال المعمارية والتشطيبات (Architectural Finishes)","fg":"#1E293B"},{"c":"C16","v":4,"f":"=COUNTIFS(سجل_اعتماد_المواد_الرئيسي!C5:C16, \"معماري\")","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D16","v":2,"f":"=COUNTIFS(سجل_اعتماد_المواد_الرئيسي!C5:C16, \"معماري\", سجل_اعتماد_المواد_الرئيسي!H5:H16, \"A\")","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E16","v":2,"f":"=COUNTIFS(سجل_اعتماد_المواد_الرئيسي!C5:C16, \"معماري\", سجل_اعتماد_المواد_الرئيسي!H5:H16, \"B\")","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"F16","v":0,"f":"=COUNTIFS(سجل_اعتماد_المواد_الرئيسي!C5:C16, \"معماري\", سجل_اعتماد_المواد_الرئيسي!H5:H16, \"C\")","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"G16","v":0,"f":"=COUNTIFS(سجل_اعتماد_المواد_الرئيسي!C5:C16, \"معماري\", سجل_اعتماد_المواد_الرئيسي!H5:H16, \"D\")","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"H16","v":1,"f":"=(D16+E16)/C16","b":true,"al":"center","nf":"0.0%"}]},{"r":17,"h":36.0,"cells":[{"c":"A17","v":"3","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"B17","v":"الأعمال الكهروميكانيكية (MEP Systems)","fg":"#1E293B"},{"c":"C17","v":3,"f":"=COUNTIFS(سجل_اعتماد_المواد_الرئيسي!C5:C16, \"كهروميكانيكا\")","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D17","v":2,"f":"=COUNTIFS(سجل_اعتماد_المواد_الرئيسي!C5:C16, \"كهروميكانيكا\", سجل_اعتماد_المواد_الرئيسي!H5:H16, \"A\")","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E17","v":0,"f":"=COUNTIFS(سجل_اعتماد_المواد_الرئيسي!C5:C16, \"كهروميكانيكا\", سجل_اعتماد_المواد_الرئيسي!H5:H16, \"B\")","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"F17","v":1,"f":"=COUNTIFS(سجل_اعتماد_المواد_الرئيسي!C5:C16, \"كهروميكانيكا\", سجل_اعتماد_المواد_الرئيسي!H5:H16, \"C\")","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"G17","v":0,"f":"=COUNTIFS(سجل_اعتماد_المواد_الرئيسي!C5:C16, \"كهروميكانيكا\", سجل_اعتماد_المواد_الرئيسي!H5:H16, \"D\")","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"H17","v":0.666667,"f":"=(D17+E17)/C17","b":true,"al":"center","nf":"0.0%"}]},{"r":18,"h":36.0,"cells":[{"c":"A18","v":"4","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"B18","v":"مواد السلامة والعوازل المتخصصة (Safety & Insulation)","fg":"#1E293B"},{"c":"C18","v":2,"f":"=COUNTIFS(سجل_اعتماد_المواد_الرئيسي!C5:C16, \"عوازل وسلامة\")","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D18","v":2,"f":"=COUNTIFS(سجل_اعتماد_المواد_الرئيسي!C5:C16, \"عوازل وسلامة\", سجل_اعتماد_المواد_الرئيسي!H5:H16, \"A\")","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E18","v":0,"f":"=COUNTIFS(سجل_اعتماد_المواد_الرئيسي!C5:C16, \"عوازل وسلامة\", سجل_اعتماد_المواد_الرئيسي!H5:H16, \"B\")","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"F18","v":0,"f":"=COUNTIFS(سجل_اعتماد_المواد_الرئيسي!C5:C16, \"عوازل وسلامة\", سجل_اعتماد_المواد_الرئيسي!H5:H16, \"C\")","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"G18","v":0,"f":"=COUNTIFS(سجل_اعتماد_المواد_الرئيسي!C5:C16, \"عوازل وسلامة\", سجل_اعتماد_المواد_الرئيسي!H5:H16, \"D\")","fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"H18","v":1,"f":"=(D18+E18)/C18","b":true,"al":"center","nf":"0.0%"}]}]},{"name":"سجل_اعتماد_المواد_الرئيسي","maxRow":16,"maxCol":11,"colWidths":[16.0,14.0,18.0,44.0,32.0,22.0,28.0,14.0,14.0,18.0,44.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"سجل اعتماد المواد والبيانات الفنية والعينات (Material Submittal Log - MSL)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"قيد رسمي لمتابعة دورة مراجعة اعتمادات المواد وتواريخ الإرسال ورد الاستشاري وفق شروط العقد","bg":"#1E293B","fg":"#E2E8F0","al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""}]},{"r":4,"h":42.0,"cells":[{"c":"A4","v":"رقم الطلب","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"تاريخ الإرسال","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"التخصص","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"اسم المادة وتوصيف البند","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"المصنع / المورد المقترح","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"بند المواصفة المرجعي","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"مرفقات الاعتماد","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"كود الاعتماد","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"تاريخ الرد","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J4","v":"مدة المراجعة (يوم)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K4","v":"ملاحظات وتوصيات الاستشاري","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":36.0,"cells":[{"c":"A5","v":"MS-CIV-001","fg":"#1E293B","al":"center"},{"c":"B5","v":"2026/01/10","fg":"#1E293B","al":"center"},{"c":"C5","v":"مدني","fg":"#1E293B","al":"center"},{"c":"D5","v":"حديد تسليح عالي المقاومة رتبة B500DWR أقطار 10-32 مم","fg":"#1E293B"},{"c":"E5","v":"شركة الراجحي للحديد والصلب","fg":"#1E293B"},{"c":"F5","v":"Div 03 / Sec 03200","fg":"#1E293B","al":"center"},{"c":"G5","v":"شهادة فحص المصنع MTC + عينة","fg":"#1E293B"},{"c":"H5","v":"A","bg":"#DCFCE7","b":true,"al":"center"},{"c":"I5","v":"2026/01/18","fg":"#1E293B","al":"center"},{"c":"J5","v":8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"K5","v":"معتمد بالكامل ومطابق لكود SBC 304","fg":"#1E293B"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"MS-CIV-002","fg":"#1E293B","al":"center"},{"c":"B6","v":"2026/01/12","fg":"#1E293B","al":"center"},{"c":"C6","v":"مدني","fg":"#1E293B","al":"center"},{"c":"D6","v":"خلطة خرسانية جاهزة سابقة الصب رتبة C40 للأساسات واللبشة","fg":"#1E293B"},{"c":"E6","v":"شركة الخرسانة الجاهزة السعودية","fg":"#1E293B"},{"c":"F6","v":"Div 03 / Sec 03300","fg":"#1E293B","al":"center"},{"c":"G6","v":"تصميم الخلطة + شهادات الركام","fg":"#1E293B"},{"c":"H6","v":"A","bg":"#DCFCE7","b":true,"al":"center"},{"c":"I6","v":"2026/01/20","fg":"#1E293B","al":"center"},{"c":"J6","v":8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"K6","v":"معتمد مع مراعاة نسبة هبوط السلمب 120 مم","fg":"#1E293B"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"MS-CIV-003","fg":"#1E293B","al":"center"},{"c":"B7","v":"2026/01/15","fg":"#1E293B","al":"center"},{"c":"C7","v":"مدني","fg":"#1E293B","al":"center"},{"c":"D7","v":"إضافات خرسانية كيميائية فائقة التلدين ومخفضة للماء (Type F)","fg":"#1E293B"},{"c":"E7","v":"سيكا السعودية (Sika Plastocrete)","fg":"#1E293B"},{"c":"F7","v":"Div 03 / Sec 03310","fg":"#1E293B","al":"center"},{"c":"G7","v":"البيانات الفنية TDS + MSDS","fg":"#1E293B"},{"c":"H7","v":"B","bg":"#E0F2FE","b":true,"al":"center"},{"c":"I7","v":"2026/01/26","fg":"#1E293B","al":"center"},{"c":"J7","v":11,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"K7","v":"معتمد بشرط إجراء خلطة تجريبية Trial Mix بالموقع","fg":"#1E293B"}]},{"r":8,"h":36.0,"cells":[{"c":"A8","v":"MS-ARC-001","fg":"#1E293B","al":"center"},{"c":"B8","v":"2026/01/20","fg":"#1E293B","al":"center"},{"c":"C8","v":"معماري","fg":"#1E293B","al":"center"},{"c":"D8","v":"بلوك إسمنتي مفرغ 20 سم عازل للصوت للواجهات والقواطع","fg":"#1E293B"},{"c":"E8","v":"مصنع البلوك الآلي المعتمد","fg":"#1E293B"},{"c":"F8","v":"Div 04 / Sec 04200","fg":"#1E293B","al":"center"},{"c":"G8","v":"شهادة كسر البلوك + عينة طبيعية","fg":"#1E293B"},{"c":"H8","v":"A","bg":"#DCFCE7","b":true,"al":"center"},{"c":"I8","v":"2026/01/28","fg":"#1E293B","al":"center"},{"c":"J8","v":8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"K8","v":"معتمد مع مراعاة التشوين السليم بالموقع","fg":"#1E293B"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"MS-ARC-002","fg":"#1E293B","al":"center"},{"c":"B9","v":"2026/01/25","fg":"#1E293B","al":"center"},{"c":"C9","v":"معماري","fg":"#1E293B","al":"center"},{"c":"D9","v":"سيراميك وبورسلين أرضيات نخب أول 60×60 سم للممرات والغرف","fg":"#1E293B"},{"c":"E9","v":"شركة الخزف السعودية","fg":"#1E293B"},{"c":"F9","v":"Div 09 / Sec 09300","fg":"#1E293B","al":"center"},{"c":"G9","v":"كتالوج الألوان + عينة موك أب Mockup","fg":"#1E293B"},{"c":"H9","v":"B","bg":"#E0F2FE","b":true,"al":"center"},{"c":"I9","v":"2026/02/05","fg":"#1E293B","al":"center"},{"c":"J9","v":11,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"K9","v":"معتمد بملاحظة اعتماد لون روبة الفواصل مسبقاً","fg":"#1E293B"}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":"MS-ARC-003","fg":"#1E293B","al":"center"},{"c":"B10","v":"2026/01/28","fg":"#1E293B","al":"center"},{"c":"C10","v":"معماري","fg":"#1E293B","al":"center"},{"c":"D10","v":"دهانات داخلية مائية صديقة للبيئة Low VOC معتمدة","fg":"#1E293B"},{"c":"E10","v":"دهانات الجزيرة (جرين جارد)","fg":"#1E293B"},{"c":"F10","v":"Div 09 / Sec 09900","fg":"#1E293B","al":"center"},{"c":"G10","v":"كتالوج المورد + شهادة خلو الرصاص","fg":"#1E293B"},{"c":"H10","v":"A","bg":"#DCFCE7","b":true,"al":"center"},{"c":"I10","v":"2026/02/06","fg":"#1E293B","al":"center"},{"c":"J10","v":9,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"K10","v":"معتمد ومطابق لمواصفات المشروع المعمارية","fg":"#1E293B"}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":"MS-ARC-004","fg":"#1E293B","al":"center"},{"c":"B11","v":"2026/02/02","fg":"#1E293B","al":"center"},{"c":"C11","v":"معماري","fg":"#1E293B","al":"center"},{"c":"D11","v":"قطاعات ألوميتال سحاب جامبو 100 مم مع زجاج دبل معزول","fg":"#1E293B"},{"c":"E11","v":"مصنع اليمامة للألومنيوم والزجاج","fg":"#1E293B"},{"c":"F11","v":"Div 08 / Sec 08520","fg":"#1E293B","al":"center"},{"c":"G11","v":"قطاع عينة + كتالوج الإكسسوارات","fg":"#1E293B"},{"c":"H11","v":"B","bg":"#E0F2FE","b":true,"al":"center"},{"c":"I11","v":"2026/02/14","fg":"#1E293B","al":"center"},{"c":"J11","v":12,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"K11","v":"معتمد بشرط ألا تقل سماكة الألومنيوم عن 1.8 مم","fg":"#1E293B"}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":"MS-MEP-001","fg":"#1E293B","al":"center"},{"c":"B12","v":"2026/02/05","fg":"#1E293B","al":"center"},{"c":"C12","v":"كهروميكانيكا","fg":"#1E293B","al":"center"},{"c":"D12","v":"مواسير تغذية مياه بولي بروبيلين PPR ضغط PN25 للمبنى","fg":"#1E293B"},{"c":"E12","v":"مصنع الأنابيب والوصلات الحديثة","fg":"#1E293B"},{"c":"F12","v":"Div 22 / Sec 22110","fg":"#1E293B","al":"center"},{"c":"G12","v":"شهادة ضمان المصنع 50 سنة","fg":"#1E293B"},{"c":"H12","v":"A","bg":"#DCFCE7","b":true,"al":"center"},{"c":"I12","v":"2026/02/12","fg":"#1E293B","al":"center"},{"c":"J12","v":7,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"K12","v":"معتمد مع التزام الفنيين المعتمدين باللحام","fg":"#1E293B"}]},{"r":13,"h":36.0,"cells":[{"c":"A13","v":"MS-MEP-002","fg":"#1E293B","al":"center"},{"c":"B13","v":"2026/02/10","fg":"#1E293B","al":"center"},{"c":"C13","v":"كهروميكانيكا","fg":"#1E293B","al":"center"},{"c":"D13","v":"كابلات نحاسية معزولة XLPE/PVC ضغط منخفض 0.6/1 ك.ف","fg":"#1E293B"},{"c":"E13","v":"كابلات الرياض المعتمدة","fg":"#1E293B"},{"c":"F13","v":"Div 26 / Sec 26050","fg":"#1E293B","al":"center"},{"c":"G13","v":"جداول الحسابات + موافقة SEC","fg":"#1E293B"},{"c":"H13","v":"A","bg":"#DCFCE7","b":true,"al":"center"},{"c":"I13","v":"2026/02/18","fg":"#1E293B","al":"center"},{"c":"J13","v":8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"K13","v":"معتمد ومطابق لمخططات الأحمال وهبوط الجهد","fg":"#1E293B"}]},{"r":14,"h":36.0,"cells":[{"c":"A14","v":"MS-MEP-003","fg":"#1E293B","al":"center"},{"c":"B14","v":"2026/02/15","fg":"#1E293B","al":"center"},{"c":"C14","v":"كهروميكانيكا","fg":"#1E293B","al":"center"},{"c":"D14","v":"وحدات تكييف مخفي كونسيلد VRF عالية الكفاءة التبريدية","fg":"#1E293B"},{"c":"E14","v":"شركة الزامل للمكيفات (Zamil AC)","fg":"#1E293B"},{"c":"F14","v":"Div 23 / Sec 23810","fg":"#1E293B","al":"center"},{"c":"G14","v":"حسابات الطاقة والمقاسات","fg":"#1E293B"},{"c":"H14","v":"C","bg":"#FEF3C7","b":true,"al":"center"},{"c":"I14","v":"2026/02/27","fg":"#1E293B","al":"center"},{"c":"J14","v":12,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"K14","v":"إعادة تقديم: تحديث حسابات CFM ومستويات الضوضاء","fg":"#1E293B"}]},{"r":15,"h":36.0,"cells":[{"c":"A15","v":"MS-INS-001","fg":"#1E293B","al":"center"},{"c":"B15","v":"2026/02/18","fg":"#1E293B","al":"center"},{"c":"C15","v":"عوازل وسلامة","fg":"#1E293B","al":"center"},{"c":"D15","v":"لفائف بيتومين معدل SBS سمك 4 مم مسلحة ببوليستر 200 جم","fg":"#1E293B"},{"c":"E15","v":"شركة العوازل المائية (ديرمابيت)","fg":"#1E293B"},{"c":"F15","v":"Div 07 / Sec 07130","fg":"#1E293B","al":"center"},{"c":"G15","v":"عينة لفافة + شهادة الفحص المخبري","fg":"#1E293B"},{"c":"H15","v":"A","bg":"#DCFCE7","b":true,"al":"center"},{"c":"I15","v":"2026/02/25","fg":"#1E293B","al":"center"},{"c":"J15","v":7,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"K15","v":"معتمد ومطابق لاشتراطات SBC 501","fg":"#1E293B"}]},{"r":16,"h":36.0,"cells":[{"c":"A16","v":"MS-INS-002","fg":"#1E293B","al":"center"},{"c":"B16","v":"2026/02/22","fg":"#1E293B","al":"center"},{"c":"C16","v":"عوازل وسلامة","fg":"#1E293B","al":"center"},{"c":"D16","v":"ألواح عزل حراري بوليسترين مبثوق XPS سمك 5 سم كثافة 35","fg":"#1E293B"},{"c":"E16","v":"شركة صناعات العزل الحراري (سافيد)","fg":"#1E293B"},{"c":"F16","v":"Div 07 / Sec 07210","fg":"#1E293B","al":"center"},{"c":"G16","v":"شهادة كفاءة الطاقة SASO","fg":"#1E293B"},{"c":"H16","v":"A","bg":"#DCFCE7","b":true,"al":"center"},{"c":"I16","v":"2026/03/01","fg":"#1E293B","al":"center"},{"c":"J16","v":7,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"K16","v":"معتمد ومطابق لكود كفاءة الطاقة SBC 601","fg":"#1E293B"}]}]},{"name":"سجل_فحص_المواد_الموردة_MIR","maxRow":12,"maxCol":11,"colWidths":[16.0,14.0,18.0,38.0,16.0,16.0,20.0,32.0,18.0,24.0,40.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"سجل طلبات فحص وتوريد المواد بالموقع (Material Inspection Request - MIR Log)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"فحص الشحنات الموردة ومطابقتها لشهادات المنشأ واعتماد العينات وشروط التشوين والحماية الموقعية","bg":"#1E293B","fg":"#E2E8F0","al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"رقم طلب الفحص","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"تاريخ الفحص","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"رقم الاعتماد المرجعي","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"بيان المادة الموردة","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"رقم إشعار التوريد (DN)","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"الكمية الموردة","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"شهادة الفحص (MTC)","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"حالة التشوين والتخزين","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"قرار الفحص الموقعي","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J4","v":"اسم مهندس الاستشاري","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K4","v":"الملاحظات والإجراء التصحيحي","bg":"#1D4ED8","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":36.0,"cells":[{"c":"A5","v":"MIR-CIV-001","fg":"#1E293B","al":"center"},{"c":"B5","v":"2026/01/22","fg":"#1E293B","al":"center"},{"c":"C5","v":"MS-CIV-001","fg":"#1E293B","al":"center"},{"c":"D5","v":"حديد تسليح قطر 16 مم و 20 مم (تشوينة 1)","fg":"#1E293B"},{"c":"E5","v":"DN-98421","fg":"#1E293B","al":"center"},{"c":"F5","v":"75 طن","b":true,"al":"center"},{"c":"G5","v":"مرفقة ومطابقة","fg":"#1E293B","al":"center"},{"c":"H5","v":"تشوين على عوارض خشبية ومغطى","fg":"#1E293B"},{"c":"I5","v":"مطابق ومقبول","bg":"#DCFCE7","b":true,"al":"center"},{"c":"J5","v":"م. عبد الرحمن الشهري","fg":"#1E293B","al":"center"},{"c":"K5","v":"تم أخذ عينات عشوائية لاختبار الشد والثني","fg":"#1E293B"}]},{"r":6,"h":36.0,"cells":[{"c":"A6","v":"MIR-CIV-002","fg":"#1E293B","al":"center"},{"c":"B6","v":"2026/01/29","fg":"#1E293B","al":"center"},{"c":"C6","v":"MS-ARC-001","fg":"#1E293B","al":"center"},{"c":"D6","v":"بلوك إسمنتي مفرغ 20 سم لبناء القواطع","fg":"#1E293B"},{"c":"E6","v":"DN-10432","fg":"#1E293B","al":"center"},{"c":"F6","v":"12,000 بلكة","b":true,"al":"center"},{"c":"G6","v":"مرفقة ومطابقة","fg":"#1E293B","al":"center"},{"c":"H6","v":"تشوين رصات بارتفاع لا يتجاوز 1.5 م","fg":"#1E293B"},{"c":"I6","v":"مطابق ومقبول","bg":"#DCFCE7","b":true,"al":"center"},{"c":"J6","v":"م. حسام الدين المصري","fg":"#1E293B","al":"center"},{"c":"K6","v":"فحص نسبة التكسير ووجد أنها أقل من 1%","fg":"#1E293B"}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":"MIR-ARC-001","fg":"#1E293B","al":"center"},{"c":"B7","v":"2026/02/10","fg":"#1E293B","al":"center"},{"c":"C7","v":"MS-ARC-002","fg":"#1E293B","al":"center"},{"c":"D7","v":"بورسلين أرضيات 60×60 سم (دفعة الدور الأول)","fg":"#1E293B"},{"c":"E7","v":"DN-55410","fg":"#1E293B","al":"center"},{"c":"F7","v":"1,850 م²","b":true,"al":"center"},{"c":"G7","v":"مرفقة نخب أول","fg":"#1E293B","al":"center"},{"c":"H7","v":"مخزن في مستودع مغلق وجاف","fg":"#1E293B"},{"c":"I7","v":"مطابق ومقبول","bg":"#DCFCE7","b":true,"al":"center"},{"c":"J7","v":"م. فهد الدوسري","fg":"#1E293B","al":"center"},{"c":"K7","v":"التأكد من رقم الشحنة والباتش لتفادي تفاوت اللون","fg":"#1E293B"}]},{"r":8,"h":36.0,"cells":[{"c":"A8","v":"MIR-ARC-002","fg":"#1E293B","al":"center"},{"c":"B8","v":"2026/02/18","fg":"#1E293B","al":"center"},{"c":"C8","v":"MS-ARC-003","fg":"#1E293B","al":"center"},{"c":"D8","v":"دهانات مائية وبراميل برايمر تأسيسي","fg":"#1E293B"},{"c":"E8","v":"DN-88319","fg":"#1E293B","al":"center"},{"c":"F8","v":"450 برميل","b":true,"al":"center"},{"c":"G8","v":"مرفقة مع تاريخ الصلاحية","fg":"#1E293B","al":"center"},{"c":"H8","v":"تخزين مظلل بدرجة حرارة أقل من 30°","fg":"#1E293B"},{"c":"I8","v":"مطابق ومقبول","bg":"#DCFCE7","b":true,"al":"center"},{"c":"J8","v":"م. ماجد القحطاني","fg":"#1E293B","al":"center"},{"c":"K8","v":"التأكد من تاريخ الإنتاج وعدم وجود ترسيب","fg":"#1E293B"}]},{"r":9,"h":36.0,"cells":[{"c":"A9","v":"MIR-MEP-001","fg":"#1E293B","al":"center"},{"c":"B9","v":"2026/02/20","fg":"#1E293B","al":"center"},{"c":"C9","v":"MS-MEP-001","fg":"#1E293B","al":"center"},{"c":"D9","v":"مواسير تغذية مياه PPR أقطار 25-50 مم","fg":"#1E293B"},{"c":"E9","v":"DN-33120","fg":"#1E293B","al":"center"},{"c":"F9","v":"3,200 م.ط","b":true,"al":"center"},{"c":"G9","v":"مرفقة وضمان 50 سنة","fg":"#1E293B","al":"center"},{"c":"H9","v":"تشوين أفقي مستو ومحمي من الشمس","fg":"#1E293B"},{"c":"I9","v":"مطابق ومقبول","bg":"#DCFCE7","b":true,"al":"center"},{"c":"J9","v":"م. هيثم العلي","fg":"#1E293B","al":"center"},{"c":"K9","v":"فحص سمك الجدار واستدارة المواسير","fg":"#1E293B"}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":"MIR-MEP-002","fg":"#1E293B","al":"center"},{"c":"B10","v":"2026/02/28","fg":"#1E293B","al":"center"},{"c":"C10","v":"MS-MEP-002","fg":"#1E293B","al":"center"},{"c":"D10","v":"كابلات نحاسية ضغط منخفض بكرات خشبية","fg":"#1E293B"},{"c":"E10","v":"DN-77144","fg":"#1E293B","al":"center"},{"c":"F10","v":"12 بكرة","b":true,"al":"center"},{"c":"G10","v":"مرفقة ومختومة من المصنع","fg":"#1E293B","al":"center"},{"c":"H10","v":"تثبيت البكرات على أرضية صلبة","fg":"#1E293B"},{"c":"I10","v":"مطابق ومقبول","bg":"#DCFCE7","b":true,"al":"center"},{"c":"J10","v":"م. سالم الحربي","fg":"#1E293B","al":"center"},{"c":"K10","v":"فحص سلامة العزل الخارجي ومقاومة العزل Megger","fg":"#1E293B"}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":"MIR-INS-001","fg":"#1E293B","al":"center"},{"c":"B11","v":"2026/03/05","fg":"#1E293B","al":"center"},{"c":"C11","v":"MS-INS-001","fg":"#1E293B","al":"center"},{"c":"D11","v":"لفائف بيتومين معدل SBS 4 مم لعزل الأسطح","fg":"#1E293B"},{"c":"E11","v":"DN-11209","fg":"#1E293B","al":"center"},{"c":"F11","v":"450 رول","b":true,"al":"center"},{"c":"G11","v":"مرفقة ومطابقة","fg":"#1E293B","al":"center"},{"c":"H11","v":"تخزين رأسي على طبالي خشبية","fg":"#1E293B"},{"c":"I11","v":"مطابق ومقبول","bg":"#DCFCE7","b":true,"al":"center"},{"c":"J11","v":"م. كمال عبد الله","fg":"#1E293B","al":"center"},{"c":"K11","v":"التحقق من التخزين الرأسي لمنع تشوه اللفائف","fg":"#1E293B"}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":"MIR-INS-002","fg":"#1E293B","al":"center"},{"c":"B12","v":"2026/03/12","fg":"#1E293B","al":"center"},{"c":"C12","v":"MS-INS-002","fg":"#1E293B","al":"center"},{"c":"D12","v":"ألواح عزل حراري XPS 5 سم كثافة 35","fg":"#1E293B"},{"c":"E12","v":"DN-66321","fg":"#1E293B","al":"center"},{"c":"F12","v":"2,400 لوح","b":true,"al":"center"},{"c":"G12","v":"مرفقة وشهادة SASO","fg":"#1E293B","al":"center"},{"c":"H12","v":"تخزين مظلل محمي من أشعة الشمس المباشرة","fg":"#1E293B"},{"c":"I12","v":"مطابق ومقبول","bg":"#DCFCE7","b":true,"al":"center"},{"c":"J12","v":"م. ياسر الزهراني","fg":"#1E293B","al":"center"},{"c":"K12","v":"فحص الأبعاد ونظام الحواف المتداخلة L-Edge","fg":"#1E293B"}]}]},{"name":"أكواد_الاعتماد_والإجراءات","maxRow":9,"maxCol":7,"colWidths":[12.0,28.0,24.0,44.0,46.0,16.0,22.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"دليل تفسير أكواد الاعتماد والإجراءات النظامية لضبط الجودة","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"المرجعية التعاقدية لأكواد مراجعة استشاري الإشراف والاشتراطات الإلزامية لحزم اعتماد المواد","bg":"#1E293B","fg":"#E2E8F0","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":40.0,"cells":[{"c":"A4","v":"الكود","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"حالة الاعتماد باللغة العربية","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"المعنى بالإنجليزية","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"التصريح التنفيذي بالموقع","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"الإجراء المطلوب من المقاول","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"اللون المميز","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"المرجعية","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":40.0,"cells":[{"c":"A5","v":"A","bg":"#DCFCE7","b":true,"al":"center"},{"c":"B5","v":"معتمد دون ملاحظات","fg":"#1E293B"},{"c":"C5","v":"Approved","fg":"#1E293B"},{"c":"D5","v":"يصرح فوراً بتوريد المادة وتصنيعها وتركيبها بالموقع","fg":"#1E293B"},{"c":"E5","v":"تقديم طلب فحص توريد مواد MIR عند وصول الشحنة للمشروع","fg":"#1E293B"},{"c":"F5","v":"أخضر فاتح","fg":"#1E293B","al":"center"},{"c":"G5","v":"ISO 9001 / SBC","fg":"#1E293B","al":"center"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"B","bg":"#E0F2FE","b":true,"al":"center"},{"c":"B6","v":"معتمد بملاحظات","fg":"#1E293B"},{"c":"C6","v":"Approved as Noted","fg":"#1E293B"},{"c":"D6","v":"يصرح بالتوريد والتركيب مع الالتزام التام بتنفيذ الملاحظات","fg":"#1E293B"},{"c":"E6","v":"تعديل الملاحظات الواردة وإرفاق ما يثبت ذلك في طلب الفحص MIR","fg":"#1E293B"},{"c":"F6","v":"أزرق فاتح","fg":"#1E293B","al":"center"},{"c":"G6","v":"شروط العقد الفيديك","fg":"#1E293B","al":"center"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"C","bg":"#FEF3C7","b":true,"al":"center"},{"c":"B7","v":"مطلوب تعديل وإعادة تقديم","fg":"#1E293B"},{"c":"C7","v":"Revise and Resubmit","fg":"#1E293B"},{"c":"D7","v":"يحظر تماماً توريد المادة أو البدء في تصنيعها بالموقع","fg":"#1E293B"},{"c":"E7","v":"معالجة أسباب الرفض وتقديم نسخة معدلة برقم مراجعة جديد Rev-1","fg":"#1E293B"},{"c":"F7","v":"أصفر / برتقالي","fg":"#1E293B","al":"center"},{"c":"G7","v":"مواصفات المشروع","fg":"#1E293B","al":"center"}]},{"r":8,"h":40.0,"cells":[{"c":"A8","v":"D","bg":"#FEE2E2","b":true,"al":"center"},{"c":"B8","v":"مرفوض لمخالفته المواصفات","fg":"#1E293B"},{"c":"C8","v":"Rejected","fg":"#1E293B"},{"c":"D8","v":"مرفوض كلياً ولا يجوز استخدام المادة في المشروع بأي حال","fg":"#1E293B"},{"c":"E8","v":"تقديم بديل مطابق تماماً للمواصفات المعمارية والإنشائية","fg":"#1E293B"},{"c":"F8","v":"أحمر فاتح","fg":"#1E293B","al":"center"},{"c":"G8","v":"كود البناء السعودي","fg":"#1E293B","al":"center"}]},{"r":9,"h":40.0,"cells":[{"c":"A9","v":"E","b":true,"al":"center"},{"c":"B9","v":"للعلم والمطالعة فقط","fg":"#1E293B"},{"c":"C9","v":"For Information Only","fg":"#1E293B"},{"c":"D9","v":"لا يتطلب توقيع موافقة رسمية، للاطلاع والتوثيق فقط","fg":"#1E293B"},{"c":"E9","v":"حفظ المستند في السجلات الرسمية للأرشيف الهندسي للمشروع","fg":"#1E293B"},{"c":"F9","v":"رمادي","fg":"#1E293B","al":"center"},{"c":"G9","v":"إدارة الوثائق EDMS","fg":"#1E293B","al":"center"}]}]}]}