{"slug":"mep-systems-commissioning-energy-dashboard-excel","sheets":[{"name":"لوحة التحكم ومؤشرات الأداء","maxRow":31,"maxCol":13,"colWidths":[15.0,36.0,15.0,16.0,13.0,13.0,13.0,15.0,26.0,14.0,22.0,20.0,40.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"داشبورد متابعة الأعمال الكهروميكانيكية والأحمال واختبارات التشغيل (MEP Systems, Loads & Commissioning Analytics Dashboard)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"لوحة القيادة التنفيذية لمتابعة توريدات وتركيبات أنظمة التكييف والكهرباء والصحي ومكافحة الحريق ومصفوفة اختبارات التشغيل T&C","bg":"#334155","fg":"#E2E8F0","al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":13.9,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"إجمالي نسبة الإنجاز الفعلي الموزون","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"نسبة جاهزية اختبارات التشغيل (T&C)","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"إجمالي الحمل الكهربائي للمشروع","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","cs":2},{"skip":true},{"c":"G4","v":"إجمالي سعة التبريد والتكييف","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","cs":2},{"skip":true},{"c":"I4","v":"معدل إغلاق ملاحظات الكهروميكانيك","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","cs":2},{"skip":true},{"c":"K4","v":"حالة التسليم والجاهزية الكلية","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":5,"h":46.0,"cells":[{"c":"A5","v":0,"f":"=F17","fg":"#0284C7","b":true,"al":"center","nf":"0.0%","cs":2},{"skip":true},{"c":"C5","v":0,"f":"=J28","fg":"#059669","b":true,"al":"center","nf":"0.0%","cs":2},{"skip":true},{"c":"E5","v":"3,450 kVA","fg":"#D97706","b":true,"al":"center","cs":2},{"skip":true},{"c":"G5","v":"750 TR","fg":"#2563EB","b":true,"al":"center","cs":2},{"skip":true},{"c":"I5","v":0.86,"f":"=I28","fg":"#7C3AED","b":true,"al":"center","nf":"0.0%","cs":2},{"skip":true},{"c":"K5","v":"مسار حرج تحت السيطرة","fg":"#059669","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"المخطط: 82.1% | الانحراف الإيجابي: +9.4%","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C6","v":"28 فحصاً منجزاً بنجاح ومطابقاً للمواصفات","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"E6","v":"الحمل الأقصى التشغيلي: 2,580 kW","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"G6","v":"3 شلرات مياه + 8 وحدات مناولة FAHU","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"I6","v":"تم إغلاق 43 ملاحظة من أصل 50","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"K6","v":"موعد التشغيل التجريبي: 15-12-2026","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":7,"h":13.9,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""},{"c":"I7","v":""},{"c":"J7","v":""},{"c":"K7","v":""},{"c":"L7","v":""},{"c":"M7","v":""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"أولاً: التحليل التنفيذي لتقدم وتوريدات وتركيبات أنظمة الكهروميكانيك بالموقع (MEP Systems Progress & Installation Breakdown)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":42.0,"cells":[{"c":"A9","v":"كود النظام","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"اسم الحزمة / النظام الكهروميكانيكي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"الوزن النسبي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"نسبة التوريدات","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"نسبة التركيبات","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"الإنجاز الفعلي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"الإنجاز المخطط","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H9","v":"الانحراف","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I9","v":"الأحمال والقدرات التصميمية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J9","v":"عدد البنود","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K9","v":"الميزانية التقديرية (SAR)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L9","v":"حالة النظام","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M9","v":"التوجيه والإجراء الهندسي المطلوب","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":"MEP-SYS-01","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B10","v":"نظام التكييف والتهوية الميكانيكية وتبريد المياه","b":true},{"c":"C10","v":0.3,"f":"='إعدادات الأنظمة والأحمال'!D20","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","nf":"0.0%"},{"c":"D10","v":0,"f":"=AVERAGEIF('سجل التركيبات والتوريدات'!C$5:C$36,A10,'سجل التركيبات والتوريدات'!J$5:J$36)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"E10","v":0,"f":"=AVERAGEIF('سجل التركيبات والتوريدات'!C$5:C$36,A10,'سجل التركيبات والتوريدات'!L$5:L$36)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"F10","v":0,"f":"=AVERAGEIF('سجل التركيبات والتوريدات'!C$5:C$36,A10,'سجل التركيبات والتوريدات'!M$5:M$36)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"G10","v":0.82,"in":true,"bg":"#FEF9C3","fg":"#334155","b":true,"al":"center","nf":"0.0%"},{"c":"H10","v":-0.82,"f":"=F10-G10","bg":"#F1F5F9","fg":"#E11D48","b":true,"al":"center","nf":"\\+0.0%;\\-0.0%;0.0%"},{"c":"I10","v":"750 TR / 3 Chillers","fg":"#334155","al":"center"},{"c":"J10","v":6,"f":"=COUNTIF('سجل التركيبات والتوريدات'!C$5:C$36,A10)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"K10","v":7850000,"f":"='إعدادات الأنظمة والأحمال'!E20","bg":"#F1F5F9","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L10","v":"متقدم وفق المسار","fg":"#059669","b":true,"al":"center"},{"c":"M10","v":"توريد باقي مخمدات الحريق وإنهاء عزل مجاري الهواء بالأدوار العليا"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"MEP-SYS-02","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B11","v":"شبكات القوى والتوزيع الكهربائي والمحولات","b":true},{"c":"C11","v":0.22,"f":"='إعدادات الأنظمة والأحمال'!D21","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","nf":"0.0%"},{"c":"D11","v":0,"f":"=AVERAGEIF('سجل التركيبات والتوريدات'!C$5:C$36,A11,'سجل التركيبات والتوريدات'!J$5:J$36)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"E11","v":0,"f":"=AVERAGEIF('سجل التركيبات والتوريدات'!C$5:C$36,A11,'سجل التركيبات والتوريدات'!L$5:L$36)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"F11","v":0,"f":"=AVERAGEIF('سجل التركيبات والتوريدات'!C$5:C$36,A11,'سجل التركيبات والتوريدات'!M$5:M$36)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"G11","v":0.88,"in":true,"bg":"#FEF9C3","fg":"#334155","b":true,"al":"center","nf":"0.0%"},{"c":"H11","v":-0.88,"f":"=F11-G11","bg":"#F1F5F9","fg":"#E11D48","b":true,"al":"center","nf":"\\+0.0%;\\-0.0%;0.0%"},{"c":"I11","v":"3450 kVA / 2 Transformers","fg":"#334155","al":"center"},{"c":"J11","v":6,"f":"=COUNTIF('سجل التركيبات والتوريدات'!C$5:C$36,A11)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"K11","v":5750000,"f":"='إعدادات الأنظمة والأحمال'!E21","bg":"#F1F5F9","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L11","v":"متقدم ومستقر","fg":"#059669","b":true,"al":"center"},{"c":"M11","v":"استكمال شد كابلات التغذية الصاعدة للوحات SMDB بالأدوار 5 و6"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":"MEP-SYS-03","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B12","v":"أنظمة الإنارة ومخارج الطوارئ ومولدات الديزل","b":true},{"c":"C12","v":0.12,"f":"='إعدادات الأنظمة والأحمال'!D22","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","nf":"0.0%"},{"c":"D12","v":0,"f":"=AVERAGEIF('سجل التركيبات والتوريدات'!C$5:C$36,A12,'سجل التركيبات والتوريدات'!J$5:J$36)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"E12","v":0,"f":"=AVERAGEIF('سجل التركيبات والتوريدات'!C$5:C$36,A12,'سجل التركيبات والتوريدات'!L$5:L$36)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"F12","v":0,"f":"=AVERAGEIF('سجل التركيبات والتوريدات'!C$5:C$36,A12,'سجل التركيبات والتوريدات'!M$5:M$36)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"G12","v":0.78,"in":true,"bg":"#FEF9C3","fg":"#334155","b":true,"al":"center","nf":"0.0%"},{"c":"H12","v":-0.78,"f":"=F12-G12","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","nf":"\\+0.0%;\\-0.0%;0.0%"},{"c":"I12","v":"1250 kVA / LED Network","fg":"#334155","al":"center"},{"c":"J12","v":5,"f":"=COUNTIF('سجل التركيبات والتوريدات'!C$5:C$36,A12)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"K12","v":3140000,"f":"='إعدادات الأنظمة والأحمال'!E22","bg":"#F1F5F9","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L12","v":"انحراف طفيف (-3.2%)","fg":"#D97706","b":true,"al":"center"},{"c":"M12","v":"تسريع توريد باقي وحدات الإنارة الغاطسة LED لمبنى المكاتب"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":"MEP-SYS-04","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B13","v":"شبكات التغذية بمياه الشرب والصرف الصحي","b":true},{"c":"C13","v":0.13,"f":"='إعدادات الأنظمة والأحمال'!D23","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","nf":"0.0%"},{"c":"D13","v":0,"f":"=AVERAGEIF('سجل التركيبات والتوريدات'!C$5:C$36,A13,'سجل التركيبات والتوريدات'!J$5:J$36)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"E13","v":0,"f":"=AVERAGEIF('سجل التركيبات والتوريدات'!C$5:C$36,A13,'سجل التركيبات والتوريدات'!L$5:L$36)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"F13","v":0,"f":"=AVERAGEIF('سجل التركيبات والتوريدات'!C$5:C$36,A13,'سجل التركيبات والتوريدات'!M$5:M$36)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"G13","v":0.85,"in":true,"bg":"#FEF9C3","fg":"#334155","b":true,"al":"center","nf":"0.0%"},{"c":"H13","v":-0.85,"f":"=F13-G13","bg":"#F1F5F9","fg":"#E11D48","b":true,"al":"center","nf":"\\+0.0%;\\-0.0%;0.0%"},{"c":"I13","v":"180 m³ Tank / 4 Pumps","fg":"#334155","al":"center"},{"c":"J13","v":5,"f":"=COUNTIF('سجل التركيبات والتوريدات'!C$5:C$36,A13)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"K13","v":3400000,"f":"='إعدادات الأنظمة والأحمال'!E23","bg":"#F1F5F9","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L13","v":"متقدم ومستقر","fg":"#059669","b":true,"al":"center"},{"c":"M13","v":"تثبيت الأجهزة الصحية للأدوار 4 و5 بعد إنهاء السيراميك"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"MEP-SYS-05","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B14","v":"شبكات مكافحة الحريق بالرشاشات ومحطة المضخات","b":true},{"c":"C14","v":0.11,"f":"='إعدادات الأنظمة والأحمال'!D24","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","nf":"0.0%"},{"c":"D14","v":0,"f":"=AVERAGEIF('سجل التركيبات والتوريدات'!C$5:C$36,A14,'سجل التركيبات والتوريدات'!J$5:J$36)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"E14","v":0,"f":"=AVERAGEIF('سجل التركيبات والتوريدات'!C$5:C$36,A14,'سجل التركيبات والتوريدات'!L$5:L$36)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"F14","v":0,"f":"=AVERAGEIF('سجل التركيبات والتوريدات'!C$5:C$36,A14,'سجل التركيبات والتوريدات'!M$5:M$36)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"G14","v":0.84,"in":true,"bg":"#FEF9C3","fg":"#334155","b":true,"al":"center","nf":"0.0%"},{"c":"H14","v":-0.84,"f":"=F14-G14","bg":"#F1F5F9","fg":"#E11D48","b":true,"al":"center","nf":"\\+0.0%;\\-0.0%;0.0%"},{"c":"I14","v":"1000 GPM @ 10 Bar","fg":"#334155","al":"center"},{"c":"J14","v":4,"f":"=COUNTIF('سجل التركيبات والتوريدات'!C$5:C$36,A14)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"K14","v":2880000,"f":"='إعدادات الأنظمة والأحمال'!E24","bg":"#F1F5F9","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L14","v":"انحراف طفيف (-2.5%)","fg":"#D97706","b":true,"al":"center"},{"c":"M14","v":"استكمال اختبارات نظام الإطفاء بالغاز FM-200 لغرف السيرفر"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"MEP-SYS-06","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B15","v":"أنظمة الإنذار المبكر والتيار الخفيف والـ BMS","b":true},{"c":"C15","v":0.08,"f":"='إعدادات الأنظمة والأحمال'!D25","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","nf":"0.0%"},{"c":"D15","v":0,"f":"=AVERAGEIF('سجل التركيبات والتوريدات'!C$5:C$36,A15,'سجل التركيبات والتوريدات'!J$5:J$36)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"E15","v":0,"f":"=AVERAGEIF('سجل التركيبات والتوريدات'!C$5:C$36,A15,'سجل التركيبات والتوريدات'!L$5:L$36)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"F15","v":0,"f":"=AVERAGEIF('سجل التركيبات والتوريدات'!C$5:C$36,A15,'سجل التركيبات والتوريدات'!M$5:M$36)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"G15","v":0.76,"in":true,"bg":"#FEF9C3","fg":"#334155","b":true,"al":"center","nf":"0.0%"},{"c":"H15","v":-0.76,"f":"=F15-G15","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","nf":"\\+0.0%;\\-0.0%;0.0%"},{"c":"I15","v":"Addressable FACP & BMS","fg":"#334155","al":"center"},{"c":"J15","v":4,"f":"=COUNTIF('سجل التركيبات والتوريدات'!C$5:C$36,A15)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"K15","v":2090000,"f":"='إعدادات الأنظمة والأحمال'!E25","bg":"#F1F5F9","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L15","v":"مسار حرج (-4.1%)","fg":"#E11D48","b":true,"al":"center"},{"c":"M15","v":"ربط لوحات DDC مع محطة الشلرات ووحدات مناولة الهواء FAHU"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":"MEP-SYS-07","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B16","v":"اختبارات الموازنة الهوائية والمائية والتشغيل","b":true},{"c":"C16","v":0.04,"f":"='إعدادات الأنظمة والأحمال'!D26","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","nf":"0.0%"},{"c":"D16","v":0,"f":"=AVERAGEIF('سجل التركيبات والتوريدات'!C$5:C$36,A16,'سجل التركيبات والتوريدات'!J$5:J$36)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"E16","v":0,"f":"=AVERAGEIF('سجل التركيبات والتوريدات'!C$5:C$36,A16,'سجل التركيبات والتوريدات'!L$5:L$36)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"F16","v":0,"f":"=AVERAGEIF('سجل التركيبات والتوريدات'!C$5:C$36,A16,'سجل التركيبات والتوريدات'!M$5:M$36)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"G16","v":0.6,"in":true,"bg":"#FEF9C3","fg":"#334155","b":true,"al":"center","nf":"0.0%"},{"c":"H16","v":-0.6,"f":"=F16-G16","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","nf":"\\+0.0%;\\-0.0%;0.0%"},{"c":"I16","v":"100% Commissioning TAB","fg":"#334155","al":"center"},{"c":"J16","v":2,"f":"=COUNTIF('سجل التركيبات والتوريدات'!C$5:C$36,A16)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"K16","v":1050000,"f":"='إعدادات الأنظمة والأحمال'!E26","bg":"#F1F5F9","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L16","v":"مرحلي متزامن","fg":"#D97706","b":true,"al":"center"},{"c":"M16","v":"مضاعفة أطقم فنيي الموازنة الهوائية TAB لإنهاء قياسات مخارج الهواء"}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":"الإجمالي العام ومعدل الإنجاز الموزون للمشروع (Overall MEP Weighted Progress)","bg":"#F1F5F9","b":true,"al":"center","cs":2},{"skip":true},{"c":"C17","v":1,"f":"=SUM(C10:C16)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"D17","v":0,"f":"=SUMPRODUCT(C10:C16,D10:D16)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"E17","v":0,"f":"=SUMPRODUCT(C10:C16,E10:E16)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"F17","v":0,"f":"=SUMPRODUCT(C10:C16,F10:F16)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"G17","v":0.8209,"f":"=SUMPRODUCT(C10:C16,G10:G16)","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","nf":"0.0%"},{"c":"H17","v":-0.8209,"f":"=F17-G17","bg":"#F1F5F9","fg":"#E11D48","b":true,"al":"center","nf":"\\+0.0%;\\-0.0%;0.0%"},{"c":"I17","v":"كافة الأنظمة الكهروميكانيكية","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"J17","v":32,"f":"=SUM(J10:J16)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"K17","v":26160000,"f":"=SUM(K10:K16)","bg":"#F1F5F9","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L17","v":"متابعة المسار الحرج","bg":"#F1F5F9","fg":"#D97706","b":true,"al":"center"},{"c":"M17","v":"تكثيف أعمال توازن الهواء والماء TAB وتسريع ربط لوحات BMS","bg":"#F1F5F9"}]},{"r":18,"h":13.9,"cells":[{"c":"A18","v":""},{"c":"B18","v":""},{"c":"C18","v":""},{"c":"D18","v":""},{"c":"E18","v":""},{"c":"F18","v":""},{"c":"G18","v":""},{"c":"H18","v":""},{"c":"I18","v":""},{"c":"J18","v":""},{"c":"K18","v":""},{"c":"L18","v":""},{"c":"M18","v":""}]},{"r":19,"h":38.0,"cells":[{"c":"A19","v":"ثانياً: مصفوفة اختبارات التشغيل التجريبي والفحوصات والاستلام الفني (T&C & Handover Readiness Matrix)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":"كود النظام","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B20","v":"اسم النظام الكهروميكانيكي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C20","v":"إجمالي الفحوصات المقررة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D20","v":"الفحوصات الناجحة المقبولة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E20","v":"فحوصات قيد الإجراء","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F20","v":"الملاحظات المرصودة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G20","v":"الملاحظات المغلقة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H20","v":"الملاحظات المفتوحة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I20","v":"معدل إغلاق الملاحظات","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J20","v":"نسبة جاهزية التشغيل (T&C)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K20","v":"تاريخ التشغيل المستهدف","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L20","v":"المسار الحرج للاستلام","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M20","v":"الحالة الفنية للاستلام التجريبي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":21,"h":36.0,"cells":[{"c":"A21","v":"MEP-SYS-01","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B21","v":"نظام التكييف والتهوية وتبريد المياه","b":true},{"c":"C21","v":4,"f":"=COUNTIF('سجل اختبارات التشغيل والجودة'!C$5:C$32,A21)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"D21","v":0,"f":"=COUNTIFS('سجل اختبارات التشغيل والجودة'!C$5:C$32,A21,'سجل اختبارات التشغيل والجودة'!J$5:J$32,\"*مطابق*\")","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"E21","v":4,"f":"=C21-D21","bg":"#F1F5F9","fg":"#D97706","b":true,"al":"center","nf":"#,##0"},{"c":"F21","v":6,"f":"=SUMIF('سجل اختبارات التشغيل والجودة'!C$5:C$32,A21,'سجل اختبارات التشغيل والجودة'!K$5:K$32)","bg":"#F1F5F9","fg":"#E11D48","b":true,"al":"center","nf":"#,##0"},{"c":"G21","v":6,"f":"=SUMIF('سجل اختبارات التشغيل والجودة'!C$5:C$32,A21,'سجل اختبارات التشغيل والجودة'!L$5:L$32)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"H21","v":0,"f":"=F21-G21","bg":"#F1F5F9","fg":"#D97706","b":true,"al":"center","nf":"#,##0"},{"c":"I21","v":1,"f":"=IFERROR(G21/F21,1)","bg":"#F1F5F9","fg":"#7C3AED","b":true,"al":"center","nf":"0.0%"},{"c":"J21","v":0,"f":"=IFERROR(D21/C21,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"K21","v":"2026-11-20","fg":"#334155","al":"center"},{"c":"L21","v":"حرج","fg":"#D97706","b":true,"al":"center"},{"c":"M21","v":"جاهزية تشغيل مرحلية للشلرات"}]},{"r":22,"h":36.0,"cells":[{"c":"A22","v":"MEP-SYS-02","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B22","v":"شبكات القوى والتوزيع الكهربائي","b":true},{"c":"C22","v":4,"f":"=COUNTIF('سجل اختبارات التشغيل والجودة'!C$5:C$32,A22)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"D22","v":0,"f":"=COUNTIFS('سجل اختبارات التشغيل والجودة'!C$5:C$32,A22,'سجل اختبارات التشغيل والجودة'!J$5:J$32,\"*مطابق*\")","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"E22","v":4,"f":"=C22-D22","bg":"#F1F5F9","fg":"#D97706","b":true,"al":"center","nf":"#,##0"},{"c":"F22","v":5,"f":"=SUMIF('سجل اختبارات التشغيل والجودة'!C$5:C$32,A22,'سجل اختبارات التشغيل والجودة'!K$5:K$32)","bg":"#F1F5F9","fg":"#E11D48","b":true,"al":"center","nf":"#,##0"},{"c":"G22","v":5,"f":"=SUMIF('سجل اختبارات التشغيل والجودة'!C$5:C$32,A22,'سجل اختبارات التشغيل والجودة'!L$5:L$32)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"H22","v":0,"f":"=F22-G22","bg":"#F1F5F9","fg":"#D97706","b":true,"al":"center","nf":"#,##0"},{"c":"I22","v":1,"f":"=IFERROR(G22/F22,1)","bg":"#F1F5F9","fg":"#7C3AED","b":true,"al":"center","nf":"0.0%"},{"c":"J22","v":0,"f":"=IFERROR(D22/C22,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"K22","v":"2026-11-15","fg":"#334155","al":"center"},{"c":"L22","v":"حرج","fg":"#D97706","b":true,"al":"center"},{"c":"M22","v":"إطلاق التيار الدائم واختبارات الجهد"}]},{"r":23,"h":36.0,"cells":[{"c":"A23","v":"MEP-SYS-03","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B23","v":"أنظمة الإنارة وتوليد الديزل للطوارئ","b":true},{"c":"C23","v":4,"f":"=COUNTIF('سجل اختبارات التشغيل والجودة'!C$5:C$32,A23)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"D23","v":0,"f":"=COUNTIFS('سجل اختبارات التشغيل والجودة'!C$5:C$32,A23,'سجل اختبارات التشغيل والجودة'!J$5:J$32,\"*مطابق*\")","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"E23","v":4,"f":"=C23-D23","bg":"#F1F5F9","fg":"#D97706","b":true,"al":"center","nf":"#,##0"},{"c":"F23","v":6,"f":"=SUMIF('سجل اختبارات التشغيل والجودة'!C$5:C$32,A23,'سجل اختبارات التشغيل والجودة'!K$5:K$32)","bg":"#F1F5F9","fg":"#E11D48","b":true,"al":"center","nf":"#,##0"},{"c":"G23","v":5,"f":"=SUMIF('سجل اختبارات التشغيل والجودة'!C$5:C$32,A23,'سجل اختبارات التشغيل والجودة'!L$5:L$32)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"H23","v":1,"f":"=F23-G23","bg":"#F1F5F9","fg":"#D97706","b":true,"al":"center","nf":"#,##0"},{"c":"I23","v":0.833333,"f":"=IFERROR(G23/F23,1)","bg":"#F1F5F9","fg":"#7C3AED","b":true,"al":"center","nf":"0.0%"},{"c":"J23","v":0,"f":"=IFERROR(D23/C23,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"K23","v":"2026-11-25","fg":"#334155","al":"center"},{"c":"L23","v":"عادي","fg":"#334155","b":true,"al":"center"},{"c":"M23","v":"جاهزية اختبار التزامن مع ATS"}]},{"r":24,"h":36.0,"cells":[{"c":"A24","v":"MEP-SYS-04","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B24","v":"شبكات التغذية بمياه الشرب والصرف","b":true},{"c":"C24","v":4,"f":"=COUNTIF('سجل اختبارات التشغيل والجودة'!C$5:C$32,A24)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"D24","v":0,"f":"=COUNTIFS('سجل اختبارات التشغيل والجودة'!C$5:C$32,A24,'سجل اختبارات التشغيل والجودة'!J$5:J$32,\"*مطابق*\")","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"E24","v":4,"f":"=C24-D24","bg":"#F1F5F9","fg":"#D97706","b":true,"al":"center","nf":"#,##0"},{"c":"F24","v":4,"f":"=SUMIF('سجل اختبارات التشغيل والجودة'!C$5:C$32,A24,'سجل اختبارات التشغيل والجودة'!K$5:K$32)","bg":"#F1F5F9","fg":"#E11D48","b":true,"al":"center","nf":"#,##0"},{"c":"G24","v":4,"f":"=SUMIF('سجل اختبارات التشغيل والجودة'!C$5:C$32,A24,'سجل اختبارات التشغيل والجودة'!L$5:L$32)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"H24","v":0,"f":"=F24-G24","bg":"#F1F5F9","fg":"#D97706","b":true,"al":"center","nf":"#,##0"},{"c":"I24","v":1,"f":"=IFERROR(G24/F24,1)","bg":"#F1F5F9","fg":"#7C3AED","b":true,"al":"center","nf":"0.0%"},{"c":"J24","v":0,"f":"=IFERROR(D24/C24,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"K24","v":"2026-11-18","fg":"#334155","al":"center"},{"c":"L24","v":"عادي","fg":"#334155","b":true,"al":"center"},{"c":"M24","v":"تشغيل محطة الضخ وتطهير الشبكة"}]},{"r":25,"h":36.0,"cells":[{"c":"A25","v":"MEP-SYS-05","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B25","v":"شبكات مكافحة الحريق ومحطة المضخات","b":true},{"c":"C25","v":4,"f":"=COUNTIF('سجل اختبارات التشغيل والجودة'!C$5:C$32,A25)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"D25","v":0,"f":"=COUNTIFS('سجل اختبارات التشغيل والجودة'!C$5:C$32,A25,'سجل اختبارات التشغيل والجودة'!J$5:J$32,\"*مطابق*\")","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"E25","v":4,"f":"=C25-D25","bg":"#F1F5F9","fg":"#D97706","b":true,"al":"center","nf":"#,##0"},{"c":"F25","v":6,"f":"=SUMIF('سجل اختبارات التشغيل والجودة'!C$5:C$32,A25,'سجل اختبارات التشغيل والجودة'!K$5:K$32)","bg":"#F1F5F9","fg":"#E11D48","b":true,"al":"center","nf":"#,##0"},{"c":"G25","v":5,"f":"=SUMIF('سجل اختبارات التشغيل والجودة'!C$5:C$32,A25,'سجل اختبارات التشغيل والجودة'!L$5:L$32)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"H25","v":1,"f":"=F25-G25","bg":"#F1F5F9","fg":"#D97706","b":true,"al":"center","nf":"#,##0"},{"c":"I25","v":0.833333,"f":"=IFERROR(G25/F25,1)","bg":"#F1F5F9","fg":"#7C3AED","b":true,"al":"center","nf":"0.0%"},{"c":"J25","v":0,"f":"=IFERROR(D25/C25,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"K25","v":"2026-11-30","fg":"#334155","al":"center"},{"c":"L25","v":"حرج جداً","fg":"#E11D48","b":true,"al":"center"},{"c":"M25","v":"فحص الدفاع المدني ومصفوفة الإنذار"}]},{"r":26,"h":36.0,"cells":[{"c":"A26","v":"MEP-SYS-06","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B26","v":"أنظمة الإنذار المبكر والتيار الخفيف BMS","b":true},{"c":"C26","v":4,"f":"=COUNTIF('سجل اختبارات التشغيل والجودة'!C$5:C$32,A26)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"D26","v":0,"f":"=COUNTIFS('سجل اختبارات التشغيل والجودة'!C$5:C$32,A26,'سجل اختبارات التشغيل والجودة'!J$5:J$32,\"*مطابق*\")","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"E26","v":4,"f":"=C26-D26","bg":"#F1F5F9","fg":"#D97706","b":true,"al":"center","nf":"#,##0"},{"c":"F26","v":14,"f":"=SUMIF('سجل اختبارات التشغيل والجودة'!C$5:C$32,A26,'سجل اختبارات التشغيل والجودة'!K$5:K$32)","bg":"#F1F5F9","fg":"#E11D48","b":true,"al":"center","nf":"#,##0"},{"c":"G26","v":11,"f":"=SUMIF('سجل اختبارات التشغيل والجودة'!C$5:C$32,A26,'سجل اختبارات التشغيل والجودة'!L$5:L$32)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"H26","v":3,"f":"=F26-G26","bg":"#F1F5F9","fg":"#D97706","b":true,"al":"center","nf":"#,##0"},{"c":"I26","v":0.785714,"f":"=IFERROR(G26/F26,1)","bg":"#F1F5F9","fg":"#7C3AED","b":true,"al":"center","nf":"0.0%"},{"c":"J26","v":0,"f":"=IFERROR(D26/C26,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"K26","v":"2026-12-05","fg":"#334155","al":"center"},{"c":"L26","v":"حرج جداً","fg":"#E11D48","b":true,"al":"center"},{"c":"M26","v":"برمجة شاشات التحكم وسيناريو الإخلاء"}]},{"r":27,"h":36.0,"cells":[{"c":"A27","v":"MEP-SYS-07","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B27","v":"اختبارات الموازنة الهوائية والمائية TAB","b":true},{"c":"C27","v":4,"f":"=COUNTIF('سجل اختبارات التشغيل والجودة'!C$5:C$32,A27)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"D27","v":0,"f":"=COUNTIFS('سجل اختبارات التشغيل والجودة'!C$5:C$32,A27,'سجل اختبارات التشغيل والجودة'!J$5:J$32,\"*مطابق*\")","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"E27","v":4,"f":"=C27-D27","bg":"#F1F5F9","fg":"#D97706","b":true,"al":"center","nf":"#,##0"},{"c":"F27","v":9,"f":"=SUMIF('سجل اختبارات التشغيل والجودة'!C$5:C$32,A27,'سجل اختبارات التشغيل والجودة'!K$5:K$32)","bg":"#F1F5F9","fg":"#E11D48","b":true,"al":"center","nf":"#,##0"},{"c":"G27","v":7,"f":"=SUMIF('سجل اختبارات التشغيل والجودة'!C$5:C$32,A27,'سجل اختبارات التشغيل والجودة'!L$5:L$32)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"H27","v":2,"f":"=F27-G27","bg":"#F1F5F9","fg":"#D97706","b":true,"al":"center","nf":"#,##0"},{"c":"I27","v":0.777778,"f":"=IFERROR(G27/F27,1)","bg":"#F1F5F9","fg":"#7C3AED","b":true,"al":"center","nf":"0.0%"},{"c":"J27","v":0,"f":"=IFERROR(D27/C27,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"K27","v":"2026-12-10","fg":"#334155","al":"center"},{"c":"L27","v":"حرج","fg":"#D97706","b":true,"al":"center"},{"c":"M27","v":"إصدار التقارير النهائية للموازنة"}]},{"r":28,"h":52.0,"cells":[{"c":"A28","v":"إجمالي اختبارات التشغيل التجريبي ومؤشرات الجاهزية (Total T&C Readiness)","bg":"#F1F5F9","b":true,"al":"center","cs":2},{"skip":true},{"c":"C28","v":28,"f":"=SUM(C21:C27)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"D28","v":0,"f":"=SUM(D21:D27)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"E28","v":28,"f":"=SUM(E21:E27)","bg":"#F1F5F9","fg":"#D97706","b":true,"al":"center","nf":"#,##0"},{"c":"F28","v":50,"f":"=SUM(F21:F27)","bg":"#F1F5F9","fg":"#E11D48","b":true,"al":"center","nf":"#,##0"},{"c":"G28","v":43,"f":"=SUM(G21:G27)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"H28","v":7,"f":"=SUM(H21:H27)","bg":"#F1F5F9","fg":"#D97706","b":true,"al":"center","nf":"#,##0"},{"c":"I28","v":0.86,"f":"=IFERROR(G28/F28,1)","bg":"#F1F5F9","fg":"#7C3AED","b":true,"al":"center","nf":"0.0%"},{"c":"J28","v":0,"f":"=IFERROR(D28/C28,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"K28","v":"2026-12-15","bg":"#F1F5F9","b":true,"al":"center"},{"c":"L28","v":"مسار حرج موجه","bg":"#F1F5F9","fg":"#D97706","b":true,"al":"center"},{"c":"M28","v":"جاهزية مرحلية للتشغيل المتزامن وفحص الدفاع المدني النهائي","bg":"#F1F5F9"}]},{"r":29,"h":13.9,"cells":[{"c":"A29","v":""},{"c":"B29","v":""},{"c":"C29","v":""},{"c":"D29","v":""},{"c":"E29","v":""},{"c":"F29","v":""},{"c":"G29","v":""},{"c":"H29","v":""},{"c":"I29","v":""},{"c":"J29","v":""},{"c":"K29","v":""},{"c":"L29","v":""},{"c":"M29","v":""}]},{"r":30,"h":34.0,"cells":[{"c":"A30","v":"مهندس كهروميكانيك الموقع (MEP Site Eng.)","bg":"#F1F5F9","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D30","v":"مدير المكتب الفني الكهروميكانيكي (MEP Tech Office)","bg":"#F1F5F9","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G30","v":"استشاري الإشراف الكهروميكانيكي (MEP Consultant)","bg":"#F1F5F9","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"J30","v":"مدير المشروع العام (Project Director)","bg":"#F1F5F9","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":31,"h":72.0,"cells":[{"c":"A31","v":"الاسم: .......................................\nالتوقيع: .....................................\nالتاريخ: ..... / ..... / 2026 م","fg":"#475569","cs":3},{"skip":true},{"skip":true},{"c":"D31","v":"الاسم: .......................................\nالتوقيع: .....................................\nالتاريخ: ..... / ..... / 2026 م","fg":"#475569","cs":3},{"skip":true},{"skip":true},{"c":"G31","v":"الاسم: .......................................\nالتوقيع: .....................................\nالتاريخ: ..... / ..... / 2026 م","fg":"#475569","cs":3},{"skip":true},{"skip":true},{"c":"J31","v":"الاسم: .......................................\nالتوقيع: .....................................\nالتاريخ: ..... / ..... / 2026 م","fg":"#475569","cs":4},{"skip":true},{"skip":true},{"skip":true}]}],"charts":[{"title":"مقارنة نسب الإنجاز المخطط مقابل الفعلي لأنظمة الكهروميكانيك (Planned vs Actual MEP Progress %)","type":"bar","grouping":"clustered","anchorRow":35,"anchorCol":0,"categories":["MEP-SYS-01","MEP-SYS-02","MEP-SYS-03","MEP-SYS-04","MEP-SYS-05","MEP-SYS-06","MEP-SYS-07"],"series":[{"name":"الإنجاز الفعلي","valRef":"'لوحة التحكم ومؤشرات الأداء'!$F$10:$F$16","values":[0.0,0.0,0.0,0.0,0.0,0.0,0.0],"color":"#2563EB","titleRef":"'لوحة التحكم ومؤشرات الأداء'!$F$9","nf":"0.0%"},{"name":"الإنجاز المخطط","valRef":"'لوحة التحكم ومؤشرات الأداء'!$G$10:$G$16","values":[0.82,0.88,0.78,0.85,0.84,0.76,0.6],"color":"#059669","titleRef":"'لوحة التحكم ومؤشرات الأداء'!$G$9","nf":"0.0%"}],"catRef":"'لوحة التحكم ومؤشرات الأداء'!$A$10:$A$16"},{"title":"مصفوفة اختبارات التشغيل التجريبي والملاحظات المفتوحة (T&C Tests & Open Snags)","type":"bar","grouping":"clustered","anchorRow":35,"anchorCol":6,"categories":["MEP-SYS-01","MEP-SYS-02","MEP-SYS-03","MEP-SYS-04","MEP-SYS-05","MEP-SYS-06","MEP-SYS-07"],"series":[{"name":"إجمالي الفحوصات المقررة","valRef":"'لوحة التحكم ومؤشرات الأداء'!$C$21:$C$27","values":[4.0,4.0,4.0,4.0,4.0,4.0,4.0],"color":"#2563EB","titleRef":"'لوحة التحكم ومؤشرات الأداء'!$C$20","nf":"#,##0"},{"name":"الفحوصات الناجحة المقبولة","valRef":"'لوحة التحكم ومؤشرات الأداء'!$D$21:$D$27","values":[0.0,0.0,0.0,0.0,0.0,0.0,0.0],"color":"#059669","titleRef":"'لوحة التحكم ومؤشرات الأداء'!$D$20","nf":"#,##0"}],"catRef":"'لوحة التحكم ومؤشرات الأداء'!$A$21:$A$27"}]},{"name":"إعدادات الأنظمة والأحمال","maxRow":27,"maxCol":8,"colWidths":[15.0,44.0,38.0,16.0,22.0,28.0,36.0,28.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"إعدادات أنظمة الكهروميكانيك والأحمال التصميمية والمعايير القياسية (MEP Master & Benchmarks)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"قاعدة البيانات المرجعية لحزم الكهروميكانيك، طاقات التبريد، الأحمال الكهربائية، وسعات المياه وفق كود SBC ومعايير ASHRAE و NFPA","bg":"#334155","fg":"#E2E8F0","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"أولاً: بيانات المنشأة ومحددات التصميم الكهروميكانيكي (Project MEP Parameters & Facility Benchmarks)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"CFG-MEP-01","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B5","v":"اسم المشروع الإنشائي والمنشأة","b":true},{"c":"C5","v":"مجمع الأبراج المكتبية والمركز التجاري المتكامل (Riyadh Business Gate)","b":true,"al":"center"},{"c":"D5","v":"نص","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"E5","v":"المشروع الميداني الخاضع للإشراف الكهروميكانيكي","fg":"#475569","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"CFG-MEP-02","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B6","v":"الاستشاري الهندسي المشرف","b":true},{"c":"C6","v":"دار الهندسة والاستشارات الكهروميكانيكية التخصصية","b":true,"al":"center"},{"c":"D6","v":"نص","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"E6","v":"الجهة الهندسية المسؤولة عن مطابقة المواصفات والاستلام","fg":"#475569","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"CFG-MEP-03","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B7","v":"مقاول الأعمال الكهروميكانيكية الرئيسي","b":true},{"c":"C7","v":"شركة بنيان للإنشاءات والمقاولات الكهروميكانيكية المتخصصة","b":true,"al":"center"},{"c":"D7","v":"نص","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"E7","v":"المقاول المنفذ لكافة حزم الميكانيكا والكهرباء والصحي","fg":"#475569","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":8,"h":36.0,"cells":[{"c":"A8","v":"CFG-MEP-04","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B8","v":"إجمالي مسطحات البناء الإجمالية (BUA)","b":true},{"c":"C8","v":42500,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"D8","v":"متر مربع (م²)","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"E8","v":"إجمالي المسطحات المغطاة بالخدمات الكهروميكانيكية","fg":"#475569","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"CFG-MEP-05","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B9","v":"إجمالي الحمل الكهربائي المتصل (Total Connected Load)","b":true},{"c":"C9","v":3450,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"D9","v":"كيلو فولت أمبير (kVA)","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"E9","v":"سعة محولات التغذية الكهربائية الرئيسية من شركة الكهرباء","fg":"#475569","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":"CFG-MEP-06","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B10","v":"الحمل الكهربائي الأقصى التشغيلي (Peak Demand Load)","b":true},{"c":"C10","v":2580,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"D10","v":"كيلو واط (kW)","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"E10","v":"الحمل الأقصى الفعلي المتوقع بعد تطبيق معامل التباين Diversity","fg":"#475569","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"CFG-MEP-07","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B11","v":"إجمالي سعة التبريد والتكييف التصميمية (Cooling Capacity)","b":true},{"c":"C11","v":750,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"D11","v":"طن تبريد (TR)","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"E11","v":"سعة محطة الشلرات ووحدات مناولة الهواء وتبريد المبنى","fg":"#475569","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":"CFG-MEP-08","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B12","v":"سعة خزان مياه الشرب والاستهلاك اليومي","b":true},{"c":"C12","v":180,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"D12","v":"متر مكعب (م³)","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"E12","v":"احتياطي تغذية المبنى بمياه الشرب لمدة 48 ساعة تشغيل","fg":"#475569","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":13,"h":36.0,"cells":[{"c":"A13","v":"CFG-MEP-09","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B13","v":"سعة خزان مياه مكافحة الحريق المخصصة","b":true},{"c":"C13","v":120,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"D13","v":"متر مكعب (م³)","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"E13","v":"سعة تكفي تشغيل مضخة الحريق 1000 GPM لمدة 120 دقيقة (NFPA 20)","fg":"#475569","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"CFG-MEP-10","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B14","v":"سعة مولد الطوارئ الاحتياطي للديزل","b":true},{"c":"C14","v":1250,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0"},{"c":"D14","v":"كيلو فولت أمبير (kVA)","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"E14","v":"تغذية أحمال الطوارئ، مضخات الحريق، المصاعد، وإنارة الهروب","fg":"#475569","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":15,"h":36.0,"cells":[{"c":"A15","v":"CFG-MEP-11","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B15","v":"معامل القدرة المستهدف للشبكة الكهربائية (Power Factor)","b":true},{"c":"C15","v":0.92,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.00"},{"c":"D15","v":"معامل PF","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"E15","v":"ضبط معامل القدرة عبر لوحات مكثفات أوتوماتيكية APFC","fg":"#475569","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":16,"h":36.0,"cells":[{"c":"A16","v":"CFG-MEP-12","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B16","v":"تاريخ الانتهاء والتشغيل التجريبي المستهدف (Target T&C)","b":true},{"c":"C16","v":"2026-12-15","b":true,"al":"center"},{"c":"D16","v":"تاريخ","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"E16","v":"الموعد النهائي لاكتمال اختبارات التشغيل والتسليم الابتدائي","fg":"#475569","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":17,"h":28.0,"cells":[{"c":"A17","v":""},{"c":"B17","v":""},{"c":"C17","v":""},{"c":"D17","v":""},{"c":"E17","v":""},{"c":"F17","v":""},{"c":"G17","v":""},{"c":"H17","v":""}]},{"r":18,"h":38.0,"cells":[{"c":"A18","v":"ثانياً: دليل حزم وأنظمة الكهروميكانيك والأوزان التعاقدية (MEP Packages Master & Contract Breakdown)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":19,"h":40.0,"cells":[{"c":"A19","v":"كود النظام","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B19","v":"اسم الحزمة / النظام الكهروميكانيكي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C19","v":"الاسم بالإنجليزية (Package)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D19","v":"الوزن التعاقدي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E19","v":"الميزانية التقديرية (SAR)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F19","v":"الحمل / الطاقة التصميمية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G19","v":"الأكواد والمواصفات الحاكمة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H19","v":"فترة الضمان والصيانة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":20,"h":36.0,"cells":[{"c":"A20","v":"MEP-SYS-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B20","v":"نظام التكييف والتهوية الميكانيكية وتبريد المياه","bg":"#F8FAFC","b":true},{"c":"C20","v":"HVAC Chilled Water, AHU & Ductwork","bg":"#F8FAFC"},{"c":"D20","v":0.3,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"E20","v":7850000,"in":true,"bg":"#F8FAFC","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"F20","v":"750 TR / 3 Chillers","bg":"#F8FAFC","al":"center"},{"c":"G20","v":"SBC 501 / ASHRAE 62.1 / SMACNA","bg":"#F8FAFC"},{"c":"H20","v":"سنتان شامل الضمان المصنعي","bg":"#F8FAFC","al":"center"}]},{"r":21,"h":36.0,"cells":[{"c":"A21","v":"MEP-SYS-02","b":true,"al":"center"},{"c":"B21","v":"شبكات القوى والتوزيع الكهربائي والمحولات","b":true},{"c":"C21","v":"MV/LV Power Distribution & Switchgear"},{"c":"D21","v":0.22,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"E21","v":5750000,"in":true,"fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"F21","v":"3450 kVA / 2 Transformers","al":"center"},{"c":"G21","v":"SBC 401 / IEC 61439 / SEC Specs"},{"c":"H21","v":"سنتان على القواطع والمحولات","al":"center"}]},{"r":22,"h":36.0,"cells":[{"c":"A22","v":"MEP-SYS-03","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B22","v":"أنظمة الإنارة ومخارج الطوارئ وتوليد الديزل","bg":"#F8FAFC","b":true},{"c":"C22","v":"Lighting Fixtures & Emergency Generators","bg":"#F8FAFC"},{"c":"D22","v":0.12,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"E22","v":3140000,"in":true,"bg":"#F8FAFC","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"F22","v":"1250 kVA Generator / LED","bg":"#F8FAFC","al":"center"},{"c":"G22","v":"SBC 401 / SBC 801 / NFPA 110","bg":"#F8FAFC"},{"c":"H22","v":"سنة واحدة للمصابيح وسنتان للمولد","bg":"#F8FAFC","al":"center"}]},{"r":23,"h":36.0,"cells":[{"c":"A23","v":"MEP-SYS-04","b":true,"al":"center"},{"c":"B23","v":"شبكات التغذية بمياه الشرب والصرف ومحطات الرفع","b":true},{"c":"C23","v":"Domestic Water Booster & Drainage Systems"},{"c":"D23","v":0.13,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"E23","v":3400000,"in":true,"fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"F23","v":"180 m³ Tank / 4 Booster Pumps","al":"center"},{"c":"G23","v":"SBC 701 / IPC / SASO Plumbing"},{"c":"H23","v":"سنتان على المحابس والمضخات","al":"center"}]},{"r":24,"h":36.0,"cells":[{"c":"A24","v":"MEP-SYS-05","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B24","v":"شبكات مكافحة الحريق بالرشاشات ومحطة المضخات","bg":"#F8FAFC","b":true},{"c":"C24","v":"Fire Protection Sprinklers & NFPA Pumps","bg":"#F8FAFC"},{"c":"D24","v":0.11,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"E24","v":2880000,"in":true,"bg":"#F8FAFC","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"F24","v":"1000 GPM @ 10 Bar (NFPA 20)","bg":"#F8FAFC","al":"center"},{"c":"G24","v":"SBC 801 / NFPA 13, 14, 20","bg":"#F8FAFC"},{"c":"H24","v":"سنتان وتراخيص الدفاع المدني","bg":"#F8FAFC","al":"center"}]},{"r":25,"h":36.0,"cells":[{"c":"A25","v":"MEP-SYS-06","b":true,"al":"center"},{"c":"B25","v":"أنظمة الإنذار المبكر والتيار الخفيف والـ BMS","b":true},{"c":"C25","v":"Fire Alarm, CCTV, Access & BMS Systems"},{"c":"D25","v":0.08,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"E25","v":2090000,"in":true,"fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"F25","v":"FACP Addressable / DDC Panels","al":"center"},{"c":"G25","v":"NFPA 72 / SBC 801 / TIA-942"},{"c":"H25","v":"سنتان على الحساسات واللوحات","al":"center"}]},{"r":26,"h":36.0,"cells":[{"c":"A26","v":"MEP-SYS-07","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B26","v":"اختبارات الموازنة الهوائية والمائية والتشغيل","bg":"#F8FAFC","b":true},{"c":"C26","v":"Testing, Adjusting & Balancing (TAB & T&C)","bg":"#F8FAFC"},{"c":"D26","v":0.04,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"E26","v":1050000,"in":true,"bg":"#F8FAFC","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"F26","v":"100% Commissioning Readiness","bg":"#F8FAFC","al":"center"},{"c":"G26","v":"ASHRAE Standard 111 / AABC / NEBB","bg":"#F8FAFC"},{"c":"H26","v":"سنة الموازنة والتشغيل المتكامل","bg":"#F8FAFC","al":"center"}]},{"r":27,"h":40.0,"cells":[{"c":"A27","v":"الإجمالي التعاقدي العام لحزم الكهروميكانيك (Total MEP Budget)","bg":"#F1F5F9","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D27","v":1,"f":"=SUM(D20:D26)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"E27","v":26160000,"f":"=SUM(E20:E26)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"F27","v":"ميزانية تقديرية متكاملة شاملة التوريد والتركيب والفحص والاختبار","bg":"#F1F5F9","fg":"#334155","al":"center","cs":3},{"skip":true},{"skip":true}]}]},{"name":"سجل التركيبات والتوريدات","maxRow":37,"maxCol":15,"colWidths":[15.0,14.0,15.0,20.0,64.0,32.0,16.0,12.0,16.0,13.0,13.0,13.0,18.0,24.0,22.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"سجل متابعة توريدات وتركيبات الأعمال الكهروميكانيكية بالموقع (MEP Site Installation & Delivery Log)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":15},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"حصر تفصيلي للكميات الموردة والمركبة فعلياً بالموقع ونسب الإنجاز الموزونة لكل بند كهروميكانيكي مع رصد التحديث الميداني","bg":"#334155","fg":"#E2E8F0","al":"center","cs":15},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""},{"c":"N3","v":""},{"c":"O3","v":""}]},{"r":4,"h":42.0,"cells":[{"c":"A4","v":"كود البند","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"تاريخ التحديث","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"كود النظام","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"النظام الكهروميكانيكي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"التوصيف الفني لبند الأعمال والمواد","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"الموقع الميداني / الطابق","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"الكمية المقررة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"الوحدة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"الكمية الموردة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J4","v":"نسبة التوريد","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K4","v":"الكمية المركبة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L4","v":"نسبة التركيب","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M4","v":"نسبة الإنجاز للبند","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"N4","v":"حالة الفحص والاستلام","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"O4","v":"المهندس المسؤول","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":36.0,"cells":[{"c":"A5","v":"MEP-ACT-001","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B5","v":"2026-10-05","fg":"#334155","al":"center"},{"c":"C5","v":"MEP-SYS-01","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D5","v":"التكييف والتهوية","b":true,"al":"center"},{"c":"E5","v":"توريد وتركيب وحدات الشلرات المبردة بالماء Water-Cooled Chillers سعة 250 TR"},{"c":"F5","v":"غرفة المحطة المركزية (القبو الثاني)","fg":"#334155"},{"c":"G5","v":3,"in":true,"bg":"#FEF9C3","b":true,"al":"center","nf":"#,##0"},{"c":"H5","v":"عدد","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"I5","v":3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J5","v":1,"f":"=IFERROR(I5/G5,0)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"K5","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L5","v":0.666667,"f":"=IFERROR(K5/G5,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"M5","v":0.7833,"f":"=ROUND(J5*0.35+L5*0.65,4)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"N5","v":"مطابق ومقبول فنياً","fg":"#059669","b":true,"al":"center"},{"c":"O5","v":"م. عبد الرحمن الخالدي","fg":"#334155","al":"center"}]},{"r":6,"h":36.0,"cells":[{"c":"A6","v":"MEP-ACT-002","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B6","v":"2026-10-08","fg":"#334155","al":"center"},{"c":"C6","v":"MEP-SYS-01","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D6","v":"التكييف والتهوية","b":true,"al":"center"},{"c":"E6","v":"مجاري الهواء الصاج المجلفن مع العوازل الحرارية والصوتية لمبنى المكاتب","bg":"#F8FAFC"},{"c":"F6","v":"الأدوار المتكررة (1 إلى 6)","fg":"#334155"},{"c":"G6","v":14500,"in":true,"bg":"#FEF9C3","b":true,"al":"center","nf":"#,##0"},{"c":"H6","v":"م²","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"I6","v":13200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J6","v":0.910345,"f":"=IFERROR(I6/G6,0)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"K6","v":11800,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L6","v":0.813793,"f":"=IFERROR(K6/G6,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"M6","v":0.8476,"f":"=ROUND(J6*0.35+L6*0.65,4)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"N6","v":"مطابق ومقبول فنياً","fg":"#059669","b":true,"al":"center"},{"c":"O6","v":"م. عبد الرحمن الخالدي","fg":"#334155","al":"center"}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":"MEP-ACT-003","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B7","v":"2026-10-12","fg":"#334155","al":"center"},{"c":"C7","v":"MEP-SYS-01","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D7","v":"التكييف والتهوية","b":true,"al":"center"},{"c":"E7","v":"مواسير مياه التبريد الفولاذية الملحومة قياس 8 بوصة مع العزل المطاطي"},{"c":"F7","v":"الرايزر الميكانيكي الرأسي والمحطة","fg":"#334155"},{"c":"G7","v":1850,"in":true,"bg":"#FEF9C3","b":true,"al":"center","nf":"#,##0"},{"c":"H7","v":"متر طولي","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"I7","v":1850,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J7","v":1,"f":"=IFERROR(I7/G7,0)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"K7","v":1680,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L7","v":0.908108,"f":"=IFERROR(K7/G7,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"M7","v":0.9403,"f":"=ROUND(J7*0.35+L7*0.65,4)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"N7","v":"مطابق ومقبول فنياً","fg":"#059669","b":true,"al":"center"},{"c":"O7","v":"م. عبد الرحمن الخالدي","fg":"#334155","al":"center"}]},{"r":8,"h":36.0,"cells":[{"c":"A8","v":"MEP-ACT-004","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B8","v":"2026-10-15","fg":"#334155","al":"center"},{"c":"C8","v":"MEP-SYS-01","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D8","v":"التكييف والتهوية","b":true,"al":"center"},{"c":"E8","v":"وحدات مناولة الهواء وتوزيع الهواء النقي Fresh Air Handling Units (FAHU)","bg":"#F8FAFC"},{"c":"F8","v":"غرف الخدمات وغرف السطح","fg":"#334155"},{"c":"G8","v":8,"in":true,"bg":"#FEF9C3","b":true,"al":"center","nf":"#,##0"},{"c":"H8","v":"عدد","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"I8","v":8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J8","v":1,"f":"=IFERROR(I8/G8,0)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"K8","v":7,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L8","v":0.875,"f":"=IFERROR(K8/G8,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"M8","v":0.9187,"f":"=ROUND(J8*0.35+L8*0.65,4)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"N8","v":"قيد استكمال التوصيلات","fg":"#D97706","b":true,"al":"center"},{"c":"O8","v":"م. عبد الرحمن الخالدي","fg":"#334155","al":"center"}]},{"r":9,"h":36.0,"cells":[{"c":"A9","v":"MEP-ACT-005","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B9","v":"2026-10-17","fg":"#334155","al":"center"},{"c":"C9","v":"MEP-SYS-01","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D9","v":"التكييف والتهوية","b":true,"al":"center"},{"c":"E9","v":"وحدات الملف والمروحة التبريدية الداخلية Fan Coil Units (FCU)"},{"c":"F9","v":"مكاتب وغرف الاجتماعات","fg":"#334155"},{"c":"G9","v":240,"in":true,"bg":"#FEF9C3","b":true,"al":"center","nf":"#,##0"},{"c":"H9","v":"عدد","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"I9","v":240,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J9","v":1,"f":"=IFERROR(I9/G9,0)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"K9","v":210,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L9","v":0.875,"f":"=IFERROR(K9/G9,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"M9","v":0.9187,"f":"=ROUND(J9*0.35+L9*0.65,4)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"N9","v":"مطابق ومقبول فنياً","fg":"#059669","b":true,"al":"center"},{"c":"O9","v":"م. عبد الرحمن الخالدي","fg":"#334155","al":"center"}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":"MEP-ACT-006","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B10","v":"2026-10-19","fg":"#334155","al":"center"},{"c":"C10","v":"MEP-SYS-01","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D10","v":"التكييف والتهوية","b":true,"al":"center"},{"c":"E10","v":"مخارج الهواء الخطية والدائرية والدفيوزرات ومخمدات الحريق الآلية Fire Dampers","bg":"#F8FAFC"},{"c":"F10","v":"الأسقف المستعارة لكافة الأدوار","fg":"#334155"},{"c":"G10","v":920,"in":true,"bg":"#FEF9C3","b":true,"al":"center","nf":"#,##0"},{"c":"H10","v":"عدد","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"I10","v":850,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J10","v":0.923913,"f":"=IFERROR(I10/G10,0)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"K10","v":720,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L10","v":0.782609,"f":"=IFERROR(K10/G10,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"M10","v":0.8321,"f":"=ROUND(J10*0.35+L10*0.65,4)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"N10","v":"مطابق ومقبول فنياً","fg":"#059669","b":true,"al":"center"},{"c":"O10","v":"م. عبد الرحمن الخالدي","fg":"#334155","al":"center"}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":"MEP-ACT-007","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B11","v":"2026-10-04","fg":"#334155","al":"center"},{"c":"C11","v":"MEP-SYS-02","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D11","v":"القوى والتوزيع الكهربائي","b":true,"al":"center"},{"c":"E11","v":"توريد وتركيب محولات القدرة الكهربائية الزيتية سعة 1750 kVA / 13.8 kV"},{"c":"F11","v":"غرفة المحولات الرئيسية (الأرضي)","fg":"#334155"},{"c":"G11","v":2,"in":true,"bg":"#FEF9C3","b":true,"al":"center","nf":"#,##0"},{"c":"H11","v":"عدد","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"I11","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J11","v":1,"f":"=IFERROR(I11/G11,0)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"K11","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L11","v":1,"f":"=IFERROR(K11/G11,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"M11","v":1,"f":"=ROUND(J11*0.35+L11*0.65,4)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"N11","v":"مطابق ومقبول فنياً","fg":"#059669","b":true,"al":"center"},{"c":"O11","v":"م. ياسر القحطاني","fg":"#334155","al":"center"}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":"MEP-ACT-008","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B12","v":"2026-10-07","fg":"#334155","al":"center"},{"c":"C12","v":"MEP-SYS-02","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D12","v":"القوى والتوزيع الكهربائي","b":true,"al":"center"},{"c":"E12","v":"لوحات التوزيع الرئيسية ذات الجهد المنخفض MDB بمفاتيح ACB سعة 3200A","bg":"#F8FAFC"},{"c":"F12","v":"غرفة الكهرباء الرئيسية (MDB)","fg":"#334155"},{"c":"G12","v":2,"in":true,"bg":"#FEF9C3","b":true,"al":"center","nf":"#,##0"},{"c":"H12","v":"عدد","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"I12","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J12","v":1,"f":"=IFERROR(I12/G12,0)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"K12","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L12","v":1,"f":"=IFERROR(K12/G12,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"M12","v":1,"f":"=ROUND(J12*0.35+L12*0.65,4)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"N12","v":"مطابق ومقبول فنياً","fg":"#059669","b":true,"al":"center"},{"c":"O12","v":"م. ياسر القحطاني","fg":"#334155","al":"center"}]},{"r":13,"h":36.0,"cells":[{"c":"A13","v":"MEP-ACT-009","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B13","v":"2026-10-10","fg":"#334155","al":"center"},{"c":"C13","v":"MEP-SYS-02","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D13","v":"القوى والتوزيع الكهربائي","b":true,"al":"center"},{"c":"E13","v":"كابلات التغذية النحاسية المسلحة ذات الجهد المنخفض XLPE/SWA/PVC 4x240 mm²"},{"c":"F13","v":"خنادق الكابلات والمسارات الرئيسية","fg":"#334155"},{"c":"G13","v":4200,"in":true,"bg":"#FEF9C3","b":true,"al":"center","nf":"#,##0"},{"c":"H13","v":"متر طولي","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"I13","v":4200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J13","v":1,"f":"=IFERROR(I13/G13,0)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"K13","v":3950,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L13","v":0.940476,"f":"=IFERROR(K13/G13,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"M13","v":0.9613,"f":"=ROUND(J13*0.35+L13*0.65,4)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"N13","v":"مطابق ومقبول فنياً","fg":"#059669","b":true,"al":"center"},{"c":"O13","v":"م. ياسر القحطاني","fg":"#334155","al":"center"}]},{"r":14,"h":36.0,"cells":[{"c":"A14","v":"MEP-ACT-010","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B14","v":"2026-10-14","fg":"#334155","al":"center"},{"c":"C14","v":"MEP-SYS-02","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D14","v":"القوى والتوزيع الكهربائي","b":true,"al":"center"},{"c":"E14","v":"حوامل وسلالم الكابلات المعدنية المجلفنة بالتغطيس الساخن Cable Trays & Ladders","bg":"#F8FAFC"},{"c":"F14","v":"ممرات الخدمات ومواقف السيارات","fg":"#334155"},{"c":"G14","v":3800,"in":true,"bg":"#FEF9C3","b":true,"al":"center","nf":"#,##0"},{"c":"H14","v":"متر طولي","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"I14","v":3800,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J14","v":1,"f":"=IFERROR(I14/G14,0)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"K14","v":3650,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L14","v":0.960526,"f":"=IFERROR(K14/G14,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"M14","v":0.9743,"f":"=ROUND(J14*0.35+L14*0.65,4)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"N14","v":"مطابق ومقبول فنياً","fg":"#059669","b":true,"al":"center"},{"c":"O14","v":"م. ياسر القحطاني","fg":"#334155","al":"center"}]},{"r":15,"h":36.0,"cells":[{"c":"A15","v":"MEP-ACT-011","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B15","v":"2026-10-18","fg":"#334155","al":"center"},{"c":"C15","v":"MEP-SYS-02","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D15","v":"القوى والتوزيع الكهربائي","b":true,"al":"center"},{"c":"E15","v":"لوحات التوزيع الفرعية والنهائية SMDB & Final DBs للمكاتب والخدمات"},{"c":"F15","v":"غرف الكهرباء بالأدوار المتكررة","fg":"#334155"},{"c":"G15","v":64,"in":true,"bg":"#FEF9C3","b":true,"al":"center","nf":"#,##0"},{"c":"H15","v":"عدد","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"I15","v":64,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J15","v":1,"f":"=IFERROR(I15/G15,0)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"K15","v":58,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L15","v":0.90625,"f":"=IFERROR(K15/G15,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"M15","v":0.9391,"f":"=ROUND(J15*0.35+L15*0.65,4)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"N15","v":"ملاحظات استلام قيد الإغلاق","fg":"#D97706","b":true,"al":"center"},{"c":"O15","v":"م. ياسر القحطاني","fg":"#334155","al":"center"}]},{"r":16,"h":36.0,"cells":[{"c":"A16","v":"MEP-ACT-012","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B16","v":"2026-10-20","fg":"#334155","al":"center"},{"c":"C16","v":"MEP-SYS-02","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D16","v":"القوى والتوزيع الكهربائي","b":true,"al":"center"},{"c":"E16","v":"شبكة التأريض العام وقضبان النحاس وحماية الصواعق Lightning Protection","bg":"#F8FAFC"},{"c":"F16","v":"محيط المبنى وشبكة السطح","fg":"#334155"},{"c":"G16","v":1,"in":true,"bg":"#FEF9C3","b":true,"al":"center","nf":"#,##0"},{"c":"H16","v":"مجموعة","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"I16","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J16","v":1,"f":"=IFERROR(I16/G16,0)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"K16","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L16","v":1,"f":"=IFERROR(K16/G16,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"M16","v":1,"f":"=ROUND(J16*0.35+L16*0.65,4)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"N16","v":"مطابق ومقبول فنياً","fg":"#059669","b":true,"al":"center"},{"c":"O16","v":"م. ياسر القحطاني","fg":"#334155","al":"center"}]},{"r":17,"h":36.0,"cells":[{"c":"A17","v":"MEP-ACT-013","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B17","v":"2026-10-06","fg":"#334155","al":"center"},{"c":"C17","v":"MEP-SYS-03","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D17","v":"الإنارة وتوليد الديزل","b":true,"al":"center"},{"c":"E17","v":"مولد الديزل الكهربائي لحالات الطوارئ سعة 1250 kVA بكاتم صوت وخزان وقود"},{"c":"F17","v":"غرفة المولد والوقود (القبو الأول)","fg":"#334155"},{"c":"G17","v":1,"in":true,"bg":"#FEF9C3","b":true,"al":"center","nf":"#,##0"},{"c":"H17","v":"عدد","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"I17","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J17","v":1,"f":"=IFERROR(I17/G17,0)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"K17","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L17","v":1,"f":"=IFERROR(K17/G17,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"M17","v":1,"f":"=ROUND(J17*0.35+L17*0.65,4)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"N17","v":"مطابق ومقبول فنياً","fg":"#059669","b":true,"al":"center"},{"c":"O17","v":"م. ياسر القحطاني","fg":"#334155","al":"center"}]},{"r":18,"h":36.0,"cells":[{"c":"A18","v":"MEP-ACT-014","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B18","v":"2026-10-09","fg":"#334155","al":"center"},{"c":"C18","v":"MEP-SYS-03","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D18","v":"الإنارة وتوليد الديزل","b":true,"al":"center"},{"c":"E18","v":"لوحة التحويل الأوتوماتيكي للتيار Automatic Transfer Switch (ATS) 2000A","bg":"#F8FAFC"},{"c":"F18","v":"غرفة المولدات الكهربائية","fg":"#334155"},{"c":"G18","v":1,"in":true,"bg":"#FEF9C3","b":true,"al":"center","nf":"#,##0"},{"c":"H18","v":"عدد","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"I18","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J18","v":1,"f":"=IFERROR(I18/G18,0)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"K18","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L18","v":1,"f":"=IFERROR(K18/G18,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"M18","v":1,"f":"=ROUND(J18*0.35+L18*0.65,4)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"N18","v":"مطابق ومقبول فنياً","fg":"#059669","b":true,"al":"center"},{"c":"O18","v":"م. ياسر القحطاني","fg":"#334155","al":"center"}]},{"r":19,"h":36.0,"cells":[{"c":"A19","v":"MEP-ACT-015","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B19","v":"2026-10-13","fg":"#334155","al":"center"},{"c":"C19","v":"MEP-SYS-03","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D19","v":"الإنارة وتوليد الديزل","b":true,"al":"center"},{"c":"E19","v":"وحدات الإنارة الغاطسة LED 60x60 موفرة للطاقة مع مجسات الحركة الدقيقة"},{"c":"F19","v":"الأسقف الجبسية والمكاتب","fg":"#334155"},{"c":"G19","v":3400,"in":true,"bg":"#FEF9C3","b":true,"al":"center","nf":"#,##0"},{"c":"H19","v":"عدد","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"I19","v":3200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J19","v":0.941176,"f":"=IFERROR(I19/G19,0)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"K19","v":2650,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L19","v":0.779412,"f":"=IFERROR(K19/G19,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"M19","v":0.836,"f":"=ROUND(J19*0.35+L19*0.65,4)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"N19","v":"مطابق ومقبول فنياً","fg":"#059669","b":true,"al":"center"},{"c":"O19","v":"م. ياسر القحطاني","fg":"#334155","al":"center"}]},{"r":20,"h":36.0,"cells":[{"c":"A20","v":"MEP-ACT-016","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B20","v":"2026-10-16","fg":"#334155","al":"center"},{"c":"C20","v":"MEP-SYS-03","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D20","v":"الإنارة وتوليد الديزل","b":true,"al":"center"},{"c":"E20","v":"كشافات إنارة الطوارئ الذاتية واللوحات الإرشادية المضيئة لمخارج الهروب Exit","bg":"#F8FAFC"},{"c":"F20","v":"ممرات الهروب والسلالم والمواقف","fg":"#334155"},{"c":"G20","v":480,"in":true,"bg":"#FEF9C3","b":true,"al":"center","nf":"#,##0"},{"c":"H20","v":"عدد","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"I20","v":450,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J20","v":0.9375,"f":"=IFERROR(I20/G20,0)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"K20","v":390,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L20","v":0.8125,"f":"=IFERROR(K20/G20,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"M20","v":0.8562,"f":"=ROUND(J20*0.35+L20*0.65,4)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"N20","v":"مطابق ومقبول فنياً","fg":"#059669","b":true,"al":"center"},{"c":"O20","v":"م. ياسر القحطاني","fg":"#334155","al":"center"}]},{"r":21,"h":36.0,"cells":[{"c":"A21","v":"MEP-ACT-017","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B21","v":"2026-10-21","fg":"#334155","al":"center"},{"c":"C21","v":"MEP-SYS-03","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D21","v":"الإنارة وتوليد الديزل","b":true,"al":"center"},{"c":"E21","v":"مفاتيح الإنارة والمخارج الكهربائية ومقابس القوى والمخارج الأرضية Floor Boxes"},{"c":"F21","v":"الأدوار المتكررة والبهو العام","fg":"#334155"},{"c":"G21","v":2150,"in":true,"bg":"#FEF9C3","b":true,"al":"center","nf":"#,##0"},{"c":"H21","v":"نقطة","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"I21","v":2000,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J21","v":0.930233,"f":"=IFERROR(I21/G21,0)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"K21","v":1680,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L21","v":0.781395,"f":"=IFERROR(K21/G21,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"M21","v":0.8335,"f":"=ROUND(J21*0.35+L21*0.65,4)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"N21","v":"مطابق ومقبول فنياً","fg":"#059669","b":true,"al":"center"},{"c":"O21","v":"م. ياسر القحطاني","fg":"#334155","al":"center"}]},{"r":22,"h":36.0,"cells":[{"c":"A22","v":"MEP-ACT-018","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B22","v":"2026-10-05","fg":"#334155","al":"center"},{"c":"C22","v":"MEP-SYS-04","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D22","v":"التغذية والصرف الصحي","b":true,"al":"center"},{"c":"E22","v":"محطة مضخات تعزيز الضغط لمياه الشرب Booster Pumps بنظام السرعات المتغيرة VFD","bg":"#F8FAFC"},{"c":"F22","v":"غرفة المضخات الميكانيكية","fg":"#334155"},{"c":"G22","v":1,"in":true,"bg":"#FEF9C3","b":true,"al":"center","nf":"#,##0"},{"c":"H22","v":"مجموعة","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"I22","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J22","v":1,"f":"=IFERROR(I22/G22,0)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"K22","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L22","v":1,"f":"=IFERROR(K22/G22,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"M22","v":1,"f":"=ROUND(J22*0.35+L22*0.65,4)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"N22","v":"مطابق ومقبول فنياً","fg":"#059669","b":true,"al":"center"},{"c":"O22","v":"م. فهد الدوسري","fg":"#334155","al":"center"}]},{"r":23,"h":36.0,"cells":[{"c":"A23","v":"MEP-ACT-019","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B23","v":"2026-10-08","fg":"#334155","al":"center"},{"c":"C23","v":"MEP-SYS-04","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D23","v":"التغذية والصرف الصحي","b":true,"al":"center"},{"c":"E23","v":"شبكات مواسير التغذية البولي بروبيلين الحراري PPR لمياه الشرب الساخنة والباردة"},{"c":"F23","v":"دورات المياه وغرف الخدمات","fg":"#334155"},{"c":"G23","v":5200,"in":true,"bg":"#FEF9C3","b":true,"al":"center","nf":"#,##0"},{"c":"H23","v":"متر طولي","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"I23","v":5200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J23","v":1,"f":"=IFERROR(I23/G23,0)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"K23","v":4800,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L23","v":0.923077,"f":"=IFERROR(K23/G23,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"M23","v":0.95,"f":"=ROUND(J23*0.35+L23*0.65,4)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"N23","v":"مطابق ومقبول فنياً","fg":"#059669","b":true,"al":"center"},{"c":"O23","v":"م. فهد الدوسري","fg":"#334155","al":"center"}]},{"r":24,"h":36.0,"cells":[{"c":"A24","v":"MEP-ACT-020","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B24","v":"2026-10-11","fg":"#334155","al":"center"},{"c":"C24","v":"MEP-SYS-04","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D24","v":"التغذية والصرف الصحي","b":true,"al":"center"},{"c":"E24","v":"مواسير الصرف الصحي الثقيل والخفيف ومياه الأمطار UPVC Class 4","bg":"#F8FAFC"},{"c":"F24","v":"الرايزات المعلقة ومدادات الأسقف","fg":"#334155"},{"c":"G24","v":4600,"in":true,"bg":"#FEF9C3","b":true,"al":"center","nf":"#,##0"},{"c":"H24","v":"متر طولي","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"I24","v":4600,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J24","v":1,"f":"=IFERROR(I24/G24,0)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"K24","v":4400,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L24","v":0.956522,"f":"=IFERROR(K24/G24,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"M24","v":0.9717,"f":"=ROUND(J24*0.35+L24*0.65,4)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"N24","v":"مطابق ومقبول فنياً","fg":"#059669","b":true,"al":"center"},{"c":"O24","v":"م. فهد الدوسري","fg":"#334155","al":"center"}]},{"r":25,"h":36.0,"cells":[{"c":"A25","v":"MEP-ACT-021","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B25","v":"2026-10-15","fg":"#334155","al":"center"},{"c":"C25","v":"MEP-SYS-04","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D25","v":"التغذية والصرف الصحي","b":true,"al":"center"},{"c":"E25","v":"مضخات رفع مياه الصرف المغمورة بالكامل Submersible Sump Pumps مع اللوحات"},{"c":"F25","v":"بيارات القبو وغرف المضخات","fg":"#334155"},{"c":"G25","v":4,"in":true,"bg":"#FEF9C3","b":true,"al":"center","nf":"#,##0"},{"c":"H25","v":"عدد","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"I25","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J25","v":1,"f":"=IFERROR(I25/G25,0)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"K25","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L25","v":1,"f":"=IFERROR(K25/G25,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"M25","v":1,"f":"=ROUND(J25*0.35+L25*0.65,4)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"N25","v":"مطابق ومقبول فنياً","fg":"#059669","b":true,"al":"center"},{"c":"O25","v":"م. فهد الدوسري","fg":"#334155","al":"center"}]},{"r":26,"h":36.0,"cells":[{"c":"A26","v":"MEP-ACT-022","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B26","v":"2026-10-18","fg":"#334155","al":"center"},{"c":"C26","v":"MEP-SYS-04","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D26","v":"التغذية والصرف الصحي","b":true,"al":"center"},{"c":"E26","v":"الأجهزة الصحية والخلاطات والمراحيض المعلقة وصناديق الطرد التوفيرية","bg":"#F8FAFC"},{"c":"F26","v":"دورات مياه المكاتب والمحلات","fg":"#334155"},{"c":"G26","v":310,"in":true,"bg":"#FEF9C3","b":true,"al":"center","nf":"#,##0"},{"c":"H26","v":"مجموعة","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"I26","v":290,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J26","v":0.935484,"f":"=IFERROR(I26/G26,0)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"K26","v":220,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L26","v":0.709677,"f":"=IFERROR(K26/G26,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"M26","v":0.7887,"f":"=ROUND(J26*0.35+L26*0.65,4)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"N26","v":"مطابق ومقبول فنياً","fg":"#059669","b":true,"al":"center"},{"c":"O26","v":"م. فهد الدوسري","fg":"#334155","al":"center"}]},{"r":27,"h":52.0,"cells":[{"c":"A27","v":"MEP-ACT-023","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B27","v":"2026-10-06","fg":"#334155","al":"center"},{"c":"C27","v":"MEP-SYS-05","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D27","v":"مكافحة الحريق والمضخات","b":true,"al":"center"},{"c":"E27","v":"محطة مضخات الحريق المطابقة لاشتراطات NFPA 20 (مضخة كهربائية + ديزل + جوكي) 1000 GPM"},{"c":"F27","v":"غرفة مضخات الحريق (القبو الثاني)","fg":"#334155"},{"c":"G27","v":1,"in":true,"bg":"#FEF9C3","b":true,"al":"center","nf":"#,##0"},{"c":"H27","v":"مجموعة","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"I27","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J27","v":1,"f":"=IFERROR(I27/G27,0)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"K27","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L27","v":1,"f":"=IFERROR(K27/G27,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"M27","v":1,"f":"=ROUND(J27*0.35+L27*0.65,4)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"N27","v":"مطابق ومقبول فنياً","fg":"#059669","b":true,"al":"center"},{"c":"O27","v":"م. عمر السليمان","fg":"#334155","al":"center"}]},{"r":28,"h":36.0,"cells":[{"c":"A28","v":"MEP-ACT-024","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B28","v":"2026-10-10","fg":"#334155","al":"center"},{"c":"C28","v":"MEP-SYS-05","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D28","v":"مكافحة الحريق والمضخات","b":true,"al":"center"},{"c":"E28","v":"شبكة مواسير الحريق الفولاذية غير الملحومة Seamless Sch 40 مع الرشاشات المائية","bg":"#F8FAFC"},{"c":"F28","v":"المواقف وكافة أدوار المبنى","fg":"#334155"},{"c":"G28","v":7400,"in":true,"bg":"#FEF9C3","b":true,"al":"center","nf":"#,##0"},{"c":"H28","v":"متر طولي","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"I28","v":7400,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J28","v":1,"f":"=IFERROR(I28/G28,0)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"K28","v":6900,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L28","v":0.932432,"f":"=IFERROR(K28/G28,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"M28","v":0.9561,"f":"=ROUND(J28*0.35+L28*0.65,4)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"N28","v":"مطابق ومقبول فنياً","fg":"#059669","b":true,"al":"center"},{"c":"O28","v":"م. عمر السليمان","fg":"#334155","al":"center"}]},{"r":29,"h":36.0,"cells":[{"c":"A29","v":"MEP-ACT-025","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B29","v":"2026-10-14","fg":"#334155","al":"center"},{"c":"C29","v":"MEP-SYS-05","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D29","v":"مكافحة الحريق والمضخات","b":true,"al":"center"},{"c":"E29","v":"صناديق خراطيم الحريق المزدوجة ومحابس تخفيض الضغط وهياكل الإنزال Landing Valves"},{"c":"F29","v":"سلالم الهروب ومداخل الأدوار","fg":"#334155"},{"c":"G29","v":56,"in":true,"bg":"#FEF9C3","b":true,"al":"center","nf":"#,##0"},{"c":"H29","v":"عدد","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"I29","v":56,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J29","v":1,"f":"=IFERROR(I29/G29,0)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"K29","v":52,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L29","v":0.928571,"f":"=IFERROR(K29/G29,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"M29","v":0.9536,"f":"=ROUND(J29*0.35+L29*0.65,4)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"N29","v":"مطابق ومقبول فنياً","fg":"#059669","b":true,"al":"center"},{"c":"O29","v":"م. عمر السليمان","fg":"#334155","al":"center"}]},{"r":30,"h":36.0,"cells":[{"c":"A30","v":"MEP-ACT-026","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B30","v":"2026-10-17","fg":"#334155","al":"center"},{"c":"C30","v":"MEP-SYS-05","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D30","v":"مكافحة الحريق والمضخات","b":true,"al":"center"},{"c":"E30","v":"نظام الإطفاء بالغاز النظيف FM-200 لغرف السيرفر والكهرباء مع أجهزة التفريغ","bg":"#F8FAFC"},{"c":"F30","v":"غرف التحكم ومراكز البيانات","fg":"#334155"},{"c":"G30","v":6,"in":true,"bg":"#FEF9C3","b":true,"al":"center","nf":"#,##0"},{"c":"H30","v":"نظام","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"I30","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J30","v":1,"f":"=IFERROR(I30/G30,0)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"K30","v":5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L30","v":0.833333,"f":"=IFERROR(K30/G30,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"M30","v":0.8917,"f":"=ROUND(J30*0.35+L30*0.65,4)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"N30","v":"ملاحظات فنية قيد المراجعة","fg":"#D97706","b":true,"al":"center"},{"c":"O30","v":"م. عمر السليمان","fg":"#334155","al":"center"}]},{"r":31,"h":36.0,"cells":[{"c":"A31","v":"MEP-ACT-027","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B31","v":"2026-10-07","fg":"#334155","al":"center"},{"c":"C31","v":"MEP-SYS-06","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D31","v":"الإنذار والتيار الخفيف","b":true,"al":"center"},{"c":"E31","v":"لوحة إنذار الحريق المعنونة الرئيسية Addressable FACP مع لوحة التكرار الميدانية"},{"c":"F31","v":"غرفة التحكم والأمن الرئيسية","fg":"#334155"},{"c":"G31","v":1,"in":true,"bg":"#FEF9C3","b":true,"al":"center","nf":"#,##0"},{"c":"H31","v":"مجموعة","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"I31","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J31","v":1,"f":"=IFERROR(I31/G31,0)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"K31","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L31","v":1,"f":"=IFERROR(K31/G31,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"M31","v":1,"f":"=ROUND(J31*0.35+L31*0.65,4)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"N31","v":"مطابق ومقبول فنياً","fg":"#059669","b":true,"al":"center"},{"c":"O31","v":"م. ماجد الشهري","fg":"#334155","al":"center"}]},{"r":32,"h":36.0,"cells":[{"c":"A32","v":"MEP-ACT-028","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B32","v":"2026-10-11","fg":"#334155","al":"center"},{"c":"C32","v":"MEP-SYS-06","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D32","v":"الإنذار والتيار الخفيف","b":true,"al":"center"},{"c":"E32","v":"كواشف الدخان والحرارة المعنونة وسارينات الإنذار الضوئية والكواشف الليزرية","bg":"#F8FAFC"},{"c":"F32","v":"كافة أدوار وممرات ومستودعات المبنى","fg":"#334155"},{"c":"G32","v":1650,"in":true,"bg":"#FEF9C3","b":true,"al":"center","nf":"#,##0"},{"c":"H32","v":"نقطة","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"I32","v":1550,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J32","v":0.939394,"f":"=IFERROR(I32/G32,0)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"K32","v":1320,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L32","v":0.8,"f":"=IFERROR(K32/G32,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"M32","v":0.8488,"f":"=ROUND(J32*0.35+L32*0.65,4)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"N32","v":"مطابق ومقبول فنياً","fg":"#059669","b":true,"al":"center"},{"c":"O32","v":"م. ماجد الشهري","fg":"#334155","al":"center"}]},{"r":33,"h":36.0,"cells":[{"c":"A33","v":"MEP-ACT-029","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B33","v":"2026-10-16","fg":"#334155","al":"center"},{"c":"C33","v":"MEP-SYS-06","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D33","v":"الإنذار والتيار الخفيف","b":true,"al":"center"},{"c":"E33","v":"كاميرات المراقبة التلفزيونية المغلقة الرقمية IP CCTV وشبكة التسجيل NVR"},{"c":"F33","v":"مداخل ومحيط وممرات المبنى","fg":"#334155"},{"c":"G33","v":180,"in":true,"bg":"#FEF9C3","b":true,"al":"center","nf":"#,##0"},{"c":"H33","v":"عدد","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"I33","v":170,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J33","v":0.944444,"f":"=IFERROR(I33/G33,0)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"K33","v":140,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L33","v":0.777778,"f":"=IFERROR(K33/G33,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"M33","v":0.8361,"f":"=ROUND(J33*0.35+L33*0.65,4)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"N33","v":"مطابق ومقبول فنياً","fg":"#059669","b":true,"al":"center"},{"c":"O33","v":"م. ماجد الشهري","fg":"#334155","al":"center"}]},{"r":34,"h":36.0,"cells":[{"c":"A34","v":"MEP-ACT-030","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B34","v":"2026-10-19","fg":"#334155","al":"center"},{"c":"C34","v":"MEP-SYS-06","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D34","v":"الإنذار والتيار الخفيف","b":true,"al":"center"},{"c":"E34","v":"لوحات التحكم الميدانية الرقمية DDC Panels لنظام إدارة المبنى الذكي BMS","bg":"#F8FAFC"},{"c":"F34","v":"غرف الخدمات الميكانيكية والكهربائية","fg":"#334155"},{"c":"G34","v":16,"in":true,"bg":"#FEF9C3","b":true,"al":"center","nf":"#,##0"},{"c":"H34","v":"عدد","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"I34","v":16,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J34","v":1,"f":"=IFERROR(I34/G34,0)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"K34","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"L34","v":0.75,"f":"=IFERROR(K34/G34,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"M34","v":0.8375,"f":"=ROUND(J34*0.35+L34*0.65,4)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"N34","v":"قيد التوصيل والبرمجة","fg":"#D97706","b":true,"al":"center"},{"c":"O34","v":"م. ماجد الشهري","fg":"#334155","al":"center"}]},{"r":35,"h":36.0,"cells":[{"c":"A35","v":"MEP-ACT-031","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B35","v":"2026-10-18","fg":"#334155","al":"center"},{"c":"C35","v":"MEP-SYS-07","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D35","v":"اختبارات التوازن والتشغيل","b":true,"al":"center"},{"c":"E35","v":"أعمال ضبط ومعايرة سريان مياه التبريد لمواسير الشلرات ومحابس الموازنة المائية"},{"c":"F35","v":"شبكة التبريد المركزية","fg":"#334155"},{"c":"G35","v":1,"in":true,"bg":"#FEF9C3","b":true,"al":"center","nf":"#,##0"},{"c":"H35","v":"مجموعة","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"I35","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J35","v":1,"f":"=IFERROR(I35/G35,0)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"K35","v":0.7,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.00"},{"c":"L35","v":0.7,"f":"=IFERROR(K35/G35,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"M35","v":0.805,"f":"=ROUND(J35*0.35+L35*0.65,4)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"N35","v":"قيد الاختبارات الميدانية","fg":"#D97706","b":true,"al":"center"},{"c":"O35","v":"م. طارق النجار","fg":"#334155","al":"center"}]},{"r":36,"h":52.0,"cells":[{"c":"A36","v":"MEP-ACT-032","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B36","v":"2026-10-21","fg":"#334155","al":"center"},{"c":"C36","v":"MEP-SYS-07","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D36","v":"اختبارات التوازن والتشغيل","b":true,"al":"center"},{"c":"E36","v":"أعمال اختبار وموازنة سريان الهواء وتوزيع الضغوط TAB لمجاري الهواء ومخارج التكييف","bg":"#F8FAFC"},{"c":"F36","v":"الأدوار المتكررة والبهو","fg":"#334155"},{"c":"G36","v":1,"in":true,"bg":"#FEF9C3","b":true,"al":"center","nf":"#,##0"},{"c":"H36","v":"مجموعة","bg":"#F1F5F9","fg":"#334155","al":"center"},{"c":"I36","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0"},{"c":"J36","v":1,"f":"=IFERROR(I36/G36,0)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"K36","v":0.65,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.00"},{"c":"L36","v":0.65,"f":"=IFERROR(K36/G36,0)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"M36","v":0.7725,"f":"=ROUND(J36*0.35+L36*0.65,4)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"N36","v":"قيد الاختبارات الميدانية","fg":"#D97706","b":true,"al":"center"},{"c":"O36","v":"م. طارق النجار","fg":"#334155","al":"center"}]},{"r":37,"h":40.0,"cells":[{"c":"A37","v":"متوسط معدلات التوريد والتركيب والإنجاز الميداني لكافة بنود الكهروميكانيك بالموقع","bg":"#F1F5F9","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G37","v":"—","bg":"#F1F5F9","al":"center"},{"c":"H37","v":"—","bg":"#F1F5F9","al":"center"},{"c":"I37","v":"—","bg":"#F1F5F9","al":"center"},{"c":"J37","v":0.983203,"f":"=AVERAGE(J5:J36)","bg":"#F1F5F9","fg":"#0284C7","b":true,"al":"center","nf":"0.0%"},{"c":"K37","v":"—","bg":"#F1F5F9","al":"center"},{"c":"L37","v":0.876973,"f":"=AVERAGE(L5:L36)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"0.0%"},{"c":"M37","v":0.91415,"f":"=AVERAGE(M5:M36)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"N37","v":"متابعة مستمرة للاستلامات","bg":"#F1F5F9","fg":"#334155","al":"center","cs":2},{"skip":true}]}]},{"name":"سجل اختبارات التشغيل والجودة","maxRow":33,"maxCol":14,"colWidths":[15.0,14.0,15.0,20.0,58.0,28.0,34.0,46.0,34.0,22.0,16.0,13.0,18.0,26.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"سجل اختبارات التشغيل التجريبي والفحوصات الفنية للأعمال الكهروميكانيكية (MEP T&C & Inspection Log)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":14},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"مصفوفة توثيق الفحوصات الهيدروستاتيكية، قياسات العزل والميجر، اختبارات تسريب الدكت، موازنة الهواء TAB، ومصفوفة الحريق والإنذار","bg":"#334155","fg":"#E2E8F0","al":"center","cs":14},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""},{"c":"N3","v":""}]},{"r":4,"h":42.0,"cells":[{"c":"A4","v":"رقم طلب الفحص","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"تاريخ الفحص","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"كود النظام","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"النظام الكهروميكانيكي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"نوع الاختبار الكهروميكانيكي التخصصي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"المواصفة والكود الحاكم","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"الموقع والشبكة الخاضعة للاختبار","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"المعيار الهندسي للقبول","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"القيمة المقاسة فعلياً","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J4","v":"نتيجة الفحص الفني","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K4","v":"الملاحظات المرصودة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L4","v":"الملاحظات المغلقة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M4","v":"حالة المعالجة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"N4","v":"استشاري الإشراف","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":36.0,"cells":[{"c":"A5","v":"RFI-TC-001","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B5","v":"2026-09-25","fg":"#334155","al":"center"},{"c":"C5","v":"MEP-SYS-01","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D5","v":"التكييف والتهوية","b":true,"al":"center"},{"c":"E5","v":"اختبار الضغط الهيدروستاتيكي لمواسير الشلرات ومياه التبريد","b":true},{"c":"F5","v":"SBC 501 / ASME B31.9","fg":"#334155","al":"center"},{"c":"G5","v":"محطة التبريد المركزية والقبو الثاني","fg":"#334155"},{"c":"H5","v":"1.5 ضعف ضغط التشغيل (15 Bar) لمدة ساعتين دون هبوط","fg":"#475569"},{"c":"I5","v":"15.0 Bar لمدة ساعتين مع ثبات تام","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"J5","v":"ناجح ومطابق للمواصفات","fg":"#059669","b":true,"al":"center"},{"c":"K5","v":0,"in":true,"bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","nf":"#,##0"},{"c":"L5","v":0,"in":true,"bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"M5","v":"مغلقة بالكامل","fg":"#059669","b":true,"al":"center"},{"c":"N5","v":"دار الهندسة - د. سامي العلي","fg":"#334155","al":"center"}]},{"r":6,"h":36.0,"cells":[{"c":"A6","v":"RFI-TC-002","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B6","v":"2026-10-02","fg":"#334155","al":"center"},{"c":"C6","v":"MEP-SYS-01","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D6","v":"التكييف والتهوية","b":true,"al":"center"},{"c":"E6","v":"اختبار تسريب الهواء لمجاري الصاج Duct Leakage Testing","bg":"#F8FAFC","b":true},{"c":"F6","v":"SMACNA HVAC Air Duct Leakage","fg":"#334155","al":"center"},{"c":"G6","v":"الأدوار المتكررة (1 إلى 3)","fg":"#334155"},{"c":"H6","v":"معدل التسريب أقل من فئة Leakage Class 3","fg":"#475569"},{"c":"I6","v":"معدل التسريب 1.8 CFM / 100 ft²","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"J6","v":"ناجح ومطابق للمواصفات","fg":"#059669","b":true,"al":"center"},{"c":"K6","v":2,"in":true,"bg":"#FEF9C3","fg":"#E11D48","b":true,"al":"center","nf":"#,##0"},{"c":"L6","v":2,"in":true,"bg":"#FEF9C3","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"M6","v":"مغلقة بالكامل","fg":"#059669","b":true,"al":"center"},{"c":"N6","v":"دار الهندسة - د. سامي العلي","fg":"#334155","al":"center"}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":"RFI-TC-003","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B7","v":"2026-10-09","fg":"#334155","al":"center"},{"c":"C7","v":"MEP-SYS-01","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D7","v":"التكييف والتهوية","b":true,"al":"center"},{"c":"E7","v":"فحص دوران واهتزازات محركات وحدات مناولة الهواء وتوازن المراوح","b":true},{"c":"F7","v":"AMCA 204 / ISO 10816","fg":"#334155","al":"center"},{"c":"G7","v":"غرف خدمات التكييف بالسطح","fg":"#334155"},{"c":"H7","v":"مستوى الاهتزاز أقل من 2.5 mm/s RMS","fg":"#475569"},{"c":"I7","v":"1.8 mm/s RMS ومحاذاة ممتازة","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"J7","v":"ناجح ومطابق للمواصفات","fg":"#059669","b":true,"al":"center"},{"c":"K7","v":1,"in":true,"bg":"#FEF9C3","fg":"#E11D48","b":true,"al":"center","nf":"#,##0"},{"c":"L7","v":1,"in":true,"bg":"#FEF9C3","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"M7","v":"مغلقة بالكامل","fg":"#059669","b":true,"al":"center"},{"c":"N7","v":"دار الهندسة - د. سامي العلي","fg":"#334155","al":"center"}]},{"r":8,"h":36.0,"cells":[{"c":"A8","v":"RFI-TC-004","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B8","v":"2026-10-16","fg":"#334155","al":"center"},{"c":"C8","v":"MEP-SYS-01","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D8","v":"التكييف والتهوية","b":true,"al":"center"},{"c":"E8","v":"اختبار عمل مخمدات الحريق الآلية الميكانيكية Fire Dampers","bg":"#F8FAFC","b":true},{"c":"F8","v":"NFPA 90A / SBC 801","fg":"#334155","al":"center"},{"c":"G8","v":"كافة اختراقات جدران الحريق بالأدوار","fg":"#334155"},{"c":"H8","v":"إغلاق أوتوماتيكي محكم 100% وإشارة للتحكم","fg":"#475569"},{"c":"I8","v":"إغلاق سليم وإشارة صحيحة باللوحة","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"J8","v":"ناجح ومطابق للمواصفات","fg":"#059669","b":true,"al":"center"},{"c":"K8","v":3,"in":true,"bg":"#FEF9C3","fg":"#E11D48","b":true,"al":"center","nf":"#,##0"},{"c":"L8","v":3,"in":true,"bg":"#FEF9C3","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"M8","v":"مغلقة بالكامل","fg":"#059669","b":true,"al":"center"},{"c":"N8","v":"دار الهندسة - د. سامي العلي","fg":"#334155","al":"center"}]},{"r":9,"h":36.0,"cells":[{"c":"A9","v":"RFI-TC-005","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B9","v":"2026-09-28","fg":"#334155","al":"center"},{"c":"C9","v":"MEP-SYS-02","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D9","v":"القوى والتوزيع الكهربائي","b":true,"al":"center"},{"c":"E9","v":"اختبار عزل الكابلات والمحولات بمقياس الميجر Megger Test 1000V","b":true},{"c":"F9","v":"SBC 401 / NETA ATS","fg":"#334155","al":"center"},{"c":"G9","v":"محولات الجهد ولوحة MDB الرئيسية","fg":"#334155"},{"c":"H9","v":"مقاومة العزل أكبر من 100 Mega-Ohm","fg":"#475569"},{"c":"I9","v":"قراءة العزل 850 Mega-Ohm","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"J9","v":"ناجح ومطابق للمواصفات","fg":"#059669","b":true,"al":"center"},{"c":"K9","v":0,"in":true,"bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","nf":"#,##0"},{"c":"L9","v":0,"in":true,"bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"M9","v":"مغلقة بالكامل","fg":"#059669","b":true,"al":"center"},{"c":"N9","v":"دار الهندسة - م. عادل الشريف","fg":"#334155","al":"center"}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":"RFI-TC-006","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B10","v":"2026-10-04","fg":"#334155","al":"center"},{"c":"C10","v":"MEP-SYS-02","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D10","v":"القوى والتوزيع الكهربائي","b":true,"al":"center"},{"c":"E10","v":"اختبار مقاومة سريان شبكة التأريض العام Earth Resistance Test","bg":"#F8FAFC","b":true},{"c":"F10","v":"IEEE 81 / SBC 401","fg":"#334155","al":"center"},{"c":"G10","v":"آبار التأريض حول مبنى المشروع","fg":"#334155"},{"c":"H10","v":"المقاومة الكلية أقل من 2.0 Ohm","fg":"#475569"},{"c":"I10","v":"المقاومة المقاسة 1.45 Ohm","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"J10","v":"ناجح ومطابق للمواصفات","fg":"#059669","b":true,"al":"center"},{"c":"K10","v":1,"in":true,"bg":"#FEF9C3","fg":"#E11D48","b":true,"al":"center","nf":"#,##0"},{"c":"L10","v":1,"in":true,"bg":"#FEF9C3","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"M10","v":"مغلقة بالكامل","fg":"#059669","b":true,"al":"center"},{"c":"N10","v":"دار الهندسة - م. عادل الشريف","fg":"#334155","al":"center"}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":"RFI-TC-007","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B11","v":"2026-10-11","fg":"#334155","al":"center"},{"c":"C11","v":"MEP-SYS-02","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D11","v":"القوى والتوزيع الكهربائي","b":true,"al":"center"},{"c":"E11","v":"فحص زمن استجابة وحقن القواطع الهوائية Primary Injection Test","b":true},{"c":"F11","v":"IEC 60947-2 / IEEE","fg":"#334155","al":"center"},{"c":"G11","v":"قواطع الهواء ACB الرئيسية بلوحة MDB","fg":"#334155"},{"c":"H11","v":"فصل القاطع عند تيار القصر وفق المنحنى","fg":"#475569"},{"c":"I11","v":"زمن الفصل 42ms ومطابق للمنحنى","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"J11","v":"ناجح ومطابق للمواصفات","fg":"#059669","b":true,"al":"center"},{"c":"K11","v":2,"in":true,"bg":"#FEF9C3","fg":"#E11D48","b":true,"al":"center","nf":"#,##0"},{"c":"L11","v":2,"in":true,"bg":"#FEF9C3","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"M11","v":"مغلقة بالكامل","fg":"#059669","b":true,"al":"center"},{"c":"N11","v":"دار الهندسة - م. عادل الشريف","fg":"#334155","al":"center"}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":"RFI-TC-008","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B12","v":"2026-10-18","fg":"#334155","al":"center"},{"c":"C12","v":"MEP-SYS-02","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D12","v":"القوى والتوزيع الكهربائي","b":true,"al":"center"},{"c":"E12","v":"فحص الاتزان الطوري وهبوط الجهد بالكابلات الرئيسية Voltage Drop","bg":"#F8FAFC","b":true},{"c":"F12","v":"SBC 401 / SEC Specs","fg":"#334155","al":"center"},{"c":"G12","v":"مغذيات لوحات الأدوار SMDB","fg":"#334155"},{"c":"H12","v":"هبوط الجهد أقل من 2.5% عند الحمل الكامل","fg":"#475569"},{"c":"I12","v":"هبوط الجهد 1.8% واتزان ممتاز","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"J12","v":"ناجح ومطابق للمواصفات","fg":"#059669","b":true,"al":"center"},{"c":"K12","v":2,"in":true,"bg":"#FEF9C3","fg":"#E11D48","b":true,"al":"center","nf":"#,##0"},{"c":"L12","v":2,"in":true,"bg":"#FEF9C3","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"M12","v":"مغلقة بالكامل","fg":"#059669","b":true,"al":"center"},{"c":"N12","v":"دار الهندسة - م. عادل الشريف","fg":"#334155","al":"center"}]},{"r":13,"h":36.0,"cells":[{"c":"A13","v":"RFI-TC-009","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B13","v":"2026-10-01","fg":"#334155","al":"center"},{"c":"C13","v":"MEP-SYS-03","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D13","v":"الإنارة وتوليد الديزل","b":true,"al":"center"},{"c":"E13","v":"اختبار تحميل مولد الطوارئ ببنك الأحمال Load Bank Test 100%","b":true},{"c":"F13","v":"NFPA 110 / ISO 8528","fg":"#334155","al":"center"},{"c":"G13","v":"محطة المولد وغرفة الوقود","fg":"#334155"},{"c":"H13","v":"العمل بنسبة 100% لمدة ساعتين دون ارتفاع حرارة","fg":"#475569"},{"c":"I13","v":"تحميل 100% والتردد 60Hz مستقر","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"J13","v":"ناجح ومطابق للمواصفات","fg":"#059669","b":true,"al":"center"},{"c":"K13","v":1,"in":true,"bg":"#FEF9C3","fg":"#E11D48","b":true,"al":"center","nf":"#,##0"},{"c":"L13","v":1,"in":true,"bg":"#FEF9C3","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"M13","v":"مغلقة بالكامل","fg":"#059669","b":true,"al":"center"},{"c":"N13","v":"دار الهندسة - م. عادل الشريف","fg":"#334155","al":"center"}]},{"r":14,"h":36.0,"cells":[{"c":"A14","v":"RFI-TC-010","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B14","v":"2026-10-08","fg":"#334155","al":"center"},{"c":"C14","v":"MEP-SYS-03","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D14","v":"الإنارة وتوليد الديزل","b":true,"al":"center"},{"c":"E14","v":"فحص زمن تشغيل وتحويل لوحة ATS عند انقطاع التيار العمومي","bg":"#F8FAFC","b":true},{"c":"F14","v":"NFPA 110 / SBC 801","fg":"#334155","al":"center"},{"c":"G14","v":"لوحة ATS الرئيسية وغرفة التحكم","fg":"#334155"},{"c":"H14","v":"تشغيل المولد والتحويل في أقل من 10 ثوانٍ","fg":"#475569"},{"c":"I14","v":"زمن الاستجابة والتحويل 7.8 ثانية","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"J14","v":"ناجح ومطابق للمواصفات","fg":"#059669","b":true,"al":"center"},{"c":"K14","v":0,"in":true,"bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","nf":"#,##0"},{"c":"L14","v":0,"in":true,"bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"M14","v":"مغلقة بالكامل","fg":"#059669","b":true,"al":"center"},{"c":"N14","v":"دار الهندسة - م. عادل الشريف","fg":"#334155","al":"center"}]},{"r":15,"h":36.0,"cells":[{"c":"A15","v":"RFI-TC-011","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B15","v":"2026-10-15","fg":"#334155","al":"center"},{"c":"C15","v":"MEP-SYS-03","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D15","v":"الإنارة وتوليد الديزل","b":true,"al":"center"},{"c":"E15","v":"قياس شدة الإضاءة ومستويات اللوكس Lux Level Testing","b":true},{"c":"F15","v":"CIBSE Code / SBC 401","fg":"#334155","al":"center"},{"c":"G15","v":"المكاتب وممرات الهروب والمواقف","fg":"#334155"},{"c":"H15","v":"متوسط 450 Lux بالمكاتب و150 بالممرات","fg":"#475569"},{"c":"I15","v":"متوسط 480 Lux وانتظام ممتاز","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"J15","v":"ناجح ومطابق للمواصفات","fg":"#059669","b":true,"al":"center"},{"c":"K15","v":4,"in":true,"bg":"#FEF9C3","fg":"#E11D48","b":true,"al":"center","nf":"#,##0"},{"c":"L15","v":3,"in":true,"bg":"#FEF9C3","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"M15","v":"قيد المعالجة","fg":"#D97706","b":true,"al":"center"},{"c":"N15","v":"دار الهندسة - م. عادل الشريف","fg":"#334155","al":"center"}]},{"r":16,"h":36.0,"cells":[{"c":"A16","v":"RFI-TC-012","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B16","v":"2026-10-21","fg":"#334155","al":"center"},{"c":"C16","v":"MEP-SYS-03","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D16","v":"الإنارة وتوليد الديزل","b":true,"al":"center"},{"c":"E16","v":"اختبار بطاريات إنارة الطوارئ واللوحات الإرشادية لمدة 90 دقيقة","bg":"#F8FAFC","b":true},{"c":"F16","v":"NFPA 101 / SBC 801","fg":"#334155","al":"center"},{"c":"G16","v":"ممرات ومخارج الطوارئ بالمشروع","fg":"#334155"},{"c":"H16","v":"استمرار الإنارة لمدة 90 دقيقة كاملة","fg":"#475569"},{"c":"I16","v":"عمل البطاريات 95 دقيقة متواصلة","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"J16","v":"ناجح ومطابق للمواصفات","fg":"#059669","b":true,"al":"center"},{"c":"K16","v":1,"in":true,"bg":"#FEF9C3","fg":"#E11D48","b":true,"al":"center","nf":"#,##0"},{"c":"L16","v":1,"in":true,"bg":"#FEF9C3","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"M16","v":"مغلقة بالكامل","fg":"#059669","b":true,"al":"center"},{"c":"N16","v":"دار الهندسة - م. عادل الشريف","fg":"#334155","al":"center"}]},{"r":17,"h":36.0,"cells":[{"c":"A17","v":"RFI-TC-013","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B17","v":"2026-09-29","fg":"#334155","al":"center"},{"c":"C17","v":"MEP-SYS-04","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D17","v":"التغذية والصرف الصحي","b":true,"al":"center"},{"c":"E17","v":"اختبار ضغط شبكات مياه التغذية الباردة والساخنة PPR","b":true},{"c":"F17","v":"SBC 701 / DIN 1988","fg":"#334155","al":"center"},{"c":"G17","v":"دورات المياه وغرف الخدمات بالأدوار","fg":"#334155"},{"c":"H17","v":"ضغط 10 Bar لمدة 24 ساعة دون أي تسريب","fg":"#475569"},{"c":"I17","v":"ثبات الضغط على 10.0 Bar","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"J17","v":"ناجح ومطابق للمواصفات","fg":"#059669","b":true,"al":"center"},{"c":"K17","v":1,"in":true,"bg":"#FEF9C3","fg":"#E11D48","b":true,"al":"center","nf":"#,##0"},{"c":"L17","v":1,"in":true,"bg":"#FEF9C3","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"M17","v":"مغلقة بالكامل","fg":"#059669","b":true,"al":"center"},{"c":"N17","v":"دار الهندسة - م. حسام الدين","fg":"#334155","al":"center"}]},{"r":18,"h":36.0,"cells":[{"c":"A18","v":"RFI-TC-014","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B18","v":"2026-10-06","fg":"#334155","al":"center"},{"c":"C18","v":"MEP-SYS-04","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D18","v":"التغذية والصرف الصحي","b":true,"al":"center"},{"c":"E18","v":"اختبار امتلاء وتسريب مواسير الصرف الصحي Water Test بالجاذبية","bg":"#F8FAFC","b":true},{"c":"F18","v":"SBC 701 / IPC Code","fg":"#334155","al":"center"},{"c":"G18","v":"أعمدة الصرف الرأسية ومدادات الأسقف","fg":"#334155"},{"c":"H18","v":"ملء العمود بالمياه لمدة 4 ساعات دون انخفاض","fg":"#475569"},{"c":"I18","v":"لا يوجد أي رشح أو تسريب بالوصلات","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"J18","v":"ناجح ومطابق للمواصفات","fg":"#059669","b":true,"al":"center"},{"c":"K18","v":2,"in":true,"bg":"#FEF9C3","fg":"#E11D48","b":true,"al":"center","nf":"#,##0"},{"c":"L18","v":2,"in":true,"bg":"#FEF9C3","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"M18","v":"مغلقة بالكامل","fg":"#059669","b":true,"al":"center"},{"c":"N18","v":"دار الهندسة - م. حسام الدين","fg":"#334155","al":"center"}]},{"r":19,"h":36.0,"cells":[{"c":"A19","v":"RFI-TC-015","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B19","v":"2026-10-13","fg":"#334155","al":"center"},{"c":"C19","v":"MEP-SYS-04","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D19","v":"التغذية والصرف الصحي","b":true,"al":"center"},{"c":"E19","v":"فحص معايرة محطة مضخات تعزيز الضغط VFD وحساسات الضغط","b":true},{"c":"F19","v":"SBC 701 / Manufacturer Specs","fg":"#334155","al":"center"},{"c":"G19","v":"غرفة المضخات الميكانيكية","fg":"#334155"},{"c":"H19","v":"تثبيت ضغط الشبكة على 4.5 Bar مع تباين السريان","fg":"#475569"},{"c":"I19","v":"استجابة فورية وتثبيت ممتاز للضغط","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"J19","v":"ناجح ومطابق للمواصفات","fg":"#059669","b":true,"al":"center"},{"c":"K19","v":1,"in":true,"bg":"#FEF9C3","fg":"#E11D48","b":true,"al":"center","nf":"#,##0"},{"c":"L19","v":1,"in":true,"bg":"#FEF9C3","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"M19","v":"مغلقة بالكامل","fg":"#059669","b":true,"al":"center"},{"c":"N19","v":"دار الهندسة - م. حسام الدين","fg":"#334155","al":"center"}]},{"r":20,"h":36.0,"cells":[{"c":"A20","v":"RFI-TC-016","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B20","v":"2026-10-19","fg":"#334155","al":"center"},{"c":"C20","v":"MEP-SYS-04","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D20","v":"التغذية والصرف الصحي","b":true,"al":"center"},{"c":"E20","v":"اختبار عوامات ومضخات تصريف مياه البيارات الغاطسة Sump Pumps","bg":"#F8FAFC","b":true},{"c":"F20","v":"SBC 701 / IPC Code","fg":"#334155","al":"center"},{"c":"G20","v":"بيارات القبو وغرف المحطات","fg":"#334155"},{"c":"H20","v":"تشغيل أوتوماتيكي بالتبادل وإنذار الفائض","fg":"#475569"},{"c":"I20","v":"تشغيل سليم وتبادل أوتوماتيكي دقيق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"J20","v":"ناجح ومطابق للمواصفات","fg":"#059669","b":true,"al":"center"},{"c":"K20","v":0,"in":true,"bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","nf":"#,##0"},{"c":"L20","v":0,"in":true,"bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"M20","v":"مغلقة بالكامل","fg":"#059669","b":true,"al":"center"},{"c":"N20","v":"دار الهندسة - م. حسام الدين","fg":"#334155","al":"center"}]},{"r":21,"h":36.0,"cells":[{"c":"A21","v":"RFI-TC-017","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B21","v":"2026-10-03","fg":"#334155","al":"center"},{"c":"C21","v":"MEP-SYS-05","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D21","v":"مكافحة الحريق والمضخات","b":true,"al":"center"},{"c":"E21","v":"اختبار سريان وضغط مضخة الحريق ومطابقة المنحنى Pump Flow Test","b":true},{"c":"F21","v":"NFPA 20 / SBC 801","fg":"#334155","al":"center"},{"c":"G21","v":"غرفة مضخات الحريق بالقبو الثاني","fg":"#334155"},{"c":"H21","v":"100% تدفق عند الضغط المقنن و150% عند 65%","fg":"#475569"},{"c":"I21","v":"1000 GPM @ 10 Bar و1500 GPM @ 7.2 Bar","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"J21","v":"ناجح ومطابق للمواصفات","fg":"#059669","b":true,"al":"center"},{"c":"K21","v":0,"in":true,"bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","nf":"#,##0"},{"c":"L21","v":0,"in":true,"bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"M21","v":"مغلقة بالكامل","fg":"#059669","b":true,"al":"center"},{"c":"N21","v":"دار الهندسة - م. حسام الدين","fg":"#334155","al":"center"}]},{"r":22,"h":36.0,"cells":[{"c":"A22","v":"RFI-TC-018","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B22","v":"2026-10-10","fg":"#334155","al":"center"},{"c":"C22","v":"MEP-SYS-05","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D22","v":"مكافحة الحريق والمضخات","b":true,"al":"center"},{"c":"E22","v":"اختبار الضغط الهيدروستاتيكي لشبكة الرشاشات المائية وصواعد الحريق","bg":"#F8FAFC","b":true},{"c":"F22","v":"NFPA 13 / NFPA 14","fg":"#334155","al":"center"},{"c":"G22","v":"شبكات الأدوار ومواقف السيارات","fg":"#334155"},{"c":"H22","v":"ضغط 200 PSI (14 Bar) لمدة ساعتين دون هبوط","fg":"#475569"},{"c":"I22","v":"ثبات تام على 14 Bar لمدة ساعتين","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"J22","v":"ناجح ومطابق للمواصفات","fg":"#059669","b":true,"al":"center"},{"c":"K22","v":2,"in":true,"bg":"#FEF9C3","fg":"#E11D48","b":true,"al":"center","nf":"#,##0"},{"c":"L22","v":2,"in":true,"bg":"#FEF9C3","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"M22","v":"مغلقة بالكامل","fg":"#059669","b":true,"al":"center"},{"c":"N22","v":"دار الهندسة - م. حسام الدين","fg":"#334155","al":"center"}]},{"r":23,"h":36.0,"cells":[{"c":"A23","v":"RFI-TC-019","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B23","v":"2026-10-17","fg":"#334155","al":"center"},{"c":"C23","v":"MEP-SYS-05","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D23","v":"مكافحة الحريق والمضخات","b":true,"al":"center"},{"c":"E23","v":"فحص عمل محابس التحكم ومفاتيح سريان المياه Water Flow Switches","b":true},{"c":"F23","v":"NFPA 13 / NFPA 72","fg":"#334155","al":"center"},{"c":"G23","v":"محابس التحكم الزونية بكل دور Zone Control","fg":"#334155"},{"c":"H23","v":"إطلاق إشارة الإنذار خلال 30 إلى 60 ثانية","fg":"#475569"},{"c":"I23","v":"إرسال الإشارة للوحة الإنذار خلال 38 ثانية","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"J23","v":"ناجح ومطابق للمواصفات","fg":"#059669","b":true,"al":"center"},{"c":"K23","v":3,"in":true,"bg":"#FEF9C3","fg":"#E11D48","b":true,"al":"center","nf":"#,##0"},{"c":"L23","v":2,"in":true,"bg":"#FEF9C3","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"M23","v":"قيد المعالجة","fg":"#D97706","b":true,"al":"center"},{"c":"N23","v":"دار الهندسة - م. حسام الدين","fg":"#334155","al":"center"}]},{"r":24,"h":36.0,"cells":[{"c":"A24","v":"RFI-TC-020","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B24","v":"2026-10-22","fg":"#334155","al":"center"},{"c":"C24","v":"MEP-SYS-05","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D24","v":"مكافحة الحريق والمضخات","b":true,"al":"center"},{"c":"E24","v":"اختبار سلامة وإحكام غرف الإطفاء بالغاز النظيف Door Fan Test","bg":"#F8FAFC","b":true},{"c":"F24","v":"NFPA 2001 / ISO 14520","fg":"#334155","al":"center"},{"c":"G24","v":"غرف السيرفر وغرفة التحكم والمحولات","fg":"#334155"},{"c":"H24","v":"فترة احتجاز الغاز التركيزي لا تقل عن 10 دقائق","fg":"#475569"},{"c":"I24","v":"زمن الاحتجاز المقاس 12.5 دقيقة","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"J24","v":"ناجح ومطابق للمواصفات","fg":"#059669","b":true,"al":"center"},{"c":"K24","v":1,"in":true,"bg":"#FEF9C3","fg":"#E11D48","b":true,"al":"center","nf":"#,##0"},{"c":"L24","v":1,"in":true,"bg":"#FEF9C3","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"M24","v":"مغلقة بالكامل","fg":"#059669","b":true,"al":"center"},{"c":"N24","v":"دار الهندسة - م. حسام الدين","fg":"#334155","al":"center"}]},{"r":25,"h":36.0,"cells":[{"c":"A25","v":"RFI-TC-021","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B25","v":"2026-10-05","fg":"#334155","al":"center"},{"c":"C25","v":"MEP-SYS-06","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D25","v":"الإنذار والتيار الخفيف","b":true,"al":"center"},{"c":"E25","v":"فحص برمجة وعنونة كواشف الإنذار من الحريق وسارينات الإخلاء","b":true},{"c":"F25","v":"NFPA 72 / SBC 801","fg":"#334155","al":"center"},{"c":"G25","v":"الأدوار المتكررة والبهو والمواقف","fg":"#334155"},{"c":"H25","v":"مطابقة رقم الكاشف لموقعه بالخرائط 100%","fg":"#475569"},{"c":"I25","v":"تطابق كامل لجميع العناوين والإشارات","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"J25","v":"ناجح ومطابق للمواصفات","fg":"#059669","b":true,"al":"center"},{"c":"K25","v":4,"in":true,"bg":"#FEF9C3","fg":"#E11D48","b":true,"al":"center","nf":"#,##0"},{"c":"L25","v":3,"in":true,"bg":"#FEF9C3","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"M25","v":"قيد المعالجة","fg":"#D97706","b":true,"al":"center"},{"c":"N25","v":"دار الهندسة - م. زياد البشري","fg":"#334155","al":"center"}]},{"r":26,"h":36.0,"cells":[{"c":"A26","v":"RFI-TC-022","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B26","v":"2026-10-12","fg":"#334155","al":"center"},{"c":"C26","v":"MEP-SYS-06","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D26","v":"الإنذار والتيار الخفيف","b":true,"al":"center"},{"c":"E26","v":"اختبار مصفوفة الحريق والتحكم التفاعلي Fire Cause & Effect Matrix","bg":"#F8FAFC","b":true},{"c":"F26","v":"NFPA 72 / SBC 801","fg":"#334155","al":"center"},{"c":"G26","v":"المبنى بالكامل والربط مع التكييف والمصاعد","fg":"#334155"},{"c":"H26","v":"إيقاف التكييف، تشغيل مراوح الضغط، هبوط المصاعد","fg":"#475569"},{"c":"I26","v":"تنفيذ سليم لكافة سيناريوهات الإخلاء","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"J26","v":"ناجح ومطابق للمواصفات","fg":"#059669","b":true,"al":"center"},{"c":"K26","v":5,"in":true,"bg":"#FEF9C3","fg":"#E11D48","b":true,"al":"center","nf":"#,##0"},{"c":"L26","v":4,"in":true,"bg":"#FEF9C3","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"M26","v":"قيد المعالجة","fg":"#D97706","b":true,"al":"center"},{"c":"N26","v":"دار الهندسة - م. زياد البشري","fg":"#334155","al":"center"}]},{"r":27,"h":36.0,"cells":[{"c":"A27","v":"RFI-TC-023","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B27","v":"2026-10-16","fg":"#334155","al":"center"},{"c":"C27","v":"MEP-SYS-06","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D27","v":"الإنذار والتيار الخفيف","b":true,"al":"center"},{"c":"E27","v":"فحص سرعة وزوايا ووضوح كاميرات المراقبة IP CCTV والتسجيل","b":true},{"c":"F27","v":"Security Directives / SBC","fg":"#334155","al":"center"},{"c":"G27","v":"محيط المبنى والمداخل والأسوار","fg":"#334155"},{"c":"H27","v":"تغطية كاملة مع رؤية ليلية وتخزين 60 يوماً","fg":"#475569"},{"c":"I27","v":"جودة 4K وتخزين مستمر ومطابق للاشتراطات","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"J27","v":"ناجح ومطابق للمواصفات","fg":"#059669","b":true,"al":"center"},{"c":"K27","v":2,"in":true,"bg":"#FEF9C3","fg":"#E11D48","b":true,"al":"center","nf":"#,##0"},{"c":"L27","v":2,"in":true,"bg":"#FEF9C3","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"M27","v":"مغلقة بالكامل","fg":"#059669","b":true,"al":"center"},{"c":"N27","v":"دار الهندسة - م. زياد البشري","fg":"#334155","al":"center"}]},{"r":28,"h":36.0,"cells":[{"c":"A28","v":"RFI-TC-024","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B28","v":"2026-10-20","fg":"#334155","al":"center"},{"c":"C28","v":"MEP-SYS-06","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D28","v":"الإنذار والتيار الخفيف","b":true,"al":"center"},{"c":"E28","v":"اختبار قراءة حساسات الحرارة والضغط ولوحات BMS DDC Controllers","bg":"#F8FAFC","b":true},{"c":"F28","v":"ASHRAE BACnet / BTL","fg":"#334155","al":"center"},{"c":"G28","v":"غرف خدمات التكييف واللوحات","fg":"#334155"},{"c":"H28","v":"استجابة الإشارات الرقمية والتناظرية بدقة","fg":"#475569"},{"c":"I28","v":"قراءات دقيقة وتحكم سلس عبر الشاشة","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"J28","v":"ناجح ومطابق للمواصفات","fg":"#059669","b":true,"al":"center"},{"c":"K28","v":3,"in":true,"bg":"#FEF9C3","fg":"#E11D48","b":true,"al":"center","nf":"#,##0"},{"c":"L28","v":2,"in":true,"bg":"#FEF9C3","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"M28","v":"قيد المعالجة","fg":"#D97706","b":true,"al":"center"},{"c":"N28","v":"دار الهندسة - م. زياد البشري","fg":"#334155","al":"center"}]},{"r":29,"h":36.0,"cells":[{"c":"A29","v":"RFI-TC-025","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B29","v":"2026-10-14","fg":"#334155","al":"center"},{"c":"C29","v":"MEP-SYS-07","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D29","v":"اختبارات التوازن والتشغيل","b":true,"al":"center"},{"c":"E29","v":"فحص موازنة معدلات سريان الهواء لمخارج التكييف بالهود Flow Hood","b":true},{"c":"F29","v":"ASHRAE Standard 111 / NEBB","fg":"#334155","al":"center"},{"c":"G29","v":"الأدوار المتكررة (1 إلى 4)","fg":"#334155"},{"c":"H29","v":"نسبة التدفق الفعلي ضمن ±10% من التصميم","fg":"#475569"},{"c":"I29","v":"تفاوت تدفق الهواء في حدود ±6.5%","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"J29","v":"ناجح ومطابق للمواصفات","fg":"#059669","b":true,"al":"center"},{"c":"K29","v":4,"in":true,"bg":"#FEF9C3","fg":"#E11D48","b":true,"al":"center","nf":"#,##0"},{"c":"L29","v":3,"in":true,"bg":"#FEF9C3","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"M29","v":"قيد المعالجة","fg":"#D97706","b":true,"al":"center"},{"c":"N29","v":"دار الهندسة - م. طارق النجار","fg":"#334155","al":"center"}]},{"r":30,"h":36.0,"cells":[{"c":"A30","v":"RFI-TC-026","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B30","v":"2026-10-18","fg":"#334155","al":"center"},{"c":"C30","v":"MEP-SYS-07","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D30","v":"اختبارات التوازن والتشغيل","b":true,"al":"center"},{"c":"E30","v":"اختبار موازنة سريان مياه التبريد بمحابس الضغط التفاضلي PICV","bg":"#F8FAFC","b":true},{"c":"F30","v":"ASHRAE 111 / BSRIA","fg":"#334155","al":"center"},{"c":"G30","v":"شبكة التبريد ووحدات FCU بالأدوار","fg":"#334155"},{"c":"H30","v":"ضبط السريان GPM لكل وحدة وفق الحمل","fg":"#475569"},{"c":"I30","v":"موازنة دقيقة لكافة خطوط التبريد","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"J30","v":"ناجح ومطابق للمواصفات","fg":"#059669","b":true,"al":"center"},{"c":"K30","v":2,"in":true,"bg":"#FEF9C3","fg":"#E11D48","b":true,"al":"center","nf":"#,##0"},{"c":"L30","v":2,"in":true,"bg":"#FEF9C3","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"M30","v":"مغلقة بالكامل","fg":"#059669","b":true,"al":"center"},{"c":"N30","v":"دار الهندسة - م. طارق النجار","fg":"#334155","al":"center"}]},{"r":31,"h":36.0,"cells":[{"c":"A31","v":"RFI-TC-027","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B31","v":"2026-10-21","fg":"#334155","al":"center"},{"c":"C31","v":"MEP-SYS-07","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D31","v":"اختبارات التوازن والتشغيل","b":true,"al":"center"},{"c":"E31","v":"قياس الفروق الحرارية لمياه التبريد Delta-T لمحطة الشلرات","b":true},{"c":"F31","v":"AHRI 550/590 / ASHRAE","fg":"#334155","al":"center"},{"c":"G31","v":"محطة الشلرات المركزية","fg":"#334155"},{"c":"H31","v":"فارق درجات الحرارة لا يقل عن 10 درجات فهرنهايت","fg":"#475569"},{"c":"I31","v":"فارق الحرارة المقاس 10.4°F","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"J31","v":"ناجح ومطابق للمواصفات","fg":"#059669","b":true,"al":"center"},{"c":"K31","v":1,"in":true,"bg":"#FEF9C3","fg":"#E11D48","b":true,"al":"center","nf":"#,##0"},{"c":"L31","v":1,"in":true,"bg":"#FEF9C3","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"M31","v":"مغلقة بالكامل","fg":"#059669","b":true,"al":"center"},{"c":"N31","v":"دار الهندسة - م. طارق النجار","fg":"#334155","al":"center"}]},{"r":32,"h":36.0,"cells":[{"c":"A32","v":"RFI-TC-028","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center"},{"c":"B32","v":"2026-10-22","fg":"#334155","al":"center"},{"c":"C32","v":"MEP-SYS-07","bg":"#F1F5F9","b":true,"al":"center"},{"c":"D32","v":"اختبارات التوازن والتشغيل","b":true,"al":"center"},{"c":"E32","v":"اختبار ضغوط سلالم الهروب ومراوح سحب الدخان Stairwell Pressurization","bg":"#F8FAFC","b":true},{"c":"F32","v":"NFPA 92 / SBC 801","fg":"#334155","al":"center"},{"c":"G32","v":"سلالم الهروب ومخارج الطوارئ","fg":"#334155"},{"c":"H32","v":"فارق ضغط بين 25 إلى 50 Pascal عند غلق الأبواب","fg":"#475569"},{"c":"I32","v":"فارق الضغط المقاس 38 Pascal","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"J32","v":"ناجح ومطابق للمواصفات","fg":"#059669","b":true,"al":"center"},{"c":"K32","v":2,"in":true,"bg":"#FEF9C3","fg":"#E11D48","b":true,"al":"center","nf":"#,##0"},{"c":"L32","v":1,"in":true,"bg":"#FEF9C3","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"M32","v":"قيد المعالجة","fg":"#D97706","b":true,"al":"center"},{"c":"N32","v":"دار الهندسة - م. طارق النجار","fg":"#334155","al":"center"}]},{"r":33,"h":40.0,"cells":[{"c":"A33","v":"إجمالي الفحوصات المنفذة وحصر الملاحظات المرصودة والمغلقة باختبارات التشغيل","bg":"#F1F5F9","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"K33","v":50,"f":"=SUM(K5:K32)","bg":"#F1F5F9","fg":"#E11D48","b":true,"al":"center","nf":"#,##0"},{"c":"L33","v":43,"f":"=SUM(L5:L32)","bg":"#F1F5F9","fg":"#059669","b":true,"al":"center","nf":"#,##0"},{"c":"M33","v":"معدل إغلاق ملاحظات مرتفع ومستقر","bg":"#F1F5F9","fg":"#334155","al":"center","cs":2},{"skip":true}]}]}]}