{"slug":"mep-testing-commissioning-log","sheets":[{"name":"معايير اختبارات التشغيل T&C","maxRow":14,"maxCol":6,"colWidths":[8.0,56.0,18.0,14.0,22.0,22.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"معايير ولوحة تحكم اختبارات التشغيل والتسليم للأعمال الكهروميكانيكية (MEP Testing & Commissioning Log)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"تتبع اختبارات العزل Megger، موازنة الهواء والماء TAB، ضغط الشبكات، والتشغيل التكاملي طبقاً لـ ASHRAE و NFPA","bg":"#1D4ED8","fg":"#DBEAFE","al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":12.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"إجمالي حزم اختبارات الـ T&C","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"الاختبارات القياسية والناجحة","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"الاختبارات المتبقية للربط التكاملي","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center"},{"c":"F4","v":"نسبة جاهزية التسليم الابتدائي MEP","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center"}]},{"r":5,"h":42.0,"cells":[{"c":"A5","v":8,"f":"=COUNTA('سجل اختبارات التشغيل T&C Log'!A5:A12)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0","cs":2},{"skip":true},{"c":"C5","v":0,"f":"=COUNTIF('سجل اختبارات التشغيل T&C Log'!H5:H12,\"*محقق*\")","bg":"#DCFCE7","b":true,"al":"center","nf":"#,##0","cs":2},{"skip":true},{"c":"E5","v":0,"f":"=COUNTIF('سجل اختبارات التشغيل T&C Log'!H5:H12,\"*قيد*\")","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0"},{"c":"F5","v":0,"f":"=B5/A5","bg":"#EFF6FF","b":true,"al":"center","nf":"0.0%"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"اختبار كهروميكانيكي رئيسي","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C6","v":"Approved & Signed Off","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"E6","v":"Pending Witness Tests","bg":"#F1F5F9","fg":"#64748B","al":"center"},{"c":"F6","v":"T&C Completion Rate %","bg":"#F1F5F9","fg":"#64748B","al":"center"}]},{"r":7,"h":14.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"جدول الإعدادات المركزية والمعايير المرجعية (Central Setup & Parameters)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":40.0,"cells":[{"c":"A9","v":"م","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"بيان المعامل / بند الإعداد المركزي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"القيمة / الفئة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"الوحدة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"التوصيف الفني وملاحظات التطبيق","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":1,"b":true,"al":"center"},{"c":"B10","v":"معيار اختبار مقاومة عزل الكابلات الكهربائية (Megger Insulation Test)","b":true},{"c":"C10","v":100,"in":true,"bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"D10","v":"ميجا أوم","fg":"#1E293B","al":"center"},{"c":"E10","v":"فحص عزل الكابلات بجهد 500V/1000V DC قبل إطلاق التيار","fg":"#1E293B","cs":2},{"skip":true}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":2,"b":true,"al":"center"},{"c":"B11","v":"معيار التفاوت المسموح في موازنة الهواء والماء (TAB Tolerance %)","b":true},{"c":"C11","v":0.1,"in":true,"bg":"#EFF6FF","b":true,"al":"center","nf":"0.0%"},{"c":"D11","v":"%","fg":"#1E293B","al":"center"},{"c":"E11","v":"تفاوت تدفق الهواء CFM والمياه GPM المسموح ±10% طبقاً لـ NEBB/ASHRAE","fg":"#1E293B","cs":2},{"skip":true}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":3,"b":true,"al":"center"},{"c":"B12","v":"ضغط الاختبار الهيدروستاتيكي لشبكات إطفاء الحريق والمياه","b":true},{"c":"C12","v":14,"in":true,"bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"D12","v":"بار","fg":"#1E293B","al":"center"},{"c":"E12","v":"فحص شبكات الحريق على 13.8 بار (200 psi) لمدة ساعتين طبقاً لـ NFPA 13","fg":"#1E293B","cs":2},{"skip":true}]},{"r":13,"h":14.0,"cells":[{"c":"A13","v":""},{"c":"B13","v":""},{"c":"C13","v":""},{"c":"D13","v":""},{"c":"E13","v":""},{"c":"F13","v":""}]},{"r":14,"h":104.0,"cells":[{"c":"A14","v":"إعداد مهندس المكتب الفني / المختص\nالاسم: .........................................\nالتوقيع والتاريخ: .............................","bg":"#F1F5F9","b":true,"al":"center","cs":2},{"skip":true},{"c":"C14","v":"مراجعة وتدقيق مدير المشروع\nالاسم: .........................................\nالتوقيع والتاريخ: .............................","bg":"#F1F5F9","b":true,"al":"center","cs":2},{"skip":true},{"c":"E14","v":"اعتماد الاستشاري / الإدارة العليا\nالاسم: .........................................\nالتوقيع والختم: ...............................","bg":"#F1F5F9","b":true,"al":"center","cs":2},{"skip":true}]}]},{"name":"سجل اختبارات التشغيل T&C Log","maxRow":14,"maxCol":8,"colWidths":[13.0,56.0,14.0,16.0,18.0,18.0,14.0,20.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"السجل التنفيذي لمتابعة اختبارات الفحص والتشغيل التجريبي للأنظمة الكهروميكانيكية (MEP T&C Master Register)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"يرصد حالة كل اختبار كهروميكانيكي من الفحص المبدئي Pre-Commissioning حتى التشغيل النهائي واعتماد الاستشاري","bg":"#1D4ED8","fg":"#DBEAFE","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":12.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":40.0,"cells":[{"c":"A4","v":"كود الاختبار","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"النظام الكهروميكانيكي ومعدات الاختبار (MEP System & Test)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"التخصص","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"الكود المرجعي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"القيمة المستهدفة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"النتيجة الفعلية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"تاريخ الاختبار","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"حالة الاعتماد النهائي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"TC-EL-01","b":true,"al":"center"},{"c":"B5","v":"اختبار مقاومة العزل والاستمرارية لكابلات التغذية الرئيسية والفرعية (Megger Test)","b":true},{"c":"C5","v":"كهرباء","fg":"#1E293B","al":"center"},{"c":"D5","v":"IEC 60364","fg":"#1E293B","al":"center"},{"c":"E5","v":">= 100 MOhm","fg":"#1E293B","al":"center"},{"c":"F5","v":"450 MOhm","fg":"#1E293B","al":"center"},{"c":"G5","v":"02-10-2026","fg":"#1E293B","al":"center"},{"c":"H5","v":"محقق (Approved)","b":true,"al":"center"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"TC-EL-02","b":true,"al":"center"},{"c":"B6","v":"اختبار مقاومة بئر التأريض الرئيسي للمبنى (Earth Pit Resistance Test)","b":true},{"c":"C6","v":"كهرباء","fg":"#1E293B","al":"center"},{"c":"D6","v":"IEEE 81 / SBC","fg":"#1E293B","al":"center"},{"c":"E6","v":"<= 2.0 Ohm","fg":"#1E293B","al":"center"},{"c":"F6","v":"1.15 Ohm","fg":"#1E293B","al":"center"},{"c":"G6","v":"04-10-2026","fg":"#1E293B","al":"center"},{"c":"H6","v":"محقق (Approved)","b":true,"al":"center"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"TC-EL-03","b":true,"al":"center"},{"c":"B7","v":"اختبار التشغيل الوظيفي للوحات التوزيع الرئيسية وربط المولد الاحتياطي ATS","b":true},{"c":"C7","v":"كهرباء","fg":"#1E293B","al":"center"},{"c":"D7","v":"NFPA 110","fg":"#1E293B","al":"center"},{"c":"E7","v":"نقل خلال <= 10 ثوانٍ","fg":"#1E293B","al":"center"},{"c":"F7","v":"6.5 ثانية","fg":"#1E293B","al":"center"},{"c":"G7","v":"06-10-2026","fg":"#1E293B","al":"center"},{"c":"H7","v":"محقق (Approved)","b":true,"al":"center"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"TC-HV-01","b":true,"al":"center"},{"c":"B8","v":"اختبار تسريب الهواء لدكتات التكييف وموازنة التدفق (Duct Leakage & Air TAB)","b":true},{"c":"C8","v":"تكييف HVAC","fg":"#1E293B","al":"center"},{"c":"D8","v":"ASHRAE 111 / SMACNA","fg":"#1E293B","al":"center"},{"c":"E8","v":"Cfm Design ±10%","fg":"#1E293B","al":"center"},{"c":"F8","v":"محقق (+3.5%)","fg":"#1E293B","al":"center"},{"c":"G8","v":"08-10-2026","fg":"#1E293B","al":"center"},{"c":"H8","v":"محقق (Approved)","b":true,"al":"center"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"TC-HV-02","b":true,"al":"center"},{"c":"B9","v":"اختبار التشغيل التجريبي لوحدات التكييف المدمجة والمراوح لمدة 72 ساعة متواصلة","b":true},{"c":"C9","v":"تكييف HVAC","fg":"#1E293B","al":"center"},{"c":"D9","v":"ASHRAE 202","fg":"#1E293B","al":"center"},{"c":"E9","v":"22±1°C بدون اهتزاز","fg":"#1E293B","al":"center"},{"c":"F9","v":"21.8°C مستقر","fg":"#1E293B","al":"center"},{"c":"G9","v":"11-10-2026","fg":"#1E293B","al":"center"},{"c":"H9","v":"محقق (Approved)","b":true,"al":"center"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":"TC-PL-01","b":true,"al":"center"},{"c":"B10","v":"اختبار الضغط الهيدروستاتيكي وتعقيم شبكة مياه التغذية ومضخات الرفع (Booster Set)","b":true},{"c":"C10","v":"صحي ومياه","fg":"#1E293B","al":"center"},{"c":"D10","v":"IPC / UPC","fg":"#1E293B","al":"center"},{"c":"E10","v":"10 Bar لمدة 24 ساعة","fg":"#1E293B","al":"center"},{"c":"F10","v":"10 Bar بدون هبوط","fg":"#1E293B","al":"center"},{"c":"G10","v":"12-10-2026","fg":"#1E293B","al":"center"},{"c":"H10","v":"محقق (Approved)","b":true,"al":"center"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"TC-FF-01","b":true,"al":"center"},{"c":"B11","v":"اختبار أداء طلمبات الحريق (الديزل والكهرباء والجوكي) على منحنى التدفق والضغط","b":true},{"c":"C11","v":"مكافحة حريق","fg":"#1E293B","al":"center"},{"c":"D11","v":"NFPA 20","fg":"#1E293B","al":"center"},{"c":"E11","v":"150% Flow @ 65% Head","fg":"#1E293B","al":"center"},{"c":"F11","v":"محقق بالكامل","fg":"#1E293B","al":"center"},{"c":"G11","v":"14-10-2026","fg":"#1E293B","al":"center"},{"c":"H11","v":"محقق (Approved)","b":true,"al":"center"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":"TC-FA-01","b":true,"al":"center"},{"c":"B12","v":"اختبار التكامل والربط الذكي بين إنذار الحريق والمصاعد والتكييف وأبواب الهروب (Cause & Effect)","b":true},{"c":"C12","v":"تيار خفيف","fg":"#1E293B","al":"center"},{"c":"D12","v":"NFPA 72","fg":"#1E293B","al":"center"},{"c":"E12","v":"فصل التكييف ونزول المصعد","fg":"#1E293B","al":"center"},{"c":"F12","v":"قيد الفحص النهائي","fg":"#1E293B","al":"center"},{"c":"G12","v":"16-10-2026","fg":"#1E293B","al":"center"},{"c":"H12","v":"قيد الاعتماد (Pending)","b":true,"al":"center"}]},{"r":13,"h":14.0,"cells":[{"c":"A13","v":""},{"c":"B13","v":""},{"c":"C13","v":""},{"c":"D13","v":""},{"c":"E13","v":""},{"c":"F13","v":""},{"c":"G13","v":""},{"c":"H13","v":""}]},{"r":14,"h":75.0,"cells":[{"c":"A14","v":"إعداد مهندس المكتب الفني / المختص\nالاسم: .........................................\nالتوقيع والتاريخ: .............................","bg":"#F1F5F9","b":true,"al":"center","cs":2},{"skip":true},{"c":"C14","v":"مراجعة وتدقيق مدير المشروع\nالاسم: .........................................\nالتوقيع والتاريخ: .............................","bg":"#F1F5F9","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"F14","v":"اعتماد الاستشاري / الإدارة العليا\nالاسم: .........................................\nالتوقيع والختم: ...............................","bg":"#F1F5F9","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]}]}]}