{"slug":"painting-putty-and-wall-coatings-qto-and-inspection-sheet","sheets":[{"name":"ملخص المقايسة ومؤشرات الدهانات","maxRow":28,"maxCol":7,"colWidths":[8.0,64.0,14.0,20.0,22.0,13.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"شيت حصر واستلام أعمال الدهانات والمعجون والبطانة والطلاءات الجدارية وحساب معدلات الفرد","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"نموذج عملي للمكتب الفني ومهندسي التشطيبات لحصر مسطحات النقاشة، حساب عبوات السيلر والمعجون والبلاستيك، وتقدير التكاليف | الخلايا الصفراء مخصصة للإدخال المباشر","bg":"#F1F5F9","fg":"#334155","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"اسم المشروع / الوحدة:","bg":"#F8FAFC","b":true},{"c":"B4","v":"مشروع تشطيب فيلا وشقق سكنية - حي الياسمين","bg":"#FEF9C3","fg":"#0000FF","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"E4","v":"تاريخ إعداد المقايسة:","bg":"#F8FAFC","b":true},{"c":"F4","v":"2026-11-01","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","cs":2},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"المالك / جهة الإشراف:","bg":"#F8FAFC","b":true},{"c":"B5","v":"شركة الرؤية العمرانية للتطوير العقاري","bg":"#FEF9C3","fg":"#0000FF","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"E5","v":"مهندس المكتب الفني والتشطيبات:","bg":"#F8FAFC","b":true},{"c":"F5","v":"م. أحمد الجندي","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","cs":2},{"skip":true}]},{"r":6,"h":104.0,"cells":[{"c":"A6","v":"إجمالي مسطح أرضية الوحدة (م²):","bg":"#F8FAFC","b":true},{"c":"B6","v":150,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00\" م²\";\\(#,##0.00\" م²\"\\);\"-\"","cs":3},{"skip":true},{"skip":true},{"c":"E6","v":"العملة المستخدمة بالتسعير:","bg":"#F8FAFC","b":true},{"c":"F6","v":"ريال سعودي (SAR)","f":"='معدلات الفرد وكتالوج الخامات'!B5","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","cs":2},{"skip":true}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"📊 المؤشرات الهندسية والمالية لأعمال الدهانات والطلاءات الجدارية (Executive Painting KPIs)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"إجمالي المسطح الصافي للدهان","bg":"#EFF6FF","fg":"#334155","b":true,"al":"center","cs":2},{"skip":true},{"c":"C9","v":"إجمالي العبوات التجارية","bg":"#EFF6FF","fg":"#334155","b":true,"al":"center"},{"c":"D9","v":"إجمالي تكلفة توريد الخامات","bg":"#EFF6FF","fg":"#334155","b":true,"al":"center","cs":2},{"skip":true},{"c":"F9","v":"التكلفة الكلية الشاملة (مع الضريبة)","bg":"#EFF6FF","fg":"#334155","b":true,"al":"center","cs":2},{"skip":true}]},{"r":10,"h":46.0,"cells":[{"c":"A10","v":1036.98,"f":"='دفتر حصر المسطحات والعبوات'!I23","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00\" م²\";\\(#,##0.00\" م²\"\\);\"-\"","cs":2},{"skip":true},{"c":"C10","v":0,"f":"='دفتر حصر المسطحات والعبوات'!J24+'دفتر حصر المسطحات والعبوات'!K24+'دفتر حصر المسطحات والعبوات'!L24","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D10","v":2592.45,"f":"=E20","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\"","cs":2},{"skip":true},{"c":"F10","v":45661.6125,"f":"=F23","bg":"#EFF6FF","fg":"#047857","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\"","cs":2},{"skip":true}]},{"r":11,"h":72.0,"cells":[{"c":"A11","v":"حوائط داخلية + أسقف + واجهات بعد الخصم","bg":"#EFF6FF","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C11","v":"بستلات سيلر + معجون + دهان تشطيب","bg":"#EFF6FF","fg":"#64748B","al":"center"},{"c":"D11","v":"شاملة السيلر والمعجون والدهانات والسنفرة","bg":"#EFF6FF","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"F11","v":"خامات + مصنعيات نقاشة + إشراف وضريبة","bg":"#EFF6FF","fg":"#64748B","al":"center","cs":2},{"skip":true}]},{"r":12,"h":28.0,"cells":[{"c":"A12","v":""},{"c":"B12","v":""},{"c":"C12","v":""},{"c":"D12","v":""},{"c":"E12","v":""},{"c":"F12","v":""},{"c":"G12","v":""}]},{"r":13,"h":38.0,"cells":[{"c":"A13","v":"📑 جدول خلاصة مقايسة أعمال الدهانات والمعجون والطلاءات الجدارية حسب مراحل التنفيذ","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"م","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B14","v":"بيان مراحل وأنظمة أعمال الدهانات والمعجون والطلاءات الجدارية","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C14","v":"الوحدة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D14","v":"إجمالي المسطح / الكمية","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E14","v":"تكلفة توريد الخامات","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F14","v":"تكلفة مصنعية النقاشة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G14","v":"الإجمالي الفرعي للبند","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":15,"h":54.0,"cells":[{"c":"A15","v":1,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B15","v":"أعمال الدهانات البلاستيكية المائية للأسقف والحوائط الداخلية (سيلر مائي + 3 سكينات معجون + بطانة + وجهين بلاستيك قابل للغسيل)","bg":"#F8FAFC"},{"c":"C15","v":"م²","bg":"#F8FAFC","al":"center"},{"c":"D15","v":487.16,"f":"=SUM('دفتر حصر المسطحات والعبوات'!I6:I12)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00\" م²\";\\(#,##0.00\" م²\"\\);\"-\""},{"c":"E15","v":0,"f":"=SUM('دفتر حصر المسطحات والعبوات'!M6:M12)","bg":"#F8FAFC","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F15","v":15101.96,"f":"=SUM('دفتر حصر المسطحات والعبوات'!N6:N12)","bg":"#F8FAFC","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G15","v":15101.96,"f":"=E15+F15","bg":"#F8FAFC","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":16,"h":54.0,"cells":[{"c":"A16","v":2,"b":true,"al":"center"},{"c":"B16","v":"أعمال الدهانات المقاومة للرطوبة والبكتيريا والكرانيش الجبسية (معجون إيبوكسي + طلاء أكريليك ربع لامع للمطابخ والحمامات والكرانيش)"},{"c":"C16","v":"م²","al":"center"},{"c":"D16","v":71.14,"f":"=SUM('دفتر حصر المسطحات والعبوات'!I13:I15)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00\" م²\";\\(#,##0.00\" م²\"\\);\"-\""},{"c":"E16","v":0,"f":"=SUM('دفتر حصر المسطحات والعبوات'!M13:M15)","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F16","v":2703.32,"f":"=SUM('دفتر حصر المسطحات والعبوات'!N13:N15)","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G16","v":2703.32,"f":"=E16+F16","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":17,"h":54.0,"cells":[{"c":"A17","v":3,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B17","v":"أعمال الطلاءات الخارجية للواجهات والأسوار (برايمر نافذ للعمق + معجون أسمنتي + طلاء جرافياتو / بروفايل واجهات مقاوم للعوامل الجوية)","bg":"#F8FAFC"},{"c":"C17","v":"م²","bg":"#F8FAFC","al":"center"},{"c":"D17","v":420.6,"f":"=SUM('دفتر حصر المسطحات والعبوات'!I18:I20)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00\" م²\";\\(#,##0.00\" م²\"\\);\"-\""},{"c":"E17","v":0,"f":"=SUM('دفتر حصر المسطحات والعبوات'!M18:M20)","bg":"#F8FAFC","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F17","v":13829,"f":"=SUM('دفتر حصر المسطحات والعبوات'!N18:N20)","bg":"#F8FAFC","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G17","v":13829,"f":"=E17+F17","bg":"#F8FAFC","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":18,"h":54.0,"cells":[{"c":"A18","v":4,"b":true,"al":"center"},{"c":"B18","v":"أعمال دهانات الأخشاب والأبواب والحلوق والحديد (صنفرة + سيلر أخشاب / برايمر زينك كرومات + معجون دوكو + وجهين لاكيه بولي يوريثان)"},{"c":"C18","v":"م²","al":"center"},{"c":"D18","v":58.08,"f":"='دفتر حصر المسطحات والعبوات'!I21","fg":"#008000","b":true,"al":"center","nf":"#,##0.00\" م²\";\\(#,##0.00\" م²\"\\);\"-\""},{"c":"E18","v":0,"f":"='دفتر حصر المسطحات والعبوات'!M21","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F18","v":2032.8,"f":"='دفتر حصر المسطحات والعبوات'!N21","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G18","v":2032.8,"f":"=E18+F18","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":19,"h":54.0,"cells":[{"c":"A19","v":5,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B19","v":"مستلزمات التجهيز والحماية والسنفرة (أوراق سنفرة متدرجة 120-320، شريط تيب لاصق، مشمع حماية الأرضيات والوزرات، رولات وفراشي)","bg":"#F8FAFC"},{"c":"C19","v":"مقطوعية","bg":"#F8FAFC","al":"center"},{"c":"D19","v":1,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E19","v":2592.45,"f":"='دفتر حصر المسطحات والعبوات'!I23 * 'معدلات الفرد وكتالوج الخامات'!G21","bg":"#F8FAFC","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F19","v":1555.47,"f":"='دفتر حصر المسطحات والعبوات'!I23 * 'معدلات الفرد وكتالوج الخامات'!H21","bg":"#F8FAFC","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G19","v":4147.92,"f":"=E19+F19","bg":"#F8FAFC","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":20,"h":40.0,"cells":[{"c":"A20","v":"إجمالي التكاليف المباشرة لأعمال الدهانات والنقاشة (Direct Painting Cost Subtotal)","bg":"#E2E8F0","b":true,"cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"E20","v":2592.45,"f":"=SUM(E15:E19)","bg":"#E2E8F0","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F20","v":35222.55,"f":"=SUM(F15:F19)","bg":"#E2E8F0","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G20","v":37815,"f":"=SUM(G15:G19)","bg":"#E2E8F0","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":21,"h":36.0,"cells":[{"c":"A21","v":"المصاريف الإدارية والإشراف الهندسي وضبط الجودة (Supervision & Overheads)","bg":"#F8FAFC","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F21","v":0.05,"f":"='معدلات الفرد وكتالوج الخامات'!D5","fg":"#008000","b":true,"al":"center","nf":"0.0%"},{"c":"G21","v":1890.75,"f":"=G20*F21","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":22,"h":36.0,"cells":[{"c":"A22","v":"ضريبة القيمة المضافة على التوريد والأعمال (VAT)","bg":"#F8FAFC","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F22","v":0.15,"f":"='معدلات الفرد وكتالوج الخامات'!F5","fg":"#008000","b":true,"al":"center","nf":"0.0%"},{"c":"G22","v":5955.8625,"f":"=(G20+G21)*F22","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":23,"h":46.0,"cells":[{"c":"A23","v":"الإجمالي العام النهائي لمقايسة أعمال الدهانات والطلاءات (Grand Total Including VAT)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F23","v":45661.6125,"f":"=G20+G21+G22","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\"","cs":2},{"skip":true}]},{"r":24,"h":52.0,"cells":[{"c":"A24","v":"متوسط تكلفة المتر المربع الفعلي من مسطح الدهان (خامات + مصنعية):","bg":"#EFF6FF","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"D24","v":36.46647,"f":"=IF(A10>0, G20/A10, 0)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E24","v":"متوسط تكلفة الدهانات لكل م² من مسطح أرضية الوحدة:","bg":"#EFF6FF","b":true,"cs":2},{"skip":true},{"c":"G24","v":304.41075,"f":"=IF(B6>0, F23/B6, 0)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":25,"h":28.0,"cells":[{"c":"A25","v":""},{"c":"B25","v":""},{"c":"C25","v":""},{"c":"D25","v":""},{"c":"E25","v":""},{"c":"F25","v":""},{"c":"G25","v":""}]},{"r":26,"h":38.0,"cells":[{"c":"A26","v":"✍️ محضر توقيع ومراجعة الحصر والمقايسة النهائية لأعمال الدهانات (Sign-off & Review)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":27,"h":36.0,"cells":[{"c":"A27","v":"مهندس المكتب الفني والتشطيبات","bg":"#E2E8F0","b":true,"al":"center","cs":2},{"skip":true},{"c":"C27","v":"مقاول أعمال النقاشة والدهانات","bg":"#E2E8F0","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"F27","v":"مراجعة الاستشاري المشرف / المالك","bg":"#E2E8F0","b":true,"al":"center","cs":2},{"skip":true}]},{"r":28,"h":104.0,"cells":[{"c":"A28","v":"الاسم: م. أحمد الجندي\nالتوقيع: ............................\nالتاريخ: 2026/11/01","bg":"#F8FAFC","fg":"#334155","cs":2},{"skip":true},{"c":"C28","v":"الاسم / المؤسسة: ............................\nالإقرار: تمت مراجعة المسطحات ومعدلات الفرد\nالتوقيع: ............................","bg":"#F8FAFC","fg":"#334155","cs":3},{"skip":true},{"skip":true},{"c":"F28","v":"الاسم: ............................\nالقرار: موافقة على التوريد والتنفيذ\nالتوقيع والختم: ............................","bg":"#F8FAFC","fg":"#334155","cs":2},{"skip":true}]}]},{"name":"معدلات الفرد وكتالوج الخامات","maxRow":28,"maxCol":8,"colWidths":[14.0,64.0,18.0,13.0,20.0,22.0,20.0,22.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"دليل معدلات الفرد القياسية للدهانات والمعجون والسيلر وكتالوج أسعار الخامات والمصنعيات","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"مرجع هندسي لمعدلات فرد جردل السيلر المائي والبرايمر وشكائر المعجون وبستلات البلاستيك وفق النشرات الفنية (جوتن / الجزيرة / سيبس / GLC) | عدّل الخلايا الصفراء لتحديث كامل الشيت","bg":"#F1F5F9","fg":"#334155","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"⚙️ المعاملات الهندسية والمالية العامة (العملة، نسب الهدر، معامل المسطح، والضريبة)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"العملة المستخدمة:","b":true},{"c":"B5","v":"ريال سعودي (SAR)","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"C5","v":"نسبة الإشراف والمصاريف:","b":true},{"c":"D5","v":0.05,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"E5","v":"ضريبة القيمة المضافة VAT:","b":true},{"c":"F5","v":0.15,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G5","v":"معامل مسطح دهان الشقة:","b":true},{"c":"H5","v":3.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.00\"x\""}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"نسبة هدر الدهان والرولة:","b":true},{"c":"B6","v":0.08,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"C6","v":"الحد الأقصى لرطوبة المحارة:","b":true},{"c":"D6","v":0.12,"in":true,"b":true,"al":"center","nf":"0.0%"},{"c":"E6","v":"سماكة الفيلم الجاف DFT:","b":true},{"c":"F6","v":"85 - 110 ميكرون","b":true,"al":"center"},{"c":"G6","v":"زمن الجفاف بين الأوجه:","b":true},{"c":"H6","v":"4 - 6 ساعات","b":true,"al":"center"}]},{"r":7,"h":38.0,"cells":[{"c":"A7","v":"🪣 جدول معدلات الفرد العملية للعبوات التجارية وأسعار التوريد والمصنعيات (Spreading Rates & Price Matrix)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"كود الخامة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B8","v":"توصيف الخامة ونظام الطلاء المعماري (داخلي / خارجي / عازل)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C8","v":"سعة العبوة (لتر/كجم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D8","v":"عدد الأوجه / السكينات","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E8","v":"معدل الفرد النظري للوجه (م²/وحدة)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F8","v":"صافي فرد العبوة بعد الهدر (م²/عبوة)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G8","v":"سعر توريد العبوة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H8","v":"مصنعية التنفيذ (للمتر م²)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"PNT-SLR-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B9","v":"جردل سيلر مائي داخلي مقاوم للقلويات والأملاح (Alkali-Resistant PVA/Acrylic Sealer - 18L)","bg":"#F8FAFC"},{"c":"C9","v":18,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D9","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E9","v":9.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F9","v":0,"f":"=ROUND((C9*E9/D9)*(1-$B$6), 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00\" م²\";\\(#,##0.00\" م²\"\\);\"-\""},{"c":"G9","v":135,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H9","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":10,"h":38.0,"cells":[{"c":"A10","v":"PNT-PRM-02","b":true,"al":"center"},{"c":"B10","v":"جردل برايمر أساس خارجي نافذ للعمق للواجهات (Exterior Penetrating Primer - 18L)"},{"c":"C10","v":18,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D10","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E10","v":8.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F10","v":0,"f":"=ROUND((C10*E10/D10)*(1-$B$6), 2)","b":true,"al":"center","nf":"#,##0.00\" م²\";\\(#,##0.00\" م²\"\\);\"-\""},{"c":"G10","v":185,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H10","v":5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"PNT-PUT-03","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":"شيكارة معجون أسمنتي تأسيسي لمعالجة خشونة المحارة والواجهات (Cementitious Base Putty - 25kg)","bg":"#F8FAFC"},{"c":"C11","v":25,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D11","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E11","v":1.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F11","v":0,"f":"=ROUND((C11*E11/D11)*(1-$B$6), 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00\" م²\";\\(#,##0.00\" م²\"\\);\"-\""},{"c":"G11","v":48,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H11","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":"PNT-PUT-04","b":true,"al":"center"},{"c":"B12","v":"بستلة معجون أكريليك جاهز ناعم للحوائط الداخلية - إجمالي 3 سكينات (Ready-Mix Putty - 25kg)"},{"c":"C12","v":25,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D12","v":3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E12","v":4.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F12","v":0,"f":"=ROUND((C12*E12/D12)*(1-$B$6), 2)","b":true,"al":"center","nf":"#,##0.00\" م²\";\\(#,##0.00\" م²\"\\);\"-\""},{"c":"G12","v":95,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H12","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":"PNT-PUT-05","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":"جردل معجون إيبوكسي مقاوم للرطوبة والأبخرة للحمامات والمطابخ - سكينتان (Epoxy Putty - 20kg)","bg":"#F8FAFC"},{"c":"C13","v":20,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D13","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E13","v":3.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F13","v":0,"f":"=ROUND((C13*E13/D13)*(1-$B$6), 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00\" م²\";\\(#,##0.00\" م²\"\\);\"-\""},{"c":"G13","v":240,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H13","v":16,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"PNT-EML-06","b":true,"al":"center"},{"c":"B14","v":"بستلة دهان بلاستيك مائي مطفي فائق البياض للأسقف والبطانة - وجهان (Super Matt Emulsion - 18L)"},{"c":"C14","v":18,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D14","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E14","v":11.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F14","v":0,"f":"=ROUND((C14*E14/D14)*(1-$B$6), 2)","b":true,"al":"center","nf":"#,##0.00\" م²\";\\(#,##0.00\" م²\"\\);\"-\""},{"c":"G14","v":195,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H14","v":10,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"PNT-EML-07","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B15","v":"بستلة دهان أكريليك نصف لامع قابل للغسيل للحوائط الداخلية - وجهان (Silk / Fenomastic - 18L)","bg":"#F8FAFC"},{"c":"C15","v":18,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D15","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E15","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F15","v":0,"f":"=ROUND((C15*E15/D15)*(1-$B$6), 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00\" م²\";\\(#,##0.00\" م²\"\\);\"-\""},{"c":"G15","v":310,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H15","v":15,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":"PNT-EML-08","b":true,"al":"center"},{"c":"B16","v":"بستلة دهان ربع لامع مقاوم للبقع والبكتيريا للمطابخ والحمامات - وجهان (Hygienic Eggshell - 18L)"},{"c":"C16","v":18,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D16","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E16","v":11,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F16","v":0,"f":"=ROUND((C16*E16/D16)*(1-$B$6), 2)","b":true,"al":"center","nf":"#,##0.00\" م²\";\\(#,##0.00\" م²\"\\);\"-\""},{"c":"G16","v":345,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H16","v":18,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":"PNT-DEC-09","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B17","v":"جردل دهان ديكوري قطيفة / لؤلؤي شامواه لحوائط الاستقبال المميزة (Velvet Decorative Paint - 4L)","bg":"#F8FAFC"},{"c":"C17","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D17","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E17","v":8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F17","v":0,"f":"=ROUND((C17*E17/D17)*(1-$B$6), 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00\" م²\";\\(#,##0.00\" م²\"\\);\"-\""},{"c":"G17","v":220,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H17","v":28,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":"PNT-EXT-10","b":true,"al":"center"},{"c":"B18","v":"بستلة طلاء واجهات خارجي جرافياتو / بروفايل حبيبي مقاوم للشمس (Exterior Profile Coating - 25kg)"},{"c":"C18","v":25,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D18","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E18","v":0.65,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F18","v":0,"f":"=ROUND((C18*E18/D18)*(1-$B$6), 2)","b":true,"al":"center","nf":"#,##0.00\" م²\";\\(#,##0.00\" م²\"\\);\"-\""},{"c":"G18","v":165,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H18","v":24,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":"PNT-EXT-11","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B19","v":"بستلة دهان واجهات مطاطي إكريليكي مقاوم للتشققات والأمطار - وجهان (Elastomeric Exterior - 18L)","bg":"#F8FAFC"},{"c":"C19","v":18,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D19","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E19","v":8.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F19","v":0,"f":"=ROUND((C19*E19/D19)*(1-$B$6), 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00\" م²\";\\(#,##0.00\" م²\"\\);\"-\""},{"c":"G19","v":360,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H19","v":20,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":"PNT-WOD-12","b":true,"al":"center"},{"c":"B20","v":"جالون دهان لاكيه بولي يوريثان للأبواب والحلوق الخشبية والحديد - وجهان (PU Enamel Gloss - 3.78L)"},{"c":"C20","v":3.78,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D20","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E20","v":10,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F20","v":0,"f":"=ROUND((C20*E20/D20)*(1-$B$6), 2)","b":true,"al":"center","nf":"#,##0.00\" م²\";\\(#,##0.00\" م²\"\\);\"-\""},{"c":"G20","v":145,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H20","v":35,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":21,"h":52.0,"cells":[{"c":"A21","v":"PNT-ACC-13","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B21","v":"معدل استهلاك السنفرة وتيب الحماية ومشمع الأرضيات والرولات لكل متر مربع من المسطح","bg":"#F8FAFC"},{"c":"C21","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D21","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E21","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F21","v":1,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00\" م²\";\\(#,##0.00\" م²\"\\);\"-\""},{"c":"G21","v":2.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H21","v":1.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":22,"h":28.0,"cells":[{"c":"A22","v":""},{"c":"B22","v":""},{"c":"C22","v":""},{"c":"D22","v":""},{"c":"E22","v":""},{"c":"F22","v":""},{"c":"G22","v":""},{"c":"H22","v":""}]},{"r":23,"h":38.0,"cells":[{"c":"A23","v":"🏠 حاسبة استرشادية سريعة لمقايسة دهانات الشقق السكنية حسب المساحة (شقة 100م²، 120م²، 150م²، 200م²)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":24,"h":52.0,"cells":[{"c":"A24","v":"نموذج الوحدة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B24","v":"مساحة الشقة وبنود الدهان القياسية (سيلر + 3 سكينات معجون + وشين بلاستيك)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C24","v":"مساحة الشقة (م²)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D24","v":"صافي مسطح الحوائط والأسقف","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E24","v":"جرادل السيلر المائي (18L)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F24","v":"بستلات المعجون الجاهز (25kg)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G24","v":"بستلات دهان البلاستيك (18L)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H24","v":"التكلفة التقديرية الشاملة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":25,"h":36.0,"cells":[{"c":"A25","v":"APT-100","b":true,"al":"center"},{"c":"B25","v":"مقايسة دهانات شقة سكنية 100 متر مربع (غرفتين وصالة ومطبخ وحمام)"},{"c":"C25","v":100,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00\" م²\";\\(#,##0.00\" م²\"\\);\"-\""},{"c":"D25","v":0,"f":"=C25*$H$5","b":true,"al":"center","nf":"#,##0.00\" م²\";\\(#,##0.00\" م²\"\\);\"-\""},{"c":"E25","v":0,"f":"=ROUNDUP(D25/$F$9, 0)","al":"center","nf":"#,##0.0\" عبوة\";\\(#,##0.0\" عبوة\"\\);\"-\""},{"c":"F25","v":0,"f":"=ROUNDUP(D25/$F$12, 0)","al":"center","nf":"#,##0.0\" عبوة\";\\(#,##0.0\" عبوة\"\\);\"-\""},{"c":"G25","v":0,"f":"=ROUNDUP(D25/$F$15, 0)","al":"center","nf":"#,##0.0\" عبوة\";\\(#,##0.0\" عبوة\"\\);\"-\""},{"c":"H25","v":0,"f":"=(E25*$G$9)+(F25*$G$12)+(G25*$G$15)+(D25*($H$9+$H$12+$H$15+$G$21+$H$21))","bg":"#EFF6FF","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":26,"h":36.0,"cells":[{"c":"A26","v":"APT-120","b":true,"al":"center"},{"c":"B26","v":"مقايسة دهانات شقة سكنية 120 متر مربع (3 غرف نوم وريسبشن و2 حمام)"},{"c":"C26","v":120,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00\" م²\";\\(#,##0.00\" م²\"\\);\"-\""},{"c":"D26","v":0,"f":"=C26*$H$5","b":true,"al":"center","nf":"#,##0.00\" م²\";\\(#,##0.00\" م²\"\\);\"-\""},{"c":"E26","v":0,"f":"=ROUNDUP(D26/$F$9, 0)","al":"center","nf":"#,##0.0\" عبوة\";\\(#,##0.0\" عبوة\"\\);\"-\""},{"c":"F26","v":0,"f":"=ROUNDUP(D26/$F$12, 0)","al":"center","nf":"#,##0.0\" عبوة\";\\(#,##0.0\" عبوة\"\\);\"-\""},{"c":"G26","v":0,"f":"=ROUNDUP(D26/$F$15, 0)","al":"center","nf":"#,##0.0\" عبوة\";\\(#,##0.0\" عبوة\"\\);\"-\""},{"c":"H26","v":0,"f":"=(E26*$G$9)+(F26*$G$12)+(G26*$G$15)+(D26*($H$9+$H$12+$H$15+$G$21+$H$21))","bg":"#EFF6FF","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":27,"h":36.0,"cells":[{"c":"A27","v":"APT-150","b":true,"al":"center"},{"c":"B27","v":"مقايسة دهانات شقة سكنية عائلية 150 متر مربع (3 غرف نوم وصالة كبيرة)"},{"c":"C27","v":150,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00\" م²\";\\(#,##0.00\" م²\"\\);\"-\""},{"c":"D27","v":0,"f":"=C27*$H$5","b":true,"al":"center","nf":"#,##0.00\" م²\";\\(#,##0.00\" م²\"\\);\"-\""},{"c":"E27","v":0,"f":"=ROUNDUP(D27/$F$9, 0)","al":"center","nf":"#,##0.0\" عبوة\";\\(#,##0.0\" عبوة\"\\);\"-\""},{"c":"F27","v":0,"f":"=ROUNDUP(D27/$F$12, 0)","al":"center","nf":"#,##0.0\" عبوة\";\\(#,##0.0\" عبوة\"\\);\"-\""},{"c":"G27","v":0,"f":"=ROUNDUP(D27/$F$15, 0)","al":"center","nf":"#,##0.0\" عبوة\";\\(#,##0.0\" عبوة\"\\);\"-\""},{"c":"H27","v":0,"f":"=(E27*$G$9)+(F27*$G$12)+(G27*$G$15)+(D27*($H$9+$H$12+$H$15+$G$21+$H$21))","bg":"#EFF6FF","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":28,"h":36.0,"cells":[{"c":"A28","v":"APT-200","b":true,"al":"center"},{"c":"B28","v":"مقايسة دهانات شقة فاخرة / روف 200 متر مربع (4 غرف نوم ومجلس و3 حمام)"},{"c":"C28","v":200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00\" م²\";\\(#,##0.00\" م²\"\\);\"-\""},{"c":"D28","v":0,"f":"=C28*$H$5","b":true,"al":"center","nf":"#,##0.00\" م²\";\\(#,##0.00\" م²\"\\);\"-\""},{"c":"E28","v":0,"f":"=ROUNDUP(D28/$F$9, 0)","al":"center","nf":"#,##0.0\" عبوة\";\\(#,##0.0\" عبوة\"\\);\"-\""},{"c":"F28","v":0,"f":"=ROUNDUP(D28/$F$12, 0)","al":"center","nf":"#,##0.0\" عبوة\";\\(#,##0.0\" عبوة\"\\);\"-\""},{"c":"G28","v":0,"f":"=ROUNDUP(D28/$F$15, 0)","al":"center","nf":"#,##0.0\" عبوة\";\\(#,##0.0\" عبوة\"\\);\"-\""},{"c":"H28","v":0,"f":"=(E28*$G$9)+(F28*$G$12)+(G28*$G$15)+(D28*($H$9+$H$12+$H$15+$G$21+$H$21))","bg":"#EFF6FF","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]}]},{"name":"دفتر حصر المسطحات والعبوات","maxRow":24,"maxCol":15,"colWidths":[10.0,58.0,12.0,13.0,13.0,14.0,16.0,14.0,16.0,15.0,13.0,13.0,16.0,13.0,18.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"دفتر الحصر الهندسي التفصيلي لمسطحات الدهانات والمعجون والواجهات وحساب العبوات والتكاليف لكل فراغ","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":15},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"أدخل أبعاد الغرف والواجهات ومساحات خصم الفتحات (الأبواب والشبابيك) بالخلايا الصفراء؛ يحسب الشيت تلقائياً صافي المسطح وعدد البستلات المطلوبة وتكلفة المواد والمصنعيات","bg":"#F1F5F9","fg":"#334155","al":"center","cs":15},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""},{"c":"N3","v":""},{"c":"O3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"أولاً: حصر أعمال الدهانات الداخلية للحوائط والأسقف والكرانيش (سيلر مائي + 3 سكينات معجون + وجهين دهان تشطيب)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center","cs":15},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"كود","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"اسم الفراغ المعماري وتوصيف نظام الدهان والتشطيب","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"طول الفراغ (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"عرض الفراغ (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"ارتفاع السقف (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"مسطح السقف (م²)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"مسطح الحوائط القائم (م²)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"خصم الفتحات (م²)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I5","v":"صافي مسطح الدهان (م²)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J5","v":"عبوات السيلر / البرايمر","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K5","v":"بستلات المعجون","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L5","v":"بستلات دهان التشطيب","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M5","v":"تكلفة الخامات","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"N5","v":"تكلفة المصنعيات","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"O5","v":"إجمالي البند","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"RM-01","b":true,"al":"center"},{"c":"B6","v":"صالة الاستقبال والريسبشن الرئيسي (سيلر مائي + 3 سكينات معجون + بلاستيك نصف لامع)"},{"c":"C6","v":7.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D6","v":4.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E6","v":3.1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F6","v":36,"f":"=C6*D6","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G6","v":76.26,"f":"=2*(C6+D6)*E6","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H6","v":8.4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I6","v":103.86,"f":"=MAX(0, F6+G6-H6)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J6","v":0,"f":"=ROUND(I6/'معدلات الفرد وكتالوج الخامات'!$F$9, 2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K6","v":0,"f":"=ROUND(I6/'معدلات الفرد وكتالوج الخامات'!$F$12, 2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L6","v":0,"f":"=ROUND(I6/'معدلات الفرد وكتالوج الخامات'!$F$15, 2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M6","v":0,"f":"=(J6*'معدلات الفرد وكتالوج الخامات'!$G$9)+(K6*'معدلات الفرد وكتالوج الخامات'!$G$12)+(L6*'معدلات الفرد وكتالوج الخامات'!$G$15)","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N6","v":3219.66,"f":"=I6*('معدلات الفرد وكتالوج الخامات'!$H$9+'معدلات الفرد وكتالوج الخامات'!$H$12+'معدلات الفرد وكتالوج الخامات'!$H$15)","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O6","v":3219.66,"f":"=M6+N6","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"RM-02","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B7","v":"مجلس الضيوف وصالة الطعام (سيلر مائي + 3 سكينات معجون + دهان قطيفة ونصف لامع)","bg":"#F8FAFC"},{"c":"C7","v":5.6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D7","v":4.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E7","v":3.1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F7","v":23.52,"f":"=C7*D7","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G7","v":60.76,"f":"=2*(C7+D7)*E7","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H7","v":5.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I7","v":79.08,"f":"=MAX(0, F7+G7-H7)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J7","v":0,"f":"=ROUND(I7/'معدلات الفرد وكتالوج الخامات'!$F$9, 2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K7","v":0,"f":"=ROUND(I7/'معدلات الفرد وكتالوج الخامات'!$F$12, 2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L7","v":0,"f":"=ROUND(I7/'معدلات الفرد وكتالوج الخامات'!$F$15, 2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M7","v":0,"f":"=(J7*'معدلات الفرد وكتالوج الخامات'!$G$9)+(K7*'معدلات الفرد وكتالوج الخامات'!$G$12)+(L7*'معدلات الفرد وكتالوج الخامات'!$G$15)","bg":"#F8FAFC","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N7","v":2451.48,"f":"=I7*('معدلات الفرد وكتالوج الخامات'!$H$9+'معدلات الفرد وكتالوج الخامات'!$H$12+'معدلات الفرد وكتالوج الخامات'!$H$15)","bg":"#F8FAFC","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O7","v":2451.48,"f":"=M7+N7","bg":"#F8FAFC","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"RM-03","b":true,"al":"center"},{"c":"B8","v":"غرفة النوم الرئيسية ماستر Master Bedroom (سيلر + 3 سكينات معجون + نصف لامع قابل للغسيل)"},{"c":"C8","v":4.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D8","v":4.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E8","v":3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F8","v":20.16,"f":"=C8*D8","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G8","v":54,"f":"=2*(C8+D8)*E8","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H8","v":4.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I8","v":69.66,"f":"=MAX(0, F8+G8-H8)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J8","v":0,"f":"=ROUND(I8/'معدلات الفرد وكتالوج الخامات'!$F$9, 2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K8","v":0,"f":"=ROUND(I8/'معدلات الفرد وكتالوج الخامات'!$F$12, 2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L8","v":0,"f":"=ROUND(I8/'معدلات الفرد وكتالوج الخامات'!$F$15, 2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M8","v":0,"f":"=(J8*'معدلات الفرد وكتالوج الخامات'!$G$9)+(K8*'معدلات الفرد وكتالوج الخامات'!$G$12)+(L8*'معدلات الفرد وكتالوج الخامات'!$G$15)","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N8","v":2159.46,"f":"=I8*('معدلات الفرد وكتالوج الخامات'!$H$9+'معدلات الفرد وكتالوج الخامات'!$H$12+'معدلات الفرد وكتالوج الخامات'!$H$15)","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O8","v":2159.46,"f":"=M8+N8","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"RM-04","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B9","v":"غرفة نوم الأطفال رقم (1) (سيلر مائي + 3 سكينات معجون + بلاستيك أكريليك صحي)","bg":"#F8FAFC"},{"c":"C9","v":4.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D9","v":3.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E9","v":3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F9","v":15.96,"f":"=C9*D9","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G9","v":48,"f":"=2*(C9+D9)*E9","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H9","v":3.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I9","v":60.16,"f":"=MAX(0, F9+G9-H9)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J9","v":0,"f":"=ROUND(I9/'معدلات الفرد وكتالوج الخامات'!$F$9, 2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K9","v":0,"f":"=ROUND(I9/'معدلات الفرد وكتالوج الخامات'!$F$12, 2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L9","v":0,"f":"=ROUND(I9/'معدلات الفرد وكتالوج الخامات'!$F$15, 2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M9","v":0,"f":"=(J9*'معدلات الفرد وكتالوج الخامات'!$G$9)+(K9*'معدلات الفرد وكتالوج الخامات'!$G$12)+(L9*'معدلات الفرد وكتالوج الخامات'!$G$15)","bg":"#F8FAFC","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N9","v":1864.96,"f":"=I9*('معدلات الفرد وكتالوج الخامات'!$H$9+'معدلات الفرد وكتالوج الخامات'!$H$12+'معدلات الفرد وكتالوج الخامات'!$H$15)","bg":"#F8FAFC","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O9","v":1864.96,"f":"=M9+N9","bg":"#F8FAFC","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":10,"h":38.0,"cells":[{"c":"A10","v":"RM-05","b":true,"al":"center"},{"c":"B10","v":"غرفة نوم رقم (2) (سيلر مائي + 3 سكينات معجون + بلاستيك نصف لامع)"},{"c":"C10","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D10","v":3.6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E10","v":3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F10","v":14.4,"f":"=C10*D10","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G10","v":45.6,"f":"=2*(C10+D10)*E10","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H10","v":3.6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I10","v":56.4,"f":"=MAX(0, F10+G10-H10)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J10","v":0,"f":"=ROUND(I10/'معدلات الفرد وكتالوج الخامات'!$F$9, 2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K10","v":0,"f":"=ROUND(I10/'معدلات الفرد وكتالوج الخامات'!$F$12, 2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L10","v":0,"f":"=ROUND(I10/'معدلات الفرد وكتالوج الخامات'!$F$15, 2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M10","v":0,"f":"=(J10*'معدلات الفرد وكتالوج الخامات'!$G$9)+(K10*'معدلات الفرد وكتالوج الخامات'!$G$12)+(L10*'معدلات الفرد وكتالوج الخامات'!$G$15)","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N10","v":1748.4,"f":"=I10*('معدلات الفرد وكتالوج الخامات'!$H$9+'معدلات الفرد وكتالوج الخامات'!$H$12+'معدلات الفرد وكتالوج الخامات'!$H$15)","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O10","v":1748.4,"f":"=M10+N10","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"RM-06","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":"غرفة المعيشة العائلية Living Room (سيلر مائي + 3 سكينات معجون + بلاستيك نصف لامع)","bg":"#F8FAFC"},{"c":"C11","v":4.6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D11","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E11","v":3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F11","v":18.4,"f":"=C11*D11","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G11","v":51.6,"f":"=2*(C11+D11)*E11","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H11","v":4.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I11","v":65.8,"f":"=MAX(0, F11+G11-H11)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J11","v":0,"f":"=ROUND(I11/'معدلات الفرد وكتالوج الخامات'!$F$9, 2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K11","v":0,"f":"=ROUND(I11/'معدلات الفرد وكتالوج الخامات'!$F$12, 2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L11","v":0,"f":"=ROUND(I11/'معدلات الفرد وكتالوج الخامات'!$F$15, 2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M11","v":0,"f":"=(J11*'معدلات الفرد وكتالوج الخامات'!$G$9)+(K11*'معدلات الفرد وكتالوج الخامات'!$G$12)+(L11*'معدلات الفرد وكتالوج الخامات'!$G$15)","bg":"#F8FAFC","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N11","v":2039.8,"f":"=I11*('معدلات الفرد وكتالوج الخامات'!$H$9+'معدلات الفرد وكتالوج الخامات'!$H$12+'معدلات الفرد وكتالوج الخامات'!$H$15)","bg":"#F8FAFC","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O11","v":2039.8,"f":"=M11+N11","bg":"#F8FAFC","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":"RM-07","b":true,"al":"center"},{"c":"B12","v":"الممرات والطرقات ومدخل الشقة الفوير (سيلر مائي + 3 سكينات معجون + نصف لامع مقاوم للاحتكاك)"},{"c":"C12","v":6.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D12","v":1.6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E12","v":3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F12","v":10.4,"f":"=C12*D12","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G12","v":48.6,"f":"=2*(C12+D12)*E12","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H12","v":6.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I12","v":52.2,"f":"=MAX(0, F12+G12-H12)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J12","v":0,"f":"=ROUND(I12/'معدلات الفرد وكتالوج الخامات'!$F$9, 2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K12","v":0,"f":"=ROUND(I12/'معدلات الفرد وكتالوج الخامات'!$F$12, 2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L12","v":0,"f":"=ROUND(I12/'معدلات الفرد وكتالوج الخامات'!$F$15, 2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M12","v":0,"f":"=(J12*'معدلات الفرد وكتالوج الخامات'!$G$9)+(K12*'معدلات الفرد وكتالوج الخامات'!$G$12)+(L12*'معدلات الفرد وكتالوج الخامات'!$G$15)","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N12","v":1618.2,"f":"=I12*('معدلات الفرد وكتالوج الخامات'!$H$9+'معدلات الفرد وكتالوج الخامات'!$H$12+'معدلات الفرد وكتالوج الخامات'!$H$15)","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O12","v":1618.2,"f":"=M12+N12","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":"RM-08","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":"سقف وأعلى حوائط المطبخ (سيلر + معجون إيبوكسي مقاوم للرطوبة والأبخرة + ربع لامع)","bg":"#F8FAFC"},{"c":"C13","v":4.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D13","v":3.4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E13","v":1.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F13","v":14.28,"f":"=C13*D13","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G13","v":18.24,"f":"=2*(C13+D13)*E13","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H13","v":2.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I13","v":30.32,"f":"=MAX(0, F13+G13-H13)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J13","v":0,"f":"=ROUND(I13/'معدلات الفرد وكتالوج الخامات'!$F$9, 2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K13","v":0,"f":"=ROUND(I13/'معدلات الفرد وكتالوج الخامات'!$F$13, 2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L13","v":0,"f":"=ROUND(I13/'معدلات الفرد وكتالوج الخامات'!$F$16, 2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M13","v":0,"f":"=(J13*'معدلات الفرد وكتالوج الخامات'!$G$9)+(K13*'معدلات الفرد وكتالوج الخامات'!$G$13)+(L13*'معدلات الفرد وكتالوج الخامات'!$G$16)","bg":"#F8FAFC","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N13","v":1152.16,"f":"=I13*('معدلات الفرد وكتالوج الخامات'!$H$9+'معدلات الفرد وكتالوج الخامات'!$H$13+'معدلات الفرد وكتالوج الخامات'!$H$16)","bg":"#F8FAFC","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O13","v":1152.16,"f":"=M13+N13","bg":"#F8FAFC","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"RM-09","b":true,"al":"center"},{"c":"B14","v":"أسقف الحمام الرئيسي وحمام الضيوف (سيلر + معجون إيبوكسي + طلاء مقاوم للفطريات والبكتيريا)"},{"c":"C14","v":3.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D14","v":2.4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E14","v":0.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F14","v":7.68,"f":"=C14*D14","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G14","v":8.96,"f":"=2*(C14+D14)*E14","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H14","v":1.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I14","v":15.14,"f":"=MAX(0, F14+G14-H14)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J14","v":0,"f":"=ROUND(I14/'معدلات الفرد وكتالوج الخامات'!$F$9, 2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K14","v":0,"f":"=ROUND(I14/'معدلات الفرد وكتالوج الخامات'!$F$13, 2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L14","v":0,"f":"=ROUND(I14/'معدلات الفرد وكتالوج الخامات'!$F$16, 2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M14","v":0,"f":"=(J14*'معدلات الفرد وكتالوج الخامات'!$G$9)+(K14*'معدلات الفرد وكتالوج الخامات'!$G$13)+(L14*'معدلات الفرد وكتالوج الخامات'!$G$16)","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N14","v":575.32,"f":"=I14*('معدلات الفرد وكتالوج الخامات'!$H$9+'معدلات الفرد وكتالوج الخامات'!$H$13+'معدلات الفرد وكتالوج الخامات'!$H$16)","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O14","v":575.32,"f":"=M14+N14","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"RM-10","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B15","v":"كرانيش الأسقف المعلقة وبيت النور الجبس بورد (معجون فواصل + بطانة + مطفي ناصع البياض)","bg":"#F8FAFC"},{"c":"C15","v":18,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D15","v":0.6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E15","v":0.4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F15","v":10.8,"f":"=C15*D15","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G15","v":14.88,"f":"=2*(C15+D15)*E15","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H15","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I15","v":25.68,"f":"=MAX(0, F15+G15-H15)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J15","v":0,"f":"=ROUND(I15/'معدلات الفرد وكتالوج الخامات'!$F$9, 2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K15","v":0,"f":"=ROUND(I15/'معدلات الفرد وكتالوج الخامات'!$F$13, 2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L15","v":0,"f":"=ROUND(I15/'معدلات الفرد وكتالوج الخامات'!$F$16, 2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M15","v":0,"f":"=(J15*'معدلات الفرد وكتالوج الخامات'!$G$9)+(K15*'معدلات الفرد وكتالوج الخامات'!$G$13)+(L15*'معدلات الفرد وكتالوج الخامات'!$G$16)","bg":"#F8FAFC","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N15","v":975.84,"f":"=I15*('معدلات الفرد وكتالوج الخامات'!$H$9+'معدلات الفرد وكتالوج الخامات'!$H$13+'معدلات الفرد وكتالوج الخامات'!$H$16)","bg":"#F8FAFC","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O15","v":975.84,"f":"=M15+N15","bg":"#F8FAFC","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":16,"h":40.0,"cells":[{"c":"A16","v":"إجمالي مسطحات وكميات الدهانات الداخلية والأسقف (Interior Painting Subtotal)","bg":"#E2E8F0","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F16","v":171.6,"f":"=SUM(F6:F15)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G16","v":426.9,"f":"=SUM(G6:G15)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H16","v":40.2,"f":"=SUM(H6:H15)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I16","v":558.3,"f":"=SUM(I6:I15)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J16","v":0,"f":"=SUM(J6:J15)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K16","v":0,"f":"=SUM(K6:K15)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L16","v":0,"f":"=SUM(L6:L15)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M16","v":0,"f":"=SUM(M6:M15)","bg":"#E2E8F0","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N16","v":17805.28,"f":"=SUM(N6:N15)","bg":"#E2E8F0","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O16","v":17805.28,"f":"=SUM(O6:O15)","bg":"#E2E8F0","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":17,"h":38.0,"cells":[{"c":"A17","v":"ثانياً: حصر أعمال طلاءات الواجهات الخارجية والأسوار ودهانات الأخشاب والحديد (برايمر + معجون أسمنتي + بروفايل / لاكيه)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center","cs":15},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":"EXT-01","b":true,"al":"center"},{"c":"B18","v":"الواجهة الأمامية الرئيسية للمبنى (برايمر خارجي نافذ + معجون أسمنتي + طلاء بروفايل جرافياتو مقاوم للشمس)"},{"c":"C18","v":14,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D18","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E18","v":9.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F18","v":0,"in":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G18","v":133,"f":"=IF(D18=0, C18*E18, 2*C18*D18*E18)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H18","v":18.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I18","v":114.5,"f":"=MAX(0, F18+G18-H18)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J18","v":0,"f":"=ROUND(I18/'معدلات الفرد وكتالوج الخامات'!$F$10, 2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K18","v":0,"f":"=ROUND(I18/'معدلات الفرد وكتالوج الخامات'!$F$11, 2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L18","v":0,"f":"=ROUND(I18/'معدلات الفرد وكتالوج الخامات'!$F$18, 2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M18","v":0,"f":"=(J18*'معدلات الفرد وكتالوج الخامات'!$G$10)+(K18*'معدلات الفرد وكتالوج الخامات'!$G$11)+(L18*'معدلات الفرد وكتالوج الخامات'!$G$18)","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N18","v":4007.5,"f":"=I18*('معدلات الفرد وكتالوج الخامات'!$H$10+'معدلات الفرد وكتالوج الخامات'!$H$11+'معدلات الفرد وكتالوج الخامات'!$H$18)","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O18","v":4007.5,"f":"=M18+N18","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":"EXT-02","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B19","v":"الواجهات الجانبية والخلفية (برايمر خارجي + معجون أسمنتي + دهان واجهات مطاطي إكريليكي مقاوم للأمطار)","bg":"#F8FAFC"},{"c":"C19","v":26,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D19","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E19","v":9.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F19","v":0,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G19","v":247,"f":"=IF(D19=0, C19*E19, 2*C19*D19*E19)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H19","v":24,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I19","v":223,"f":"=MAX(0, F19+G19-H19)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J19","v":0,"f":"=ROUND(I19/'معدلات الفرد وكتالوج الخامات'!$F$10, 2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K19","v":0,"f":"=ROUND(I19/'معدلات الفرد وكتالوج الخامات'!$F$11, 2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L19","v":0,"f":"=ROUND(I19/'معدلات الفرد وكتالوج الخامات'!$F$19, 2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M19","v":0,"f":"=(J19*'معدلات الفرد وكتالوج الخامات'!$G$10)+(K19*'معدلات الفرد وكتالوج الخامات'!$G$11)+(L19*'معدلات الفرد وكتالوج الخامات'!$G$19)","bg":"#F8FAFC","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N19","v":6913,"f":"=I19*('معدلات الفرد وكتالوج الخامات'!$H$10+'معدلات الفرد وكتالوج الخامات'!$H$11+'معدلات الفرد وكتالوج الخامات'!$H$19)","bg":"#F8FAFC","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O19","v":6913,"f":"=M19+N19","bg":"#F8FAFC","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":"EXT-03","b":true,"al":"center"},{"c":"B20","v":"أسوار المبنى الخارجية والمدخل (برايمر خارجي + معجون أسمنتي + طلاء واجهات جرافياتو خشن)"},{"c":"C20","v":32,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D20","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E20","v":2.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F20","v":0,"in":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G20","v":89.6,"f":"=IF(D20=0, C20*E20, 2*C20*D20*E20)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H20","v":6.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I20","v":83.1,"f":"=MAX(0, F20+G20-H20)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J20","v":0,"f":"=ROUND(I20/'معدلات الفرد وكتالوج الخامات'!$F$10, 2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K20","v":0,"f":"=ROUND(I20/'معدلات الفرد وكتالوج الخامات'!$F$11, 2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L20","v":0,"f":"=ROUND(I20/'معدلات الفرد وكتالوج الخامات'!$F$18, 2)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M20","v":0,"f":"=(J20*'معدلات الفرد وكتالوج الخامات'!$G$10)+(K20*'معدلات الفرد وكتالوج الخامات'!$G$11)+(L20*'معدلات الفرد وكتالوج الخامات'!$G$18)","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N20","v":2908.5,"f":"=I20*('معدلات الفرد وكتالوج الخامات'!$H$10+'معدلات الفرد وكتالوج الخامات'!$H$11+'معدلات الفرد وكتالوج الخامات'!$H$18)","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O20","v":2908.5,"f":"=M20+N20","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":21,"h":52.0,"cells":[{"c":"A21","v":"WOD-04","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B21","v":"أبواب الغرف الخشبية والحلوق والشبابيك الحديدية (سيلر/برايمر + معجون + وجهين لاكيه بولي يوريثان)","bg":"#F8FAFC"},{"c":"C21","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"D21","v":1.1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E21","v":2.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F21","v":0,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G21","v":58.08,"f":"=IF(D21=0, C21*E21, 2*C21*D21*E21)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H21","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I21","v":58.08,"f":"=MAX(0, F21+G21-H21)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J21","v":0,"f":"=ROUND(I21/'معدلات الفرد وكتالوج الخامات'!$F$10, 2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K21","v":0,"f":"=ROUND(I21/'معدلات الفرد وكتالوج الخامات'!$F$13, 2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L21","v":0,"f":"=ROUND(I21/'معدلات الفرد وكتالوج الخامات'!$F$20, 2)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M21","v":0,"f":"=(J21*'معدلات الفرد وكتالوج الخامات'!$G$10)+(K21*'معدلات الفرد وكتالوج الخامات'!$G$13)+(L21*'معدلات الفرد وكتالوج الخامات'!$G$20)","bg":"#F8FAFC","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N21","v":2032.8,"f":"=I21*'معدلات الفرد وكتالوج الخامات'!$H$20","bg":"#F8FAFC","fg":"#008000","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O21","v":2032.8,"f":"=M21+N21","bg":"#F8FAFC","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":22,"h":40.0,"cells":[{"c":"A22","v":"إجمالي مسطحات وكميات الواجهات الخارجية والأخشاب (Exterior & Joinery Subtotal)","bg":"#E2E8F0","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F22","v":0,"f":"=SUM(F18:F21)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G22","v":527.68,"f":"=SUM(G18:G21)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H22","v":49,"f":"=SUM(H18:H21)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I22","v":478.68,"f":"=SUM(I18:I21)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J22","v":0,"f":"=SUM(J18:J21)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K22","v":0,"f":"=SUM(K18:K21)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L22","v":0,"f":"=SUM(L18:L21)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M22","v":0,"f":"=SUM(M18:M21)","bg":"#E2E8F0","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N22","v":15861.8,"f":"=SUM(N18:N21)","bg":"#E2E8F0","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O22","v":15861.8,"f":"=SUM(O18:O21)","bg":"#E2E8F0","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":23,"h":44.0,"cells":[{"c":"A23","v":"الإجمالي الكلي للمسطحات المحصورة والتكاليف (Total QTO Summary)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F23","v":171.6,"f":"=F16+F22","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G23","v":954.58,"f":"=G16+G22","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H23","v":89.2,"f":"=H16+H22","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I23","v":1036.98,"f":"=I16+I22","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J23","v":0,"f":"=J16+J22","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K23","v":0,"f":"=K16+K22","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L23","v":0,"f":"=L16+L22","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M23","v":0,"f":"=M16+M22","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N23","v":33667.08,"f":"=N16+N22","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O23","v":33667.08,"f":"=O16+O22","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":24,"h":42.0,"cells":[{"c":"A24","v":"📦 إجمالي طلبية التوريد التجارية المقربة لأقرب عبوة صحيحة لأمر الشراء (Commercial Purchase Order - ROUNDUP)","bg":"#EFF6FF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"J24","v":0,"f":"=ROUNDUP(J23, 0)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"K24","v":0,"f":"=ROUNDUP(K23, 0)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"L24","v":0,"f":"=ROUNDUP(L23, 0)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"M24","v":45661.6125,"f":"='ملخص المقايسة ومؤشرات الدهانات'!F23","bg":"#EFF6FF","fg":"#047857","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\"","cs":3},{"skip":true},{"skip":true}]}]},{"name":"محضر استلام أعمال النقاشة QC","maxRow":22,"maxCol":7,"colWidths":[12.0,62.0,18.0,22.0,24.0,14.0,36.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"قائمة الفحص ومحضر استلام أعمال الدهانات والمعجون والبطانة والواجهات (QA/QC Inspection & RFI)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"نموذج فحص هندسي ميداني لاستلام مراحل النقاشة (الرشاش الحجري، السيلر المائي، سكينات المعجون باللمبة الكاشفة، وأوجه التشطيب) وفق كود البناء السعودي SBC 201 والكود المصري ECP 203 ومعايير ASTM D3359","bg":"#F1F5F9","fg":"#334155","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"إجمالي بنود الفحص:","bg":"#EFF6FF","b":true},{"c":"B4","v":16,"f":"=COUNTA(F7:F22)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"C4","v":"البنود المطابقة:","bg":"#EFF6FF","b":true},{"c":"D4","v":16,"f":"=COUNTIF(F7:F22, \"مطابق\")","bg":"#DCFCE7","fg":"#047857","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E4","v":"نسبة المطابقة الهندسية:","bg":"#EFF6FF","b":true},{"c":"F4","v":1,"f":"=IF(B4>0, D4/B4, 0)","bg":"#DCFCE7","fg":"#1E3A8A","b":true,"al":"center","nf":"0.0%","cs":2},{"skip":true}]},{"r":5,"h":28.0,"cells":[{"c":"A5","v":""},{"c":"B5","v":""},{"c":"C5","v":""},{"c":"D5","v":""},{"c":"E5","v":""},{"c":"F5","v":""},{"c":"G5","v":""}]},{"r":6,"h":42.0,"cells":[{"c":"A6","v":"رقم الفحص","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B6","v":"بيان نقطة الفحص والاستلام الفني لأعمال النقاشة والدهانات","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C6","v":"مرحلة الاستلام","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D6","v":"الكود / المعيار المرجعي","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E6","v":"أداة القياس والتفاوت المسموح","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F6","v":"حالة الفحص","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G6","v":"ملاحظات الاستشاري وتوجيهات الإصلاح","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"QC-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B7","v":"التحقق من تمام جفاف بياض المحارة والخرسانة وألا تتجاوز نسبة الرطوبة بالسطح 12% قبل البدء بالسيلر","bg":"#F8FAFC"},{"c":"C7","v":"1. تحضير السطح","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D7","v":"ASTM D4263 / SBC 201","bg":"#F8FAFC","al":"center"},{"c":"E7","v":"جهاز قياس الرطوبة (<= 12%)","bg":"#F8FAFC","al":"center"},{"c":"F7","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"G7","v":"تم القياس في 8 نقاط بالحوائط والنتيجة 9.5%","bg":"#F8FAFC"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"QC-02","b":true,"al":"center"},{"c":"B8","v":"تنفيذ الرشاش الحجري وإزالة حبيبات الرمل السائبة والرايش الأسمنتي وتنظيف الحوائط من الأتربة والزيوت"},{"c":"C8","v":"1. تحضير السطح","b":true,"al":"center"},{"c":"D8","v":"ECP 203 / أصول الصناعة","al":"center"},{"c":"E8","v":"حجر جلخ + فرشاة سلك","al":"center"},{"c":"F8","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"G8","v":"الأسطح نظيفة وخالية من البروزات"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"QC-03","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B9","v":"تغطية وحماية الأرضيات والوزرات وحلوق الأبواب والشبابيك بالمشمع البلاستيكي وشريط التيب الورقي اللاصق","bg":"#F8FAFC"},{"c":"C9","v":"1. تحضير السطح","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D9","v":"اشتراطات الموقع QC","bg":"#F8FAFC","al":"center"},{"c":"E9","v":"فحص بصري شامل (100%)","bg":"#F8FAFC","al":"center"},{"c":"F9","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"G9","v":"تم تغليف كافة الوزرات والحلوق بالكامل","bg":"#F8FAFC"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":"QC-04","b":true,"al":"center"},{"c":"B10","v":"معالجة الشروخ الشعرية وتفتيحها على شكل حرف V وملؤها بمعجون شروخ مرن وشريط فايبر مش عند الفواصل"},{"c":"C10","v":"1. تحضير السطح","b":true,"al":"center"},{"c":"D10","v":"SBC 201 / BS 6150","al":"center"},{"c":"E10","v":"سكين تفتيح + شريط فايبر","al":"center"},{"c":"F10","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"G10","v":"تم تسليح فواصل التقاء المباني بالخرسانة"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"QC-05","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":"فحص عبوات الخامات الموردة للموقع ومطابقتها لطلب فحص المواد (MIR) وتاريخ الصلاحية ورقم التشغيلة Batch","bg":"#F8FAFC"},{"c":"C11","v":"2. البطانة والتأسيس","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D11","v":"ISO 9001 / MIR Log","bg":"#F8FAFC","al":"center"},{"c":"E11","v":"مراجعة شهادات المصنع","bg":"#F8FAFC","al":"center"},{"c":"F11","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"G11","v":"جميع البستلات مطابقة للمواصفات ومغلقة بإحكام","bg":"#F8FAFC"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":"QC-06","b":true,"al":"center"},{"c":"B12","v":"تطبيق وجه السيلر المائي المقاوم للقلويات والأملاح بانتظام والالتزام بنسبة التخفيف المحددة بالنشرة الفنية"},{"c":"C12","v":"2. البطانة والتأسيس","b":true,"al":"center"},{"c":"D12","v":"Technical Data Sheet","al":"center"},{"c":"E12","v":"مقياس اللزوجة والتغطية","al":"center"},{"c":"F12","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"G12","v":"تشبع منتظم للسطح بدون تسييل"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":"QC-07","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":"سحب السكينة الأولى من المعجون باتجاه رأسي لملء المسام مع مراعاة عدم زيادة سماكة الطبقة عن 1 ملم","bg":"#F8FAFC"},{"c":"C13","v":"3. سحب المعجون","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D13","v":"ECP 203 / BS 6150","bg":"#F8FAFC","al":"center"},{"c":"E13","v":"كف معجون صلب مستوٍ","bg":"#F8FAFC","al":"center"},{"c":"F13","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"G13","v":"تغطية متجانسة بدون تكتل أو تشقق","bg":"#F8FAFC"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"QC-08","b":true,"al":"center"},{"c":"B14","v":"سحب السكينة الثانية من المعجون باتجاه أفقي متعامد على الأولى بعد جفافها التام (4-6 ساعات) بلون مميز"},{"c":"C14","v":"3. سحب المعجون","b":true,"al":"center"},{"c":"D14","v":"ECP 203 / أصول الصناعة","al":"center"},{"c":"E14","v":"فحص تعامد السكينتين","al":"center"},{"c":"F14","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"G14","v":"تم التمييز اللوني بين السكينتين الأولى والثانية"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"QC-09","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B15","v":"سحب السكينة الثالثة وصنفرة الحوائط بورق سنفرة ناعم (رقم 180 ثم 220) وإزالة غبار الصنفرة تماماً","bg":"#F8FAFC"},{"c":"C15","v":"3. سحب المعجون","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D15","v":"SBC 201 / ASTM D6386","bg":"#F8FAFC","al":"center"},{"c":"E15","v":"صنفرة يدوية أو كهربائية","bg":"#F8FAFC","al":"center"},{"c":"F15","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"G15","v":"نعومة ممتازة للسطح وخلوه من الخدوش","bg":"#F8FAFC"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":"QC-10","b":true,"al":"center"},{"c":"B16","v":"الفحص الهندسي باللمبة الكاشفة (المسلطة موازية للجدار) والقدة الألومنيوم للتأكد من عدم وجود تموجات"},{"c":"C16","v":"3. سحب المعجون","b":true,"al":"center"},{"c":"D16","v":"معيار الاستلام الهندسي","al":"center"},{"c":"E16","v":"لمبة كاشفة 200W + قدة 2م","al":"center"},{"c":"F16","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"G16","v":"تفاوت الاستواء أقل من 1.5 ملم لكل 2 متر"}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":"QC-11","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B17","v":"تطبيق وجه البطانة البلاستيكية بعد الصنفرة وتلقيط أي عيوب أو ثقوب شعرية (Touch-up) بمعجون أستوك","bg":"#F8FAFC"},{"c":"C17","v":"3. سحب المعجون","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D17","v":"ECP 203 / TDS","bg":"#F8FAFC","al":"center"},{"c":"E17","v":"فحص باللمبة الكاشفة","bg":"#F8FAFC","al":"center"},{"c":"F17","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"G17","v":"تم تلقيط الملاحظات وصنفرتها محلياً","bg":"#F8FAFC"}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":"QC-12","b":true,"al":"center"},{"c":"B18","v":"استلام زوايا الأركان البارزة والغاطسة (الأميات) والتأكد من استقامتها ورأسيتها بميزان الليزر وحمايتها بـ Corner Bead"},{"c":"C18","v":"3. سحب المعجون","b":true,"al":"center"},{"c":"D18","v":"SBC 201 / ECP 203","al":"center"},{"c":"E18","v":"ميزان ليزر + زاوية قائمة","al":"center"},{"c":"F18","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"G18","v":"جميع السوك والأركان رأسية تماماً"}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":"QC-13","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B19","v":"استلام الوجه الأول من دهان التشطيب النهائي بالرولة المخصصة والتأكد من تجانس اللون وعدم وجود تبطيع","bg":"#F8FAFC"},{"c":"C19","v":"4. التشطيب النهائي","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D19","v":"BS 6150 / ISO 11998","bg":"#F8FAFC","al":"center"},{"c":"E19","v":"فحص بصري في إضاءة النهار","bg":"#F8FAFC","al":"center"},{"c":"F19","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"G19","v":"تغطية ممتازة وموحدة الدرجة اللونية","bg":"#F8FAFC"}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":"QC-14","b":true,"al":"center"},{"c":"B20","v":"استلام الوجه النهائي (التشطيب) والتأكد من خلوه من التسييل أو آثار الرولة أو فقاعات الهواء أو تغير اللمعة"},{"c":"C20","v":"4. التشطيب النهائي","b":true,"al":"center"},{"c":"D20","v":"ASTM D2244 / BS 6150","al":"center"},{"c":"E20","v":"جهاز قياس اللمعان Gloss","al":"center"},{"c":"F20","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"G20","v":"اللمعة النصف لامعة متجانسة بكامل الفراغات"}]},{"r":21,"h":52.0,"cells":[{"c":"A21","v":"QC-15","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B21","v":"إجراء اختبار سماكة الفيلم الجاف (Dry Film Thickness - DFT) واختبار قوة الالتصاق الشبكي (Cross-Cut)","bg":"#F8FAFC"},{"c":"C21","v":"4. التشطيب النهائي","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D21","v":"ASTM D3359 / ISO 2409","bg":"#F8FAFC","al":"center"},{"c":"E21","v":"مقياس DFT (85-110 ميكرون)","bg":"#F8FAFC","al":"center"},{"c":"F21","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"G21","v":"نتيجة اختبار الالتصاق 5B بدون أي تقشير","bg":"#F8FAFC"}]},{"r":22,"h":52.0,"cells":[{"c":"A22","v":"QC-16","b":true,"al":"center"},{"c":"B22","v":"فك أشرطة التيب وتنظيف براويز ومفاتيح الكهرباء والوزرات والنوافذ وتسليم الفراغ نظيفاً للاستلام الابتدائي"},{"c":"C22","v":"4. التشطيب النهائي","b":true,"al":"center"},{"c":"D22","v":"اشتراطات التسليم النهائي","al":"center"},{"c":"E22","v":"معاينة التسليم النهائي","al":"center"},{"c":"F22","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"G22","v":"الفراغات جاهزة للتسليم الابتدائي بدون ملاحظات"}]}]}]}