{"slug":"plumbing-water-supply-and-drainage-network-boq-and-pipe-sizing-sheet","sheets":[{"name":"ملخص مقايسة السباكة والخزانات","maxRow":19,"maxCol":10,"colWidths":[8.0,60.0,15.0,16.0,13.0,13.0,13.0,18.0,13.0,26.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"شيت مقايسة وحصر كميات أعمال السباكة وتغذية المياه والصرف الصحي وحساب أقطار المواسير وخزانات المياه","bg":"#0369A1","fg":"#FFFFFF","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"نموذج تشغيلي للمكتب الفني ومهندسي الميكانيكا لحصر شبكات PPR و UPVC، وحساب وحدات التغذية والصرف (WSFU/DFU)، وتصميم سعة الخزانات وفق SBC 701","bg":"#F0F9FF","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"أولاً: بيانات المشروع وحاسبة سعة خزانات المياه الأرضية والعلوية ومعاملات التسعير (مدخلات قابلة للتعديل)","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":1,"b":true,"al":"center"},{"c":"B5","v":"اسم المشروع / المبنى:","b":true},{"c":"C5","v":"عمارة سكنية / فيلا دورين وملحق - حي النرجس","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","cs":2},{"skip":true},{"c":"E5","v":"عدد شاغلي المبنى (فرد):","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"G5","v":18,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H5","v":"استهلاك الفرد اليومي (لتر/يوم):","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"J5","v":250,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":6,"h":36.0,"cells":[{"c":"A6","v":2,"b":true,"al":"center"},{"c":"B6","v":"أيام التخزين الاحتياطي للخزان الأرضي:","b":true},{"c":"C6","v":2.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\"","cs":2},{"skip":true},{"c":"E6","v":"نسبة الخزان العلوي من اليومي:","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"G6","v":0.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"H6","v":"نسبة ضريبة القيمة المضافة VAT:","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"J6","v":0.15,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":3,"b":true,"al":"center"},{"c":"B7","v":"الحجم التصميمي للخزان الأرضي (م³):","b":true},{"c":"C7","v":11.25,"f":"=(G5*J5*C6)/1000","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\"","cs":2},{"skip":true},{"c":"E7","v":"حجم الخزان العلوي المطلوب (م³):","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"G7","v":2.25,"f":"=(G5*J5*G6)/1000","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H7","v":"نسبة الإشراف الهندسي والاختبارات:","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"J7","v":0.05,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"}]},{"r":8,"h":28.0,"cells":[{"c":"A8","v":""},{"c":"B8","v":""},{"c":"C8","v":""},{"c":"D8","v":""},{"c":"E8","v":""},{"c":"F8","v":""},{"c":"G8","v":""},{"c":"H8","v":""},{"c":"I8","v":""},{"c":"J8","v":""}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"سعة الخزان الأرضي + الخزان العلوي (م³)","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C9","v":"إجمالي أطوال مواسير التغذية والصرف (م.ط)","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"F9","v":"إجمالي وحدات التغذية التصميمية (WSFU)","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"H9","v":"إجمالي مقايسة السباكة شاملة الضريبة","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":10,"h":46.0,"cells":[{"c":"A10","v":13.5,"f":"=C7+G7","bg":"#F0F9FF","fg":"#0369A1","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\"","cs":2},{"skip":true},{"c":"C10","v":786.54,"f":"=SUM('حصر مواسير PPR و UPVC والقطع'!G6:G14)","bg":"#F0F9FF","fg":"#0369A1","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\"","cs":3},{"skip":true},{"skip":true},{"c":"F10","v":52,"f":"='حساب أقطار التغذية والصرف FU'!G14","bg":"#F0F9FF","fg":"#0369A1","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\"","cs":2},{"skip":true},{"c":"H10","v":0,"f":"=I19","bg":"#F0F9FF","fg":"#0369A1","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\"","cs":3},{"skip":true},{"skip":true}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"متر مكعب تخزين مياه صالحة للشرب","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C11","v":"متر طولي مواسير PPR و UPVC شاملة الهدر","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"F11","v":"وحدة جهاز صحي وفق كود السباكة SBC 701","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"H11","v":"شاملة المواسير والمضخات والأجهزة والمصنعيات","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":12,"h":38.0,"cells":[{"c":"A12","v":"ثانياً: جدول خلاصة مقايسة أعمال السباكة وتغذية المياه والصرف الصحي والأجهزة الصحية","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":"م","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B13","v":"بيان قسم الأعمال الصحية والميكانيكية","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C13","v":"الوحدة","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D13","v":"الكمية الصافية","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E13","v":"الكمية بالتوريد والهدر","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F13","v":"تكلفة توريد الخامات","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G13","v":"القطع والإكسسوارات","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H13","v":"مصنعيات التركيب","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I13","v":"الإجمالي الكلي للبند","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J13","v":"المرجع الهندسي في الشيت","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":14,"h":38.0,"cells":[{"c":"A14","v":1,"b":true,"al":"center"},{"c":"B14","v":"شبكة تغذية المياه الباردة والساخنة والروافع (مواسير PPR PN20 ومحبس دفن)","b":true},{"c":"C14","v":"م.ط","al":"center"},{"c":"D14","v":414,"f":"=SUM('حصر مواسير PPR و UPVC والقطع'!E6:E10)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E14","v":445.17,"f":"=SUM('حصر مواسير PPR و UPVC والقطع'!G6:G10)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F14","v":7176,"f":"=SUM('حصر مواسير PPR و UPVC والقطع'!K6:K10)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G14","v":1794,"f":"=F14*0.25","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H14","v":5053,"f":"=SUM('حصر مواسير PPR و UPVC والقطع'!L6:L10)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I14","v":14023,"f":"=F14+G14+H14","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J14","v":"تبويب حصر المواسير (بنود 1-5)","al":"center"}]},{"r":15,"h":38.0,"cells":[{"c":"A15","v":2,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B15","v":"شبكة الصرف الصحي والتهوية وصرف التكييف والأمطار (مواسير UPVC Class 4/5)","bg":"#F8FAFC","b":true},{"c":"C15","v":"م.ط","bg":"#F8FAFC","al":"center"},{"c":"D15","v":319,"f":"=SUM('حصر مواسير PPR و UPVC والقطع'!E11:E14)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E15","v":341.37,"f":"=SUM('حصر مواسير PPR و UPVC والقطع'!G11:G14)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F15","v":11544,"f":"=SUM('حصر مواسير PPR و UPVC والقطع'!K11:K14)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G15","v":3463.2,"f":"=F15*0.3","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H15","v":6062,"f":"=SUM('حصر مواسير PPR و UPVC والقطع'!L11:L14)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I15","v":21069.2,"f":"=F15+G15+H15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J15","v":"تبويب حصر المواسير (بنود 6-9)","bg":"#F8FAFC","al":"center"}]},{"r":16,"h":38.0,"cells":[{"c":"A16","v":3,"b":true,"al":"center"},{"c":"B16","v":"الصفايات الأرضية وغرف التفتيش والردادات ومحبس الخدمة الرئيسي","b":true},{"c":"C16","v":"عدد","al":"center"},{"c":"D16","v":46,"f":"=SUM('حصر مواسير PPR و UPVC والقطع'!E15:E16)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E16","v":46,"f":"=SUM('حصر مواسير PPR و UPVC والقطع'!G15:G16)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F16","v":7450,"f":"=SUM('حصر مواسير PPR و UPVC والقطع'!K15:K16)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G16","v":745,"f":"=F16*0.1","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H16","v":2610,"f":"=SUM('حصر مواسير PPR و UPVC والقطع'!L15:L16)","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I16","v":10805,"f":"=F16+G16+H16","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J16","v":"تبويب حصر المواسير (بنود 10-11)","al":"center"}]},{"r":17,"h":38.0,"cells":[{"c":"A17","v":4,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B17","v":"مضخات الرفع والتعزيز (Booster Pumps) والخزانات والسخانات والأجهزة الصحية","bg":"#F8FAFC","b":true},{"c":"C17","v":"مجموعة","bg":"#F8FAFC","al":"center"},{"c":"D17","v":15,"f":"=SUM('حصر مواسير PPR و UPVC والقطع'!E17:E20)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E17","v":15,"f":"=SUM('حصر مواسير PPR و UPVC والقطع'!G17:G20)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F17","v":20710,"f":"=SUM('حصر مواسير PPR و UPVC والقطع'!K17:K20)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G17","v":1656.8,"f":"=F17*0.08","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H17","v":4630,"f":"=SUM('حصر مواسير PPR و UPVC والقطع'!L17:L20)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I17","v":26996.8,"f":"=F17+G17+H17","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J17","v":"تبويب حصر المواسير (بنود 12-15)","bg":"#F8FAFC","al":"center"}]},{"r":18,"h":44.0,"cells":[{"c":"A18","v":"إجمالي التكلفة المباشرة لأعمال السباكة (مواسير + قطع + أجهزة + مصنعيات)","bg":"#E0F2FE","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F18","v":46880,"f":"=SUM(F14:F17)","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G18","v":7659,"f":"=SUM(G14:G17)","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H18","v":18355,"f":"=SUM(H14:H17)","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I18","v":72894,"f":"=SUM(I14:I17)","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J18","v":"قبل الضريبة","bg":"#E0F2FE","b":true,"al":"center"}]},{"r":19,"h":44.0,"cells":[{"c":"A19","v":"إجمالي المقايسة شامل الإشراف والاختبارات وضريبة القيمة المضافة VAT (15%)","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F19","v":0,"f":"=F18*(1+$J$7)*(1+$J$6)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G19","v":0,"f":"=G18*(1+$J$7)*(1+$J$6)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H19","v":0,"f":"=H18*(1+$J$7)*(1+$J$6)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I19","v":0,"f":"=I18*(1+$J$7)*(1+$J$6)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J19","v":"شامل الضريبة والإشراف","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"}]}]},{"name":"حصر مواسير PPR و UPVC والقطع","maxRow":21,"maxCol":13,"colWidths":[8.0,58.0,14.0,12.0,14.0,12.0,15.0,14.0,13.0,13.0,16.0,13.0,13.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"دفتر حصر كميات مواسير التغذية (PPR) ومواسير الصرف الصحي (UPVC) والمحابس والمضخات والأجهزة الصحية","bg":"#0369A1","fg":"#FFFFFF","b":true,"al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"يحسب الأطوال الصافية، ويضيف نسبة هدر القص والوصلات، ويقرب الطلبيات لعدد المواسير التجارية (طول 4م للـ PPR و 6م للـ UPVC) عبر دالة ROUNDUP","bg":"#F0F9FF","b":true,"al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"جدول الحصر الهندسي التفصيلي لمواسير التغذية والصرف الصحي والمحابس والمضخات والأجهزة الصحية","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"م","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"بيان المواسير والقطع والأجهزة الصحية والمواصفة الفنية","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"القطر / السعة","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"الوحدة","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"الكمية الصافية","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"نسبة الهدر %","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"الكمية بالهدر","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"طول العود (م)","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I5","v":"عدد الأعواد/القطع","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J5","v":"سعر التوريد","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K5","v":"تكلفة التوريد","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L5","v":"تكلفة المصنعية","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M5","v":"الإجمالي المباشر","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":1,"b":true,"al":"center"},{"c":"B6","v":"مواسير تغذية مياه حرارية بولي بروبلين PPR PN20 (فرعيات الأجهزة داخل الحمامات والمطابخ)","b":true},{"c":"C6","v":"20 ملم (1/2\")","al":"center"},{"c":"D6","v":"م.ط","al":"center"},{"c":"E6","v":145,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F6","v":0.08,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G6","v":156.6,"f":"=E6*(1+F6)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H6","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I6","v":40,"f":"=ROUNDUP(G6/H6, 0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J6","v":7.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K6","v":1200,"f":"=I6*H6*J6","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L6","v":1305,"f":"=E6*9","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M6","v":2505,"f":"=K6+L6","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":2,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B7","v":"مواسير تغذية مياه حرارية PPR PN20 (خطوط التغذية الرئيسية للحمامات والسخانات)","bg":"#F8FAFC","b":true},{"c":"C7","v":"25 ملم (3/4\")","bg":"#F8FAFC","al":"center"},{"c":"D7","v":"م.ط","bg":"#F8FAFC","al":"center"},{"c":"E7","v":110,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F7","v":0.08,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G7","v":118.8,"f":"=E7*(1+F7)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H7","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I7","v":30,"f":"=ROUNDUP(G7/H7, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J7","v":11.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K7","v":1380,"f":"=I7*H7*J7","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L7","v":1210,"f":"=E7*11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M7","v":2590,"f":"=K7+L7","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":3,"b":true,"al":"center"},{"c":"B8","v":"مواسير تغذية مياه حرارية PPR PN20 (الروافع الرأسية والخطوط الصاعدة من الخزان)","b":true},{"c":"C8","v":"32 ملم (1\")","al":"center"},{"c":"D8","v":"م.ط","al":"center"},{"c":"E8","v":75,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F8","v":0.07,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G8","v":80.25,"f":"=E8*(1+F8)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H8","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I8","v":21,"f":"=ROUNDUP(G8/H8, 0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J8","v":18,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K8","v":1512,"f":"=I8*H8*J8","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L8","v":1050,"f":"=E8*14","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M8","v":2562,"f":"=K8+L8","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":4,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B9","v":"مواسير تغذية مياه حرارية PPR PN20 مقاومة للأشعة UV (شبكة السطح وتغذية المضخات)","bg":"#F8FAFC","b":true},{"c":"C9","v":"40 ملم (1.25\")","bg":"#F8FAFC","al":"center"},{"c":"D9","v":"م.ط","bg":"#F8FAFC","al":"center"},{"c":"E9","v":48,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F9","v":0.07,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G9","v":51.36,"f":"=E9*(1+F9)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H9","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I9","v":13,"f":"=ROUNDUP(G9/H9, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J9","v":27,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K9","v":1404,"f":"=I9*H9*J9","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L9","v":768,"f":"=E9*16","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M9","v":2172,"f":"=K9+L9","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":5,"b":true,"al":"center"},{"c":"B10","v":"مواسير تغذية مياه حرارية PPR PN20 (الخط الرئيسي من الخزان الأرضي للخزان العلوي)","b":true},{"c":"C10","v":"50 ملم (1.5\")","al":"center"},{"c":"D10","v":"م.ط","al":"center"},{"c":"E10","v":36,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F10","v":0.06,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G10","v":38.16,"f":"=E10*(1+F10)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H10","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I10","v":10,"f":"=ROUNDUP(G10/H10, 0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J10","v":42,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K10","v":1680,"f":"=I10*H10*J10","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L10","v":720,"f":"=E10*20","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M10","v":2400,"f":"=K10+L10","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":6,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":"مواسير صرف صحي UPVC Class 4 (صرف الأحواض والبيديه والغسالات وتكثيف التكييف)","bg":"#F8FAFC","b":true},{"c":"C11","v":"50 ملم (2\")","bg":"#F8FAFC","al":"center"},{"c":"D11","v":"م.ط","bg":"#F8FAFC","al":"center"},{"c":"E11","v":92,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F11","v":0.08,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G11","v":99.36,"f":"=E11*(1+F11)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H11","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I11","v":17,"f":"=ROUNDUP(G11/H11, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J11","v":14,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K11","v":1428,"f":"=I11*H11*J11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L11","v":1104,"f":"=E11*12","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M11","v":2532,"f":"=K11+L11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":7,"b":true,"al":"center"},{"c":"B12","v":"مواسير صرف صحي UPVC Class 4 (صرف الصفايات الأرضية ومجاري المطابخ والتهوية)","b":true},{"c":"C12","v":"75 ملم (3\")","al":"center"},{"c":"D12","v":"م.ط","al":"center"},{"c":"E12","v":68,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F12","v":0.07,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G12","v":72.76,"f":"=E12*(1+F12)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H12","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I12","v":13,"f":"=ROUNDUP(G12/H12, 0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J12","v":24,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K12","v":1872,"f":"=I12*H12*J12","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L12","v":1020,"f":"=E12*15","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M12","v":2892,"f":"=K12+L12","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":8,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":"مواسير صرف صحي UPVC Class 4 (أعمدة العمل للمراحيض ومدادات الصرف وتصريف المطر)","bg":"#F8FAFC","b":true},{"c":"C13","v":"110 ملم (4\")","bg":"#F8FAFC","al":"center"},{"c":"D13","v":"م.ط","bg":"#F8FAFC","al":"center"},{"c":"E13","v":115,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F13","v":0.07,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G13","v":123.05,"f":"=E13*(1+F13)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H13","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I13","v":21,"f":"=ROUNDUP(G13/H13, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J13","v":38,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K13","v":4788,"f":"=I13*H13*J13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L13","v":2530,"f":"=E13*22","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M13","v":7318,"f":"=K13+L13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":9,"b":true,"al":"center"},{"c":"B14","v":"مواسير صرف صحي أرضي UPVC Class 5 الثقيل (الخطوط المدفونة بين غرف التفتيش)","b":true},{"c":"C14","v":"160 ملم (6\")","al":"center"},{"c":"D14","v":"م.ط","al":"center"},{"c":"E14","v":44,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F14","v":0.05,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G14","v":46.2,"f":"=E14*(1+F14)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H14","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I14","v":8,"f":"=ROUNDUP(G14/H14, 0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J14","v":72,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K14","v":3456,"f":"=I14*H14*J14","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L14","v":1408,"f":"=E14*32","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M14","v":4864,"f":"=K14+L14","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":10,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B15","v":"محابس دفن PPR بقلب نحاس + محابس زاوية نيكل كروم + صفايات أرضية بغطاء إستانلس","bg":"#F8FAFC","b":true},{"c":"C15","v":"متنوع","bg":"#F8FAFC","al":"center"},{"c":"D15","v":"عدد","bg":"#F8FAFC","al":"center"},{"c":"E15","v":38,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F15","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G15","v":38,"f":"=E15*(1+F15)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H15","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I15","v":38,"f":"=ROUNDUP(G15/H15, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J15","v":95,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K15","v":3610,"f":"=I15*H15*J15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L15","v":1330,"f":"=E15*35","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M15","v":4940,"f":"=K15+L15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":11,"b":true,"al":"center"},{"c":"B16","v":"غرف تفتيش خرسانية/بلاستيكية 60×60 سم بأغطية فونت الدكتايل + رداد صرف صحي 160 ملم","b":true},{"c":"C16","v":"60×60 سم","al":"center"},{"c":"D16","v":"عدد","al":"center"},{"c":"E16","v":8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F16","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G16","v":8,"f":"=E16*(1+F16)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H16","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I16","v":8,"f":"=ROUNDUP(G16/H16, 0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J16","v":480,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K16","v":3840,"f":"=I16*H16*J16","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L16","v":1280,"f":"=E16*160","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M16","v":5120,"f":"=K16+L16","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":17,"h":38.0,"cells":[{"c":"A17","v":12,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B17","v":"خزان مياه علوي بولي إيثيلين معزول 4 طبقات + عوامة كهربائية وميكانيكية","bg":"#F8FAFC","b":true},{"c":"C17","v":"3,000 لتر","bg":"#F8FAFC","al":"center"},{"c":"D17","v":"عدد","bg":"#F8FAFC","al":"center"},{"c":"E17","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F17","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G17","v":1,"f":"=E17*(1+F17)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H17","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I17","v":1,"f":"=ROUNDUP(G17/H17, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J17","v":2450,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K17","v":2450,"f":"=I17*H17*J17","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L17","v":450,"f":"=E17*450","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M17","v":2900,"f":"=K17+L17","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":13,"b":true,"al":"center"},{"c":"B18","v":"مجموعة مضخات رفع (Transfer) ومضخة تقوية ضغط أوتوماتيكية (Booster Pump) باللوحة","b":true},{"c":"C18","v":"1.5 حصان","al":"center"},{"c":"D18","v":"مجموعة","al":"center"},{"c":"E18","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F18","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G18","v":2,"f":"=E18*(1+F18)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H18","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I18","v":2,"f":"=ROUNDUP(G18/H18, 0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J18","v":2200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K18","v":4400,"f":"=I18*H18*J18","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L18","v":1000,"f":"=E18*500","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M18","v":5400,"f":"=K18+L18","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":19,"h":38.0,"cells":[{"c":"A19","v":14,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B19","v":"سخانات مياه كهربائية معزولة بصمام أمان وشيك بلف (سعة 50 لتر و 80 لتر)","bg":"#F8FAFC","b":true},{"c":"C19","v":"50-80 لتر","bg":"#F8FAFC","al":"center"},{"c":"D19","v":"عدد","bg":"#F8FAFC","al":"center"},{"c":"E19","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F19","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G19","v":6,"f":"=E19*(1+F19)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H19","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I19","v":6,"f":"=ROUNDUP(G19/H19, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J19","v":460,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K19","v":2760,"f":"=I19*H19*J19","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L19","v":660,"f":"=E19*110","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M19","v":3420,"f":"=K19+L19","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":15,"b":true,"al":"center"},{"c":"B20","v":"أطقم أجهزة صحية كاملة (مرحاض معلق/أفرنجي + مغسلة + خلاط دفن وشطاف ومجلى مطبخ)","b":true},{"c":"C20","v":"طقم كامل","al":"center"},{"c":"D20","v":"عدد","al":"center"},{"c":"E20","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F20","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"G20","v":6,"f":"=E20*(1+F20)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H20","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I20","v":6,"f":"=ROUNDUP(G20/H20, 0)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J20","v":1850,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K20","v":11100,"f":"=I20*H20*J20","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L20","v":2520,"f":"=E20*420","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M20","v":13620,"f":"=K20+L20","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":21,"h":44.0,"cells":[{"c":"A21","v":"إجمالي حصر كميات وتكاليف مواسير التغذية والصرف والأجهزة الصحية","bg":"#E0F2FE","b":true,"cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"E21","v":794,"f":"=SUM(E6:E20)","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F21","v":0.07,"f":"=AVERAGE(F6:F14)","bg":"#E0F2FE","b":true,"al":"center","nf":"0.0%"},{"c":"G21","v":847.54,"f":"=SUM(G6:G20)","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H21","v":4.888889,"f":"=AVERAGE(H6:H14)","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I21","v":234,"f":"=SUM(I6:I20)","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J21","v":519.266667,"f":"=AVERAGE(J6:J20)","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K21","v":46880,"f":"=SUM(K6:K20)","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L21","v":18355,"f":"=SUM(L6:L20)","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M21","v":65235,"f":"=SUM(M6:M20)","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]}]},{"name":"حساب أقطار التغذية والصرف FU","maxRow":22,"maxCol":12,"colWidths":[8.0,58.0,13.0,13.0,13.0,13.0,15.0,13.0,13.0,13.0,13.0,18.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"حاسبة أقطار مواسير تغذية المياه (WSFU) وأقطار وميول مواسير الصرف الصحي (DFU) وفق كود SBC 701","bg":"#0369A1","fg":"#FFFFFF","b":true,"al":"center","cs":12},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"تحسب وحدات الأجهزة الصحية، والتدفق التصميمي الأقصى (L/s & GPM)، وتتحقق من سرعة الجريان داخل مواسير PPR (≤ 2.0 م/ث) وسعة أعمدة الصرف UPVC","bg":"#F0F9FF","b":true,"al":"center","cs":12},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"أولاً: جدول حساب وحدات تغذية المياه (WSFU) والتدفق التصميمي واختيار قطر الماسورة وفحص السرعة (SBC 701 / IPC)","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":12},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"م","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"الفرعة أو الخط الهيدروليكي ومجموعة الحمامات المخدومة","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"عدد المراحيض","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"عدد المغاسل","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"عدد الدش/المجلى","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"غسالة/سخان","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"إجمالي WSFU","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"التدفق (لتر/ث)","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I5","v":"التدفق (GPM)","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J5","v":"القطر الخارجي PPR","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K5","v":"القطر الداخلي (ملم)","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L5","v":"السرعة الفعلية (م/ث)","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":36.0,"cells":[{"c":"A6","v":1,"b":true,"al":"center"},{"c":"B6","v":"فرعة تغذية الحمام الرئيسي (الماستر) — مرحاض + مغسلتين + دش مطري + شطاف","b":true},{"c":"C6","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D6","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E6","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F6","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G6","v":8.5,"f":"=(C6*2.5)+(D6*1)+(E6*2)+(F6*2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H6","v":0.641405,"f":"=0.22*SQRT(G6)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I6","v":10.166269,"f":"=H6*15.85","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J6","v":"25 ملم (3/4\")","b":true,"al":"center"},{"c":"K6","v":16.6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L6","v":0,"f":"=(H6/1000)/(3.14159*POWER(K6/2000,2))","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":2,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B7","v":"فرعة تغذية حمام الضيوف — مرحاض + مغسلة + شطاف","bg":"#F8FAFC","b":true},{"c":"C7","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D7","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E7","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F7","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G7","v":5.5,"f":"=(C7*2.5)+(D7*1)+(E7*2)+(F7*2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H7","v":0.515946,"f":"=0.22*SQRT(G7)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I7","v":8.177744,"f":"=H7*15.85","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J7","v":"20 ملم (1/2\")","bg":"#F8FAFC","b":true,"al":"center"},{"c":"K7","v":13.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L7","v":0,"f":"=(H7/1000)/(3.14159*POWER(K7/2000,2))","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":8,"h":36.0,"cells":[{"c":"A8","v":3,"b":true,"al":"center"},{"c":"B8","v":"فرعة تغذية حمام الأولاد المشترك — مرحاض + مغسلة + دش استحمام + شطاف","b":true},{"c":"C8","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D8","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E8","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F8","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G8","v":7.5,"f":"=(C8*2.5)+(D8*1)+(E8*2)+(F8*2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H8","v":0.602495,"f":"=0.22*SQRT(G8)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I8","v":9.549546,"f":"=H8*15.85","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J8","v":"25 ملم (3/4\")","b":true,"al":"center"},{"c":"K8","v":16.6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L8","v":0,"f":"=(H8/1000)/(3.14159*POWER(K8/2000,2))","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":9,"h":36.0,"cells":[{"c":"A9","v":4,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B9","v":"فرعة تغذية المطبخ الرئيسي — مجلى مزدوج + غسالة أطباق + فلتر مياه","bg":"#F8FAFC","b":true},{"c":"C9","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D9","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E9","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F9","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G9","v":7,"f":"=(C9*2.5)+(D9*1)+(E9*2)+(F9*2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H9","v":0.582065,"f":"=0.22*SQRT(G9)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I9","v":9.22573,"f":"=H9*15.85","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J9","v":"25 ملم (3/4\")","bg":"#F8FAFC","b":true,"al":"center"},{"c":"K9","v":16.6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L9","v":0,"f":"=(H9/1000)/(3.14159*POWER(K9/2000,2))","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":5,"b":true,"al":"center"},{"c":"B10","v":"فرعة تغذية غرفة الغسيل والخدمة — غسالة ملابس أوتوماتيك + حوض غسيل","b":true},{"c":"C10","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D10","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E10","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F10","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G10","v":7,"f":"=(C10*2.5)+(D10*1)+(E10*2)+(F10*2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H10","v":0.582065,"f":"=0.22*SQRT(G10)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I10","v":9.22573,"f":"=H10*15.85","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J10","v":"25 ملم (3/4\")","b":true,"al":"center"},{"c":"K10","v":16.6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L10","v":0,"f":"=(H10/1000)/(3.14159*POWER(K10/2000,2))","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":6,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":"الخط الصاعد لتغذية الدور الأرضي بالكامل (مجمع الحمامات والمطبخ)","bg":"#F8FAFC","b":true},{"c":"C11","v":3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D11","v":5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E11","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F11","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G11","v":28.5,"f":"=(C11*2.5)+(D11*1)+(E11*2)+(F11*2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H11","v":1.174479,"f":"=0.22*SQRT(G11)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I11","v":18.615492,"f":"=H11*15.85","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J11","v":"32 ملم (1\")","bg":"#F8FAFC","b":true,"al":"center"},{"c":"K11","v":21.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L11","v":0,"f":"=(H11/1000)/(3.14159*POWER(K11/2000,2))","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":7,"b":true,"al":"center"},{"c":"B12","v":"الخط الصاعد لتغذية الدور الأول والملحق العلوي بالكامل","b":true},{"c":"C12","v":3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D12","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E12","v":3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F12","v":3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G12","v":23.5,"f":"=(C12*2.5)+(D12*1)+(E12*2)+(F12*2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H12","v":1.06649,"f":"=0.22*SQRT(G12)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I12","v":16.903866,"f":"=H12*15.85","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J12","v":"32 ملم (1\")","b":true,"al":"center"},{"c":"K12","v":21.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L12","v":0,"f":"=(H12/1000)/(3.14159*POWER(K12/2000,2))","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":8,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":"الخط الرئيسي الخارج من مضخة التقوية (Booster Header) لتغذية المبنى بالكامل","bg":"#F8FAFC","b":true},{"c":"C13","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D13","v":9,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E13","v":7,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F13","v":7,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G13","v":52,"f":"=(C13*2.5)+(D13*1)+(E13*2)+(F13*2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H13","v":1.586443,"f":"=0.22*SQRT(G13)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I13","v":25.145122,"f":"=H13*15.85","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J13","v":"50 ملم (1.5\")","bg":"#F8FAFC","b":true,"al":"center"},{"c":"K13","v":33.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L13","v":0,"f":"=(H13/1000)/(3.14159*POWER(K13/2000,2))","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":14,"h":42.0,"cells":[{"c":"A14","v":"إجمالي الحمل الهيدروليكي التصميمي للمبنى بالكامل ومعدل السرعة القصوى","bg":"#E0F2FE","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G14","v":52,"f":"=G13","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H14","v":1.586443,"f":"=H13","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I14","v":25.145122,"f":"=I13","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J14","v":"50 ملم (1.5\")","bg":"#E0F2FE","b":true,"al":"center"},{"c":"K14","v":33.2,"f":"=K13","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L14","v":0,"f":"=MAX(L6:L13)","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":15,"h":28.0,"cells":[{"c":"A15","v":""},{"c":"B15","v":""},{"c":"C15","v":""},{"c":"D15","v":""},{"c":"E15","v":""},{"c":"F15","v":""},{"c":"G15","v":""},{"c":"H15","v":""},{"c":"I15","v":""},{"c":"J15","v":""},{"c":"K15","v":""},{"c":"L15","v":""}]},{"r":16,"h":38.0,"cells":[{"c":"A16","v":"ثانياً: جدول حساب وحدات الصرف الصحي (DFU) واختيار أقطار وميول مواسير UPVC وفق كود السباكة السعودي SBC 701","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":12},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":"م","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B17","v":"خط أو عمود الصرف الصحي ونوعه (فرعي أفقي / عمود رأسي / مداد أرضي)","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C17","v":"عدد المراحيض","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D17","v":"عدد الصفايات","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E17","v":"أحواض/مغاسل","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F17","v":"غسالات/مجلى","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G17","v":"إجمالي DFU","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H17","v":"الميل التصميمي %","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I17","v":"قطر الماسورة UPVC","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J17","v":"السعة القصوى DFU","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K17","v":"نسبة التحميل %","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L17","v":"حالة المطابقة للكود","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":18,"h":36.0,"cells":[{"c":"A18","v":1,"b":true,"al":"center"},{"c":"B18","v":"فرعة صرف خفيف (مغاسل وحوض غسيل يدوي) إلى الصفاية الأرضية","b":true},{"c":"C18","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D18","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E18","v":3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F18","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G18","v":5,"f":"=(C18*4)+(D18*2)+(E18*1)+(F18*2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H18","v":0.02,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"I18","v":"50 ملم (2\")","b":true,"al":"center"},{"c":"J18","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"K18","v":0.833333,"f":"=G18/J18","b":true,"al":"center","nf":"0.0%"},{"c":"L18","v":"مطابق للكود SBC 701","f":"=IF(G18<=J18,\"مطابق للكود SBC 701\",\"يلزم تكبير القطر\")","b":true,"al":"center"}]},{"r":19,"h":36.0,"cells":[{"c":"A19","v":2,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B19","v":"فرعة تجميع الصفاية الأرضية ومجلى المطبخ والغسالة الأوتوماتيك","bg":"#F8FAFC","b":true},{"c":"C19","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D19","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E19","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F19","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G19","v":10,"f":"=(C19*4)+(D19*2)+(E19*1)+(F19*2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H19","v":0.02,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"I19","v":"75 ملم (3\")","bg":"#F8FAFC","b":true,"al":"center"},{"c":"J19","v":20,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"K19","v":0.5,"f":"=G19/J19","bg":"#F8FAFC","b":true,"al":"center","nf":"0.0%"},{"c":"L19","v":"مطابق للكود SBC 701","f":"=IF(G19<=J19,\"مطابق للكود SBC 701\",\"يلزم تكبير القطر\")","bg":"#F8FAFC","b":true,"al":"center"}]},{"r":20,"h":36.0,"cells":[{"c":"A20","v":3,"b":true,"al":"center"},{"c":"B20","v":"فرعة صرف مرحاض الحمام الرئيسي وحمام الضيوف (خط العمل الثقيل)","b":true},{"c":"C20","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D20","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E20","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F20","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G20","v":8,"f":"=(C20*4)+(D20*2)+(E20*1)+(F20*2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H20","v":0.015,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"I20","v":"110 ملم (4\")","b":true,"al":"center"},{"c":"J20","v":160,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"K20","v":0.05,"f":"=G20/J20","b":true,"al":"center","nf":"0.0%"},{"c":"L20","v":"مطابق للكود SBC 701","f":"=IF(G20<=J20,\"مطابق للكود SBC 701\",\"يلزم تكبير القطر\")","b":true,"al":"center"}]},{"r":21,"h":36.0,"cells":[{"c":"A21","v":4,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B21","v":"عمود الصرف الرأسي الرئيسي (Soil Stack) لخدمة أدوار المبنى","bg":"#F8FAFC","b":true},{"c":"C21","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D21","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E21","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F21","v":3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G21","v":36,"f":"=(C21*4)+(D21*2)+(E21*1)+(F21*2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H21","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"I21","v":"110 ملم (4\")","bg":"#F8FAFC","b":true,"al":"center"},{"c":"J21","v":240,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"K21","v":0.15,"f":"=G21/J21","bg":"#F8FAFC","b":true,"al":"center","nf":"0.0%"},{"c":"L21","v":"مطابق للكود SBC 701","f":"=IF(G21<=J21,\"مطابق للكود SBC 701\",\"يلزم تكبير القطر\")","bg":"#F8FAFC","b":true,"al":"center"}]},{"r":22,"h":36.0,"cells":[{"c":"A22","v":5,"b":true,"al":"center"},{"c":"B22","v":"مداد الصرف الأرضي الرئيسي بين غرف التفتيش حتى المطبق العمومي","b":true},{"c":"C22","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D22","v":8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E22","v":9,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F22","v":5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G22","v":59,"f":"=(C22*4)+(D22*2)+(E22*1)+(F22*2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H22","v":0.01,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"0.0%"},{"c":"I22","v":"160 ملم (6\")","b":true,"al":"center"},{"c":"J22","v":620,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"K22","v":0.095161,"f":"=G22/J22","b":true,"al":"center","nf":"0.0%"},{"c":"L22","v":"مطابق للكود SBC 701","f":"=IF(G22<=J22,\"مطابق للكود SBC 701\",\"يلزم تكبير القطر\")","b":true,"al":"center"}]}]},{"name":"استلام واختبار أعمال السباكة","maxRow":15,"maxCol":8,"colWidths":[8.0,58.0,16.0,13.0,13.0,13.0,13.0,28.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"قائمة الفحص والاستلام الميداني والاختبارات الهيدروستاتيكية لأعمال السباكة والتغذية والصرف (QA/QC Checklist)","bg":"#0369A1","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"تغطي فحص اللحام الحراري لمواسير PPR، واختبار الضغط الهيدروستاتيكي (10-15 بار)، واختبار الغمر لمواسير الصرف UPVC، وضبط الميول وفق SBC 701","bg":"#F0F9FF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"جدول الفحص والاستلام الهندسي والاختبارات الميدانية لشبكات التغذية والصرف الصحي (QA/QC Inspection)","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":42.0,"cells":[{"c":"A5","v":"م","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"بند الفحص والاختبار الهيدروليكي والميداني لأعمال السباكة","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"النظام","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"الكود المرجعي","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"معيار القبول","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"أداة الفحص","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"حالة المطابقة","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"ملاحظات مهندس الإشراف","bg":"#075985","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":1,"b":true,"al":"center"},{"c":"B6","v":"فحص وجود الجلب البلاستيكية والمعدنية (Sleeves) وأطواق منع التسرب (Puddle Flanges) قبل صب الخرسانات","b":true},{"c":"C6","v":"التأسيس الإنشائي","al":"center"},{"c":"D6","v":"SBC 701 / BS 8007","b":true,"al":"center"},{"c":"E6","v":"تواجد 100% بالجدران","al":"center"},{"c":"F6","v":"معاينة قبل الصب","al":"center"},{"c":"G6","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"H6","v":"عدم تكسير الكمرات والأعمدة"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":2,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B7","v":"فحص جودة اللحام الحراري لمواسير PPR عند 260 درجة مئوية وانتظام دبلة اللحام المزدوجة دون انسداد داخلي","bg":"#F8FAFC","b":true},{"c":"C7","v":"تغذية المياه PPR","bg":"#F8FAFC","al":"center"},{"c":"D7","v":"DIN 8077 / 8078","bg":"#F8FAFC","b":true,"al":"center"},{"c":"E7","v":"صفر اختناق داخلي","bg":"#F8FAFC","al":"center"},{"c":"F7","v":"فحص بصري ومقطعي","bg":"#F8FAFC","al":"center"},{"c":"G7","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"H7","v":"التزام زمن التسخين القياسي","bg":"#F8FAFC"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":3,"b":true,"al":"center"},{"c":"B8","v":"إجراء اختبار الضغط الهيدروستاتيكي لشبكة التغذية PPR على ضغط 1.5× ضغط التشغيل (بحد أدنى 10 إلى 15 بار)","b":true},{"c":"C8","v":"اختبار التغذية","al":"center"},{"c":"D8","v":"SBC 701 / IPC","b":true,"al":"center"},{"c":"E8","v":"ثبات 120 دقيقة (0 هبوط)","al":"center"},{"c":"F8","v":"طلمبة اختبار ومانومتر","al":"center"},{"c":"G8","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"H8","v":"فصل السخانات والعدادات أثناء الضخ"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":4,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B9","v":"ضبط مناسيب مخارج التغذية والصرف للأحواض والمراحيض والخلاطات المدفونة بميزان الليزر وشرب التشطيب","bg":"#F8FAFC","b":true},{"c":"C9","v":"مناسيب المخارج","bg":"#F8FAFC","al":"center"},{"c":"D9","v":"ECP 203 / SBC 701","bg":"#F8FAFC","b":true,"al":"center"},{"c":"E9","v":"تفاوت ≤ ± 2 ملم","bg":"#F8FAFC","al":"center"},{"c":"F9","v":"ميزان الليزر والمتر","bg":"#F8FAFC","al":"center"},{"c":"G9","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"H9","v":"تركيب طبات اختبار معدنية","bg":"#F8FAFC"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":5,"b":true,"al":"center"},{"c":"B10","v":"عزل مواسير المياه الساخنة المدفونة والمعرضة، وتغليف مواسير PPR الخارجية على السطح ضد الأشعة فوق البنفسجية UV","b":true},{"c":"C10","v":"العزل والحماية","al":"center"},{"c":"D10","v":"SBC 501 / 701","b":true,"al":"center"},{"c":"E10","v":"عزل مطاطي 9-13 ملم","al":"center"},{"c":"F10","v":"فحص بصري","al":"center"},{"c":"G10","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"H10","v":"حماية المواسير من الشمس"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":6,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":"فحص ميول مواسير الصرف الأفقية UPVC (1% إلى 2% باتجاه الجريان) والتأكد من إحكام الجوانات أو الغراء الحار","bg":"#F8FAFC","b":true},{"c":"C11","v":"شبكة الصرف UPVC","bg":"#F8FAFC","al":"center"},{"c":"D11","v":"SBC 701 / EN 1401","bg":"#F8FAFC","b":true,"al":"center"},{"c":"E11","v":"ميل 1-2 سم لكل متر","bg":"#F8FAFC","al":"center"},{"c":"F11","v":"ميزان المياه والليزر","bg":"#F8FAFC","al":"center"},{"c":"G11","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"H11","v":"استخدام كيعان مفتوحة 45 درجة","bg":"#F8FAFC"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":7,"b":true,"al":"center"},{"c":"B12","v":"إجراء اختبار الغمر المائي (Water Head Test) لمواسير الصرف الصحي بعمود ماء ارتفاع 3 أمتار لمدة لا تقل عن 4 ساعات","b":true},{"c":"C12","v":"اختبار الصرف","al":"center"},{"c":"D12","v":"SBC 701 / IPC 312","b":true,"al":"center"},{"c":"E12","v":"0% رشح في الوصلات","al":"center"},{"c":"F12","v":"بالونة سد وعمود ماء","al":"center"},{"c":"G12","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"H12","v":"قبل الدفن أو صب الأرضية"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":8,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":"التأكد من وجود حاجز مائي بعمق (5-10 سم) في جميع الصفايات الأرضية (P-Trap) وتمديد أعمدة التهوية أعلى السطح","bg":"#F8FAFC","b":true},{"c":"C13","v":"الصفايات والتهوية","bg":"#F8FAFC","al":"center"},{"c":"D13","v":"SBC 701","bg":"#F8FAFC","b":true,"al":"center"},{"c":"E13","v":"عمق حاجز ≥ 50 ملم","bg":"#F8FAFC","al":"center"},{"c":"F13","v":"فحص واختبار غمر","bg":"#F8FAFC","al":"center"},{"c":"G13","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"H13","v":"منع ارتداد الروائح الكريهة","bg":"#F8FAFC"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":9,"b":true,"al":"center"},{"c":"B14","v":"فحص تبطين وميول قاع غرف التفتيش (Benchings) وتركيب رداد الصرف الرئيسي (Backwater Valve) لمنع رجوع المجاري","b":true},{"c":"C14","v":"غرف التفتيش","al":"center"},{"c":"D14","v":"SBC 701","b":true,"al":"center"},{"c":"E14","v":"إحكام البوابة والغطاء","al":"center"},{"c":"F14","v":"تجربة جريان","al":"center"},{"c":"G14","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"H14","v":"أغطية دكتايل تتحمل الأحمال"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":10,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B15","v":"غسيل وتعقيم خزانات المياه وشبكة التغذية بمحلول الكلور (50 جزء بالمليون لمدة 24 ساعة) قبل التسليم النهائي","bg":"#F8FAFC","b":true},{"c":"C15","v":"التعقيم والتسليم","bg":"#F8FAFC","al":"center"},{"c":"D15","v":"SBC 701 / AWWA","bg":"#F8FAFC","b":true,"al":"center"},{"c":"E15","v":"كلور متبقي < 2 ppm","bg":"#F8FAFC","al":"center"},{"c":"F15","v":"جهاز فحص الكلور","bg":"#F8FAFC","al":"center"},{"c":"G15","v":"مطابق","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"H15","v":"تحرير شهادة تعقيم الشبكة","bg":"#F8FAFC"}]}]}]}