{"slug":"post-tension-slab-tendon-elongation-and-jacking-record-sheet","sheets":[{"name":"إعدادات المشروع ومواصفات الشد","maxRow":23,"maxCol":5,"colWidths":[32.0,28.0,22.0,20.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"إعدادات المشروع والخصائص الميكانيكية لجدائل الشد اللاحق (Post-Tension Parameters)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"⚠️ تنبيه فني استرشادي: المعاملات وخصائص الفولاذ أدناه تمثل القيم المرجعية لجدائل الشد اللاحق ASTM A416 Gr 270 وكود SBC 304 و ACI 318. يرجى مطابقة قيم المساحة ومعامل المرونة مع شهادات اختبار المصنع (Mill Test Certificates) المعتمدة لمشروعك.","bg":"#EFF6FF","fg":"#475569","al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"أولاً: بيانات المشروع والعنصر الإنشائي وصب الخرسانة","bg":"#2563EB","fg":"#FFFFFF","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"اسم المشروع الإنشائي:","bg":"#DBEAFE","fg":"#1E293B","b":true},{"c":"B5","v":"برج الأعمال السكني والتجاري - البوديوم والبرج","cs":2},{"skip":true},{"c":"D5","v":"المقاول العام للمشروع:","bg":"#DBEAFE","fg":"#1E293B","b":true},{"c":"E5","v":"شركة الإنشاءات الكبرى للمقاولات العامة"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"المالك / جهة العمل:","bg":"#DBEAFE","fg":"#1E293B","b":true},{"c":"B6","v":"شركة التطوير العقاري الحديثة","bg":"#F8FAFC","cs":2},{"skip":true},{"c":"D6","v":"مقاول الشد اللاحق المتخصص:","bg":"#DBEAFE","fg":"#1E293B","b":true},{"c":"E6","v":"المتخصصة للأنظمة الإنشائية والشد اللاحق","bg":"#F8FAFC"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"المهندس الاستشاري المشرف:","bg":"#DBEAFE","fg":"#1E293B","b":true},{"c":"B7","v":"دار الهندسة والاستشارات الإنشائية المعتمدة","cs":2},{"skip":true},{"c":"D7","v":"العنصر الإنشائي / السقف:","bg":"#DBEAFE","fg":"#1E293B","b":true},{"c":"E7","v":"بلاطة سقف الدور المتكرر (Zone A - Pour 03)"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"رتبة الخرسانة التصميمية f'c:","bg":"#DBEAFE","fg":"#1E293B","b":true},{"c":"B8","v":"40 ميجاباسكال (N/mm²)","bg":"#F8FAFC","cs":2},{"skip":true},{"c":"D8","v":"إجهاد الخرسانة المطلوب قبل الشد f'ci:","bg":"#DBEAFE","fg":"#1E293B","b":true},{"c":"E8","v":"25 ميجاباسكال (75% من رتبة الخرسانة)","bg":"#F8FAFC"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"تاريخ صب الخرسانة:","bg":"#DBEAFE","fg":"#1E293B","b":true},{"c":"B9","v":"2026-10-12","cs":2},{"skip":true},{"c":"D9","v":"تاريخ إجراء عملية الشد الموقعي:","bg":"#DBEAFE","fg":"#1E293B","b":true},{"c":"E9","v":"2026-10-16 (بعد 4 أيام من الصب)"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":"رقم مضخة الشد والجاك الهيدروليكي:","bg":"#DBEAFE","fg":"#1E293B","b":true},{"c":"B10","v":"Jack Set #PT-04 (Ram Area = 345 cm²)","bg":"#F8FAFC","cs":2},{"skip":true},{"c":"D10","v":"رقم وتاريخ شهادة معايرة المانومتر:","bg":"#DBEAFE","fg":"#1E293B","b":true},{"c":"E10","v":"CAL-2026-0881 (صالحة حتى 2027-01)","bg":"#F8FAFC"}]},{"r":11,"h":28.0,"cells":[{"c":"A11","v":""},{"c":"B11","v":""},{"c":"C11","v":""},{"c":"D11","v":""},{"c":"E11","v":""}]},{"r":12,"h":38.0,"cells":[{"c":"A12","v":"ثانياً: المواصفات الميكانيكية للجدائل الفولاذية والشد وفق ASTM A416 و PTI","bg":"#2563EB","fg":"#FFFFFF","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":13,"h":40.0,"cells":[{"c":"A13","v":"المعامل الفني / الخاصية الميكانيكية","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":2},{"skip":true},{"c":"C13","v":"القيمة التصميمية المعتمدة","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D13","v":"الوحدة الهندسية","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E13","v":"المرجع والملاحظات الفنية","bg":"#0F172A","fg":"#FFFFFF","b":true}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":"مساحة مقطع الجديلة الواحدة (Nominal Area Ap)","bg":"#F8FAFC","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C14","v":98.7,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center"},{"c":"D14","v":"ملم² (mm²)","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"E14","v":"جدائل مسبقة الإجهاد 0.5 بوصة (12.7 ملم) 7 أسلاك منخفضة الاسترخاء","bg":"#F8FAFC","fg":"#334155"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":"مقاومة الشد القصوى الاسمية (Ultimate Strength fpu)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C15","v":1860,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center"},{"c":"D15","v":"ميجاباسكال (MPa)","fg":"#64748B","al":"center"},{"c":"E15","v":"فولاذ عالي المقاومة ASTM A416 Grade 270","fg":"#334155"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":"إجهاد الخضوع الاسمي (Yield Strength fpy = 0.90 fpu)","bg":"#F8FAFC","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C16","v":1674,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center"},{"c":"D16","v":"ميجاباسكال (MPa)","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"E16","v":"الحد التصميمي الأقصى لإجهاد الشد اللحظي","bg":"#F8FAFC","fg":"#334155"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":"معامل المرونة الاستاتيكي لصلب الشد (Modulus Ep)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C17","v":195,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center"},{"c":"D17","v":"كيلونيوتن/ملم² (kN/mm²)","fg":"#64748B","al":"center"},{"c":"E17","v":"195,000 ميجاباسكال حسب نتائج اختبارات الشد المعملية","fg":"#334155"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":"نسبة قوة الشد القصوى المسموحة عند الجاك (Max Jacking Stress)","bg":"#F8FAFC","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C18","v":0.8,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"0.00%"},{"c":"D18","v":"نسبة مئوية (80% fpu)","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"E18","v":"أقصى قوة شد ابتدائية مسموحة بالكود الأمريكي والسعودي","bg":"#F8FAFC","fg":"#334155"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":"معامل الاحتكاك بالانحناء (Curvature Friction μ)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C19","v":0.18,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"0.00%"},{"c":"D19","v":"راديان⁻¹ (rad⁻¹)","fg":"#64748B","al":"center"},{"c":"E19","v":"مواسير دكت بلاستيكية مموجة غير ملتحمة (Flat HDPE Duct)","fg":"#334155"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":"معامل الاحتكاك بالتمايل العشوائي (Wobble Friction k)","bg":"#F8FAFC","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C20","v":0.002,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"0.00%"},{"c":"D20","v":"متر⁻¹ (m⁻¹)","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"E20","v":"التذبذب الأفقي والرأسي لمسار الدكت على الكراسي","bg":"#F8FAFC","fg":"#334155"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":"قيمة انزلاق الإسفين عند التثبيت (Wedge Seating Loss)","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C21","v":6,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center"},{"c":"D21","v":"ملم (mm)","fg":"#64748B","al":"center"},{"c":"E21","v":"هبوط رأس التثبيت الأوتوماتيكي داخل فجوة البلاطة","fg":"#334155"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":"الحد الأدنى لنسبة التفاوت المسموحة للتندون الفردي","bg":"#F8FAFC","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C22","v":-5,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"0.00%"},{"c":"D22","v":"%","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"E22","v":"كود ACI 318 و PTI و SBC 304","bg":"#F8FAFC","fg":"#334155"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":"الحد الأقصى لنسبة التفاوت المسموحة للتندون الفردي","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C23","v":7,"in":true,"bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center"},{"c":"D23","v":"%","fg":"#64748B","al":"center"},{"c":"E23","v":"كود ACI 318 و PTI و SBC 304","fg":"#334155"}]}]},{"name":"سجل وحسابات شد الكابلات","maxRow":25,"maxCol":20,"colWidths":[6.0,14.0,24.0,24.0,14.0,14.0,16.0,18.0,18.0,22.0,14.0,14.0,14.0,14.0,18.0,14.0,22.0,18.0,22.0,38.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"سجل وحسابات شد كابلات ما بعد الشد (Post-Tension Tendon Elongation & Stressing Record Sheet)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":20},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"قالب تشغيلي لحساب الاستطالة النظرية والفعلية وفواقد الاحتكاك وانزلاق الإسفين ومطابقة التفاوت الكودي (±5% إلى +7%) وفق ACI 318 و PTI و SBC 304","bg":"#EFF6FF","fg":"#475569","al":"center","cs":20},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""},{"c":"N3","v":""},{"c":"O3","v":""},{"c":"P3","v":""},{"c":"Q3","v":""},{"c":"R3","v":""},{"c":"S3","v":""},{"c":"T3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"إجمالي الكابلات المشدودة بالسقف","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"E4","v":"الكابلات المطابقة لحدود التفاوت","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"I4","v":"الكابلات خارج حدود السماحية","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"N4","v":"نسبة الامتثال الكلية للصبة","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":42.0,"cells":[{"c":"A5","v":12,"f":"=COUNTA(B10:B21)","fg":"#1E3A8A","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"E5","v":2,"f":"=COUNTIF(S10:S21, \"مطابق للمواصفات\")","fg":"#166534","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"I5","v":10,"f":"=COUNTIF(S10:S21, \"خارج حدود السماحية\")","fg":"#991B1B","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"N5","v":"16.7%","f":"=ROUND((E5/A5)*100, 1) & \"%\"","fg":"#2563EB","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"كابل تم تنفيذ الشد وتوثيقه","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"E6","v":"نسبة تفاوت ضمن المجال المسموح (-5% إلى +7%)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"I6","v":"تتطلب معايرة ضغط أو فحص مسار الكابل","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"N6","v":"مؤشر قبول واعتماد استشاري المشروع للصبة","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""},{"c":"I7","v":""},{"c":"J7","v":""},{"c":"K7","v":""},{"c":"L7","v":""},{"c":"M7","v":""},{"c":"N7","v":""},{"c":"O7","v":""},{"c":"P7","v":""},{"c":"Q7","v":""},{"c":"R7","v":""},{"c":"S7","v":""},{"c":"T7","v":""}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"البيانات الهندسية وهوية التندون","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F8","v":"الحسابات النظرية وفواقد الاحتكاك","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"K8","v":"القراءات والقياسات الميدانية بمقياس الضغط والشريط","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"R8","v":"المطابقة الفنية وقرار الاعتماد","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"م","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"كود التندون","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"الباكية / المحور","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"طريقة الشد","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"عدد الجدائل N","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"طول الكابل L (م)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"زاوية الانحناء α (rad)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H9","v":"قوة الشد P_jack (kN)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I9","v":"متوسط القوة P_avg (kN)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J9","v":"الاستطالة النظرية ΔL_th (ملم)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K9","v":"ضغط 20% (Bar)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L9","v":"قراءة 20% (ملم)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M9","v":"ضغط 100% (Bar)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"N9","v":"قراءة 100% (ملم)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"O9","v":"الاستطالة المقاسة (ملم)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"P9","v":"انزلاق الإسفين (ملم)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"Q9","v":"الاستطالة الصافية ΔL_act (ملم)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"R9","v":"الانحراف Variance %","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"S9","v":"حالة المطابقة الكودية","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"T9","v":"ملاحظات وتوجيهات المهندس","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":1,"bg":"#F8FAFC","al":"center"},{"c":"B10","v":"TD-A01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C10","v":"محور A (بين 1 - 5)","bg":"#F8FAFC"},{"c":"D10","v":"طرف حي واحد (Live-Dead)","bg":"#F8FAFC","al":"center"},{"c":"E10","v":4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F10","v":28.5,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G10","v":0.42,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H10","v":587,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"I10","v":524.5,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"J10","v":194.2,"f":"=ROUND((I10*F10*1000)/(E10*'إعدادات المشروع ومواصفات الشد'!$C$14*'إعدادات المشروع ومواصفات الشد'!$C$17), 1)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center"},{"c":"K10","v":90,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"L10","v":24,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"M10","v":450,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"N10","v":172,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"O10","v":185,"f":"=ROUND((N10-L10)*1.25, 1)","bg":"#F8FAFC","al":"center"},{"c":"P10","v":6,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"Q10","v":179,"f":"=ROUND(O10-P10, 1)","bg":"#F0FDFA","fg":"#0F766E","b":true,"al":"center"},{"c":"R10","v":-7.83,"f":"=ROUND(((Q10-J10)/J10)*100, 2)","bg":"#FEFCE8","b":true,"al":"center"},{"c":"S10","v":"خارج حدود السماحية","f":"=IF(AND(R10>=-5, R10<=7), \"مطابق للمواصفات\", \"خارج حدود السماحية\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"T10","v":"تم الشد بسلاسة وبدون أي صوت تفرقع","bg":"#F8FAFC"}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":2,"al":"center"},{"c":"B11","v":"TD-A02","b":true,"al":"center"},{"c":"C11","v":"محور A (بين 1 - 5)"},{"c":"D11","v":"طرف حي واحد (Live-Dead)","al":"center"},{"c":"E11","v":4,"in":true,"al":"center"},{"c":"F11","v":28.5,"in":true,"al":"center"},{"c":"G11","v":0.42,"in":true,"al":"center"},{"c":"H11","v":587,"in":true,"al":"center"},{"c":"I11","v":524.5,"in":true,"al":"center"},{"c":"J11","v":194.2,"f":"=ROUND((I11*F11*1000)/(E11*'إعدادات المشروع ومواصفات الشد'!$C$14*'إعدادات المشروع ومواصفات الشد'!$C$17), 1)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center"},{"c":"K11","v":90,"in":true,"al":"center"},{"c":"L11","v":25,"in":true,"al":"center"},{"c":"M11","v":450,"in":true,"al":"center"},{"c":"N11","v":174,"in":true,"al":"center"},{"c":"O11","v":186.2,"f":"=ROUND((N11-L11)*1.25, 1)","al":"center"},{"c":"P11","v":6,"in":true,"al":"center"},{"c":"Q11","v":180.2,"f":"=ROUND(O11-P11, 1)","bg":"#F0FDFA","fg":"#0F766E","b":true,"al":"center"},{"c":"R11","v":-7.21,"f":"=ROUND(((Q11-J11)/J11)*100, 2)","bg":"#FEFCE8","b":true,"al":"center"},{"c":"S11","v":"خارج حدود السماحية","f":"=IF(AND(R11>=-5, R11<=7), \"مطابق للمواصفات\", \"خارج حدود السماحية\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"T11","v":"مطابق تماماً للحسابات النظرية"}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":3,"bg":"#F8FAFC","al":"center"},{"c":"B12","v":"TD-B01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C12","v":"محور B (بين 1 - 6)","bg":"#F8FAFC"},{"c":"D12","v":"طرفين حيين (Live-Live)","bg":"#F8FAFC","al":"center"},{"c":"E12","v":4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F12","v":38,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G12","v":0.58,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H12","v":587,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"I12","v":542,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"J12","v":267.5,"f":"=ROUND((I12*F12*1000)/(E12*'إعدادات المشروع ومواصفات الشد'!$C$14*'إعدادات المشروع ومواصفات الشد'!$C$17), 1)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center"},{"c":"K12","v":90,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"L12","v":32,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"M12","v":450,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"N12","v":231,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"O12","v":248.8,"f":"=ROUND((N12-L12)*1.25, 1)","bg":"#F8FAFC","al":"center"},{"c":"P12","v":6,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"Q12","v":242.8,"f":"=ROUND(O12-P12, 1)","bg":"#F0FDFA","fg":"#0F766E","b":true,"al":"center"},{"c":"R12","v":-9.23,"f":"=ROUND(((Q12-J12)/J12)*100, 2)","bg":"#FEFCE8","b":true,"al":"center"},{"c":"S12","v":"خارج حدود السماحية","f":"=IF(AND(R12>=-5, R12<=7), \"مطابق للمواصفات\", \"خارج حدود السماحية\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"T12","v":"تم الشد المتزامن من الطرفين A و B","bg":"#F8FAFC"}]},{"r":13,"h":36.0,"cells":[{"c":"A13","v":4,"al":"center"},{"c":"B13","v":"TD-B02","b":true,"al":"center"},{"c":"C13","v":"محور B (بين 1 - 6)"},{"c":"D13","v":"طرفين حيين (Live-Live)","al":"center"},{"c":"E13","v":4,"in":true,"al":"center"},{"c":"F13","v":38,"in":true,"al":"center"},{"c":"G13","v":0.58,"in":true,"al":"center"},{"c":"H13","v":587,"in":true,"al":"center"},{"c":"I13","v":542,"in":true,"al":"center"},{"c":"J13","v":267.5,"f":"=ROUND((I13*F13*1000)/(E13*'إعدادات المشروع ومواصفات الشد'!$C$14*'إعدادات المشروع ومواصفات الشد'!$C$17), 1)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center"},{"c":"K13","v":90,"in":true,"al":"center"},{"c":"L13","v":31,"in":true,"al":"center"},{"c":"M13","v":450,"in":true,"al":"center"},{"c":"N13","v":229,"in":true,"al":"center"},{"c":"O13","v":247.5,"f":"=ROUND((N13-L13)*1.25, 1)","al":"center"},{"c":"P13","v":6,"in":true,"al":"center"},{"c":"Q13","v":241.5,"f":"=ROUND(O13-P13, 1)","bg":"#F0FDFA","fg":"#0F766E","b":true,"al":"center"},{"c":"R13","v":-9.72,"f":"=ROUND(((Q13-J13)/J13)*100, 2)","bg":"#FEFCE8","b":true,"al":"center"},{"c":"S13","v":"خارج حدود السماحية","f":"=IF(AND(R13>=-5, R13<=7), \"مطابق للمواصفات\", \"خارج حدود السماحية\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"T13","v":"الاستطالة مطابقة والتثبيت محكم"}]},{"r":14,"h":36.0,"cells":[{"c":"A14","v":5,"bg":"#F8FAFC","al":"center"},{"c":"B14","v":"TD-C01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C14","v":"محور C (باكية كابولي)","bg":"#F8FAFC"},{"c":"D14","v":"طرف حي واحد (Live-Dead)","bg":"#F8FAFC","al":"center"},{"c":"E14","v":3,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F14","v":16.2,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G14","v":0.28,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H14","v":440,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"I14","v":412,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"J14","v":115.6,"f":"=ROUND((I14*F14*1000)/(E14*'إعدادات المشروع ومواصفات الشد'!$C$14*'إعدادات المشروع ومواصفات الشد'!$C$17), 1)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center"},{"c":"K14","v":90,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"L14","v":15,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"M14","v":450,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"N14","v":98,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"O14","v":103.8,"f":"=ROUND((N14-L14)*1.25, 1)","bg":"#F8FAFC","al":"center"},{"c":"P14","v":6,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"Q14","v":97.8,"f":"=ROUND(O14-P14, 1)","bg":"#F0FDFA","fg":"#0F766E","b":true,"al":"center"},{"c":"R14","v":-15.4,"f":"=ROUND(((Q14-J14)/J14)*100, 2)","bg":"#FEFCE8","b":true,"al":"center"},{"c":"S14","v":"خارج حدود السماحية","f":"=IF(AND(R14>=-5, R14<=7), \"مطابق للمواصفات\", \"خارج حدود السماحية\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"T14","v":"كابولي الواجهة الجنوبية","bg":"#F8FAFC"}]},{"r":15,"h":36.0,"cells":[{"c":"A15","v":6,"al":"center"},{"c":"B15","v":"TD-C02","b":true,"al":"center"},{"c":"C15","v":"محور C (باكية كابولي)"},{"c":"D15","v":"طرف حي واحد (Live-Dead)","al":"center"},{"c":"E15","v":3,"in":true,"al":"center"},{"c":"F15","v":16.2,"in":true,"al":"center"},{"c":"G15","v":0.28,"in":true,"al":"center"},{"c":"H15","v":440,"in":true,"al":"center"},{"c":"I15","v":412,"in":true,"al":"center"},{"c":"J15","v":115.6,"f":"=ROUND((I15*F15*1000)/(E15*'إعدادات المشروع ومواصفات الشد'!$C$14*'إعدادات المشروع ومواصفات الشد'!$C$17), 1)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center"},{"c":"K15","v":90,"in":true,"al":"center"},{"c":"L15","v":14.5,"in":true,"al":"center"},{"c":"M15","v":450,"in":true,"al":"center"},{"c":"N15","v":97,"in":true,"al":"center"},{"c":"O15","v":103.1,"f":"=ROUND((N15-L15)*1.25, 1)","al":"center"},{"c":"P15","v":6,"in":true,"al":"center"},{"c":"Q15","v":97.1,"f":"=ROUND(O15-P15, 1)","bg":"#F0FDFA","fg":"#0F766E","b":true,"al":"center"},{"c":"R15","v":-16,"f":"=ROUND(((Q15-J15)/J15)*100, 2)","bg":"#FEFCE8","b":true,"al":"center"},{"c":"S15","v":"خارج حدود السماحية","f":"=IF(AND(R15>=-5, R15<=7), \"مطابق للمواصفات\", \"خارج حدود السماحية\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"T15","v":"مطابق لجدول الاستطالات المعتمد"}]},{"r":16,"h":36.0,"cells":[{"c":"A16","v":7,"bg":"#F8FAFC","al":"center"},{"c":"B16","v":"TD-D01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C16","v":"كمرة تحويل رئيسية MB-1","bg":"#F8FAFC"},{"c":"D16","v":"طرفين حيين (Live-Live)","bg":"#F8FAFC","al":"center"},{"c":"E16","v":5,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F16","v":42,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G16","v":0.65,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H16","v":734,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"I16","v":668,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"J16","v":291.5,"f":"=ROUND((I16*F16*1000)/(E16*'إعدادات المشروع ومواصفات الشد'!$C$14*'إعدادات المشروع ومواصفات الشد'!$C$17), 1)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center"},{"c":"K16","v":90,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"L16","v":38,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"M16","v":450,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"N16","v":268,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"O16","v":287.5,"f":"=ROUND((N16-L16)*1.25, 1)","bg":"#F8FAFC","al":"center"},{"c":"P16","v":6,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"Q16","v":281.5,"f":"=ROUND(O16-P16, 1)","bg":"#F0FDFA","fg":"#0F766E","b":true,"al":"center"},{"c":"R16","v":-3.43,"f":"=ROUND(((Q16-J16)/J16)*100, 2)","bg":"#FEFCE8","b":true,"al":"center"},{"c":"S16","v":"مطابق للمواصفات","f":"=IF(AND(R16>=-5, R16<=7), \"مطابق للمواصفات\", \"خارج حدود السماحية\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"T16","v":"كمرة نقل الأحمال فوق البوديوم","bg":"#F8FAFC"}]},{"r":17,"h":36.0,"cells":[{"c":"A17","v":8,"al":"center"},{"c":"B17","v":"TD-D02","b":true,"al":"center"},{"c":"C17","v":"كمرة تحويل رئيسية MB-1"},{"c":"D17","v":"طرفين حيين (Live-Live)","al":"center"},{"c":"E17","v":5,"in":true,"al":"center"},{"c":"F17","v":42,"in":true,"al":"center"},{"c":"G17","v":0.65,"in":true,"al":"center"},{"c":"H17","v":734,"in":true,"al":"center"},{"c":"I17","v":668,"in":true,"al":"center"},{"c":"J17","v":291.5,"f":"=ROUND((I17*F17*1000)/(E17*'إعدادات المشروع ومواصفات الشد'!$C$14*'إعدادات المشروع ومواصفات الشد'!$C$17), 1)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center"},{"c":"K17","v":90,"in":true,"al":"center"},{"c":"L17","v":37.5,"in":true,"al":"center"},{"c":"M17","v":450,"in":true,"al":"center"},{"c":"N17","v":266,"in":true,"al":"center"},{"c":"O17","v":285.6,"f":"=ROUND((N17-L17)*1.25, 1)","al":"center"},{"c":"P17","v":6,"in":true,"al":"center"},{"c":"Q17","v":279.6,"f":"=ROUND(O17-P17, 1)","bg":"#F0FDFA","fg":"#0F766E","b":true,"al":"center"},{"c":"R17","v":-4.08,"f":"=ROUND(((Q17-J17)/J17)*100, 2)","bg":"#FEFCE8","b":true,"al":"center"},{"c":"S17","v":"مطابق للمواصفات","f":"=IF(AND(R17>=-5, R17<=7), \"مطابق للمواصفات\", \"خارج حدود السماحية\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"T17","v":"مطابقة بنسبة انحراف ممتازة 1.2%"}]},{"r":18,"h":36.0,"cells":[{"c":"A18","v":9,"bg":"#F8FAFC","al":"center"},{"c":"B18","v":"TD-E01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C18","v":"باكية وسطية صالة عرض","bg":"#F8FAFC"},{"c":"D18","v":"طرف حي واحد (Live-Dead)","bg":"#F8FAFC","al":"center"},{"c":"E18","v":4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F18","v":32.4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G18","v":0.48,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H18","v":587,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"I18","v":518,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"J18","v":218,"f":"=ROUND((I18*F18*1000)/(E18*'إعدادات المشروع ومواصفات الشد'!$C$14*'إعدادات المشروع ومواصفات الشد'!$C$17), 1)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center"},{"c":"K18","v":90,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"L18","v":28,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"M18","v":450,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"N18","v":192,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"O18","v":205,"f":"=ROUND((N18-L18)*1.25, 1)","bg":"#F8FAFC","al":"center"},{"c":"P18","v":6,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"Q18","v":199,"f":"=ROUND(O18-P18, 1)","bg":"#F0FDFA","fg":"#0F766E","b":true,"al":"center"},{"c":"R18","v":-8.72,"f":"=ROUND(((Q18-J18)/J18)*100, 2)","bg":"#FEFCE8","b":true,"al":"center"},{"c":"S18","v":"خارج حدود السماحية","f":"=IF(AND(R18>=-5, R18<=7), \"مطابق للمواصفات\", \"خارج حدود السماحية\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"T18","v":"مطابق وتفريغ الهواء من الدكت تام","bg":"#F8FAFC"}]},{"r":19,"h":36.0,"cells":[{"c":"A19","v":10,"al":"center"},{"c":"B19","v":"TD-E02","b":true,"al":"center"},{"c":"C19","v":"باكية وسطية صالة عرض"},{"c":"D19","v":"طرف حي واحد (Live-Dead)","al":"center"},{"c":"E19","v":4,"in":true,"al":"center"},{"c":"F19","v":32.4,"in":true,"al":"center"},{"c":"G19","v":0.48,"in":true,"al":"center"},{"c":"H19","v":587,"in":true,"al":"center"},{"c":"I19","v":518,"in":true,"al":"center"},{"c":"J19","v":218,"f":"=ROUND((I19*F19*1000)/(E19*'إعدادات المشروع ومواصفات الشد'!$C$14*'إعدادات المشروع ومواصفات الشد'!$C$17), 1)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center"},{"c":"K19","v":90,"in":true,"al":"center"},{"c":"L19","v":27.5,"in":true,"al":"center"},{"c":"M19","v":450,"in":true,"al":"center"},{"c":"N19","v":191,"in":true,"al":"center"},{"c":"O19","v":204.4,"f":"=ROUND((N19-L19)*1.25, 1)","al":"center"},{"c":"P19","v":6,"in":true,"al":"center"},{"c":"Q19","v":198.4,"f":"=ROUND(O19-P19, 1)","bg":"#F0FDFA","fg":"#0F766E","b":true,"al":"center"},{"c":"R19","v":-8.99,"f":"=ROUND(((Q19-J19)/J19)*100, 2)","bg":"#FEFCE8","b":true,"al":"center"},{"c":"S19","v":"خارج حدود السماحية","f":"=IF(AND(R19>=-5, R19<=7), \"مطابق للمواصفات\", \"خارج حدود السماحية\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"T19","v":"استطالة مستقرة بدون تفويت أسافين"}]},{"r":20,"h":36.0,"cells":[{"c":"A20","v":11,"bg":"#F8FAFC","al":"center"},{"c":"B20","v":"TD-F01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C20","v":"محور F قرب المنور","bg":"#F8FAFC"},{"c":"D20","v":"طرف حي واحد (Live-Dead)","bg":"#F8FAFC","al":"center"},{"c":"E20","v":3,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F20","v":22,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G20","v":0.35,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H20","v":440,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"I20","v":401,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"J20","v":152.8,"f":"=ROUND((I20*F20*1000)/(E20*'إعدادات المشروع ومواصفات الشد'!$C$14*'إعدادات المشروع ومواصفات الشد'!$C$17), 1)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center"},{"c":"K20","v":90,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"L20","v":20,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"M20","v":450,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"N20","v":131,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"O20","v":138.8,"f":"=ROUND((N20-L20)*1.25, 1)","bg":"#F8FAFC","al":"center"},{"c":"P20","v":6,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"Q20","v":132.8,"f":"=ROUND(O20-P20, 1)","bg":"#F0FDFA","fg":"#0F766E","b":true,"al":"center"},{"c":"R20","v":-13.09,"f":"=ROUND(((Q20-J20)/J20)*100, 2)","bg":"#FEFCE8","b":true,"al":"center"},{"c":"S20","v":"خارج حدود السماحية","f":"=IF(AND(R20>=-5, R20<=7), \"مطابق للمواصفات\", \"خارج حدود السماحية\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"T20","v":"تم الشد بنجاح","bg":"#F8FAFC"}]},{"r":21,"h":36.0,"cells":[{"c":"A21","v":12,"al":"center"},{"c":"B21","v":"TD-F02","b":true,"al":"center"},{"c":"C21","v":"محور F قرب المنور"},{"c":"D21","v":"طرف حي واحد (Live-Dead)","al":"center"},{"c":"E21","v":3,"in":true,"al":"center"},{"c":"F21","v":22,"in":true,"al":"center"},{"c":"G21","v":0.35,"in":true,"al":"center"},{"c":"H21","v":440,"in":true,"al":"center"},{"c":"I21","v":401,"in":true,"al":"center"},{"c":"J21","v":152.8,"f":"=ROUND((I21*F21*1000)/(E21*'إعدادات المشروع ومواصفات الشد'!$C$14*'إعدادات المشروع ومواصفات الشد'!$C$17), 1)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center"},{"c":"K21","v":90,"in":true,"al":"center"},{"c":"L21","v":19.5,"in":true,"al":"center"},{"c":"M21","v":450,"in":true,"al":"center"},{"c":"N21","v":130,"in":true,"al":"center"},{"c":"O21","v":138.1,"f":"=ROUND((N21-L21)*1.25, 1)","al":"center"},{"c":"P21","v":6,"in":true,"al":"center"},{"c":"Q21","v":132.1,"f":"=ROUND(O21-P21, 1)","bg":"#F0FDFA","fg":"#0F766E","b":true,"al":"center"},{"c":"R21","v":-13.55,"f":"=ROUND(((Q21-J21)/J21)*100, 2)","bg":"#FEFCE8","b":true,"al":"center"},{"c":"S21","v":"خارج حدود السماحية","f":"=IF(AND(R21>=-5, R21<=7), \"مطابق للمواصفات\", \"خارج حدود السماحية\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"T21","v":"مطابق ومسجل في محضر الاستلام"}]},{"r":22,"h":38.0,"cells":[{"c":"A22","v":"المتوسط العام للصبة وحصيلة الفحص الميداني:","bg":"#DBEAFE","fg":"#1E293B","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F22","v":358.2,"f":"=ROUND(SUM(F10:F21), 1)","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center"},{"c":"G22","v":"","bg":"#DBEAFE"},{"c":"H22","v":"","bg":"#DBEAFE"},{"c":"I22","v":"","bg":"#DBEAFE"},{"c":"J22","v":206.6,"f":"=ROUND(AVERAGE(J10:J21), 1)","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center"},{"c":"K22","v":"","bg":"#DBEAFE"},{"c":"L22","v":"","bg":"#DBEAFE"},{"c":"M22","v":"","bg":"#DBEAFE"},{"c":"N22","v":"","bg":"#DBEAFE"},{"c":"O22","v":"","bg":"#DBEAFE"},{"c":"P22","v":"","bg":"#DBEAFE"},{"c":"Q22","v":188.5,"f":"=ROUND(AVERAGE(Q10:Q21), 1)","bg":"#DBEAFE","fg":"#0F766E","b":true,"al":"center"},{"c":"R22","v":-9.77,"f":"=ROUND(AVERAGE(R10:R21), 2)","bg":"#DBEAFE","fg":"#B45309","b":true,"al":"center"},{"c":"S22","v":"تتطلب مراجعة استشاري المشروع","f":"=IF(AND(R22>=-5, R22<=7), \"كامل الصبة مطابقة للاشتراطات الفنية\", \"تتطلب مراجعة استشاري المشروع\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center","cs":2},{"skip":true}]},{"r":23,"h":28.0,"cells":[{"c":"A23","v":""},{"c":"B23","v":""},{"c":"C23","v":""},{"c":"D23","v":""},{"c":"E23","v":""},{"c":"F23","v":""},{"c":"G23","v":""},{"c":"H23","v":""},{"c":"I23","v":""},{"c":"J23","v":""},{"c":"K23","v":""},{"c":"L23","v":""},{"c":"M23","v":""},{"c":"N23","v":""},{"c":"O23","v":""},{"c":"P23","v":""},{"c":"Q23","v":""},{"c":"R23","v":""},{"c":"S23","v":""},{"c":"T23","v":""}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":"مهندس مقاول الشد اللاحق المتخصص (Prepared By)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G24","v":"مدير ضبط الجودة بالمقاول العام QA/QC (Verified By)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"N24","v":"المهندس الاستشاري المشرف المقيم (Approved By)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":25,"h":75.0,"cells":[{"c":"A25","v":"الاسم: م. أحمد عبد الرحمن الفالح\nالصفة: مهندس تنفيذ أنظمة الشد اللاحق PT Engineer\nالتوقيع والختم: _____________________","fg":"#1E293B","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G25","v":"الاسم: م. مصطفى كمال الدين الجوهري\nالصفة: مدير قسم الجودة والتسليمات بالمشروع QA/QC Manager\nالتوقيع والختم: _____________________","fg":"#1E293B","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"N25","v":"الاسم: د.م. طارق عبد العزيز المنصور\nالصفة: مهندس الإشراف الإنشائي المقيم Resident Consultant\nالتوقيع والختم: _____________________","fg":"#1E293B","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]}]},{"name":"مقاومة الخرسانة وحقن الجراوت","maxRow":17,"maxCol":8,"colWidths":[36.0,22.0,22.0,16.0,28.0,18.0,38.0,20.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"فحص مقاومة الخرسانة عند نقل الإجهاد وضبط جودة حقن الدكت بالجراوت (Grouting Inspection)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"توثيق نتائج كسر مكعبات الخرسانة قبل الشد (f'ci ≥ 25 MPa) واختبارات سيولة وتماسك ومقاومة روبة الجراوت غير المنكمشة وفق ASTM C939 و ASTM C940","bg":"#EFF6FF","fg":"#475569","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"أولاً: سجل اختبار كسر مكعبات الخرسانة الميدانية قبل بدء الشد (Concrete Transfer Strength f'ci)","bg":"#2563EB","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"رقم العينة","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"عمر العينة (أيام)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"أبعاد المكعب (ملم)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"وزن العينة (كجم)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"حمل الكسر P (kN)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"المقاومة المحسوبة (MPa)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"المقاومة المطلوبة f'ci","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"قرار السماح بالشد","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":1,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B6","v":4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"C6","v":"150 × 150 × 150","bg":"#F8FAFC","al":"center"},{"c":"D6","v":8.12,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E6","v":645,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F6","v":28.7,"f":"=ROUND((E6*1000)/22500, 1)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G6","v":25,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H6","v":"مسموح بالشد فوراً","f":"=IF(F6>=G6, \"مسموح بالشد فوراً\", \"تأجيل الشد\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":2,"b":true,"al":"center"},{"c":"B7","v":4,"in":true,"al":"center"},{"c":"C7","v":"150 × 150 × 150","al":"center"},{"c":"D7","v":8.15,"in":true,"al":"center"},{"c":"E7","v":660,"in":true,"al":"center"},{"c":"F7","v":29.3,"f":"=ROUND((E7*1000)/22500, 1)","b":true,"al":"center"},{"c":"G7","v":25,"in":true,"al":"center"},{"c":"H7","v":"مسموح بالشد فوراً","f":"=IF(F7>=G7, \"مسموح بالشد فوراً\", \"تأجيل الشد\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":3,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B8","v":4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"C8","v":"150 × 150 × 150","bg":"#F8FAFC","al":"center"},{"c":"D8","v":8.1,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E8","v":652,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F8","v":29,"f":"=ROUND((E8*1000)/22500, 1)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G8","v":25,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H8","v":"مسموح بالشد فوراً","f":"=IF(F8>=G8, \"مسموح بالشد فوراً\", \"تأجيل الشد\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":9,"h":28.0,"cells":[{"c":"A9","v":""},{"c":"B9","v":""},{"c":"C9","v":""},{"c":"D9","v":""},{"c":"E9","v":""},{"c":"F9","v":""},{"c":"G9","v":""},{"c":"H9","v":""}]},{"r":10,"h":38.0,"cells":[{"c":"A10","v":"ثانياً: اختبارات ومعايير ضبط جودة روبة حقن الدكت الإسمنتية (PT Grouting Quality Standards)","bg":"#2563EB","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":11,"h":38.0,"cells":[{"c":"A11","v":"نوع الاختبار الميداني / الخاصية","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B11","v":"المواصفة القياسية","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C11","v":"القيمة المقاسة بالموقع","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D11","v":"الوحدة","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E11","v":"الحدود الكودية المسموحة","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F11","v":"حالة القبول","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G11","v":"ملاحظات الفحص والاعتماد","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H11","v":"رقم التقرير المعملي","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":"زمن انسياب الروبة بقمع مارش (Flow Cone Initial)","bg":"#F8FAFC","b":true},{"c":"B12","v":"ASTM C939","bg":"#F8FAFC","al":"center"},{"c":"C12","v":18.5,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"D12","v":"ثانية (sec)","bg":"#F8FAFC","al":"center"},{"c":"E12","v":"11 إلى 30 ثانية بعد الخلط مباشرة","bg":"#F8FAFC","al":"center"},{"c":"F12","v":"مطابق ومقبول","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"G12","v":"سيولة ممتازة لملء الفراغات حول الجدائل","bg":"#F8FAFC"},{"c":"H12","v":"LAB-GR-01","bg":"#F8FAFC","al":"center"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":"زمن الانسياب بعد 30 دقيقة (Efflux Time @ 30 min)","b":true},{"c":"B13","v":"ASTM C939","al":"center"},{"c":"C13","v":22,"in":true,"b":true,"al":"center"},{"c":"D13","v":"ثانية (sec)","al":"center"},{"c":"E13","v":"ألا يزيد عن 30 ثانية","al":"center"},{"c":"F13","v":"مطابق ومقبول","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"G13","v":"ثبات القوام وعدم التصلب المبكر بالخلاطة"},{"c":"H13","v":"LAB-GR-01","al":"center"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"نسبة النضح المائي والانفصال (Bleeding @ 3 hrs)","bg":"#F8FAFC","b":true},{"c":"B14","v":"ASTM C940","bg":"#F8FAFC","al":"center"},{"c":"C14","v":0,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"D14","v":"نسبة مئوية %","bg":"#F8FAFC","al":"center"},{"c":"E14","v":"صفر % (Zero Bleeding) بعد 3 ساعات","bg":"#F8FAFC","al":"center"},{"c":"F14","v":"مطابق ومقبول","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"G14","v":"استخدام أسمنت فائق النعومة مع مادة ممددة","bg":"#F8FAFC"},{"c":"H14","v":"LAB-GR-02","bg":"#F8FAFC","al":"center"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"مقاومة ضغط الجراوت بعمر 7 أيام (Compressive 7d)","b":true},{"c":"B15","v":"ASTM C942","al":"center"},{"c":"C15","v":42.5,"in":true,"b":true,"al":"center"},{"c":"D15","v":"ميجاباسكال (MPa)","al":"center"},{"c":"E15","v":"≥ 35 ميجاباسكال","al":"center"},{"c":"F15","v":"مطابق ومقبول","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"G15","v":"مكعبات 50 × 50 ملم بمعمل الموقع"},{"c":"H15","v":"LAB-GR-03","al":"center"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":"مقاومة ضغط الجراوت بعمر 28 يوماً (Compressive 28d)","bg":"#F8FAFC","b":true},{"c":"B16","v":"ASTM C942","bg":"#F8FAFC","al":"center"},{"c":"C16","v":68,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"D16","v":"ميجاباسكال (MPa)","bg":"#F8FAFC","al":"center"},{"c":"E16","v":"≥ 55 ميجاباسكال","bg":"#F8FAFC","al":"center"},{"c":"F16","v":"مطابق ومقبول","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"G16","v":"تحقيق كامل المتطلبات الهندسية","bg":"#F8FAFC"},{"c":"H16","v":"LAB-GR-04","bg":"#F8FAFC","al":"center"}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":"ضغط مضخة الحقن عند فتحات التهوية (Grout Pressure)","b":true},{"c":"B17","v":"PTI Guide","al":"center"},{"c":"C17","v":5.5,"in":true,"b":true,"al":"center"},{"c":"D17","v":"بار (Bar)","al":"center"},{"c":"E17","v":"3 إلى 7 بار عند فتحات التهوية","al":"center"},{"c":"F17","v":"مطابق ومقبول","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"G17","v":"خروج الروبة النقية الخالية من الفقاعات"},{"c":"H17","v":"SITE-OBS-08","al":"center"}]}]}]}